summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
authorRoger Frank <rfrank@pglaf.org>2025-10-15 04:54:01 -0700
committerRoger Frank <rfrank@pglaf.org>2025-10-15 04:54:01 -0700
commit225c5410157442e1c413a17e5557a710168466e6 (patch)
tree80493af7734294946d0717c23a81301817793845
initial commit of ebook 18722HEADmain
-rw-r--r--.gitattributes3
-rw-r--r--18722-8.txt3190
-rw-r--r--18722-8.zipbin0 -> 57118 bytes
-rw-r--r--18722-h.zipbin0 -> 4196883 bytes
-rw-r--r--18722-h/18722-h.htm4570
-rw-r--r--18722-h/images/fig01.jpgbin0 -> 40194 bytes
-rw-r--r--18722-h/images/fig01large.jpgbin0 -> 166285 bytes
-rw-r--r--18722-h/images/fig02.jpgbin0 -> 53665 bytes
-rw-r--r--18722-h/images/fig02large.jpgbin0 -> 218130 bytes
-rw-r--r--18722-h/images/fig03.jpgbin0 -> 50001 bytes
-rw-r--r--18722-h/images/fig03large.jpgbin0 -> 231246 bytes
-rw-r--r--18722-h/images/ill01.jpgbin0 -> 23833 bytes
-rw-r--r--18722-h/images/ill01large.jpgbin0 -> 734310 bytes
-rw-r--r--18722-h/images/ill02.jpgbin0 -> 35799 bytes
-rw-r--r--18722-h/images/ill03.jpgbin0 -> 38268 bytes
-rw-r--r--18722-h/images/ill04.jpgbin0 -> 38888 bytes
-rw-r--r--18722-h/images/ill05.jpgbin0 -> 37243 bytes
-rw-r--r--18722-h/images/ill06.jpgbin0 -> 45002 bytes
-rw-r--r--18722-h/images/ill07.jpgbin0 -> 49132 bytes
-rw-r--r--18722-h/images/ill08.jpgbin0 -> 50640 bytes
-rw-r--r--18722-h/images/ill09.jpgbin0 -> 45729 bytes
-rw-r--r--18722-h/images/ill10.jpgbin0 -> 37390 bytes
-rw-r--r--18722-h/images/ill10large.jpgbin0 -> 273955 bytes
-rw-r--r--18722-h/images/ill11.jpgbin0 -> 36959 bytes
-rw-r--r--18722-h/images/ill11large.jpgbin0 -> 275466 bytes
-rw-r--r--18722-h/images/ill12.jpgbin0 -> 60529 bytes
-rw-r--r--18722-h/images/ill12large.jpgbin0 -> 395310 bytes
-rw-r--r--18722-h/images/ill13.jpgbin0 -> 27991 bytes
-rw-r--r--18722-h/images/ill14.jpgbin0 -> 29676 bytes
-rw-r--r--18722-h/images/ill15.jpgbin0 -> 34377 bytes
-rw-r--r--18722-h/images/ill16.jpgbin0 -> 35155 bytes
-rw-r--r--18722-h/images/ill17.jpgbin0 -> 50064 bytes
-rw-r--r--18722-h/images/ill17large.jpgbin0 -> 342956 bytes
-rw-r--r--18722-h/images/ill18.jpgbin0 -> 42035 bytes
-rw-r--r--18722-h/images/ill18large.jpgbin0 -> 306848 bytes
-rw-r--r--18722-h/images/ill19.jpgbin0 -> 36597 bytes
-rw-r--r--18722-h/images/ill20.jpgbin0 -> 34139 bytes
-rw-r--r--18722-h/images/ill21.jpgbin0 -> 39795 bytes
-rw-r--r--18722-h/images/ill22.jpgbin0 -> 43305 bytes
-rw-r--r--18722-h/images/ill23.jpgbin0 -> 50892 bytes
-rw-r--r--18722-h/images/ill23large.jpgbin0 -> 227631 bytes
-rw-r--r--18722.txt3190
-rw-r--r--18722.zipbin0 -> 57108 bytes
-rw-r--r--LICENSE.txt11
-rw-r--r--README.md2
45 files changed, 10966 insertions, 0 deletions
diff --git a/.gitattributes b/.gitattributes
new file mode 100644
index 0000000..6833f05
--- /dev/null
+++ b/.gitattributes
@@ -0,0 +1,3 @@
+* text=auto
+*.txt text
+*.md text
diff --git a/18722-8.txt b/18722-8.txt
new file mode 100644
index 0000000..3a0a66a
--- /dev/null
+++ b/18722-8.txt
@@ -0,0 +1,3190 @@
+The Project Gutenberg EBook of Transactions of the American Society of
+Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard
+
+This eBook is for the use of anyone anywhere at no cost and with
+almost no restrictions whatsoever. You may copy it, give it away or
+re-use it under the terms of the Project Gutenberg License included
+with this eBook or online at www.gutenberg.org
+
+
+Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910
+ The New York Tunnel Extension of the Pennsylvania Railroad.
+ The East River Tunnels. Paper No. 1159
+
+Author: James H. Brace, Francis Mason and S. H. Woodard
+
+Release Date: July 1, 2006 [EBook #18722]
+
+Language: English
+
+Character set encoding: ISO-8859-1
+
+*** START OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN ***
+
+
+
+
+Produced by Juliet Sutherland, Taavi Kalju and the Online
+Distributed Proofreading Team at http://www.pgdp.net
+
+
+
+
+
+
+
+
+
+AMERICAN SOCIETY OF CIVIL ENGINEERS
+
+INSTITUTED 1852
+
+
+TRANSACTIONS
+
+Paper No. 1159
+
+
+THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA RAILROAD.
+
+THE EAST RIVER TUNNELS.[A]
+
+BY JAMES H. BRACE, FRANCIS MASON, AND S. H. WOODARD, MEMBERS, AM. SOC.
+C. E.
+
+
+This paper will be limited to a consideration of the construction of the
+tunnels, the broader questions of design, etc., having already been
+considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C.
+E., and Alfred Noble, Past-President, Am. Soc. C. E.
+
+The location of the section of the work to be considered here is shown
+on Plate XIII of Mr. Noble's paper. There are two permanent shafts on
+each side of the East River and four single cast-iron tube tunnels, each
+about 6,000 ft. long, and consisting of 3,900 ft. between shafts under
+the river, and 2,000 ft. in Long Island City, mostly under the depot and
+passenger yard of the Long Island Railroad. This tube-tunnel work was
+naturally a single job. The contract for its construction was let to S.
+Pearson and Son, Incorporated, ground being broken on May 17th, 1904.
+Five years later, to a day, the work was finished and received its final
+inspection for acceptance by the Railroad Company.
+
+The contract was of the profit-sharing type, and required an audit, by
+the Railroad Company, of the contractor's books, and a careful system of
+cost-keeping by the Company's engineers, so that it is possible to
+include in the following some of the unit costs of the work. These are
+given in two parts: The first is called the unit labor cost, and is the
+cost of the labor in the tunnel directly chargeable to the thing
+considered. It does not include the labor of operating the plant, nor
+watchmen, yardmen, pipemen, and electricians. The second is called "top
+charges," a common term, but meaning different things to different
+contractors and engineers. Here, it is made to include the cost of the
+contractor's staff and roving laborers, such as pipemen, electricians,
+and yardmen, the cost of the plant and its operation, and all
+miscellaneous expenses, but does not include any contractor's profit,
+nor cost of materials entering permanent work.
+
+The contractor's plant is to be described in a paper by Henry Japp,[B]
+M. Am. Soc. C. E., and will not be dealt with here.
+
+The contractors carried on their work from three different sites. From
+permanent shafts, located near the river in Manhattan, four shields were
+driven eastward to about the middle of the river; and, from two similar
+shafts at the river front in Long Island City, four shields were driven
+westward to meet those from Manhattan. From a temporary shaft, near East
+Avenue, Long Island City, the land section of about 2,000 ft. was driven
+to the river shafts.
+
+[Footnote A: Presented at the meeting of December 15th, 1909.]
+
+[Footnote B: _Transactions_, Am. Soc. C. E., Vol. LXIX. p. 1.]
+
+
+TUNNELS FROM EAST AVENUE TO THE RIVER SHAFTS.
+
+The sinking of the temporary shaft at East Avenue was a fairly simple
+matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34
+ft., braced across by heavy timbering, was driven about 28 ft. to rock
+as the excavation progressed. Below this, the shaft was sunk into rock,
+about 27 ft., without timbering. As soon as the shaft was down, on
+September 30th, 1904, bottom headings were started westward in Tunnels
+_A_, _B_, and _D_. When these had been driven about half the distance to
+the river shafts, soft ground was encountered. (See Station 59, Plate
+XIII.) As the ground carried considerable water, it was decided to use
+compressed air. Bulkheads were built in the heading, and, with an air
+pressure of about 15 lb. per sq. in., the heading was driven through the
+soft ground and into rock by ordinary mining methods. The use of
+compressed air was then discontinued. West of this soft ground, a top
+heading, followed by a bench, was driven to the soft ground at about
+Station 66. Tunnel _C_, being higher, was more in soft ground, and at
+first it was the intention to delay its excavation until it had been
+well drained by the bottom headings in the tunnels on each side. A
+little later it was decided to use a shield without compressed air. This
+shield had been used in excavating the stations of the Great Northern
+and City Tunnel in London. It was rebuilt, its diameter being changed
+from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after
+it had flattened about 4 in. and had been jacked up three times, the
+scheme was abandoned, the shield was removed, and work was continued by
+the methods which were being used in the other tunnels. The shield was
+rather light, but probably it would have been strong enough had it been
+used with compressed air, or had the material passed through been all
+earth. Here, there was a narrow concrete cradle in the bottom, with rock
+up to about the middle of the tunnel, which was excavated to clear the
+shield, and gave no support on its sides. The shield was a cylinder
+crushed between forces applied along the top and bottom.
+
+With the exception of this trial of a shield in Tunnel _C_, and a novel
+method in Tunnel _B_, where compressed air, but no shield, was used, the
+description of the work in one tunnel will do for all.
+
+From the bottom headings break-ups were started at several places in
+each tunnel where there was ample cover of rock above. Where the roof
+was in soft ground, top headings were driven from the points of break-up
+and timbered. As soon as the full-sized excavation was completed, the
+iron lining was built, usually in short lengths.
+
+It will be noticed on Plate XIII that there is a depression in the rock
+between Station 65 and the river shafts, leaving all the tunnels in soft
+ground. As this was directly under the Long Island Railroad passenger
+station, it was thought best to use a shield and compressed air. This
+was done in Tunnels _A_, _C_, and _D_, one shield being used
+successively for all three. It was first erected in Tunnel _D_ at
+Station 64 + 47. From there it was driven westward to the river shaft.
+It was then taken apart and re-erected in Tunnel _C_ at Station 63 + 63
+and driven westward to the shaft. It was then found that there would not
+be time for one shield to do all four lines. The experience in Tunnels
+_C_ and _D_ had proven the ground to be much better than had been
+expected. There was considerable clay in the sand, and, with the water
+blown out by compressed air, it was very stable. A special timbering
+method was devised, and Tunnel _B_ was driven from Station 66 + 10 to
+the shaft with compressed air, but without a shield. In the meantime the
+shield was re-erected in Tunnel _A_ and was shoved through the soft
+ground from Station 65 + 48 nearly to the river shaft, where it was
+dismantled.
+
+There was nothing unusual about the shield work; it was about the same
+as that under the river, which is fully described elsewhere. In spite of
+great care in excavating in front of the shield, and prompt grouting
+behind it, there was a small settlement of the building above, amounting
+to about 1-1/2 in. in the walls and about 5 in. in the ground floors
+which were of concrete laid like a sidewalk directly upon the ground.
+Whether this settlement was due to ground lost in the shield work or to
+a compacting of the ground on account of its being dried out by
+compressed air, it is impossible to say.
+
+The interesting features of this work from East Avenue to the river
+shafts are the mining methods and the building of the iron tube without
+a shield.
+
+
+EXCAVATION IN ALL ROCK.
+
+Where the tunnel was all in good rock two distinct methods were used.
+The first was the bottom-heading-and-break-up, and the second, the
+top-heading-and-bench method. The first is illustrated by Figs. 1 and 2,
+Plate LXIII. The bottom heading, 13 ft. wide and 9 ft. high, having
+first been driven, a break-up was started by blasting down the rock,
+forming a chamber the full height of the tunnel. The timber platform,
+shown in the drawing, was erected in the bottom heading, and extended
+through the break-up chamber. The plan was then to drill the entire face
+above the bottom heading and blast it down upon the timber staging, thus
+maintaining a passage below for the traffic from the heading and
+break-ups farther down the line. Starting with the condition indicated
+by Plate XIII, the face was drilled, the columns were then taken down
+and the muck pile was shoveled through holes in the staging into muck
+cars below. The face was then blasted down upon the staging, the drill
+columns were set up on the muck pile, and the operation was repeated.
+This method has the advantage that the bottom heading can be pushed
+through rapidly, and from it the tunnel may be attacked at a number of
+points at one time. It was found to be more expensive than the
+top-heading-and-bench method, and as soon as the depression in the rock
+at about Station 59 was passed, a top heading about 7 ft. high, and
+roughly the segment of a 23-ft. circle, was driven to the next soft
+ground in each of the four tunnels. The remainder of the section was
+taken out in two benches, the first, about 4 ft. high, was kept about
+15 ft. ahead of the lower bench, which was about the remaining 11 ft.
+high.
+
+
+EXCAVATION IN EARTH AND ROCK.
+
+About 2,500 ft. of tunnel, the roof of which was in soft ground, was
+excavated in normal air by the mining-and-timbering method. In the
+greater part of this the rock surface was well above the middle of the
+tunnel. The method of timbering and mining, while well enough known, has
+not been generally used in the United States.
+
+[Illustration: PLATE LXIII]
+
+Starting from the break-up in all rock, as described above, and
+illustrated on Plate XIII, when soft ground was approached, a top
+heading was driven from the rock into and through the earth. This
+heading was about 7 ft. high and about 6 ft. wide. This was done by the
+usual post, cap, and poling-board method. The ground was a running sand
+with little or no clay, and, at first, considerable water, in places.
+All headings required side polings. The roof poling boards were about
+2-1/2 or 3 ft. above the outside limit of the tunnel lining, as
+illustrated by Figs. 3, 4, and 5, Plate LXIII. The next step was to
+place two crown-bars, _AA_, usually about 20 ft. long, under the caps.
+Posts were then placed under the bars, and poling boards at right angles
+to the axis of the tunnel were then driven out over the bars. As these
+polings were being driven, the side polings of the original heading were
+removed, and the earth was mined out to the end of these new transverse
+polings. Breast boards were set on end under the ends of the transverse
+polings when they had been driven out to their limit. Side bars, _BB_,
+were then placed as far out as possible and supported on raking posts.
+These posts were carried down to rock, if it was near, if not, a sill
+was placed.
+
+A new set of transverse polings was driven over these side bars and the
+process was repeated until the sides had been carried down to rock or
+down to the elevation of the sills supporting the posts, which were
+usually about 4 ft. above the axis of the tunnel.
+
+The plan then was to excavate the remainder of the section and build the
+iron lining in short lengths, gradually transferring the weight of the
+roof bars of the iron lining as the posts were taken out. This meant
+that not more than four rings, and often only one ring, could be built
+before excavation and a short length of cradle became necessary. Before
+the posts under the roof bars could be built and the weight transferred
+to the iron lining, a grout dam was placed at the leading end of the
+iron lining, and grout was brought up to at least 45° from the top. Such
+workings were in progress at as many as eight places in one tunnel at
+the same time. Where there was only the ordinary ground-water to contend
+with, the driving of the top heading drained the ground very thoroughly,
+and the enlarging was done easily and without a serious loss of ground.
+Under these conditions the surface settlement was from 6 in. to 2 ft.
+
+Under Borden Avenue, there was more water, which probably came from a
+leaky sewer; it was not enough to form a stream, but just kept the
+ground thoroughly saturated. There was a continued though hardly
+perceptible flow of earth through every crevice in the timbering during
+the six or eight weeks between the driving of the top heading and the
+placing of the iron lining; and here there was a settlement of from 4 to
+8 ft. at the surface.
+
+
+TUNNELING IN COMPRESSED AIR WITHOUT A SHIELD.
+
+When it became evident that there would not be time for one shield to do
+the soft ground portions of all four tunnels under the Long Island
+Railroad station, a plan was adopted and used in Tunnel B which, while
+not as rapid, turned out to be as cheap as the work done by the shields.
+Figs. 6 and 7, Plate LXIII, and Fig. 1, Plate LXIV, illustrate this work
+fairly well. The operation of this scheme was about as follows: Having
+the iron built up to the face of the full-sized excavation, a hole or
+top heading, about 3 ft. wide and 4 or 5 ft. high, was excavated to
+about 10 ft. in advance. This was done in a few hours without timbering
+of any kind; but, as soon as the hole or heading was 10 ft. out, 6 by
+12-in. laggings or polings were put up in the roof, with the rear ends
+resting on the iron lining and the leading ends resting on vertical
+breast boards. The heading was then widened out rapidly and the lagging
+was placed, down to about 45° from the crown. The forward ends of the
+laggings were then supported by a timber rib and sill. Protected by this
+roof, the full section was excavated, and three rings of the iron lining
+were built and grouted, and then the whole process was repeated.
+
+[Illustration: PLATE LXIV, FIG. 1.--TUNNELING IN COMPRESSED AIR WITHOUT
+SHIELD.]
+
+[Illustration: PLATE LXIV, FIG. 2.--T-HEAD AIR-LOCK.]
+
+[Illustration: PLATE LXIV, FIG. 3.--CUTTING EDGE OF CAISSON ASSEMBLED.]
+
+[Illustration: PLATE LXIV, FIG. 4.--CAISSON SUPPORTED ON JACKS AND
+BLOCKS.]
+
+
+CONCRETE CRADLES, HAND-PACKED STONE AND GROUTING.
+
+Had the East Avenue Tunnel been built by shields, as was contemplated at
+the time of its design, the space between the limits of excavation
+and the iron lining would have been somewhat less than by the method
+actually used, especially in the earth portions. This space would have
+been filled with grout ejected through the iron lining. The change in
+the method of doing the work permitted the use of cheaper material, in
+place of part of the grout, and, at the same time, facilitated the work.
+
+The tube of cast-iron rings is adapted to be built in the tail of the
+shield. Where no shield was used, after the excavation was completed and
+all loose rock was removed, timbers were fixed across the tunnel from
+which semicircular ribs were hung, below which lagging was placed. The
+space between this and the rough rock surface was filled with concrete.
+This formed a cradle in which the iron tube could be erected, and, at
+the same time, occupied space which would have been filled by grout, at
+greater cost, had a shield been used.
+
+As soon as each ring of iron was erected, the space between it and the
+roof of the excavation was filled with hand-packed stone. At about every
+sixth ring a wall of stone laid in mortar was built between the lining
+and the rock to serve as a dam to retain grout. The interstices between
+the hand-packed stones were then filled with 1 to 1 grout of cement and
+sand, ejected through the iron lining. The concrete cradles averaged
+1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70
+per cu. yd., of which $2.25 was for labor and $4.45 was for top charges.
+The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost
+$2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top
+charges.
+
+
+ERECTION OF IRON LINING.
+
+The contractors planned to erect the iron lining with erectors of the
+same pattern as that used on the shield under the river, mounted on a
+traveling stage. These will be described in detail in Mr. Japp's paper.
+Two of these stages and erectors worked in each tunnel at different
+points. The tunnel was attacked from so many points that these erectors
+could not be moved from working to working. The result was that about
+58% of the lining was built by hand. At first thought, this seems to be
+a crude and extravagant method, as the plates weighed about 1 ton each
+and about 20,000 were erected by hand. As it turned out, the cost was
+not greater than for those erected by machinery, taking into account the
+cost of erectors and power. This, however, was largely because the hand
+erection reduced the amount of work to be done by the machines so much
+that the machines had an undue plant charge.
+
+The hand erection was very simple. A portable hand-winch, with a 3/8-in.
+wire rope, was set in any convenient place. The wire rope was carried to
+a snatch-block fastened to the top of the iron previously built; or,
+where the roof was in soft ground, the timbering furnished points of
+attachment. The end of the wire rope was then hooked to a bolt hole in a
+new plate, two men at the winch lifted the plate, and three or four
+others swung it into approximate place, and, with the aid of bars and
+drift-pins, coaxed it into position and bolted it. Where there was no
+timbering above the iron, sometimes the key and adjoining plates were
+set on blocking on a timber staging and then jacked up to place.
+
+
+LONG ISLAND SHAFTS.
+
+The river shafts were designed to serve both as working shafts and as
+permanent openings to the tunnels, and were larger and more substantial
+than would have been required for construction purposes. Plate X of Mr.
+Noble's paper shows their design. They consist of two steel caissons,
+each 40 by 74 ft. in plan, with walls 5 ft. thick filled with concrete.
+A wall 6 ft. thick separated each shaft into two wells 29 by 30 ft.,
+each directly over a tunnel. Circular openings for the tunnel, 25 ft. in
+diameter, were provided in the sides of the caissons. During the sinking
+these were closed by bulkheads of steel plates backed by horizontal
+steel girders. The shafts were sunk as pneumatic caissons to a depth of
+78 ft. below mean high water. There have been a few caissons which were
+larger and were sunk deeper than these, but most large caissons have
+been for foundations, such as bridge piers, and have been stopped at or
+a little below the surface of the rock. The unusual feature of the
+caissons for the Long Island shaft is that they were sunk 54 ft. through
+rock.
+
+It had been hoped that the rock would prove sound enough to permit
+stopping the caissons at or a little below the surface and continuing
+the excavation without sinking them further; for this reason only the
+steel for the lower 40 ft. of the caissons was ordered at first.
+
+The roof of the working chamber was placed 7 ft. above the cutting edge.
+It was a steel floor, designed by the contractors, and consisted of
+five steel girders, 6 ft. deep, 29 ft. long, and spaced at 5-ft.
+centers. Between were plates curved upward to a radius of 4 ft. Each
+working chamber had two shafts, 3 ft. by 5 ft. in cross-section, with a
+diaphragm dividing it into two passages, the smaller for men and the
+larger for muck buckets. On top of these shafts were Moran locks.
+Mounted on top of the caisson was a 5-ton Wilson crane, which would
+reach each shaft and also the muck cars standing on tracks on the ground
+level beside the caissons. Circular steel buckets, 2 ft. 6 in. in
+diameter and 3 ft. high, were used for handling all muck. These were
+taken from the bottom of the working chamber, dumped in cars, and
+returned to the bottom without unhooking. Work was carried on by three
+8-hour shifts per day. The earth excavation was done at the rate of
+about 67 cu. yd. per day from one caisson. The rock excavation,
+amounting to about 6,200 cu. yd. in each caisson, was done at the rate
+of about 44.5 cu. yd. per day. The average rate of lowering, when the
+cutting edge of the south caisson was passing through earth, was 0.7 ft.
+per day. In rock, the rate was 0.48 ft. per day in the south caisson,
+and 0.39 ft. per day in the north caisson.
+
+At the beginning all lowering was done with sixteen hydraulic jacks.
+Temporary brackets were fastened to the outside of the caisson. A
+100-ton hydraulic jack was placed under each alternate bracket and under
+each of the others there was blocking. The jacks were connected to a
+high-pressure pump in the power-house. As the jacks lifted the caisson,
+the blocking was set for a lower position, to which the caisson settled
+as the jacks were exhausted. After the caisson had penetrated the earth
+about 10 ft., the outside brackets were removed and the lowering was
+regulated by blocking placed under brackets in the working chamber. The
+caisson usually rested on three sets of blockings on each side and two
+on each end. The blocking was about 4 ft. inside the cutting edge. In
+the rock, as the cutting edge was cleared for a lowering of about 2 ft.,
+6 by 8-in. oak posts were placed under the cutting-edge angle. When a
+sufficient number of posts had been placed, the blocking on which the
+caisson had rested was knocked or blasted out, and the rock underneath
+was excavated. The blocking was then re-set at a lower elevation. The
+posts under the cutting edge were then chopped part way through and the
+air pressure was lowered about 10 lb., which increased the net weight to
+more than 4,000,000 lb. The posts then gradually crushed and the
+caissons settled to the new blocking. The tilt or level of the caisson
+was controlled by chopping the posts more on the side which was desired
+to move first.
+
+The caisson nearly always carried a very large net weight, usually about
+870 tons. The concrete in the walls, which was added as the caisson was
+being sunk, was kept at about the elevation of the ground. There was
+generally a depth of from 5 to 20 ft. of water ballast on top of the
+roof of the working chamber. The air pressure in the working chamber was
+usually much less than the hydrostatic head outside the caisson. For
+example, the average air pressure in the south caisson during January,
+1906, was 16-1/2 lb., while the average head was 62.5 ft., equivalent to
+27 lb. per sq. in. Under these conditions, there was a continued but
+small leakage into the caisson of from 15,000 to 20,000 gal. per day.
+
+In the rock the excavation was always carried from 2 to 5 in. outside
+the cutting edge. As soon as the cutting edge was cleared, bags of clay
+were placed under it in a well-tiered, solid pile, so that when the
+caisson was lowered the bags were cut through and most of the clay, bags
+and all, was squeezed back of the cutting edge between the rock and the
+caisson.
+
+Table 1 shows the relation of the final position of the caissons to that
+designed.
+
+The cost of rock excavation in the caisson was $4.48 per cu. yd. for
+labor and $10.54 for top charges.
+
+The bottom of the shaft is an inverted concrete arch, 4 ft. thick,
+water-proofed with 6-ply felt and pitch. As soon as the caisson was down
+to its final position and the excavation was completed, concrete was
+deposited on the uneven rock surfaces, brought up to the line of the
+water-proofing, and given a smooth 1-in. mortar coat. The felt was stuck
+together in 3-ply mats on the surface with hot coal-tar pitch. These
+were rolled and sent down into the working chamber, where they were put
+down with cold pitch liquid at 60° Fahr. Each sheet of felt overlapped
+the one below 6 in. The water-proofing was covered by a 1-in. mortar
+plaster coat, after which the concrete of the 4-ft. inverted arch was
+placed. While the water-proofing and concreting were being done, the air
+pressure was kept at from 30 to 33 lb. per sq. in., the full hydrostatic
+head at the cutting edge. After standing for ten days, the air pressure
+was taken off, and the removal of the roof of the working chamber was
+begun. The water-proofing was done by the Union Construction and
+Waterproofing Company.
+
+TABLE 1.--RELATION OF THE FINAL POSITION OF THE CAISSONS TO THAT
+DESIGNED.
+
+================================================================
+LOCATION.| LONG ISLAND CITY. |
+----------------------------------------------------------------
+Shaft. | North. | South. |
+----------------------------------------------------------------
+Corner. | High. | East. | North. | High. | East. | North. |
+----------------------------------------------------------------
+Northeast|0.21 ft.|0.08 ft.|0.05 ft.|0.32 ft.|0.15 ft.|0.28 ft.|
+Northwest|0.22 " |0.08 " |0.02 " |0.00 " |0.15 " |0.12 " |
+Southwest|0.27 " |0.14 " |0.02 " |0.18 " |0.45 " |0.12 " |
+Southeast|0.23 " |0.14 " |0.05 " |0.39 " |0.45 " |0.28 " |
+================================================================
+
+=============================================================================
+LOCATION.| MANHATTAN. |
+-----------------------------------------------------------------------------
+Shaft. | North. | South. |
+-----------------------------------------------------------------------------
+Corner. | High. | East. | South. | High. | East or West.|North or South.|
+-----------------------------------------------------------------------------
+Northeast|0.23 ft.|0.74 ft.|0.38 ft.|0.00 ft.|0.06 ft. east.|0.04 ft. south.|
+Northwest|0.00 " |0.74 " |0.22 " |0.08 " |0.06 " " |0.13 " north.|
+Southwest|0.11 " |0.31 " |0.22 " |0.21 " |0.45 " west.|0.13 " " |
+Southeast|0.46 " |0.31 " |0.38 " |0.04 " |0.45 " " |0.04 " south.|
+=============================================================================
+
+The cost of labor in compressed air chargeable to concreting was $3.40
+per cu. yd.
+
+After the roof of each working chamber had been removed, the shield was
+erected on a timber cradle in the bottom of the shaft, in position to be
+shoved out of the opening in the west side of the caisson. Temporary
+rings of iron lining were erected across the shaft in order to furnish
+something for the shield jacks to shove against.
+
+The roof of the working chamber was then re-erected about 35 ft. above
+its original position and about 8 ft. above the tunnel openings. This
+time, instead of the two small shafts which were in use during the
+sinking of the caisson, a large steel shaft with a T-head lock was
+built. This is illustrated in Fig. 2, Plate LXIV. The shaft was 8 ft. in
+diameter. Inside there was a ladder and an elevator cage for lowering
+and hoisting men and the standard 1-yd. tunnel cars. At the top, forming
+the head of the T, there were two standard tunnel locks.
+
+
+MANHATTAN SHAFTS.
+
+A permanent shaft, similar to the river shafts in Long Island City, was
+constructed at Manhattan over each pair of tunnels. Each shaft was
+located across two lines, with its longer axis transverse to the
+tunnels. Plate XIII shows their relative positions. They were divided
+equally by a reinforced concrete partition wall transverse to the line
+of the tunnels. On completion, the western portions were turned over to
+the contractor for the cross-town tunnels for his exclusive use.
+
+_South Shaft._--Work on the south shaft was started on June 9th, 1904,
+with the sinking of a 16 by 16-ft. test pit in the center of the south
+half of the south shaft, which reached disintegrated rock at a depth of
+about 20 ft.
+
+Starting in August, the full shaft area, 74 by 40 ft., was taken out in
+an open untimbered cut to the rock, and a 20 by 50-ft. shaft was sunk
+through the rock to tunnel grade, leaving a 10 or 12-ft. berm around it.
+(Fig. 1, Plate LXX.)
+
+The erection of the caisson was started, about the middle of January, on
+the rock berm surrounding the 20 by 50-ft. shaft and about 15 ft. below
+the surface. Fig. 3, Plate LXIV, shows the cutting edge of the caisson
+assembled. The excavation of the small shaft had shown that hard rock
+and only a very small quantity of water would be encountered, and that
+the caisson need be sunk only a short distance below the rock surface.
+Therefore, no working-chamber roof was provided, the caisson was built
+to a height of only 40 ft., and the circular openings were permanently
+closed.
+
+The assembling of the caisson took 2-1/2 months, and on April 2d
+lowering was started. Inverted brackets were bolted temporarily to the
+cutting-edge stiffening brackets, and the sinking was carried on by
+methods similar to those used at Long Island. The jacks and blocking
+supporting the caisson are shown in Fig. 4, Plate LXIV. As soon as the
+cutting edge entered the rock, which was drilled about 6 in. outside of
+the neat lines, the space surrounding the caisson was back-filled with
+clay and muck to steady it and provide skin friction. As the friction
+increased, the walls were filled with concrete, and as the caisson
+slowly settled, it was checked and guided by blocking. The cutting edge
+finally came to rest 31 ft. below mean high water, the sinking having
+been accomplished in about seven weeks, at an average rate of 0.50 ft.
+per day.
+
+The final position of the cutting edge in relation to its designed
+position is shown in Table 1.
+
+A berm about 4 ft. wide was left at the foot of the caisson below which
+the rock was somewhat fissured and required timbering. The cutting edge
+of the caisson was sealed to the rock with grout on the outside and a
+concrete base to the caisson walls on the inside, the latter resting on
+the 4-ft. berm. Following the completion of the shaft, the permanent
+sump was excavated to grade for use during construction.
+
+_North Shaft._--The north shaft had to be sunk in a very restricted
+area. The east side of the caisson cleared an adjoining building at one
+point by only 1 ft., while the northwest corner was within the same
+distance of the east line of First Avenue. As in the case of the Long
+Island shafts, the steelwork for only the lower 40 ft. was ordered at
+the start. This height was completely assembled before sinking was
+begun. The caisson was lowered in about the same manner as those
+previously described. The bearing brackets for the hydraulic jacks were
+attached, as at the south shaft, to the inside of the cutting-edge
+brackets. The east side of the caisson was in contact with the
+foundations of the neighboring building, while the west side was in much
+softer material. As a consequence, the west side tended to settle more
+rapidly and thus throw the caisson out of level and position. To
+counteract that tendency, it was necessary to load the east wall heavily
+with cast-iron tunnel sections, in addition to the concrete filling in
+the walls.
+
+Soon after sinking was begun, a small test shaft was sunk to a point
+below the elevation of the top of the tunnels. The rock was found to be
+sound, hard, and nearly dry. It was then decided to stop the caisson as
+soon as a foundation could be secured on sound rock. The latter was
+found at a depth of 38 ft. below mean high water. With the cutting edge
+seated at that depth, the top of the caisson was only 2 ft. above mean
+high water, and as this was insufficient protection against high tides,
+a 10-ft. extension was ordered for the top. Work, however, went on
+without delay on the remainder of the excavation. The junction between
+the cutting edge and the rock was sealed with concrete and grout. The
+caisson was lowered at an average rate of 0.53 ft. per day. The size of
+the shaft below the cutting edge was 62 ft. 7 in. by 32 ft. The average
+rate of excavation during the sinking in soft material was 84 cu. yd.
+per day. The average rate of rock excavation below the final position of
+the cutting edge was 125 cu. yd. per day. There were night and day
+shifts, each working 10 hours. Excavation in earth cost $3.96 per cu.
+yd., of which $1.45 was for labor and $2.51 for top charges, etc. The
+excavation of rock cost $8.93 per cu. yd., $2.83 being for labor and
+$6.10 for top charges.
+
+The final elevations of the four corners of the cutting edge, together
+with their displacement from the desired positions, are shown in Table
+1.
+
+
+RIVER TUNNELS.
+
+The four river tunnels, between the Manhattan and Long Island City
+shafts, a distance of about 3,900 ft., were constructed by the shield
+method. Eight shields were erected, one on each line in each shaft, the
+four from Manhattan working eastward to a junction near the middle of
+the river with the four working westward from Long Island City. Toward
+the end of the work it was evident that the shields in Tunnels _B_, _C_,
+and _D_ would meet in the soft material a short distance east of the
+Blackwell's Island Reef if work were continued in all headings. In order
+that the junction might be made in firm material, work from Manhattan in
+those three tunnels was suspended when the shields reached the edge
+of the ledge. The shields in Tunnel _A_ met at a corresponding point
+without the suspension of work in either. An average of 1,760 ft. of
+tunnel was driven from Manhattan and 2,142 ft. from Long Island City.
+
+[Illustration: PLATE LXV, FIG. 1.--SHIELD FITTED WITH SECTIONAL SLIDING
+HOODS AND SLIDING EXTENSIONS TO THE FLOORS.]
+
+[Illustration: PLATE LXV, FIG. 2.--SHIELD FITTED WITH FIXED HOODS AND
+FIXED EXTENSIONS TO THE FLOORS.]
+
+
+TUNNELS DRIVEN EASTWARD FROM MANHATTAN.
+
+_Materials and Inception of Work._--The materials encountered are shown
+in the profile on Plate XIII, and were similar in all the tunnels. In
+general, they were found to be about as indicated in the preliminary
+borings. The materials met in Tunnel _A_ may be taken as typical of all.
+
+From the Manhattan shaft eastward, in succession, there were 123 ft. of
+all-rock section, 87 ft. of part earth and part rock, 723 ft. of all
+earth, 515 ft. of part rock and part earth, 291 ft. of all rock, and 56
+ft. of part rock and part earth.
+
+The rock on the Manhattan side was Hudson schist, while that in the reef
+was Fordham gneiss. Here, as elsewhere, they resembled each other
+closely; the gneiss was slightly the harder, but both were badly seamed
+and fissured. Wherever it was encountered in this work, the rock surface
+was covered by a deposit of boulders, gravel, and sand, varying in
+thickness from 4 to 10 ft. and averaging about 6 ft.
+
+The slope of the surface of the ledge on the Manhattan side averaged
+about 1 vertical to 4 horizontal. The rock near the surface was full of
+disintegrated seams, and was badly broken up. It was irregularly
+stratified, and dipped toward the west at an angle of about 60 degrees.
+Large pieces frequently broke from the face and slid into the shield,
+often exposing the sand. The rock surface was very irregular, and was
+covered with boulders and detached masses of rock embedded in coarse
+sand and gravel. The sand and gravel allowed the air to escape freely.
+By the time the shields had entirely cleared the rock, the material in
+the face had changed to a fine sand, stratified every few inches by very
+thin layers of chocolate-colored clayey material. This is the material
+elsewhere referred to as quicksand. As the shield advanced eastward, the
+number and thickness of the layers of clay increased until the clay
+formed at least 20% of the entire mass, and many of the layers were 2
+in. thick.
+
+At a distance of about 440 ft. beyond the Manhattan ledge, the material
+at the bottom of the face changed suddenly to one in which the layers
+of clay composed probably 98% of the whole. The sand layers were not
+more than 1/16 in. thick and averaged about 2 in. apart. The surface of
+the clay rose gradually for a distance of 40 ft. in Tunnels _A_ and _B_,
+and 100 ft. in Tunnels _C_ and _D_, when gravel and boulders appeared at
+the bottom of the shield. At that time the clay composed about one-half
+of the face.
+
+The surfaces of both the clay and gravel were irregular, but they rose
+gradually. After rock was encountered, the formations of gravel and clay
+were roughly parallel to the rock surface.
+
+As the surface of the rock rose they disappeared in order and were again
+encountered when the shields broke out of rock on the east side of the
+Blackwell's Island Reef. East of the reef a large quantity of coarse
+open sand was present in the gravel formations before the clay appeared
+below the top of the cutting edge. In Tunnels _C_ and _D_ this was
+especially difficult to handle. It appears to be a reasonable assumption
+that the layer of clay was continuous across the reef. Wherever the clay
+extended above the top of the shield it reduced the escape of air
+materially. It is doubtless largely due to this circumstance that the
+part-rock sections in the reef were not the most difficult portions of
+the work.
+
+While sinking the lower portions of the shafts the tunnels were
+excavated eastward in the solid rock for a distance of about 60 ft.,
+where the rock at the top was found to be somewhat disintegrated. This
+was as far as it was considered prudent to go with the full-sized
+section without air pressure. At about the same time top headings were
+excavated westward from the shafts for a distance of 100 ft., and the
+headings were enlarged to full size for 50 ft. The object was to avoid
+damage to the shaft and interference with the river tunnel when work was
+started by the contractor for the cross-town tunnel.
+
+[Illustration: PLATE LXVI, FIG. 1.--REAR OF SHIELD SHOWING COMPLETE
+FITTINGS.]
+
+[Illustration: PLATE LXVI, FIG. 2.--SHIELD WITH LOWER PORTION OF
+BULKHEAD REMOVED.]
+
+The shields were erected on timber cradles in the shaft, and were shoved
+forward to the face of the excavation. Concrete bulkheads, with the
+necessary air-locks, were then built across the tunnels behind the
+shields. The shields were erected before the dividing walls between the
+two contracts were placed. Rings of iron tunnel lining, backed by
+timbers spanning the openings on the west side, were erected temporarily
+across the shafts in order to afford a bearing for the shield jacks
+while shoving into the portals. The movement of the shield eastward was
+continued in each tunnel for a distance of about 60 ft., and the
+permanent cast-iron tunnel lining was erected as the shield advanced.
+Before breaking out of rock, it was necessary to have air pressure in
+the tunnels. This required the building of bulkheads with air-locks
+inside the cast-iron linings just east of the portals. Before erecting
+the bulkheads it was necessary to close the annular space between the
+iron tunnel lining and the rock. The space at the portal was filled with
+a concrete wall. After about twenty permanent rings had been erected in
+each tunnel, two rings were pulled apart at the tail of the shield and a
+second masonry wall or dam was built. The space between the two dams was
+then filled with grout. To avoid the possibility of pushing the iron
+backward after the air pressure was on, rings of segmental plates, 5/8
+in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential
+joints in each tunnel between the rings as they were erected. The plates
+contained slotted holes to match those in the segments. After the rings
+left the shield, the plates were driven outward, and projected about 5
+in. When the tunnel was grouted, the plates were embedded.
+
+The bulkheads were completed, and the tunnels were put under air
+pressure on the following dates:
+
+Line _D_, on October 5th, 1905;
+Line _C_, on November 6th, 1905;
+Line _B_, on November 25th, 1905;
+Line _A_, on December 1st, 1905.
+
+This marked the end of the preparatory period.
+
+In the deepest part of the river, near the pier-head line on the
+Manhattan side, there was only 8 ft. of natural cover over the tops of
+the tunnels. This cover consisted of the fine sand previously described,
+and it was certain that the air would escape freely from the tunnels
+through it. To give a greater depth of cover and to check the loss of
+air, the contractor prepared to cover the lines of the tunnels with
+blankets of clay, which, however, had been provided for in the
+specifications. Permits, as described later, were obtained at different
+times from the Secretary of War, for dumping clay in varying thicknesses
+over the line of work. The dumping for the blanket allowed under the
+first permit was completed in February, 1906. The thickness of this
+blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan
+side. The original blanket was of material advantage, but the depth of
+clay was insufficient to stop the loss of air.
+
+The essential parts of the shields in the four tunnels were exactly
+alike. Those in Tunnels _B_ and _D_, however, were originally fitted
+with sectional sliding hoods and sliding extensions to the floors of the
+working chambers, as shown by Fig. 1, Plate LXV. The shields in Tunnels
+_A_ and _C_ were originally fitted with fixed hoods and fixed extensions
+to the floors, as shown in Fig. 2, Plate LXV. A full description of the
+shields will be found in Mr. Japp's paper.
+
+The shields in each pair of tunnels were advanced through the solid rock
+section about abreast of each other, until test holes from the faces
+indicated soft ground within a few feet. As the distance between the
+sides of the two tunnels was only 14 ft., it was thought best to let
+Tunnels _B_ and _D_ gain a lead of about 100 ft. before Tunnels _A_ and
+_C_ opened out into soft ground, in order that a blow from one tunnel
+might not extend to the other. Work in Tunnel _C_ was shut down on
+December 23d, 1905, after exposing sand to a depth of 3 ft. at the top,
+and it remained closed for seven weeks. Work in Tunnel _A_ was suspended
+on September 29th, 1905. By the time Tunnel _B_ had made the required
+advance, it, together with Tunnels _C_ and _D_, was overtaxing the
+capacities of the compressor plant. Only a little work was done in
+Tunnel _C_ until July, 1906, and work in Tunnel _A_ was not resumed
+until October 22d, 1906.
+
+
+TUNNELS DRIVEN WESTWARD FROM LONG ISLAND CITY.
+
+_Materials and Inception of the Work._--The materials met in Tunnel A
+are typical of all four tunnels. From the Long Island shafts westward,
+in succession, there were 124 ft. of all-rock section, 125 ft. of part
+rock and part earth section, 22 ft. of all-rock section, 56 ft. of part
+rock and part earth section, 387 ft. of all-rock section, 70 ft. of part
+earth and part rock section, and 1,333 ft. of all-earth section.
+
+[Illustration: PLATE LXVII]
+
+The materials passed through are indicated on Plate XIII. The rock was
+similar to that of the Blackwell's Island Reef, and was likewise covered
+by a layer of sand and boulders. The remainder of the soft ground was
+divided into three classes. The first was a very fine red sand, which
+occurred in a layer varying in thickness from 6 ft. to at least 15 ft.
+It may have been much deeper above the tunnel. It is the quicksand
+usually encountered in all deep foundations in New York City. The
+following is the result of the sifting test of this sand:
+
+ Held on No. 30 sieve 0.6%
+Passed No. 30, " " No. 40 " 0.4%
+ " No. 40, " " No. 50 " 0.7%
+ " No. 50, " " No. 60 " 2.4%
+ " No. 60, " " No. 80 " 14.9%
+ " No. 80, " " No. 100 " 54.0%
+ " No. 100, " " No. 200 " 8.0%
+ " No. 200 " 19.0%
+ ------
+ 100.0%
+
+This means that grains of all but 4% of it were less than 0.0071 in. in
+diameter. The 19% which passed the No. 200 sieve, the grains of which
+were 0.0026 in. or less in diameter, when observed with a microscope
+appeared to be perfectly clean grains of quartz; to the eye it looked
+like ordinary building sand, sharp, and well graded from large to small
+grains. This sand, with a surplus of water, was quick. With the water
+blown out of it by air pressure, it is stable, stands up well, and is
+very easy to work. It appears to be the same as the reddish quicksand
+found in most deep excavations around New York City.
+
+The second material was pronounced "bull's liver" by the miners as soon
+as it was uncovered. "Bull's liver" seems to be a common term among
+English-speaking miners the world over. It is doubtful, however, if it
+is always applied to the same thing. In this case it consisted of layers
+of blue clay and very fine red sand. The clay seemed to be perfectly
+pure and entirely free from sand. It would break easily with a clean,
+almost crystalline, fracture, and yet it was soft and would work up
+easily. The layers of clay varied in thickness from 1/16 in. to 1 in.,
+while the thickness of the sand layer varied from 1/4 in. to several
+inches. The sand was the same as the quicksand already described.
+
+The "bull's liver" was ideal material in which to work a shield. It
+stood up as well and held the air about as well as clay, and was much
+easier to handle.
+
+The third material was a layer of fine gray sand which was encountered
+in the top of all the tunnels for about 400 ft. just east of Blackwell's
+Island Reef. It was very open, and had grains of rather uniform size.
+
+During the starting out of the tunnels from the shafts, and for more
+than a year afterward, the roof of the working chamber in the caissons
+and the locks previously described under the Long Island shafts took the
+place of the bulkhead across the tunnels for confining the air pressure.
+
+The first work in air pressure was to remove the shield plug closing the
+opening in the side of the shaft. This being done, the shield was shoved
+through the opening, and excavation begun.
+
+At the start the shields were fitted with movable platforms, but no
+hoods of any kind were placed until after the rock excavation was
+completed.
+
+
+METHODS OF EXCAVATION.
+
+The distribution of materials to be excavated, as previously outlined,
+divided the excavation into three distinct classes, for which different
+methods had to be developed.
+
+These three classes were:
+
+_First._--All-rock section.
+_Second._--Rock in the bottom, earth in the top.
+_Third._--All-earth section.
+
+The extent of the second and third classes was much greater than that of
+the first, and they, of course, determined the use of the shield.
+Shields had not previously been used extensively in rock work, either
+where the face was wholly or partly in rock, and it was necessary to
+develop the methods by experience. The specifications required that
+where rock was present in the bottom, a bed of concrete should be laid
+in the form of a cradle on which to advance the shield.
+
+_All Rock._--At different times, three general methods were used for
+excavating in all-rock sections. They may be called: The bottom-heading
+method; the full-face method; and the center-heading method.
+
+The bottom-heading method was first tried. A heading, about 8 ft. high
+and 12 ft. wide, was driven on the center line, with its bottom as
+nearly as possible on the grade line of the bottom of the tunnel. It was
+drilled in the ordinary manner by four drills mounted on two columns.
+The face of the headings varied from 10 to 30 ft. in advance of the
+cutting edge. After driving the heading for about 10 ft., the bottom was
+cleared out and a concrete cradle was set. The width of the cradles
+varied, but was generally from 8 to 10 ft.
+
+The excavation was enlarged to full size as the shield advanced, the
+drills being mounted in the forward compartments of the shield, as
+shown by Fig. 1, Plate LXVII, which represents the conditions after the
+opening had been cut in the bulkhead, but before the new methods,
+mentioned later, had been developed.
+
+[Illustration: PLATE LXVIII]
+
+The sides and top were shot downward into the heading. The area of the
+face remaining behind the heading was large, and a great number of holes
+and several rounds were required to fire the face to advantage. As soon
+as firing was started at the face, the heading was completely blocked,
+and operations there had to be suspended until the mucking was nearly
+completed. The bottom-heading method was probably as good as any that
+could be devised for use with the shields as originally installed. All
+the muck had to be taken from the face by hand and handled through the
+chutes or doors. By drilling from the shield, some muck was blasted on
+to the extensions of the floors and could be handled from the upper
+compartments. At best, however, the shield with the closed transverse
+bulkhead was a serious obstacle to rapid work in rock sections.
+
+The full-face method was only used where the rock was not considered
+safe for a heading. A cut was fired at the bottom, together with side
+holes, in a manner quite similar to that adopted in the first set of
+holes for a bottom heading. The cradle was then placed, in lengths of
+either 2.5 or 5 ft., after which the remainder of the face was fired in
+the same manner as for the bottom-heading method. The closed transverse
+bulkhead with air-locks, as shown in Fig. 1, Plate LXVI, was placed in
+the shield in the hope that it would only be necessary to maintain the
+full air pressure in the working compartments in front of the bulkhead.
+It was also thought that some form of bulkhead which could be closed
+quickly and tightly would be necessary to prevent flooding the tunnel in
+case of blows. While no attempt was ever made to reduce the pressure
+behind the shield bulkhead, it was obvious from the experience with
+Tunnels _B_ and _D,_ while working in the sand between Manhattan and the
+reef, that the plan was not practicable, and that the closed bulkhead in
+the bottom was a hindrance instead of a safeguard. As soon as rock was
+encountered in those tunnels at the west edge of the reef, the
+contractor cut through the bulkheads and altered them, as shown in Fig.
+2, Plate LXVI.
+
+Taking advantage of the experience gained, openings were cut through the
+bulkheads in Shields _A_ and _C_, while they were shut down near the
+edge of the Manhattan ledge. In erecting the shields at Long Island
+City in May and June, 1906, openings were also provided. These shields
+had to pass through about 700 ft. of rock at the start, the greater
+portion of which was all-rock section. It was at that point that
+openings were first used extensively and methods were developed, which
+would not have been possible except where ears could be passed through
+the shield. The bottom-heading method was first tried, but the working
+space in front of the shield was cramped, and but few men could be
+employed in loading the cars. To give more room, the heading was
+gradually widened. The enlargement at the top, when made from the
+shield, blocked all work at the face of the heading while the former
+operation was in progress. To reduce the delays, the heading was raised,
+thus reducing the quantity of rock left in the top, and the bottom was
+taken out as a bench. To avoid blocking the tracks when firing the top,
+a heavy timber platform was built out from the floors of the middle
+working compartments. Most of the muck from the top was caught on the
+platform and dropped into cars below. This method of working is shown by
+Fig. 2, Plate LXVII. The platforms were not entirely satisfactory, and,
+later, the drills in the heading were turned upward and a top bench was
+also drilled and fired, as shown by Fig. 3, Plate LXVII. There was then
+so little excavation left in the top that the muck was allowed to fall
+on the tracks and was quickly cleared away. The method just outlined is
+called the center-heading method, and was the most satisfactory plan
+devised for full-rock sections.
+
+_Excavation in Part Rock and Part Earth._--This was probably the most
+difficult work encountered, particularly when the rock was covered with
+boulders and coarse sharp sand which permitted a free escape of air. It
+was necessary, before removing the rock immediately under the soft
+ground, to excavate the earth in advance of the shield to a point beyond
+where the rock was to be disturbed, and to support, in some way, the
+roof, sides, and face of the opening thus made. The hoods were designed
+mainly for the purpose of supporting the roof and the sides. With the
+fixed hood it was necessary either to excavate for the distance of the
+desired shove in front of it or else to force the hood into the
+undisturbed material. To avoid this difficulty, the sliding hoods were
+tried as an experiment.
+
+In using the sliding hood, which will be described in detail in Mr.
+Japp's paper, the segments commencing at the top were forced forward by
+the screw rod, one at a time, as far as possible into the undisturbed
+material. Just enough material was then removed from underneath and in
+front of the section to free it, and it was again forced forward. These
+operations were repeated until the section had been extended far enough
+for a shove. As soon as two or three sections had been pushed forward in
+this way, the face near the advance end of the sliding hood was
+protected by a breast board set on edge and braced from the face.
+Gradually, all the segments were worked forward, and, at the same time,
+the whole soft ground face was sheeted with timber. At times polings
+were placed over the extended segments in order to make room for a
+second shove, as shown on Plate LXVIII. When the shield was advanced the
+nuts on the screw rods were loosened and the sections of the hoods were
+telescoped on to the shield. The idea was ingenious, but proved
+impracticable, because of the unequal relative movements of the top and
+bottom of the shield in shoving, bringing transverse strains on the hood
+sections.
+
+[Illustration: PLATE LXIX]
+
+With the fixed hood, poling boards were used to support the roof and
+sides, and the face was supported in the manner described for the
+sliding hoods. The polings were usually maple or oak planks, 2 in.
+thick, about 8 in. wide, and 6-1/2 ft. long. In advancing the face, the
+top board of the old breast was first removed, then the material was
+carefully worked out for the length of the poling. The latter was then
+placed, with the rear end resting over the hood and the forward end
+forced as far as possible into the undisturbed material. When two or
+three polings had been placed, a breast board was set. After several
+polings were in position, their forward ends were supported by some form
+a cantilever attached to the hood. Plate LXIX shows one kind of
+supports. In this way all the soft material was excavated down to the
+rock surface, and the roof, sides, and face were sheeted with timber. In
+shoving, the polings in the roof and sides were lost. It was found that
+the breast could usually be advanced 5 ft. with safety. The fixed hood
+made it possible to set the face about 7 or 8 ft. in front of the
+cutting edge without increasing the length of the polings. This distance
+was ample for two shoves, and was generally adopted, although a great
+many faces were set for one shove only.
+
+Fixed hoods were substituted for those of the sliding type, originally
+placed on Shields _B_ and _D_ at Manhattan, at about the time the latter
+encountered the rock at the reef.
+
+In placing the polings and breasting, all voids behind them were filled
+as far as possible with marsh hay or bags of sawdust or clay. To prevent
+loss of air in open material, the joints between the boards were
+plastered with clay especially prepared for the purpose in a pug mill.
+The sliding extensions to the floors of the working compartments were
+often used, in the early part of the work, to support the timber face or
+loose rock, as shown in Fig. 1, Plate LXVIII. At such times the front of
+the extensions was held tightly against the planking by the pressure of
+the floor jacks. While shoving, the pressure on the floor jacks was
+gradually released, allowing the floors to slide back into the shield
+and still afford support to the face. The extensions also afforded
+convenient working platforms. They were subject to severe bending
+strains while the shield was being shoved, however, and the cast-iron
+rams were frequently broken or jammed. The extensions did not last
+beyond the edge of the ledge at Manhattan, nor more than about half
+through the rock work at Long Island City. The fixed extensions
+originally placed on Shields _A_ and _C_ at Manhattan were not
+substantial enough, and lasted only a few days.
+
+Wherever the rock face was sufficiently sound and high, a bottom heading
+was driven some 20 or 30 ft. in advance of the shield. The heading was
+driven and the cradle placed independently of the face of the soft
+ground above, and in the manner described for all-rock sections. The
+remainder of the rock face was removed by firing top and side rounds
+into the bottom heading after the soft ground had been excavated. Great
+care had to be taken in firing in order not to disturb the timber work
+or break the rock away from under the breast boards. If either occurred,
+a serious run was likely to follow. The bottom-heading method is shown
+by Figs. 1, 2, and 3, Plate LXVIII, and the breasting and poling by Fig.
+2, Plate LXX.
+
+In the early part of the work, where a bottom heading was impracticable,
+the soft ground was first excavated as described above, and the rock was
+drilled by machines mounted on tripods, and fired as a bench. By this
+plan no drilling could be done until the soft ground was removed. This
+is called the rock-bench method.
+
+Later the rock-cut method was devised. Drills were set up on columns in
+the bottom compartments of the shield, and the face was drilled while
+work was in progress on the soft ground above. The drilling was done
+either for a horizontal or vertical cut and side and top rounds. The
+drillers were protected while at work by platforms of timber built out
+from the floors of the compartments above. This plan, while probably not
+quite as economical of explosives, saved nearly all the delay due to
+drilling the bench.
+
+[Illustration: PLATE LXX, FIG. 1.--SMALL SHAFT SUNK TO ROCK.]
+
+[Illustration: PLATE LXX, FIG. 2.--BREASTING AND POLING IN FRONT OF
+SHIELD.]
+
+[Illustration: PLATE LXX, FIG. 3.--SHUTTERS ON FRONT OF SHIELD.]
+
+[Illustration: PLATE LXX, FIG. 4.--HYDRAULIC ERECTOR PLACING SEGMENT.]
+
+_All-Earth Section._--As described by Messrs. Hay and Fitzmaurice, in a
+paper on the Blackwall Tunnel,[C] the contractor had used, with marked
+success, shutters in the face of the shield for excavating in loose open
+material. He naturally adopted the method for the East River work. When
+the shields in Tunnels _B_ and _D_, at Manhattan, the first to be driven
+through soft ground, reached a point under the actual bulkhead line,
+work was partly suspended and shutters were put in place in the face of
+the top and center compartments. The shutters in the center compartments
+in Shield _D_ are shown in Fig. 3, Plate LXX, while the method of work
+with the shutters is shown by Figs. 4, 5, 6, and 7, Plate LXVIII. Fig. 4
+on that plate shows the shield ready for a shove. As the pressure was
+applied to the shield jacks, men loosened the nuts on the screws holding
+the ends of the shutters, and allowed the latter to slide back into the
+working compartments. At the end of the shove, the shutters were in the
+position shown in Fig. 5, Plate LXVIII. In preparing for a new shove,
+the slides in the shutters were opened, and the material in front was
+raked into the shield. At the same time, the shutters were gradually
+worked forward. The two upper shutters in a compartment were generally
+advanced from 12 to 15 in., after which the muck could be shoveled out
+over the bottom shutters, as shown on Fig. 6, Plate LXVIII, and Fig. 3,
+Plate LXX. No shutters were placed in the bottom compartments, and as
+the air pressure was not generally high enough to keep the face dry at
+the bottom, these compartments were pretty well filled with the soft,
+wet quicksand. Just before shoving, this material was excavated to a
+point where it ran in faster than it could be taken out. Much of the
+excavation in the bottom compartment was done by the blow-pipe. During
+the shove the material from the bottom compartment often ran back
+through the open door in the transverse bulkhead, as shown by Fig. 5,
+Plate LXVIII.
+
+In the Blackwall Tunnel the material was reported to have been loose
+enough to keep in close contact with the shutters at all times. In the
+East River Tunnels this was not the case. The sand at the top was dry
+and would often stand with a vertical face for some hours. In advancing
+the shutters, it was difficult to bring them into close contact with the
+face at the end of the operation. The soft material at the bottom was
+constantly running into the lower compartment and undermining the stiff
+dry material at the top. The latter gradually broke away, and, at times,
+the actual face was some feet in advance of the shutters. Under those
+circumstances, the air escaped freely through the unprotected sand face.
+The joints of the shutters were plastered with clay, but this did not
+keep the air from passing out through the lower compartments. This
+condition facilitated the formation of blows, which were of constant
+occurrence where shutters were used in the sand. In Tunnels _B_ and _D_,
+at Manhattan, the shutters were used in the above manner clear across to
+the reef. In Tunnel _C_, which was considerably behind Tunnels _B_ and
+_D_, the shutters, although placed, were never used against the face,
+and the excavation was carried on by poling the top and breasting the
+face. The change resulted in much better progress and fewer blows. The
+excavation through the soft material in Tunnel _C_ had just been
+completed when Tunnel _A_ was started, and the gangs of workmen were
+exchanged.
+
+The work in soft ground in Tunnel _A_ thus gained the benefit of the
+experience in Tunnel _C_. Shutters were placed only in the top
+compartments in this tunnel, and, as in Tunnel _C_, were never used in
+contact with the face. The method of work is shown by Figs. 1, 2, and 3,
+Plate LXXI. The result was still more rapid progress in Tunnel _A_, and
+although the loss of air was fully as great in this tunnel as in the
+other three, there was only one blow which caused any considerable loss
+of pressure. In Tunnels _A_ and _C_ the diaphragms in the rear of the
+center compartments of the lower tiers of working chambers were removed
+before the shields entered the soft ground. The change was not of as
+much advantage in soft ground as in rock, but it facilitated the removal
+of the soft wet sand in the bottom. In Tunnel _A_, after encountering
+gravel, a belt conveyor was suspended from the traveling stage with one
+end projecting through the opening into the working compartment. The use
+of the conveyor made it possible to continue mucking at the face while
+the bottom plates of the iron lining were being put in place, and
+resulted in a material increase in the rate of progress.
+
+[Illustration: PLATE LXXI]
+
+The shutters were not placed on the Long Island shields at all. Just
+before the shields passed into all soft ground, a fixed hood was
+attached to each.
+
+The method of working in soft ground from Long Island City is
+illustrated by Plate LXXII. The full lines at the face of the shield
+show the position of the earth before a shove of the shield, and the
+dotted lines show the same after the shove. The face was mined out to
+the front of the hood and breasted down to a little below the floor of
+the top pockets of the shield. In the middle pocket the earth was
+allowed to take its natural slope back on the floor. Toward the rear of
+the bottom pockets it was held by stop-planks. The air pressure was
+always about equal to the hydrostatic head at the middle of the shield,
+so that the face in the upper and middle pockets was dry. In the lower
+pockets it was wet, and flowed under the pressure of shoving the shield.
+By this method 4,195 lin. ft. of tunnel was excavated by the four Long
+Island shields in 120 days, from November 1st, 1907, to March 1st, 1908.
+This was an average of 8.74 ft. per day per shield.
+
+The rate of progress, the nature of the materials, and the methods
+adopted are shown in Table 2.
+
+_Preparations for Junction of Shields._--As previously mentioned, the
+Manhattan shields were stopped at the edge of the reef. Before making
+the final shove of those shields, special polings were placed with
+unusual care. The excavation was bell-shaped to receive the Long Island
+shields. The arrangement of the polings is shown by Figs. 4 and 5, Plate
+LXXI. After the shields were shoved into final position, as shown at the
+right in Fig. 5, the rear end of the polings rested over the cutting
+edge and allowed room for the removal of the hood. After the latter had
+been accomplished, the temporary bulkheads of concrete and clay bags
+were built as a precaution against blows when the shields were close
+together. An 8-in. pipe was then driven forward through the bulkhead for
+distances varying from 30 to 100 ft., in order to check the alignment
+and grade between the two workings before the shields were actually
+shoved together. The errors in the surveys were negligible, but here, as
+elsewhere, the shields were not exactly in the desired position, and it
+took careful handling to bring the cutting edges together. The Long
+Island shields were driven to meet those from Manhattan.
+
+TABLE 2.--RATE OF PROGRESS, NATURE OF MATERIALS, AND METHODS ADOPTED IN
+CONSTRUCTION OF EAST RIVER TUNNELS.
+
+LINE A, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+All rock |Bottom heading | 69+39.9 | 69+79 |Aug. 2, '06|Sept 25, '06|
+ | | | | | |
+All rock |Center heading | 69+79 | 70+64 |Sept 25, '06|Nov. 21, '06|
+ | | | | | |
+Earth and rock|Center heading | 70+64 | 71+34 |Nov. 21, '06|Dec. 30, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 71+34 | 71+89 |Dec. 30, '06|Feb. 13, '07|
+ | | | | | |
+All rock |Bottom heading | 71+89 | 72+11 |Feb. 13, '07|Feb. 21, '07|
+ | | | | | |
+Earth and rock|Center heading | 72+11 | 72+67 |Feb. 21, '07|Mar. 19, '07|
+ | | | | | |
+All rock |Center heading | 72+67 | 76+54 |Mar. 19, '07|Sept 6, '07|
+ | | | | | |
+Earth and rock|Going out of rock| 76+54 | 77+24 |Sept 6, '07|Oct. 4, '07|
+ | | | | | |
+All earth |Soft ground | 77+24 | 90+57.3 |Oct. 4, '07|Mar. 26, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+All rock | 54 | 39.1 | 0.724 | |
+ | | | | |
+All rock | 57 | 85 | 1.49 | |
+ | | | | |
+Earth and rock| 39 | 70 | 1.79 | |
+ | | | | |
+Earth and rock| 45 | 55 | 1.22 | |
+ | | | | |
+All rock | 8 | 22 | 2.75 | |
+ | | | | |
+Earth and rock| 26 | 56 | 2.15 | |
+ | | | | |
+All rock | 171 | 387 | 2.26 | |
+ | | | | |
+Earth and rock| 28 | 70 | 2.50 | |
+ | | | | |
+All earth | 174 |1,333.3 | 7.66 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE B, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+All rock |Bottom heading | 69+29.6 | 70+46 |Oct. 16, '06|Nov. 20, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 70+46 | 71+95 |Nov. 20, '06|Feb. 23, '07|
+ | | | | | |
+All rock |Bottom heading | 71+95 | 72+25 |Feb. 23, '07|Mar. 6, '07|
+ | | | | | |
+Earth and rock|Center heading | 72+25 | 72+60 |Mar. 6, '07|Mar. 24, '07|
+ | | | | | |
+All rock |Going out of rock| 72+60 | 76+57 |Mar. 24, '07|Aug. 7, '07|
+ | | | | | |
+Earth and rock|Soft ground | 76+57 | 77+30 |Aug. 7, '07|Sept 5, '07|
+ | | | | | |
+All earth |Soft ground | 77+30 | 90+49.6 |Sept 5, '07|Mar. 19, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+All rock | 35 | 116.4 | 3.33 | |
+ | | | | |
+Earth and rock| 95 | 149 | 1.57 | |
+ | | | | |
+All rock | 11 | 30 | 2.73 | |
+ | | | | |
+Earth and rock| 18 | 35 | 1.94 | |
+ | | | | |
+All rock | 136 | 397 | 2.92 | |
+ | | | | |
+Earth and rock| 29 | 73 | 2.52 | |
+ | | | | |
+All earth | 196 |1,319.6 | 6.73 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE C, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+All rock |Bottom heading | 68+61.9 | 69+93 |June 11, '06|Oct. 16, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 69+93 | 71+65 |Oct. 16, '06|Feb. 7, '07|
+ | | | | | |
+All rock |Bottom heading | 71+65 | 71+91 |Feb. 7, '07|Feb. 13, '07|
+ | | | | | |
+All rock |Center heading | 71+91 | 75+81 |Feb. 13, '07|July 20, '07|
+ | | | | | |
+Earth and rock|Going out of rock| 75+81 | 76+56 |July 20, '07|Aug. 25, '07|
+ | | | | | |
+All earth |Soft ground | 76+56 | 90+44.4 |Aug. 25, '07|Mar. 17, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+All rock | 127 | 131.1 | 1.03 | |
+ | | | | |
+Earth and rock| 114 | 172 | 1.51 | |
+ | | | | |
+All rock | 6 | 26 | 4.33 | |
+ | | | | |
+All rock | 157 | 390 | 2.48 | |
+ | | | | |
+Earth and rock| 36 | 75 | 2.08 | |
+ | | | | |
+All earth | 205 |1,388.4 | 6.77 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE D, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+Rock |Bottom heading | 68+50.6 | 69+77 |June 2, '06|Oct. 24, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 69+77 | 71+22 |Oct. 24, '06|Jan. 13, '06|
+ | | | | | |
+All rock |Bottom heading | 71+23 | 72+00 |Jan. 13, '07|Mar. 3, '07|
+ | | | | | |
+All rock |Center heading | 72+00 | 75+73 |Mar. 3, '07|July 10, '07|
+ | | | | | |
+Earth and rock|Going out of rock| 75+73 | 77+63 |July 10, '07|Sept 25, '07|
+ | | | | | |
+All earth |Soft ground | 77+63 | 90+38.6 |Sept 25, '07|Mar. 7. '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+Rock |144 | 126.4 | 0.87 | |
+ | | | | |
+Earth and rock| 81 | 145 | 1.79 | |
+ | | | | |
+All rock | 49 | 78 | 1.59 | |
+ | | | | |
+All rock |129 | 373 | 2.89 | |
+ | | | | |
+Earth and rock| 77 | 190 | 2.47 | |
+ | | | | |
+All earth |164 |1,275.6 | 7.78 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE A, MANHATTAN.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |108+43 |107+74 |July 20, '05|Aug. 3, '05|
+Rock {|Top lift of bench|108+43 |107+74 |Aug. 8, '05|Aug. 23, '05|
+ {|Bottom lift of |108+43 |107+74 |Aug. 30, '05|Sept 27, '05|
+ {| bench | | | | |
+ | | | | | |
+Rock {|Bottom heading |107+74 |107+21 |Sept 27, '05|Oct. 23, '05|
+ {|Bottom heading |107+74 |107+21 |Nov. 30, '05|Dec. 29, '05|
+ | | | | | |
+Mixed |Bottom heading |107+21 |106+99 |Oct. 26, '06|Nov. 20, '06|
+ | | | | | |
+Mixed |Rock bench |106+99 |106+34 |Nov. 20, '06|Jan. 13, '07|
+ | | | | | |
+Earth |Poling and |106+34 | 99+11 |Jan. 13, '07|Apr. 17, '07|
+ | breasting | | | | |
+ | | | | | |
+Mixed |Rock cut | 99+11 | 93+96 |Apr. 17, '07|Oct. 24, '07|
+ | | | | | |
+Rock |Bottom heading | 93+96 | 93+58 |Oct. 24, '07|Nov. 14, '07|
+ | | | | | |
+Rock |Center heading | 93+58 | 92+42 |Nov. 14, '07|Dec. 27, '07|
+ | | | | | |
+Rock |Bottom heading | 92+42 | 91+05 |Dec. 27, '07|Feb. 24, '08|
+ | | | | | |
+Mixed |Rock cut | 91+05 | 90+57 |Feb. 24, '08|Mar. 20, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| 14} | | {|Excavation in normal air, and before |
+Rock {| 15}57| 69 | 1.21 {|advance of shield. |
+ {| 28} | | {| |
+ {| | | {| |
+ | | | | |
+Rock {| 26}55| 53 | 0.96 {|Bottom heading timbered to avoid the |
+ {| 29} | | {|possibility of a break. |
+ | | | | |
+Mixed | 25 | 22 | 0.88 |Bottom heading timbered. |
+ | | | | |
+Mixed | 54 | 65 | 1.20 | |
+ | | | | |
+Earth | 94 | 723 | 7.69 | |
+ | | | | |
+ | | | | |
+Mixed |190 | 515 | 2.71 | |
+ | | | | |
+Rock | 21 | 38 | 1.81 | |
+ | | | | |
+Rock | 46 | 116 | 2.52 | |
+ | | | | |
+Rock | 59 | 137 | 2.32 | |
+ | | | | |
+Mixed | 25 | 48 | 1.92 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE B, MANHATTAN.
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |108+35 |107+87 |July 6, '05|July 27, '05|
+ {|Top lift of bench|108+35 |107+87 |Aug. 3, '05|Aug. 14, '05|
+Rock {|Bottom lift of | | | | |
+ {| bench |108+35 |108+15 |Aug. 26, '05|Aug. 30, '05|
+ {|Bottom lift of | | | | |
+ {| bench |108+15 |107+87 |Sept 11, '05|Sept 26, '05|
+ | | | | | |
+Rock |Bottom heading |107+87 |107+00 |Oct. 23, '05|Jan. 17, '06|
+ | | | | | |
+Mixed |Bottom heading |107+00 |106+64 |Jan. 17, '06|Feb. 12, '06|
+ | | | | | |
+Mixed |Rock bench |106+64 |106+31 |Feb. 12, '06|Mar. 1, '06|
+ | | | | | |
+Earth |Poling and |106+31 |105+58 |Mar. 1, '06|Apr. 3, '06|
+ | breasting | | | | |
+ | | | | | |
+ |Shutters in | | | | |
+Earth | contact with |105+58 | 99+19 |Apr. 9, '06|Nov. 1, '06|
+ | face | | | | |
+ | | | | | |
+Mixed |Rock bench | 99+19 | 98+44 |Nov. 1. '06|Dec. 29, '06|
+ | | | | | |
+Mixed |Bottom heading | 98+44 | 97+76 |Dec, 29, '06|Feb. 12, '07|
+ | | | | | |
+Mixed |Rock cut | 97+66 | 93+84 |Feb. 12, '07|Aug. 6, '07|
+ | | | | | |
+Rock |Full face | 93+84 | 93+21 |Aug. 6, '07|Sept 2, '07|
+ | | | | | |
+Rock |Center Heading | 93+21 | 92+30 |Sept 2, '07|Oct. 12, '07|
+ | | | | | |
+Rock |Bottom heading | 92+30 | 90+99 |Oct. 12, '07|Dec. 6, '07|
+ | | | | | |
+Mixed |Rock cut | 90+99 | 90+49.6 |Dec. 6, '07|Jan. 3, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| 21} | | {| |
+ {| 11} | | {| |
+Rock {| }51| 48 | 0.94 {|Excavation done in normal air and |
+ {| 4} | | {|before advance of shield. |
+ {| } | | {| |
+ {| 15} | | {| |
+ | | | | |
+Rock | 86 | 87 | 1.01 | |
+ | | | | |
+Mixed | 26 | 36 | 1.38 | |
+ | | | | |
+Mixed | 17 | 33 | 1.94 | |
+ | | | | |
+Earth | | | | |
+ | 33 | 73 | 2.21 | |
+ | | | | |
+ | | | | |
+Earth |206 | 639 | 3.10 | |
+ | | | | |
+ | | | | |
+Mixed | 58 | 75 | 1.30 | |
+ | | | | |
+Mixed | 45 | 68 | 1.51 | |
+ | | | | |
+Mixed |175 | 392 | 2.24 | |
+ | | | | |
+Rock | 27 | 63 | 2.33 | |
+ | | | | |
+Rock | 40 | 91 | 2.28 | |
+ | | | | |
+Rock | 55 | 131 | 2.38 | |
+ | | | | |
+Mixed | 28 | 49.4 | 1.76 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE C, MANHATTAN.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |107+79.03|107+69 |Dec. 20, '04|Dec. 27, '04|
+ {|Top heading |107+69 |107+23 |Jan. 1, '05|Jan. 15, '05|
+Rock {|Excavating bench |107+79 |107+23 |Jan. 21, '05|Feb. 28, '05|
+ {|Bottom heading |107+23 |106+72 |Mar. 1, '05|Mar. 11, '05|
+ {|Bottom heading |107+23 |107+15 |Oct. 12, '05|Oct. 27, '05|
+ {| | | | | |
+ | | | | | |
+Rock |Bottom heading |107+15 |106+62 |Nov. 6, '05|Dec. 2, '05|
+ | | | | | |
+ | | | | | |
+Mixed |Bottom heading |106+62 |106+55 |Dec. 2, '05|Dec. 23, '05|
+ | | | | | |
+ | | | | | |
+Mixed |Bottom heading |106+55 |106+17 |Feb. 12, '06|Mar. 22, '06|
+ | | | | | |
+Mixed |Rock cut |106+17 |105+85 |Apr. 2, '06|Apr. 20, '06|
+ | | | | | |
+Mixed |Rock cut |105+85 |105+55 |July 27, '06|Aug. 26, '06|
+ | | | | | |
+ | | | | | |
+Earth |Breasting and |105+55 | 99+40 |Aug. 26, '06|Jan. 2, '07|
+ | poling | | | | |
+ | | | | | |
+Mixed |Rock cut | 99+40 | 98+70 |Jan. 2, '07|Feb. 6, '07|
+ | | | | | |
+Rock |Full face | 98+70 | 98+60 |Feb. 6, '07|Feb. 12, '07|
+ | | | | | |
+Mixed |Bottom heading | 98+60 | 98+39 |Feb. 12, '07|Mar. 6, '07|
+ | | | | | |
+Rock |Bottom heading | 98+39 | 98+17 |Mar. 6, '07|Mar. 15, '07|
+ | | | | | |
+Mixed |Rock cut | 98+17 | 95+68 |Mar. 15, '07|July 30, '07|
+ | | | | | |
+Rock |Middle heading | 95+68 | 94+61 |July 30, '07|Aug. 21, '07|
+ | | | | | |
+Mixed |Rock cut | 94+61 | 93+56 |Aug. 21, '07|Oct. 3, '07|
+ | | | | | |
+Rock |Middle heading | 93+56 | 92+73 |Oct. 3, '07|Nov. 11, '07|
+ | | | | | |
+Mixed |Rock cut | 92+73 | 90+55 |Nov. 11, '07|Feb. 13, '08|
+ | | | | | |
+Mixed |Rock cut | 90+55 | 90+44.4 |Feb. 25, '08|Mar. 3, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| 7} | | {|Stopped to brace portal. No work done |
+ {| 14} | | {|from March 12th to October 11th, 1905,|
+Rock {| 38} | 54 | 0.77 {|except a little trimming in September.|
+ {| 10} | | {|All work up to this date done in |
+ {| 15} | | {|normal air. Heading advanced to 106+70|
+ {| } | | {|and bulkheaded. |
+ | | | | |
+Rock | 26 | 53 | 2.04 | |
+ | | | | |
+ | | | {|Heading advanced to 106 + 40. Shut |
+Mixed | 21 | 7 | 0.33 {|down in order that Line D might have a|
+ | | | {|lead. |
+ | | | | |
+Mixed | 38 | 38 | 1.00 {|Shut down on account of air shortage. |
+ | | | | |
+Mixed | 18 | 32 | 1.78 |Shut down on account of air shortage. |
+ | | | | |
+Mixed | 30 | 30 | 1.00 |Shut down April 20th to July 27th, |
+ | | | |1906. |
+ | | | | |
+Earth |127 | 615 | 4.84 | |
+ | | | | |
+ | | | | |
+Mixed | 35 | 70 | 2.00 | |
+ | | | | |
+Rock | 6 | 10 | 1.66 | |
+ | | | | |
+Mixed | 22 | 21 | 0.95 | |
+ | | | | |
+Rock | 9 | 22 | 2.44 | |
+ | | | | |
+Mixed |110 | 249 | 2.26 |Heading advanced to 97+82. |
+ | | | | |
+Rock | 49 | 107 | 2.18 | " " " 94+35. |
+ | | | | |
+Mixed | 43 | 106 | 2.46 | |
+ | | | | |
+Rock | 39 | 83 | 2.13 | |
+ | | | | |
+Mixed | 94 | 218 | 2.32 |Shut down until Line D shields met. |
+ | | | | |
+Mixed | 6 | 11 | 1.83 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE D, MANHATTAN.
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |107+70.49|107+16 |Dec. 9, '04|Jan. 31, '05|}
+ {|Removing bench |107+70.49|107+35 |Jan. 1, '05|Jan. 27, '05|}
+Rock {|Bottom heading |107+35 |106+80 |Jan. 30, '05|Feb. 10, '05|}
+ {|Trimming |107+70 |106+80 |Mar. 29, '05|Apr. 12, '05|}
+ {|Trimming |107+70 |106+80 |Aug. 31, '05|Sept 19, '05|}
+ | | | | | |
+Rock |Bottom heading |106+80 |106+67 |Oct. 5, '05|Nov. 8, '05|
+ | | | | | |
+Mixed |Bottom heading |106+67 |106+39 |Nov. 8, '05|Dec. 23, '05|
+ | | | | | |
+ |Sliding hood and | | | | |
+Mixed |breasting. Rock |106+29 |105+70 |Dec. 23, '05|Jan. 24, '06|
+ |bench | | | | |
+ | | | | | |
+Earth |Poling and |105+70 |104+61 |Jan. 24, '06|Feb. 27, '06|
+ |breasting | | | | |
+ | | | | | |
+ | | | | | |
+Earth |Poling, breasting|104+61 |103+90 |Mar. 2, '06|Mar. 31, '06|
+ | and shutters | | | | |
+ | | | | | |
+ | | | | | |
+Earth |Shutters |103+90 | 99+41 |Apr. 20, '06|Sept 3, '06|
+ | | | | | |
+ | | | | | |
+Mixed |Bottom bench | 99+41 | 99+17 |Sept 3, '06|Sept 23, '06|
+ | | | | | |
+Mixed |Bottom heading | 99+17 | 98+50 |Oct. 2, '06|Nov. 24, '06|
+ | | | | | |
+ | | | | | |
+Rock |Bottom heading | 98+50 | 97+72 |Nov. 24, '06|Jan. 16, '07|
+ | | | | | |
+Mixed |Bottom heading | 97+72 | 97+27 |Jan. 16, '07|Feb. 10, '07|
+ | | | | | |
+Mixed |Rock cut | 97+27 | 95+72 |Feb. 10, '07|Apr. 23, '07|
+ | | | | | |
+Rock |Middle heading | 95+72 | 95+57 |Apr. 23, '07|May 11, '07|
+ | | | | | |
+Rock |Middle heading | 95+57 | 94+65 |May 23, '07|June 17, '07|
+ | | | | | |
+ | | | | | |
+Mixed |Middle heading | 94+65 | 94+41 |June 17, '07|June 25, '07|
+ | | | | | |
+Mixed |Rock cut | 94+41 | 94+03 |June 25, '07|July 13, '07|
+ | | | | | |
+Rock |Middle heading | 94+03 | 92+64 |July 13, '07|Sept 12, '07|
+ | | | | | |
+Mixed |Middle heading | 92+64 | 92+54 |Sept 12, '07|Sept 20, '07|
+ | | | | | |
+Rock |Middle heading | 92+54 | 92+50 |Sept 20, '07|Sept 21, '07|
+ | | | | | |
+Mixed |Rock cut | 92+50 | 90+38.66|Sept 21, '07|Jan. 8, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| | | | |
+ {| | | | |
+Rock {|123 | 90 | 0.73 |In normal air. |
+ {| | | | |
+ {| | | | |
+ | | | | |
+Rock | 34 | 13 | 0.40 |Bottom heading timbered. |
+ | | | | |
+Mixed | 45 | 38 | 0.84 | |
+ | | | | |
+ | | | | |
+Mixed | 32 | 59 | 1.84 | |
+ | | | | |
+ | | | | |
+Earth | 31 | 109 | 3.41 | |
+ | | | | |
+ | | | | |
+ | | | |Three days' delay to set shutters in |
+Earth | 29 | 71 | 2.45 |top. Shut down 20 days to permit |
+ | | | |consolidation of the river bed and to |
+ | | | |repair broken plates. |
+ | | | | |
+Earth |136 | 449 | 3.40 |Four days of 136, delay account of |
+ | | | |flood. |
+ | | | | |
+Mixed | 20 | 24 | 1.20 | |
+ | | | | |
+Mixed | 53 | 67 | 1.27 |Thirteen days' shut-down to put on |
+ | | | |hood. |
+ | | | | |
+Rock | 53 | 78 | 1.47 | |
+ | | | | |
+Mixed | 25 | 45 | 1.40 | |
+ | | | | |
+Mixed | 72 | 155 | 2.15 | |
+ | | | | |
+Rock | 18 | 15 | 0.83 | |
+ | | | | |
+Rock | 25 | 92 | 3.68 |Twelve days' delay to repair cutting |
+ | | | |edge. |
+ | | | | |
+Mixed | 8 | 24 | 3.00 | |
+ | | | | |
+Mixed | 18 | 38 | 2.11 | |
+ | | | | |
+Rock | 61 | 139 | 2.28 | |
+ | | | | |
+Mixed | 8 | 10 | 1.25 | |
+ | | | | |
+Rock | 1 | 4 | 4.00 | |
+ | | | | |
+Mixed |109 | 211.34| 1.94 | |
+--------------+------+--------+--------+--------------------------------------+
+
+Openings were made between the headings as follows:
+
+Tunnel _D_, February 20th, 1908;
+Tunnel _B_, March 3d, 1908;
+Tunnel _C_, March 5th, 1908;
+Tunnel _A_, March 18th, 1908.
+
+It was necessary to cut away the projecting floors of the working
+compartments before the cutting edges could be shoved together.
+
+_Contractor's Organization._--Tunnel operations were carried on
+continuously for thirteen days out of fourteen, regular work being shut
+down for repairs on alternate Sundays. When the required pressure was
+more than 32 lb., four gangs of laborers were employed, each gang
+working two shifts of 3 hours each, with an intermission of 3 hours
+between the shifts. When the pressure was less than 32 lb., three gangs
+were employed, each gang covering 8 hours, but with an intermission of
+about 1/2 hour in low pressure for lunch.
+
+_Air Pressures Required._--During the greater portion of the work in
+soft ground, pressure was maintained which would about balance the
+hydrostatic head at the axis of the tunnel. This required a pressure
+varying from 30 to 34 lb. per sq. in. above that of the atmosphere. In
+Tunnels _B_ and _D_, at Manhattan, during the work in soft ground,
+pressures as high as 37 lb. were maintained for considerable periods of
+time; in the firm material near the reef 28 lb. was often sufficient.
+While removing the broken plates, the pressure was raised for a short
+time to 42 lb., and was maintained between 37-1/2 and 40 lb. for a
+little more than one month.
+
+_Air Supply._--For regular operation the contractor furnished four
+compressors on each side of the river, each having a rated capacity of
+5,000 cu. ft. of free air per minute delivered at 50 lb. above normal,
+when running at the rate of 100 rev. per min. An additional compressor
+of the same capacity was supplied on each side of the river, in
+compliance with the requirement for 25% excess capacity; the additional
+compressors had also high-pressure air cylinders which could be
+connected at will, and in which the pressure could be increased to 150
+lb., and the air used to supply rock drills, grouting machines, etc. The
+entire combination on each side of the river, therefore, was rated at
+25,000 cu. ft. of free air per minute, or a mean of 6,250 cu. ft. per
+heading. Its safe working capacity was not far from 20,000 cu. ft. per
+min.
+
+The shields broke through rock surface in Tunnels _B_, _C_, and _D_, at
+Manhattan, in November and December, 1905. The consumption of air in the
+four tunnels soon exceeded 15,000 cu. ft. for 24 hours, and in Tunnel
+_D_, on several occasions, it exceeded 7,000 cu. ft. for a like period.
+Blows had become frequent, and it was evident that the air plant was
+inadequate for driving four tunnels at once in the open material east of
+the Manhattan rock. Work in Tunnel _A_, therefore, was not resumed,
+after the suspension on December 29th, for about ten months, and Tunnel
+_C_ was also closed down for more than four months of the time between
+December, 1905, and July, 1906. During this period the capacity of the
+plant was increased from the rated 25,000 cu. ft. of free air per
+minute, to 35,000. In Tunnel _D_ the material had gradually become
+firmer, with more clay and less escape of air, as the Blackwell's Island
+Reef was approached, and, at the end of the period, the rock surface was
+within 3 ft. of the top of the shield; in Tunnel _B_, the rock of the
+reef was still a little below the shield, but the overlying material
+contained a large proportion of clay and held air very well. Tunnel _C_
+was still in open material, but, with two lines safe and with the
+increased air plant, it was deemed best to resume work in Tunnel _A_,
+which was done on October 23d, 1906. Thenceforward work was continuous
+in all headings until the meeting points with the Long Island shields
+were reached.
+
+This period, January to October, 1906, inclusive, was the most strenuous
+of the entire work, particularly the first six months. With one and, at
+times, two tunnels closed down, the consumption of air in the headings
+from Manhattan was an average of more than 20,000 cu. ft. per min. for
+periods of from 30 to 60 days; it was often more than 25,000 cu. ft. for
+24 hours, with a maximum of nearly 29,000 cu. ft., and doubtless this
+was exceeded considerably for shorter periods. On several occasions the
+quantity supplied to a single tunnel averaged more than 15,000 cu. ft.
+per min. for 24 hours. The greatest averages for 24 hours were obtained
+later in Tunnel _A_, after the resumption of work there, and exceeded
+19,000 cu. ft., but the conditions in the headings of the other lines
+were then so favorable that the work was carried on continuously in all.
+
+The deficiency in the original plant at Manhattan was so marked, and the
+need of driving all headings from Long Island simultaneously so clear,
+that it was decided to increase the rated capacity of the Long Island
+compressor plant to 45,400 cu. ft. of free air per minute, which was
+10,400 cu. ft. greater than the capacity of the Manhattan plant after
+the latter had been augmented.
+
+[Illustration: PLATE LXXII]
+
+The earth encountered on emerging from rock, when driving westward from
+Long Island, was far more compact and less permeable to air than on the
+Manhattan side, but for a distance of from 400 to 600 ft. immediately
+east of the reef, it was a clean open sand, and, while the shields were
+passing through this, the quantity of air supplied to the four headings
+seldom fell below 20,000 cu. ft. per min.; it was usually more than
+25,000 cu. ft., with a recorded maximum of 33,400 cu. ft. Although this
+was greater than ever used on the Manhattan side, it was more uniformly
+distributed among the several headings, and in none equalled the maximum
+observed on the Manhattan side, the largest having been 12,700 cu. ft.
+per min. for 24 hours; it must be remembered, however, that at one time
+only two tunnels were in progress in the bad material in the tunnels
+from Manhattan.
+
+From the foregoing experience, it would seem that the plant finally
+furnished at Long Island, having a rated capacity of 45,400 cu. ft. of
+free air per minute, would have been a reasonable compliance with the
+original actual needs on the Manhattan side and _vice versa_; the plant
+finally developed on the Manhattan side, having a rated capacity of
+35,000 cu. ft. of free air per minute, would have sufficed for the Long
+Island side.
+
+The total quantity of free air compressed for the supply of the working
+chambers of the tunnels and the Long Island caissons was 34,109,000,000
+cu. ft., and, in addition, 10,615,000,000 cu. ft. were compressed to
+between 80 and 125 lb. for power purposes, of which at least 80% was
+exhausted in the compressed-air working chambers. The total supply of
+free air to each heading while under pressure, therefore, averaged about
+3,550 cu. ft. per min.
+
+The quantity of air escaping during a sudden blow-out is apparently much
+smaller than might be supposed. Investigation of a number of cases,
+showing large pressure losses combined with a long stretch of tunnel
+supplying a relatively large reservoir of air, disclosed that a maximum
+loss of about 220,000 cu. ft. of free air occurred in 10 min. This
+averages only a little more than 19,000 cu. ft. per min., the maximum
+recorded supply to one tunnel for a period of 24 hours. Of this
+quantity, however, probably from 30 to 40% escaped in the first 45
+seconds, while the remainder was a more or less steady loss up to the
+time when the supply could be increased sufficiently to maintain the
+lowered pressure. Very few blows showed losses approaching this in
+quantity, but the inherent inaccuracy of the observations make the
+foregoing figures only roughly approximate.
+
+[Footnote C: _Minutes of Proceedings_, Inst. C. E., Vol. CXXX, p. 50.]
+
+
+SPECIAL DIFFICULTIES.
+
+The most serious difficulties of the work came near the start. In Tunnel
+_D_ blows and falls of sand from the face were frequent after soft
+ground was met in the top. About six weeks after entering the full sand
+face, and before the shutters had been installed, the shield showed a
+decided tendency to settle, carrying the tunnel lining down with it and
+resulting in a number of badly broken plates in the bottom of the rings.
+Notwithstanding the use of extremely high vertical leads,[D] the sand
+was so soft that the settlement of the shield continued for about
+fifteen rings, the maximum being nearly 9 in. below grade. The
+hydrostatic head at mid-height of the tunnel was 32-1/2 lb., and the
+raising of the air pressure to 37 lb., as was done at this time, was
+attended with grave danger of serious blows, on account of the recent
+disturbance of the natural cover by the pulling and re-driving of piles
+in the reconstruction of the Long Island ferry slips directly above. It
+dried the face materially, however, and the shield began to rise again,
+and had practically regained the grade when the anticipated blow-outs
+occurred, culminating with the entrance of rip-rap from the river bed
+into the shield and the flooding of the tunnel with 4 ft. of sand and
+water at the forward end. The escape of air was very great, and, as a
+pressure of more than 28 lb. could not be maintained, the face was
+bulkheaded and the tunnel was shut down for three weeks in order to
+permit the river bed to consolidate.
+
+This was the most serious difficulty encountered on any part of the
+work, and, coming at the very start, was exceedingly discouraging.
+During the shut-down the broken plates were reinforced temporarily with
+steel ribs and reinforced concrete (Fig. 1, Plate LXXIII) which, on
+completion of the work, were replaced by cast-steel segments, as
+described elsewhere. Practically, no further movement of iron took
+place, and the loss of grade caused by the settlement of the shield,
+which was by far the largest that ever occurred in this work, was not
+sufficient to require a change in the designed grade or alignment of the
+track. Work was resumed with the shutters in use at the face as an aid
+to excavation. The features of extreme seriousness did not recur, but
+for two months the escape of air continued to be extremely large, an
+average of 15,000 cu. ft. per min. being required on many days during
+this period.
+
+[Illustration: PLATE LXXIII, FIG. 1.--TEMPORARY REINFORCEMENT OF BROKEN
+PLATES AND REMOVAL OF A PLATE IN SECTIONS.]
+
+[Illustration: PLATE LXXIII, FIG. 2.--HEAVY CAST-STEEL PATCH ATTACHED TO
+BENT SEGMENT OF CUTTING EDGE.]
+
+[Illustration: PLATE LXXIII, FIG. 3.--INFLOW OF SOFT CLAY THROUGH
+SHIELD.]
+
+[Illustration: PLATE LXXIII, FIG. 4.--REINFORCEMENT OF BROKEN PLATE WITH
+LONG POLT AND TWISTED STEEL RODS.]
+
+In Tunnel _B_, after passing out from under the bulkhead line, in April,
+1906, the loss of air became very great, and blow-outs were of almost
+daily occurrence until the end of June. At the time of the blows the
+pressure in the tunnel would drop from 2 to 8 lb., and it generally took
+some hours to raise the pressure to what it was before the blow. During
+that time regular operations were interrupted. In the latter part of
+June a permit was obtained allowing the clay blanket to be increased in
+thickness up to a depth of water of 27 ft. at mean low tide. The
+additional blanket was deposited during the latter part of June and
+early in July, and almost entirely stopped the blows.
+
+By the end of the month the natural clay, previously described, formed
+the greater portion of the face, and, from that time forward, played an
+important part in reducing the quantity of air required. During April
+and the early part of May the work was under the ferry racks of the Long
+Island Railroad. The blanket had to be placed by dumping the clay from
+wheel-barrows through holes in the decking.
+
+In Tunnel _A_ a bottom heading had been driven 23 ft. in advance of the
+face at the time work was stopped at the end of 1905. During the ten
+months of inactivity the seams in the rock above opened. The rock
+surface was only from 2 to 4 ft. below the top of the cutting edge for a
+distance of about 60 ft. Over the rock there were large boulders
+embedded in sharp sand. It was an exceedingly difficult operation to
+remove the boulders and place the polings without starting a run. The
+open seams over the bottom heading also frequently caused trouble, as
+there were numerous slides of rock from the face which broke up the
+breasting and allowed the soft material from above to run into the
+shield. There were two runs of from 50 to 75 cu. yd. and many smaller
+ones.
+
+[Footnote D: The lead of the shield is the angular divergence of its
+axis from the axis of the tunnel and, in this tunnel, was measured as
+the offset in 23 ft. It was called + when the shield was pointed upward
+from grade, and - when pointed downward.]
+
+
+GUIDING THE SHIELDS.
+
+Little difficulty was experienced at any time in driving the shield
+close to the desired line, but it was much harder to keep it on grade.
+In rock section, where the cradle could be set far enough in advance to
+become hard before the shield was shoved over it, there was no trouble
+whatever. Where the cradle could be placed only a very short time before
+it had to take the weight of the shield, the case was quite different.
+The shield had a tendency to settle at the cutting edge, and when once
+pointed downward it was extremely difficult to change its direction. It
+was generally accomplished by embedding railroad rails or heavy oak
+plank in the cradle on solid foundation. This often had to be repeated
+several times before it was successful. In soft ground it was much
+easier to change the direction of the shield, but, owing to the varying
+nature of the material, it was sometimes impossible to determine in
+advance how the shield should be pointed. It was found by experience at
+Manhattan that the iron lining remained in the best position in relation
+to grade when the underside of the bottom of the shield at the rear end
+was driven on grade of the bottom of the iron, but if the rate of
+progress was slow, it was better to drive the shield a little higher.
+
+In the headings from Long Island, which, as a rule, were in soft ground,
+the cutting edges of the shields were kept from 4 to 8 in. higher, with
+respect to the grade line, than the rails. The shields would then
+usually move parallel to the grade line, though this was modified
+considerably by the way the mucking was done and by the stiffness of the
+ground at the bottom of the shield.
+
+On the average, the shields were shoved by from ten to twelve of the
+bottom jacks, with a pressure of about 4,000 lb. per sq. in. The jacks
+had 9-in. plungers, which made the average total force required to shove
+the shield 2,800,000 lb. In the soft ground, where shutters were used,
+all of the twenty-seven jacks were frequently used, and on several
+occasions the pressure exceeded 6,000 lb. per sq. in. With a unit
+pressure of 6,000 lb. per sq. in., the total pressure on the shield with
+all twenty-seven jacks in operation was 5,154 tons.
+
+
+INJURIES TO SHIELDS.
+
+There were only two instances of damage to the essential structural
+features of the shields. The most serious was in Tunnel _D_ where the
+cutting edge at the bottom of the shield was forced up a slightly
+sloping ledge of rock. A bow was formed in the steel casting which was
+markedly increased with the next few shoves. Work was suspended, and a
+heavy cast-steel patch, filling out the bow, was attached to the bent
+segments, as shown in Fig. 2, Plate LXXIII. No further trouble was
+experienced with the deformed portion. The other instance was in Tunnel
+_B_, from Long Island, where a somewhat similar but less serious
+accident occurred and was treated in a like manner.
+
+_Bulkheads._--At Manhattan, bulkheads had to be built near the shafts
+before the tunnels could be put under pressure. After 500 ft. of tunnel
+had been built on each line, the second bulkheads were constructed. The
+air pressure between the first and second bulkheads was then reduced to
+between 15 and 20 lb. When the shields had been advanced for 1,500 ft.,
+the third set of bulkheads was built. Nearly all the broken plates which
+were removed were located between the first and third bulkheads at
+Manhattan. Before undertaking this operation, the doors of the locks in
+the No. 3 bulkheads were reversed to take pressure from the west. By
+this means it was possible to carry on the work of dismantling the
+shields under comparatively low pressure simultaneously with the removal
+of the broken plates.
+
+At Long Island City the roofs of the caissons served the purpose of the
+No. 1 bulkheads. Two other sets of bulkheads were erected, the first
+about 500 ft. and the second about 1,500 ft. from the shafts.
+
+
+SETTLEMENT AT SURFACE OF GROUND.
+
+The driving of such portions of the river tunnels, with earth top, as
+were under the land section, caused a settlement at the surface varying
+usually from 3 to 6 in. The three-story brick building at No. 412 East
+34th Street required extensive repairs. This building stood over the
+section of part earth and part rock excavation where the tunnels broke
+out from the Manhattan ledge and where there were a number of runs of
+sand into the shield. In fact, the voids made by those runs eventually
+worked up to the surface and caused the pavement of the alley between
+the buildings to drop 4 or 5 ft. over a considerable area. The tunnels
+also passed directly under the ferry bridges and racks of the Long
+Island Railroad at East 34th Street. Tunnels _B_ and _D_ were constantly
+blowing at the time, and, where progress was slow, caused so much
+settlement that one of the racks had to be rebuilt. Tunnel _A_, on the
+other hand, where progress was rapid, caused practically no settlement
+in the racks.
+
+
+CLAY BLANKET.
+
+As previously mentioned, clay was dumped over the tunnels in varying
+depths at different times. A material was required which would pack
+into a compact mass and would not readily erode under the influence of
+the tidal currents of the river and the escape of the great volumes of
+air which often kept the water in the vicinity of the shields in violent
+motion. Suitable clay could not be found in the immediate vicinity of
+the work. Materials from Shooter's Island and from Haverstraw were tried
+for the purpose. The Government authorities did not approve of the
+former, and the greater portion of that used came from the latter point.
+Although a number of different permits governing the work were granted,
+there were three important ones. The first permit allowed a blanket
+which roughly followed the profile of the tunnels, with an average
+thickness of 10 ft. on the Manhattan side and somewhat less on the Long
+Island City side. The second general permit allowed the blanket to be
+built up to a plane 27 ft. below low water. This proved effective in
+checking the tendency to blow, but allowed considerable loss of air.
+Finally, dumping was allowed over limited and marked areas up to a plane
+of 20 ft. below low water. Wherever advantage was taken of this last
+authority, the excessive loss of air was almost entirely stopped. After
+all the shields had been well advanced out into the river, the blanket
+behind them was dredged up, and the clay used over again in advance of
+the shield.
+
+Soundings were taken daily over the shields, and, if marked erosion was
+found, clay was dumped into the hole. Whenever a serious blow occurred,
+a scowload of clay was dumped over it as soon as possible and without
+waiting to make soundings. For the latter purposes a considerable
+quantity of clay was placed in storage in the Pidgeon Street slip at
+Long Island City, and one or two bottom-dump scows were kept filled
+ready for emergencies. Mr. Robert Chalmers, who had charge of the
+soundings for the contractor, states that "the depressions in the
+blanket caused by erosion due to the escape of air were, as a rule,
+roughly circular in plan and of a curved section somewhat flat in the
+center." Satisfactory soundings were never obtained in the center of a
+violent blow, but the following instance illustrates in a measure what
+occurred. Over Tunnel _B_, at Station 102+80, there was normally 36 ft.
+of water, 7 ft. of clay blanket, and 20 ft. of natural cover. Air was
+escaping at the rate of about 10,000 cu. ft. per min., and small blows
+were occurring once or twice daily. On June 22d, soundings showed 54 ft.
+of water. A depth of 18 ft. of the river bottom had been eroded in about
+two days. On the next day there were taken out of the shield boulders
+which had almost certainly been deposited on the natural river bed. Clay
+from the blanket also came into the shields on a number of occasions
+during or after blows. The most notable occasion was in September, 1907,
+when the top of the shield in Tunnel _D_ was emerging from the east side
+of Blackwell's Island Reef. The sand in the top was very coarse and
+loose, and allowed the air to escape very freely. The fall of a piece of
+loose rock from under the breast precipitated a run of sand which was
+followed by clay from the blanket, which, in this locality, was largely
+the softer redredged material. Mucking out the shield was in progress
+when the soft clay started flowing again and forced its way back into
+the tunnel for a distance of 20 ft., as shown in Fig. 3, Plate LXXIII.
+Ten days of careful and arduous work were required to regain control of
+the face and complete the shove, on account of the heavy pressure of the
+plastic clay.
+
+The clay blanket was of the utmost importance to the work throughout,
+and it is difficult to see how the tunnels could have been driven
+through the soft material on the Manhattan side without it.
+
+The new material used in the blanket amounted to 283,412 cu. yd., of
+which 117,846 cu. yd. were removed from over the completed tunnels and
+redeposited in the blanket in advance of the shields. A total of 88,059
+cu. yd. of clay was dumped over blows. The total cost of placing and
+removing the blanket was $304,056.
+
+
+IRON LINING.
+
+The standard cast-iron tunnel lining was of the usual tube type, 23 ft.
+in outside diameter. The rings were 30 in. wide, and were composed of
+eleven segments and a key. The webs of the segments were 1-1/2 in. thick
+in the central portion, increasing to 2-3/8 in. at the roots of the
+flanges, which were 11 in. deep, 2-1/4 in. thick at the root, and 1-1/2
+in. at the edge, and were machined on all contact faces. Recesses were
+cast in the edge of the flanges, forming a groove, when the lining was
+in place, 1-1/2 in. deep and about 3/8 in. wide, to receive the
+caulking. The bolt holes were cored in the flanges, and the bosses
+facing the holes were not machined. The customary grout hole was tapped
+in the center of each plate for a standard 1-1/4-in. pipe. In this work,
+experience indicated that the standard pipe thread was too fine, and
+that the taper was objectionable. Each segment weighed, approximately,
+2,020 lb., and the key weighed 520 lb., the total weight being 9,102 lb.
+per lin. ft. of tunnel. Fig. 1 shows the details of the standard heavy
+lining.
+
+In addition to the standard cast-iron lining, cast-steel rings of the
+same dimensions were provided for use in a short stretch of the tunnel,
+when passing from a rock to a soft ground foundation, where it was
+anticipated that unequal settlement and consequent distortion and
+increase in stress might occur, but, aside from the small regular drop
+of the lining as it passed out of the tail of the shield, no such
+settlement was observed.
+
+Two classes of lighter iron, one with 1-in. web and 8-in. flanges and
+the other with 1-1/4-in. web and 9-in. flanges--the former weighing
+5,166 lb. per lin. ft. of tunnel and the latter, 6,776 lb.--were
+provided for use in the land sections between East Avenue and the Long
+Island City shafts. Two weights of extra heavy segments for use at the
+bottom of the rings were also furnished. The so-called _XX_ plates had
+webs and flanges 1/4 in. thicker than the standard segment and the _YY_
+plates were similarly 1/2 in. heavier. The conditions under which they
+were used will be referred to later. All the castings were of the same
+general type as shown by Fig. 1.
+
+Rings tapering 3/4 in. and 1-1/2 in. in width were used for changes in
+alignment and grade, the former being used approximately at every fourth
+ring on the 1° 30' curves. The 1-1/2-in. tapers were largely used for
+changes in grade where it was desired to free the iron from binding on
+the tail of the shield. Still wider tapers would have been advantageous
+for quick results in this respect.
+
+No lug was cast on the segments for attachment to the erector, but in
+its place the gadget shown on Fig. 4, Plate LXX, was inserted in one of
+the pairs of bolt holes near the center of the plate, and was held in
+position by the running nut at one end.
+
+In the beginning it was expected that the natural shape of the rings
+would not show more than 1 in. of shortening of the vertical diameter;
+this was slightly exceeded, however, the average distortion throughout
+the tunnels being 1-7/16 in. The erectors were attached to the shield
+and in such a position that they were in the plane of the center of the
+ring to be erected when the shove was made without lead and just far
+enough to permit placing the segments. If the shield were shoved too
+far, a rare occurrence, the erection was inconvenienced. In driving with
+high vertical leads, which occurred more frequently, the disadvantage
+of placing the erector on the shield was more apparent. Under such
+conditions the plane of the erector's motion was acutely inclined to the
+plane of the ring, and, after placing the lower portion of the ring, it
+was usually necessary to shove the shield a few inches farther in order
+to place the upper plates. The practical effect of this action is
+referred to later.
+
+[Illustration: FIG. 1.]
+
+At first the erection of the iron in the river tunnels interfered
+somewhat with the mucking operations, but the length of time required to
+complete the latter was ample for the completion of the former; and the
+starting of a shove was seldom postponed by reason of the non-completion
+of a ring. After the removal of the bottom of the diaphragms, permitting
+the muck cars to be run into the shield and beyond, the two operations
+were carried on simultaneously without serious interference. The
+installation of the belt conveyor for handling the soft ground spoil in
+Tunnel _A_ was of special benefit in this respect.
+
+Preparatory to the final bolt tightening of each ring as erected, a
+15-ton draw-jack, consisting of a small pulling-jack inserted in a light
+eye-bar chain, was placed on the horizontal diameter, and frequently the
+erectors were also used to boost the crown of the iron, the object being
+to erect the ring truly circular. Before shoving, a 1-1/4-in.
+turn-buckle was also placed on the horizontal diameter in order to
+prevent the spreading of the iron, previous to filling the void outside
+with grout. The approach of the supports for the upper floor of the
+trailing platform necessitated the removal of these turnbuckles from all
+but the three leading rings, but if the iron showed a tendency to
+continue distortion, they were re-inserted after the passage of the
+trailing platform and remained until the arch of the concrete lining was
+placed.
+
+The cost of handling and erecting the iron varied greatly at different
+times, averaging, for the river tunnels, $3.32 per ton for the directly
+chargeable labor of handling and erecting, to which must be added $7.54
+for "top charges." The cost of repairing broken plates is included in
+this figure.
+
+_Broken Plates._--During the construction of the river section of the
+tunnels, a number of segments were found to have been broken while
+shoving the shield. The breaks, which with few exceptions were confined
+to the three or four bottom plates, almost invariably occurred on the
+advanced face of the ring, and rarely extended beyond the bottom of the
+flange. A careful study of the breaks and of the shoving records
+disclosed several distinct types of fracture and three principal known
+causes of breakage by the shield.
+
+In the first case, the accidental intrusion of foreign material between
+the jack head and the iron caused the jack to take its bearings on the
+flange above its normal position opposite the web of the ring, and
+resulted usually in the breaking out of a piece of the flange or in
+several radiating cracks with or without a depression of the flange.
+These breaks were very characteristic, and the cause was readily
+recognizable, even though the intruding substance was not actually
+observed.
+
+In the second case, the working of a hard piece of metal, such as a
+small tool, into the annular space between the iron and the tail of the
+shield, where it was caught on the bead and dragged along as the shield
+advanced, was the known cause of a number of broken segments. Such
+breaks had no particular characteristic, but were usually close above
+the line of travel of the lost tool or metal. Their cause was determined
+by the finding of a heavy score on the underside of the segment or the
+discovery of the tool wedged in the tail of the shield or lying under
+the broken plate when it was removed. It is probable that a number of
+breaks ascribed to unknown causes should be placed in this class.
+
+The third cause includes the largest number of breaks, and, while
+difficult to define closely, is the most interesting. Broadly speaking,
+the breaks resulted from the movements of the shield in relation to the
+position of the tunnel lining. While shoving through soft ground, it was
+frequently difficult to apply sufficient power to the lower jacks to
+complete the full shove of 30 in. on the desired alignment. The shield,
+therefore, was driven upward at the beginning of the shove, and, as the
+sand packed in front of the shield and more power was required, it was
+furnished by applying the upper jacks. The top of the shield was slowly
+pushed over, and, at the close of the shove, the desired position had
+been obtained; but the shield had been given a rocking motion with a
+decided lifting of the tail toward the close of the shove. A similar
+lifting of the tail occurred when, with high vertical leads, the top of
+the shield was pushed over in order to place the upper plates of the
+ring. Again, when the shield was driven above grade and it was desired
+to descend, the passage of the shield over the summit produced a like
+effect. In all these movements, with the space between the tail of the
+shield and the iron packed tight with pugging, the upward thrust of the
+shield tended to flatten the iron in the bottom and occasional broken
+plates were the result. The free use of the taper rings, placed so as to
+relieve the binding of the lining on the tail of the shield, forces the
+tunnel to follow the variations in the grade of the shield, but reduces
+greatly the injuries to the rings from this action.
+
+In Tunnel _D_, where very high vertical leads were required through the
+soft sand, combined with a marked tendency of the shield to settle, the
+shield was badly cramped on the iron and dragged along it at the top.
+The bearing of the iron on its soft foundation tended to thrust up the
+bottom in this case also, as shown by the opening of the bottom
+cross-joints when the bolts were slackened to relieve the strain during
+a shove. The anticipated cracks in the crown plates, which have been
+more frequently observed in other tunnels, did not occur here, and were
+not found elsewhere except in one place in Tunnel _B_ where they were
+traced to a similar action of the shield. The cracks resulting from the
+movements of the shield, as briefly described above, in this third case
+were not confined to any particular type, but occurred more frequently
+at the extreme end of the circumferential flange than at any other
+point.
+
+The number of broken plates occurring in the river tunnels was 319, or
+0.42% of the total number erected. Of these, 52 were found and removed,
+either before or immediately after a shove, by far the greater number
+being broken in handling before or during erection. The remaining 267
+are considered below.
+
+_Repair of Broken Plates._--On the completion of a shove, the tail of
+the shield lacked about 5 in. of covering the full width of the last
+ring, and the removal of a plate broken during the shove, therefore,
+would have exposed the ground at the tail of the shield. With a firm
+material in the bottom, this introduced no particular difficulties, and,
+under such conditions, a broken plate was usually removed at once. In
+the sand, however, and especially on the Manhattan side where it was
+quick and flowing, the removal of a plate was attended with some danger,
+and such plates were usually left to be removed on the completion of the
+tunnel. Many of these had been reinforced by the use of _XX_, _YY_, and
+steel segments placed adjacent to the break in the following rings.
+
+After the meeting of the shields, the postponed replacement of the
+broken segments was taken up. The pressure was raised sufficiently to
+dry thoroughly the sand outside the segments, which were drilled and
+broken out usually in quarters as shown on Fig. 1, Plate LXXIII. A steel
+segment was then inserted in the ring and drawn into place by
+turnbuckles. The application of the draw-jack, with a pull of about 30
+tons to each end successively, brought the plate to a firm bearing on
+the radial joints at the ends.
+
+Where the broken plate was isolated and was reinforced by steel or extra
+heavy segments in the adjacent ring, the crack, if slight, was simply
+caulked to insure water-tightness. If, however, the crack was opened or
+extended to the web of the plate, the cross-flanges were tied together
+by a 1-1/2-in. by 7-ft. bolt, inserted through the bolt holes nearest
+the broken flange. The long bolt acted in the nature of a bow string,
+and was provided at its ends with two nuts set on opposite sides of the
+cross-joints to replace the standard bolts removed for its insertion.
+Fig. 4, Plate LXXIII shows one of these bolts in place. In addition, all
+broken plates remaining in the tunnel were reinforced with 1-in.
+twisted-steel rods in the concrete lining, also shown in Fig. 4, Plate
+LXXIII.
+
+_Special Construction at River Shield Junctions._--Dismantling the
+shields was started as soon as they came to rest in their final position
+with the cutting edges together. The plans contemplated their entire
+removal, with the exception of the cylindrical skins and cast-steel
+cutting edges. Inside the former the standard tunnel lining was erected
+to within 4 ft. of the heels of the cutting edges. Spanning the latter,
+and forming the continuous metal tunnel lining, the special construction
+shown by Fig. 2 was built. This consisted of a 1-1/4 in. rolled-steel
+ring, 7 ft. long, erected inside the cutting edges, with an annular
+clearance of 1 in., and two special cast-iron rings shaped to connect
+the rolled-steel ring with the normal lining. One flange of the special
+cast-iron rings was of the standard type, the other was returned 9 in.
+in the form of a ring, the inside diameter of which was the same as the
+outside diameter of the rolled-steel ring to which it was bolted.
+
+The space between the standard and special construction was of varying
+width at the various shields, and was filled with a closure ring cast to
+the lengths determined in the field. Fig. 2 shows the completed
+construction.
+
+Hook-bolts, screwed through threaded holes and buried in 1 to 1 Portland
+cement grout ejected through similar holes, reinforced the rolled-steel
+ring against external water pressure. In two of the tunnels the concrete
+lining was carried completely through the junction, and covered the
+whole construction, while in the remaining two tunnels it was omitted at
+the rolled-steel ring, leaving the latter exposed and set back about 3
+in. from the face of the concrete.
+
+[Illustration: FIG. 2.]
+
+
+GROUTING.
+
+Except as previously noted, the voids outside of the tunnel lining were
+filled with grout ejected through the grout holes in each segment. The
+possibility was always present that Portland cement, if used for grout
+in the shield-driven tunnels, would flow forward around the shield and
+set hard, "freezing" the shield to the rock or the iron lining, or at
+least forming excrescences upon it, which would render its control
+difficult. With this in mind, the contractors proposed to substitute an
+English Blue Lias lime as a grouting material. Grout of fresh English
+lime containing a moderate quantity of water set very rapidly in air to
+the consistency of chalk. Its hydraulic properties, however, were
+feeble, and in the presence of an excess of water it remained at the
+consistency of soft mud. It was not suitable, therefore, as a supporting
+material for the tunnel.
+
+An American lime, made in imitation of the Lias lime, but having greater
+hydraulic properties, was tried, but proved unsatisfactory. Two brands
+of natural cement were also tried and rejected, but a modified
+quick-setting natural cement, manufactured especially for this work, was
+eventually made satisfactory, and by far the largest part of the
+river-tunnel grouting was done with this material mixed 1 to 1 by
+volume. East of the Long Island shafts the work which was built without
+shields was grouted principally with Portland cement and sand mixed 1 to
+1 by volume.
+
+In the river tunnels large quantities of the English lime were used neat
+as grout over the top of the tunnel in attempts to stop losses of air
+through the soft ground. It was not of great efficiency, however, in
+this respect until the voids outside of the lining had been filled above
+the crown. Its properties of swelling and quick setting in the dry sand
+at that point then became of value. The use of dry lime in the face,
+where the escaping air would carry it into the voids of the sand and
+choke them, was much more promptly efficacious in checking the loss.
+
+With the exception of the English lime, all grout was mixed 1 to 1 with
+sand in a Cockburn continuous-stirring machine operated by a 3-cylinder
+air engine. The grout machine was placed on the lower floor of the
+trailing platform shown on Plate LXXII, while the materials were placed
+on the upper platform, and, together with the water, were fed into the
+machine through a hole in the upper floor. The sand was bagged in the
+yard, and the cars on which the materials were sent into the tunnels
+were lifted by an elevator to the level of the upper floor of the
+trailing platform before unloading.
+
+Great difficulty was experienced in preventing the waste of the fluid
+grout ahead of the shield and into the tail through the space between it
+and the iron lining. In a full soft ground section, the first condition
+did not usually arise. In the full-rock sections the most efficient
+method of checking the waste was found to be the construction of dams or
+bulkheads outside the lining between it and the rock surface. For this
+purpose, at intervals of about 30 ft., the leading ring and the upper
+half of the preceding one were disconnected and pulled forward
+sufficiently to give access to the exterior. A rough dam of rubble, or
+bags of mortar or clay, was then constructed outside the iron, and the
+rings were shoved back and connected up. In sections containing both
+rock and soft ground, grout dams were built at the cutting edge at
+intervals, and were carried up as high as circumstances permitted.
+
+The annular space at the tail of the shield was at all times supposed to
+be packed tight with clay and empty bags, but the pugging was difficult
+to maintain against the pressure of the grout. For a time, 1/2-in.
+segmental steel plates, slipped down between the jackets and the iron,
+were used to retain the pugging, but their displacement resulted in a
+number of broken flanges, and their use was abandoned. In their place,
+2-in. segmental plates attached to the jack heads were substituted with
+more satisfactory results. Notwithstanding these devices, the waste of
+grout at the tail was very great.
+
+The soft ground material on various portions of the work acted very
+differently. The clay and "bull's liver" did not cave in upon the iron
+lining for several hours after the shield had passed, sometimes not for
+a day or more, which permitted the space between it and the iron to be
+grouted. The fine gray or beach sand and the quicksand closed in almost
+at once. The quicksand has a tendency to fill in under the iron from the
+sides and in places to leave a cavity at about the horizontal diameter
+which was not filled from above, as the sand, being dried out by the
+air, stood up fairly well and did not cave against the iron, except
+where nearly horizontal at the top.
+
+The total quantity of grout used on the work was equivalent in set
+volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647
+bbl. were ejected through the iron lining, an average of 14.93 bbl. per
+lin. ft. The cost of grout ejected outside of the river tunnels was 93
+cents per bbl. for labor and $2.77 for "top charges." East of the Long
+Island shaft the corresponding costs were $0.68 and $1.63, the
+difference being partly due to the large percentages of work done in the
+normal air at the latter place.
+
+
+CAULKING AND LEAKAGE.
+
+Up to August, 1907, the joints between the segments of the cast-iron
+lining were caulked with iron filings and sal ammoniac, mixed in the
+proportion of 400 to 1 by weight. With the air pressure balancing the
+hydrostatic head near the tunnel axis, it was difficult to make the
+rust-joint caulking tight below the axis against the opposing water
+pressure; this form of caulking was also injured in many places by
+water dripping from service pipes attached to the tunnel lining. A few
+trials of lead wire caulked cold gave such satisfactory results that it
+was adopted as a substitute. Pneumatic hammers were used successfully on
+the lead caulking, but were only used to a small extent on the rust
+borings, which were mostly hand caulked. Immediately before placing the
+concrete lining, all leaks, whether in the rust borings or lead, were
+repaired with lead, and the remainder of the groove was filled with 1 to
+1 Portland cement mortar, leaving the joints absolutely water-tight at
+that time. The subsequent development of small seepages through the
+concrete would seem to indicate that the repair work should have been
+carried on far enough in advance of the concreting to permit the
+detection of secondary leaks which might develop slowly. The average
+labor cost chargeable against the caulking was 12 cents per lin. ft., to
+which should be added 21.8 cents for "top charges."
+
+Unfortunately, it was necessary to place the greater part of the
+concrete lining in the river tunnels during the summer months when the
+temperature at the point of work frequently exceeded 85°; and the
+temperature of the concrete while setting was much higher. This abnormal
+heat, due to chemical action in the cement, soon passed away, and, with
+the approach of winter, the contraction of the concrete resulted in
+transverse cracks. By the middle of the winter these had developed quite
+uniformly at the ends of each 30-ft. section of concrete arch as placed,
+and frequently finer cracks showed at about the center of each 30-ft.
+section.
+
+While the temperature of the concrete was falling, a like change was
+taking place in the cast-iron lining, with resulting contraction. The
+lining had been erected in compressed air, the temperature of which
+averaged about 70° in winter and higher in summer. Compressed air having
+been taken off in the summer of 1908, the tunnels then acquired the
+lower temperature of the surrounding earth, slowly falling until
+mid-winter. The contraction of the concrete, firmly bedded around the
+flanges of the iron, and showing cracks at fairly uniform intervals,
+probably localized the small corresponding movements of the iron near
+the concrete cracks, and resulted in a loosening of the caulking at
+these points. With the advent of cold weather, damp spots appeared in
+numerous places on the concrete, and small seepages showed through quite
+regularly at the temperature cracks, in some cases developing
+sufficiently to be called leaks. Only a few, however, were measurable in
+amount.
+
+Early in January small brass plugs were firmly set on opposite sides of
+a large number of cracks, and caliper readings and air temperature
+observations were taken regularly throughout the winter and spring. The
+widths of the cracks and the amount of leakage at them increased with
+each drop in temperature and decreased as the temperature rose again,
+but until spring the width of the cracks did not return to the same
+point with each return of temperature.
+
+The leakage was similar in all four tunnels, but was largest in amount
+in Tunnel _D_, where, at the beginning of February, the ordinary flow
+was about 0.0097 cu. ft. per sec., equivalent to 0.00000347 cu. ft. per
+sec. per lin. ft. of tunnel. Of this amount 0.0065 cu. ft. per sec.
+could be accounted for at eight of the cracks showing measurable
+leakage, leaving 0.0032 cu. ft. per sec. or 0.00000081 cu. ft. per sec.
+per lin. ft. of tunnel to be accounted for as general seepage
+distributed over the whole length.
+
+It was not feasible to stop every leak in the tunnel, most of which were
+indicated simply by damp spots on the concrete; a rather simple method
+was devised, however, for stopping the leaks at the eight or ten places
+in each tunnel where water dripped from the arch or flowed down the face
+of the concrete. The worst leak in any tunnel flowed about 0.0023 cu.
+ft. per sec. To stop these leaks, rows of 1-in. holes, at about 4-in.
+centers, were drilled with jap drills through the concrete to the flange
+of the iron. These rows were from 3 to 18 ft. long, extending 1 ft. or
+more beyond the limits of the leak. The bottoms of the holes were
+directly on the caulking groove and the pounding of the drill usually
+drove the caulking back, so that the leak became dry or nearly so after
+the holes were drilled. If left alone the leaks would gradually break
+out again in a few hours or a few days and flow more water than before.
+They were allowed to do this, however, in only a few cases as
+experiments. After the holes were drilled, the bottom 4 in. next the
+flange was filled with soft neat cement mortar. Immediately on top of
+this was placed two plugs of neat cement about 2-1/2 in. long, which
+were 5 or 6 hours old and rather hard. Each was tamped in with a round
+caulking tool of the size of the hole driven with a sledge hammer. On
+top of this were driven in the same way two more plugs of neat cement of
+the same size, which were hard set. These broke up under the blows of
+the hammer, and caulked the hole tight. When finished, the tamping tool
+would ring as though it was in solid rock. Great pressure was exerted on
+the plastic mortar in the bottom of the hole, which resulted in the
+re-caulking of the joint of the iron. No further measurable leakage
+developed in the repaired cracks, during a period of four months, and
+the total leakage has been reduced to about 0.002 cu. ft. per sec. in
+each tunnel, an average of 0.00000051 cu. ft. per sec. per lin. ft.
+
+
+SUMP AND PUMP CHAMBERS.
+
+To take care of the drainage of the tunnels, a sump with a pump chamber
+above it was provided for each pair of tunnels. The sumps were really
+short tunnels underneath the main ones and extending approximately
+between the center lines of the latter. They were 10 ft. 9-1/2 in. in
+outside diameter and 44 ft. long. The water drops directly from the
+drains in the center lines of the tunnels into the sumps. Above the
+sumps and between the tunnels, a pump chamber 19 ft. 5 in. long was
+built. Above the end of the latter, opposite the sump, a cross-passage
+was constructed between the bench walls of the two tunnels. This passage
+gives access from either tunnel through an opening in the floor to the
+pump chamber and through the latter to the sump.
+
+From the preliminary borings it was thought that the sumps were located
+so that the entire construction would be in rock. This proved to be the
+case on Tunnels _C_ and _D_, but not on Tunnels _A_ and _B_. The
+position of the rock surface in the latter is shown by Fig. 3. After the
+excavation was completed in Tunnel _B_, January 1st, 1908, the plates
+were removed from the side of the tunnel at the cross-passage, and a
+drift was driven through the earth above the rock surface across to the
+lining of Tunnel _A_. The heading was timbered as shown by Fig. 3. There
+was practically no loss of air from the drift, but the clay blanket had
+been removed from over this locality and the situation caused some
+anxiety. In order to make the heading as secure as possible, the 24-in.
+I-beams, shown on Fig. 3, were attached to the lining of the two
+tunnels. The beams formed a support for the permanent concrete roof arch
+of the passage, which was placed at once. At the same time plates were
+removed from the bottom in Tunnel _B_ over the site of the sump, and a
+heading was started on the line of the sump toward Tunnel _A_. As soon
+as the heading had been driven beyond the center line of the pump
+chamber, a bottom heading was driven from a break-up westward in the
+pump chamber and a connection was made with the cross-passage. The iron
+lining of the pump chamber was next placed, from the cross-passage
+eastward. The soft ground was excavated directly in advance of the
+lining, and the ground was supported by polings in much the same manner
+as described for shield work. On account of bad ground and seams of sand
+encountered in the rock below the level of the cross-beams, the entire
+west wall of the pump chamber was placed before enlarging the sump to
+full size. This was also judicious, in order to support as far as
+possible the iron lining of the tunnels. The sump was then excavated to
+full size. The iron lining of the sump and the east wall of the pump
+chamber were placed as soon as possible. The voids outside the iron
+lining of the sump and the pump chamber were filled as completely as
+possible with concrete, and then thoroughly grouted. Finally, the
+concrete lining was put in place inside of the iron.
+
+As shown by Fig. 3, the excavation of these chambers left a considerable
+portion of the iron lining of the tunnels temporarily unsupported on the
+lower inner quarter. To guard against distortion, a system of diagonals
+and struts was placed as shown.
+
+The floor of the pump chamber was water-proofed with felt and pitch in a
+manner similar to that described for the caissons at Long Island City.
+It was not possible to make the felt stick to the vertical walls with
+soft pitch, which was the only kind that could be used in compressed
+air, and, therefore, the surfaces were water-proofed by a wall of
+asphalt brick laid in pitch melting at 60° Fahr. Forms were erected on
+the neat line, and the space to the rock was filled with concrete making
+a so-called sand-wall similar to that commonly used for water-proofing
+with felt and pitch. The bricks were then laid to a height of four or
+five courses. The joints were filled with pitch instead of mortar.
+Sheets of tin were then placed against the face of the wall and braced
+from the concrete forms. As much pitch as possible was then slushed
+between the brick and the sand-wall, after which the concrete in the
+main wall was filled up to the top of the water-proofing course. The tin
+was then withdrawn and the operation repeated. This method was slow and
+expensive, but gave good results. Ordinary pitch could not be used on
+account of the fumes, which are particularly objectionable in
+compressed air. The 60° pitch was slightly heated in the open air before
+using.
+
+[Illustration: FIG. 3.]
+
+The sump and pump chamber on Tunnels _C_ and _D_ differed from the one
+described only in minor details; but, being wholly constructed in rock,
+presented fewer difficulties and permitted a complete envelope of
+water-proofing to be placed in the top.
+
+
+CONCRETE LINING.
+
+The placing of concrete inside the iron tube was done by an organization
+entirely separate from the tunneling force. A mixing plant was placed in
+each of the five shafts. The stone and sand bins discharged directly
+into mixers below, which, in turn, discharged into steel side-dump
+concrete cars. All concrete was placed in normal air.
+
+The first step, after the iron lining was scraped clean and washed down
+and all leaks were stopped, was the placing of biats, marked _B_ on
+Plate LXXIV. These were made up of a 6 by 12-in. yellow pine timber, 17
+ft. long, with two short lengths of the same size spliced to its ends by
+pieces of 12-in. channels, 3 ft. 9 in. long, clamped upon the sides.
+These biats were placed every 5 ft. along the tunnel in rings having
+side keys. Next, a floor, 13 ft. wide, was laid on the biats and two
+tracks, of 30-in. gauge and 6-1/2-ft. centers, were laid upon the floor.
+There were three stages in the concreting. Fig. 2, Plate LXXIV, shows
+the concrete in place at the end of the first, and Fig. 3, Plate LXXIV,
+at the end of the second stage. The complete arch above the bench walls
+was done in the last operation.
+
+Two 3 by 10-in. soldiers (_SS_ in Figs. 1 and 2, Plate LXXIV) were
+fastened to each biat and braced across by two horizontal and two
+diagonal braces. To each pair of soldiers a floor template, _T_, was
+then nailed. The form for the center drain was then suspended as shown
+in Fig. 1, Plate LXXIV. Three pieces of shuttering, _FFF_, 20 ft. long,
+were then nailed to the bottom of the soldiers. One is all that would
+have been needed for the first concrete placed, but it was easier to
+place them at this stage than later, when there was less room. Three
+rough shutters were also nailed to the curved portion for the floor
+template. Opposite each biat, a bracket, _bb_, was then nailed, which
+carries a set of rough boards which formed the risers for the duct
+steps. Everything was then ready for concreting except that, where
+refuge niches occurred, a form for the portion of the niche below the
+seat was nailed to the shuttering. This form is shown at _R_ in Fig. 1,
+Plate LXXIV.
+
+[Illustration: PLATE LXXIV]
+
+The concrete was dumped down on each side from side-dump cars standing
+on the track, and, falling between the risers for the duct steps, ran or
+was shoveled under the forms and down into the bottom. The horizontal
+surface on each side the center drain was smoothed off with a shovel.
+The workmen became very skillful at this, and got a fairly smooth
+surface. This concrete was usually placed in lengths of 45 or 60 ft.
+After setting for about 24 hours, the brackets, _bb_, were removed,
+together with the shuttering on the steps. The triangular pieces, _t_ in
+Fig. 1, Plate LXXIV, were not removed until later. Instead, a board was
+laid upon this lower step on which the duct layers could work. This and
+the triangular piece were not removed until just before the bench
+concrete was placed. This was important, as otherwise the bond between
+the old and new concrete would be much impaired by dirt ground into the
+surface of the old concrete. The ducts were then laid, as shown in Fig.
+2, Plate LXXIV.
+
+The remaining shutters for the face of the bench walls were then placed.
+The remainder of the forms for the refuge niches, _RR_, in Fig. 1, Plate
+LXXIV, were nailed to the shutters, the steel beam over the niche was
+laid in place, the forms for the ladders, _L_ in Fig. 2, Plate LXXIV,
+which occur every 25 ft., were tacked to the shutters, the shutters and
+forms were given a coat of creosote oil, and then all was ready for
+placing the bench concrete.
+
+The specifications required a 2-in. mortar face to be placed on all
+exposed surfaces and the remainder to be smoothed with a trowel and
+straight-edge. After about 48 hours, the biats were blocked up on the
+bench, and all forms between the bench walls below the working floor
+were removed.
+
+The centering for the arch concrete consisted of simple 5 by 3-1/2 by
+5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at
+5-ft. intervals. Each rib was made up of two pieces spliced together at
+the top. Two men easily handled one of these pieces. After splicing, the
+rib was supported by four hanger-bolts fastened to the iron lining as
+shown in Fig. 3, Plate LXXIV.
+
+In the early part of the work, two additional bolts were used about half
+way up on the side between the upper and lower hanger-bolts. It was soon
+found that by placing the strut between the tunnel lining and the crown
+of the rib, these hanger-bolts could be dispensed with. The lagging was
+of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each
+piece had three saw cuts on the back, from end to end, allowing it to be
+bent to the curve of the arch; it was kept curved by an iron strap
+screwed to the back. The arches were put in, either in 15, 30 or 45-ft.
+lengths, depending on what was ready for concrete and what could be done
+in one continuous working. The rule was that when an arch was begun, the
+work must not stop until it was finished. An arch length always ended in
+the middle of a ring. The lagging was placed to a height of about 6 ft.
+above the bench before any concreting was done. When the concrete had
+been brought up to that point, lagging was added, one piece at a time,
+just ahead of the concrete, up to the crown, where a space of about 18
+in. was left. When the lagging had reached the upper hanger-bolts, they
+were removed, which left only the two bottom bolts fixed in the
+concrete. Most of these were unscrewed from the eye and saved, as tin
+sleeves were placed around them before concreting. Two cast-iron eyes
+were lost for every 5 ft. of tunnel. To place the key concrete, a stage
+was set up in the middle of the floor, and, beginning at one end, about
+2 ft. of block lagging was placed. Over this, concrete was packed,
+filling the key as completely as possible. This was done partly by
+shoveling and using a short rammer, and partly by packing with the hands
+by the workmen, who wore rubber gloves for the purpose. Another 2 ft. of
+lagging was then placed, and the operation was repeated, and thus
+working backward, foot by foot, the key was completed. This is the usual
+way of keying a concrete arch, but in this case the difficulty was
+increased by the flanges of the iron lining. It was practically
+impossible to fill all parts of the pockets formed by these flanges. To
+meet this difficulty, provision was made for grouting any unfilled
+space. As the concrete was being put in, tin pipes were placed with
+their tops nearly touching the iron lining, and their bottoms resting on
+the lagging. Each pocket was intended to have two of these pipes, one to
+grout through and the other to act as a vent for the escape of air. Each
+center key ring had six pipes, and each side key had eight. The bottoms
+of the pipes were held by a single nail driven half way into the
+lagging. This served to keep the pipes in position and to locate them
+after the lagging was taken down.
+
+The cost of labor in the tunnels directly chargeable to concrete was
+$1.80 per cu. yd. The top charges, exclusive of the cost of materials
+(cement, sand, and stone), amounted to $3.92.
+
+
+ELECTRIC CONDUITS.
+
+In one bench wall of each tunnel there were fifteen openings for power
+cables and in the other, between the river shafts, there were forty
+openings for telephone, telegraph, and signal cables. East of the Long
+Island shaft, the number of the latter was reduced to twenty-four. The
+telephone ducts were all of the four-way type. The specifications
+required that the power ducts should have an opening of not less than
+3-1/2 in., nor more than 3-7/8 in., and that after laying they should
+pass a 4-ft. mandrel, 3-3/8 in. at the leading end and 2-5/8 in. at the
+other. The outside dimension was limited between 5 and 5-3/8 in. The
+openings of the four-way ducts were required to be not less than 3-3/8
+in., nor more than 3-5/8 in., and after laying to pass a 5-ft. mandrel,
+3-1/4 in. at the leading end and 2-1/2 in. at the other. The outside
+dimensions were limited between 9 and 9-1/2 in. All were to be laid in
+1/4-in. beds of mortar. The specifications were not definite as to the
+shape of the opening, but those used were square with corners rounded to
+a radius of 3/8 in. The four-ways were 3 ft. long, and the singles, 18
+in.
+
+A study of the foregoing dimensions will show that the working limits
+were narrow. Such narrow limits would not pay for the ordinary conduit
+line in a street, where there is more room. In the tunnel greater
+liberality meant either reducing the number of conduits or encroaching
+on the strength of the concrete tunnel lining. The small difference of
+only 1/8 in. in the size of the mandrel, or a clearance of only 1/16 in.
+on each side, no doubt did increase the cost of laying somewhat, though
+not as much as might at first be supposed. All bottom courses were laid
+to a string, in practically perfect line and grade, and all joints were
+tested with mandrels which were in all openings, and pulled forward as
+each piece of conduit was laid. As the workmen became skillful, the
+progress was excellent.
+
+All costs of labor in the tunnel chargeable to duct laying amounted to
+$0.039 per ft. of duct; top charges brought this up to $0.083.
+
+The serious problem was to guard against grout and mortar running into
+the duct opening through the joints from the concrete, which was a
+rather wet mixture. Each joint was wrapped, when laid, with canvas,
+weighing 10 oz. per sq. yd., dipped in cement grout immediately before
+using. These wraps were 6 in. wide, and were cut long enough to go
+around the lap about the middle of the duct. As soon as all the ducts
+were laid, the entire bank was plastered over with fairly stiff mortar,
+which, when properly done, closed all openings. The plastering was not
+required by the specifications, but was found by the contractor to
+result in a saving in ultimate cost.
+
+The concrete on the two sides of the bank of ducts was bonded together
+by 2 by 1/8-in. steel bonds between the ducts, laid across in horizontal
+joints. Both ends were split into two pieces, 1 in. long, one of which
+was turned up and the other down. These bonds projected 1-1/2 in. into
+the concrete on either side. Where the bond came opposite the risers of
+the duct step, against which the ducts were laid, recesses were provided
+for the projecting bond. This was done by nailing to the rough shutters
+for the steps a form which when removed left a dove-tailed vertical
+groove. This form was made in two pieces, one tapering inward and the
+other with more taper outward. As the bonds were placed, these grooves
+were filled with mortar.
+
+The ducts usually received their final rodding with the specification
+mandrel a month or more after they were laid, after which all openings
+into splicing chambers were stopped by wooden plugs, 8 in. long tapering
+from 3-3/4 in. at one end to 2-3/4 in. at the other end, and shaped to
+fit the opening tightly. At first the plugs were paraffined, to keep
+them from swelling and breaking the ducts, but were not successful, as
+the paraffin lubricated them so that they would not stay in place. They
+were expensive, and there was some swelling in the best that were
+obtained. A better plug was made by using no paraffin, but by making six
+saw cuts, three horizontal and three vertical, in the larger end,
+cutting to within about 2 in. of the smaller end. The swelling of the
+wood was then taken up by the saw cuts and the spring of the wood.
+
+The splicing chambers are at 400-ft. intervals. They are 6 ft. long, 4
+ft. 9 in. high, with a width varying from 3 ft. 2 in. at the top to 1
+ft. 2 in. at the bottom.
+
+
+
+
+
+
+End of the Project Gutenberg EBook of Transactions of the American Society
+of Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard
+
+*** END OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN ***
+
+***** This file should be named 18722-8.txt or 18722-8.zip *****
+This and all associated files of various formats will be found in:
+ http://www.gutenberg.org/1/8/7/2/18722/
+
+Produced by Juliet Sutherland, Taavi Kalju and the Online
+Distributed Proofreading Team at http://www.pgdp.net
+
+
+Updated editions will replace the previous one--the old editions
+will be renamed.
+
+Creating the works from public domain print editions means that no
+one owns a United States copyright in these works, so the Foundation
+(and you!) can copy and distribute it in the United States without
+permission and without paying copyright royalties. Special rules,
+set forth in the General Terms of Use part of this license, apply to
+copying and distributing Project Gutenberg-tm electronic works to
+protect the PROJECT GUTENBERG-tm concept and trademark. Project
+Gutenberg is a registered trademark, and may not be used if you
+charge for the eBooks, unless you receive specific permission. If you
+do not charge anything for copies of this eBook, complying with the
+rules is very easy. You may use this eBook for nearly any purpose
+such as creation of derivative works, reports, performances and
+research. They may be modified and printed and given away--you may do
+practically ANYTHING with public domain eBooks. Redistribution is
+subject to the trademark license, especially commercial
+redistribution.
+
+
+
+*** START: FULL LICENSE ***
+
+THE FULL PROJECT GUTENBERG LICENSE
+PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK
+
+To protect the Project Gutenberg-tm mission of promoting the free
+distribution of electronic works, by using or distributing this work
+(or any other work associated in any way with the phrase "Project
+Gutenberg"), you agree to comply with all the terms of the Full Project
+Gutenberg-tm License (available with this file or online at
+http://gutenberg.org/license).
+
+
+Section 1. General Terms of Use and Redistributing Project Gutenberg-tm
+electronic works
+
+1.A. By reading or using any part of this Project Gutenberg-tm
+electronic work, you indicate that you have read, understand, agree to
+and accept all the terms of this license and intellectual property
+(trademark/copyright) agreement. If you do not agree to abide by all
+the terms of this agreement, you must cease using and return or destroy
+all copies of Project Gutenberg-tm electronic works in your possession.
+If you paid a fee for obtaining a copy of or access to a Project
+Gutenberg-tm electronic work and you do not agree to be bound by the
+terms of this agreement, you may obtain a refund from the person or
+entity to whom you paid the fee as set forth in paragraph 1.E.8.
+
+1.B. "Project Gutenberg" is a registered trademark. It may only be
+used on or associated in any way with an electronic work by people who
+agree to be bound by the terms of this agreement. There are a few
+things that you can do with most Project Gutenberg-tm electronic works
+even without complying with the full terms of this agreement. See
+paragraph 1.C below. There are a lot of things you can do with Project
+Gutenberg-tm electronic works if you follow the terms of this agreement
+and help preserve free future access to Project Gutenberg-tm electronic
+works. See paragraph 1.E below.
+
+1.C. The Project Gutenberg Literary Archive Foundation ("the Foundation"
+or PGLAF), owns a compilation copyright in the collection of Project
+Gutenberg-tm electronic works. Nearly all the individual works in the
+collection are in the public domain in the United States. If an
+individual work is in the public domain in the United States and you are
+located in the United States, we do not claim a right to prevent you from
+copying, distributing, performing, displaying or creating derivative
+works based on the work as long as all references to Project Gutenberg
+are removed. Of course, we hope that you will support the Project
+Gutenberg-tm mission of promoting free access to electronic works by
+freely sharing Project Gutenberg-tm works in compliance with the terms of
+this agreement for keeping the Project Gutenberg-tm name associated with
+the work. You can easily comply with the terms of this agreement by
+keeping this work in the same format with its attached full Project
+Gutenberg-tm License when you share it without charge with others.
+
+1.D. The copyright laws of the place where you are located also govern
+what you can do with this work. Copyright laws in most countries are in
+a constant state of change. If you are outside the United States, check
+the laws of your country in addition to the terms of this agreement
+before downloading, copying, displaying, performing, distributing or
+creating derivative works based on this work or any other Project
+Gutenberg-tm work. The Foundation makes no representations concerning
+the copyright status of any work in any country outside the United
+States.
+
+1.E. Unless you have removed all references to Project Gutenberg:
+
+1.E.1. The following sentence, with active links to, or other immediate
+access to, the full Project Gutenberg-tm License must appear prominently
+whenever any copy of a Project Gutenberg-tm work (any work on which the
+phrase "Project Gutenberg" appears, or with which the phrase "Project
+Gutenberg" is associated) is accessed, displayed, performed, viewed,
+copied or distributed:
+
+This eBook is for the use of anyone anywhere at no cost and with
+almost no restrictions whatsoever. You may copy it, give it away or
+re-use it under the terms of the Project Gutenberg License included
+with this eBook or online at www.gutenberg.org
+
+1.E.2. If an individual Project Gutenberg-tm electronic work is derived
+from the public domain (does not contain a notice indicating that it is
+posted with permission of the copyright holder), the work can be copied
+and distributed to anyone in the United States without paying any fees
+or charges. If you are redistributing or providing access to a work
+with the phrase "Project Gutenberg" associated with or appearing on the
+work, you must comply either with the requirements of paragraphs 1.E.1
+through 1.E.7 or obtain permission for the use of the work and the
+Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or
+1.E.9.
+
+1.E.3. If an individual Project Gutenberg-tm electronic work is posted
+with the permission of the copyright holder, your use and distribution
+must comply with both paragraphs 1.E.1 through 1.E.7 and any additional
+terms imposed by the copyright holder. Additional terms will be linked
+to the Project Gutenberg-tm License for all works posted with the
+permission of the copyright holder found at the beginning of this work.
+
+1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm
+License terms from this work, or any files containing a part of this
+work or any other work associated with Project Gutenberg-tm.
+
+1.E.5. Do not copy, display, perform, distribute or redistribute this
+electronic work, or any part of this electronic work, without
+prominently displaying the sentence set forth in paragraph 1.E.1 with
+active links or immediate access to the full terms of the Project
+Gutenberg-tm License.
+
+1.E.6. You may convert to and distribute this work in any binary,
+compressed, marked up, nonproprietary or proprietary form, including any
+word processing or hypertext form. However, if you provide access to or
+distribute copies of a Project Gutenberg-tm work in a format other than
+"Plain Vanilla ASCII" or other format used in the official version
+posted on the official Project Gutenberg-tm web site (www.gutenberg.org),
+you must, at no additional cost, fee or expense to the user, provide a
+copy, a means of exporting a copy, or a means of obtaining a copy upon
+request, of the work in its original "Plain Vanilla ASCII" or other
+form. Any alternate format must include the full Project Gutenberg-tm
+License as specified in paragraph 1.E.1.
+
+1.E.7. Do not charge a fee for access to, viewing, displaying,
+performing, copying or distributing any Project Gutenberg-tm works
+unless you comply with paragraph 1.E.8 or 1.E.9.
+
+1.E.8. You may charge a reasonable fee for copies of or providing
+access to or distributing Project Gutenberg-tm electronic works provided
+that
+
+- You pay a royalty fee of 20% of the gross profits you derive from
+ the use of Project Gutenberg-tm works calculated using the method
+ you already use to calculate your applicable taxes. The fee is
+ owed to the owner of the Project Gutenberg-tm trademark, but he
+ has agreed to donate royalties under this paragraph to the
+ Project Gutenberg Literary Archive Foundation. Royalty payments
+ must be paid within 60 days following each date on which you
+ prepare (or are legally required to prepare) your periodic tax
+ returns. Royalty payments should be clearly marked as such and
+ sent to the Project Gutenberg Literary Archive Foundation at the
+ address specified in Section 4, "Information about donations to
+ the Project Gutenberg Literary Archive Foundation."
+
+- You provide a full refund of any money paid by a user who notifies
+ you in writing (or by e-mail) within 30 days of receipt that s/he
+ does not agree to the terms of the full Project Gutenberg-tm
+ License. You must require such a user to return or
+ destroy all copies of the works possessed in a physical medium
+ and discontinue all use of and all access to other copies of
+ Project Gutenberg-tm works.
+
+- You provide, in accordance with paragraph 1.F.3, a full refund of any
+ money paid for a work or a replacement copy, if a defect in the
+ electronic work is discovered and reported to you within 90 days
+ of receipt of the work.
+
+- You comply with all other terms of this agreement for free
+ distribution of Project Gutenberg-tm works.
+
+1.E.9. If you wish to charge a fee or distribute a Project Gutenberg-tm
+electronic work or group of works on different terms than are set
+forth in this agreement, you must obtain permission in writing from
+both the Project Gutenberg Literary Archive Foundation and Michael
+Hart, the owner of the Project Gutenberg-tm trademark. Contact the
+Foundation as set forth in Section 3 below.
+
+1.F.
+
+1.F.1. Project Gutenberg volunteers and employees expend considerable
+effort to identify, do copyright research on, transcribe and proofread
+public domain works in creating the Project Gutenberg-tm
+collection. Despite these efforts, Project Gutenberg-tm electronic
+works, and the medium on which they may be stored, may contain
+"Defects," such as, but not limited to, incomplete, inaccurate or
+corrupt data, transcription errors, a copyright or other intellectual
+property infringement, a defective or damaged disk or other medium, a
+computer virus, or computer codes that damage or cannot be read by
+your equipment.
+
+1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
+of Replacement or Refund" described in paragraph 1.F.3, the Project
+Gutenberg Literary Archive Foundation, the owner of the Project
+Gutenberg-tm trademark, and any other party distributing a Project
+Gutenberg-tm electronic work under this agreement, disclaim all
+liability to you for damages, costs and expenses, including legal
+fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
+LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
+PROVIDED IN PARAGRAPH F3. YOU AGREE THAT THE FOUNDATION, THE
+TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
+LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
+INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
+DAMAGE.
+
+1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
+defect in this electronic work within 90 days of receiving it, you can
+receive a refund of the money (if any) you paid for it by sending a
+written explanation to the person you received the work from. If you
+received the work on a physical medium, you must return the medium with
+your written explanation. The person or entity that provided you with
+the defective work may elect to provide a replacement copy in lieu of a
+refund. If you received the work electronically, the person or entity
+providing it to you may choose to give you a second opportunity to
+receive the work electronically in lieu of a refund. If the second copy
+is also defective, you may demand a refund in writing without further
+opportunities to fix the problem.
+
+1.F.4. Except for the limited right of replacement or refund set forth
+in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO OTHER
+WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO
+WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE.
+
+1.F.5. Some states do not allow disclaimers of certain implied
+warranties or the exclusion or limitation of certain types of damages.
+If any disclaimer or limitation set forth in this agreement violates the
+law of the state applicable to this agreement, the agreement shall be
+interpreted to make the maximum disclaimer or limitation permitted by
+the applicable state law. The invalidity or unenforceability of any
+provision of this agreement shall not void the remaining provisions.
+
+1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the
+trademark owner, any agent or employee of the Foundation, anyone
+providing copies of Project Gutenberg-tm electronic works in accordance
+with this agreement, and any volunteers associated with the production,
+promotion and distribution of Project Gutenberg-tm electronic works,
+harmless from all liability, costs and expenses, including legal fees,
+that arise directly or indirectly from any of the following which you do
+or cause to occur: (a) distribution of this or any Project Gutenberg-tm
+work, (b) alteration, modification, or additions or deletions to any
+Project Gutenberg-tm work, and (c) any Defect you cause.
+
+
+Section 2. Information about the Mission of Project Gutenberg-tm
+
+Project Gutenberg-tm is synonymous with the free distribution of
+electronic works in formats readable by the widest variety of computers
+including obsolete, old, middle-aged and new computers. It exists
+because of the efforts of hundreds of volunteers and donations from
+people in all walks of life.
+
+Volunteers and financial support to provide volunteers with the
+assistance they need, is critical to reaching Project Gutenberg-tm's
+goals and ensuring that the Project Gutenberg-tm collection will
+remain freely available for generations to come. In 2001, the Project
+Gutenberg Literary Archive Foundation was created to provide a secure
+and permanent future for Project Gutenberg-tm and future generations.
+To learn more about the Project Gutenberg Literary Archive Foundation
+and how your efforts and donations can help, see Sections 3 and 4
+and the Foundation web page at http://www.pglaf.org.
+
+
+Section 3. Information about the Project Gutenberg Literary Archive
+Foundation
+
+The Project Gutenberg Literary Archive Foundation is a non profit
+501(c)(3) educational corporation organized under the laws of the
+state of Mississippi and granted tax exempt status by the Internal
+Revenue Service. The Foundation's EIN or federal tax identification
+number is 64-6221541. Its 501(c)(3) letter is posted at
+http://pglaf.org/fundraising. Contributions to the Project Gutenberg
+Literary Archive Foundation are tax deductible to the full extent
+permitted by U.S. federal laws and your state's laws.
+
+The Foundation's principal office is located at 4557 Melan Dr. S.
+Fairbanks, AK, 99712., but its volunteers and employees are scattered
+throughout numerous locations. Its business office is located at
+809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email
+business@pglaf.org. Email contact links and up to date contact
+information can be found at the Foundation's web site and official
+page at http://pglaf.org
+
+For additional contact information:
+ Dr. Gregory B. Newby
+ Chief Executive and Director
+ gbnewby@pglaf.org
+
+Section 4. Information about Donations to the Project Gutenberg
+Literary Archive Foundation
+
+Project Gutenberg-tm depends upon and cannot survive without wide
+spread public support and donations to carry out its mission of
+increasing the number of public domain and licensed works that can be
+freely distributed in machine readable form accessible by the widest
+array of equipment including outdated equipment. Many small donations
+($1 to $5,000) are particularly important to maintaining tax exempt
+status with the IRS.
+
+The Foundation is committed to complying with the laws regulating
+charities and charitable donations in all 50 states of the United
+States. Compliance requirements are not uniform and it takes a
+considerable effort, much paperwork and many fees to meet and keep up
+with these requirements. We do not solicit donations in locations
+where we have not received written confirmation of compliance. To
+SEND DONATIONS or determine the status of compliance for any
+particular state visit http://pglaf.org
+
+While we cannot and do not solicit contributions from states where we
+have not met the solicitation requirements, we know of no prohibition
+against accepting unsolicited donations from donors in such states who
+approach us with offers to donate.
+
+International donations are gratefully accepted, but we cannot make
+any statements concerning tax treatment of donations received from
+outside the United States. U.S. laws alone swamp our small staff.
+
+Please check the Project Gutenberg Web pages for current donation
+methods and addresses. Donations are accepted in a number of other
+ways including checks, online payments and credit card
+donations. To donate, please visit: http://pglaf.org/donate
+
+
+Section 5. General Information About Project Gutenberg-tm electronic
+works.
+
+Professor Michael S. Hart is the originator of the Project Gutenberg-tm
+concept of a library of electronic works that could be freely shared
+with anyone. For thirty years, he produced and distributed Project
+Gutenberg-tm eBooks with only a loose network of volunteer support.
+
+Project Gutenberg-tm eBooks are often created from several printed
+editions, all of which are confirmed as Public Domain in the U.S.
+unless a copyright notice is included. Thus, we do not necessarily
+keep eBooks in compliance with any particular paper edition.
+
+Most people start at our Web site which has the main PG search facility:
+
+ http://www.gutenberg.org
+
+This Web site includes information about Project Gutenberg-tm,
+including how to make donations to the Project Gutenberg Literary
+Archive Foundation, how to help produce our new eBooks, and how to
+subscribe to our email newsletter to hear about new eBooks.
+
+*** END: FULL LICENSE ***
+
diff --git a/18722-8.zip b/18722-8.zip
new file mode 100644
index 0000000..f608d00
--- /dev/null
+++ b/18722-8.zip
Binary files differ
diff --git a/18722-h.zip b/18722-h.zip
new file mode 100644
index 0000000..d57a897
--- /dev/null
+++ b/18722-h.zip
Binary files differ
diff --git a/18722-h/18722-h.htm b/18722-h/18722-h.htm
new file mode 100644
index 0000000..cba86b2
--- /dev/null
+++ b/18722-h/18722-h.htm
@@ -0,0 +1,4570 @@
+<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN"
+ "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd">
+
+<html xmlns="http://www.w3.org/1999/xhtml">
+ <head>
+ <meta http-equiv="Content-Type" content="text/html;charset=iso-8859-1" />
+ <title>
+ The Project Gutenberg eBook of The New York Tunnel Extension of the Pennsylvania Railroad--The East River Tunnels, by James H. Brace, Francis Mason, and S. H. Woodard
+ </title>
+ <style type="text/css">
+/*<![CDATA[ XML blockout */
+<!--
+ p { margin-top: .75em;
+ text-align: justify;
+ margin-bottom: .75em;
+ }
+ h1,h2,h3,h4,h5,h6 {
+ text-align: center; /* all headings centered */
+ clear: both;
+ }
+ hr { width: 33%;
+ margin-top: 2em;
+ margin-bottom: 2em;
+ margin-left: auto;
+ margin-right: auto;
+ clear: both;
+ }
+
+ table {margin-left: auto; margin-right: auto;}
+ a img {border: none; }
+
+ body{margin-left: 10%;
+ margin-right: 10%;
+ }
+
+ .pagenum { /* uncomment the next line for invisible page numbers */
+ /* visibility: hidden; */
+ position: absolute;
+ left: 1%;
+ font-size: smaller;
+ text-align: left;
+ color: gray;
+ } /* page numbers */
+
+ .linenum {position: absolute; top: auto; left: 4%;} /* poetry number */
+ .blockquot{margin-left: 5%; margin-right: 10%;}
+ .sidenote {width: 20%; padding-bottom: .5em; padding-top: .5em;
+ padding-left: .5em; padding-right: .5em; margin-left: 1em;
+ float: right; clear: right; margin-top: 1em;
+ font-size: smaller; color: black; background: #eeeeee; border: dashed 1px;}
+
+ .bb {border-bottom: solid 2px;}
+ .bbl {border-bottom: solid 2px; border-left: solid 2px;}
+ .bbr {border-bottom: solid 2px; border-right: solid 2px;}
+ .bblr {border-bottom: solid 2px; border-right: solid 2px; border-left: solid 2px;}
+ .bbt {border-bottom: solid 2px; border-top: solid 2px;}
+ .bbtl {border-bottom: solid 2px; border-top: solid 2px; border-left: solid 2px;}
+ .bbtr {border-bottom: solid 2px; border-top: solid 2px; border-right: solid 2px;}
+ .bl {border-left: solid 2px;}
+ .blr {border-left: solid 2px; border-right: solid 2px;}
+ .btl {border-top: solid 2px; border-left: solid 2px;}
+ .btr {border-top: solid 2px; border-right: solid 2px;}
+ .btlr {border-top: solid 2px; border-left: solid 2px; border-right: solid 2px;}
+ .bt {border-top: solid 2px;}
+ .br {border-right: solid 2px;}
+ .bbox {border: solid 2px;}
+ .btlw15 {border-top: solid 2px; border-left: solid 2px; width: 15%}
+ .btw13 {border-top: solid 2px; width: 13%}
+
+ .center {text-align: center;}
+ .smcap {font-variant: small-caps;}
+ .u {text-decoration: underline;}
+
+ .caption {font-weight: bold; font-variant: small-caps;}
+
+ .figcenter {margin: auto; text-align: center;}
+
+ .figleft {float: left; clear: left; margin-left: 0; margin-bottom: 1em; margin-top:
+ 1em; margin-right: 1em; padding: 0; text-align: center;}
+
+ .figright {float: right; clear: right; margin-left: 1em; margin-bottom: 1em;
+ margin-top: 1em; margin-right: 0; padding: 0; text-align: center;}
+
+ .footnotes {border: dashed 1px;}
+ .footnote {margin-left: 10%; margin-right: 10%; font-size: 0.9em;}
+ .footnote .label {position: absolute; right: 84%; text-align: right;}
+ .fnanchor {vertical-align: super; font-size: .8em; text-decoration: none;}
+
+ .poem {margin-left:10%; margin-right:10%; text-align: left;}
+ .poem br {display: none;}
+ .poem .stanza {margin: 1em 0em 1em 0em;}
+ .poem span.i0 {display: block; margin-left: 0em; padding-left: 3em; text-indent: -3em;}
+ .poem span.i2 {display: block; margin-left: 2em; padding-left: 3em; text-indent: -3em;}
+ .poem span.i4 {display: block; margin-left: 4em; padding-left: 3em; text-indent: -3em;}
+ // -->
+ /* XML end ]]>*/
+ </style>
+ </head>
+<body>
+
+
+<pre>
+
+The Project Gutenberg EBook of Transactions of the American Society of
+Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard
+
+This eBook is for the use of anyone anywhere at no cost and with
+almost no restrictions whatsoever. You may copy it, give it away or
+re-use it under the terms of the Project Gutenberg License included
+with this eBook or online at www.gutenberg.org
+
+
+Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910
+ The New York Tunnel Extension of the Pennsylvania Railroad.
+ The East River Tunnels. Paper No. 1159
+
+Author: James H. Brace, Francis Mason and S. H. Woodard
+
+Release Date: July 1, 2006 [EBook #18722]
+
+Language: English
+
+Character set encoding: ISO-8859-1
+
+*** START OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN ***
+
+
+
+
+Produced by Juliet Sutherland, Taavi Kalju and the Online
+Distributed Proofreading Team at http://www.pgdp.net
+
+
+
+
+
+
+</pre>
+
+
+
+
+<p><span class='pagenum'><a name="Page_419" id="Page_419">[Pg 419]</a></span></p>
+
+<h2>AMERICAN SOCIETY OF CIVIL ENGINEERS</h2>
+
+<h3>INSTITUTED 1852</h3>
+
+<hr style="width: 45%;" />
+
+<h1>TRANSACTIONS</h1>
+
+<hr style="width: 45%;" />
+
+<h3>Paper No. 1159</h3>
+
+
+<h1>THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA RAILROAD.</h1>
+
+<h1>THE EAST RIVER TUNNELS.<a name="FNanchor_A_1" id="FNanchor_A_1"></a><a href="#Footnote_A_1" class="fnanchor">[A]</a></h1>
+
+<h2><span class="smcap">By James H. Brace, Francis Mason, and S. H. Woodard, Members, Am. Soc.
+C. E.</span></h2>
+
+<hr style="width: 45%;" />
+
+<p>This paper will be limited to a consideration of the construction of the
+tunnels, the broader questions of design, etc., having already been
+considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C.
+E., and Alfred Noble, Past-President, Am. Soc. C. E.</p>
+
+<p>The location of the section of the work to be considered here is shown
+on Plate XIII of Mr. Noble's paper. There are two permanent shafts on
+each side of the East River and four single cast-iron tube tunnels, each
+about 6,000 ft. long, and consisting of 3,900 ft. between shafts under
+the river, and 2,000 ft. in Long Island City, mostly under the depot and
+passenger yard of the Long Island Railroad. This tube-tunnel work was
+naturally a single job. The contract for its construction was let to S.
+Pearson and Son, Incorporated, ground being broken on May 17th, 1904.
+Five years later, to a day, the work was finished and received its final
+inspection for acceptance by the Railroad Company.</p>
+
+<p>The contract was of the profit-sharing type, and required an audit, by
+the Railroad Company, of the contractor's books, and a careful system of
+cost-keeping by the Company's engineers, so that it is possible to
+include in the following some of the unit costs of the work. These are
+<span class='pagenum'><a name="Page_420" id="Page_420">[Pg 420]</a></span>given in two parts: The first is called the unit labor cost, and is the
+cost of the labor in the tunnel directly chargeable to the thing
+considered. It does not include the labor of operating the plant, nor
+watchmen, yardmen, pipemen, and electricians. The second is called "top
+charges," a common term, but meaning different things to different
+contractors and engineers. Here, it is made to include the cost of the
+contractor's staff and roving laborers, such as pipemen, electricians,
+and yardmen, the cost of the plant and its operation, and all
+miscellaneous expenses, but does not include any contractor's profit,
+nor cost of materials entering permanent work.</p>
+
+<p>The contractor's plant is to be described in a paper by Henry Japp,<a name="FNanchor_B_2" id="FNanchor_B_2"></a><a href="#Footnote_B_2" class="fnanchor">[B]</a>
+M. Am. Soc. C. E., and will not be dealt with here.</p>
+
+<p>The contractors carried on their work from three different sites. From
+permanent shafts, located near the river in Manhattan, four shields were
+driven eastward to about the middle of the river; and, from two similar
+shafts at the river front in Long Island City, four shields were driven
+westward to meet those from Manhattan. From a temporary shaft, near East
+Avenue, Long Island City, the land section of about 2,000 ft. was driven
+to the river shafts.</p>
+
+
+<h4><span class="smcap">Tunnels From East Avenue To the River Shafts.</span></h4>
+
+<p>The sinking of the temporary shaft at East Avenue was a fairly simple
+matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34
+ft., braced across by heavy timbering, was driven about 28 ft. to rock
+as the excavation progressed. Below this, the shaft was sunk into rock,
+about 27 ft., without timbering. As soon as the shaft was down, on
+September 30th, 1904, bottom headings were started westward in Tunnels
+<i>A</i>, <i>B</i>, and <i>D</i>. When these had been driven about half the distance to
+the river shafts, soft ground was encountered. (See Station 59, Plate
+XIII.) As the ground carried considerable water, it was decided to use
+compressed air. Bulkheads were built in the heading, and, with an air
+pressure of about 15 lb. per sq. in., the heading was driven through the
+soft ground and into rock by ordinary mining methods. The use of
+compressed air was then discontinued. West of this soft ground, a top
+heading, followed by a bench, was driven to the soft ground at about
+Station 66. Tunnel <i>C</i>, being higher, was more in soft ground, and at
+first it was the intention to delay its excavation until it had been
+<span class='pagenum'><a name="Page_421" id="Page_421">[Pg 421]</a></span>well drained by the bottom headings in the tunnels on each side. A
+little later it was decided to use a shield without compressed air. This
+shield had been used in excavating the stations of the Great Northern
+and City Tunnel in London. It was rebuilt, its diameter being changed
+from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after
+it had flattened about 4 in. and had been jacked up three times, the
+scheme was abandoned, the shield was removed, and work was continued by
+the methods which were being used in the other tunnels. The shield was
+rather light, but probably it would have been strong enough had it been
+used with compressed air, or had the material passed through been all
+earth. Here, there was a narrow concrete cradle in the bottom, with rock
+up to about the middle of the tunnel, which was excavated to clear the
+shield, and gave no support on its sides. The shield was a cylinder
+crushed between forces applied along the top and bottom.</p>
+
+<p>With the exception of this trial of a shield in Tunnel <i>C</i>, and a novel
+method in Tunnel <i>B</i>, where compressed air, but no shield, was used, the
+description of the work in one tunnel will do for all.</p>
+
+<p>From the bottom headings break-ups were started at several places in
+each tunnel where there was ample cover of rock above. Where the roof
+was in soft ground, top headings were driven from the points of break-up
+and timbered. As soon as the full-sized excavation was completed, the
+iron lining was built, usually in short lengths.</p>
+
+<p>It will be noticed on Plate XIII that there is a depression in the rock
+between Station 65 and the river shafts, leaving all the tunnels in soft
+ground. As this was directly under the Long Island Railroad passenger
+station, it was thought best to use a shield and compressed air. This
+was done in Tunnels <i>A</i>, <i>C</i>, and <i>D</i>, one shield being used
+successively for all three. It was first erected in Tunnel <i>D</i> at
+Station 64 + 47. From there it was driven westward to the river shaft.
+It was then taken apart and re-erected in Tunnel <i>C</i> at Station 63 + 63
+and driven westward to the shaft. It was then found that there would not
+be time for one shield to do all four lines. The experience in Tunnels
+<i>C</i> and <i>D</i> had proven the ground to be much better than had been
+expected. There was considerable clay in the sand, and, with the water
+blown out by compressed air, it was very stable. A special timbering
+method was devised, and Tunnel <i>B</i> was driven from Station 66 + 10 to
+the shaft with compressed air, but without a shield. In the meantime the
+shield was re-erected in Tunnel <i>A</i> and was shoved<span class='pagenum'><a name="Page_422" id="Page_422">[Pg 422]</a></span> through the soft
+ground from Station 65 + 48 nearly to the river shaft, where it was
+dismantled.</p>
+
+<p>There was nothing unusual about the shield work; it was about the same
+as that under the river, which is fully described elsewhere. In spite of
+great care in excavating in front of the shield, and prompt grouting
+behind it, there was a small settlement of the building above, amounting
+to about 1-1/2 in. in the walls and about 5 in. in the ground floors
+which were of concrete laid like a sidewalk directly upon the ground.
+Whether this settlement was due to ground lost in the shield work or to
+a compacting of the ground on account of its being dried out by
+compressed air, it is impossible to say.</p>
+
+<p>The interesting features of this work from East Avenue to the river
+shafts are the mining methods and the building of the iron tube without
+a shield.</p>
+
+
+<h4><span class="smcap">Excavation In All Rock.</span></h4>
+
+<p>Where the tunnel was all in good rock two distinct methods were used.
+The first was the bottom-heading-and-break-up, and the second, the
+top-heading-and-bench method. The first is illustrated by Figs. 1 and 2,
+<a href="#ill01">Plate LXIII</a>. The bottom heading, 13 ft. wide and 9 ft. high, having
+first been driven, a break-up was started by blasting down the rock,
+forming a chamber the full height of the tunnel. The timber platform,
+shown in the drawing, was erected in the bottom heading, and extended
+through the break-up chamber. The plan was then to drill the entire face
+above the bottom heading and blast it down upon the timber staging, thus
+maintaining a passage below for the traffic from the heading and
+break-ups farther down the line. Starting with the condition indicated
+by Plate XIII, the face was drilled, the columns were then taken down
+and the muck pile was shoveled through holes in the staging into muck
+cars below. The face was then blasted down upon the staging, the drill
+columns were set up on the muck pile, and the operation was repeated.
+This method has the advantage that the bottom heading can be pushed
+through rapidly, and from it the tunnel may be attacked at a number of
+points at one time. It was found to be more expensive than the
+top-heading-and-bench method, and as soon as the depression in the rock
+at about Station 59 was passed, a top heading about 7 ft. high, and
+roughly the segment of a 23-ft. circle, was driven to the next soft
+ground in each of the four tunnels. The remainder of the section was
+taken out in two<span class='pagenum'><a name="Page_423" id="Page_423">[Pg 423]</a></span> benches, the first, about 4 ft. high, was kept about
+15 ft. ahead of the lower bench, which was about the remaining 11 ft.
+high.</p>
+
+
+<h4><span class="smcap">Excavation in Earth and Rock.</span></h4>
+
+<p>About 2,500 ft. of tunnel, the roof of which was in soft ground, was
+excavated in normal air by the mining-and-timbering method. In the
+greater part of this the rock surface was well above the middle of the
+tunnel. The method of timbering and mining, while well enough known, has
+not been generally used in the United States.</p>
+
+<div class="figcenter">
+ <a id="ill01" name="ill01"></a><a href="images/ill01large.jpg">
+ <img src="images/ill01.jpg"
+ alt="Plate LXIII"
+ title="Plate LXIII" /></a><br />
+ <span class="caption">Plate LXIII</span>
+</div>
+
+<p>Starting from the break-up in all rock, as described above, and
+illustrated on Plate XIII, when soft ground was approached, a top
+heading was driven from the rock into and through the earth. This
+heading was about 7 ft. high and about 6 ft. wide. This was done by the
+usual post, cap, and poling-board method. The ground was a running sand
+with little or no clay, and, at first, considerable water, in places.
+All headings required side polings. The roof poling boards were about
+2-1/2 or 3 ft. above the outside limit of the tunnel lining, as
+illustrated by Figs. 3, 4, and 5, <a href="#ill01">Plate LXIII</a>. The next step was to
+place two crown-bars, <i>AA</i>, usually about 20 ft. long, under the caps.
+Posts were then placed under the bars, and poling boards at right angles
+to the axis of the tunnel were then driven out over the bars. As these
+polings were being driven, the side polings of the original heading were
+removed, and the earth was mined out to the end of these new transverse
+polings. Breast boards were set on end under the ends of the transverse
+polings when they had been driven out to their limit. Side bars, <i>BB</i>,
+were then placed as far out as possible and supported on raking posts.
+These posts were carried down to rock, if it was near, if not, a sill
+was placed.</p>
+
+<p>A new set of transverse polings was driven over these side bars and the
+process was repeated until the sides had been carried down to rock or
+down to the elevation of the sills supporting the posts, which were
+usually about 4 ft. above the axis of the tunnel.</p>
+
+<p>The plan then was to excavate the remainder of the section and build the
+iron lining in short lengths, gradually transferring the weight of the
+roof bars of the iron lining as the posts were taken out. This meant
+that not more than four rings, and often only one ring, could be built
+before excavation and a short length of cradle became necessary. Before
+the posts under the roof bars could be built and the<span class='pagenum'><a name="Page_424" id="Page_424">[Pg 424]</a></span> weight transferred
+to the iron lining, a grout dam was placed at the leading end of the
+iron lining, and grout was brought up to at least 45&deg; from the top. Such
+workings were in progress at as many as eight places in one tunnel at
+the same time. Where there was only the ordinary ground-water to contend
+with, the driving of the top heading drained the ground very thoroughly,
+and the enlarging was done easily and without a serious loss of ground.
+Under these conditions the surface settlement was from 6 in. to 2 ft.</p>
+
+<p>Under Borden Avenue, there was more water, which probably came from a
+leaky sewer; it was not enough to form a stream, but just kept the
+ground thoroughly saturated. There was a continued though hardly
+perceptible flow of earth through every crevice in the timbering during
+the six or eight weeks between the driving of the top heading and the
+placing of the iron lining; and here there was a settlement of from 4 to
+8 ft. at the surface.</p>
+
+
+<h4><span class="smcap">Tunneling in Compressed Air Without a Shield.</span></h4>
+
+<p>When it became evident that there would not be time for one shield to do
+the soft ground portions of all four tunnels under the Long Island
+Railroad station, a plan was adopted and used in Tunnel B which, while
+not as rapid, turned out to be as cheap as the work done by the shields.
+Figs. 6 and 7, <a href="#ill01">Plate LXIII</a>, and <a href="#ill02">Fig. 1, Plate LXIV</a>, illustrate this work
+fairly well. The operation of this scheme was about as follows: Having
+the iron built up to the face of the full-sized excavation, a hole or
+top heading, about 3 ft. wide and 4 or 5 ft. high, was excavated to
+about 10 ft. in advance. This was done in a few hours without timbering
+of any kind; but, as soon as the hole or heading was 10 ft. out, 6 by
+12-in. laggings or polings were put up in the roof, with the rear ends
+resting on the iron lining and the leading ends resting on vertical
+breast boards. The heading was then widened out rapidly and the lagging
+was placed, down to about 45&deg; from the crown. The forward ends of the
+laggings were then supported by a timber rib and sill. Protected by this
+roof, the full section was excavated, and three rings of the iron lining
+were built and grouted, and then the whole process was repeated.</p>
+
+<div class="figcenter">
+ <a id="ill02" name="ill02">
+ <img src="images/ill02.jpg"
+ alt="Plate LXIV, Fig. 1.--Tunneling in Compressed Air Without Shield."
+ title="Plate LXIV, Fig. 1.--Tunneling in Compressed Air Without Shield." /></a><br />
+ <span class="caption">Plate LXIV, Fig. 1.&mdash;Tunneling in Compressed Air Without Shield.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill03" name="ill03">
+ <img src="images/ill03.jpg"
+ alt="Plate LXIV, Fig. 2.--T-Head Air-lock."
+ title="Plate LXIV, Fig. 2.--T-Head Air-lock." /></a><br />
+ <span class="caption">Plate LXIV, Fig. 2.&mdash;T-Head Air-lock.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill04" name="ill04">
+ <img src="images/ill04.jpg"
+ alt="Plate LXIV, Fig. 3.--Cutting Edge of Caisson Assembled."
+ title="Plate LXIV, Fig. 3.--Cutting Edge of Caisson Assembled." /></a><br />
+ <span class="caption">Plate LXIV, Fig. 3.&mdash;Cutting Edge of Caisson Assembled.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill05" name="ill05">
+ <img src="images/ill05.jpg"
+ alt="Plate LXIV, Fig. 4.--Caisson Supported on Jacks and Blocks."
+ title="Plate LXIV, Fig. 4.--Caisson Supported on Jacks and Blocks." /></a><br />
+ <span class="caption">Plate LXIV, Fig. 4.&mdash;Caisson Supported on Jacks and Blocks.</span>
+</div>
+
+
+<h4><span class="smcap">Concrete Cradles, Hand-Packed Stone and Grouting.</span></h4>
+
+<p>Had the East Avenue Tunnel been built by shields, as was contemplated at
+the time of its design, the space between the limits of<span class='pagenum'><a name="Page_425" id="Page_425">[Pg 425]</a></span> excavation
+and the iron lining would have been somewhat less than by the method
+actually used, especially in the earth portions. This space would have
+been filled with grout ejected through the iron lining. The change in
+the method of doing the work permitted the use of cheaper material, in
+place of part of the grout, and, at the same time, facilitated the work.</p>
+
+<p>The tube of cast-iron rings is adapted to be built in the tail of the
+shield. Where no shield was used, after the excavation was completed and
+all loose rock was removed, timbers were fixed across the tunnel from
+which semicircular ribs were hung, below which lagging was placed. The
+space between this and the rough rock surface was filled with concrete.
+This formed a cradle in which the iron tube could be erected, and, at
+the same time, occupied space which would have been filled by grout, at
+greater cost, had a shield been used.</p>
+
+<p>As soon as each ring of iron was erected, the space between it and the
+roof of the excavation was filled with hand-packed stone. At about every
+sixth ring a wall of stone laid in mortar was built between the lining
+and the rock to serve as a dam to retain grout. The interstices between
+the hand-packed stones were then filled with 1 to 1 grout of cement and
+sand, ejected through the iron lining. The concrete cradles averaged
+1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70
+per cu. yd., of which $2.25 was for labor and $4.45 was for top charges.
+The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost
+$2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top
+charges.</p>
+
+
+<h4><span class="smcap">Erection of Iron Lining.</span></h4>
+
+<p>The contractors planned to erect the iron lining with erectors of the
+same pattern as that used on the shield under the river, mounted on a
+traveling stage. These will be described in detail in Mr. Japp's paper.
+Two of these stages and erectors worked in each tunnel at different
+points. The tunnel was attacked from so many points that these erectors
+could not be moved from working to working. The result was that about
+58% of the lining was built by hand. At first thought, this seems to be
+a crude and extravagant method, as the plates weighed about 1 ton each
+and about 20,000 were erected by hand. As it turned out, the cost was
+not greater than for those erected by machinery, taking into account the
+cost of erectors and power. This, however,<span class='pagenum'><a name="Page_426" id="Page_426">[Pg 426]</a></span> was largely because the hand
+erection reduced the amount of work to be done by the machines so much
+that the machines had an undue plant charge.</p>
+
+<p>The hand erection was very simple. A portable hand-winch, with a 3/8-in.
+wire rope, was set in any convenient place. The wire rope was carried to
+a snatch-block fastened to the top of the iron previously built; or,
+where the roof was in soft ground, the timbering furnished points of
+attachment. The end of the wire rope was then hooked to a bolt hole in a
+new plate, two men at the winch lifted the plate, and three or four
+others swung it into approximate place, and, with the aid of bars and
+drift-pins, coaxed it into position and bolted it. Where there was no
+timbering above the iron, sometimes the key and adjoining plates were
+set on blocking on a timber staging and then jacked up to place.</p>
+
+
+<h4><span class="smcap">Long Island Shafts.</span></h4>
+
+<p>The river shafts were designed to serve both as working shafts and as
+permanent openings to the tunnels, and were larger and more substantial
+than would have been required for construction purposes. Plate X of Mr.
+Noble's paper shows their design. They consist of two steel caissons,
+each 40 by 74 ft. in plan, with walls 5 ft. thick filled with concrete.
+A wall 6 ft. thick separated each shaft into two wells 29 by 30 ft.,
+each directly over a tunnel. Circular openings for the tunnel, 25 ft. in
+diameter, were provided in the sides of the caissons. During the sinking
+these were closed by bulkheads of steel plates backed by horizontal
+steel girders. The shafts were sunk as pneumatic caissons to a depth of
+78 ft. below mean high water. There have been a few caissons which were
+larger and were sunk deeper than these, but most large caissons have
+been for foundations, such as bridge piers, and have been stopped at or
+a little below the surface of the rock. The unusual feature of the
+caissons for the Long Island shaft is that they were sunk 54 ft. through
+rock.</p>
+
+<p>It had been hoped that the rock would prove sound enough to permit
+stopping the caissons at or a little below the surface and continuing
+the excavation without sinking them further; for this reason only the
+steel for the lower 40 ft. of the caissons was ordered at first.</p>
+
+<p>The roof of the working chamber was placed 7 ft. above the cutting edge.
+It was a steel floor, designed by the contractors, and consisted<span class='pagenum'><a name="Page_427" id="Page_427">[Pg 427]</a></span> of
+five steel girders, 6 ft. deep, 29 ft. long, and spaced at 5-ft.
+centers. Between were plates curved upward to a radius of 4 ft. Each
+working chamber had two shafts, 3 ft. by 5 ft. in cross-section, with a
+diaphragm dividing it into two passages, the smaller for men and the
+larger for muck buckets. On top of these shafts were Moran locks.
+Mounted on top of the caisson was a 5-ton Wilson crane, which would
+reach each shaft and also the muck cars standing on tracks on the ground
+level beside the caissons. Circular steel buckets, 2 ft. 6 in. in
+diameter and 3 ft. high, were used for handling all muck. These were
+taken from the bottom of the working chamber, dumped in cars, and
+returned to the bottom without unhooking. Work was carried on by three
+8-hour shifts per day. The earth excavation was done at the rate of
+about 67 cu. yd. per day from one caisson. The rock excavation,
+amounting to about 6,200 cu. yd. in each caisson, was done at the rate
+of about 44.5 cu. yd. per day. The average rate of lowering, when the
+cutting edge of the south caisson was passing through earth, was 0.7 ft.
+per day. In rock, the rate was 0.48 ft. per day in the south caisson,
+and 0.39 ft. per day in the north caisson.</p>
+
+<p>At the beginning all lowering was done with sixteen hydraulic jacks.
+Temporary brackets were fastened to the outside of the caisson. A
+100-ton hydraulic jack was placed under each alternate bracket and under
+each of the others there was blocking. The jacks were connected to a
+high-pressure pump in the power-house. As the jacks lifted the caisson,
+the blocking was set for a lower position, to which the caisson settled
+as the jacks were exhausted. After the caisson had penetrated the earth
+about 10 ft., the outside brackets were removed and the lowering was
+regulated by blocking placed under brackets in the working chamber. The
+caisson usually rested on three sets of blockings on each side and two
+on each end. The blocking was about 4 ft. inside the cutting edge. In
+the rock, as the cutting edge was cleared for a lowering of about 2 ft.,
+6 by 8-in. oak posts were placed under the cutting-edge angle. When a
+sufficient number of posts had been placed, the blocking on which the
+caisson had rested was knocked or blasted out, and the rock underneath
+was excavated. The blocking was then re-set at a lower elevation. The
+posts under the cutting edge were then chopped part way through and the
+air pressure was lowered about 10 lb., which increased the net weight to
+more than 4,000,000 lb. The posts then gradually crushed and the
+caissons settled to the new block<span class='pagenum'><a name="Page_428" id="Page_428">[Pg 428]</a></span>ing. The tilt or level of the caisson
+was controlled by chopping the posts more on the side which was desired
+to move first.</p>
+
+<p>The caisson nearly always carried a very large net weight, usually about
+870 tons. The concrete in the walls, which was added as the caisson was
+being sunk, was kept at about the elevation of the ground. There was
+generally a depth of from 5 to 20 ft. of water ballast on top of the
+roof of the working chamber. The air pressure in the working chamber was
+usually much less than the hydrostatic head outside the caisson. For
+example, the average air pressure in the south caisson during January,
+1906, was 16-1/2 lb., while the average head was 62.5 ft., equivalent to
+27 lb. per sq. in. Under these conditions, there was a continued but
+small leakage into the caisson of from 15,000 to 20,000 gal. per day.</p>
+
+<p>In the rock the excavation was always carried from 2 to 5 in. outside
+the cutting edge. As soon as the cutting edge was cleared, bags of clay
+were placed under it in a well-tiered, solid pile, so that when the
+caisson was lowered the bags were cut through and most of the clay, bags
+and all, was squeezed back of the cutting edge between the rock and the
+caisson.</p>
+
+<p>Table 1 shows the relation of the final position of the caissons to that
+designed.</p>
+
+<p>The cost of rock excavation in the caisson was $4.48 per cu. yd. for
+labor and $10.54 for top charges.</p>
+
+<p>The bottom of the shaft is an inverted concrete arch, 4 ft. thick,
+water-proofed with 6-ply felt and pitch. As soon as the caisson was down
+to its final position and the excavation was completed, concrete was
+deposited on the uneven rock surfaces, brought up to the line of the
+water-proofing, and given a smooth 1-in. mortar coat. The felt was stuck
+together in 3-ply mats on the surface with hot coal-tar pitch. These
+were rolled and sent down into the working chamber, where they were put
+down with cold pitch liquid at 60&deg; Fahr. Each sheet of felt overlapped
+the one below 6 in. The water-proofing was covered by a 1-in. mortar
+plaster coat, after which the concrete of the 4-ft. inverted arch was
+placed. While the water-proofing and concreting were being done, the air
+pressure was kept at from 30 to 33 lb. per sq. in., the full hydrostatic
+head at the cutting edge. After standing for ten days, the air pressure
+was taken off, and the removal of the roof of the working chamber was
+begun. The water-proofing was done by the Union Construction and
+Waterproofing Company.</p>
+
+<p><span class='pagenum'><a name="Page_429" id="Page_429">[Pg 429]</a></span></p>
+
+<h4>TABLE 1.&mdash;<span class="smcap">Relation of the Final Position of the Caissons to That
+Designed.</span></h4>
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' class="btl"><span class="smcap">Location.</span></td>
+ <td align='center' colspan="6" class="btlr"><span class="smcap">Long Island City.</span></td>
+</tr>
+<tr>
+ <td align='center' class="btl">Shaft.</td>
+ <td align='center' colspan="3" class="btl">North.</td>
+ <td align='center' colspan="3" class="btlr">South.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">Corner.</td>
+ <td align='center' class="btl">High.</td>
+ <td align='center' class="btl">East.</td>
+ <td align='center' class="btl">North.</td>
+ <td align='center' class="btl">High.</td>
+ <td align='center' class="btl">East.</td>
+ <td align='center' class="btlr">North.</td>
+</tr>
+<tr>
+ <td align='left' class="btl">Northeast</td>
+ <td align='left' class="btl">0.21 ft.</td>
+ <td align='left' class="btl">0.08 ft.</td>
+ <td align='left' class="btl">0.05 ft.</td>
+ <td align='left' class="btl">0.32 ft.</td>
+ <td align='left' class="btl">0.15 ft.</td>
+ <td align='left' class="btlr">0.28 ft.</td>
+</tr>
+<tr>
+ <td align='left' class="bl">Northwest</td>
+ <td align='left' class="bl">0.22 "</td>
+ <td align='left' class="bl">0.08 "</td>
+ <td align='left' class="bl">0.02 "</td>
+ <td align='left' class="bl">0.00 "</td>
+ <td align='left' class="bl">0.15 "</td>
+ <td align='left' class="blr">0.12 "</td>
+</tr>
+<tr>
+ <td align='left' class="bl">Southwest</td>
+ <td align='left' class="bl">0.27 "</td>
+ <td align='left' class="bl">0.14 "</td>
+ <td align='left' class="bl">0.02 "</td>
+ <td align='left' class="bl">0.18 "</td>
+ <td align='left' class="bl">0.45 "</td>
+ <td align='left' class="blr">0.12 "</td>
+</tr>
+<tr>
+ <td align='left' class="bbl">Southeast</td>
+ <td align='left' class="bbl">0.23 "</td>
+ <td align='left' class="bbl">0.14 "</td>
+ <td align='left' class="bbl">0.05 "</td>
+ <td align='left' class="bbl">0.39 "</td>
+ <td align='left' class="bbl">0.45 "</td>
+ <td align='left' class="bblr">0.28 "</td>
+</tr>
+</table></div>
+
+<p>&nbsp;</p>
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' class="btl"><span class="smcap">Location.</span></td>
+ <td align='center' colspan="6" class="btlr"><span class="smcap">Manhattan.</span></td>
+</tr>
+<tr>
+ <td align='center' class="btl">Shaft.</td>
+ <td align='center' colspan="3" class="btl">North.</td>
+ <td align='center' colspan="3" class="btlr">South.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">Corner.</td>
+ <td align='center' class="btl">High.</td>
+ <td align='center' class="btl">East.</td>
+ <td align='center' class="btl">South.</td>
+ <td align='center' class="btl">High.</td>
+ <td align='center' class="btl">East or West.</td>
+ <td align='center' class="btlr">North or South.</td>
+</tr>
+<tr>
+ <td align='left' class="btl">Northeast</td>
+ <td align='left' class="btl">0.23 ft.</td>
+ <td align='left' class="btl">0.74 ft.</td>
+ <td align='left' class="btl">0.38 ft.</td>
+ <td align='left' class="btl">0.00 ft.</td>
+ <td align='left' class="btl">0.06 ft. east.</td>
+ <td align='left' class="btlr">0.04 ft. south.</td>
+</tr>
+<tr>
+ <td align='left' class="bl">Northwest</td>
+ <td align='left' class="bl">0.00 "</td>
+ <td align='left' class="bl">0.74 "</td>
+ <td align='left' class="bl">0.22 "</td>
+ <td align='left' class="bl">0.08 "</td>
+ <td align='left' class="bl">0.06 " &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;"</td>
+ <td align='left' class="blr">0.13 " &nbsp;&nbsp;north.</td>
+</tr>
+<tr>
+ <td align='left' class="bl">Southwest</td>
+ <td align='left' class="bl">0.11 "</td>
+ <td align='left' class="bl">0.31 "</td>
+ <td align='left' class="bl">0.22 "</td>
+ <td align='left' class="bl">0.21 "</td>
+ <td align='left' class="bl">0.45 " &nbsp;&nbsp;west.</td>
+ <td align='left' class="blr">0.13 " &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;"</td>
+</tr>
+<tr>
+ <td align='left' class="bbl">Southeast</td>
+ <td align='left' class="bbl">0.46 "</td>
+ <td align='left' class="bbl">0.31 "</td>
+ <td align='left' class="bbl">0.38 "</td>
+ <td align='left' class="bbl">0.04 "</td>
+ <td align='left' class="bbl">0.45 " &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;"</td>
+ <td align='left' class="bblr">0.04 " &nbsp;&nbsp;south.</td>
+</tr>
+</table></div>
+
+<p><span class='pagenum'><a name="Page_430" id="Page_430">[Pg 430]</a></span></p>
+
+<p>The cost of labor in compressed air chargeable to concreting was $3.40
+per cu. yd.</p>
+
+<p>After the roof of each working chamber had been removed, the shield was
+erected on a timber cradle in the bottom of the shaft, in position to be
+shoved out of the opening in the west side of the caisson. Temporary
+rings of iron lining were erected across the shaft in order to furnish
+something for the shield jacks to shove against.</p>
+
+<p>The roof of the working chamber was then re-erected about 35 ft. above
+its original position and about 8 ft. above the tunnel openings. This
+time, instead of the two small shafts which were in use during the
+sinking of the caisson, a large steel shaft with a T-head lock was
+built. This is illustrated in <a href="#ill03">Fig. 2, Plate LXIV</a>. The shaft was 8 ft. in
+diameter. Inside there was a ladder and an elevator cage for lowering
+and hoisting men and the standard 1-yd. tunnel cars. At the top, forming
+the head of the T, there were two standard tunnel locks.</p>
+
+
+<h4><span class="smcap">Manhattan Shafts.</span></h4>
+
+<p>A permanent shaft, similar to the river shafts in Long Island City, was
+constructed at Manhattan over each pair of tunnels. Each shaft was
+located across two lines, with its longer axis transverse to the
+tunnels. Plate XIII shows their relative positions. They were divided
+equally by a reinforced concrete partition wall transverse to the line
+of the tunnels. On completion, the western portions were turned over to
+the contractor for the cross-town tunnels for his exclusive use.</p>
+
+<p><i>South Shaft.</i>&mdash;Work on the south shaft was started on June 9th, 1904,
+with the sinking of a 16 by 16-ft. test pit in the center of the south
+half of the south shaft, which reached disintegrated rock at a depth of
+about 20 ft.</p>
+
+<p>Starting in August, the full shaft area, 74 by 40 ft., was taken out in
+an open untimbered cut to the rock, and a 20 by 50-ft. shaft was sunk
+through the rock to tunnel grade, leaving a 10 or 12-ft. berm around it.
+(<a href="#ill13">Fig. 1, Plate LXX.</a>)</p>
+
+<p>The erection of the caisson was started, about the middle of January, on
+the rock berm surrounding the 20 by 50-ft. shaft and about 15 ft. below
+the surface. <a href="#ill04">Fig. 3, Plate LXIV</a>, shows the cutting edge of the caisson
+assembled. The excavation of the small<span class='pagenum'><a name="Page_431" id="Page_431">[Pg 431]</a></span> shaft had shown that hard rock
+and only a very small quantity of water would be encountered, and that
+the caisson need be sunk only a short distance below the rock surface.
+Therefore, no working-chamber roof was provided, the caisson was built
+to a height of only 40 ft., and the circular openings were permanently
+closed.</p>
+
+<p>The assembling of the caisson took 2-1/2 months, and on April 2d
+lowering was started. Inverted brackets were bolted temporarily to the
+cutting-edge stiffening brackets, and the sinking was carried on by
+methods similar to those used at Long Island. The jacks and blocking
+supporting the caisson are shown in <a href="#ill05">Fig. 4, Plate LXIV</a>. As soon as the
+cutting edge entered the rock, which was drilled about 6 in. outside of
+the neat lines, the space surrounding the caisson was back-filled with
+clay and muck to steady it and provide skin friction. As the friction
+increased, the walls were filled with concrete, and as the caisson
+slowly settled, it was checked and guided by blocking. The cutting edge
+finally came to rest 31 ft. below mean high water, the sinking having
+been accomplished in about seven weeks, at an average rate of 0.50 ft.
+per day.</p>
+
+<p>The final position of the cutting edge in relation to its designed
+position is shown in Table 1.</p>
+
+<p>A berm about 4 ft. wide was left at the foot of the caisson below which
+the rock was somewhat fissured and required timbering. The cutting edge
+of the caisson was sealed to the rock with grout on the outside and a
+concrete base to the caisson walls on the inside, the latter resting on
+the 4-ft. berm. Following the completion of the shaft, the permanent
+sump was excavated to grade for use during construction.</p>
+
+<p><i>North Shaft.</i>&mdash;The north shaft had to be sunk in a very restricted
+area. The east side of the caisson cleared an adjoining building at one
+point by only 1 ft., while the northwest corner was within the same
+distance of the east line of First Avenue. As in the case of the Long
+Island shafts, the steelwork for only the lower 40 ft. was ordered at
+the start. This height was completely assembled before sinking was
+begun. The caisson was lowered in about the same manner as those
+previously described. The bearing brackets for the hydraulic jacks were
+attached, as at the south shaft, to the inside of the cutting-edge
+brackets. The east side of the caisson was in contact with the
+foundations of the neighboring building, while the west side was in much
+softer material. As a consequence, the west side tended to settle more<span class='pagenum'><a name="Page_432" id="Page_432">[Pg 432]</a></span>
+rapidly and thus throw the caisson out of level and position. To
+counteract that tendency, it was necessary to load the east wall heavily
+with cast-iron tunnel sections, in addition to the concrete filling in
+the walls.</p>
+
+<p>Soon after sinking was begun, a small test shaft was sunk to a point
+below the elevation of the top of the tunnels. The rock was found to be
+sound, hard, and nearly dry. It was then decided to stop the caisson as
+soon as a foundation could be secured on sound rock. The latter was
+found at a depth of 38 ft. below mean high water. With the cutting edge
+seated at that depth, the top of the caisson was only 2 ft. above mean
+high water, and as this was insufficient protection against high tides,
+a 10-ft. extension was ordered for the top. Work, however, went on
+without delay on the remainder of the excavation. The junction between
+the cutting edge and the rock was sealed with concrete and grout. The
+caisson was lowered at an average rate of 0.53 ft. per day. The size of
+the shaft below the cutting edge was 62 ft. 7 in. by 32 ft. The average
+rate of excavation during the sinking in soft material was 84 cu. yd.
+per day. The average rate of rock excavation below the final position of
+the cutting edge was 125 cu. yd. per day. There were night and day
+shifts, each working 10 hours. Excavation in earth cost $3.96 per cu.
+yd., of which $1.45 was for labor and $2.51 for top charges, etc. The
+excavation of rock cost $8.93 per cu. yd., $2.83 being for labor and
+$6.10 for top charges.</p>
+
+<p>The final elevations of the four corners of the cutting edge, together
+with their displacement from the desired positions, are shown in Table
+1.</p>
+
+
+<h4><span class="smcap">River Tunnels.</span></h4>
+
+<p>The four river tunnels, between the Manhattan and Long Island City
+shafts, a distance of about 3,900 ft., were constructed by the shield
+method. Eight shields were erected, one on each line in each shaft, the
+four from Manhattan working eastward to a junction near the middle of
+the river with the four working westward from Long Island City. Toward
+the end of the work it was evident that the shields in Tunnels <i>B</i>, <i>C</i>,
+and <i>D</i> would meet in the soft material a short distance east of the
+Blackwell's Island Reef if work were continued in all headings. In order
+that the junction might be made in firm material, work from Manhattan in
+those three tunnels was suspended when the shields<span class='pagenum'><a name="Page_433" id="Page_433">[Pg 433]</a></span> reached the edge
+of the ledge. The shields in Tunnel <i>A</i> met at a corresponding point
+without the suspension of work in either. An average of 1,760 ft. of
+tunnel was driven from Manhattan and 2,142 ft. from Long Island City.</p>
+
+<div class="figcenter">
+ <a id="ill06" name="ill06">
+ <img src="images/ill06.jpg"
+ alt="Plate LXV, Fig. 1.--Shield Fitted with Sectional Sliding Hoods and Sliding Extensions to the Floors."
+ title="Plate LXV, Fig. 1.--Shield Fitted with Sectional Sliding Hoods and Sliding Extensions to the Floors." /></a><br />
+ <span class="caption">Plate LXV, Fig. 1.&mdash;Shield Fitted with Sectional Sliding Hoods and Sliding Extensions to the Floors.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill07" name="ill07">
+ <img src="images/ill07.jpg"
+ alt="Plate LXV, Fig. 2.--Shield Fitted with Fixed Hoods and Fixed Extensions to the Floors."
+ title="Plate LXV, Fig. 2.--Shield Fitted with Fixed Hoods and Fixed Extensions to the Floors." /></a><br />
+ <span class="caption">Plate LXV, Fig. 2.&mdash;Shield Fitted with Fixed Hoods and Fixed Extensions to the Floors.</span>
+</div>
+
+
+<h4><span class="smcap">Tunnels Driven Eastward from Manhattan.</span></h4>
+
+<p><i>Materials and Inception of Work.</i>&mdash;The materials encountered are shown
+in the profile on Plate XIII, and were similar in all the tunnels. In
+general, they were found to be about as indicated in the preliminary
+borings. The materials met in Tunnel <i>A</i> may be taken as typical of all.</p>
+
+<p>From the Manhattan shaft eastward, in succession, there were 123 ft. of
+all-rock section, 87 ft. of part earth and part rock, 723 ft. of all
+earth, 515 ft. of part rock and part earth, 291 ft. of all rock, and 56
+ft. of part rock and part earth.</p>
+
+<p>The rock on the Manhattan side was Hudson schist, while that in the reef
+was Fordham gneiss. Here, as elsewhere, they resembled each other
+closely; the gneiss was slightly the harder, but both were badly seamed
+and fissured. Wherever it was encountered in this work, the rock surface
+was covered by a deposit of boulders, gravel, and sand, varying in
+thickness from 4 to 10 ft. and averaging about 6 ft.</p>
+
+<p>The slope of the surface of the ledge on the Manhattan side averaged
+about 1 vertical to 4 horizontal. The rock near the surface was full of
+disintegrated seams, and was badly broken up. It was irregularly
+stratified, and dipped toward the west at an angle of about 60 degrees.
+Large pieces frequently broke from the face and slid into the shield,
+often exposing the sand. The rock surface was very irregular, and was
+covered with boulders and detached masses of rock embedded in coarse
+sand and gravel. The sand and gravel allowed the air to escape freely.
+By the time the shields had entirely cleared the rock, the material in
+the face had changed to a fine sand, stratified every few inches by very
+thin layers of chocolate-colored clayey material. This is the material
+elsewhere referred to as quicksand. As the shield advanced eastward, the
+number and thickness of the layers of clay increased until the clay
+formed at least 20% of the entire mass, and many of the layers were 2
+in. thick.</p>
+
+<p>At a distance of about 440 ft. beyond the Manhattan ledge, the material
+at the bottom of the face changed suddenly to one in which<span class='pagenum'><a name="Page_434" id="Page_434">[Pg 434]</a></span> the layers
+of clay composed probably 98% of the whole. The sand layers were not
+more than 1/16 in. thick and averaged about 2 in. apart. The surface of
+the clay rose gradually for a distance of 40 ft. in Tunnels <i>A</i> and <i>B</i>,
+and 100 ft. in Tunnels <i>C</i> and <i>D</i>, when gravel and boulders appeared at
+the bottom of the shield. At that time the clay composed about one-half
+of the face.</p>
+
+<p>The surfaces of both the clay and gravel were irregular, but they rose
+gradually. After rock was encountered, the formations of gravel and clay
+were roughly parallel to the rock surface.</p>
+
+<p>As the surface of the rock rose they disappeared in order and were again
+encountered when the shields broke out of rock on the east side of the
+Blackwell's Island Reef. East of the reef a large quantity of coarse
+open sand was present in the gravel formations before the clay appeared
+below the top of the cutting edge. In Tunnels <i>C</i> and <i>D</i> this was
+especially difficult to handle. It appears to be a reasonable assumption
+that the layer of clay was continuous across the reef. Wherever the clay
+extended above the top of the shield it reduced the escape of air
+materially. It is doubtless largely due to this circumstance that the
+part-rock sections in the reef were not the most difficult portions of
+the work.</p>
+
+<p>While sinking the lower portions of the shafts the tunnels were
+excavated eastward in the solid rock for a distance of about 60 ft.,
+where the rock at the top was found to be somewhat disintegrated. This
+was as far as it was considered prudent to go with the full-sized
+section without air pressure. At about the same time top headings were
+excavated westward from the shafts for a distance of 100 ft., and the
+headings were enlarged to full size for 50 ft. The object was to avoid
+damage to the shaft and interference with the river tunnel when work was
+started by the contractor for the cross-town tunnel.</p>
+
+<div class="figcenter">
+ <a id="ill08" name="ill08">
+ <img src="images/ill08.jpg"
+ alt="Plate LXVI, Fig. 1.--Rear of Shield Showing Complete Fittings."
+ title="Plate LXVI, Fig. 1.--Rear of Shield Showing Complete Fittings." /></a><br />
+ <span class="caption">Plate LXVI, Fig. 1.&mdash;Rear of Shield Showing Complete Fittings.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill09" name="ill09">
+ <img src="images/ill09.jpg"
+ alt="Plate LXVI, Fig. 2.--Shield with Lower Portion of Bulkhead Removed."
+ title="Plate LXVI, Fig. 2.--Shield with Lower Portion of Bulkhead Removed." /></a><br />
+ <span class="caption">Plate LXVI, Fig. 2.&mdash;Shield with Lower Portion of Bulkhead Removed.</span>
+</div>
+
+<p>The shields were erected on timber cradles in the shaft, and were shoved
+forward to the face of the excavation. Concrete bulkheads, with the
+necessary air-locks, were then built across the tunnels behind the
+shields. The shields were erected before the dividing walls between the
+two contracts were placed. Rings of iron tunnel lining, backed by
+timbers spanning the openings on the west side, were erected temporarily
+across the shafts in order to afford a bearing for the shield jacks
+while shoving into the portals. The movement of the shield eastward was
+continued in each tunnel for a distance of about 60 ft.,<span class='pagenum'><a name="Page_435" id="Page_435">[Pg 435]</a></span> and the
+permanent cast-iron tunnel lining was erected as the shield advanced.
+Before breaking out of rock, it was necessary to have air pressure in
+the tunnels. This required the building of bulkheads with air-locks
+inside the cast-iron linings just east of the portals. Before erecting
+the bulkheads it was necessary to close the annular space between the
+iron tunnel lining and the rock. The space at the portal was filled with
+a concrete wall. After about twenty permanent rings had been erected in
+each tunnel, two rings were pulled apart at the tail of the shield and a
+second masonry wall or dam was built. The space between the two dams was
+then filled with grout. To avoid the possibility of pushing the iron
+backward after the air pressure was on, rings of segmental plates, 5/8
+in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential
+joints in each tunnel between the rings as they were erected. The plates
+contained slotted holes to match those in the segments. After the rings
+left the shield, the plates were driven outward, and projected about 5
+in. When the tunnel was grouted, the plates were embedded.</p>
+
+<p>The bulkheads were completed, and the tunnels were put under air
+pressure on the following dates:</p>
+
+<p>
+Line <i>D</i>, on October 5th, 1905;<br />
+Line <i>C</i>, on November 6th, 1905;<br />
+Line <i>B</i>, on November 25th, 1905;<br />
+Line <i>A</i>, on December 1st, 1905.<br />
+</p>
+
+<p>This marked the end of the preparatory period.</p>
+
+<p>In the deepest part of the river, near the pier-head line on the
+Manhattan side, there was only 8 ft. of natural cover over the tops of
+the tunnels. This cover consisted of the fine sand previously described,
+and it was certain that the air would escape freely from the tunnels
+through it. To give a greater depth of cover and to check the loss of
+air, the contractor prepared to cover the lines of the tunnels with
+blankets of clay, which, however, had been provided for in the
+specifications. Permits, as described later, were obtained at different
+times from the Secretary of War, for dumping clay in varying thicknesses
+over the line of work. The dumping for the blanket allowed under the
+first permit was completed in February, 1906. The thickness of this
+blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan
+side. The original blanket was of material advantage, but the depth of
+clay was insufficient to stop the loss of air.<span class='pagenum'><a name="Page_436" id="Page_436">[Pg 436]</a></span></p>
+
+<p>The essential parts of the shields in the four tunnels were exactly
+alike. Those in Tunnels <i>B</i> and <i>D</i>, however, were originally fitted
+with sectional sliding hoods and sliding extensions to the floors of the
+working chambers, as shown by <a href="#ill06">Fig. 1, Plate LXV</a>. The shields in Tunnels
+<i>A</i> and <i>C</i> were originally fitted with fixed hoods and fixed extensions
+to the floors, as shown in <a href="#ill07">Fig. 2, Plate LXV</a>. A full description of the
+shields will be found in Mr. Japp's paper.</p>
+
+<p>The shields in each pair of tunnels were advanced through the solid rock
+section about abreast of each other, until test holes from the faces
+indicated soft ground within a few feet. As the distance between the
+sides of the two tunnels was only 14 ft., it was thought best to let
+Tunnels <i>B</i> and <i>D</i> gain a lead of about 100 ft. before Tunnels <i>A</i> and
+<i>C</i> opened out into soft ground, in order that a blow from one tunnel
+might not extend to the other. Work in Tunnel <i>C</i> was shut down on
+December 23d, 1905, after exposing sand to a depth of 3 ft. at the top,
+and it remained closed for seven weeks. Work in Tunnel <i>A</i> was suspended
+on September 29th, 1905. By the time Tunnel <i>B</i> had made the required
+advance, it, together with Tunnels <i>C</i> and <i>D</i>, was overtaxing the
+capacities of the compressor plant. Only a little work was done in
+Tunnel <i>C</i> until July, 1906, and work in Tunnel <i>A</i> was not resumed
+until October 22d, 1906.</p>
+
+
+<h4><span class="smcap">Tunnels Driven Westward from Long Island City.</span></h4>
+
+<p><i>Materials and Inception of the Work.</i>&mdash;The materials met in Tunnel A
+are typical of all four tunnels. From the Long Island shafts westward,
+in succession, there were 124 ft. of all-rock section, 125 ft. of part
+rock and part earth section, 22 ft. of all-rock section, 56 ft. of part
+rock and part earth section, 387 ft. of all-rock section, 70 ft. of part
+earth and part rock section, and 1,333 ft. of all-earth section.</p>
+
+<div class="figcenter">
+ <a id="ill10" name="ill10"></a><a href="images/ill10large.jpg">
+ <img src="images/ill10.jpg"
+ alt="Plate LXVII"
+ title="Plate LXVII" /></a><br />
+ <span class="caption">Plate LXVII</span>
+</div>
+
+<p>The materials passed through are indicated on Plate XIII. The rock was
+similar to that of the Blackwell's Island Reef, and was likewise covered
+by a layer of sand and boulders. The remainder of the soft ground was
+divided into three classes. The first was a very fine red sand, which
+occurred in a layer varying in thickness from 6 ft. to at least 15 ft.
+It may have been much deeper above the tunnel. It is the quicksand
+usually encountered in all deep foundations in New York City. The
+following is the result of the sifting test of this sand:</p>
+
+<p><span class='pagenum'><a name="Page_437" id="Page_437">[Pg 437]</a></span></p>
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'>Held</td>
+ <td align='left'>on</td>
+ <td align='left'>No.</td>
+ <td align='right'>30</td>
+ <td align='left'>sieve</td>
+ <td align='right'>0.6%</td>
+</tr>
+<tr>
+ <td align='left'>Passed</td>
+ <td align='left'>No.</td>
+ <td align='right'>30,</td>
+ <td align='center'>"</td>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>40</td>
+ <td align='center'>"</td>
+ <td align='right'>0.4%</td>
+</tr>
+<tr>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>40,</td>
+ <td align='center'>"</td>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>50</td>
+ <td align='center'>"</td>
+ <td align='right'>0.7%</td>
+</tr>
+<tr>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>50,</td>
+ <td align='center'>"</td>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>60</td>
+ <td align='center'>"</td>
+ <td align='right'>2.4%</td>
+</tr>
+<tr>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>60,</td>
+ <td align='center'>"</td>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>80</td>
+ <td align='center'>"</td>
+ <td align='right'>14.9%</td>
+</tr>
+<tr>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>80,</td>
+ <td align='center'>"</td>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>100</td>
+ <td align='center'>"</td>
+ <td align='right'>54.0%</td>
+</tr>
+<tr>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>100,</td>
+ <td align='center'>"</td>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>200</td>
+ <td align='center'>"</td>
+ <td align='right'>8.0%</td>
+</tr>
+<tr>
+ <td align='center'>"</td>
+ <td align='left'>No.</td>
+ <td align='right'>200</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='center'>"</td>
+ <td align='right' class="bb">19.0%</td>
+</tr>
+<tr>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right'>100.0%</td>
+</tr>
+</table></div>
+
+<p>This means that grains of all but 4% of it were less than 0.0071 in. in
+diameter. The 19% which passed the No. 200 sieve, the grains of which
+were 0.0026 in. or less in diameter, when observed with a microscope
+appeared to be perfectly clean grains of quartz; to the eye it looked
+like ordinary building sand, sharp, and well graded from large to small
+grains. This sand, with a surplus of water, was quick. With the water
+blown out of it by air pressure, it is stable, stands up well, and is
+very easy to work. It appears to be the same as the reddish quicksand
+found in most deep excavations around New York City.</p>
+
+<p>The second material was pronounced "bull's liver" by the miners as soon
+as it was uncovered. "Bull's liver" seems to be a common term among
+English-speaking miners the world over. It is doubtful, however, if it
+is always applied to the same thing. In this case it consisted of layers
+of blue clay and very fine red sand. The clay seemed to be perfectly
+pure and entirely free from sand. It would break easily with a clean,
+almost crystalline, fracture, and yet it was soft and would work up
+easily. The layers of clay varied in thickness from 1/16 in. to 1 in.,
+while the thickness of the sand layer varied from 1/4 in. to several
+inches. The sand was the same as the quicksand already described.</p>
+
+<p>The "bull's liver" was ideal material in which to work a shield. It
+stood up as well and held the air about as well as clay, and was much
+easier to handle.</p>
+
+<p>The third material was a layer of fine gray sand which was encountered
+in the top of all the tunnels for about 400 ft. just east of Blackwell's
+Island Reef. It was very open, and had grains of rather uniform size.</p>
+
+<p>During the starting out of the tunnels from the shafts, and for<span class='pagenum'><a name="Page_438" id="Page_438">[Pg 438]</a></span> more
+than a year afterward, the roof of the working chamber in the caissons
+and the locks previously described under the Long Island shafts took the
+place of the bulkhead across the tunnels for confining the air pressure.</p>
+
+<p>The first work in air pressure was to remove the shield plug closing the
+opening in the side of the shaft. This being done, the shield was shoved
+through the opening, and excavation begun.</p>
+
+<p>At the start the shields were fitted with movable platforms, but no
+hoods of any kind were placed until after the rock excavation was
+completed.</p>
+
+
+<h4><span class="smcap">Methods of Excavation.</span></h4>
+
+<p>The distribution of materials to be excavated, as previously outlined,
+divided the excavation into three distinct classes, for which different
+methods had to be developed.</p>
+
+<p>These three classes were:</p>
+
+<p>
+<i>First.</i>&mdash;All-rock section.<br />
+<i>Second.</i>&mdash;Rock in the bottom, earth in the top.<br />
+<i>Third.</i>&mdash;All-earth section.<br />
+</p>
+
+<p>The extent of the second and third classes was much greater than that of
+the first, and they, of course, determined the use of the shield.
+Shields had not previously been used extensively in rock work, either
+where the face was wholly or partly in rock, and it was necessary to
+develop the methods by experience. The specifications required that
+where rock was present in the bottom, a bed of concrete should be laid
+in the form of a cradle on which to advance the shield.</p>
+
+<p><i>All Rock.</i>&mdash;At different times, three general methods were used for
+excavating in all-rock sections. They may be called: The bottom-heading
+method; the full-face method; and the center-heading method.</p>
+
+<p>The bottom-heading method was first tried. A heading, about 8 ft. high
+and 12 ft. wide, was driven on the center line, with its bottom as
+nearly as possible on the grade line of the bottom of the tunnel. It was
+drilled in the ordinary manner by four drills mounted on two columns.
+The face of the headings varied from 10 to 30 ft. in advance of the
+cutting edge. After driving the heading for about 10 ft., the bottom was
+cleared out and a concrete cradle was set. The width of the cradles
+varied, but was generally from 8 to 10 ft.</p>
+
+<p>The excavation was enlarged to full size as the shield advanced, the
+drills being mounted in the forward compartments of the shield, as<span class='pagenum'><a name="Page_439" id="Page_439">[Pg 439]</a></span>
+shown by Fig. 1, <a href="#ill10">Plate LXVII</a>, which represents the conditions after the
+opening had been cut in the bulkhead, but before the new methods,
+mentioned later, had been developed.</p>
+
+<div class="figcenter">
+ <a id="ill11" name="ill11"></a><a href="images/ill11large.jpg">
+ <img src="images/ill11.jpg"
+ alt="Plate LXVIII"
+ title="Plate LXVIII" /></a><br />
+ <span class="caption">Plate LXVIII</span>
+</div>
+
+<p>The sides and top were shot downward into the heading. The area of the
+face remaining behind the heading was large, and a great number of holes
+and several rounds were required to fire the face to advantage. As soon
+as firing was started at the face, the heading was completely blocked,
+and operations there had to be suspended until the mucking was nearly
+completed. The bottom-heading method was probably as good as any that
+could be devised for use with the shields as originally installed. All
+the muck had to be taken from the face by hand and handled through the
+chutes or doors. By drilling from the shield, some muck was blasted on
+to the extensions of the floors and could be handled from the upper
+compartments. At best, however, the shield with the closed transverse
+bulkhead was a serious obstacle to rapid work in rock sections.</p>
+
+<p>The full-face method was only used where the rock was not considered
+safe for a heading. A cut was fired at the bottom, together with side
+holes, in a manner quite similar to that adopted in the first set of
+holes for a bottom heading. The cradle was then placed, in lengths of
+either 2.5 or 5 ft., after which the remainder of the face was fired in
+the same manner as for the bottom-heading method. The closed transverse
+bulkhead with air-locks, as shown in <a href="#ill08">Fig. 1, Plate LXVI</a>, was placed in
+the shield in the hope that it would only be necessary to maintain the
+full air pressure in the working compartments in front of the bulkhead.
+It was also thought that some form of bulkhead which could be closed
+quickly and tightly would be necessary to prevent flooding the tunnel in
+case of blows. While no attempt was ever made to reduce the pressure
+behind the shield bulkhead, it was obvious from the experience with
+Tunnels <i>B</i> and <i>D,</i> while working in the sand between Manhattan and the
+reef, that the plan was not practicable, and that the closed bulkhead in
+the bottom was a hindrance instead of a safeguard. As soon as rock was
+encountered in those tunnels at the west edge of the reef, the
+contractor cut through the bulkheads and altered them, as shown in <a href="#ill09">Fig.
+2, Plate LXVI</a>.</p>
+
+<p>Taking advantage of the experience gained, openings were cut through the
+bulkheads in Shields <i>A</i> and <i>C</i>, while they were shut down near the
+edge of the Manhattan ledge. In erecting the shields at<span class='pagenum'><a name="Page_440" id="Page_440">[Pg 440]</a></span> Long Island
+City in May and June, 1906, openings were also provided. These shields
+had to pass through about 700 ft. of rock at the start, the greater
+portion of which was all-rock section. It was at that point that
+openings were first used extensively and methods were developed, which
+would not have been possible except where ears could be passed through
+the shield. The bottom-heading method was first tried, but the working
+space in front of the shield was cramped, and but few men could be
+employed in loading the cars. To give more room, the heading was
+gradually widened. The enlargement at the top, when made from the
+shield, blocked all work at the face of the heading while the former
+operation was in progress. To reduce the delays, the heading was raised,
+thus reducing the quantity of rock left in the top, and the bottom was
+taken out as a bench. To avoid blocking the tracks when firing the top,
+a heavy timber platform was built out from the floors of the middle
+working compartments. Most of the muck from the top was caught on the
+platform and dropped into cars below. This method of working is shown by
+Fig. 2, <a href="#ill10">Plate LXVII</a>. The platforms were not entirely satisfactory, and,
+later, the drills in the heading were turned upward and a top bench was
+also drilled and fired, as shown by Fig. 3, <a href="#ill10">Plate LXVII</a>. There was then
+so little excavation left in the top that the muck was allowed to fall
+on the tracks and was quickly cleared away. The method just outlined is
+called the center-heading method, and was the most satisfactory plan
+devised for full-rock sections.</p>
+
+<p><i>Excavation in Part Rock and Part Earth.</i>&mdash;This was probably the most
+difficult work encountered, particularly when the rock was covered with
+boulders and coarse sharp sand which permitted a free escape of air. It
+was necessary, before removing the rock immediately under the soft
+ground, to excavate the earth in advance of the shield to a point beyond
+where the rock was to be disturbed, and to support, in some way, the
+roof, sides, and face of the opening thus made. The hoods were designed
+mainly for the purpose of supporting the roof and the sides. With the
+fixed hood it was necessary either to excavate for the distance of the
+desired shove in front of it or else to force the hood into the
+undisturbed material. To avoid this difficulty, the sliding hoods were
+tried as an experiment.</p>
+
+<p>In using the sliding hood, which will be described in detail in Mr.
+Japp's paper, the segments commencing at the top were forced<span class='pagenum'><a name="Page_441" id="Page_441">[Pg 441]</a></span> forward by
+the screw rod, one at a time, as far as possible into the undisturbed
+material. Just enough material was then removed from underneath and in
+front of the section to free it, and it was again forced forward. These
+operations were repeated until the section had been extended far enough
+for a shove. As soon as two or three sections had been pushed forward in
+this way, the face near the advance end of the sliding hood was
+protected by a breast board set on edge and braced from the face.
+Gradually, all the segments were worked forward, and, at the same time,
+the whole soft ground face was sheeted with timber. At times polings
+were placed over the extended segments in order to make room for a
+second shove, as shown on <a href="#ill11">Plate LXVIII</a>. When the shield was advanced the
+nuts on the screw rods were loosened and the sections of the hoods were
+telescoped on to the shield. The idea was ingenious, but proved
+impracticable, because of the unequal relative movements of the top and
+bottom of the shield in shoving, bringing transverse strains on the hood
+sections.</p>
+
+<div class="figcenter">
+ <a id="ill12" name="ill12"></a><a href="images/ill12large.jpg">
+ <img src="images/ill12.jpg"
+ alt="Plate LXIX"
+ title="Plate LXIX" /></a><br />
+ <span class="caption">Plate LXIX</span>
+</div>
+
+<p>With the fixed hood, poling boards were used to support the roof and
+sides, and the face was supported in the manner described for the
+sliding hoods. The polings were usually maple or oak planks, 2 in.
+thick, about 8 in. wide, and 6-1/2 ft. long. In advancing the face, the
+top board of the old breast was first removed, then the material was
+carefully worked out for the length of the poling. The latter was then
+placed, with the rear end resting over the hood and the forward end
+forced as far as possible into the undisturbed material. When two or
+three polings had been placed, a breast board was set. After several
+polings were in position, their forward ends were supported by some form
+a cantilever attached to the hood. <a href="#ill12">Plate LXIX</a> shows one kind of
+supports. In this way all the soft material was excavated down to the
+rock surface, and the roof, sides, and face were sheeted with timber. In
+shoving, the polings in the roof and sides were lost. It was found that
+the breast could usually be advanced 5 ft. with safety. The fixed hood
+made it possible to set the face about 7 or 8 ft. in front of the
+cutting edge without increasing the length of the polings. This distance
+was ample for two shoves, and was generally adopted, although a great
+many faces were set for one shove only.</p>
+
+<p>Fixed hoods were substituted for those of the sliding type, originally
+placed on Shields <i>B</i> and <i>D</i> at Manhattan, at about the time the latter
+encountered the rock at the reef.<span class='pagenum'><a name="Page_442" id="Page_442">[Pg 442]</a></span></p>
+
+<p>In placing the polings and breasting, all voids behind them were filled
+as far as possible with marsh hay or bags of sawdust or clay. To prevent
+loss of air in open material, the joints between the boards were
+plastered with clay especially prepared for the purpose in a pug mill.
+The sliding extensions to the floors of the working compartments were
+often used, in the early part of the work, to support the timber face or
+loose rock, as shown in Fig. 1, <a href="#ill11">Plate LXVIII</a>. At such times the front of
+the extensions was held tightly against the planking by the pressure of
+the floor jacks. While shoving, the pressure on the floor jacks was
+gradually released, allowing the floors to slide back into the shield
+and still afford support to the face. The extensions also afforded
+convenient working platforms. They were subject to severe bending
+strains while the shield was being shoved, however, and the cast-iron
+rams were frequently broken or jammed. The extensions did not last
+beyond the edge of the ledge at Manhattan, nor more than about half
+through the rock work at Long Island City. The fixed extensions
+originally placed on Shields <i>A</i> and <i>C</i> at Manhattan were not
+substantial enough, and lasted only a few days.</p>
+
+<p>Wherever the rock face was sufficiently sound and high, a bottom heading
+was driven some 20 or 30 ft. in advance of the shield. The heading was
+driven and the cradle placed independently of the face of the soft
+ground above, and in the manner described for all-rock sections. The
+remainder of the rock face was removed by firing top and side rounds
+into the bottom heading after the soft ground had been excavated. Great
+care had to be taken in firing in order not to disturb the timber work
+or break the rock away from under the breast boards. If either occurred,
+a serious run was likely to follow. The bottom-heading method is shown
+by Figs. 1, 2, and 3, <a href="#ill11">Plate LXVIII</a>, and the breasting and poling by <a href="#ill14">Fig.
+2, Plate LXX.</a></p>
+
+<p>In the early part of the work, where a bottom heading was impracticable,
+the soft ground was first excavated as described above, and the rock was
+drilled by machines mounted on tripods, and fired as a bench. By this
+plan no drilling could be done until the soft ground was removed. This
+is called the rock-bench method.</p>
+
+<p>Later the rock-cut method was devised. Drills were set up on columns in
+the bottom compartments of the shield, and the face was drilled while
+work was in progress on the soft ground above. The drilling was done
+either for a horizontal or vertical cut and side and<span class='pagenum'><a name="Page_443" id="Page_443">[Pg 443]</a></span> top rounds. The
+drillers were protected while at work by platforms of timber built out
+from the floors of the compartments above. This plan, while probably not
+quite as economical of explosives, saved nearly all the delay due to
+drilling the bench.</p>
+
+<div class="figcenter">
+ <a id="ill13" name="ill13">
+ <img src="images/ill13.jpg"
+ alt="Plate LXX, Fig. 1.--Small Shaft Sunk to Rock."
+ title="Plate LXX, Fig. 1.--Small Shaft Sunk to Rock." /></a><br />
+ <span class="caption">Plate LXX, Fig. 1.&mdash;Small Shaft Sunk to Rock.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill14" name="ill14">
+ <img src="images/ill14.jpg"
+ alt="Plate LXX, Fig. 2.--Breasting and Poling in Front of Shield."
+ title="Plate LXX, Fig. 2.--Breasting and Poling in Front of Shield." /></a><br />
+ <span class="caption">Plate LXX, Fig. 2.&mdash;Breasting and Poling in Front of Shield.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill15" name="ill15">
+ <img src="images/ill15.jpg"
+ alt="Plate LXX, Fig. 3.--Shutters on Front of Shield."
+ title="Plate LXX, Fig. 3.--Shutters on Front of Shield." /></a><br />
+ <span class="caption">Plate LXX, Fig. 3.&mdash;Shutters on Front of Shield.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill16" name="ill16">
+ <img src="images/ill16.jpg"
+ alt="Plate LXX, Fig. 4.--Hydraulic Erector Placing Segment."
+ title="Plate LXX, Fig. 4.--Hydraulic Erector Placing Segment." /></a><br />
+ <span class="caption">Plate LXX, Fig. 4.&mdash;Hydraulic Erector Placing Segment.</span>
+</div>
+
+<p><i>All-Earth Section.</i>&mdash;As described by Messrs. Hay and Fitzmaurice, in a
+paper on the Blackwall Tunnel,<a name="FNanchor_C_3" id="FNanchor_C_3"></a><a href="#Footnote_C_3" class="fnanchor">[C]</a> the contractor had used, with marked
+success, shutters in the face of the shield for excavating in loose open
+material. He naturally adopted the method for the East River work. When
+the shields in Tunnels <i>B</i> and <i>D</i>, at Manhattan, the first to be driven
+through soft ground, reached a point under the actual bulkhead line,
+work was partly suspended and shutters were put in place in the face of
+the top and center compartments. The shutters in the center compartments
+in Shield <i>D</i> are shown in <a href="#ill15">Fig. 3, Plate LXX</a>, while the method of work
+with the shutters is shown by Figs. 4, 5, 6, and 7, <a href="#ill11">Plate LXVIII</a>. Fig. 4
+on that plate shows the shield ready for a shove. As the pressure was
+applied to the shield jacks, men loosened the nuts on the screws holding
+the ends of the shutters, and allowed the latter to slide back into the
+working compartments. At the end of the shove, the shutters were in the
+position shown in Fig. 5, <a href="#ill11">Plate LXVIII</a>. In preparing for a new shove,
+the slides in the shutters were opened, and the material in front was
+raked into the shield. At the same time, the shutters were gradually
+worked forward. The two upper shutters in a compartment were generally
+advanced from 12 to 15 in., after which the muck could be shoveled out
+over the bottom shutters, as shown on Fig. 6, <a href="#ill11">Plate LXVIII</a>, and <a href="#ill15">Fig. 3,
+Plate LXX</a>. No shutters were placed in the bottom compartments, and as
+the air pressure was not generally high enough to keep the face dry at
+the bottom, these compartments were pretty well filled with the soft,
+wet quicksand. Just before shoving, this material was excavated to a
+point where it ran in faster than it could be taken out. Much of the
+excavation in the bottom compartment was done by the blow-pipe. During
+the shove the material from the bottom compartment often ran back
+through the open door in the transverse bulkhead, as shown by Fig. 5,
+<a href="#ill11">Plate LXVIII</a>.</p>
+
+<p>In the Blackwall Tunnel the material was reported to have been loose
+enough to keep in close contact with the shutters at all times. In the
+East River Tunnels this was not the case. The sand at the top<span class='pagenum'><a name="Page_444" id="Page_444">[Pg 444]</a></span> was dry
+and would often stand with a vertical face for some hours. In advancing
+the shutters, it was difficult to bring them into close contact with the
+face at the end of the operation. The soft material at the bottom was
+constantly running into the lower compartment and undermining the stiff
+dry material at the top. The latter gradually broke away, and, at times,
+the actual face was some feet in advance of the shutters. Under those
+circumstances, the air escaped freely through the unprotected sand face.
+The joints of the shutters were plastered with clay, but this did not
+keep the air from passing out through the lower compartments. This
+condition facilitated the formation of blows, which were of constant
+occurrence where shutters were used in the sand. In Tunnels <i>B</i> and <i>D</i>,
+at Manhattan, the shutters were used in the above manner clear across to
+the reef. In Tunnel <i>C</i>, which was considerably behind Tunnels <i>B</i> and
+<i>D</i>, the shutters, although placed, were never used against the face,
+and the excavation was carried on by poling the top and breasting the
+face. The change resulted in much better progress and fewer blows. The
+excavation through the soft material in Tunnel <i>C</i> had just been
+completed when Tunnel <i>A</i> was started, and the gangs of workmen were
+exchanged.</p>
+
+<p>The work in soft ground in Tunnel <i>A</i> thus gained the benefit of the
+experience in Tunnel <i>C</i>. Shutters were placed only in the top
+compartments in this tunnel, and, as in Tunnel <i>C</i>, were never used in
+contact with the face. The method of work is shown by Figs. 1, 2, and 3,
+<a href="#ill17">Plate LXXI</a>. The result was still more rapid progress in Tunnel <i>A</i>, and
+although the loss of air was fully as great in this tunnel as in the
+other three, there was only one blow which caused any considerable loss
+of pressure. In Tunnels <i>A</i> and <i>C</i> the diaphragms in the rear of the
+center compartments of the lower tiers of working chambers were removed
+before the shields entered the soft ground. The change was not of as
+much advantage in soft ground as in rock, but it facilitated the removal
+of the soft wet sand in the bottom. In Tunnel <i>A</i>, after encountering
+gravel, a belt conveyor was suspended from the traveling stage with one
+end projecting through the opening into the working compartment. The use
+of the conveyor made it possible to continue mucking at the face while
+the bottom plates of the iron lining were being put in place, and
+resulted in a material increase in the rate of progress.<span class='pagenum'><a name="Page_445" id="Page_445">[Pg 445]</a></span></p>
+
+<div class="figcenter">
+ <a id="ill17" name="ill17"></a><a href="images/ill17large.jpg">
+ <img src="images/ill17.jpg"
+ alt="Plate LXXI"
+ title="Plate LXXI" /></a><br />
+ <span class="caption">Plate LXXI</span>
+</div>
+
+<p>The shutters were not placed on the Long Island shields at all. Just
+before the shields passed into all soft ground, a fixed hood was
+attached to each.</p>
+
+<p>The method of working in soft ground from Long Island City is
+illustrated by <a href="#ill18">Plate LXXII</a>. The full lines at the face of the shield
+show the position of the earth before a shove of the shield, and the
+dotted lines show the same after the shove. The face was mined out to
+the front of the hood and breasted down to a little below the floor of
+the top pockets of the shield. In the middle pocket the earth was
+allowed to take its natural slope back on the floor. Toward the rear of
+the bottom pockets it was held by stop-planks. The air pressure was
+always about equal to the hydrostatic head at the middle of the shield,
+so that the face in the upper and middle pockets was dry. In the lower
+pockets it was wet, and flowed under the pressure of shoving the shield.
+By this method 4,195 lin. ft. of tunnel was excavated by the four Long
+Island shields in 120 days, from November 1st, 1907, to March 1st, 1908.
+This was an average of 8.74 ft. per day per shield.</p>
+
+<p>The rate of progress, the nature of the materials, and the methods
+adopted are shown in Table 2.</p>
+
+<p><i>Preparations for Junction of Shields.</i>&mdash;As previously mentioned, the
+Manhattan shields were stopped at the edge of the reef. Before making
+the final shove of those shields, special polings were placed with
+unusual care. The excavation was bell-shaped to receive the Long Island
+shields. The arrangement of the polings is shown by Figs. 4 and 5, <a href="#ill17">Plate
+LXXI</a>. After the shields were shoved into final position, as shown at the
+right in Fig. 5, the rear end of the polings rested over the cutting
+edge and allowed room for the removal of the hood. After the latter had
+been accomplished, the temporary bulkheads of concrete and clay bags
+were built as a precaution against blows when the shields were close
+together. An 8-in. pipe was then driven forward through the bulkhead for
+distances varying from 30 to 100 ft., in order to check the alignment
+and grade between the two workings before the shields were actually
+shoved together. The errors in the surveys were negligible, but here, as
+elsewhere, the shields were not exactly in the desired position, and it
+took careful handling to bring the cutting edges together. The Long
+Island shields were driven to meet those from Manhattan.</p>
+
+<p><span class='pagenum'><a name="Page_446" id="Page_446">[Pg 446]</a></span></p>
+
+<h4>TABLE 2.&mdash;<span class="smcap">Rate of Progress, Nature of Materials, and Methods Adopted in
+Construction of East River Tunnels.</span></h4>
+
+<h4><span class="smcap">Line A, Long Island.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">All rock</td>
+ <td align='left' class="btl">Bottom heading</td>
+ <td align='left' class="btl">69+39.9</td>
+ <td align='left' class="btl">69+79</td>
+ <td align='left' class="btl">Aug. 2, '06</td>
+ <td align='left' class="btl">Sept 25, '06</td>
+ <td align='right' class="btl">54&nbsp;&nbsp;</td>
+ <td align='right' class="btl">39.1</td>
+ <td align='right' class="btl">0.724&nbsp;&nbsp;</td>
+ <td align='left' class="btl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">69+79</td>
+ <td align='left' class="bl">70+64</td>
+ <td align='left' class="bl">Sept 25, '06</td>
+ <td align='left' class="bl">Nov. 21, '06</td>
+ <td align='right' class="bl">57&nbsp;&nbsp;</td>
+ <td align='right' class="bl">85&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.49&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">70+64</td>
+ <td align='left' class="bl">71+34</td>
+ <td align='left' class="bl">Nov. 21, '06</td>
+ <td align='left' class="bl">Dec. 30, '06</td>
+ <td align='right' class="bl">39&nbsp;&nbsp;</td>
+ <td align='right' class="bl">70&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.79&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">71+34</td>
+ <td align='left' class="bl">71+89</td>
+ <td align='left' class="bl">Dec. 30, '06</td>
+ <td align='left' class="bl">Feb. 13, '07</td>
+ <td align='right' class="bl">45&nbsp;&nbsp;</td>
+ <td align='right' class="bl">55&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.22&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">71+89</td>
+ <td align='left' class="bl">72+11</td>
+ <td align='left' class="bl">Feb. 13, '07</td>
+ <td align='left' class="bl">Feb. 21, '07</td>
+ <td align='right' class="bl">8&nbsp;&nbsp;</td>
+ <td align='right' class="bl">22&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.75&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">72+11</td>
+ <td align='left' class="bl">72+67</td>
+ <td align='left' class="bl">Feb. 21, '07</td>
+ <td align='left' class="bl">Mar. 19, '07</td>
+ <td align='right' class="bl">26&nbsp;&nbsp;</td>
+ <td align='right' class="bl">56&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.15&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">72+67</td>
+ <td align='left' class="bl">76+54</td>
+ <td align='left' class="bl">Mar. 19, '07</td>
+ <td align='left' class="bl">Sept 6, '07</td>
+ <td align='right' class="bl">171&nbsp;&nbsp;</td>
+ <td align='right' class="bl">387&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.26&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Going out of rock</td>
+ <td align='left' class="bl">76+54</td>
+ <td align='left' class="bl">77+24</td>
+ <td align='left' class="bl">Sept 6, '07</td>
+ <td align='left' class="bl">Oct. 4, '07</td>
+ <td align='right' class="bl">28&nbsp;&nbsp;</td>
+ <td align='right' class="bl">70&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.50&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left' class="bb">All earth</td>
+ <td align='left' class="bbl">Soft ground</td>
+ <td align='left' class="bbl">77+24</td>
+ <td align='left' class="bbl">90+57.3</td>
+ <td align='left' class="bbl">Oct. 4, '07</td>
+ <td align='left' class="bbl">Mar. 26, '08</td>
+ <td align='right' class="bbl">174&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">1,333.3</td>
+ <td align='right' class="bbl">7.66&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+<h4><span class="smcap">Line B, Long Island.</span></h4>
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">All rock</td>
+ <td align='left' class="btl">Bottom heading</td>
+ <td align='left' class="btl">69+29.6</td>
+ <td align='left' class="btl">70+46</td>
+ <td align='left' class="btl">Oct. 16, '06</td>
+ <td align='left' class="btl">Nov. 20, '06</td>
+ <td align='right' class="btl">35&nbsp;&nbsp;</td>
+ <td align='right' class="btl">116.4</td>
+ <td align='right' class="btl">3.33&nbsp;&nbsp;</td>
+ <td align='left' class="btl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">70+46</td>
+ <td align='left' class="bl">71+95</td>
+ <td align='left' class="bl">Nov. 20, '06</td>
+ <td align='left' class="bl">Feb. 23, '07</td>
+ <td align='right' class="bl">95&nbsp;&nbsp;</td>
+ <td align='right' class="bl">149&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.57&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">71+95</td>
+ <td align='left' class="bl">72+25</td>
+ <td align='left' class="bl">Feb. 23, '07</td>
+ <td align='left' class="bl">Mar. 6, '07</td>
+ <td align='right' class="bl">11&nbsp;&nbsp;</td>
+ <td align='right' class="bl">30&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.73&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">72+25</td>
+ <td align='left' class="bl">72+60</td>
+ <td align='left' class="bl">Mar. 6, '07</td>
+ <td align='left' class="bl">Mar. 24, '07</td>
+ <td align='right' class="bl">18&nbsp;&nbsp;</td>
+ <td align='right' class="bl">35&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.94&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Going out of rock</td>
+ <td align='left' class="bl">72+60</td>
+ <td align='left' class="bl">76+57</td>
+ <td align='left' class="bl">Mar. 24, '07</td>
+ <td align='left' class="bl">Aug. 7, '07</td>
+ <td align='right' class="bl">136&nbsp;&nbsp;</td>
+ <td align='right' class="bl">397&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.92&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Soft ground</td>
+ <td align='left' class="bl">76+57</td>
+ <td align='left' class="bl">77+30</td>
+ <td align='left' class="bl">Aug. 7, '07</td>
+ <td align='left' class="bl">Sept 5, '07</td>
+ <td align='right' class="bl">29&nbsp;&nbsp;</td>
+ <td align='right' class="bl">73&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.52&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left' class="bb">All earth</td>
+ <td align='left' class="bbl">Soft ground</td>
+ <td align='left' class="bbl">77+30</td>
+ <td align='left' class="bbl">90+49.6</td>
+ <td align='left' class="bbl">Sept 5, '07</td>
+ <td align='left' class="bbl">Mar. 19, '08</td>
+ <td align='right' class="bbl">196&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">1,319.6</td>
+ <td align='right' class="bbl">6.73&nbsp;&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+<p><span class='pagenum'><a name="Page_447" id="Page_447">[Pg 447]</a></span></p>
+
+<h4><span class="smcap">Line C, Long Island.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">All rock</td>
+ <td align='left' class="btl">Bottom heading</td>
+ <td align='left' class="btl">68+61.9</td>
+ <td align='left' class="btl">69+93</td>
+ <td align='left' class="btl">June 11, '06</td>
+ <td align='left' class="btl">Oct. 16, '06</td>
+ <td align='right' class="btl">127&nbsp;&nbsp;</td>
+ <td align='right' class="btl">131.1</td>
+ <td align='right' class="btl">1.03&nbsp;&nbsp;</td>
+ <td align='left' class="btl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">69+93</td>
+ <td align='left' class="bl">71+65</td>
+ <td align='left' class="bl">Oct. 16, '06</td>
+ <td align='left' class="bl">Feb. 7, '07</td>
+ <td align='right' class="bl">114&nbsp;&nbsp;</td>
+ <td align='right' class="bl">172&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.51&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">71+65</td>
+ <td align='left' class="bl">71+91</td>
+ <td align='left' class="bl">Feb. 7, '07</td>
+ <td align='left' class="bl">Feb. 13, '07</td>
+ <td align='right' class="bl">6&nbsp;&nbsp;</td>
+ <td align='right' class="bl">26&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">4.33&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">71+91</td>
+ <td align='left' class="bl">75+81</td>
+ <td align='left' class="bl">Feb. 13, '07</td>
+ <td align='left' class="bl">July 20, '07</td>
+ <td align='right' class="bl">157&nbsp;&nbsp;</td>
+ <td align='right' class="bl">390&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.48&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Going out of rock</td>
+ <td align='left' class="bl">75+81</td>
+ <td align='left' class="bl">76+56</td>
+ <td align='left' class="bl">July 20, '07</td>
+ <td align='left' class="bl">Aug. 25, '07</td>
+ <td align='right' class="bl">36&nbsp;&nbsp;</td>
+ <td align='right' class="bl">75&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.08&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left' class="bb">All earth</td>
+ <td align='left' class="bbl">Soft ground</td>
+ <td align='left' class="bbl">76+56</td>
+ <td align='left' class="bbl">90+44.4</td>
+ <td align='left' class="bbl">Aug. 25, '07</td>
+ <td align='left' class="bbl">Mar. 17, '08</td>
+ <td align='right' class="bbl">205&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">1,388.4</td>
+ <td align='right' class="bbl">6.77&nbsp;&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+
+<h4><span class="smcap">Line D, Long Island.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">Rock</td>
+ <td align='left' class="btl">Bottom heading</td>
+ <td align='left' class="btl">68+50.6</td>
+ <td align='left' class="btl">69+77</td>
+ <td align='left' class="btl">June 2, '06</td>
+ <td align='left' class="btl">Oct. 24, '06</td>
+ <td align='right' class="btl">144&nbsp;&nbsp;</td>
+ <td align='right' class="btl">126.4</td>
+ <td align='right' class="btl">0.87&nbsp;&nbsp;</td>
+ <td align='left' class="btl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">69+77</td>
+ <td align='left' class="bl">71+22</td>
+ <td align='left' class="bl">Oct. 24, '06</td>
+ <td align='left' class="bl">Jan. 13, '06</td>
+ <td align='right' class="bl">81&nbsp;&nbsp;</td>
+ <td align='right' class="bl">145&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.79&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Bottom heading</td>
+ <td align='left' class="bl">71+23</td>
+ <td align='left' class="bl">72+00</td>
+ <td align='left' class="bl">Jan. 13, '07</td>
+ <td align='left' class="bl">Mar. 3, '07</td>
+ <td align='right' class="bl">49&nbsp;&nbsp;</td>
+ <td align='right' class="bl">78&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.59&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>All rock</td>
+ <td align='left' class="bl">Center heading</td>
+ <td align='left' class="bl">72+00</td>
+ <td align='left' class="bl">75+73</td>
+ <td align='left' class="bl">Mar. 3, '07</td>
+ <td align='left' class="bl">July 10, '07</td>
+ <td align='right' class="bl">129&nbsp;&nbsp;</td>
+ <td align='right' class="bl">373&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.89&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth and rock</td>
+ <td align='left' class="bl">Going out of rock</td>
+ <td align='left' class="bl">75+73</td>
+ <td align='left' class="bl">77+63</td>
+ <td align='left' class="bl">July 10, '07</td>
+ <td align='left' class="bl">Sept 25, '07</td>
+ <td align='right' class="bl">77&nbsp;&nbsp;</td>
+ <td align='right' class="bl">190&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.47&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left' class="bb">All earth</td>
+ <td align='left' class="bbl">Soft ground</td>
+ <td align='left' class="bbl">77+63</td>
+ <td align='left' class="bbl">90+38.6</td>
+ <td align='left' class="bbl">Sept 25, '07</td>
+ <td align='left' class="bbl">Mar. 7. '08</td>
+ <td align='right' class="bbl">164&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">1,275.6</td>
+ <td align='right' class="bbl">7.78&nbsp;&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+<p><span class='pagenum'><a name="Page_448" id="Page_448">[Pg 448]</a></span></p>
+
+<h4><span class="smcap">Line A, Manhattan.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl" colspan="3">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">Rock</td>
+ <td align='left' class="btl">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="bt">Top heading<br />Top lift of bench<br />Bottom lift of bench</td>
+ <td align='left' class="btl">108+43<br />108+43<br />108+43</td>
+ <td align='left' class="btl">107+74<br />107+74<br />107+74</td>
+ <td align='left' class="btl">July 20, '05<br />Aug. 8, '05<br />Aug. 30, '05</td>
+ <td align='left' class="btl">Aug. 3, '05<br />Aug. 23, '05<br />Sept 27, '05</td>
+ <td align='right' class="btl">14<br />15<br />28</td>
+ <td align='left' class="bt">&#9131;<br />&#9132;<br />&#9133;</td>
+ <td align='left' class="bt">57</td>
+ <td align='right' class="btl">69&nbsp;&nbsp;</td>
+ <td align='right' class="btl">1.21</td>
+ <td align='right' class="bt">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="btlw15">Excavation in normal air, and before advance of shield.</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left'>Bottom heading<br />Bottom heading</td>
+ <td align='left' class="bl">107+74<br />107+74</td>
+ <td align='left' class="bl">107+21<br />107+21</td>
+ <td align='left' class="bl">Sept 27, '05<br />Nov. 30, '05</td>
+ <td align='left' class="bl">Oct. 23, '05<br />Dec. 29, '05</td>
+ <td align='right' class="bl">26<br />29</td>
+ <td align='left'>&#9131;<br />&#9132;<br />&#9133;</td>
+ <td align='left'>55</td>
+ <td align='right' class="bl">53&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.96</td>
+ <td align='right'>&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="bl">Bottom heading timbered to avoid the possibility of a break.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">107+21</td>
+ <td align='left' class="bl">106+99</td>
+ <td align='left' class="bl">Oct. 26, '06</td>
+ <td align='left' class="bl">Nov. 20, '06</td>
+ <td align='right' class="bl">25</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">22&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.88</td>
+ <td align='left'></td>
+ <td align='left' class="bl">Bottom heading timbered.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock bench</td>
+ <td align='left' class="bl">106+99</td>
+ <td align='left' class="bl">106+34</td>
+ <td align='left' class="bl">Nov. 20, '06</td>
+ <td align='left' class="bl">Jan. 13, '07</td>
+ <td align='right' class="bl">54</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">65&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.20</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Poling and breasting</td>
+ <td align='left' class="bl">106+34</td>
+ <td align='left' class="bl">99+11</td>
+ <td align='left' class="bl">Jan. 13, '07</td>
+ <td align='left' class="bl">Apr. 17, '07</td>
+ <td align='right' class="bl">94</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">723&nbsp;&nbsp;</td>
+ <td align='right' class="bl">7.69</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">99+11</td>
+ <td align='left' class="bl">93+96</td>
+ <td align='left' class="bl">Apr. 17, '07</td>
+ <td align='left' class="bl">Oct. 24, '07</td>
+ <td align='right' class="bl">190</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">515&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.71</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">93+96</td>
+ <td align='left' class="bl">93+58</td>
+ <td align='left' class="bl">Oct. 24, '07</td>
+ <td align='left' class="bl">Nov. 14, '07</td>
+ <td align='right' class="bl">21</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">38&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.81</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Center heading</td>
+ <td align='left' class="bl">93+58</td>
+ <td align='left' class="bl">92+42</td>
+ <td align='left' class="bl">Nov. 14, '07</td>
+ <td align='left' class="bl">Dec. 27, '07</td>
+ <td align='right' class="bl">46</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">116&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.52</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">92+42</td>
+ <td align='left' class="bl">91+05</td>
+ <td align='left' class="bl">Dec. 27, '07</td>
+ <td align='left' class="bl">Feb. 24, '08</td>
+ <td align='right' class="bl">59</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">137&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.32</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left' class="bb">Mixed</td>
+ <td align='left' class="bbl">&nbsp;</td>
+ <td align='left' class="bb">Rock cut</td>
+ <td align='left' class="bbl">91+05</td>
+ <td align='left' class="bbl">90+57</td>
+ <td align='left' class="bbl">Feb. 24, '08</td>
+ <td align='left' class="bbl">Mar. 20, '08</td>
+ <td align='right' class="bbl">25</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='right' class="bbl">48&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">1.92</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+
+<h4><span class="smcap">Line B, Manhattan.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl" colspan="3">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">Rock</td>
+ <td align='left' class="btl">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="btw13">Top heading<br />Top lift of bench<br />Bottom lift of bench<br />Bottom lift of bench</td>
+ <td align='left' class="btl">108+35<br />108+35<br />108+35<br />108+15</td>
+ <td align='left' class="btl">107+87<br />107+87<br />108+15<br />107+87</td>
+ <td align='left' class="btl">July 6, '05<br />Aug. 3, '05<br />Aug. 26, '05<br />Sept 11, '05</td>
+ <td align='left' class="btl">July 27, '05<br />Aug. 14, '05<br />Aug. 30, '05<br />Sept 26, '05</td>
+ <td align='right' class="btl">21<br />11<br />4<br />15</td>
+ <td align='left' class="bt">&#9131;<br />&#9132;<br />&#9133;</td>
+ <td align='left' class="bt">51</td>
+ <td align='right' class="btl">48&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="btl">0.94</td>
+ <td align='left' class="bt">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="btlw15">Excavation done in normal air and before advance of shield.</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">107+87</td>
+ <td align='left' class="bl">107+00</td>
+ <td align='left' class="bl">Oct. 23, '05</td>
+ <td align='left' class="bl">Jan. 17, '06</td>
+ <td align='right' class="bl">86</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">87&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.01</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">107+00</td>
+ <td align='left' class="bl">106+64</td>
+ <td align='left' class="bl">Jan. 17, '06</td>
+ <td align='left' class="bl">Feb. 12, '06</td>
+ <td align='right' class="bl">26</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">36&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.38</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock bench</td>
+ <td align='left' class="bl">106+64</td>
+ <td align='left' class="bl">106+31</td>
+ <td align='left' class="bl">Feb. 12, '06</td>
+ <td align='left' class="bl">Mar. 1, '06</td>
+ <td align='right' class="bl">17</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">33&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.94</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Poling and breasting</td>
+ <td align='left' class="bl">106+31</td>
+ <td align='left' class="bl">105+58</td>
+ <td align='left' class="bl">Mar. 1, '06</td>
+ <td align='left' class="bl">Apr. 3, '06</td>
+ <td align='right' class="bl">33</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">73&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.21</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Shutters in contact with face</td>
+ <td align='left' class="bl">105+58</td>
+ <td align='left' class="bl">99+19</td>
+ <td align='left' class="bl">Apr. 9, '06</td>
+ <td align='left' class="bl">Nov. 1, '06</td>
+ <td align='right' class="bl">206</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">639&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">3.10</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock bench</td>
+ <td align='left' class="bl">99+19</td>
+ <td align='left' class="bl">98+44</td>
+ <td align='left' class="bl">Nov. 1. '06</td>
+ <td align='left' class="bl">Dec. 29, '06</td>
+ <td align='right' class="bl">58</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">75&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.30</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">98+44</td>
+ <td align='left' class="bl">97+76</td>
+ <td align='left' class="bl">Dec, 29, '06</td>
+ <td align='left' class="bl">Feb. 12, '07</td>
+ <td align='right' class="bl">45</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">68&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.51</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">97+66</td>
+ <td align='left' class="bl">93+84</td>
+ <td align='left' class="bl">Feb. 12, '07</td>
+ <td align='left' class="bl">Aug. 6, '07</td>
+ <td align='right' class="bl">175</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">392&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.24</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Full face</td>
+ <td align='left' class="bl">93+84</td>
+ <td align='left' class="bl">93+21</td>
+ <td align='left' class="bl">Aug. 6, '07</td>
+ <td align='left' class="bl">Sept 2, '07</td>
+ <td align='right' class="bl">27</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">63&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.33</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Center Heading</td>
+ <td align='left' class="bl">93+21</td>
+ <td align='left' class="bl">92+30</td>
+ <td align='left' class="bl">Sept 2, '07</td>
+ <td align='left' class="bl">Oct. 12, '07</td>
+ <td align='right' class="bl">40</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">91&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.28</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">92+30</td>
+ <td align='left' class="bl">90+99</td>
+ <td align='left' class="bl">Oct. 12, '07</td>
+ <td align='left' class="bl">Dec. 6, '07</td>
+ <td align='right' class="bl">55</td>
+ <td align='left'></td>
+ <td align='left'></td>
+ <td align='right' class="bl">131&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.38</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left' class="bb">Mixed</td>
+ <td align='left' class="bbl">&nbsp;</td>
+ <td align='left' class="bb">Rock cut</td>
+ <td align='left' class="bbl">90+99</td>
+ <td align='left' class="bbl">90+49.6</td>
+ <td align='left' class="bbl">Dec. 6, '07</td>
+ <td align='left' class="bbl">Jan. 3, '08</td>
+ <td align='right' class="bbl">28</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='right' class="bbl">49.4</td>
+ <td align='right' class="bbl">1.76</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+<p><span class='pagenum'><a name="Page_449" id="Page_449">[Pg 449]</a></span></p>
+
+<h4><span class="smcap">Line C, Manhattan.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="2" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">Rock</td>
+ <td align='left' class="btl">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="bt">Top heading<br />Top heading<br />Excavating bench<br />Bottom heading<br />Bottom heading</td>
+ <td align='left' class="btl">107+79.03<br />107+69<br />107+79<br />107+23<br />107+23</td>
+ <td align='left' class="btl">107+69<br />107+23<br />107+23<br />106+72<br />107+15</td>
+ <td align='left' class="btl">Dec. 20, '04<br />Jan. 1, '05<br />Jan. 21, '05<br />Mar. 1, '05<br />Oct. 12, '05</td>
+ <td align='left' class="btl">Dec. 27, '04<br />Jan. 15, '05<br />Feb. 28, '05<br />Mar. 11, '05<br />Oct. 27, '05</td>
+ <td align='right' class="btl">7<br />14<br />38<br />10<br />15</td>
+ <td align='left' class="bt">&#9131;<br />&#9132;<br />&#9133;</td>
+ <td align='right' class="btl">54&nbsp;&nbsp;</td>
+ <td align='right' class="btl">0.77</td>
+ <td align='left' class="bt">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="btlw15">Stopped to brace portal. No work done from March 12th to October 11th, 1905, except a little trimming in September. All work up to this date done in normal air. Heading advanced to 106+70 and bulkheaded.</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">107+15</td>
+ <td align='left' class="bl">106+62</td>
+ <td align='left' class="bl">Nov. 6, '05</td>
+ <td align='left' class="bl">Dec. 2, '05</td>
+ <td align='right' class="bl">26</td>
+ <td align='left'></td>
+ <td align='right' class="bl">53&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.04</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">106+62</td>
+ <td align='left' class="bl">106+55</td>
+ <td align='left' class="bl">Dec. 2, '05</td>
+ <td align='left' class="bl">Dec. 23, '05</td>
+ <td align='right' class="bl">21</td>
+ <td align='left'></td>
+ <td align='right' class="bl">7&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.33</td>
+ <td align='left'>&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="bl">Heading advanced to 106 + 40. Shut down in order that Line D might have a lead.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">106+55</td>
+ <td align='left' class="bl">106+17</td>
+ <td align='left' class="bl">Feb. 12, '06</td>
+ <td align='left' class="bl">Mar. 22, '06</td>
+ <td align='right' class="bl">38</td>
+ <td align='left'></td>
+ <td align='right' class="bl">38&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.00</td>
+ <td align='left'>&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="bl">Shut down on account of air shortage.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">106+17</td>
+ <td align='left' class="bl">105+85</td>
+ <td align='left' class="bl">Apr. 2, '06</td>
+ <td align='left' class="bl">Apr. 20, '06</td>
+ <td align='right' class="bl">18</td>
+ <td align='left'></td>
+ <td align='right' class="bl">32&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.78</td>
+ <td align='left'></td>
+ <td align='left' class="bl">Shut down on account of air shortage.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">105+85</td>
+ <td align='left' class="bl">105+55</td>
+ <td align='left' class="bl">July 27, '06</td>
+ <td align='left' class="bl">Aug. 26, '06</td>
+ <td align='right' class="bl">30</td>
+ <td align='left'></td>
+ <td align='right' class="bl">30&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.00</td>
+ <td align='left'></td>
+ <td align='left' class="bl">Shut down April 20th to July 27th, 1906.</td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Breasting and poling</td>
+ <td align='left' class="bl">105+55</td>
+ <td align='left' class="bl">99+40</td>
+ <td align='left' class="bl">Aug. 26, '06</td>
+ <td align='left' class="bl">Jan. 2, '07</td>
+ <td align='right' class="bl">127</td>
+ <td align='left'></td>
+ <td align='right' class="bl">615&nbsp;&nbsp;</td>
+ <td align='right' class="bl">4.84</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">99+40</td>
+ <td align='left' class="bl">98+70</td>
+ <td align='left' class="bl">Jan. 2, '07</td>
+ <td align='left' class="bl">Feb. 6, '07</td>
+ <td align='right' class="bl">35</td>
+ <td align='left'></td>
+ <td align='right' class="bl">70&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.00</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Full face</td>
+ <td align='left' class="bl">98+70</td>
+ <td align='left' class="bl">98+60</td>
+ <td align='left' class="bl">Feb. 6, '07</td>
+ <td align='left' class="bl">Feb. 12, '07</td>
+ <td align='right' class="bl">6</td>
+ <td align='left'></td>
+ <td align='right' class="bl">10&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.66</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">98+60</td>
+ <td align='left' class="bl">98+39</td>
+ <td align='left' class="bl">Feb. 12, '07</td>
+ <td align='left' class="bl">Mar. 6, '07</td>
+ <td align='right' class="bl">22</td>
+ <td align='left'></td>
+ <td align='right' class="bl">21&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.95</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">98+39</td>
+ <td align='left' class="bl">98+17</td>
+ <td align='left' class="bl">Mar. 6, '07</td>
+ <td align='left' class="bl">Mar. 15, '07</td>
+ <td align='right' class="bl">9</td>
+ <td align='left'></td>
+ <td align='right' class="bl">22&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.44</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">98+17</td>
+ <td align='left' class="bl">95+68</td>
+ <td align='left' class="bl">Mar. 15, '07</td>
+ <td align='left' class="bl">July 30, '07</td>
+ <td align='right' class="bl">110</td>
+ <td align='left'></td>
+ <td align='right' class="bl">249&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.26</td>
+ <td align='left'></td>
+ <td align='left' class="bl">Heading advanced to 97+82.</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">95+68</td>
+ <td align='left' class="bl">94+61</td>
+ <td align='left' class="bl">July 30, '07</td>
+ <td align='left' class="bl">Aug. 21, '07</td>
+ <td align='right' class="bl">49</td>
+ <td align='left'></td>
+ <td align='right' class="bl">107&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.18</td>
+ <td align='left'></td>
+ <td align='left' class="bl">Heading advanced to 94+35.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">94+61</td>
+ <td align='left' class="bl">93+56</td>
+ <td align='left' class="bl">Aug. 21, '07</td>
+ <td align='left' class="bl">Oct. 3, '07</td>
+ <td align='right' class="bl">43</td>
+ <td align='left'></td>
+ <td align='right' class="bl">106&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.46</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">93+56</td>
+ <td align='left' class="bl">92+73</td>
+ <td align='left' class="bl">Oct. 3, '07</td>
+ <td align='left' class="bl">Nov. 11, '07</td>
+ <td align='right' class="bl">39</td>
+ <td align='left'></td>
+ <td align='right' class="bl">83&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.13</td>
+ <td align='left'></td>
+ <td align='left' class="bl">&nbsp;</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">92+73</td>
+ <td align='left' class="bl">90+55</td>
+ <td align='left' class="bl">Nov. 11, '07</td>
+ <td align='left' class="bl">Feb. 13, '08</td>
+ <td align='right' class="bl">94</td>
+ <td align='left'></td>
+ <td align='right' class="bl">218&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.32</td>
+ <td align='left'></td>
+ <td align='left' class="bl">Shut down until Line D shields met.</td>
+</tr>
+<tr>
+ <td align='left' class="bb">Mixed</td>
+ <td align='left' class="bbl">&nbsp;</td>
+ <td align='left' class="bb">Rock cut</td>
+ <td align='left' class="bbl">90+55</td>
+ <td align='left' class="bbl">90+44.4</td>
+ <td align='left' class="bbl">Feb. 25, '08</td>
+ <td align='left' class="bbl">Mar. 3, '08</td>
+ <td align='right' class="bbl">6</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='right' class="bbl">11&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">1.83</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+</tr>
+</table></div>
+
+<p><span class='pagenum'><a name="Page_450" id="Page_450">[Pg 450]</a></span></p>
+
+
+<h4><span class="smcap">Line D, Manhattan.</span></h4>
+
+
+<div class='center'>
+<table border="0" cellpadding="4" cellspacing="0" summary="">
+<tr>
+ <td align='center' rowspan="2" class="bt">Material.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Method.</td>
+ <td align='center' colspan="2" class="btl">Station:</td>
+ <td align='center' colspan="3" class="btl">Date:</td>
+ <td align='center' rowspan="2" class="btl">Number<br />of days.</td>
+ <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td>
+ <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td>
+ <td align='center' rowspan="2" class="btl" colspan="2">Remarks.</td>
+</tr>
+<tr>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl">To</td>
+ <td align='center' class="btl">From</td>
+ <td align='center' class="btl" colspan="2">To</td>
+</tr>
+<tr>
+ <td align='left' class="bt">Rock</td>
+ <td align='left' class="btl">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left' class="btw13">Top heading<br />Removing bench<br />Bottom heading<br />Trimming<br />Trimming</td>
+ <td align='left' class="btl">107+70.49<br />107+70.49<br />107+35<br />107+70<br />107+70</td>
+ <td align='left' class="btl">107+16<br />107+35<br />106+80<br />106+80<br />106+80</td>
+ <td align='left' class="btl">Dec. 9, '04<br />Jan. 1, '05<br />Jan. 30, '05<br />Mar. 29, '05<br />Aug. 31, '05</td>
+ <td align='left' class="btl">Jan. 31, '05<br />Jan. 27, '05<br />Feb. 10, '05<br />Apr. 12, '05<br />Sept 19, '05</td>
+ <td align='left' class="bt">&#9131;<br />&#9132;<br />&#9133;</td>
+ <td align='right' class="btl">123&nbsp;&nbsp;</td>
+ <td align='right' class="btl">90&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="btl">0.73&nbsp;&nbsp;</td>
+ <td align='left' class="btl">&nbsp;</td>
+ <td align='left' class="btw13">In normal air.</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">106+80</td>
+ <td align='left' class="bl">106+67</td>
+ <td align='left' class="bl">Oct. 5, '05</td>
+ <td align='left' class="bl">Nov. 8, '05</td>
+ <td align='left'></td>
+ <td align='right' class="bl">34&nbsp;&nbsp;</td>
+ <td align='right' class="bl">13&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.40&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading timbered.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">106+67</td>
+ <td align='left' class="bl">106+39</td>
+ <td align='left' class="bl">Nov. 8, '05</td>
+ <td align='left' class="bl">Dec. 23, '05</td>
+ <td align='left'></td>
+ <td align='right' class="bl">45&nbsp;&nbsp;</td>
+ <td align='right' class="bl">38&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.84&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Sliding hood and breasting. Rock bench</td>
+ <td align='left' class="bl">106+29</td>
+ <td align='left' class="bl">105+70</td>
+ <td align='left' class="bl">Dec. 23, '05</td>
+ <td align='left' class="bl">Jan. 24, '06</td>
+ <td align='left'></td>
+ <td align='right' class="bl">32&nbsp;&nbsp;</td>
+ <td align='right' class="bl">59&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.84&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Poling and breasting</td>
+ <td align='left' class="bl">105+70</td>
+ <td align='left' class="bl">104+61</td>
+ <td align='left' class="bl">Jan. 24, '06</td>
+ <td align='left' class="bl">Feb. 27, '06</td>
+ <td align='left'></td>
+ <td align='right' class="bl">31&nbsp;&nbsp;</td>
+ <td align='right' class="bl">109&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">3.41&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Poling, breasting and shutters</td>
+ <td align='left' class="bl">104+61</td>
+ <td align='left' class="bl">103+90</td>
+ <td align='left' class="bl">Mar. 2, '06</td>
+ <td align='left' class="bl">Mar. 31, '06</td>
+ <td align='left'></td>
+ <td align='right' class="bl">29&nbsp;&nbsp;</td>
+ <td align='right' class="bl">71&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.45&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&#9127;<br />&#9128;<br />&#9129;</td>
+ <td align='left'>Three days' delay to set shutters in top. Shut down 20 days to permit consolidation of the river bed and to repair broken plates.</td>
+</tr>
+<tr>
+ <td align='left'>Earth</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Shutters</td>
+ <td align='left' class="bl">103+90</td>
+ <td align='left' class="bl">99+41</td>
+ <td align='left' class="bl">Apr. 20, '06</td>
+ <td align='left' class="bl">Sept 3, '06</td>
+ <td align='left'></td>
+ <td align='right' class="bl">136&nbsp;&nbsp;</td>
+ <td align='right' class="bl">449&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">3.40&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Four days of 136, delay account of flood.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom bench</td>
+ <td align='left' class="bl">99+41</td>
+ <td align='left' class="bl">99+17</td>
+ <td align='left' class="bl">Sept 3, '06</td>
+ <td align='left' class="bl">Sept 23, '06</td>
+ <td align='left'></td>
+ <td align='right' class="bl">20&nbsp;&nbsp;</td>
+ <td align='right' class="bl">24&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.20&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">99+17</td>
+ <td align='left' class="bl">98+50</td>
+ <td align='left' class="bl">Oct. 2, '06</td>
+ <td align='left' class="bl">Nov. 24, '06</td>
+ <td align='left'></td>
+ <td align='right' class="bl">53&nbsp;&nbsp;</td>
+ <td align='right' class="bl">67&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.27&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Thirteen days' shut-down to put on hood.</td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">98+50</td>
+ <td align='left' class="bl">97+72</td>
+ <td align='left' class="bl">Nov. 24, '06</td>
+ <td align='left' class="bl">Jan. 16, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">53&nbsp;&nbsp;</td>
+ <td align='right' class="bl">78&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.47&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Bottom heading</td>
+ <td align='left' class="bl">97+72</td>
+ <td align='left' class="bl">97+27</td>
+ <td align='left' class="bl">Jan. 16, '07</td>
+ <td align='left' class="bl">Feb. 10, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">25&nbsp;&nbsp;</td>
+ <td align='right' class="bl">45&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.40&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">97+27</td>
+ <td align='left' class="bl">95+72</td>
+ <td align='left' class="bl">Feb. 10, '07</td>
+ <td align='left' class="bl">Apr. 23, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">72&nbsp;&nbsp;</td>
+ <td align='right' class="bl">155&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.15&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">95+72</td>
+ <td align='left' class="bl">95+57</td>
+ <td align='left' class="bl">Apr. 23, '07</td>
+ <td align='left' class="bl">May 11, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">18&nbsp;&nbsp;</td>
+ <td align='right' class="bl">15&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">0.83&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">95+57</td>
+ <td align='left' class="bl">94+65</td>
+ <td align='left' class="bl">May 23, '07</td>
+ <td align='left' class="bl">June 17, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">25&nbsp;&nbsp;</td>
+ <td align='right' class="bl">92&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">3.68&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Twelve days' delay to repair cutting edge.</td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">94+65</td>
+ <td align='left' class="bl">94+41</td>
+ <td align='left' class="bl">June 17, '07</td>
+ <td align='left' class="bl">June 25, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">8&nbsp;&nbsp;</td>
+ <td align='right' class="bl">24&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">3.00&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Rock cut</td>
+ <td align='left' class="bl">94+41</td>
+ <td align='left' class="bl">94+03</td>
+ <td align='left' class="bl">June 25, '07</td>
+ <td align='left' class="bl">July 13, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">18&nbsp;&nbsp;</td>
+ <td align='right' class="bl">38&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.11&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">94+03</td>
+ <td align='left' class="bl">92+64</td>
+ <td align='left' class="bl">July 13, '07</td>
+ <td align='left' class="bl">Sept 12, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">61&nbsp;&nbsp;</td>
+ <td align='right' class="bl">139&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">2.28&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Mixed</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">92+64</td>
+ <td align='left' class="bl">92+54</td>
+ <td align='left' class="bl">Sept 12, '07</td>
+ <td align='left' class="bl">Sept 20, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">8&nbsp;&nbsp;</td>
+ <td align='right' class="bl">10&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">1.25&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left'>Rock</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'>Middle heading</td>
+ <td align='left' class="bl">92+54</td>
+ <td align='left' class="bl">92+50</td>
+ <td align='left' class="bl">Sept 20, '07</td>
+ <td align='left' class="bl">Sept 21, '07</td>
+ <td align='left'></td>
+ <td align='right' class="bl">1&nbsp;&nbsp;</td>
+ <td align='right' class="bl">4&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</td>
+ <td align='right' class="bl">4.00&nbsp;&nbsp;</td>
+ <td align='left' class="bl">&nbsp;</td>
+ <td align='left'></td>
+</tr>
+<tr>
+ <td align='left' class="bb">Mixed</td>
+ <td align='left' class="bbl">&nbsp;</td>
+ <td align='left' class="bb">Rock cut</td>
+ <td align='left' class="bbl">92+50</td>
+ <td align='left' class="bbl">90+38.66</td>
+ <td align='left' class="bbl">Sept 21, '07</td>
+ <td align='left' class="bbl">Jan. 8, '08</td>
+ <td align='left' class="bb">&nbsp;</td>
+ <td align='right' class="bbl">109&nbsp;&nbsp;</td>
+ <td align='right' class="bbl">211.34</td>
+ <td align='right' class="bbl">1.94&nbsp;&nbsp;</td>
+ <td align='left' class="bbl">&nbsp;</td>
+ <td align='left' class="bb">&nbsp;</td>
+</tr>
+</table></div>
+
+<p><span class='pagenum'><a name="Page_451" id="Page_451">[Pg 451]</a></span></p>
+
+<p>Openings were made between the headings as follows:</p>
+
+<p>
+Tunnel <i>D</i>, February 20th, 1908;<br />
+Tunnel <i>B</i>, March 3d, 1908;<br />
+Tunnel <i>C</i>, March 5th, 1908;<br />
+Tunnel <i>A</i>, March 18th, 1908.<br />
+</p>
+
+<p>It was necessary to cut away the projecting floors of the working
+compartments before the cutting edges could be shoved together.</p>
+
+<p><i>Contractor's Organization.</i>&mdash;Tunnel operations were carried on
+continuously for thirteen days out of fourteen, regular work being shut
+down for repairs on alternate Sundays. When the required pressure was
+more than 32 lb., four gangs of laborers were employed, each gang
+working two shifts of 3 hours each, with an intermission of 3 hours
+between the shifts. When the pressure was less than 32 lb., three gangs
+were employed, each gang covering 8 hours, but with an intermission of
+about 1/2 hour in low pressure for lunch.</p>
+
+<p><i>Air Pressures Required.</i>&mdash;During the greater portion of the work in
+soft ground, pressure was maintained which would about balance the
+hydrostatic head at the axis of the tunnel. This required a pressure
+varying from 30 to 34 lb. per sq. in. above that of the atmosphere. In
+Tunnels <i>B</i> and <i>D</i>, at Manhattan, during the work in soft ground,
+pressures as high as 37 lb. were maintained for considerable periods of
+time; in the firm material near the reef 28 lb. was often sufficient.
+While removing the broken plates, the pressure was raised for a short
+time to 42 lb., and was maintained between 37-1/2 and 40 lb. for a
+little more than one month.</p>
+
+<p><i>Air Supply.</i>&mdash;For regular operation the contractor furnished four
+compressors on each side of the river, each having a rated capacity of
+5,000 cu. ft. of free air per minute delivered at 50 lb. above normal,
+when running at the rate of 100 rev. per min. An additional compressor
+of the same capacity was supplied on each side of the river, in
+compliance with the requirement for 25% excess capacity; the additional
+compressors had also high-pressure air cylinders which could be
+connected at will, and in which the pressure could be increased to 150
+lb., and the air used to supply rock drills, grouting machines, etc. The
+entire combination on each side of the river, therefore, was rated at
+25,000 cu. ft. of free air per minute, or a mean of 6,250 cu. ft. per
+heading. Its safe working capacity was not far from 20,000 cu. ft. per
+min.<span class='pagenum'><a name="Page_452" id="Page_452">[Pg 452]</a></span></p>
+
+<p>The shields broke through rock surface in Tunnels <i>B</i>, <i>C</i>, and <i>D</i>, at
+Manhattan, in November and December, 1905. The consumption of air in the
+four tunnels soon exceeded 15,000 cu. ft. for 24 hours, and in Tunnel
+<i>D</i>, on several occasions, it exceeded 7,000 cu. ft. for a like period.
+Blows had become frequent, and it was evident that the air plant was
+inadequate for driving four tunnels at once in the open material east of
+the Manhattan rock. Work in Tunnel <i>A</i>, therefore, was not resumed,
+after the suspension on December 29th, for about ten months, and Tunnel
+<i>C</i> was also closed down for more than four months of the time between
+December, 1905, and July, 1906. During this period the capacity of the
+plant was increased from the rated 25,000 cu. ft. of free air per
+minute, to 35,000. In Tunnel <i>D</i> the material had gradually become
+firmer, with more clay and less escape of air, as the Blackwell's Island
+Reef was approached, and, at the end of the period, the rock surface was
+within 3 ft. of the top of the shield; in Tunnel <i>B</i>, the rock of the
+reef was still a little below the shield, but the overlying material
+contained a large proportion of clay and held air very well. Tunnel <i>C</i>
+was still in open material, but, with two lines safe and with the
+increased air plant, it was deemed best to resume work in Tunnel <i>A</i>,
+which was done on October 23d, 1906. Thenceforward work was continuous
+in all headings until the meeting points with the Long Island shields
+were reached.</p>
+
+<p>This period, January to October, 1906, inclusive, was the most strenuous
+of the entire work, particularly the first six months. With one and, at
+times, two tunnels closed down, the consumption of air in the headings
+from Manhattan was an average of more than 20,000 cu. ft. per min. for
+periods of from 30 to 60 days; it was often more than 25,000 cu. ft. for
+24 hours, with a maximum of nearly 29,000 cu. ft., and doubtless this
+was exceeded considerably for shorter periods. On several occasions the
+quantity supplied to a single tunnel averaged more than 15,000 cu. ft.
+per min. for 24 hours. The greatest averages for 24 hours were obtained
+later in Tunnel <i>A</i>, after the resumption of work there, and exceeded
+19,000 cu. ft., but the conditions in the headings of the other lines
+were then so favorable that the work was carried on continuously in all.</p>
+
+<p>The deficiency in the original plant at Manhattan was so marked, and the
+need of driving all headings from Long Island simultaneously so clear,
+that it was decided to increase the rated capacity of the Long<span class='pagenum'><a name="Page_453" id="Page_453">[Pg 453]</a></span> Island
+compressor plant to 45,400 cu. ft. of free air per minute, which was
+10,400 cu. ft. greater than the capacity of the Manhattan plant after
+the latter had been augmented.</p>
+
+<div class="figcenter">
+ <a id="ill18" name="ill18"></a><a href="images/ill18large.jpg">
+ <img src="images/ill18.jpg"
+ alt="Plate LXXII"
+ title="Plate LXXII" /></a><br />
+ <span class="caption">Plate LXXII</span>
+</div>
+
+<p>The earth encountered on emerging from rock, when driving westward from
+Long Island, was far more compact and less permeable to air than on the
+Manhattan side, but for a distance of from 400 to 600 ft. immediately
+east of the reef, it was a clean open sand, and, while the shields were
+passing through this, the quantity of air supplied to the four headings
+seldom fell below 20,000 cu. ft. per min.; it was usually more than
+25,000 cu. ft., with a recorded maximum of 33,400 cu. ft. Although this
+was greater than ever used on the Manhattan side, it was more uniformly
+distributed among the several headings, and in none equalled the maximum
+observed on the Manhattan side, the largest having been 12,700 cu. ft.
+per min. for 24 hours; it must be remembered, however, that at one time
+only two tunnels were in progress in the bad material in the tunnels
+from Manhattan.</p>
+
+<p>From the foregoing experience, it would seem that the plant finally
+furnished at Long Island, having a rated capacity of 45,400 cu. ft. of
+free air per minute, would have been a reasonable compliance with the
+original actual needs on the Manhattan side and <i>vice versa</i>; the plant
+finally developed on the Manhattan side, having a rated capacity of
+35,000 cu. ft. of free air per minute, would have sufficed for the Long
+Island side.</p>
+
+<p>The total quantity of free air compressed for the supply of the working
+chambers of the tunnels and the Long Island caissons was 34,109,000,000
+cu. ft., and, in addition, 10,615,000,000 cu. ft. were compressed to
+between 80 and 125 lb. for power purposes, of which at least 80% was
+exhausted in the compressed-air working chambers. The total supply of
+free air to each heading while under pressure, therefore, averaged about
+3,550 cu. ft. per min.</p>
+
+<p>The quantity of air escaping during a sudden blow-out is apparently much
+smaller than might be supposed. Investigation of a number of cases,
+showing large pressure losses combined with a long stretch of tunnel
+supplying a relatively large reservoir of air, disclosed that a maximum
+loss of about 220,000 cu. ft. of free air occurred in 10 min. This
+averages only a little more than 19,000 cu. ft. per min., the maximum
+recorded supply to one tunnel for a period of 24 hours. Of this<span class='pagenum'><a name="Page_454" id="Page_454">[Pg 454]</a></span>
+quantity, however, probably from 30 to 40% escaped in the first 45
+seconds, while the remainder was a more or less steady loss up to the
+time when the supply could be increased sufficiently to maintain the
+lowered pressure. Very few blows showed losses approaching this in
+quantity, but the inherent inaccuracy of the observations make the
+foregoing figures only roughly approximate.</p>
+
+
+
+<h4><span class="smcap">Special Difficulties.</span></h4>
+
+<p>The most serious difficulties of the work came near the start. In Tunnel
+<i>D</i> blows and falls of sand from the face were frequent after soft
+ground was met in the top. About six weeks after entering the full sand
+face, and before the shutters had been installed, the shield showed a
+decided tendency to settle, carrying the tunnel lining down with it and
+resulting in a number of badly broken plates in the bottom of the rings.
+Notwithstanding the use of extremely high vertical leads,<a name="FNanchor_D_4" id="FNanchor_D_4"></a><a href="#Footnote_D_4" class="fnanchor">[D]</a> the sand
+was so soft that the settlement of the shield continued for about
+fifteen rings, the maximum being nearly 9 in. below grade. The
+hydrostatic head at mid-height of the tunnel was 32-1/2 lb., and the
+raising of the air pressure to 37 lb., as was done at this time, was
+attended with grave danger of serious blows, on account of the recent
+disturbance of the natural cover by the pulling and re-driving of piles
+in the reconstruction of the Long Island ferry slips directly above. It
+dried the face materially, however, and the shield began to rise again,
+and had practically regained the grade when the anticipated blow-outs
+occurred, culminating with the entrance of rip-rap from the river bed
+into the shield and the flooding of the tunnel with 4 ft. of sand and
+water at the forward end. The escape of air was very great, and, as a
+pressure of more than 28 lb. could not be maintained, the face was
+bulkheaded and the tunnel was shut down for three weeks in order to
+permit the river bed to consolidate.</p>
+
+<p>This was the most serious difficulty encountered on any part of the
+work, and, coming at the very start, was exceedingly discouraging.
+During the shut-down the broken plates were reinforced temporarily with
+steel ribs and reinforced concrete (<a href="#ill19">Fig. 1, Plate LXXIII</a>) which, on
+completion of the work, were replaced by cast-steel segments, as
+described elsewhere. Practically, no further movement of iron took
+place, and the loss of grade caused by the settlement of the shield,<span class='pagenum'><a name="Page_455" id="Page_455">[Pg 455]</a></span>
+which was by far the largest that ever occurred in this work, was not
+sufficient to require a change in the designed grade or alignment of the
+track. Work was resumed with the shutters in use at the face as an aid
+to excavation. The features of extreme seriousness did not recur, but
+for two months the escape of air continued to be extremely large, an
+average of 15,000 cu. ft. per min. being required on many days during
+this period.</p>
+
+<div class="figcenter">
+ <a id="ill19" name="ill19">
+ <img src="images/ill19.jpg"
+ alt="Plate LXXIII, Fig. 1.--Temporary Reinforcement of Broken Plates And Removal of a Plate in Sections."
+ title="Plate LXXIII, Fig. 1.--Temporary Reinforcement of Broken Plates And Removal of a Plate in Sections." /></a><br />
+ <span class="caption">Plate LXXIII, Fig. 1.&mdash;Temporary Reinforcement of Broken Plates And Removal of a Plate in Sections.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill20" name="ill20">
+ <img src="images/ill20.jpg"
+ alt="Plate LXXIII, Fig. 2.--Heavy Cast-Steel Patch Attached to Bent Segment of Cutting Edge."
+ title="Plate LXXIII, Fig. 2.--Heavy Cast-Steel Patch Attached to Bent Segment of Cutting Edge." /></a><br />
+ <span class="caption">Plate LXXIII, Fig. 2.&mdash;Heavy Cast-Steel Patch Attached to Bent Segment of Cutting Edge.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill21" name="ill21">
+ <img src="images/ill21.jpg"
+ alt="Plate LXXIII, Fig. 3.--Inflow of Soft Clay Through Shield."
+ title="Plate LXXIII, Fig. 3.--Inflow of Soft Clay Through Shield." /></a><br />
+ <span class="caption">Plate LXXIII, Fig. 3.&mdash;Inflow of Soft Clay Through Shield.</span>
+</div>
+
+<div class="figcenter">
+ <a id="ill22" name="ill22">
+ <img src="images/ill22.jpg"
+ alt="Plate LXXIII, Fig. 4.--Reinforcement of Broken Plate with Long Polt and Twisted Steel Rods."
+ title="Plate LXXIII, Fig. 4.--Reinforcement of Broken Plate with Long Polt and Twisted Steel Rods." /></a><br />
+ <span class="caption">Plate LXXIII, Fig. 4.&mdash;Reinforcement of Broken Plate with Long Polt and Twisted Steel Rods.</span>
+</div>
+
+<p>In Tunnel <i>B</i>, after passing out from under the bulkhead line, in April,
+1906, the loss of air became very great, and blow-outs were of almost
+daily occurrence until the end of June. At the time of the blows the
+pressure in the tunnel would drop from 2 to 8 lb., and it generally took
+some hours to raise the pressure to what it was before the blow. During
+that time regular operations were interrupted. In the latter part of
+June a permit was obtained allowing the clay blanket to be increased in
+thickness up to a depth of water of 27 ft. at mean low tide. The
+additional blanket was deposited during the latter part of June and
+early in July, and almost entirely stopped the blows.</p>
+
+<p>By the end of the month the natural clay, previously described, formed
+the greater portion of the face, and, from that time forward, played an
+important part in reducing the quantity of air required. During April
+and the early part of May the work was under the ferry racks of the Long
+Island Railroad. The blanket had to be placed by dumping the clay from
+wheel-barrows through holes in the decking.</p>
+
+<p>In Tunnel <i>A</i> a bottom heading had been driven 23 ft. in advance of the
+face at the time work was stopped at the end of 1905. During the ten
+months of inactivity the seams in the rock above opened. The rock
+surface was only from 2 to 4 ft. below the top of the cutting edge for a
+distance of about 60 ft. Over the rock there were large boulders
+embedded in sharp sand. It was an exceedingly difficult operation to
+remove the boulders and place the polings without starting a run. The
+open seams over the bottom heading also frequently caused trouble, as
+there were numerous slides of rock from the face which broke up the
+breasting and allowed the soft material from above to run into the
+shield. There were two runs of from 50 to 75 cu. yd. and many smaller
+ones.</p>
+
+
+
+<h4><span class="smcap">Guiding the Shields.</span></h4>
+
+<p>Little difficulty was experienced at any time in driving the shield
+close to the desired line, but it was much harder to keep it on grade.
+In rock section, where the cradle could be set far enough in advance<span class='pagenum'><a name="Page_456" id="Page_456">[Pg 456]</a></span> to
+become hard before the shield was shoved over it, there was no trouble
+whatever. Where the cradle could be placed only a very short time before
+it had to take the weight of the shield, the case was quite different.
+The shield had a tendency to settle at the cutting edge, and when once
+pointed downward it was extremely difficult to change its direction. It
+was generally accomplished by embedding railroad rails or heavy oak
+plank in the cradle on solid foundation. This often had to be repeated
+several times before it was successful. In soft ground it was much
+easier to change the direction of the shield, but, owing to the varying
+nature of the material, it was sometimes impossible to determine in
+advance how the shield should be pointed. It was found by experience at
+Manhattan that the iron lining remained in the best position in relation
+to grade when the underside of the bottom of the shield at the rear end
+was driven on grade of the bottom of the iron, but if the rate of
+progress was slow, it was better to drive the shield a little higher.</p>
+
+<p>In the headings from Long Island, which, as a rule, were in soft ground,
+the cutting edges of the shields were kept from 4 to 8 in. higher, with
+respect to the grade line, than the rails. The shields would then
+usually move parallel to the grade line, though this was modified
+considerably by the way the mucking was done and by the stiffness of the
+ground at the bottom of the shield.</p>
+
+<p>On the average, the shields were shoved by from ten to twelve of the
+bottom jacks, with a pressure of about 4,000 lb. per sq. in. The jacks
+had 9-in. plungers, which made the average total force required to shove
+the shield 2,800,000 lb. In the soft ground, where shutters were used,
+all of the twenty-seven jacks were frequently used, and on several
+occasions the pressure exceeded 6,000 lb. per sq. in. With a unit
+pressure of 6,000 lb. per sq. in., the total pressure on the shield with
+all twenty-seven jacks in operation was 5,154 tons.</p>
+
+
+<h4><span class="smcap">Injuries to Shields.</span></h4>
+
+<p>There were only two instances of damage to the essential structural
+features of the shields. The most serious was in Tunnel <i>D</i> where the
+cutting edge at the bottom of the shield was forced up a slightly
+sloping ledge of rock. A bow was formed in the steel casting which was
+markedly increased with the next few shoves. Work was suspended, and a
+heavy cast-steel patch, filling out the bow, was attached to the bent
+segments, as shown in <a href="#ill20">Fig. 2, Plate LXXIII</a>. No further trouble<span class='pagenum'><a name="Page_457" id="Page_457">[Pg 457]</a></span> was
+experienced with the deformed portion. The other instance was in Tunnel
+<i>B</i>, from Long Island, where a somewhat similar but less serious
+accident occurred and was treated in a like manner.</p>
+
+<p><i>Bulkheads.</i>&mdash;At Manhattan, bulkheads had to be built near the shafts
+before the tunnels could be put under pressure. After 500 ft. of tunnel
+had been built on each line, the second bulkheads were constructed. The
+air pressure between the first and second bulkheads was then reduced to
+between 15 and 20 lb. When the shields had been advanced for 1,500 ft.,
+the third set of bulkheads was built. Nearly all the broken plates which
+were removed were located between the first and third bulkheads at
+Manhattan. Before undertaking this operation, the doors of the locks in
+the No. 3 bulkheads were reversed to take pressure from the west. By
+this means it was possible to carry on the work of dismantling the
+shields under comparatively low pressure simultaneously with the removal
+of the broken plates.</p>
+
+<p>At Long Island City the roofs of the caissons served the purpose of the
+No. 1 bulkheads. Two other sets of bulkheads were erected, the first
+about 500 ft. and the second about 1,500 ft. from the shafts.</p>
+
+
+<h4><span class="smcap">Settlement at Surface of Ground.</span></h4>
+
+<p>The driving of such portions of the river tunnels, with earth top, as
+were under the land section, caused a settlement at the surface varying
+usually from 3 to 6 in. The three-story brick building at No. 412 East
+34th Street required extensive repairs. This building stood over the
+section of part earth and part rock excavation where the tunnels broke
+out from the Manhattan ledge and where there were a number of runs of
+sand into the shield. In fact, the voids made by those runs eventually
+worked up to the surface and caused the pavement of the alley between
+the buildings to drop 4 or 5 ft. over a considerable area. The tunnels
+also passed directly under the ferry bridges and racks of the Long
+Island Railroad at East 34th Street. Tunnels <i>B</i> and <i>D</i> were constantly
+blowing at the time, and, where progress was slow, caused so much
+settlement that one of the racks had to be rebuilt. Tunnel <i>A</i>, on the
+other hand, where progress was rapid, caused practically no settlement
+in the racks.</p>
+
+
+<h4><span class="smcap">Clay Blanket.</span></h4>
+
+<p>As previously mentioned, clay was dumped over the tunnels in varying
+depths at different times. A material was required which would<span class='pagenum'><a name="Page_458" id="Page_458">[Pg 458]</a></span> pack
+into a compact mass and would not readily erode under the influence of
+the tidal currents of the river and the escape of the great volumes of
+air which often kept the water in the vicinity of the shields in violent
+motion. Suitable clay could not be found in the immediate vicinity of
+the work. Materials from Shooter's Island and from Haverstraw were tried
+for the purpose. The Government authorities did not approve of the
+former, and the greater portion of that used came from the latter point.
+Although a number of different permits governing the work were granted,
+there were three important ones. The first permit allowed a blanket
+which roughly followed the profile of the tunnels, with an average
+thickness of 10 ft. on the Manhattan side and somewhat less on the Long
+Island City side. The second general permit allowed the blanket to be
+built up to a plane 27 ft. below low water. This proved effective in
+checking the tendency to blow, but allowed considerable loss of air.
+Finally, dumping was allowed over limited and marked areas up to a plane
+of 20 ft. below low water. Wherever advantage was taken of this last
+authority, the excessive loss of air was almost entirely stopped. After
+all the shields had been well advanced out into the river, the blanket
+behind them was dredged up, and the clay used over again in advance of
+the shield.</p>
+
+<p>Soundings were taken daily over the shields, and, if marked erosion was
+found, clay was dumped into the hole. Whenever a serious blow occurred,
+a scowload of clay was dumped over it as soon as possible and without
+waiting to make soundings. For the latter purposes a considerable
+quantity of clay was placed in storage in the Pidgeon Street slip at
+Long Island City, and one or two bottom-dump scows were kept filled
+ready for emergencies. Mr. Robert Chalmers, who had charge of the
+soundings for the contractor, states that "the depressions in the
+blanket caused by erosion due to the escape of air were, as a rule,
+roughly circular in plan and of a curved section somewhat flat in the
+center." Satisfactory soundings were never obtained in the center of a
+violent blow, but the following instance illustrates in a measure what
+occurred. Over Tunnel <i>B</i>, at Station 102+80, there was normally 36 ft.
+of water, 7 ft. of clay blanket, and 20 ft. of natural cover. Air was
+escaping at the rate of about 10,000 cu. ft. per min., and small blows
+were occurring once or twice daily. On June 22d, soundings showed 54 ft.
+of water. A depth of 18 ft. of the river bottom had been eroded in about
+two days. On the next day there were taken out of the<span class='pagenum'><a name="Page_459" id="Page_459">[Pg 459]</a></span> shield boulders
+which had almost certainly been deposited on the natural river bed. Clay
+from the blanket also came into the shields on a number of occasions
+during or after blows. The most notable occasion was in September, 1907,
+when the top of the shield in Tunnel <i>D</i> was emerging from the east side
+of Blackwell's Island Reef. The sand in the top was very coarse and
+loose, and allowed the air to escape very freely. The fall of a piece of
+loose rock from under the breast precipitated a run of sand which was
+followed by clay from the blanket, which, in this locality, was largely
+the softer redredged material. Mucking out the shield was in progress
+when the soft clay started flowing again and forced its way back into
+the tunnel for a distance of 20 ft., as shown in <a href="#ill21">Fig. 3, Plate LXXIII</a>.
+Ten days of careful and arduous work were required to regain control of
+the face and complete the shove, on account of the heavy pressure of the
+plastic clay.</p>
+
+<p>The clay blanket was of the utmost importance to the work throughout,
+and it is difficult to see how the tunnels could have been driven
+through the soft material on the Manhattan side without it.</p>
+
+<p>The new material used in the blanket amounted to 283,412 cu. yd., of
+which 117,846 cu. yd. were removed from over the completed tunnels and
+redeposited in the blanket in advance of the shields. A total of 88,059
+cu. yd. of clay was dumped over blows. The total cost of placing and
+removing the blanket was $304,056.</p>
+
+
+<h4><span class="smcap">Iron Lining.</span></h4>
+
+<p>The standard cast-iron tunnel lining was of the usual tube type, 23 ft.
+in outside diameter. The rings were 30 in. wide, and were composed of
+eleven segments and a key. The webs of the segments were 1-1/2 in. thick
+in the central portion, increasing to 2-3/8 in. at the roots of the
+flanges, which were 11 in. deep, 2-1/4 in. thick at the root, and 1-1/2
+in. at the edge, and were machined on all contact faces. Recesses were
+cast in the edge of the flanges, forming a groove, when the lining was
+in place, 1-1/2 in. deep and about 3/8 in. wide, to receive the
+caulking. The bolt holes were cored in the flanges, and the bosses
+facing the holes were not machined. The customary grout hole was tapped
+in the center of each plate for a standard 1-1/4-in. pipe. In this work,
+experience indicated that the standard pipe thread was too fine, and
+that the taper was objectionable. Each segment weighed, approximately,
+2,020 lb., and the key weighed 520 lb., the total weight being 9,102 lb.
+per<span class='pagenum'><a name="Page_460" id="Page_460">[Pg 460]</a></span> lin. ft. of tunnel. <a href="#fig01">Fig. 1</a> shows the details of the standard heavy
+lining.</p>
+
+<p>In addition to the standard cast-iron lining, cast-steel rings of the
+same dimensions were provided for use in a short stretch of the tunnel,
+when passing from a rock to a soft ground foundation, where it was
+anticipated that unequal settlement and consequent distortion and
+increase in stress might occur, but, aside from the small regular drop
+of the lining as it passed out of the tail of the shield, no such
+settlement was observed.</p>
+
+<p>Two classes of lighter iron, one with 1-in. web and 8-in. flanges and
+the other with 1-1/4-in. web and 9-in. flanges&mdash;the former weighing
+5,166 lb. per lin. ft. of tunnel and the latter, 6,776 lb.&mdash;were
+provided for use in the land sections between East Avenue and the Long
+Island City shafts. Two weights of extra heavy segments for use at the
+bottom of the rings were also furnished. The so-called <i>XX</i> plates had
+webs and flanges 1/4 in. thicker than the standard segment and the <i>YY</i>
+plates were similarly 1/2 in. heavier. The conditions under which they
+were used will be referred to later. All the castings were of the same
+general type as shown by <a href="#fig01">Fig. 1</a>.</p>
+
+<p>Rings tapering 3/4 in. and 1-1/2 in. in width were used for changes in
+alignment and grade, the former being used approximately at every fourth
+ring on the 1&deg; 30' curves. The 1-1/2-in. tapers were largely used for
+changes in grade where it was desired to free the iron from binding on
+the tail of the shield. Still wider tapers would have been advantageous
+for quick results in this respect.</p>
+
+<p>No lug was cast on the segments for attachment to the erector, but in
+its place the gadget shown on <a href="#ill16">Fig. 4, Plate LXX</a>, was inserted in one of
+the pairs of bolt holes near the center of the plate, and was held in
+position by the running nut at one end.</p>
+
+<p>In the beginning it was expected that the natural shape of the rings
+would not show more than 1 in. of shortening of the vertical diameter;
+this was slightly exceeded, however, the average distortion throughout
+the tunnels being 1-7/16 in. The erectors were attached to the shield
+and in such a position that they were in the plane of the center of the
+ring to be erected when the shove was made without lead and just far
+enough to permit placing the segments. If the shield were shoved too
+far, a rare occurrence, the erection was inconvenienced. In driving with
+high vertical leads, which occurred more frequently, the dis<span class='pagenum'><a name="Page_462" id="Page_462">[Pg 462]</a></span>advantage
+of placing the erector on the shield was more apparent. Under such
+conditions the plane of the erector's motion was acutely inclined to the
+plane of the ring, and, after placing the lower portion of the ring, it
+was usually necessary to shove the shield a few inches farther in order
+to place the upper plates. The practical effect of this action is
+referred to later.</p>
+
+<div class="figcenter">
+ <a id="fig01" name="fig01"></a><a href="images/fig01large.jpg">
+ <img src="images/fig01.jpg"
+ alt="Fig. 1."
+ title="Fig. 1." /></a><br />
+ <span class="caption">Fig. 1.</span>
+</div>
+
+<p>At first the erection of the iron in the river tunnels interfered
+somewhat with the mucking operations, but the length of time required to
+complete the latter was ample for the completion of the former; and the
+starting of a shove was seldom postponed by reason of the non-completion
+of a ring. After the removal of the bottom of the diaphragms, permitting
+the muck cars to be run into the shield and beyond, the two operations
+were carried on simultaneously without serious interference. The
+installation of the belt conveyor for handling the soft ground spoil in
+Tunnel <i>A</i> was of special benefit in this respect.</p>
+
+<p>Preparatory to the final bolt tightening of each ring as erected, a
+15-ton draw-jack, consisting of a small pulling-jack inserted in a light
+eye-bar chain, was placed on the horizontal diameter, and frequently the
+erectors were also used to boost the crown of the iron, the object being
+to erect the ring truly circular. Before shoving, a 1-1/4-in.
+turn-buckle was also placed on the horizontal diameter in order to
+prevent the spreading of the iron, previous to filling the void outside
+with grout. The approach of the supports for the upper floor of the
+trailing platform necessitated the removal of these turnbuckles from all
+but the three leading rings, but if the iron showed a tendency to
+continue distortion, they were re-inserted after the passage of the
+trailing platform and remained until the arch of the concrete lining was
+placed.</p>
+
+<p>The cost of handling and erecting the iron varied greatly at different
+times, averaging, for the river tunnels, $3.32 per ton for the directly
+chargeable labor of handling and erecting, to which must be added $7.54
+for "top charges." The cost of repairing broken plates is included in
+this figure.</p>
+
+<p><i>Broken Plates.</i>&mdash;During the construction of the river section of the
+tunnels, a number of segments were found to have been broken while
+shoving the shield. The breaks, which with few exceptions were confined
+to the three or four bottom plates, almost invariably occurred on the
+advanced face of the ring, and rarely extended beyond the bottom<span class='pagenum'><a name="Page_463" id="Page_463">[Pg 463]</a></span> of the
+flange. A careful study of the breaks and of the shoving records
+disclosed several distinct types of fracture and three principal known
+causes of breakage by the shield.</p>
+
+<p>In the first case, the accidental intrusion of foreign material between
+the jack head and the iron caused the jack to take its bearings on the
+flange above its normal position opposite the web of the ring, and
+resulted usually in the breaking out of a piece of the flange or in
+several radiating cracks with or without a depression of the flange.
+These breaks were very characteristic, and the cause was readily
+recognizable, even though the intruding substance was not actually
+observed.</p>
+
+<p>In the second case, the working of a hard piece of metal, such as a
+small tool, into the annular space between the iron and the tail of the
+shield, where it was caught on the bead and dragged along as the shield
+advanced, was the known cause of a number of broken segments. Such
+breaks had no particular characteristic, but were usually close above
+the line of travel of the lost tool or metal. Their cause was determined
+by the finding of a heavy score on the underside of the segment or the
+discovery of the tool wedged in the tail of the shield or lying under
+the broken plate when it was removed. It is probable that a number of
+breaks ascribed to unknown causes should be placed in this class.</p>
+
+<p>The third cause includes the largest number of breaks, and, while
+difficult to define closely, is the most interesting. Broadly speaking,
+the breaks resulted from the movements of the shield in relation to the
+position of the tunnel lining. While shoving through soft ground, it was
+frequently difficult to apply sufficient power to the lower jacks to
+complete the full shove of 30 in. on the desired alignment. The shield,
+therefore, was driven upward at the beginning of the shove, and, as the
+sand packed in front of the shield and more power was required, it was
+furnished by applying the upper jacks. The top of the shield was slowly
+pushed over, and, at the close of the shove, the desired position had
+been obtained; but the shield had been given a rocking motion with a
+decided lifting of the tail toward the close of the shove. A similar
+lifting of the tail occurred when, with high vertical leads, the top of
+the shield was pushed over in order to place the upper plates of the
+ring. Again, when the shield was driven above grade and it was desired
+to descend, the passage of the shield over the summit pro<span class='pagenum'><a name="Page_464" id="Page_464">[Pg 464]</a></span>duced a like
+effect. In all these movements, with the space between the tail of the
+shield and the iron packed tight with pugging, the upward thrust of the
+shield tended to flatten the iron in the bottom and occasional broken
+plates were the result. The free use of the taper rings, placed so as to
+relieve the binding of the lining on the tail of the shield, forces the
+tunnel to follow the variations in the grade of the shield, but reduces
+greatly the injuries to the rings from this action.</p>
+
+<p>In Tunnel <i>D</i>, where very high vertical leads were required through the
+soft sand, combined with a marked tendency of the shield to settle, the
+shield was badly cramped on the iron and dragged along it at the top.
+The bearing of the iron on its soft foundation tended to thrust up the
+bottom in this case also, as shown by the opening of the bottom
+cross-joints when the bolts were slackened to relieve the strain during
+a shove. The anticipated cracks in the crown plates, which have been
+more frequently observed in other tunnels, did not occur here, and were
+not found elsewhere except in one place in Tunnel <i>B</i> where they were
+traced to a similar action of the shield. The cracks resulting from the
+movements of the shield, as briefly described above, in this third case
+were not confined to any particular type, but occurred more frequently
+at the extreme end of the circumferential flange than at any other
+point.</p>
+
+<p>The number of broken plates occurring in the river tunnels was 319, or
+0.42% of the total number erected. Of these, 52 were found and removed,
+either before or immediately after a shove, by far the greater number
+being broken in handling before or during erection. The remaining 267
+are considered below.</p>
+
+<p><i>Repair of Broken Plates.</i>&mdash;On the completion of a shove, the tail of
+the shield lacked about 5 in. of covering the full width of the last
+ring, and the removal of a plate broken during the shove, therefore,
+would have exposed the ground at the tail of the shield. With a firm
+material in the bottom, this introduced no particular difficulties, and,
+under such conditions, a broken plate was usually removed at once. In
+the sand, however, and especially on the Manhattan side where it was
+quick and flowing, the removal of a plate was attended with some danger,
+and such plates were usually left to be removed on the completion of the
+tunnel. Many of these had been reinforced by the use of <i>XX</i>, <i>YY</i>, and
+steel segments placed adjacent to the break in the following rings.</p>
+
+<p>After the meeting of the shields, the postponed replacement of the<span class='pagenum'><a name="Page_465" id="Page_465">[Pg 465]</a></span>
+broken segments was taken up. The pressure was raised sufficiently to
+dry thoroughly the sand outside the segments, which were drilled and
+broken out usually in quarters as shown on <a href="#ill19">Fig. 1, Plate LXXIII</a>. A steel
+segment was then inserted in the ring and drawn into place by
+turnbuckles. The application of the draw-jack, with a pull of about 30
+tons to each end successively, brought the plate to a firm bearing on
+the radial joints at the ends.</p>
+
+<p>Where the broken plate was isolated and was reinforced by steel or extra
+heavy segments in the adjacent ring, the crack, if slight, was simply
+caulked to insure water-tightness. If, however, the crack was opened or
+extended to the web of the plate, the cross-flanges were tied together
+by a 1-1/2-in. by 7-ft. bolt, inserted through the bolt holes nearest
+the broken flange. The long bolt acted in the nature of a bow string,
+and was provided at its ends with two nuts set on opposite sides of the
+cross-joints to replace the standard bolts removed for its insertion.
+<a href="#ill22">Fig. 4, Plate LXXIII</a> shows one of these bolts in place. In addition, all
+broken plates remaining in the tunnel were reinforced with 1-in.
+twisted-steel rods in the concrete lining, also shown in <a href="#ill22">Fig. 4, Plate
+LXXIII</a>.</p>
+
+<p><i>Special Construction at River Shield Junctions.</i>&mdash;Dismantling the
+shields was started as soon as they came to rest in their final position
+with the cutting edges together. The plans contemplated their entire
+removal, with the exception of the cylindrical skins and cast-steel
+cutting edges. Inside the former the standard tunnel lining was erected
+to within 4 ft. of the heels of the cutting edges. Spanning the latter,
+and forming the continuous metal tunnel lining, the special construction
+shown by <a href="#fig02">Fig. 2</a> was built. This consisted of a 1-1/4 in. rolled-steel
+ring, 7 ft. long, erected inside the cutting edges, with an annular
+clearance of 1 in., and two special cast-iron rings shaped to connect
+the rolled-steel ring with the normal lining. One flange of the special
+cast-iron rings was of the standard type, the other was returned 9 in.
+in the form of a ring, the inside diameter of which was the same as the
+outside diameter of the rolled-steel ring to which it was bolted.</p>
+
+<p>The space between the standard and special construction was of varying
+width at the various shields, and was filled with a closure ring cast to
+the lengths determined in the field. <a href="#fig02">Fig. 2</a> shows the completed
+construction.<span class='pagenum'><a name="Page_466" id="Page_466">[Pg 466]</a></span></p>
+
+<p>Hook-bolts, screwed through threaded holes and buried in 1 to 1 Portland
+cement grout ejected through similar holes, reinforced the rolled-steel
+ring against external water pressure. In two of the tunnels the concrete
+lining was carried completely through the junction, and covered the
+whole construction, while in the remaining two tunnels it was omitted at
+the rolled-steel ring, leaving the latter exposed and set back about 3
+in. from the face of the concrete.</p>
+
+<div class="figcenter">
+ <a id="fig02" name="fig02"></a><a href="images/fig02large.jpg">
+ <img src="images/fig02.jpg"
+ alt="Fig. 2."
+ title="Fig. 2." /></a><br />
+ <span class="caption">Fig. 2.</span>
+</div>
+
+
+<h4><span class="smcap">Grouting.</span></h4>
+
+<p>Except as previously noted, the voids outside of the tunnel lining were
+filled with grout ejected through the grout holes in each segment. The
+possibility was always present that Portland cement, if used for grout
+in the shield-driven tunnels, would flow forward around the shield and
+set hard, "freezing" the shield to the rock or the iron lining, or at
+least forming excrescences upon it, which would render its control
+difficult. With this in mind, the contractors proposed to substitute an
+English Blue Lias lime as a grouting material. Grout of fresh English
+lime containing a moderate quantity of water set very rapidly in air to
+the consistency of chalk. Its hydraulic properties, however,<span class='pagenum'><a name="Page_467" id="Page_467">[Pg 467]</a></span> were
+feeble, and in the presence of an excess of water it remained at the
+consistency of soft mud. It was not suitable, therefore, as a supporting
+material for the tunnel.</p>
+
+<p>An American lime, made in imitation of the Lias lime, but having greater
+hydraulic properties, was tried, but proved unsatisfactory. Two brands
+of natural cement were also tried and rejected, but a modified
+quick-setting natural cement, manufactured especially for this work, was
+eventually made satisfactory, and by far the largest part of the
+river-tunnel grouting was done with this material mixed 1 to 1 by
+volume. East of the Long Island shafts the work which was built without
+shields was grouted principally with Portland cement and sand mixed 1 to
+1 by volume.</p>
+
+<p>In the river tunnels large quantities of the English lime were used neat
+as grout over the top of the tunnel in attempts to stop losses of air
+through the soft ground. It was not of great efficiency, however, in
+this respect until the voids outside of the lining had been filled above
+the crown. Its properties of swelling and quick setting in the dry sand
+at that point then became of value. The use of dry lime in the face,
+where the escaping air would carry it into the voids of the sand and
+choke them, was much more promptly efficacious in checking the loss.</p>
+
+<p>With the exception of the English lime, all grout was mixed 1 to 1 with
+sand in a Cockburn continuous-stirring machine operated by a 3-cylinder
+air engine. The grout machine was placed on the lower floor of the
+trailing platform shown on <a href="#ill18">Plate LXXII</a>, while the materials were placed
+on the upper platform, and, together with the water, were fed into the
+machine through a hole in the upper floor. The sand was bagged in the
+yard, and the cars on which the materials were sent into the tunnels
+were lifted by an elevator to the level of the upper floor of the
+trailing platform before unloading.</p>
+
+<p>Great difficulty was experienced in preventing the waste of the fluid
+grout ahead of the shield and into the tail through the space between it
+and the iron lining. In a full soft ground section, the first condition
+did not usually arise. In the full-rock sections the most efficient
+method of checking the waste was found to be the construction of dams or
+bulkheads outside the lining between it and the rock surface. For this
+purpose, at intervals of about 30 ft., the leading ring and the upper
+half of the preceding one were disconnected and pulled forward
+sufficiently to give access to the exterior. A rough dam of rubble, or<span class='pagenum'><a name="Page_468" id="Page_468">[Pg 468]</a></span>
+bags of mortar or clay, was then constructed outside the iron, and the
+rings were shoved back and connected up. In sections containing both
+rock and soft ground, grout dams were built at the cutting edge at
+intervals, and were carried up as high as circumstances permitted.</p>
+
+<p>The annular space at the tail of the shield was at all times supposed to
+be packed tight with clay and empty bags, but the pugging was difficult
+to maintain against the pressure of the grout. For a time, 1/2-in.
+segmental steel plates, slipped down between the jackets and the iron,
+were used to retain the pugging, but their displacement resulted in a
+number of broken flanges, and their use was abandoned. In their place,
+2-in. segmental plates attached to the jack heads were substituted with
+more satisfactory results. Notwithstanding these devices, the waste of
+grout at the tail was very great.</p>
+
+<p>The soft ground material on various portions of the work acted very
+differently. The clay and "bull's liver" did not cave in upon the iron
+lining for several hours after the shield had passed, sometimes not for
+a day or more, which permitted the space between it and the iron to be
+grouted. The fine gray or beach sand and the quicksand closed in almost
+at once. The quicksand has a tendency to fill in under the iron from the
+sides and in places to leave a cavity at about the horizontal diameter
+which was not filled from above, as the sand, being dried out by the
+air, stood up fairly well and did not cave against the iron, except
+where nearly horizontal at the top.</p>
+
+<p>The total quantity of grout used on the work was equivalent in set
+volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647
+bbl. were ejected through the iron lining, an average of 14.93 bbl. per
+lin. ft. The cost of grout ejected outside of the river tunnels was 93
+cents per bbl. for labor and $2.77 for "top charges." East of the Long
+Island shaft the corresponding costs were $0.68 and $1.63, the
+difference being partly due to the large percentages of work done in the
+normal air at the latter place.</p>
+
+
+<h4><span class="smcap">Caulking and Leakage.</span></h4>
+
+<p>Up to August, 1907, the joints between the segments of the cast-iron
+lining were caulked with iron filings and sal ammoniac, mixed in the
+proportion of 400 to 1 by weight. With the air pressure balancing the
+hydrostatic head near the tunnel axis, it was difficult to make the
+rust-joint caulking tight below the axis against the opposing water
+pressure;<span class='pagenum'><a name="Page_469" id="Page_469">[Pg 469]</a></span> this form of caulking was also injured in many places by
+water dripping from service pipes attached to the tunnel lining. A few
+trials of lead wire caulked cold gave such satisfactory results that it
+was adopted as a substitute. Pneumatic hammers were used successfully on
+the lead caulking, but were only used to a small extent on the rust
+borings, which were mostly hand caulked. Immediately before placing the
+concrete lining, all leaks, whether in the rust borings or lead, were
+repaired with lead, and the remainder of the groove was filled with 1 to
+1 Portland cement mortar, leaving the joints absolutely water-tight at
+that time. The subsequent development of small seepages through the
+concrete would seem to indicate that the repair work should have been
+carried on far enough in advance of the concreting to permit the
+detection of secondary leaks which might develop slowly. The average
+labor cost chargeable against the caulking was 12 cents per lin. ft., to
+which should be added 21.8 cents for "top charges."</p>
+
+<p>Unfortunately, it was necessary to place the greater part of the
+concrete lining in the river tunnels during the summer months when the
+temperature at the point of work frequently exceeded 85&deg;; and the
+temperature of the concrete while setting was much higher. This abnormal
+heat, due to chemical action in the cement, soon passed away, and, with
+the approach of winter, the contraction of the concrete resulted in
+transverse cracks. By the middle of the winter these had developed quite
+uniformly at the ends of each 30-ft. section of concrete arch as placed,
+and frequently finer cracks showed at about the center of each 30-ft.
+section.</p>
+
+<p>While the temperature of the concrete was falling, a like change was
+taking place in the cast-iron lining, with resulting contraction. The
+lining had been erected in compressed air, the temperature of which
+averaged about 70&deg; in winter and higher in summer. Compressed air having
+been taken off in the summer of 1908, the tunnels then acquired the
+lower temperature of the surrounding earth, slowly falling until
+mid-winter. The contraction of the concrete, firmly bedded around the
+flanges of the iron, and showing cracks at fairly uniform intervals,
+probably localized the small corresponding movements of the iron near
+the concrete cracks, and resulted in a loosening of the caulking at
+these points. With the advent of cold weather, damp spots appeared in
+numerous places on the concrete, and small seepages showed through quite
+regularly at the temperature cracks, in some cases developing<span class='pagenum'><a name="Page_470" id="Page_470">[Pg 470]</a></span>
+sufficiently to be called leaks. Only a few, however, were measurable in
+amount.</p>
+
+<p>Early in January small brass plugs were firmly set on opposite sides of
+a large number of cracks, and caliper readings and air temperature
+observations were taken regularly throughout the winter and spring. The
+widths of the cracks and the amount of leakage at them increased with
+each drop in temperature and decreased as the temperature rose again,
+but until spring the width of the cracks did not return to the same
+point with each return of temperature.</p>
+
+<p>The leakage was similar in all four tunnels, but was largest in amount
+in Tunnel <i>D</i>, where, at the beginning of February, the ordinary flow
+was about 0.0097 cu. ft. per sec., equivalent to 0.00000347 cu. ft. per
+sec. per lin. ft. of tunnel. Of this amount 0.0065 cu. ft. per sec.
+could be accounted for at eight of the cracks showing measurable
+leakage, leaving 0.0032 cu. ft. per sec. or 0.00000081 cu. ft. per sec.
+per lin. ft. of tunnel to be accounted for as general seepage
+distributed over the whole length.</p>
+
+<p>It was not feasible to stop every leak in the tunnel, most of which were
+indicated simply by damp spots on the concrete; a rather simple method
+was devised, however, for stopping the leaks at the eight or ten places
+in each tunnel where water dripped from the arch or flowed down the face
+of the concrete. The worst leak in any tunnel flowed about 0.0023 cu.
+ft. per sec. To stop these leaks, rows of 1-in. holes, at about 4-in.
+centers, were drilled with jap drills through the concrete to the flange
+of the iron. These rows were from 3 to 18 ft. long, extending 1 ft. or
+more beyond the limits of the leak. The bottoms of the holes were
+directly on the caulking groove and the pounding of the drill usually
+drove the caulking back, so that the leak became dry or nearly so after
+the holes were drilled. If left alone the leaks would gradually break
+out again in a few hours or a few days and flow more water than before.
+They were allowed to do this, however, in only a few cases as
+experiments. After the holes were drilled, the bottom 4 in. next the
+flange was filled with soft neat cement mortar. Immediately on top of
+this was placed two plugs of neat cement about 2-1/2 in. long, which
+were 5 or 6 hours old and rather hard. Each was tamped in with a round
+caulking tool of the size of the hole driven with a sledge hammer. On
+top of this were driven in the same way two more plugs of neat cement of
+the same size, which were hard set.<span class='pagenum'><a name="Page_471" id="Page_471">[Pg 471]</a></span> These broke up under the blows of
+the hammer, and caulked the hole tight. When finished, the tamping tool
+would ring as though it was in solid rock. Great pressure was exerted on
+the plastic mortar in the bottom of the hole, which resulted in the
+re-caulking of the joint of the iron. No further measurable leakage
+developed in the repaired cracks, during a period of four months, and
+the total leakage has been reduced to about 0.002 cu. ft. per sec. in
+each tunnel, an average of 0.00000051 cu. ft. per sec. per lin. ft.</p>
+
+
+<h4><span class="smcap">Sump and Pump Chambers.</span></h4>
+
+<p>To take care of the drainage of the tunnels, a sump with a pump chamber
+above it was provided for each pair of tunnels. The sumps were really
+short tunnels underneath the main ones and extending approximately
+between the center lines of the latter. They were 10 ft. 9-1/2 in. in
+outside diameter and 44 ft. long. The water drops directly from the
+drains in the center lines of the tunnels into the sumps. Above the
+sumps and between the tunnels, a pump chamber 19 ft. 5 in. long was
+built. Above the end of the latter, opposite the sump, a cross-passage
+was constructed between the bench walls of the two tunnels. This passage
+gives access from either tunnel through an opening in the floor to the
+pump chamber and through the latter to the sump.</p>
+
+<p>From the preliminary borings it was thought that the sumps were located
+so that the entire construction would be in rock. This proved to be the
+case on Tunnels <i>C</i> and <i>D</i>, but not on Tunnels <i>A</i> and <i>B</i>. The
+position of the rock surface in the latter is shown by <a href="#fig03">Fig. 3</a>. After the
+excavation was completed in Tunnel <i>B</i>, January 1st, 1908, the plates
+were removed from the side of the tunnel at the cross-passage, and a
+drift was driven through the earth above the rock surface across to the
+lining of Tunnel <i>A</i>. The heading was timbered as shown by <a href="#fig03">Fig. 3</a>. There
+was practically no loss of air from the drift, but the clay blanket had
+been removed from over this locality and the situation caused some
+anxiety. In order to make the heading as secure as possible, the 24-in.
+I-beams, shown on <a href="#fig03">Fig. 3</a>, were attached to the lining of the two
+tunnels. The beams formed a support for the permanent concrete roof arch
+of the passage, which was placed at once. At the same time plates were
+removed from the bottom in Tunnel <i>B</i> over the site of the sump, and a
+heading was started on the line of the sump<span class='pagenum'><a name="Page_472" id="Page_472">[Pg 472]</a></span> toward Tunnel <i>A</i>. As soon
+as the heading had been driven beyond the center line of the pump
+chamber, a bottom heading was driven from a break-up westward in the
+pump chamber and a connection was made with the cross-passage. The iron
+lining of the pump chamber was next placed, from the cross-passage
+eastward. The soft ground was excavated directly in advance of the
+lining, and the ground was supported by polings in much the same manner
+as described for shield work. On account of bad ground and seams of sand
+encountered in the rock below the level of the cross-beams, the entire
+west wall of the pump chamber was placed before enlarging the sump to
+full size. This was also judicious, in order to support as far as
+possible the iron lining of the tunnels. The sump was then excavated to
+full size. The iron lining of the sump and the east wall of the pump
+chamber were placed as soon as possible. The voids outside the iron
+lining of the sump and the pump chamber were filled as completely as
+possible with concrete, and then thoroughly grouted. Finally, the
+concrete lining was put in place inside of the iron.</p>
+
+<p>As shown by <a href="#fig03">Fig. 3</a>, the excavation of these chambers left a considerable
+portion of the iron lining of the tunnels temporarily unsupported on the
+lower inner quarter. To guard against distortion, a system of diagonals
+and struts was placed as shown.</p>
+
+<p>The floor of the pump chamber was water-proofed with felt and pitch in a
+manner similar to that described for the caissons at Long Island City.
+It was not possible to make the felt stick to the vertical walls with
+soft pitch, which was the only kind that could be used in compressed
+air, and, therefore, the surfaces were water-proofed by a wall of
+asphalt brick laid in pitch melting at 60&deg; Fahr. Forms were erected on
+the neat line, and the space to the rock was filled with concrete making
+a so-called sand-wall similar to that commonly used for water-proofing
+with felt and pitch. The bricks were then laid to a height of four or
+five courses. The joints were filled with pitch instead of mortar.
+Sheets of tin were then placed against the face of the wall and braced
+from the concrete forms. As much pitch as possible was then slushed
+between the brick and the sand-wall, after which the concrete in the
+main wall was filled up to the top of the water-proofing course. The tin
+was then withdrawn and the operation repeated. This method was slow and
+expensive, but gave good results. Ordinary pitch could not be used on
+account of the fumes, which are<span class='pagenum'><a name="Page_474" id="Page_474">[Pg 474]</a></span> particularly objectionable in
+compressed air. The 60&deg; pitch was slightly heated in the open air before
+using.</p>
+
+<div class="figcenter">
+ <a id="fig03" name="fig03"></a><a href="images/fig03large.jpg">
+ <img src="images/fig03.jpg"
+ alt="Fig. 3."
+ title="Fig. 3." /></a><br />
+ <span class="caption">Fig. 3.</span>
+</div>
+
+<p>The sump and pump chamber on Tunnels <i>C</i> and <i>D</i> differed from the one
+described only in minor details; but, being wholly constructed in rock,
+presented fewer difficulties and permitted a complete envelope of
+water-proofing to be placed in the top.</p>
+
+
+<h4><span class="smcap">Concrete Lining.</span></h4>
+
+<p>The placing of concrete inside the iron tube was done by an organization
+entirely separate from the tunneling force. A mixing plant was placed in
+each of the five shafts. The stone and sand bins discharged directly
+into mixers below, which, in turn, discharged into steel side-dump
+concrete cars. All concrete was placed in normal air.</p>
+
+<p>The first step, after the iron lining was scraped clean and washed down
+and all leaks were stopped, was the placing of biats, marked <i>B</i> on
+<a href="#ill23">Plate LXXIV</a>. These were made up of a 6 by 12-in. yellow pine timber, 17
+ft. long, with two short lengths of the same size spliced to its ends by
+pieces of 12-in. channels, 3 ft. 9 in. long, clamped upon the sides.
+These biats were placed every 5 ft. along the tunnel in rings having
+side keys. Next, a floor, 13 ft. wide, was laid on the biats and two
+tracks, of 30-in. gauge and 6-1/2-ft. centers, were laid upon the floor.
+There were three stages in the concreting. Fig. 2, <a href="#ill23">Plate LXXIV</a>, shows
+the concrete in place at the end of the first, and Fig. 3, <a href="#ill23">Plate LXXIV</a>,
+at the end of the second stage. The complete arch above the bench walls
+was done in the last operation.</p>
+
+<p>Two 3 by 10-in. soldiers (<i>SS</i> in Figs. 1 and 2, <a href="#ill23">Plate LXXIV</a>) were
+fastened to each biat and braced across by two horizontal and two
+diagonal braces. To each pair of soldiers a floor template, <i>T</i>, was
+then nailed. The form for the center drain was then suspended as shown
+in Fig. 1, <a href="#ill23">Plate LXXIV</a>. Three pieces of shuttering, <i>FFF</i>, 20 ft. long,
+were then nailed to the bottom of the soldiers. One is all that would
+have been needed for the first concrete placed, but it was easier to
+place them at this stage than later, when there was less room. Three
+rough shutters were also nailed to the curved portion for the floor
+template. Opposite each biat, a bracket, <i>bb</i>, was then nailed, which
+carries a set of rough boards which formed the risers for the duct
+steps. Everything was then ready for concreting except that, where
+refuge niches occurred, a<span class='pagenum'><a name="Page_475" id="Page_475">[Pg 475]</a></span> form for the portion of the niche below the
+seat was nailed to the shuttering. This form is shown at <i>R</i> in Fig. 1,
+<a href="#ill23">Plate LXXIV</a>.</p>
+
+<div class="figcenter">
+ <a id="ill23" name="ill23"></a><a href="images/ill23large.jpg">
+ <img src="images/ill23.jpg"
+ alt="Plate LXXIV"
+ title="Plate LXXIV" /></a><br />
+ <span class="caption">Plate LXXIV</span>
+</div>
+
+<p>The concrete was dumped down on each side from side-dump cars standing
+on the track, and, falling between the risers for the duct steps, ran or
+was shoveled under the forms and down into the bottom. The horizontal
+surface on each side the center drain was smoothed off with a shovel.
+The workmen became very skillful at this, and got a fairly smooth
+surface. This concrete was usually placed in lengths of 45 or 60 ft.
+After setting for about 24 hours, the brackets, <i>bb</i>, were removed,
+together with the shuttering on the steps. The triangular pieces, <i>t</i> in
+Fig. 1, <a href="#ill23">Plate LXXIV</a>, were not removed until later. Instead, a board was
+laid upon this lower step on which the duct layers could work. This and
+the triangular piece were not removed until just before the bench
+concrete was placed. This was important, as otherwise the bond between
+the old and new concrete would be much impaired by dirt ground into the
+surface of the old concrete. The ducts were then laid, as shown in Fig.
+2, <a href="#ill23">Plate LXXIV</a>.</p>
+
+<p>The remaining shutters for the face of the bench walls were then placed.
+The remainder of the forms for the refuge niches, <i>RR</i>, in Fig. 1, <a href="#ill23">Plate
+LXXIV</a>, were nailed to the shutters, the steel beam over the niche was
+laid in place, the forms for the ladders, <i>L</i> in Fig. 2, <a href="#ill23">Plate LXXIV</a>,
+which occur every 25 ft., were tacked to the shutters, the shutters and
+forms were given a coat of creosote oil, and then all was ready for
+placing the bench concrete.</p>
+
+<p>The specifications required a 2-in. mortar face to be placed on all
+exposed surfaces and the remainder to be smoothed with a trowel and
+straight-edge. After about 48 hours, the biats were blocked up on the
+bench, and all forms between the bench walls below the working floor
+were removed.</p>
+
+<p>The centering for the arch concrete consisted of simple 5 by 3-1/2 by
+5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at
+5-ft. intervals. Each rib was made up of two pieces spliced together at
+the top. Two men easily handled one of these pieces. After splicing, the
+rib was supported by four hanger-bolts fastened to the iron lining as
+shown in Fig. 3, <a href="#ill23">Plate LXXIV</a>.</p>
+
+<p>In the early part of the work, two additional bolts were used about half
+way up on the side between the upper and lower hanger-bolts. It was soon
+found that by placing the strut between the tunnel lining<span class='pagenum'><a name="Page_476" id="Page_476">[Pg 476]</a></span> and the crown
+of the rib, these hanger-bolts could be dispensed with. The lagging was
+of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each
+piece had three saw cuts on the back, from end to end, allowing it to be
+bent to the curve of the arch; it was kept curved by an iron strap
+screwed to the back. The arches were put in, either in 15, 30 or 45-ft.
+lengths, depending on what was ready for concrete and what could be done
+in one continuous working. The rule was that when an arch was begun, the
+work must not stop until it was finished. An arch length always ended in
+the middle of a ring. The lagging was placed to a height of about 6 ft.
+above the bench before any concreting was done. When the concrete had
+been brought up to that point, lagging was added, one piece at a time,
+just ahead of the concrete, up to the crown, where a space of about 18
+in. was left. When the lagging had reached the upper hanger-bolts, they
+were removed, which left only the two bottom bolts fixed in the
+concrete. Most of these were unscrewed from the eye and saved, as tin
+sleeves were placed around them before concreting. Two cast-iron eyes
+were lost for every 5 ft. of tunnel. To place the key concrete, a stage
+was set up in the middle of the floor, and, beginning at one end, about
+2 ft. of block lagging was placed. Over this, concrete was packed,
+filling the key as completely as possible. This was done partly by
+shoveling and using a short rammer, and partly by packing with the hands
+by the workmen, who wore rubber gloves for the purpose. Another 2 ft. of
+lagging was then placed, and the operation was repeated, and thus
+working backward, foot by foot, the key was completed. This is the usual
+way of keying a concrete arch, but in this case the difficulty was
+increased by the flanges of the iron lining. It was practically
+impossible to fill all parts of the pockets formed by these flanges. To
+meet this difficulty, provision was made for grouting any unfilled
+space. As the concrete was being put in, tin pipes were placed with
+their tops nearly touching the iron lining, and their bottoms resting on
+the lagging. Each pocket was intended to have two of these pipes, one to
+grout through and the other to act as a vent for the escape of air. Each
+center key ring had six pipes, and each side key had eight. The bottoms
+of the pipes were held by a single nail driven half way into the
+lagging. This served to keep the pipes in position and to locate them
+after the lagging was taken down.</p>
+
+<p>The cost of labor in the tunnels directly chargeable to concrete was<span class='pagenum'><a name="Page_477" id="Page_477">[Pg 477]</a></span>
+$1.80 per cu. yd. The top charges, exclusive of the cost of materials
+(cement, sand, and stone), amounted to $3.92.</p>
+
+
+<h4><span class="smcap">Electric Conduits.</span></h4>
+
+<p>In one bench wall of each tunnel there were fifteen openings for power
+cables and in the other, between the river shafts, there were forty
+openings for telephone, telegraph, and signal cables. East of the Long
+Island shaft, the number of the latter was reduced to twenty-four. The
+telephone ducts were all of the four-way type. The specifications
+required that the power ducts should have an opening of not less than
+3-1/2 in., nor more than 3-7/8 in., and that after laying they should
+pass a 4-ft. mandrel, 3-3/8 in. at the leading end and 2-5/8 in. at the
+other. The outside dimension was limited between 5 and 5-3/8 in. The
+openings of the four-way ducts were required to be not less than 3-3/8
+in., nor more than 3-5/8 in., and after laying to pass a 5-ft. mandrel,
+3-1/4 in. at the leading end and 2-1/2 in. at the other. The outside
+dimensions were limited between 9 and 9-1/2 in. All were to be laid in
+1/4-in. beds of mortar. The specifications were not definite as to the
+shape of the opening, but those used were square with corners rounded to
+a radius of 3/8 in. The four-ways were 3 ft. long, and the singles, 18
+in.</p>
+
+<p>A study of the foregoing dimensions will show that the working limits
+were narrow. Such narrow limits would not pay for the ordinary conduit
+line in a street, where there is more room. In the tunnel greater
+liberality meant either reducing the number of conduits or encroaching
+on the strength of the concrete tunnel lining. The small difference of
+only 1/8 in. in the size of the mandrel, or a clearance of only 1/16 in.
+on each side, no doubt did increase the cost of laying somewhat, though
+not as much as might at first be supposed. All bottom courses were laid
+to a string, in practically perfect line and grade, and all joints were
+tested with mandrels which were in all openings, and pulled forward as
+each piece of conduit was laid. As the workmen became skillful, the
+progress was excellent.</p>
+
+<p>All costs of labor in the tunnel chargeable to duct laying amounted to
+$0.039 per ft. of duct; top charges brought this up to $0.083.</p>
+
+<p>The serious problem was to guard against grout and mortar running into
+the duct opening through the joints from the concrete, which was a
+rather wet mixture. Each joint was wrapped, when laid, with canvas,
+weighing 10 oz. per sq. yd., dipped in cement grout immediately before<span class='pagenum'><a name="Page_478" id="Page_478">[Pg 478]</a></span>
+using. These wraps were 6 in. wide, and were cut long enough to go
+around the lap about the middle of the duct. As soon as all the ducts
+were laid, the entire bank was plastered over with fairly stiff mortar,
+which, when properly done, closed all openings. The plastering was not
+required by the specifications, but was found by the contractor to
+result in a saving in ultimate cost.</p>
+
+<p>The concrete on the two sides of the bank of ducts was bonded together
+by 2 by 1/8-in. steel bonds between the ducts, laid across in horizontal
+joints. Both ends were split into two pieces, 1 in. long, one of which
+was turned up and the other down. These bonds projected 1-1/2 in. into
+the concrete on either side. Where the bond came opposite the risers of
+the duct step, against which the ducts were laid, recesses were provided
+for the projecting bond. This was done by nailing to the rough shutters
+for the steps a form which when removed left a dove-tailed vertical
+groove. This form was made in two pieces, one tapering inward and the
+other with more taper outward. As the bonds were placed, these grooves
+were filled with mortar.</p>
+
+<p>The ducts usually received their final rodding with the specification
+mandrel a month or more after they were laid, after which all openings
+into splicing chambers were stopped by wooden plugs, 8 in. long tapering
+from 3-3/4 in. at one end to 2-3/4 in. at the other end, and shaped to
+fit the opening tightly. At first the plugs were paraffined, to keep
+them from swelling and breaking the ducts, but were not successful, as
+the paraffin lubricated them so that they would not stay in place. They
+were expensive, and there was some swelling in the best that were
+obtained. A better plug was made by using no paraffin, but by making six
+saw cuts, three horizontal and three vertical, in the larger end,
+cutting to within about 2 in. of the smaller end. The swelling of the
+wood was then taken up by the saw cuts and the spring of the wood.</p>
+
+<p>The splicing chambers are at 400-ft. intervals. They are 6 ft. long, 4
+ft. 9 in. high, with a width varying from 3 ft. 2 in. at the top to 1
+ft. 2 in. at the bottom.</p>
+
+<div class="footnotes"><h3>FOOTNOTES:</h3>
+
+<div class="footnote"><p><a name="Footnote_A_1" id="Footnote_A_1"></a><a href="#FNanchor_A_1"><span class="label">[A]</span></a> Presented at the meeting of December 15th, 1909.</p></div>
+
+<div class="footnote"><p><a name="Footnote_B_2" id="Footnote_B_2"></a><a href="#FNanchor_B_2"><span class="label">[B]</span></a> <i>Transactions</i>, Am. Soc. C. E., Vol. LXIX. p. 1.</p></div>
+
+<div class="footnote"><p><a name="Footnote_C_3" id="Footnote_C_3"></a><a href="#FNanchor_C_3"><span class="label">[C]</span></a> <i>Minutes of Proceedings</i>, Inst. C. E., Vol. CXXX, p. 50.</p></div>
+
+<div class="footnote"><p><a name="Footnote_D_4" id="Footnote_D_4"></a><a href="#FNanchor_D_4"><span class="label">[D]</span></a> The lead of the shield is the angular divergence of its
+axis from the axis of the tunnel and, in this tunnel, was measured as
+the offset in 23 ft. It was called + when the shield was pointed upward
+from grade, and - when pointed downward.</p></div>
+</div>
+
+
+
+
+
+
+
+
+
+<pre>
+
+
+
+
+
+End of the Project Gutenberg EBook of Transactions of the American Society
+of Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard
+
+*** END OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN ***
+
+***** This file should be named 18722-h.htm or 18722-h.zip *****
+This and all associated files of various formats will be found in:
+ http://www.gutenberg.org/1/8/7/2/18722/
+
+Produced by Juliet Sutherland, Taavi Kalju and the Online
+Distributed Proofreading Team at http://www.pgdp.net
+
+
+Updated editions will replace the previous one--the old editions
+will be renamed.
+
+Creating the works from public domain print editions means that no
+one owns a United States copyright in these works, so the Foundation
+(and you!) can copy and distribute it in the United States without
+permission and without paying copyright royalties. Special rules,
+set forth in the General Terms of Use part of this license, apply to
+copying and distributing Project Gutenberg-tm electronic works to
+protect the PROJECT GUTENBERG-tm concept and trademark. Project
+Gutenberg is a registered trademark, and may not be used if you
+charge for the eBooks, unless you receive specific permission. If you
+do not charge anything for copies of this eBook, complying with the
+rules is very easy. You may use this eBook for nearly any purpose
+such as creation of derivative works, reports, performances and
+research. They may be modified and printed and given away--you may do
+practically ANYTHING with public domain eBooks. Redistribution is
+subject to the trademark license, especially commercial
+redistribution.
+
+
+
+*** START: FULL LICENSE ***
+
+THE FULL PROJECT GUTENBERG LICENSE
+PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK
+
+To protect the Project Gutenberg-tm mission of promoting the free
+distribution of electronic works, by using or distributing this work
+(or any other work associated in any way with the phrase "Project
+Gutenberg"), you agree to comply with all the terms of the Full Project
+Gutenberg-tm License (available with this file or online at
+http://gutenberg.org/license).
+
+
+Section 1. General Terms of Use and Redistributing Project Gutenberg-tm
+electronic works
+
+1.A. By reading or using any part of this Project Gutenberg-tm
+electronic work, you indicate that you have read, understand, agree to
+and accept all the terms of this license and intellectual property
+(trademark/copyright) agreement. If you do not agree to abide by all
+the terms of this agreement, you must cease using and return or destroy
+all copies of Project Gutenberg-tm electronic works in your possession.
+If you paid a fee for obtaining a copy of or access to a Project
+Gutenberg-tm electronic work and you do not agree to be bound by the
+terms of this agreement, you may obtain a refund from the person or
+entity to whom you paid the fee as set forth in paragraph 1.E.8.
+
+1.B. "Project Gutenberg" is a registered trademark. It may only be
+used on or associated in any way with an electronic work by people who
+agree to be bound by the terms of this agreement. There are a few
+things that you can do with most Project Gutenberg-tm electronic works
+even without complying with the full terms of this agreement. See
+paragraph 1.C below. There are a lot of things you can do with Project
+Gutenberg-tm electronic works if you follow the terms of this agreement
+and help preserve free future access to Project Gutenberg-tm electronic
+works. See paragraph 1.E below.
+
+1.C. The Project Gutenberg Literary Archive Foundation ("the Foundation"
+or PGLAF), owns a compilation copyright in the collection of Project
+Gutenberg-tm electronic works. Nearly all the individual works in the
+collection are in the public domain in the United States. If an
+individual work is in the public domain in the United States and you are
+located in the United States, we do not claim a right to prevent you from
+copying, distributing, performing, displaying or creating derivative
+works based on the work as long as all references to Project Gutenberg
+are removed. Of course, we hope that you will support the Project
+Gutenberg-tm mission of promoting free access to electronic works by
+freely sharing Project Gutenberg-tm works in compliance with the terms of
+this agreement for keeping the Project Gutenberg-tm name associated with
+the work. You can easily comply with the terms of this agreement by
+keeping this work in the same format with its attached full Project
+Gutenberg-tm License when you share it without charge with others.
+
+1.D. The copyright laws of the place where you are located also govern
+what you can do with this work. Copyright laws in most countries are in
+a constant state of change. If you are outside the United States, check
+the laws of your country in addition to the terms of this agreement
+before downloading, copying, displaying, performing, distributing or
+creating derivative works based on this work or any other Project
+Gutenberg-tm work. The Foundation makes no representations concerning
+the copyright status of any work in any country outside the United
+States.
+
+1.E. Unless you have removed all references to Project Gutenberg:
+
+1.E.1. The following sentence, with active links to, or other immediate
+access to, the full Project Gutenberg-tm License must appear prominently
+whenever any copy of a Project Gutenberg-tm work (any work on which the
+phrase "Project Gutenberg" appears, or with which the phrase "Project
+Gutenberg" is associated) is accessed, displayed, performed, viewed,
+copied or distributed:
+
+This eBook is for the use of anyone anywhere at no cost and with
+almost no restrictions whatsoever. You may copy it, give it away or
+re-use it under the terms of the Project Gutenberg License included
+with this eBook or online at www.gutenberg.org
+
+1.E.2. If an individual Project Gutenberg-tm electronic work is derived
+from the public domain (does not contain a notice indicating that it is
+posted with permission of the copyright holder), the work can be copied
+and distributed to anyone in the United States without paying any fees
+or charges. If you are redistributing or providing access to a work
+with the phrase "Project Gutenberg" associated with or appearing on the
+work, you must comply either with the requirements of paragraphs 1.E.1
+through 1.E.7 or obtain permission for the use of the work and the
+Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or
+1.E.9.
+
+1.E.3. If an individual Project Gutenberg-tm electronic work is posted
+with the permission of the copyright holder, your use and distribution
+must comply with both paragraphs 1.E.1 through 1.E.7 and any additional
+terms imposed by the copyright holder. Additional terms will be linked
+to the Project Gutenberg-tm License for all works posted with the
+permission of the copyright holder found at the beginning of this work.
+
+1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm
+License terms from this work, or any files containing a part of this
+work or any other work associated with Project Gutenberg-tm.
+
+1.E.5. Do not copy, display, perform, distribute or redistribute this
+electronic work, or any part of this electronic work, without
+prominently displaying the sentence set forth in paragraph 1.E.1 with
+active links or immediate access to the full terms of the Project
+Gutenberg-tm License.
+
+1.E.6. You may convert to and distribute this work in any binary,
+compressed, marked up, nonproprietary or proprietary form, including any
+word processing or hypertext form. However, if you provide access to or
+distribute copies of a Project Gutenberg-tm work in a format other than
+"Plain Vanilla ASCII" or other format used in the official version
+posted on the official Project Gutenberg-tm web site (www.gutenberg.org),
+you must, at no additional cost, fee or expense to the user, provide a
+copy, a means of exporting a copy, or a means of obtaining a copy upon
+request, of the work in its original "Plain Vanilla ASCII" or other
+form. Any alternate format must include the full Project Gutenberg-tm
+License as specified in paragraph 1.E.1.
+
+1.E.7. Do not charge a fee for access to, viewing, displaying,
+performing, copying or distributing any Project Gutenberg-tm works
+unless you comply with paragraph 1.E.8 or 1.E.9.
+
+1.E.8. You may charge a reasonable fee for copies of or providing
+access to or distributing Project Gutenberg-tm electronic works provided
+that
+
+- You pay a royalty fee of 20% of the gross profits you derive from
+ the use of Project Gutenberg-tm works calculated using the method
+ you already use to calculate your applicable taxes. The fee is
+ owed to the owner of the Project Gutenberg-tm trademark, but he
+ has agreed to donate royalties under this paragraph to the
+ Project Gutenberg Literary Archive Foundation. Royalty payments
+ must be paid within 60 days following each date on which you
+ prepare (or are legally required to prepare) your periodic tax
+ returns. Royalty payments should be clearly marked as such and
+ sent to the Project Gutenberg Literary Archive Foundation at the
+ address specified in Section 4, "Information about donations to
+ the Project Gutenberg Literary Archive Foundation."
+
+- You provide a full refund of any money paid by a user who notifies
+ you in writing (or by e-mail) within 30 days of receipt that s/he
+ does not agree to the terms of the full Project Gutenberg-tm
+ License. You must require such a user to return or
+ destroy all copies of the works possessed in a physical medium
+ and discontinue all use of and all access to other copies of
+ Project Gutenberg-tm works.
+
+- You provide, in accordance with paragraph 1.F.3, a full refund of any
+ money paid for a work or a replacement copy, if a defect in the
+ electronic work is discovered and reported to you within 90 days
+ of receipt of the work.
+
+- You comply with all other terms of this agreement for free
+ distribution of Project Gutenberg-tm works.
+
+1.E.9. If you wish to charge a fee or distribute a Project Gutenberg-tm
+electronic work or group of works on different terms than are set
+forth in this agreement, you must obtain permission in writing from
+both the Project Gutenberg Literary Archive Foundation and Michael
+Hart, the owner of the Project Gutenberg-tm trademark. Contact the
+Foundation as set forth in Section 3 below.
+
+1.F.
+
+1.F.1. Project Gutenberg volunteers and employees expend considerable
+effort to identify, do copyright research on, transcribe and proofread
+public domain works in creating the Project Gutenberg-tm
+collection. Despite these efforts, Project Gutenberg-tm electronic
+works, and the medium on which they may be stored, may contain
+"Defects," such as, but not limited to, incomplete, inaccurate or
+corrupt data, transcription errors, a copyright or other intellectual
+property infringement, a defective or damaged disk or other medium, a
+computer virus, or computer codes that damage or cannot be read by
+your equipment.
+
+1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
+of Replacement or Refund" described in paragraph 1.F.3, the Project
+Gutenberg Literary Archive Foundation, the owner of the Project
+Gutenberg-tm trademark, and any other party distributing a Project
+Gutenberg-tm electronic work under this agreement, disclaim all
+liability to you for damages, costs and expenses, including legal
+fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
+LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
+PROVIDED IN PARAGRAPH F3. YOU AGREE THAT THE FOUNDATION, THE
+TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
+LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
+INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
+DAMAGE.
+
+1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
+defect in this electronic work within 90 days of receiving it, you can
+receive a refund of the money (if any) you paid for it by sending a
+written explanation to the person you received the work from. If you
+received the work on a physical medium, you must return the medium with
+your written explanation. The person or entity that provided you with
+the defective work may elect to provide a replacement copy in lieu of a
+refund. If you received the work electronically, the person or entity
+providing it to you may choose to give you a second opportunity to
+receive the work electronically in lieu of a refund. If the second copy
+is also defective, you may demand a refund in writing without further
+opportunities to fix the problem.
+
+1.F.4. Except for the limited right of replacement or refund set forth
+in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO OTHER
+WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO
+WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE.
+
+1.F.5. Some states do not allow disclaimers of certain implied
+warranties or the exclusion or limitation of certain types of damages.
+If any disclaimer or limitation set forth in this agreement violates the
+law of the state applicable to this agreement, the agreement shall be
+interpreted to make the maximum disclaimer or limitation permitted by
+the applicable state law. The invalidity or unenforceability of any
+provision of this agreement shall not void the remaining provisions.
+
+1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the
+trademark owner, any agent or employee of the Foundation, anyone
+providing copies of Project Gutenberg-tm electronic works in accordance
+with this agreement, and any volunteers associated with the production,
+promotion and distribution of Project Gutenberg-tm electronic works,
+harmless from all liability, costs and expenses, including legal fees,
+that arise directly or indirectly from any of the following which you do
+or cause to occur: (a) distribution of this or any Project Gutenberg-tm
+work, (b) alteration, modification, or additions or deletions to any
+Project Gutenberg-tm work, and (c) any Defect you cause.
+
+
+Section 2. Information about the Mission of Project Gutenberg-tm
+
+Project Gutenberg-tm is synonymous with the free distribution of
+electronic works in formats readable by the widest variety of computers
+including obsolete, old, middle-aged and new computers. It exists
+because of the efforts of hundreds of volunteers and donations from
+people in all walks of life.
+
+Volunteers and financial support to provide volunteers with the
+assistance they need, is critical to reaching Project Gutenberg-tm's
+goals and ensuring that the Project Gutenberg-tm collection will
+remain freely available for generations to come. In 2001, the Project
+Gutenberg Literary Archive Foundation was created to provide a secure
+and permanent future for Project Gutenberg-tm and future generations.
+To learn more about the Project Gutenberg Literary Archive Foundation
+and how your efforts and donations can help, see Sections 3 and 4
+and the Foundation web page at http://www.pglaf.org.
+
+
+Section 3. Information about the Project Gutenberg Literary Archive
+Foundation
+
+The Project Gutenberg Literary Archive Foundation is a non profit
+501(c)(3) educational corporation organized under the laws of the
+state of Mississippi and granted tax exempt status by the Internal
+Revenue Service. The Foundation's EIN or federal tax identification
+number is 64-6221541. Its 501(c)(3) letter is posted at
+http://pglaf.org/fundraising. Contributions to the Project Gutenberg
+Literary Archive Foundation are tax deductible to the full extent
+permitted by U.S. federal laws and your state's laws.
+
+The Foundation's principal office is located at 4557 Melan Dr. S.
+Fairbanks, AK, 99712., but its volunteers and employees are scattered
+throughout numerous locations. Its business office is located at
+809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email
+business@pglaf.org. Email contact links and up to date contact
+information can be found at the Foundation's web site and official
+page at http://pglaf.org
+
+For additional contact information:
+ Dr. Gregory B. Newby
+ Chief Executive and Director
+ gbnewby@pglaf.org
+
+Section 4. Information about Donations to the Project Gutenberg
+Literary Archive Foundation
+
+Project Gutenberg-tm depends upon and cannot survive without wide
+spread public support and donations to carry out its mission of
+increasing the number of public domain and licensed works that can be
+freely distributed in machine readable form accessible by the widest
+array of equipment including outdated equipment. Many small donations
+($1 to $5,000) are particularly important to maintaining tax exempt
+status with the IRS.
+
+The Foundation is committed to complying with the laws regulating
+charities and charitable donations in all 50 states of the United
+States. Compliance requirements are not uniform and it takes a
+considerable effort, much paperwork and many fees to meet and keep up
+with these requirements. We do not solicit donations in locations
+where we have not received written confirmation of compliance. To
+SEND DONATIONS or determine the status of compliance for any
+particular state visit http://pglaf.org
+
+While we cannot and do not solicit contributions from states where we
+have not met the solicitation requirements, we know of no prohibition
+against accepting unsolicited donations from donors in such states who
+approach us with offers to donate.
+
+International donations are gratefully accepted, but we cannot make
+any statements concerning tax treatment of donations received from
+outside the United States. U.S. laws alone swamp our small staff.
+
+Please check the Project Gutenberg Web pages for current donation
+methods and addresses. Donations are accepted in a number of other
+ways including checks, online payments and credit card
+donations. To donate, please visit: http://pglaf.org/donate
+
+
+Section 5. General Information About Project Gutenberg-tm electronic
+works.
+
+Professor Michael S. Hart is the originator of the Project Gutenberg-tm
+concept of a library of electronic works that could be freely shared
+with anyone. For thirty years, he produced and distributed Project
+Gutenberg-tm eBooks with only a loose network of volunteer support.
+
+Project Gutenberg-tm eBooks are often created from several printed
+editions, all of which are confirmed as Public Domain in the U.S.
+unless a copyright notice is included. Thus, we do not necessarily
+keep eBooks in compliance with any particular paper edition.
+
+Most people start at our Web site which has the main PG search facility:
+
+ http://www.gutenberg.org
+
+This Web site includes information about Project Gutenberg-tm,
+including how to make donations to the Project Gutenberg Literary
+Archive Foundation, how to help produce our new eBooks, and how to
+subscribe to our email newsletter to hear about new eBooks.
+
+*** END: FULL LICENSE ***
+
+
+
+</pre>
+
+</body>
+</html>
+
diff --git a/18722-h/images/fig01.jpg b/18722-h/images/fig01.jpg
new file mode 100644
index 0000000..00c8335
--- /dev/null
+++ b/18722-h/images/fig01.jpg
Binary files differ
diff --git a/18722-h/images/fig01large.jpg b/18722-h/images/fig01large.jpg
new file mode 100644
index 0000000..7646769
--- /dev/null
+++ b/18722-h/images/fig01large.jpg
Binary files differ
diff --git a/18722-h/images/fig02.jpg b/18722-h/images/fig02.jpg
new file mode 100644
index 0000000..3194e93
--- /dev/null
+++ b/18722-h/images/fig02.jpg
Binary files differ
diff --git a/18722-h/images/fig02large.jpg b/18722-h/images/fig02large.jpg
new file mode 100644
index 0000000..39da6e9
--- /dev/null
+++ b/18722-h/images/fig02large.jpg
Binary files differ
diff --git a/18722-h/images/fig03.jpg b/18722-h/images/fig03.jpg
new file mode 100644
index 0000000..7fb0fad
--- /dev/null
+++ b/18722-h/images/fig03.jpg
Binary files differ
diff --git a/18722-h/images/fig03large.jpg b/18722-h/images/fig03large.jpg
new file mode 100644
index 0000000..0693eed
--- /dev/null
+++ b/18722-h/images/fig03large.jpg
Binary files differ
diff --git a/18722-h/images/ill01.jpg b/18722-h/images/ill01.jpg
new file mode 100644
index 0000000..89f47e6
--- /dev/null
+++ b/18722-h/images/ill01.jpg
Binary files differ
diff --git a/18722-h/images/ill01large.jpg b/18722-h/images/ill01large.jpg
new file mode 100644
index 0000000..b698ac6
--- /dev/null
+++ b/18722-h/images/ill01large.jpg
Binary files differ
diff --git a/18722-h/images/ill02.jpg b/18722-h/images/ill02.jpg
new file mode 100644
index 0000000..f7ca16b
--- /dev/null
+++ b/18722-h/images/ill02.jpg
Binary files differ
diff --git a/18722-h/images/ill03.jpg b/18722-h/images/ill03.jpg
new file mode 100644
index 0000000..c62b98b
--- /dev/null
+++ b/18722-h/images/ill03.jpg
Binary files differ
diff --git a/18722-h/images/ill04.jpg b/18722-h/images/ill04.jpg
new file mode 100644
index 0000000..3f812db
--- /dev/null
+++ b/18722-h/images/ill04.jpg
Binary files differ
diff --git a/18722-h/images/ill05.jpg b/18722-h/images/ill05.jpg
new file mode 100644
index 0000000..636db3e
--- /dev/null
+++ b/18722-h/images/ill05.jpg
Binary files differ
diff --git a/18722-h/images/ill06.jpg b/18722-h/images/ill06.jpg
new file mode 100644
index 0000000..b02d53d
--- /dev/null
+++ b/18722-h/images/ill06.jpg
Binary files differ
diff --git a/18722-h/images/ill07.jpg b/18722-h/images/ill07.jpg
new file mode 100644
index 0000000..a5b2e1e
--- /dev/null
+++ b/18722-h/images/ill07.jpg
Binary files differ
diff --git a/18722-h/images/ill08.jpg b/18722-h/images/ill08.jpg
new file mode 100644
index 0000000..155432e
--- /dev/null
+++ b/18722-h/images/ill08.jpg
Binary files differ
diff --git a/18722-h/images/ill09.jpg b/18722-h/images/ill09.jpg
new file mode 100644
index 0000000..c1ca0b3
--- /dev/null
+++ b/18722-h/images/ill09.jpg
Binary files differ
diff --git a/18722-h/images/ill10.jpg b/18722-h/images/ill10.jpg
new file mode 100644
index 0000000..e9a4b10
--- /dev/null
+++ b/18722-h/images/ill10.jpg
Binary files differ
diff --git a/18722-h/images/ill10large.jpg b/18722-h/images/ill10large.jpg
new file mode 100644
index 0000000..963c431
--- /dev/null
+++ b/18722-h/images/ill10large.jpg
Binary files differ
diff --git a/18722-h/images/ill11.jpg b/18722-h/images/ill11.jpg
new file mode 100644
index 0000000..836607a
--- /dev/null
+++ b/18722-h/images/ill11.jpg
Binary files differ
diff --git a/18722-h/images/ill11large.jpg b/18722-h/images/ill11large.jpg
new file mode 100644
index 0000000..4217789
--- /dev/null
+++ b/18722-h/images/ill11large.jpg
Binary files differ
diff --git a/18722-h/images/ill12.jpg b/18722-h/images/ill12.jpg
new file mode 100644
index 0000000..baa017a
--- /dev/null
+++ b/18722-h/images/ill12.jpg
Binary files differ
diff --git a/18722-h/images/ill12large.jpg b/18722-h/images/ill12large.jpg
new file mode 100644
index 0000000..aa2d408
--- /dev/null
+++ b/18722-h/images/ill12large.jpg
Binary files differ
diff --git a/18722-h/images/ill13.jpg b/18722-h/images/ill13.jpg
new file mode 100644
index 0000000..1deb651
--- /dev/null
+++ b/18722-h/images/ill13.jpg
Binary files differ
diff --git a/18722-h/images/ill14.jpg b/18722-h/images/ill14.jpg
new file mode 100644
index 0000000..5486245
--- /dev/null
+++ b/18722-h/images/ill14.jpg
Binary files differ
diff --git a/18722-h/images/ill15.jpg b/18722-h/images/ill15.jpg
new file mode 100644
index 0000000..7c00ff8
--- /dev/null
+++ b/18722-h/images/ill15.jpg
Binary files differ
diff --git a/18722-h/images/ill16.jpg b/18722-h/images/ill16.jpg
new file mode 100644
index 0000000..4423d34
--- /dev/null
+++ b/18722-h/images/ill16.jpg
Binary files differ
diff --git a/18722-h/images/ill17.jpg b/18722-h/images/ill17.jpg
new file mode 100644
index 0000000..9170e7d
--- /dev/null
+++ b/18722-h/images/ill17.jpg
Binary files differ
diff --git a/18722-h/images/ill17large.jpg b/18722-h/images/ill17large.jpg
new file mode 100644
index 0000000..8047f84
--- /dev/null
+++ b/18722-h/images/ill17large.jpg
Binary files differ
diff --git a/18722-h/images/ill18.jpg b/18722-h/images/ill18.jpg
new file mode 100644
index 0000000..27c35b1
--- /dev/null
+++ b/18722-h/images/ill18.jpg
Binary files differ
diff --git a/18722-h/images/ill18large.jpg b/18722-h/images/ill18large.jpg
new file mode 100644
index 0000000..532f654
--- /dev/null
+++ b/18722-h/images/ill18large.jpg
Binary files differ
diff --git a/18722-h/images/ill19.jpg b/18722-h/images/ill19.jpg
new file mode 100644
index 0000000..8b502b2
--- /dev/null
+++ b/18722-h/images/ill19.jpg
Binary files differ
diff --git a/18722-h/images/ill20.jpg b/18722-h/images/ill20.jpg
new file mode 100644
index 0000000..58b2231
--- /dev/null
+++ b/18722-h/images/ill20.jpg
Binary files differ
diff --git a/18722-h/images/ill21.jpg b/18722-h/images/ill21.jpg
new file mode 100644
index 0000000..79725e0
--- /dev/null
+++ b/18722-h/images/ill21.jpg
Binary files differ
diff --git a/18722-h/images/ill22.jpg b/18722-h/images/ill22.jpg
new file mode 100644
index 0000000..da6745b
--- /dev/null
+++ b/18722-h/images/ill22.jpg
Binary files differ
diff --git a/18722-h/images/ill23.jpg b/18722-h/images/ill23.jpg
new file mode 100644
index 0000000..735ff61
--- /dev/null
+++ b/18722-h/images/ill23.jpg
Binary files differ
diff --git a/18722-h/images/ill23large.jpg b/18722-h/images/ill23large.jpg
new file mode 100644
index 0000000..2b04fad
--- /dev/null
+++ b/18722-h/images/ill23large.jpg
Binary files differ
diff --git a/18722.txt b/18722.txt
new file mode 100644
index 0000000..1b681b5
--- /dev/null
+++ b/18722.txt
@@ -0,0 +1,3190 @@
+The Project Gutenberg EBook of Transactions of the American Society of
+Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard
+
+This eBook is for the use of anyone anywhere at no cost and with
+almost no restrictions whatsoever. You may copy it, give it away or
+re-use it under the terms of the Project Gutenberg License included
+with this eBook or online at www.gutenberg.org
+
+
+Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910
+ The New York Tunnel Extension of the Pennsylvania Railroad.
+ The East River Tunnels. Paper No. 1159
+
+Author: James H. Brace, Francis Mason and S. H. Woodard
+
+Release Date: July 1, 2006 [EBook #18722]
+
+Language: English
+
+Character set encoding: ASCII
+
+*** START OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN ***
+
+
+
+
+Produced by Juliet Sutherland, Taavi Kalju and the Online
+Distributed Proofreading Team at http://www.pgdp.net
+
+
+
+
+
+
+
+
+
+AMERICAN SOCIETY OF CIVIL ENGINEERS
+
+INSTITUTED 1852
+
+
+TRANSACTIONS
+
+Paper No. 1159
+
+
+THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA RAILROAD.
+
+THE EAST RIVER TUNNELS.[A]
+
+BY JAMES H. BRACE, FRANCIS MASON, AND S. H. WOODARD, MEMBERS, AM. SOC.
+C. E.
+
+
+This paper will be limited to a consideration of the construction of the
+tunnels, the broader questions of design, etc., having already been
+considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C.
+E., and Alfred Noble, Past-President, Am. Soc. C. E.
+
+The location of the section of the work to be considered here is shown
+on Plate XIII of Mr. Noble's paper. There are two permanent shafts on
+each side of the East River and four single cast-iron tube tunnels, each
+about 6,000 ft. long, and consisting of 3,900 ft. between shafts under
+the river, and 2,000 ft. in Long Island City, mostly under the depot and
+passenger yard of the Long Island Railroad. This tube-tunnel work was
+naturally a single job. The contract for its construction was let to S.
+Pearson and Son, Incorporated, ground being broken on May 17th, 1904.
+Five years later, to a day, the work was finished and received its final
+inspection for acceptance by the Railroad Company.
+
+The contract was of the profit-sharing type, and required an audit, by
+the Railroad Company, of the contractor's books, and a careful system of
+cost-keeping by the Company's engineers, so that it is possible to
+include in the following some of the unit costs of the work. These are
+given in two parts: The first is called the unit labor cost, and is the
+cost of the labor in the tunnel directly chargeable to the thing
+considered. It does not include the labor of operating the plant, nor
+watchmen, yardmen, pipemen, and electricians. The second is called "top
+charges," a common term, but meaning different things to different
+contractors and engineers. Here, it is made to include the cost of the
+contractor's staff and roving laborers, such as pipemen, electricians,
+and yardmen, the cost of the plant and its operation, and all
+miscellaneous expenses, but does not include any contractor's profit,
+nor cost of materials entering permanent work.
+
+The contractor's plant is to be described in a paper by Henry Japp,[B]
+M. Am. Soc. C. E., and will not be dealt with here.
+
+The contractors carried on their work from three different sites. From
+permanent shafts, located near the river in Manhattan, four shields were
+driven eastward to about the middle of the river; and, from two similar
+shafts at the river front in Long Island City, four shields were driven
+westward to meet those from Manhattan. From a temporary shaft, near East
+Avenue, Long Island City, the land section of about 2,000 ft. was driven
+to the river shafts.
+
+[Footnote A: Presented at the meeting of December 15th, 1909.]
+
+[Footnote B: _Transactions_, Am. Soc. C. E., Vol. LXIX. p. 1.]
+
+
+TUNNELS FROM EAST AVENUE TO THE RIVER SHAFTS.
+
+The sinking of the temporary shaft at East Avenue was a fairly simple
+matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34
+ft., braced across by heavy timbering, was driven about 28 ft. to rock
+as the excavation progressed. Below this, the shaft was sunk into rock,
+about 27 ft., without timbering. As soon as the shaft was down, on
+September 30th, 1904, bottom headings were started westward in Tunnels
+_A_, _B_, and _D_. When these had been driven about half the distance to
+the river shafts, soft ground was encountered. (See Station 59, Plate
+XIII.) As the ground carried considerable water, it was decided to use
+compressed air. Bulkheads were built in the heading, and, with an air
+pressure of about 15 lb. per sq. in., the heading was driven through the
+soft ground and into rock by ordinary mining methods. The use of
+compressed air was then discontinued. West of this soft ground, a top
+heading, followed by a bench, was driven to the soft ground at about
+Station 66. Tunnel _C_, being higher, was more in soft ground, and at
+first it was the intention to delay its excavation until it had been
+well drained by the bottom headings in the tunnels on each side. A
+little later it was decided to use a shield without compressed air. This
+shield had been used in excavating the stations of the Great Northern
+and City Tunnel in London. It was rebuilt, its diameter being changed
+from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after
+it had flattened about 4 in. and had been jacked up three times, the
+scheme was abandoned, the shield was removed, and work was continued by
+the methods which were being used in the other tunnels. The shield was
+rather light, but probably it would have been strong enough had it been
+used with compressed air, or had the material passed through been all
+earth. Here, there was a narrow concrete cradle in the bottom, with rock
+up to about the middle of the tunnel, which was excavated to clear the
+shield, and gave no support on its sides. The shield was a cylinder
+crushed between forces applied along the top and bottom.
+
+With the exception of this trial of a shield in Tunnel _C_, and a novel
+method in Tunnel _B_, where compressed air, but no shield, was used, the
+description of the work in one tunnel will do for all.
+
+From the bottom headings break-ups were started at several places in
+each tunnel where there was ample cover of rock above. Where the roof
+was in soft ground, top headings were driven from the points of break-up
+and timbered. As soon as the full-sized excavation was completed, the
+iron lining was built, usually in short lengths.
+
+It will be noticed on Plate XIII that there is a depression in the rock
+between Station 65 and the river shafts, leaving all the tunnels in soft
+ground. As this was directly under the Long Island Railroad passenger
+station, it was thought best to use a shield and compressed air. This
+was done in Tunnels _A_, _C_, and _D_, one shield being used
+successively for all three. It was first erected in Tunnel _D_ at
+Station 64 + 47. From there it was driven westward to the river shaft.
+It was then taken apart and re-erected in Tunnel _C_ at Station 63 + 63
+and driven westward to the shaft. It was then found that there would not
+be time for one shield to do all four lines. The experience in Tunnels
+_C_ and _D_ had proven the ground to be much better than had been
+expected. There was considerable clay in the sand, and, with the water
+blown out by compressed air, it was very stable. A special timbering
+method was devised, and Tunnel _B_ was driven from Station 66 + 10 to
+the shaft with compressed air, but without a shield. In the meantime the
+shield was re-erected in Tunnel _A_ and was shoved through the soft
+ground from Station 65 + 48 nearly to the river shaft, where it was
+dismantled.
+
+There was nothing unusual about the shield work; it was about the same
+as that under the river, which is fully described elsewhere. In spite of
+great care in excavating in front of the shield, and prompt grouting
+behind it, there was a small settlement of the building above, amounting
+to about 1-1/2 in. in the walls and about 5 in. in the ground floors
+which were of concrete laid like a sidewalk directly upon the ground.
+Whether this settlement was due to ground lost in the shield work or to
+a compacting of the ground on account of its being dried out by
+compressed air, it is impossible to say.
+
+The interesting features of this work from East Avenue to the river
+shafts are the mining methods and the building of the iron tube without
+a shield.
+
+
+EXCAVATION IN ALL ROCK.
+
+Where the tunnel was all in good rock two distinct methods were used.
+The first was the bottom-heading-and-break-up, and the second, the
+top-heading-and-bench method. The first is illustrated by Figs. 1 and 2,
+Plate LXIII. The bottom heading, 13 ft. wide and 9 ft. high, having
+first been driven, a break-up was started by blasting down the rock,
+forming a chamber the full height of the tunnel. The timber platform,
+shown in the drawing, was erected in the bottom heading, and extended
+through the break-up chamber. The plan was then to drill the entire face
+above the bottom heading and blast it down upon the timber staging, thus
+maintaining a passage below for the traffic from the heading and
+break-ups farther down the line. Starting with the condition indicated
+by Plate XIII, the face was drilled, the columns were then taken down
+and the muck pile was shoveled through holes in the staging into muck
+cars below. The face was then blasted down upon the staging, the drill
+columns were set up on the muck pile, and the operation was repeated.
+This method has the advantage that the bottom heading can be pushed
+through rapidly, and from it the tunnel may be attacked at a number of
+points at one time. It was found to be more expensive than the
+top-heading-and-bench method, and as soon as the depression in the rock
+at about Station 59 was passed, a top heading about 7 ft. high, and
+roughly the segment of a 23-ft. circle, was driven to the next soft
+ground in each of the four tunnels. The remainder of the section was
+taken out in two benches, the first, about 4 ft. high, was kept about
+15 ft. ahead of the lower bench, which was about the remaining 11 ft.
+high.
+
+
+EXCAVATION IN EARTH AND ROCK.
+
+About 2,500 ft. of tunnel, the roof of which was in soft ground, was
+excavated in normal air by the mining-and-timbering method. In the
+greater part of this the rock surface was well above the middle of the
+tunnel. The method of timbering and mining, while well enough known, has
+not been generally used in the United States.
+
+[Illustration: PLATE LXIII]
+
+Starting from the break-up in all rock, as described above, and
+illustrated on Plate XIII, when soft ground was approached, a top
+heading was driven from the rock into and through the earth. This
+heading was about 7 ft. high and about 6 ft. wide. This was done by the
+usual post, cap, and poling-board method. The ground was a running sand
+with little or no clay, and, at first, considerable water, in places.
+All headings required side polings. The roof poling boards were about
+2-1/2 or 3 ft. above the outside limit of the tunnel lining, as
+illustrated by Figs. 3, 4, and 5, Plate LXIII. The next step was to
+place two crown-bars, _AA_, usually about 20 ft. long, under the caps.
+Posts were then placed under the bars, and poling boards at right angles
+to the axis of the tunnel were then driven out over the bars. As these
+polings were being driven, the side polings of the original heading were
+removed, and the earth was mined out to the end of these new transverse
+polings. Breast boards were set on end under the ends of the transverse
+polings when they had been driven out to their limit. Side bars, _BB_,
+were then placed as far out as possible and supported on raking posts.
+These posts were carried down to rock, if it was near, if not, a sill
+was placed.
+
+A new set of transverse polings was driven over these side bars and the
+process was repeated until the sides had been carried down to rock or
+down to the elevation of the sills supporting the posts, which were
+usually about 4 ft. above the axis of the tunnel.
+
+The plan then was to excavate the remainder of the section and build the
+iron lining in short lengths, gradually transferring the weight of the
+roof bars of the iron lining as the posts were taken out. This meant
+that not more than four rings, and often only one ring, could be built
+before excavation and a short length of cradle became necessary. Before
+the posts under the roof bars could be built and the weight transferred
+to the iron lining, a grout dam was placed at the leading end of the
+iron lining, and grout was brought up to at least 45 deg. from the top. Such
+workings were in progress at as many as eight places in one tunnel at
+the same time. Where there was only the ordinary ground-water to contend
+with, the driving of the top heading drained the ground very thoroughly,
+and the enlarging was done easily and without a serious loss of ground.
+Under these conditions the surface settlement was from 6 in. to 2 ft.
+
+Under Borden Avenue, there was more water, which probably came from a
+leaky sewer; it was not enough to form a stream, but just kept the
+ground thoroughly saturated. There was a continued though hardly
+perceptible flow of earth through every crevice in the timbering during
+the six or eight weeks between the driving of the top heading and the
+placing of the iron lining; and here there was a settlement of from 4 to
+8 ft. at the surface.
+
+
+TUNNELING IN COMPRESSED AIR WITHOUT A SHIELD.
+
+When it became evident that there would not be time for one shield to do
+the soft ground portions of all four tunnels under the Long Island
+Railroad station, a plan was adopted and used in Tunnel B which, while
+not as rapid, turned out to be as cheap as the work done by the shields.
+Figs. 6 and 7, Plate LXIII, and Fig. 1, Plate LXIV, illustrate this work
+fairly well. The operation of this scheme was about as follows: Having
+the iron built up to the face of the full-sized excavation, a hole or
+top heading, about 3 ft. wide and 4 or 5 ft. high, was excavated to
+about 10 ft. in advance. This was done in a few hours without timbering
+of any kind; but, as soon as the hole or heading was 10 ft. out, 6 by
+12-in. laggings or polings were put up in the roof, with the rear ends
+resting on the iron lining and the leading ends resting on vertical
+breast boards. The heading was then widened out rapidly and the lagging
+was placed, down to about 45 deg. from the crown. The forward ends of the
+laggings were then supported by a timber rib and sill. Protected by this
+roof, the full section was excavated, and three rings of the iron lining
+were built and grouted, and then the whole process was repeated.
+
+[Illustration: PLATE LXIV, FIG. 1.--TUNNELING IN COMPRESSED AIR WITHOUT
+SHIELD.]
+
+[Illustration: PLATE LXIV, FIG. 2.--T-HEAD AIR-LOCK.]
+
+[Illustration: PLATE LXIV, FIG. 3.--CUTTING EDGE OF CAISSON ASSEMBLED.]
+
+[Illustration: PLATE LXIV, FIG. 4.--CAISSON SUPPORTED ON JACKS AND
+BLOCKS.]
+
+
+CONCRETE CRADLES, HAND-PACKED STONE AND GROUTING.
+
+Had the East Avenue Tunnel been built by shields, as was contemplated at
+the time of its design, the space between the limits of excavation
+and the iron lining would have been somewhat less than by the method
+actually used, especially in the earth portions. This space would have
+been filled with grout ejected through the iron lining. The change in
+the method of doing the work permitted the use of cheaper material, in
+place of part of the grout, and, at the same time, facilitated the work.
+
+The tube of cast-iron rings is adapted to be built in the tail of the
+shield. Where no shield was used, after the excavation was completed and
+all loose rock was removed, timbers were fixed across the tunnel from
+which semicircular ribs were hung, below which lagging was placed. The
+space between this and the rough rock surface was filled with concrete.
+This formed a cradle in which the iron tube could be erected, and, at
+the same time, occupied space which would have been filled by grout, at
+greater cost, had a shield been used.
+
+As soon as each ring of iron was erected, the space between it and the
+roof of the excavation was filled with hand-packed stone. At about every
+sixth ring a wall of stone laid in mortar was built between the lining
+and the rock to serve as a dam to retain grout. The interstices between
+the hand-packed stones were then filled with 1 to 1 grout of cement and
+sand, ejected through the iron lining. The concrete cradles averaged
+1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70
+per cu. yd., of which $2.25 was for labor and $4.45 was for top charges.
+The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost
+$2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top
+charges.
+
+
+ERECTION OF IRON LINING.
+
+The contractors planned to erect the iron lining with erectors of the
+same pattern as that used on the shield under the river, mounted on a
+traveling stage. These will be described in detail in Mr. Japp's paper.
+Two of these stages and erectors worked in each tunnel at different
+points. The tunnel was attacked from so many points that these erectors
+could not be moved from working to working. The result was that about
+58% of the lining was built by hand. At first thought, this seems to be
+a crude and extravagant method, as the plates weighed about 1 ton each
+and about 20,000 were erected by hand. As it turned out, the cost was
+not greater than for those erected by machinery, taking into account the
+cost of erectors and power. This, however, was largely because the hand
+erection reduced the amount of work to be done by the machines so much
+that the machines had an undue plant charge.
+
+The hand erection was very simple. A portable hand-winch, with a 3/8-in.
+wire rope, was set in any convenient place. The wire rope was carried to
+a snatch-block fastened to the top of the iron previously built; or,
+where the roof was in soft ground, the timbering furnished points of
+attachment. The end of the wire rope was then hooked to a bolt hole in a
+new plate, two men at the winch lifted the plate, and three or four
+others swung it into approximate place, and, with the aid of bars and
+drift-pins, coaxed it into position and bolted it. Where there was no
+timbering above the iron, sometimes the key and adjoining plates were
+set on blocking on a timber staging and then jacked up to place.
+
+
+LONG ISLAND SHAFTS.
+
+The river shafts were designed to serve both as working shafts and as
+permanent openings to the tunnels, and were larger and more substantial
+than would have been required for construction purposes. Plate X of Mr.
+Noble's paper shows their design. They consist of two steel caissons,
+each 40 by 74 ft. in plan, with walls 5 ft. thick filled with concrete.
+A wall 6 ft. thick separated each shaft into two wells 29 by 30 ft.,
+each directly over a tunnel. Circular openings for the tunnel, 25 ft. in
+diameter, were provided in the sides of the caissons. During the sinking
+these were closed by bulkheads of steel plates backed by horizontal
+steel girders. The shafts were sunk as pneumatic caissons to a depth of
+78 ft. below mean high water. There have been a few caissons which were
+larger and were sunk deeper than these, but most large caissons have
+been for foundations, such as bridge piers, and have been stopped at or
+a little below the surface of the rock. The unusual feature of the
+caissons for the Long Island shaft is that they were sunk 54 ft. through
+rock.
+
+It had been hoped that the rock would prove sound enough to permit
+stopping the caissons at or a little below the surface and continuing
+the excavation without sinking them further; for this reason only the
+steel for the lower 40 ft. of the caissons was ordered at first.
+
+The roof of the working chamber was placed 7 ft. above the cutting edge.
+It was a steel floor, designed by the contractors, and consisted of
+five steel girders, 6 ft. deep, 29 ft. long, and spaced at 5-ft.
+centers. Between were plates curved upward to a radius of 4 ft. Each
+working chamber had two shafts, 3 ft. by 5 ft. in cross-section, with a
+diaphragm dividing it into two passages, the smaller for men and the
+larger for muck buckets. On top of these shafts were Moran locks.
+Mounted on top of the caisson was a 5-ton Wilson crane, which would
+reach each shaft and also the muck cars standing on tracks on the ground
+level beside the caissons. Circular steel buckets, 2 ft. 6 in. in
+diameter and 3 ft. high, were used for handling all muck. These were
+taken from the bottom of the working chamber, dumped in cars, and
+returned to the bottom without unhooking. Work was carried on by three
+8-hour shifts per day. The earth excavation was done at the rate of
+about 67 cu. yd. per day from one caisson. The rock excavation,
+amounting to about 6,200 cu. yd. in each caisson, was done at the rate
+of about 44.5 cu. yd. per day. The average rate of lowering, when the
+cutting edge of the south caisson was passing through earth, was 0.7 ft.
+per day. In rock, the rate was 0.48 ft. per day in the south caisson,
+and 0.39 ft. per day in the north caisson.
+
+At the beginning all lowering was done with sixteen hydraulic jacks.
+Temporary brackets were fastened to the outside of the caisson. A
+100-ton hydraulic jack was placed under each alternate bracket and under
+each of the others there was blocking. The jacks were connected to a
+high-pressure pump in the power-house. As the jacks lifted the caisson,
+the blocking was set for a lower position, to which the caisson settled
+as the jacks were exhausted. After the caisson had penetrated the earth
+about 10 ft., the outside brackets were removed and the lowering was
+regulated by blocking placed under brackets in the working chamber. The
+caisson usually rested on three sets of blockings on each side and two
+on each end. The blocking was about 4 ft. inside the cutting edge. In
+the rock, as the cutting edge was cleared for a lowering of about 2 ft.,
+6 by 8-in. oak posts were placed under the cutting-edge angle. When a
+sufficient number of posts had been placed, the blocking on which the
+caisson had rested was knocked or blasted out, and the rock underneath
+was excavated. The blocking was then re-set at a lower elevation. The
+posts under the cutting edge were then chopped part way through and the
+air pressure was lowered about 10 lb., which increased the net weight to
+more than 4,000,000 lb. The posts then gradually crushed and the
+caissons settled to the new blocking. The tilt or level of the caisson
+was controlled by chopping the posts more on the side which was desired
+to move first.
+
+The caisson nearly always carried a very large net weight, usually about
+870 tons. The concrete in the walls, which was added as the caisson was
+being sunk, was kept at about the elevation of the ground. There was
+generally a depth of from 5 to 20 ft. of water ballast on top of the
+roof of the working chamber. The air pressure in the working chamber was
+usually much less than the hydrostatic head outside the caisson. For
+example, the average air pressure in the south caisson during January,
+1906, was 16-1/2 lb., while the average head was 62.5 ft., equivalent to
+27 lb. per sq. in. Under these conditions, there was a continued but
+small leakage into the caisson of from 15,000 to 20,000 gal. per day.
+
+In the rock the excavation was always carried from 2 to 5 in. outside
+the cutting edge. As soon as the cutting edge was cleared, bags of clay
+were placed under it in a well-tiered, solid pile, so that when the
+caisson was lowered the bags were cut through and most of the clay, bags
+and all, was squeezed back of the cutting edge between the rock and the
+caisson.
+
+Table 1 shows the relation of the final position of the caissons to that
+designed.
+
+The cost of rock excavation in the caisson was $4.48 per cu. yd. for
+labor and $10.54 for top charges.
+
+The bottom of the shaft is an inverted concrete arch, 4 ft. thick,
+water-proofed with 6-ply felt and pitch. As soon as the caisson was down
+to its final position and the excavation was completed, concrete was
+deposited on the uneven rock surfaces, brought up to the line of the
+water-proofing, and given a smooth 1-in. mortar coat. The felt was stuck
+together in 3-ply mats on the surface with hot coal-tar pitch. These
+were rolled and sent down into the working chamber, where they were put
+down with cold pitch liquid at 60 deg. Fahr. Each sheet of felt overlapped
+the one below 6 in. The water-proofing was covered by a 1-in. mortar
+plaster coat, after which the concrete of the 4-ft. inverted arch was
+placed. While the water-proofing and concreting were being done, the air
+pressure was kept at from 30 to 33 lb. per sq. in., the full hydrostatic
+head at the cutting edge. After standing for ten days, the air pressure
+was taken off, and the removal of the roof of the working chamber was
+begun. The water-proofing was done by the Union Construction and
+Waterproofing Company.
+
+TABLE 1.--RELATION OF THE FINAL POSITION OF THE CAISSONS TO THAT
+DESIGNED.
+
+================================================================
+LOCATION.| LONG ISLAND CITY. |
+----------------------------------------------------------------
+Shaft. | North. | South. |
+----------------------------------------------------------------
+Corner. | High. | East. | North. | High. | East. | North. |
+----------------------------------------------------------------
+Northeast|0.21 ft.|0.08 ft.|0.05 ft.|0.32 ft.|0.15 ft.|0.28 ft.|
+Northwest|0.22 " |0.08 " |0.02 " |0.00 " |0.15 " |0.12 " |
+Southwest|0.27 " |0.14 " |0.02 " |0.18 " |0.45 " |0.12 " |
+Southeast|0.23 " |0.14 " |0.05 " |0.39 " |0.45 " |0.28 " |
+================================================================
+
+=============================================================================
+LOCATION.| MANHATTAN. |
+-----------------------------------------------------------------------------
+Shaft. | North. | South. |
+-----------------------------------------------------------------------------
+Corner. | High. | East. | South. | High. | East or West.|North or South.|
+-----------------------------------------------------------------------------
+Northeast|0.23 ft.|0.74 ft.|0.38 ft.|0.00 ft.|0.06 ft. east.|0.04 ft. south.|
+Northwest|0.00 " |0.74 " |0.22 " |0.08 " |0.06 " " |0.13 " north.|
+Southwest|0.11 " |0.31 " |0.22 " |0.21 " |0.45 " west.|0.13 " " |
+Southeast|0.46 " |0.31 " |0.38 " |0.04 " |0.45 " " |0.04 " south.|
+=============================================================================
+
+The cost of labor in compressed air chargeable to concreting was $3.40
+per cu. yd.
+
+After the roof of each working chamber had been removed, the shield was
+erected on a timber cradle in the bottom of the shaft, in position to be
+shoved out of the opening in the west side of the caisson. Temporary
+rings of iron lining were erected across the shaft in order to furnish
+something for the shield jacks to shove against.
+
+The roof of the working chamber was then re-erected about 35 ft. above
+its original position and about 8 ft. above the tunnel openings. This
+time, instead of the two small shafts which were in use during the
+sinking of the caisson, a large steel shaft with a T-head lock was
+built. This is illustrated in Fig. 2, Plate LXIV. The shaft was 8 ft. in
+diameter. Inside there was a ladder and an elevator cage for lowering
+and hoisting men and the standard 1-yd. tunnel cars. At the top, forming
+the head of the T, there were two standard tunnel locks.
+
+
+MANHATTAN SHAFTS.
+
+A permanent shaft, similar to the river shafts in Long Island City, was
+constructed at Manhattan over each pair of tunnels. Each shaft was
+located across two lines, with its longer axis transverse to the
+tunnels. Plate XIII shows their relative positions. They were divided
+equally by a reinforced concrete partition wall transverse to the line
+of the tunnels. On completion, the western portions were turned over to
+the contractor for the cross-town tunnels for his exclusive use.
+
+_South Shaft._--Work on the south shaft was started on June 9th, 1904,
+with the sinking of a 16 by 16-ft. test pit in the center of the south
+half of the south shaft, which reached disintegrated rock at a depth of
+about 20 ft.
+
+Starting in August, the full shaft area, 74 by 40 ft., was taken out in
+an open untimbered cut to the rock, and a 20 by 50-ft. shaft was sunk
+through the rock to tunnel grade, leaving a 10 or 12-ft. berm around it.
+(Fig. 1, Plate LXX.)
+
+The erection of the caisson was started, about the middle of January, on
+the rock berm surrounding the 20 by 50-ft. shaft and about 15 ft. below
+the surface. Fig. 3, Plate LXIV, shows the cutting edge of the caisson
+assembled. The excavation of the small shaft had shown that hard rock
+and only a very small quantity of water would be encountered, and that
+the caisson need be sunk only a short distance below the rock surface.
+Therefore, no working-chamber roof was provided, the caisson was built
+to a height of only 40 ft., and the circular openings were permanently
+closed.
+
+The assembling of the caisson took 2-1/2 months, and on April 2d
+lowering was started. Inverted brackets were bolted temporarily to the
+cutting-edge stiffening brackets, and the sinking was carried on by
+methods similar to those used at Long Island. The jacks and blocking
+supporting the caisson are shown in Fig. 4, Plate LXIV. As soon as the
+cutting edge entered the rock, which was drilled about 6 in. outside of
+the neat lines, the space surrounding the caisson was back-filled with
+clay and muck to steady it and provide skin friction. As the friction
+increased, the walls were filled with concrete, and as the caisson
+slowly settled, it was checked and guided by blocking. The cutting edge
+finally came to rest 31 ft. below mean high water, the sinking having
+been accomplished in about seven weeks, at an average rate of 0.50 ft.
+per day.
+
+The final position of the cutting edge in relation to its designed
+position is shown in Table 1.
+
+A berm about 4 ft. wide was left at the foot of the caisson below which
+the rock was somewhat fissured and required timbering. The cutting edge
+of the caisson was sealed to the rock with grout on the outside and a
+concrete base to the caisson walls on the inside, the latter resting on
+the 4-ft. berm. Following the completion of the shaft, the permanent
+sump was excavated to grade for use during construction.
+
+_North Shaft._--The north shaft had to be sunk in a very restricted
+area. The east side of the caisson cleared an adjoining building at one
+point by only 1 ft., while the northwest corner was within the same
+distance of the east line of First Avenue. As in the case of the Long
+Island shafts, the steelwork for only the lower 40 ft. was ordered at
+the start. This height was completely assembled before sinking was
+begun. The caisson was lowered in about the same manner as those
+previously described. The bearing brackets for the hydraulic jacks were
+attached, as at the south shaft, to the inside of the cutting-edge
+brackets. The east side of the caisson was in contact with the
+foundations of the neighboring building, while the west side was in much
+softer material. As a consequence, the west side tended to settle more
+rapidly and thus throw the caisson out of level and position. To
+counteract that tendency, it was necessary to load the east wall heavily
+with cast-iron tunnel sections, in addition to the concrete filling in
+the walls.
+
+Soon after sinking was begun, a small test shaft was sunk to a point
+below the elevation of the top of the tunnels. The rock was found to be
+sound, hard, and nearly dry. It was then decided to stop the caisson as
+soon as a foundation could be secured on sound rock. The latter was
+found at a depth of 38 ft. below mean high water. With the cutting edge
+seated at that depth, the top of the caisson was only 2 ft. above mean
+high water, and as this was insufficient protection against high tides,
+a 10-ft. extension was ordered for the top. Work, however, went on
+without delay on the remainder of the excavation. The junction between
+the cutting edge and the rock was sealed with concrete and grout. The
+caisson was lowered at an average rate of 0.53 ft. per day. The size of
+the shaft below the cutting edge was 62 ft. 7 in. by 32 ft. The average
+rate of excavation during the sinking in soft material was 84 cu. yd.
+per day. The average rate of rock excavation below the final position of
+the cutting edge was 125 cu. yd. per day. There were night and day
+shifts, each working 10 hours. Excavation in earth cost $3.96 per cu.
+yd., of which $1.45 was for labor and $2.51 for top charges, etc. The
+excavation of rock cost $8.93 per cu. yd., $2.83 being for labor and
+$6.10 for top charges.
+
+The final elevations of the four corners of the cutting edge, together
+with their displacement from the desired positions, are shown in Table
+1.
+
+
+RIVER TUNNELS.
+
+The four river tunnels, between the Manhattan and Long Island City
+shafts, a distance of about 3,900 ft., were constructed by the shield
+method. Eight shields were erected, one on each line in each shaft, the
+four from Manhattan working eastward to a junction near the middle of
+the river with the four working westward from Long Island City. Toward
+the end of the work it was evident that the shields in Tunnels _B_, _C_,
+and _D_ would meet in the soft material a short distance east of the
+Blackwell's Island Reef if work were continued in all headings. In order
+that the junction might be made in firm material, work from Manhattan in
+those three tunnels was suspended when the shields reached the edge
+of the ledge. The shields in Tunnel _A_ met at a corresponding point
+without the suspension of work in either. An average of 1,760 ft. of
+tunnel was driven from Manhattan and 2,142 ft. from Long Island City.
+
+[Illustration: PLATE LXV, FIG. 1.--SHIELD FITTED WITH SECTIONAL SLIDING
+HOODS AND SLIDING EXTENSIONS TO THE FLOORS.]
+
+[Illustration: PLATE LXV, FIG. 2.--SHIELD FITTED WITH FIXED HOODS AND
+FIXED EXTENSIONS TO THE FLOORS.]
+
+
+TUNNELS DRIVEN EASTWARD FROM MANHATTAN.
+
+_Materials and Inception of Work._--The materials encountered are shown
+in the profile on Plate XIII, and were similar in all the tunnels. In
+general, they were found to be about as indicated in the preliminary
+borings. The materials met in Tunnel _A_ may be taken as typical of all.
+
+From the Manhattan shaft eastward, in succession, there were 123 ft. of
+all-rock section, 87 ft. of part earth and part rock, 723 ft. of all
+earth, 515 ft. of part rock and part earth, 291 ft. of all rock, and 56
+ft. of part rock and part earth.
+
+The rock on the Manhattan side was Hudson schist, while that in the reef
+was Fordham gneiss. Here, as elsewhere, they resembled each other
+closely; the gneiss was slightly the harder, but both were badly seamed
+and fissured. Wherever it was encountered in this work, the rock surface
+was covered by a deposit of boulders, gravel, and sand, varying in
+thickness from 4 to 10 ft. and averaging about 6 ft.
+
+The slope of the surface of the ledge on the Manhattan side averaged
+about 1 vertical to 4 horizontal. The rock near the surface was full of
+disintegrated seams, and was badly broken up. It was irregularly
+stratified, and dipped toward the west at an angle of about 60 degrees.
+Large pieces frequently broke from the face and slid into the shield,
+often exposing the sand. The rock surface was very irregular, and was
+covered with boulders and detached masses of rock embedded in coarse
+sand and gravel. The sand and gravel allowed the air to escape freely.
+By the time the shields had entirely cleared the rock, the material in
+the face had changed to a fine sand, stratified every few inches by very
+thin layers of chocolate-colored clayey material. This is the material
+elsewhere referred to as quicksand. As the shield advanced eastward, the
+number and thickness of the layers of clay increased until the clay
+formed at least 20% of the entire mass, and many of the layers were 2
+in. thick.
+
+At a distance of about 440 ft. beyond the Manhattan ledge, the material
+at the bottom of the face changed suddenly to one in which the layers
+of clay composed probably 98% of the whole. The sand layers were not
+more than 1/16 in. thick and averaged about 2 in. apart. The surface of
+the clay rose gradually for a distance of 40 ft. in Tunnels _A_ and _B_,
+and 100 ft. in Tunnels _C_ and _D_, when gravel and boulders appeared at
+the bottom of the shield. At that time the clay composed about one-half
+of the face.
+
+The surfaces of both the clay and gravel were irregular, but they rose
+gradually. After rock was encountered, the formations of gravel and clay
+were roughly parallel to the rock surface.
+
+As the surface of the rock rose they disappeared in order and were again
+encountered when the shields broke out of rock on the east side of the
+Blackwell's Island Reef. East of the reef a large quantity of coarse
+open sand was present in the gravel formations before the clay appeared
+below the top of the cutting edge. In Tunnels _C_ and _D_ this was
+especially difficult to handle. It appears to be a reasonable assumption
+that the layer of clay was continuous across the reef. Wherever the clay
+extended above the top of the shield it reduced the escape of air
+materially. It is doubtless largely due to this circumstance that the
+part-rock sections in the reef were not the most difficult portions of
+the work.
+
+While sinking the lower portions of the shafts the tunnels were
+excavated eastward in the solid rock for a distance of about 60 ft.,
+where the rock at the top was found to be somewhat disintegrated. This
+was as far as it was considered prudent to go with the full-sized
+section without air pressure. At about the same time top headings were
+excavated westward from the shafts for a distance of 100 ft., and the
+headings were enlarged to full size for 50 ft. The object was to avoid
+damage to the shaft and interference with the river tunnel when work was
+started by the contractor for the cross-town tunnel.
+
+[Illustration: PLATE LXVI, FIG. 1.--REAR OF SHIELD SHOWING COMPLETE
+FITTINGS.]
+
+[Illustration: PLATE LXVI, FIG. 2.--SHIELD WITH LOWER PORTION OF
+BULKHEAD REMOVED.]
+
+The shields were erected on timber cradles in the shaft, and were shoved
+forward to the face of the excavation. Concrete bulkheads, with the
+necessary air-locks, were then built across the tunnels behind the
+shields. The shields were erected before the dividing walls between the
+two contracts were placed. Rings of iron tunnel lining, backed by
+timbers spanning the openings on the west side, were erected temporarily
+across the shafts in order to afford a bearing for the shield jacks
+while shoving into the portals. The movement of the shield eastward was
+continued in each tunnel for a distance of about 60 ft., and the
+permanent cast-iron tunnel lining was erected as the shield advanced.
+Before breaking out of rock, it was necessary to have air pressure in
+the tunnels. This required the building of bulkheads with air-locks
+inside the cast-iron linings just east of the portals. Before erecting
+the bulkheads it was necessary to close the annular space between the
+iron tunnel lining and the rock. The space at the portal was filled with
+a concrete wall. After about twenty permanent rings had been erected in
+each tunnel, two rings were pulled apart at the tail of the shield and a
+second masonry wall or dam was built. The space between the two dams was
+then filled with grout. To avoid the possibility of pushing the iron
+backward after the air pressure was on, rings of segmental plates, 5/8
+in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential
+joints in each tunnel between the rings as they were erected. The plates
+contained slotted holes to match those in the segments. After the rings
+left the shield, the plates were driven outward, and projected about 5
+in. When the tunnel was grouted, the plates were embedded.
+
+The bulkheads were completed, and the tunnels were put under air
+pressure on the following dates:
+
+Line _D_, on October 5th, 1905;
+Line _C_, on November 6th, 1905;
+Line _B_, on November 25th, 1905;
+Line _A_, on December 1st, 1905.
+
+This marked the end of the preparatory period.
+
+In the deepest part of the river, near the pier-head line on the
+Manhattan side, there was only 8 ft. of natural cover over the tops of
+the tunnels. This cover consisted of the fine sand previously described,
+and it was certain that the air would escape freely from the tunnels
+through it. To give a greater depth of cover and to check the loss of
+air, the contractor prepared to cover the lines of the tunnels with
+blankets of clay, which, however, had been provided for in the
+specifications. Permits, as described later, were obtained at different
+times from the Secretary of War, for dumping clay in varying thicknesses
+over the line of work. The dumping for the blanket allowed under the
+first permit was completed in February, 1906. The thickness of this
+blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan
+side. The original blanket was of material advantage, but the depth of
+clay was insufficient to stop the loss of air.
+
+The essential parts of the shields in the four tunnels were exactly
+alike. Those in Tunnels _B_ and _D_, however, were originally fitted
+with sectional sliding hoods and sliding extensions to the floors of the
+working chambers, as shown by Fig. 1, Plate LXV. The shields in Tunnels
+_A_ and _C_ were originally fitted with fixed hoods and fixed extensions
+to the floors, as shown in Fig. 2, Plate LXV. A full description of the
+shields will be found in Mr. Japp's paper.
+
+The shields in each pair of tunnels were advanced through the solid rock
+section about abreast of each other, until test holes from the faces
+indicated soft ground within a few feet. As the distance between the
+sides of the two tunnels was only 14 ft., it was thought best to let
+Tunnels _B_ and _D_ gain a lead of about 100 ft. before Tunnels _A_ and
+_C_ opened out into soft ground, in order that a blow from one tunnel
+might not extend to the other. Work in Tunnel _C_ was shut down on
+December 23d, 1905, after exposing sand to a depth of 3 ft. at the top,
+and it remained closed for seven weeks. Work in Tunnel _A_ was suspended
+on September 29th, 1905. By the time Tunnel _B_ had made the required
+advance, it, together with Tunnels _C_ and _D_, was overtaxing the
+capacities of the compressor plant. Only a little work was done in
+Tunnel _C_ until July, 1906, and work in Tunnel _A_ was not resumed
+until October 22d, 1906.
+
+
+TUNNELS DRIVEN WESTWARD FROM LONG ISLAND CITY.
+
+_Materials and Inception of the Work._--The materials met in Tunnel A
+are typical of all four tunnels. From the Long Island shafts westward,
+in succession, there were 124 ft. of all-rock section, 125 ft. of part
+rock and part earth section, 22 ft. of all-rock section, 56 ft. of part
+rock and part earth section, 387 ft. of all-rock section, 70 ft. of part
+earth and part rock section, and 1,333 ft. of all-earth section.
+
+[Illustration: PLATE LXVII]
+
+The materials passed through are indicated on Plate XIII. The rock was
+similar to that of the Blackwell's Island Reef, and was likewise covered
+by a layer of sand and boulders. The remainder of the soft ground was
+divided into three classes. The first was a very fine red sand, which
+occurred in a layer varying in thickness from 6 ft. to at least 15 ft.
+It may have been much deeper above the tunnel. It is the quicksand
+usually encountered in all deep foundations in New York City. The
+following is the result of the sifting test of this sand:
+
+ Held on No. 30 sieve 0.6%
+Passed No. 30, " " No. 40 " 0.4%
+ " No. 40, " " No. 50 " 0.7%
+ " No. 50, " " No. 60 " 2.4%
+ " No. 60, " " No. 80 " 14.9%
+ " No. 80, " " No. 100 " 54.0%
+ " No. 100, " " No. 200 " 8.0%
+ " No. 200 " 19.0%
+ ------
+ 100.0%
+
+This means that grains of all but 4% of it were less than 0.0071 in. in
+diameter. The 19% which passed the No. 200 sieve, the grains of which
+were 0.0026 in. or less in diameter, when observed with a microscope
+appeared to be perfectly clean grains of quartz; to the eye it looked
+like ordinary building sand, sharp, and well graded from large to small
+grains. This sand, with a surplus of water, was quick. With the water
+blown out of it by air pressure, it is stable, stands up well, and is
+very easy to work. It appears to be the same as the reddish quicksand
+found in most deep excavations around New York City.
+
+The second material was pronounced "bull's liver" by the miners as soon
+as it was uncovered. "Bull's liver" seems to be a common term among
+English-speaking miners the world over. It is doubtful, however, if it
+is always applied to the same thing. In this case it consisted of layers
+of blue clay and very fine red sand. The clay seemed to be perfectly
+pure and entirely free from sand. It would break easily with a clean,
+almost crystalline, fracture, and yet it was soft and would work up
+easily. The layers of clay varied in thickness from 1/16 in. to 1 in.,
+while the thickness of the sand layer varied from 1/4 in. to several
+inches. The sand was the same as the quicksand already described.
+
+The "bull's liver" was ideal material in which to work a shield. It
+stood up as well and held the air about as well as clay, and was much
+easier to handle.
+
+The third material was a layer of fine gray sand which was encountered
+in the top of all the tunnels for about 400 ft. just east of Blackwell's
+Island Reef. It was very open, and had grains of rather uniform size.
+
+During the starting out of the tunnels from the shafts, and for more
+than a year afterward, the roof of the working chamber in the caissons
+and the locks previously described under the Long Island shafts took the
+place of the bulkhead across the tunnels for confining the air pressure.
+
+The first work in air pressure was to remove the shield plug closing the
+opening in the side of the shaft. This being done, the shield was shoved
+through the opening, and excavation begun.
+
+At the start the shields were fitted with movable platforms, but no
+hoods of any kind were placed until after the rock excavation was
+completed.
+
+
+METHODS OF EXCAVATION.
+
+The distribution of materials to be excavated, as previously outlined,
+divided the excavation into three distinct classes, for which different
+methods had to be developed.
+
+These three classes were:
+
+_First._--All-rock section.
+_Second._--Rock in the bottom, earth in the top.
+_Third._--All-earth section.
+
+The extent of the second and third classes was much greater than that of
+the first, and they, of course, determined the use of the shield.
+Shields had not previously been used extensively in rock work, either
+where the face was wholly or partly in rock, and it was necessary to
+develop the methods by experience. The specifications required that
+where rock was present in the bottom, a bed of concrete should be laid
+in the form of a cradle on which to advance the shield.
+
+_All Rock._--At different times, three general methods were used for
+excavating in all-rock sections. They may be called: The bottom-heading
+method; the full-face method; and the center-heading method.
+
+The bottom-heading method was first tried. A heading, about 8 ft. high
+and 12 ft. wide, was driven on the center line, with its bottom as
+nearly as possible on the grade line of the bottom of the tunnel. It was
+drilled in the ordinary manner by four drills mounted on two columns.
+The face of the headings varied from 10 to 30 ft. in advance of the
+cutting edge. After driving the heading for about 10 ft., the bottom was
+cleared out and a concrete cradle was set. The width of the cradles
+varied, but was generally from 8 to 10 ft.
+
+The excavation was enlarged to full size as the shield advanced, the
+drills being mounted in the forward compartments of the shield, as
+shown by Fig. 1, Plate LXVII, which represents the conditions after the
+opening had been cut in the bulkhead, but before the new methods,
+mentioned later, had been developed.
+
+[Illustration: PLATE LXVIII]
+
+The sides and top were shot downward into the heading. The area of the
+face remaining behind the heading was large, and a great number of holes
+and several rounds were required to fire the face to advantage. As soon
+as firing was started at the face, the heading was completely blocked,
+and operations there had to be suspended until the mucking was nearly
+completed. The bottom-heading method was probably as good as any that
+could be devised for use with the shields as originally installed. All
+the muck had to be taken from the face by hand and handled through the
+chutes or doors. By drilling from the shield, some muck was blasted on
+to the extensions of the floors and could be handled from the upper
+compartments. At best, however, the shield with the closed transverse
+bulkhead was a serious obstacle to rapid work in rock sections.
+
+The full-face method was only used where the rock was not considered
+safe for a heading. A cut was fired at the bottom, together with side
+holes, in a manner quite similar to that adopted in the first set of
+holes for a bottom heading. The cradle was then placed, in lengths of
+either 2.5 or 5 ft., after which the remainder of the face was fired in
+the same manner as for the bottom-heading method. The closed transverse
+bulkhead with air-locks, as shown in Fig. 1, Plate LXVI, was placed in
+the shield in the hope that it would only be necessary to maintain the
+full air pressure in the working compartments in front of the bulkhead.
+It was also thought that some form of bulkhead which could be closed
+quickly and tightly would be necessary to prevent flooding the tunnel in
+case of blows. While no attempt was ever made to reduce the pressure
+behind the shield bulkhead, it was obvious from the experience with
+Tunnels _B_ and _D,_ while working in the sand between Manhattan and the
+reef, that the plan was not practicable, and that the closed bulkhead in
+the bottom was a hindrance instead of a safeguard. As soon as rock was
+encountered in those tunnels at the west edge of the reef, the
+contractor cut through the bulkheads and altered them, as shown in Fig.
+2, Plate LXVI.
+
+Taking advantage of the experience gained, openings were cut through the
+bulkheads in Shields _A_ and _C_, while they were shut down near the
+edge of the Manhattan ledge. In erecting the shields at Long Island
+City in May and June, 1906, openings were also provided. These shields
+had to pass through about 700 ft. of rock at the start, the greater
+portion of which was all-rock section. It was at that point that
+openings were first used extensively and methods were developed, which
+would not have been possible except where ears could be passed through
+the shield. The bottom-heading method was first tried, but the working
+space in front of the shield was cramped, and but few men could be
+employed in loading the cars. To give more room, the heading was
+gradually widened. The enlargement at the top, when made from the
+shield, blocked all work at the face of the heading while the former
+operation was in progress. To reduce the delays, the heading was raised,
+thus reducing the quantity of rock left in the top, and the bottom was
+taken out as a bench. To avoid blocking the tracks when firing the top,
+a heavy timber platform was built out from the floors of the middle
+working compartments. Most of the muck from the top was caught on the
+platform and dropped into cars below. This method of working is shown by
+Fig. 2, Plate LXVII. The platforms were not entirely satisfactory, and,
+later, the drills in the heading were turned upward and a top bench was
+also drilled and fired, as shown by Fig. 3, Plate LXVII. There was then
+so little excavation left in the top that the muck was allowed to fall
+on the tracks and was quickly cleared away. The method just outlined is
+called the center-heading method, and was the most satisfactory plan
+devised for full-rock sections.
+
+_Excavation in Part Rock and Part Earth._--This was probably the most
+difficult work encountered, particularly when the rock was covered with
+boulders and coarse sharp sand which permitted a free escape of air. It
+was necessary, before removing the rock immediately under the soft
+ground, to excavate the earth in advance of the shield to a point beyond
+where the rock was to be disturbed, and to support, in some way, the
+roof, sides, and face of the opening thus made. The hoods were designed
+mainly for the purpose of supporting the roof and the sides. With the
+fixed hood it was necessary either to excavate for the distance of the
+desired shove in front of it or else to force the hood into the
+undisturbed material. To avoid this difficulty, the sliding hoods were
+tried as an experiment.
+
+In using the sliding hood, which will be described in detail in Mr.
+Japp's paper, the segments commencing at the top were forced forward by
+the screw rod, one at a time, as far as possible into the undisturbed
+material. Just enough material was then removed from underneath and in
+front of the section to free it, and it was again forced forward. These
+operations were repeated until the section had been extended far enough
+for a shove. As soon as two or three sections had been pushed forward in
+this way, the face near the advance end of the sliding hood was
+protected by a breast board set on edge and braced from the face.
+Gradually, all the segments were worked forward, and, at the same time,
+the whole soft ground face was sheeted with timber. At times polings
+were placed over the extended segments in order to make room for a
+second shove, as shown on Plate LXVIII. When the shield was advanced the
+nuts on the screw rods were loosened and the sections of the hoods were
+telescoped on to the shield. The idea was ingenious, but proved
+impracticable, because of the unequal relative movements of the top and
+bottom of the shield in shoving, bringing transverse strains on the hood
+sections.
+
+[Illustration: PLATE LXIX]
+
+With the fixed hood, poling boards were used to support the roof and
+sides, and the face was supported in the manner described for the
+sliding hoods. The polings were usually maple or oak planks, 2 in.
+thick, about 8 in. wide, and 6-1/2 ft. long. In advancing the face, the
+top board of the old breast was first removed, then the material was
+carefully worked out for the length of the poling. The latter was then
+placed, with the rear end resting over the hood and the forward end
+forced as far as possible into the undisturbed material. When two or
+three polings had been placed, a breast board was set. After several
+polings were in position, their forward ends were supported by some form
+a cantilever attached to the hood. Plate LXIX shows one kind of
+supports. In this way all the soft material was excavated down to the
+rock surface, and the roof, sides, and face were sheeted with timber. In
+shoving, the polings in the roof and sides were lost. It was found that
+the breast could usually be advanced 5 ft. with safety. The fixed hood
+made it possible to set the face about 7 or 8 ft. in front of the
+cutting edge without increasing the length of the polings. This distance
+was ample for two shoves, and was generally adopted, although a great
+many faces were set for one shove only.
+
+Fixed hoods were substituted for those of the sliding type, originally
+placed on Shields _B_ and _D_ at Manhattan, at about the time the latter
+encountered the rock at the reef.
+
+In placing the polings and breasting, all voids behind them were filled
+as far as possible with marsh hay or bags of sawdust or clay. To prevent
+loss of air in open material, the joints between the boards were
+plastered with clay especially prepared for the purpose in a pug mill.
+The sliding extensions to the floors of the working compartments were
+often used, in the early part of the work, to support the timber face or
+loose rock, as shown in Fig. 1, Plate LXVIII. At such times the front of
+the extensions was held tightly against the planking by the pressure of
+the floor jacks. While shoving, the pressure on the floor jacks was
+gradually released, allowing the floors to slide back into the shield
+and still afford support to the face. The extensions also afforded
+convenient working platforms. They were subject to severe bending
+strains while the shield was being shoved, however, and the cast-iron
+rams were frequently broken or jammed. The extensions did not last
+beyond the edge of the ledge at Manhattan, nor more than about half
+through the rock work at Long Island City. The fixed extensions
+originally placed on Shields _A_ and _C_ at Manhattan were not
+substantial enough, and lasted only a few days.
+
+Wherever the rock face was sufficiently sound and high, a bottom heading
+was driven some 20 or 30 ft. in advance of the shield. The heading was
+driven and the cradle placed independently of the face of the soft
+ground above, and in the manner described for all-rock sections. The
+remainder of the rock face was removed by firing top and side rounds
+into the bottom heading after the soft ground had been excavated. Great
+care had to be taken in firing in order not to disturb the timber work
+or break the rock away from under the breast boards. If either occurred,
+a serious run was likely to follow. The bottom-heading method is shown
+by Figs. 1, 2, and 3, Plate LXVIII, and the breasting and poling by Fig.
+2, Plate LXX.
+
+In the early part of the work, where a bottom heading was impracticable,
+the soft ground was first excavated as described above, and the rock was
+drilled by machines mounted on tripods, and fired as a bench. By this
+plan no drilling could be done until the soft ground was removed. This
+is called the rock-bench method.
+
+Later the rock-cut method was devised. Drills were set up on columns in
+the bottom compartments of the shield, and the face was drilled while
+work was in progress on the soft ground above. The drilling was done
+either for a horizontal or vertical cut and side and top rounds. The
+drillers were protected while at work by platforms of timber built out
+from the floors of the compartments above. This plan, while probably not
+quite as economical of explosives, saved nearly all the delay due to
+drilling the bench.
+
+[Illustration: PLATE LXX, FIG. 1.--SMALL SHAFT SUNK TO ROCK.]
+
+[Illustration: PLATE LXX, FIG. 2.--BREASTING AND POLING IN FRONT OF
+SHIELD.]
+
+[Illustration: PLATE LXX, FIG. 3.--SHUTTERS ON FRONT OF SHIELD.]
+
+[Illustration: PLATE LXX, FIG. 4.--HYDRAULIC ERECTOR PLACING SEGMENT.]
+
+_All-Earth Section._--As described by Messrs. Hay and Fitzmaurice, in a
+paper on the Blackwall Tunnel,[C] the contractor had used, with marked
+success, shutters in the face of the shield for excavating in loose open
+material. He naturally adopted the method for the East River work. When
+the shields in Tunnels _B_ and _D_, at Manhattan, the first to be driven
+through soft ground, reached a point under the actual bulkhead line,
+work was partly suspended and shutters were put in place in the face of
+the top and center compartments. The shutters in the center compartments
+in Shield _D_ are shown in Fig. 3, Plate LXX, while the method of work
+with the shutters is shown by Figs. 4, 5, 6, and 7, Plate LXVIII. Fig. 4
+on that plate shows the shield ready for a shove. As the pressure was
+applied to the shield jacks, men loosened the nuts on the screws holding
+the ends of the shutters, and allowed the latter to slide back into the
+working compartments. At the end of the shove, the shutters were in the
+position shown in Fig. 5, Plate LXVIII. In preparing for a new shove,
+the slides in the shutters were opened, and the material in front was
+raked into the shield. At the same time, the shutters were gradually
+worked forward. The two upper shutters in a compartment were generally
+advanced from 12 to 15 in., after which the muck could be shoveled out
+over the bottom shutters, as shown on Fig. 6, Plate LXVIII, and Fig. 3,
+Plate LXX. No shutters were placed in the bottom compartments, and as
+the air pressure was not generally high enough to keep the face dry at
+the bottom, these compartments were pretty well filled with the soft,
+wet quicksand. Just before shoving, this material was excavated to a
+point where it ran in faster than it could be taken out. Much of the
+excavation in the bottom compartment was done by the blow-pipe. During
+the shove the material from the bottom compartment often ran back
+through the open door in the transverse bulkhead, as shown by Fig. 5,
+Plate LXVIII.
+
+In the Blackwall Tunnel the material was reported to have been loose
+enough to keep in close contact with the shutters at all times. In the
+East River Tunnels this was not the case. The sand at the top was dry
+and would often stand with a vertical face for some hours. In advancing
+the shutters, it was difficult to bring them into close contact with the
+face at the end of the operation. The soft material at the bottom was
+constantly running into the lower compartment and undermining the stiff
+dry material at the top. The latter gradually broke away, and, at times,
+the actual face was some feet in advance of the shutters. Under those
+circumstances, the air escaped freely through the unprotected sand face.
+The joints of the shutters were plastered with clay, but this did not
+keep the air from passing out through the lower compartments. This
+condition facilitated the formation of blows, which were of constant
+occurrence where shutters were used in the sand. In Tunnels _B_ and _D_,
+at Manhattan, the shutters were used in the above manner clear across to
+the reef. In Tunnel _C_, which was considerably behind Tunnels _B_ and
+_D_, the shutters, although placed, were never used against the face,
+and the excavation was carried on by poling the top and breasting the
+face. The change resulted in much better progress and fewer blows. The
+excavation through the soft material in Tunnel _C_ had just been
+completed when Tunnel _A_ was started, and the gangs of workmen were
+exchanged.
+
+The work in soft ground in Tunnel _A_ thus gained the benefit of the
+experience in Tunnel _C_. Shutters were placed only in the top
+compartments in this tunnel, and, as in Tunnel _C_, were never used in
+contact with the face. The method of work is shown by Figs. 1, 2, and 3,
+Plate LXXI. The result was still more rapid progress in Tunnel _A_, and
+although the loss of air was fully as great in this tunnel as in the
+other three, there was only one blow which caused any considerable loss
+of pressure. In Tunnels _A_ and _C_ the diaphragms in the rear of the
+center compartments of the lower tiers of working chambers were removed
+before the shields entered the soft ground. The change was not of as
+much advantage in soft ground as in rock, but it facilitated the removal
+of the soft wet sand in the bottom. In Tunnel _A_, after encountering
+gravel, a belt conveyor was suspended from the traveling stage with one
+end projecting through the opening into the working compartment. The use
+of the conveyor made it possible to continue mucking at the face while
+the bottom plates of the iron lining were being put in place, and
+resulted in a material increase in the rate of progress.
+
+[Illustration: PLATE LXXI]
+
+The shutters were not placed on the Long Island shields at all. Just
+before the shields passed into all soft ground, a fixed hood was
+attached to each.
+
+The method of working in soft ground from Long Island City is
+illustrated by Plate LXXII. The full lines at the face of the shield
+show the position of the earth before a shove of the shield, and the
+dotted lines show the same after the shove. The face was mined out to
+the front of the hood and breasted down to a little below the floor of
+the top pockets of the shield. In the middle pocket the earth was
+allowed to take its natural slope back on the floor. Toward the rear of
+the bottom pockets it was held by stop-planks. The air pressure was
+always about equal to the hydrostatic head at the middle of the shield,
+so that the face in the upper and middle pockets was dry. In the lower
+pockets it was wet, and flowed under the pressure of shoving the shield.
+By this method 4,195 lin. ft. of tunnel was excavated by the four Long
+Island shields in 120 days, from November 1st, 1907, to March 1st, 1908.
+This was an average of 8.74 ft. per day per shield.
+
+The rate of progress, the nature of the materials, and the methods
+adopted are shown in Table 2.
+
+_Preparations for Junction of Shields._--As previously mentioned, the
+Manhattan shields were stopped at the edge of the reef. Before making
+the final shove of those shields, special polings were placed with
+unusual care. The excavation was bell-shaped to receive the Long Island
+shields. The arrangement of the polings is shown by Figs. 4 and 5, Plate
+LXXI. After the shields were shoved into final position, as shown at the
+right in Fig. 5, the rear end of the polings rested over the cutting
+edge and allowed room for the removal of the hood. After the latter had
+been accomplished, the temporary bulkheads of concrete and clay bags
+were built as a precaution against blows when the shields were close
+together. An 8-in. pipe was then driven forward through the bulkhead for
+distances varying from 30 to 100 ft., in order to check the alignment
+and grade between the two workings before the shields were actually
+shoved together. The errors in the surveys were negligible, but here, as
+elsewhere, the shields were not exactly in the desired position, and it
+took careful handling to bring the cutting edges together. The Long
+Island shields were driven to meet those from Manhattan.
+
+TABLE 2.--RATE OF PROGRESS, NATURE OF MATERIALS, AND METHODS ADOPTED IN
+CONSTRUCTION OF EAST RIVER TUNNELS.
+
+LINE A, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+All rock |Bottom heading | 69+39.9 | 69+79 |Aug. 2, '06|Sept 25, '06|
+ | | | | | |
+All rock |Center heading | 69+79 | 70+64 |Sept 25, '06|Nov. 21, '06|
+ | | | | | |
+Earth and rock|Center heading | 70+64 | 71+34 |Nov. 21, '06|Dec. 30, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 71+34 | 71+89 |Dec. 30, '06|Feb. 13, '07|
+ | | | | | |
+All rock |Bottom heading | 71+89 | 72+11 |Feb. 13, '07|Feb. 21, '07|
+ | | | | | |
+Earth and rock|Center heading | 72+11 | 72+67 |Feb. 21, '07|Mar. 19, '07|
+ | | | | | |
+All rock |Center heading | 72+67 | 76+54 |Mar. 19, '07|Sept 6, '07|
+ | | | | | |
+Earth and rock|Going out of rock| 76+54 | 77+24 |Sept 6, '07|Oct. 4, '07|
+ | | | | | |
+All earth |Soft ground | 77+24 | 90+57.3 |Oct. 4, '07|Mar. 26, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+All rock | 54 | 39.1 | 0.724 | |
+ | | | | |
+All rock | 57 | 85 | 1.49 | |
+ | | | | |
+Earth and rock| 39 | 70 | 1.79 | |
+ | | | | |
+Earth and rock| 45 | 55 | 1.22 | |
+ | | | | |
+All rock | 8 | 22 | 2.75 | |
+ | | | | |
+Earth and rock| 26 | 56 | 2.15 | |
+ | | | | |
+All rock | 171 | 387 | 2.26 | |
+ | | | | |
+Earth and rock| 28 | 70 | 2.50 | |
+ | | | | |
+All earth | 174 |1,333.3 | 7.66 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE B, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+All rock |Bottom heading | 69+29.6 | 70+46 |Oct. 16, '06|Nov. 20, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 70+46 | 71+95 |Nov. 20, '06|Feb. 23, '07|
+ | | | | | |
+All rock |Bottom heading | 71+95 | 72+25 |Feb. 23, '07|Mar. 6, '07|
+ | | | | | |
+Earth and rock|Center heading | 72+25 | 72+60 |Mar. 6, '07|Mar. 24, '07|
+ | | | | | |
+All rock |Going out of rock| 72+60 | 76+57 |Mar. 24, '07|Aug. 7, '07|
+ | | | | | |
+Earth and rock|Soft ground | 76+57 | 77+30 |Aug. 7, '07|Sept 5, '07|
+ | | | | | |
+All earth |Soft ground | 77+30 | 90+49.6 |Sept 5, '07|Mar. 19, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+All rock | 35 | 116.4 | 3.33 | |
+ | | | | |
+Earth and rock| 95 | 149 | 1.57 | |
+ | | | | |
+All rock | 11 | 30 | 2.73 | |
+ | | | | |
+Earth and rock| 18 | 35 | 1.94 | |
+ | | | | |
+All rock | 136 | 397 | 2.92 | |
+ | | | | |
+Earth and rock| 29 | 73 | 2.52 | |
+ | | | | |
+All earth | 196 |1,319.6 | 6.73 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE C, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+All rock |Bottom heading | 68+61.9 | 69+93 |June 11, '06|Oct. 16, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 69+93 | 71+65 |Oct. 16, '06|Feb. 7, '07|
+ | | | | | |
+All rock |Bottom heading | 71+65 | 71+91 |Feb. 7, '07|Feb. 13, '07|
+ | | | | | |
+All rock |Center heading | 71+91 | 75+81 |Feb. 13, '07|July 20, '07|
+ | | | | | |
+Earth and rock|Going out of rock| 75+81 | 76+56 |July 20, '07|Aug. 25, '07|
+ | | | | | |
+All earth |Soft ground | 76+56 | 90+44.4 |Aug. 25, '07|Mar. 17, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+All rock | 127 | 131.1 | 1.03 | |
+ | | | | |
+Earth and rock| 114 | 172 | 1.51 | |
+ | | | | |
+All rock | 6 | 26 | 4.33 | |
+ | | | | |
+All rock | 157 | 390 | 2.48 | |
+ | | | | |
+Earth and rock| 36 | 75 | 2.08 | |
+ | | | | |
+All earth | 205 |1,388.4 | 6.77 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE D, LONG ISLAND.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+Rock |Bottom heading | 68+50.6 | 69+77 |June 2, '06|Oct. 24, '06|
+ | | | | | |
+Earth and rock|Bottom heading | 69+77 | 71+22 |Oct. 24, '06|Jan. 13, '06|
+ | | | | | |
+All rock |Bottom heading | 71+23 | 72+00 |Jan. 13, '07|Mar. 3, '07|
+ | | | | | |
+All rock |Center heading | 72+00 | 75+73 |Mar. 3, '07|July 10, '07|
+ | | | | | |
+Earth and rock|Going out of rock| 75+73 | 77+63 |July 10, '07|Sept 25, '07|
+ | | | | | |
+All earth |Soft ground | 77+63 | 90+38.6 |Sept 25, '07|Mar. 7. '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+Rock |144 | 126.4 | 0.87 | |
+ | | | | |
+Earth and rock| 81 | 145 | 1.79 | |
+ | | | | |
+All rock | 49 | 78 | 1.59 | |
+ | | | | |
+All rock |129 | 373 | 2.89 | |
+ | | | | |
+Earth and rock| 77 | 190 | 2.47 | |
+ | | | | |
+All earth |164 |1,275.6 | 7.78 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE A, MANHATTAN.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |108+43 |107+74 |July 20, '05|Aug. 3, '05|
+Rock {|Top lift of bench|108+43 |107+74 |Aug. 8, '05|Aug. 23, '05|
+ {|Bottom lift of |108+43 |107+74 |Aug. 30, '05|Sept 27, '05|
+ {| bench | | | | |
+ | | | | | |
+Rock {|Bottom heading |107+74 |107+21 |Sept 27, '05|Oct. 23, '05|
+ {|Bottom heading |107+74 |107+21 |Nov. 30, '05|Dec. 29, '05|
+ | | | | | |
+Mixed |Bottom heading |107+21 |106+99 |Oct. 26, '06|Nov. 20, '06|
+ | | | | | |
+Mixed |Rock bench |106+99 |106+34 |Nov. 20, '06|Jan. 13, '07|
+ | | | | | |
+Earth |Poling and |106+34 | 99+11 |Jan. 13, '07|Apr. 17, '07|
+ | breasting | | | | |
+ | | | | | |
+Mixed |Rock cut | 99+11 | 93+96 |Apr. 17, '07|Oct. 24, '07|
+ | | | | | |
+Rock |Bottom heading | 93+96 | 93+58 |Oct. 24, '07|Nov. 14, '07|
+ | | | | | |
+Rock |Center heading | 93+58 | 92+42 |Nov. 14, '07|Dec. 27, '07|
+ | | | | | |
+Rock |Bottom heading | 92+42 | 91+05 |Dec. 27, '07|Feb. 24, '08|
+ | | | | | |
+Mixed |Rock cut | 91+05 | 90+57 |Feb. 24, '08|Mar. 20, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| 14} | | {|Excavation in normal air, and before |
+Rock {| 15}57| 69 | 1.21 {|advance of shield. |
+ {| 28} | | {| |
+ {| | | {| |
+ | | | | |
+Rock {| 26}55| 53 | 0.96 {|Bottom heading timbered to avoid the |
+ {| 29} | | {|possibility of a break. |
+ | | | | |
+Mixed | 25 | 22 | 0.88 |Bottom heading timbered. |
+ | | | | |
+Mixed | 54 | 65 | 1.20 | |
+ | | | | |
+Earth | 94 | 723 | 7.69 | |
+ | | | | |
+ | | | | |
+Mixed |190 | 515 | 2.71 | |
+ | | | | |
+Rock | 21 | 38 | 1.81 | |
+ | | | | |
+Rock | 46 | 116 | 2.52 | |
+ | | | | |
+Rock | 59 | 137 | 2.32 | |
+ | | | | |
+Mixed | 25 | 48 | 1.92 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE B, MANHATTAN.
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |108+35 |107+87 |July 6, '05|July 27, '05|
+ {|Top lift of bench|108+35 |107+87 |Aug. 3, '05|Aug. 14, '05|
+Rock {|Bottom lift of | | | | |
+ {| bench |108+35 |108+15 |Aug. 26, '05|Aug. 30, '05|
+ {|Bottom lift of | | | | |
+ {| bench |108+15 |107+87 |Sept 11, '05|Sept 26, '05|
+ | | | | | |
+Rock |Bottom heading |107+87 |107+00 |Oct. 23, '05|Jan. 17, '06|
+ | | | | | |
+Mixed |Bottom heading |107+00 |106+64 |Jan. 17, '06|Feb. 12, '06|
+ | | | | | |
+Mixed |Rock bench |106+64 |106+31 |Feb. 12, '06|Mar. 1, '06|
+ | | | | | |
+Earth |Poling and |106+31 |105+58 |Mar. 1, '06|Apr. 3, '06|
+ | breasting | | | | |
+ | | | | | |
+ |Shutters in | | | | |
+Earth | contact with |105+58 | 99+19 |Apr. 9, '06|Nov. 1, '06|
+ | face | | | | |
+ | | | | | |
+Mixed |Rock bench | 99+19 | 98+44 |Nov. 1. '06|Dec. 29, '06|
+ | | | | | |
+Mixed |Bottom heading | 98+44 | 97+76 |Dec, 29, '06|Feb. 12, '07|
+ | | | | | |
+Mixed |Rock cut | 97+66 | 93+84 |Feb. 12, '07|Aug. 6, '07|
+ | | | | | |
+Rock |Full face | 93+84 | 93+21 |Aug. 6, '07|Sept 2, '07|
+ | | | | | |
+Rock |Center Heading | 93+21 | 92+30 |Sept 2, '07|Oct. 12, '07|
+ | | | | | |
+Rock |Bottom heading | 92+30 | 90+99 |Oct. 12, '07|Dec. 6, '07|
+ | | | | | |
+Mixed |Rock cut | 90+99 | 90+49.6 |Dec. 6, '07|Jan. 3, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| 21} | | {| |
+ {| 11} | | {| |
+Rock {| }51| 48 | 0.94 {|Excavation done in normal air and |
+ {| 4} | | {|before advance of shield. |
+ {| } | | {| |
+ {| 15} | | {| |
+ | | | | |
+Rock | 86 | 87 | 1.01 | |
+ | | | | |
+Mixed | 26 | 36 | 1.38 | |
+ | | | | |
+Mixed | 17 | 33 | 1.94 | |
+ | | | | |
+Earth | | | | |
+ | 33 | 73 | 2.21 | |
+ | | | | |
+ | | | | |
+Earth |206 | 639 | 3.10 | |
+ | | | | |
+ | | | | |
+Mixed | 58 | 75 | 1.30 | |
+ | | | | |
+Mixed | 45 | 68 | 1.51 | |
+ | | | | |
+Mixed |175 | 392 | 2.24 | |
+ | | | | |
+Rock | 27 | 63 | 2.33 | |
+ | | | | |
+Rock | 40 | 91 | 2.28 | |
+ | | | | |
+Rock | 55 | 131 | 2.38 | |
+ | | | | |
+Mixed | 28 | 49.4 | 1.76 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE C, MANHATTAN.
+
+--------------+-----------------+-------------------+-------------------------+
+ | | Station: | Date: |
+ | |---------+---------+------------+------------+
+ | | | | | |
+ Material. | Method. | From | To | From | To |
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |107+79.03|107+69 |Dec. 20, '04|Dec. 27, '04|
+ {|Top heading |107+69 |107+23 |Jan. 1, '05|Jan. 15, '05|
+Rock {|Excavating bench |107+79 |107+23 |Jan. 21, '05|Feb. 28, '05|
+ {|Bottom heading |107+23 |106+72 |Mar. 1, '05|Mar. 11, '05|
+ {|Bottom heading |107+23 |107+15 |Oct. 12, '05|Oct. 27, '05|
+ {| | | | | |
+ | | | | | |
+Rock |Bottom heading |107+15 |106+62 |Nov. 6, '05|Dec. 2, '05|
+ | | | | | |
+ | | | | | |
+Mixed |Bottom heading |106+62 |106+55 |Dec. 2, '05|Dec. 23, '05|
+ | | | | | |
+ | | | | | |
+Mixed |Bottom heading |106+55 |106+17 |Feb. 12, '06|Mar. 22, '06|
+ | | | | | |
+Mixed |Rock cut |106+17 |105+85 |Apr. 2, '06|Apr. 20, '06|
+ | | | | | |
+Mixed |Rock cut |105+85 |105+55 |July 27, '06|Aug. 26, '06|
+ | | | | | |
+ | | | | | |
+Earth |Breasting and |105+55 | 99+40 |Aug. 26, '06|Jan. 2, '07|
+ | poling | | | | |
+ | | | | | |
+Mixed |Rock cut | 99+40 | 98+70 |Jan. 2, '07|Feb. 6, '07|
+ | | | | | |
+Rock |Full face | 98+70 | 98+60 |Feb. 6, '07|Feb. 12, '07|
+ | | | | | |
+Mixed |Bottom heading | 98+60 | 98+39 |Feb. 12, '07|Mar. 6, '07|
+ | | | | | |
+Rock |Bottom heading | 98+39 | 98+17 |Mar. 6, '07|Mar. 15, '07|
+ | | | | | |
+Mixed |Rock cut | 98+17 | 95+68 |Mar. 15, '07|July 30, '07|
+ | | | | | |
+Rock |Middle heading | 95+68 | 94+61 |July 30, '07|Aug. 21, '07|
+ | | | | | |
+Mixed |Rock cut | 94+61 | 93+56 |Aug. 21, '07|Oct. 3, '07|
+ | | | | | |
+Rock |Middle heading | 93+56 | 92+73 |Oct. 3, '07|Nov. 11, '07|
+ | | | | | |
+Mixed |Rock cut | 92+73 | 90+55 |Nov. 11, '07|Feb. 13, '08|
+ | | | | | |
+Mixed |Rock cut | 90+55 | 90+44.4 |Feb. 25, '08|Mar. 3, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| 7} | | {|Stopped to brace portal. No work done |
+ {| 14} | | {|from March 12th to October 11th, 1905,|
+Rock {| 38} | 54 | 0.77 {|except a little trimming in September.|
+ {| 10} | | {|All work up to this date done in |
+ {| 15} | | {|normal air. Heading advanced to 106+70|
+ {| } | | {|and bulkheaded. |
+ | | | | |
+Rock | 26 | 53 | 2.04 | |
+ | | | | |
+ | | | {|Heading advanced to 106 + 40. Shut |
+Mixed | 21 | 7 | 0.33 {|down in order that Line D might have a|
+ | | | {|lead. |
+ | | | | |
+Mixed | 38 | 38 | 1.00 {|Shut down on account of air shortage. |
+ | | | | |
+Mixed | 18 | 32 | 1.78 |Shut down on account of air shortage. |
+ | | | | |
+Mixed | 30 | 30 | 1.00 |Shut down April 20th to July 27th, |
+ | | | |1906. |
+ | | | | |
+Earth |127 | 615 | 4.84 | |
+ | | | | |
+ | | | | |
+Mixed | 35 | 70 | 2.00 | |
+ | | | | |
+Rock | 6 | 10 | 1.66 | |
+ | | | | |
+Mixed | 22 | 21 | 0.95 | |
+ | | | | |
+Rock | 9 | 22 | 2.44 | |
+ | | | | |
+Mixed |110 | 249 | 2.26 |Heading advanced to 97+82. |
+ | | | | |
+Rock | 49 | 107 | 2.18 | " " " 94+35. |
+ | | | | |
+Mixed | 43 | 106 | 2.46 | |
+ | | | | |
+Rock | 39 | 83 | 2.13 | |
+ | | | | |
+Mixed | 94 | 218 | 2.32 |Shut down until Line D shields met. |
+ | | | | |
+Mixed | 6 | 11 | 1.83 | |
+--------------+------+--------+--------+--------------------------------------+
+
+
+LINE D, MANHATTAN.
+--------------+-----------------+---------+---------+------------+------------+
+ {|Top heading |107+70.49|107+16 |Dec. 9, '04|Jan. 31, '05|}
+ {|Removing bench |107+70.49|107+35 |Jan. 1, '05|Jan. 27, '05|}
+Rock {|Bottom heading |107+35 |106+80 |Jan. 30, '05|Feb. 10, '05|}
+ {|Trimming |107+70 |106+80 |Mar. 29, '05|Apr. 12, '05|}
+ {|Trimming |107+70 |106+80 |Aug. 31, '05|Sept 19, '05|}
+ | | | | | |
+Rock |Bottom heading |106+80 |106+67 |Oct. 5, '05|Nov. 8, '05|
+ | | | | | |
+Mixed |Bottom heading |106+67 |106+39 |Nov. 8, '05|Dec. 23, '05|
+ | | | | | |
+ |Sliding hood and | | | | |
+Mixed |breasting. Rock |106+29 |105+70 |Dec. 23, '05|Jan. 24, '06|
+ |bench | | | | |
+ | | | | | |
+Earth |Poling and |105+70 |104+61 |Jan. 24, '06|Feb. 27, '06|
+ |breasting | | | | |
+ | | | | | |
+ | | | | | |
+Earth |Poling, breasting|104+61 |103+90 |Mar. 2, '06|Mar. 31, '06|
+ | and shutters | | | | |
+ | | | | | |
+ | | | | | |
+Earth |Shutters |103+90 | 99+41 |Apr. 20, '06|Sept 3, '06|
+ | | | | | |
+ | | | | | |
+Mixed |Bottom bench | 99+41 | 99+17 |Sept 3, '06|Sept 23, '06|
+ | | | | | |
+Mixed |Bottom heading | 99+17 | 98+50 |Oct. 2, '06|Nov. 24, '06|
+ | | | | | |
+ | | | | | |
+Rock |Bottom heading | 98+50 | 97+72 |Nov. 24, '06|Jan. 16, '07|
+ | | | | | |
+Mixed |Bottom heading | 97+72 | 97+27 |Jan. 16, '07|Feb. 10, '07|
+ | | | | | |
+Mixed |Rock cut | 97+27 | 95+72 |Feb. 10, '07|Apr. 23, '07|
+ | | | | | |
+Rock |Middle heading | 95+72 | 95+57 |Apr. 23, '07|May 11, '07|
+ | | | | | |
+Rock |Middle heading | 95+57 | 94+65 |May 23, '07|June 17, '07|
+ | | | | | |
+ | | | | | |
+Mixed |Middle heading | 94+65 | 94+41 |June 17, '07|June 25, '07|
+ | | | | | |
+Mixed |Rock cut | 94+41 | 94+03 |June 25, '07|July 13, '07|
+ | | | | | |
+Rock |Middle heading | 94+03 | 92+64 |July 13, '07|Sept 12, '07|
+ | | | | | |
+Mixed |Middle heading | 92+64 | 92+54 |Sept 12, '07|Sept 20, '07|
+ | | | | | |
+Rock |Middle heading | 92+54 | 92+50 |Sept 20, '07|Sept 21, '07|
+ | | | | | |
+Mixed |Rock cut | 92+50 | 90+38.66|Sept 21, '07|Jan. 8, '08|
+--------------+-----------------+---------+---------+------------+------------+
+
+--------------+------+--------+--------+--------------------------------------+
+ | | |Rate of | |
+ |Number| |progress| |
+ | of | Linear |in feet | |
+ Material. | days.| feet. |per day.| Remarks |
+--------------+------+--------+--------+--------------------------------------+
+ {| | | | |
+ {| | | | |
+Rock {|123 | 90 | 0.73 |In normal air. |
+ {| | | | |
+ {| | | | |
+ | | | | |
+Rock | 34 | 13 | 0.40 |Bottom heading timbered. |
+ | | | | |
+Mixed | 45 | 38 | 0.84 | |
+ | | | | |
+ | | | | |
+Mixed | 32 | 59 | 1.84 | |
+ | | | | |
+ | | | | |
+Earth | 31 | 109 | 3.41 | |
+ | | | | |
+ | | | | |
+ | | | |Three days' delay to set shutters in |
+Earth | 29 | 71 | 2.45 |top. Shut down 20 days to permit |
+ | | | |consolidation of the river bed and to |
+ | | | |repair broken plates. |
+ | | | | |
+Earth |136 | 449 | 3.40 |Four days of 136, delay account of |
+ | | | |flood. |
+ | | | | |
+Mixed | 20 | 24 | 1.20 | |
+ | | | | |
+Mixed | 53 | 67 | 1.27 |Thirteen days' shut-down to put on |
+ | | | |hood. |
+ | | | | |
+Rock | 53 | 78 | 1.47 | |
+ | | | | |
+Mixed | 25 | 45 | 1.40 | |
+ | | | | |
+Mixed | 72 | 155 | 2.15 | |
+ | | | | |
+Rock | 18 | 15 | 0.83 | |
+ | | | | |
+Rock | 25 | 92 | 3.68 |Twelve days' delay to repair cutting |
+ | | | |edge. |
+ | | | | |
+Mixed | 8 | 24 | 3.00 | |
+ | | | | |
+Mixed | 18 | 38 | 2.11 | |
+ | | | | |
+Rock | 61 | 139 | 2.28 | |
+ | | | | |
+Mixed | 8 | 10 | 1.25 | |
+ | | | | |
+Rock | 1 | 4 | 4.00 | |
+ | | | | |
+Mixed |109 | 211.34| 1.94 | |
+--------------+------+--------+--------+--------------------------------------+
+
+Openings were made between the headings as follows:
+
+Tunnel _D_, February 20th, 1908;
+Tunnel _B_, March 3d, 1908;
+Tunnel _C_, March 5th, 1908;
+Tunnel _A_, March 18th, 1908.
+
+It was necessary to cut away the projecting floors of the working
+compartments before the cutting edges could be shoved together.
+
+_Contractor's Organization._--Tunnel operations were carried on
+continuously for thirteen days out of fourteen, regular work being shut
+down for repairs on alternate Sundays. When the required pressure was
+more than 32 lb., four gangs of laborers were employed, each gang
+working two shifts of 3 hours each, with an intermission of 3 hours
+between the shifts. When the pressure was less than 32 lb., three gangs
+were employed, each gang covering 8 hours, but with an intermission of
+about 1/2 hour in low pressure for lunch.
+
+_Air Pressures Required._--During the greater portion of the work in
+soft ground, pressure was maintained which would about balance the
+hydrostatic head at the axis of the tunnel. This required a pressure
+varying from 30 to 34 lb. per sq. in. above that of the atmosphere. In
+Tunnels _B_ and _D_, at Manhattan, during the work in soft ground,
+pressures as high as 37 lb. were maintained for considerable periods of
+time; in the firm material near the reef 28 lb. was often sufficient.
+While removing the broken plates, the pressure was raised for a short
+time to 42 lb., and was maintained between 37-1/2 and 40 lb. for a
+little more than one month.
+
+_Air Supply._--For regular operation the contractor furnished four
+compressors on each side of the river, each having a rated capacity of
+5,000 cu. ft. of free air per minute delivered at 50 lb. above normal,
+when running at the rate of 100 rev. per min. An additional compressor
+of the same capacity was supplied on each side of the river, in
+compliance with the requirement for 25% excess capacity; the additional
+compressors had also high-pressure air cylinders which could be
+connected at will, and in which the pressure could be increased to 150
+lb., and the air used to supply rock drills, grouting machines, etc. The
+entire combination on each side of the river, therefore, was rated at
+25,000 cu. ft. of free air per minute, or a mean of 6,250 cu. ft. per
+heading. Its safe working capacity was not far from 20,000 cu. ft. per
+min.
+
+The shields broke through rock surface in Tunnels _B_, _C_, and _D_, at
+Manhattan, in November and December, 1905. The consumption of air in the
+four tunnels soon exceeded 15,000 cu. ft. for 24 hours, and in Tunnel
+_D_, on several occasions, it exceeded 7,000 cu. ft. for a like period.
+Blows had become frequent, and it was evident that the air plant was
+inadequate for driving four tunnels at once in the open material east of
+the Manhattan rock. Work in Tunnel _A_, therefore, was not resumed,
+after the suspension on December 29th, for about ten months, and Tunnel
+_C_ was also closed down for more than four months of the time between
+December, 1905, and July, 1906. During this period the capacity of the
+plant was increased from the rated 25,000 cu. ft. of free air per
+minute, to 35,000. In Tunnel _D_ the material had gradually become
+firmer, with more clay and less escape of air, as the Blackwell's Island
+Reef was approached, and, at the end of the period, the rock surface was
+within 3 ft. of the top of the shield; in Tunnel _B_, the rock of the
+reef was still a little below the shield, but the overlying material
+contained a large proportion of clay and held air very well. Tunnel _C_
+was still in open material, but, with two lines safe and with the
+increased air plant, it was deemed best to resume work in Tunnel _A_,
+which was done on October 23d, 1906. Thenceforward work was continuous
+in all headings until the meeting points with the Long Island shields
+were reached.
+
+This period, January to October, 1906, inclusive, was the most strenuous
+of the entire work, particularly the first six months. With one and, at
+times, two tunnels closed down, the consumption of air in the headings
+from Manhattan was an average of more than 20,000 cu. ft. per min. for
+periods of from 30 to 60 days; it was often more than 25,000 cu. ft. for
+24 hours, with a maximum of nearly 29,000 cu. ft., and doubtless this
+was exceeded considerably for shorter periods. On several occasions the
+quantity supplied to a single tunnel averaged more than 15,000 cu. ft.
+per min. for 24 hours. The greatest averages for 24 hours were obtained
+later in Tunnel _A_, after the resumption of work there, and exceeded
+19,000 cu. ft., but the conditions in the headings of the other lines
+were then so favorable that the work was carried on continuously in all.
+
+The deficiency in the original plant at Manhattan was so marked, and the
+need of driving all headings from Long Island simultaneously so clear,
+that it was decided to increase the rated capacity of the Long Island
+compressor plant to 45,400 cu. ft. of free air per minute, which was
+10,400 cu. ft. greater than the capacity of the Manhattan plant after
+the latter had been augmented.
+
+[Illustration: PLATE LXXII]
+
+The earth encountered on emerging from rock, when driving westward from
+Long Island, was far more compact and less permeable to air than on the
+Manhattan side, but for a distance of from 400 to 600 ft. immediately
+east of the reef, it was a clean open sand, and, while the shields were
+passing through this, the quantity of air supplied to the four headings
+seldom fell below 20,000 cu. ft. per min.; it was usually more than
+25,000 cu. ft., with a recorded maximum of 33,400 cu. ft. Although this
+was greater than ever used on the Manhattan side, it was more uniformly
+distributed among the several headings, and in none equalled the maximum
+observed on the Manhattan side, the largest having been 12,700 cu. ft.
+per min. for 24 hours; it must be remembered, however, that at one time
+only two tunnels were in progress in the bad material in the tunnels
+from Manhattan.
+
+From the foregoing experience, it would seem that the plant finally
+furnished at Long Island, having a rated capacity of 45,400 cu. ft. of
+free air per minute, would have been a reasonable compliance with the
+original actual needs on the Manhattan side and _vice versa_; the plant
+finally developed on the Manhattan side, having a rated capacity of
+35,000 cu. ft. of free air per minute, would have sufficed for the Long
+Island side.
+
+The total quantity of free air compressed for the supply of the working
+chambers of the tunnels and the Long Island caissons was 34,109,000,000
+cu. ft., and, in addition, 10,615,000,000 cu. ft. were compressed to
+between 80 and 125 lb. for power purposes, of which at least 80% was
+exhausted in the compressed-air working chambers. The total supply of
+free air to each heading while under pressure, therefore, averaged about
+3,550 cu. ft. per min.
+
+The quantity of air escaping during a sudden blow-out is apparently much
+smaller than might be supposed. Investigation of a number of cases,
+showing large pressure losses combined with a long stretch of tunnel
+supplying a relatively large reservoir of air, disclosed that a maximum
+loss of about 220,000 cu. ft. of free air occurred in 10 min. This
+averages only a little more than 19,000 cu. ft. per min., the maximum
+recorded supply to one tunnel for a period of 24 hours. Of this
+quantity, however, probably from 30 to 40% escaped in the first 45
+seconds, while the remainder was a more or less steady loss up to the
+time when the supply could be increased sufficiently to maintain the
+lowered pressure. Very few blows showed losses approaching this in
+quantity, but the inherent inaccuracy of the observations make the
+foregoing figures only roughly approximate.
+
+[Footnote C: _Minutes of Proceedings_, Inst. C. E., Vol. CXXX, p. 50.]
+
+
+SPECIAL DIFFICULTIES.
+
+The most serious difficulties of the work came near the start. In Tunnel
+_D_ blows and falls of sand from the face were frequent after soft
+ground was met in the top. About six weeks after entering the full sand
+face, and before the shutters had been installed, the shield showed a
+decided tendency to settle, carrying the tunnel lining down with it and
+resulting in a number of badly broken plates in the bottom of the rings.
+Notwithstanding the use of extremely high vertical leads,[D] the sand
+was so soft that the settlement of the shield continued for about
+fifteen rings, the maximum being nearly 9 in. below grade. The
+hydrostatic head at mid-height of the tunnel was 32-1/2 lb., and the
+raising of the air pressure to 37 lb., as was done at this time, was
+attended with grave danger of serious blows, on account of the recent
+disturbance of the natural cover by the pulling and re-driving of piles
+in the reconstruction of the Long Island ferry slips directly above. It
+dried the face materially, however, and the shield began to rise again,
+and had practically regained the grade when the anticipated blow-outs
+occurred, culminating with the entrance of rip-rap from the river bed
+into the shield and the flooding of the tunnel with 4 ft. of sand and
+water at the forward end. The escape of air was very great, and, as a
+pressure of more than 28 lb. could not be maintained, the face was
+bulkheaded and the tunnel was shut down for three weeks in order to
+permit the river bed to consolidate.
+
+This was the most serious difficulty encountered on any part of the
+work, and, coming at the very start, was exceedingly discouraging.
+During the shut-down the broken plates were reinforced temporarily with
+steel ribs and reinforced concrete (Fig. 1, Plate LXXIII) which, on
+completion of the work, were replaced by cast-steel segments, as
+described elsewhere. Practically, no further movement of iron took
+place, and the loss of grade caused by the settlement of the shield,
+which was by far the largest that ever occurred in this work, was not
+sufficient to require a change in the designed grade or alignment of the
+track. Work was resumed with the shutters in use at the face as an aid
+to excavation. The features of extreme seriousness did not recur, but
+for two months the escape of air continued to be extremely large, an
+average of 15,000 cu. ft. per min. being required on many days during
+this period.
+
+[Illustration: PLATE LXXIII, FIG. 1.--TEMPORARY REINFORCEMENT OF BROKEN
+PLATES AND REMOVAL OF A PLATE IN SECTIONS.]
+
+[Illustration: PLATE LXXIII, FIG. 2.--HEAVY CAST-STEEL PATCH ATTACHED TO
+BENT SEGMENT OF CUTTING EDGE.]
+
+[Illustration: PLATE LXXIII, FIG. 3.--INFLOW OF SOFT CLAY THROUGH
+SHIELD.]
+
+[Illustration: PLATE LXXIII, FIG. 4.--REINFORCEMENT OF BROKEN PLATE WITH
+LONG POLT AND TWISTED STEEL RODS.]
+
+In Tunnel _B_, after passing out from under the bulkhead line, in April,
+1906, the loss of air became very great, and blow-outs were of almost
+daily occurrence until the end of June. At the time of the blows the
+pressure in the tunnel would drop from 2 to 8 lb., and it generally took
+some hours to raise the pressure to what it was before the blow. During
+that time regular operations were interrupted. In the latter part of
+June a permit was obtained allowing the clay blanket to be increased in
+thickness up to a depth of water of 27 ft. at mean low tide. The
+additional blanket was deposited during the latter part of June and
+early in July, and almost entirely stopped the blows.
+
+By the end of the month the natural clay, previously described, formed
+the greater portion of the face, and, from that time forward, played an
+important part in reducing the quantity of air required. During April
+and the early part of May the work was under the ferry racks of the Long
+Island Railroad. The blanket had to be placed by dumping the clay from
+wheel-barrows through holes in the decking.
+
+In Tunnel _A_ a bottom heading had been driven 23 ft. in advance of the
+face at the time work was stopped at the end of 1905. During the ten
+months of inactivity the seams in the rock above opened. The rock
+surface was only from 2 to 4 ft. below the top of the cutting edge for a
+distance of about 60 ft. Over the rock there were large boulders
+embedded in sharp sand. It was an exceedingly difficult operation to
+remove the boulders and place the polings without starting a run. The
+open seams over the bottom heading also frequently caused trouble, as
+there were numerous slides of rock from the face which broke up the
+breasting and allowed the soft material from above to run into the
+shield. There were two runs of from 50 to 75 cu. yd. and many smaller
+ones.
+
+[Footnote D: The lead of the shield is the angular divergence of its
+axis from the axis of the tunnel and, in this tunnel, was measured as
+the offset in 23 ft. It was called + when the shield was pointed upward
+from grade, and - when pointed downward.]
+
+
+GUIDING THE SHIELDS.
+
+Little difficulty was experienced at any time in driving the shield
+close to the desired line, but it was much harder to keep it on grade.
+In rock section, where the cradle could be set far enough in advance to
+become hard before the shield was shoved over it, there was no trouble
+whatever. Where the cradle could be placed only a very short time before
+it had to take the weight of the shield, the case was quite different.
+The shield had a tendency to settle at the cutting edge, and when once
+pointed downward it was extremely difficult to change its direction. It
+was generally accomplished by embedding railroad rails or heavy oak
+plank in the cradle on solid foundation. This often had to be repeated
+several times before it was successful. In soft ground it was much
+easier to change the direction of the shield, but, owing to the varying
+nature of the material, it was sometimes impossible to determine in
+advance how the shield should be pointed. It was found by experience at
+Manhattan that the iron lining remained in the best position in relation
+to grade when the underside of the bottom of the shield at the rear end
+was driven on grade of the bottom of the iron, but if the rate of
+progress was slow, it was better to drive the shield a little higher.
+
+In the headings from Long Island, which, as a rule, were in soft ground,
+the cutting edges of the shields were kept from 4 to 8 in. higher, with
+respect to the grade line, than the rails. The shields would then
+usually move parallel to the grade line, though this was modified
+considerably by the way the mucking was done and by the stiffness of the
+ground at the bottom of the shield.
+
+On the average, the shields were shoved by from ten to twelve of the
+bottom jacks, with a pressure of about 4,000 lb. per sq. in. The jacks
+had 9-in. plungers, which made the average total force required to shove
+the shield 2,800,000 lb. In the soft ground, where shutters were used,
+all of the twenty-seven jacks were frequently used, and on several
+occasions the pressure exceeded 6,000 lb. per sq. in. With a unit
+pressure of 6,000 lb. per sq. in., the total pressure on the shield with
+all twenty-seven jacks in operation was 5,154 tons.
+
+
+INJURIES TO SHIELDS.
+
+There were only two instances of damage to the essential structural
+features of the shields. The most serious was in Tunnel _D_ where the
+cutting edge at the bottom of the shield was forced up a slightly
+sloping ledge of rock. A bow was formed in the steel casting which was
+markedly increased with the next few shoves. Work was suspended, and a
+heavy cast-steel patch, filling out the bow, was attached to the bent
+segments, as shown in Fig. 2, Plate LXXIII. No further trouble was
+experienced with the deformed portion. The other instance was in Tunnel
+_B_, from Long Island, where a somewhat similar but less serious
+accident occurred and was treated in a like manner.
+
+_Bulkheads._--At Manhattan, bulkheads had to be built near the shafts
+before the tunnels could be put under pressure. After 500 ft. of tunnel
+had been built on each line, the second bulkheads were constructed. The
+air pressure between the first and second bulkheads was then reduced to
+between 15 and 20 lb. When the shields had been advanced for 1,500 ft.,
+the third set of bulkheads was built. Nearly all the broken plates which
+were removed were located between the first and third bulkheads at
+Manhattan. Before undertaking this operation, the doors of the locks in
+the No. 3 bulkheads were reversed to take pressure from the west. By
+this means it was possible to carry on the work of dismantling the
+shields under comparatively low pressure simultaneously with the removal
+of the broken plates.
+
+At Long Island City the roofs of the caissons served the purpose of the
+No. 1 bulkheads. Two other sets of bulkheads were erected, the first
+about 500 ft. and the second about 1,500 ft. from the shafts.
+
+
+SETTLEMENT AT SURFACE OF GROUND.
+
+The driving of such portions of the river tunnels, with earth top, as
+were under the land section, caused a settlement at the surface varying
+usually from 3 to 6 in. The three-story brick building at No. 412 East
+34th Street required extensive repairs. This building stood over the
+section of part earth and part rock excavation where the tunnels broke
+out from the Manhattan ledge and where there were a number of runs of
+sand into the shield. In fact, the voids made by those runs eventually
+worked up to the surface and caused the pavement of the alley between
+the buildings to drop 4 or 5 ft. over a considerable area. The tunnels
+also passed directly under the ferry bridges and racks of the Long
+Island Railroad at East 34th Street. Tunnels _B_ and _D_ were constantly
+blowing at the time, and, where progress was slow, caused so much
+settlement that one of the racks had to be rebuilt. Tunnel _A_, on the
+other hand, where progress was rapid, caused practically no settlement
+in the racks.
+
+
+CLAY BLANKET.
+
+As previously mentioned, clay was dumped over the tunnels in varying
+depths at different times. A material was required which would pack
+into a compact mass and would not readily erode under the influence of
+the tidal currents of the river and the escape of the great volumes of
+air which often kept the water in the vicinity of the shields in violent
+motion. Suitable clay could not be found in the immediate vicinity of
+the work. Materials from Shooter's Island and from Haverstraw were tried
+for the purpose. The Government authorities did not approve of the
+former, and the greater portion of that used came from the latter point.
+Although a number of different permits governing the work were granted,
+there were three important ones. The first permit allowed a blanket
+which roughly followed the profile of the tunnels, with an average
+thickness of 10 ft. on the Manhattan side and somewhat less on the Long
+Island City side. The second general permit allowed the blanket to be
+built up to a plane 27 ft. below low water. This proved effective in
+checking the tendency to blow, but allowed considerable loss of air.
+Finally, dumping was allowed over limited and marked areas up to a plane
+of 20 ft. below low water. Wherever advantage was taken of this last
+authority, the excessive loss of air was almost entirely stopped. After
+all the shields had been well advanced out into the river, the blanket
+behind them was dredged up, and the clay used over again in advance of
+the shield.
+
+Soundings were taken daily over the shields, and, if marked erosion was
+found, clay was dumped into the hole. Whenever a serious blow occurred,
+a scowload of clay was dumped over it as soon as possible and without
+waiting to make soundings. For the latter purposes a considerable
+quantity of clay was placed in storage in the Pidgeon Street slip at
+Long Island City, and one or two bottom-dump scows were kept filled
+ready for emergencies. Mr. Robert Chalmers, who had charge of the
+soundings for the contractor, states that "the depressions in the
+blanket caused by erosion due to the escape of air were, as a rule,
+roughly circular in plan and of a curved section somewhat flat in the
+center." Satisfactory soundings were never obtained in the center of a
+violent blow, but the following instance illustrates in a measure what
+occurred. Over Tunnel _B_, at Station 102+80, there was normally 36 ft.
+of water, 7 ft. of clay blanket, and 20 ft. of natural cover. Air was
+escaping at the rate of about 10,000 cu. ft. per min., and small blows
+were occurring once or twice daily. On June 22d, soundings showed 54 ft.
+of water. A depth of 18 ft. of the river bottom had been eroded in about
+two days. On the next day there were taken out of the shield boulders
+which had almost certainly been deposited on the natural river bed. Clay
+from the blanket also came into the shields on a number of occasions
+during or after blows. The most notable occasion was in September, 1907,
+when the top of the shield in Tunnel _D_ was emerging from the east side
+of Blackwell's Island Reef. The sand in the top was very coarse and
+loose, and allowed the air to escape very freely. The fall of a piece of
+loose rock from under the breast precipitated a run of sand which was
+followed by clay from the blanket, which, in this locality, was largely
+the softer redredged material. Mucking out the shield was in progress
+when the soft clay started flowing again and forced its way back into
+the tunnel for a distance of 20 ft., as shown in Fig. 3, Plate LXXIII.
+Ten days of careful and arduous work were required to regain control of
+the face and complete the shove, on account of the heavy pressure of the
+plastic clay.
+
+The clay blanket was of the utmost importance to the work throughout,
+and it is difficult to see how the tunnels could have been driven
+through the soft material on the Manhattan side without it.
+
+The new material used in the blanket amounted to 283,412 cu. yd., of
+which 117,846 cu. yd. were removed from over the completed tunnels and
+redeposited in the blanket in advance of the shields. A total of 88,059
+cu. yd. of clay was dumped over blows. The total cost of placing and
+removing the blanket was $304,056.
+
+
+IRON LINING.
+
+The standard cast-iron tunnel lining was of the usual tube type, 23 ft.
+in outside diameter. The rings were 30 in. wide, and were composed of
+eleven segments and a key. The webs of the segments were 1-1/2 in. thick
+in the central portion, increasing to 2-3/8 in. at the roots of the
+flanges, which were 11 in. deep, 2-1/4 in. thick at the root, and 1-1/2
+in. at the edge, and were machined on all contact faces. Recesses were
+cast in the edge of the flanges, forming a groove, when the lining was
+in place, 1-1/2 in. deep and about 3/8 in. wide, to receive the
+caulking. The bolt holes were cored in the flanges, and the bosses
+facing the holes were not machined. The customary grout hole was tapped
+in the center of each plate for a standard 1-1/4-in. pipe. In this work,
+experience indicated that the standard pipe thread was too fine, and
+that the taper was objectionable. Each segment weighed, approximately,
+2,020 lb., and the key weighed 520 lb., the total weight being 9,102 lb.
+per lin. ft. of tunnel. Fig. 1 shows the details of the standard heavy
+lining.
+
+In addition to the standard cast-iron lining, cast-steel rings of the
+same dimensions were provided for use in a short stretch of the tunnel,
+when passing from a rock to a soft ground foundation, where it was
+anticipated that unequal settlement and consequent distortion and
+increase in stress might occur, but, aside from the small regular drop
+of the lining as it passed out of the tail of the shield, no such
+settlement was observed.
+
+Two classes of lighter iron, one with 1-in. web and 8-in. flanges and
+the other with 1-1/4-in. web and 9-in. flanges--the former weighing
+5,166 lb. per lin. ft. of tunnel and the latter, 6,776 lb.--were
+provided for use in the land sections between East Avenue and the Long
+Island City shafts. Two weights of extra heavy segments for use at the
+bottom of the rings were also furnished. The so-called _XX_ plates had
+webs and flanges 1/4 in. thicker than the standard segment and the _YY_
+plates were similarly 1/2 in. heavier. The conditions under which they
+were used will be referred to later. All the castings were of the same
+general type as shown by Fig. 1.
+
+Rings tapering 3/4 in. and 1-1/2 in. in width were used for changes in
+alignment and grade, the former being used approximately at every fourth
+ring on the 1 deg. 30' curves. The 1-1/2-in. tapers were largely used for
+changes in grade where it was desired to free the iron from binding on
+the tail of the shield. Still wider tapers would have been advantageous
+for quick results in this respect.
+
+No lug was cast on the segments for attachment to the erector, but in
+its place the gadget shown on Fig. 4, Plate LXX, was inserted in one of
+the pairs of bolt holes near the center of the plate, and was held in
+position by the running nut at one end.
+
+In the beginning it was expected that the natural shape of the rings
+would not show more than 1 in. of shortening of the vertical diameter;
+this was slightly exceeded, however, the average distortion throughout
+the tunnels being 1-7/16 in. The erectors were attached to the shield
+and in such a position that they were in the plane of the center of the
+ring to be erected when the shove was made without lead and just far
+enough to permit placing the segments. If the shield were shoved too
+far, a rare occurrence, the erection was inconvenienced. In driving with
+high vertical leads, which occurred more frequently, the disadvantage
+of placing the erector on the shield was more apparent. Under such
+conditions the plane of the erector's motion was acutely inclined to the
+plane of the ring, and, after placing the lower portion of the ring, it
+was usually necessary to shove the shield a few inches farther in order
+to place the upper plates. The practical effect of this action is
+referred to later.
+
+[Illustration: FIG. 1.]
+
+At first the erection of the iron in the river tunnels interfered
+somewhat with the mucking operations, but the length of time required to
+complete the latter was ample for the completion of the former; and the
+starting of a shove was seldom postponed by reason of the non-completion
+of a ring. After the removal of the bottom of the diaphragms, permitting
+the muck cars to be run into the shield and beyond, the two operations
+were carried on simultaneously without serious interference. The
+installation of the belt conveyor for handling the soft ground spoil in
+Tunnel _A_ was of special benefit in this respect.
+
+Preparatory to the final bolt tightening of each ring as erected, a
+15-ton draw-jack, consisting of a small pulling-jack inserted in a light
+eye-bar chain, was placed on the horizontal diameter, and frequently the
+erectors were also used to boost the crown of the iron, the object being
+to erect the ring truly circular. Before shoving, a 1-1/4-in.
+turn-buckle was also placed on the horizontal diameter in order to
+prevent the spreading of the iron, previous to filling the void outside
+with grout. The approach of the supports for the upper floor of the
+trailing platform necessitated the removal of these turnbuckles from all
+but the three leading rings, but if the iron showed a tendency to
+continue distortion, they were re-inserted after the passage of the
+trailing platform and remained until the arch of the concrete lining was
+placed.
+
+The cost of handling and erecting the iron varied greatly at different
+times, averaging, for the river tunnels, $3.32 per ton for the directly
+chargeable labor of handling and erecting, to which must be added $7.54
+for "top charges." The cost of repairing broken plates is included in
+this figure.
+
+_Broken Plates._--During the construction of the river section of the
+tunnels, a number of segments were found to have been broken while
+shoving the shield. The breaks, which with few exceptions were confined
+to the three or four bottom plates, almost invariably occurred on the
+advanced face of the ring, and rarely extended beyond the bottom of the
+flange. A careful study of the breaks and of the shoving records
+disclosed several distinct types of fracture and three principal known
+causes of breakage by the shield.
+
+In the first case, the accidental intrusion of foreign material between
+the jack head and the iron caused the jack to take its bearings on the
+flange above its normal position opposite the web of the ring, and
+resulted usually in the breaking out of a piece of the flange or in
+several radiating cracks with or without a depression of the flange.
+These breaks were very characteristic, and the cause was readily
+recognizable, even though the intruding substance was not actually
+observed.
+
+In the second case, the working of a hard piece of metal, such as a
+small tool, into the annular space between the iron and the tail of the
+shield, where it was caught on the bead and dragged along as the shield
+advanced, was the known cause of a number of broken segments. Such
+breaks had no particular characteristic, but were usually close above
+the line of travel of the lost tool or metal. Their cause was determined
+by the finding of a heavy score on the underside of the segment or the
+discovery of the tool wedged in the tail of the shield or lying under
+the broken plate when it was removed. It is probable that a number of
+breaks ascribed to unknown causes should be placed in this class.
+
+The third cause includes the largest number of breaks, and, while
+difficult to define closely, is the most interesting. Broadly speaking,
+the breaks resulted from the movements of the shield in relation to the
+position of the tunnel lining. While shoving through soft ground, it was
+frequently difficult to apply sufficient power to the lower jacks to
+complete the full shove of 30 in. on the desired alignment. The shield,
+therefore, was driven upward at the beginning of the shove, and, as the
+sand packed in front of the shield and more power was required, it was
+furnished by applying the upper jacks. The top of the shield was slowly
+pushed over, and, at the close of the shove, the desired position had
+been obtained; but the shield had been given a rocking motion with a
+decided lifting of the tail toward the close of the shove. A similar
+lifting of the tail occurred when, with high vertical leads, the top of
+the shield was pushed over in order to place the upper plates of the
+ring. Again, when the shield was driven above grade and it was desired
+to descend, the passage of the shield over the summit produced a like
+effect. In all these movements, with the space between the tail of the
+shield and the iron packed tight with pugging, the upward thrust of the
+shield tended to flatten the iron in the bottom and occasional broken
+plates were the result. The free use of the taper rings, placed so as to
+relieve the binding of the lining on the tail of the shield, forces the
+tunnel to follow the variations in the grade of the shield, but reduces
+greatly the injuries to the rings from this action.
+
+In Tunnel _D_, where very high vertical leads were required through the
+soft sand, combined with a marked tendency of the shield to settle, the
+shield was badly cramped on the iron and dragged along it at the top.
+The bearing of the iron on its soft foundation tended to thrust up the
+bottom in this case also, as shown by the opening of the bottom
+cross-joints when the bolts were slackened to relieve the strain during
+a shove. The anticipated cracks in the crown plates, which have been
+more frequently observed in other tunnels, did not occur here, and were
+not found elsewhere except in one place in Tunnel _B_ where they were
+traced to a similar action of the shield. The cracks resulting from the
+movements of the shield, as briefly described above, in this third case
+were not confined to any particular type, but occurred more frequently
+at the extreme end of the circumferential flange than at any other
+point.
+
+The number of broken plates occurring in the river tunnels was 319, or
+0.42% of the total number erected. Of these, 52 were found and removed,
+either before or immediately after a shove, by far the greater number
+being broken in handling before or during erection. The remaining 267
+are considered below.
+
+_Repair of Broken Plates._--On the completion of a shove, the tail of
+the shield lacked about 5 in. of covering the full width of the last
+ring, and the removal of a plate broken during the shove, therefore,
+would have exposed the ground at the tail of the shield. With a firm
+material in the bottom, this introduced no particular difficulties, and,
+under such conditions, a broken plate was usually removed at once. In
+the sand, however, and especially on the Manhattan side where it was
+quick and flowing, the removal of a plate was attended with some danger,
+and such plates were usually left to be removed on the completion of the
+tunnel. Many of these had been reinforced by the use of _XX_, _YY_, and
+steel segments placed adjacent to the break in the following rings.
+
+After the meeting of the shields, the postponed replacement of the
+broken segments was taken up. The pressure was raised sufficiently to
+dry thoroughly the sand outside the segments, which were drilled and
+broken out usually in quarters as shown on Fig. 1, Plate LXXIII. A steel
+segment was then inserted in the ring and drawn into place by
+turnbuckles. The application of the draw-jack, with a pull of about 30
+tons to each end successively, brought the plate to a firm bearing on
+the radial joints at the ends.
+
+Where the broken plate was isolated and was reinforced by steel or extra
+heavy segments in the adjacent ring, the crack, if slight, was simply
+caulked to insure water-tightness. If, however, the crack was opened or
+extended to the web of the plate, the cross-flanges were tied together
+by a 1-1/2-in. by 7-ft. bolt, inserted through the bolt holes nearest
+the broken flange. The long bolt acted in the nature of a bow string,
+and was provided at its ends with two nuts set on opposite sides of the
+cross-joints to replace the standard bolts removed for its insertion.
+Fig. 4, Plate LXXIII shows one of these bolts in place. In addition, all
+broken plates remaining in the tunnel were reinforced with 1-in.
+twisted-steel rods in the concrete lining, also shown in Fig. 4, Plate
+LXXIII.
+
+_Special Construction at River Shield Junctions._--Dismantling the
+shields was started as soon as they came to rest in their final position
+with the cutting edges together. The plans contemplated their entire
+removal, with the exception of the cylindrical skins and cast-steel
+cutting edges. Inside the former the standard tunnel lining was erected
+to within 4 ft. of the heels of the cutting edges. Spanning the latter,
+and forming the continuous metal tunnel lining, the special construction
+shown by Fig. 2 was built. This consisted of a 1-1/4 in. rolled-steel
+ring, 7 ft. long, erected inside the cutting edges, with an annular
+clearance of 1 in., and two special cast-iron rings shaped to connect
+the rolled-steel ring with the normal lining. One flange of the special
+cast-iron rings was of the standard type, the other was returned 9 in.
+in the form of a ring, the inside diameter of which was the same as the
+outside diameter of the rolled-steel ring to which it was bolted.
+
+The space between the standard and special construction was of varying
+width at the various shields, and was filled with a closure ring cast to
+the lengths determined in the field. Fig. 2 shows the completed
+construction.
+
+Hook-bolts, screwed through threaded holes and buried in 1 to 1 Portland
+cement grout ejected through similar holes, reinforced the rolled-steel
+ring against external water pressure. In two of the tunnels the concrete
+lining was carried completely through the junction, and covered the
+whole construction, while in the remaining two tunnels it was omitted at
+the rolled-steel ring, leaving the latter exposed and set back about 3
+in. from the face of the concrete.
+
+[Illustration: FIG. 2.]
+
+
+GROUTING.
+
+Except as previously noted, the voids outside of the tunnel lining were
+filled with grout ejected through the grout holes in each segment. The
+possibility was always present that Portland cement, if used for grout
+in the shield-driven tunnels, would flow forward around the shield and
+set hard, "freezing" the shield to the rock or the iron lining, or at
+least forming excrescences upon it, which would render its control
+difficult. With this in mind, the contractors proposed to substitute an
+English Blue Lias lime as a grouting material. Grout of fresh English
+lime containing a moderate quantity of water set very rapidly in air to
+the consistency of chalk. Its hydraulic properties, however, were
+feeble, and in the presence of an excess of water it remained at the
+consistency of soft mud. It was not suitable, therefore, as a supporting
+material for the tunnel.
+
+An American lime, made in imitation of the Lias lime, but having greater
+hydraulic properties, was tried, but proved unsatisfactory. Two brands
+of natural cement were also tried and rejected, but a modified
+quick-setting natural cement, manufactured especially for this work, was
+eventually made satisfactory, and by far the largest part of the
+river-tunnel grouting was done with this material mixed 1 to 1 by
+volume. East of the Long Island shafts the work which was built without
+shields was grouted principally with Portland cement and sand mixed 1 to
+1 by volume.
+
+In the river tunnels large quantities of the English lime were used neat
+as grout over the top of the tunnel in attempts to stop losses of air
+through the soft ground. It was not of great efficiency, however, in
+this respect until the voids outside of the lining had been filled above
+the crown. Its properties of swelling and quick setting in the dry sand
+at that point then became of value. The use of dry lime in the face,
+where the escaping air would carry it into the voids of the sand and
+choke them, was much more promptly efficacious in checking the loss.
+
+With the exception of the English lime, all grout was mixed 1 to 1 with
+sand in a Cockburn continuous-stirring machine operated by a 3-cylinder
+air engine. The grout machine was placed on the lower floor of the
+trailing platform shown on Plate LXXII, while the materials were placed
+on the upper platform, and, together with the water, were fed into the
+machine through a hole in the upper floor. The sand was bagged in the
+yard, and the cars on which the materials were sent into the tunnels
+were lifted by an elevator to the level of the upper floor of the
+trailing platform before unloading.
+
+Great difficulty was experienced in preventing the waste of the fluid
+grout ahead of the shield and into the tail through the space between it
+and the iron lining. In a full soft ground section, the first condition
+did not usually arise. In the full-rock sections the most efficient
+method of checking the waste was found to be the construction of dams or
+bulkheads outside the lining between it and the rock surface. For this
+purpose, at intervals of about 30 ft., the leading ring and the upper
+half of the preceding one were disconnected and pulled forward
+sufficiently to give access to the exterior. A rough dam of rubble, or
+bags of mortar or clay, was then constructed outside the iron, and the
+rings were shoved back and connected up. In sections containing both
+rock and soft ground, grout dams were built at the cutting edge at
+intervals, and were carried up as high as circumstances permitted.
+
+The annular space at the tail of the shield was at all times supposed to
+be packed tight with clay and empty bags, but the pugging was difficult
+to maintain against the pressure of the grout. For a time, 1/2-in.
+segmental steel plates, slipped down between the jackets and the iron,
+were used to retain the pugging, but their displacement resulted in a
+number of broken flanges, and their use was abandoned. In their place,
+2-in. segmental plates attached to the jack heads were substituted with
+more satisfactory results. Notwithstanding these devices, the waste of
+grout at the tail was very great.
+
+The soft ground material on various portions of the work acted very
+differently. The clay and "bull's liver" did not cave in upon the iron
+lining for several hours after the shield had passed, sometimes not for
+a day or more, which permitted the space between it and the iron to be
+grouted. The fine gray or beach sand and the quicksand closed in almost
+at once. The quicksand has a tendency to fill in under the iron from the
+sides and in places to leave a cavity at about the horizontal diameter
+which was not filled from above, as the sand, being dried out by the
+air, stood up fairly well and did not cave against the iron, except
+where nearly horizontal at the top.
+
+The total quantity of grout used on the work was equivalent in set
+volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647
+bbl. were ejected through the iron lining, an average of 14.93 bbl. per
+lin. ft. The cost of grout ejected outside of the river tunnels was 93
+cents per bbl. for labor and $2.77 for "top charges." East of the Long
+Island shaft the corresponding costs were $0.68 and $1.63, the
+difference being partly due to the large percentages of work done in the
+normal air at the latter place.
+
+
+CAULKING AND LEAKAGE.
+
+Up to August, 1907, the joints between the segments of the cast-iron
+lining were caulked with iron filings and sal ammoniac, mixed in the
+proportion of 400 to 1 by weight. With the air pressure balancing the
+hydrostatic head near the tunnel axis, it was difficult to make the
+rust-joint caulking tight below the axis against the opposing water
+pressure; this form of caulking was also injured in many places by
+water dripping from service pipes attached to the tunnel lining. A few
+trials of lead wire caulked cold gave such satisfactory results that it
+was adopted as a substitute. Pneumatic hammers were used successfully on
+the lead caulking, but were only used to a small extent on the rust
+borings, which were mostly hand caulked. Immediately before placing the
+concrete lining, all leaks, whether in the rust borings or lead, were
+repaired with lead, and the remainder of the groove was filled with 1 to
+1 Portland cement mortar, leaving the joints absolutely water-tight at
+that time. The subsequent development of small seepages through the
+concrete would seem to indicate that the repair work should have been
+carried on far enough in advance of the concreting to permit the
+detection of secondary leaks which might develop slowly. The average
+labor cost chargeable against the caulking was 12 cents per lin. ft., to
+which should be added 21.8 cents for "top charges."
+
+Unfortunately, it was necessary to place the greater part of the
+concrete lining in the river tunnels during the summer months when the
+temperature at the point of work frequently exceeded 85 deg.; and the
+temperature of the concrete while setting was much higher. This abnormal
+heat, due to chemical action in the cement, soon passed away, and, with
+the approach of winter, the contraction of the concrete resulted in
+transverse cracks. By the middle of the winter these had developed quite
+uniformly at the ends of each 30-ft. section of concrete arch as placed,
+and frequently finer cracks showed at about the center of each 30-ft.
+section.
+
+While the temperature of the concrete was falling, a like change was
+taking place in the cast-iron lining, with resulting contraction. The
+lining had been erected in compressed air, the temperature of which
+averaged about 70 deg. in winter and higher in summer. Compressed air having
+been taken off in the summer of 1908, the tunnels then acquired the
+lower temperature of the surrounding earth, slowly falling until
+mid-winter. The contraction of the concrete, firmly bedded around the
+flanges of the iron, and showing cracks at fairly uniform intervals,
+probably localized the small corresponding movements of the iron near
+the concrete cracks, and resulted in a loosening of the caulking at
+these points. With the advent of cold weather, damp spots appeared in
+numerous places on the concrete, and small seepages showed through quite
+regularly at the temperature cracks, in some cases developing
+sufficiently to be called leaks. Only a few, however, were measurable in
+amount.
+
+Early in January small brass plugs were firmly set on opposite sides of
+a large number of cracks, and caliper readings and air temperature
+observations were taken regularly throughout the winter and spring. The
+widths of the cracks and the amount of leakage at them increased with
+each drop in temperature and decreased as the temperature rose again,
+but until spring the width of the cracks did not return to the same
+point with each return of temperature.
+
+The leakage was similar in all four tunnels, but was largest in amount
+in Tunnel _D_, where, at the beginning of February, the ordinary flow
+was about 0.0097 cu. ft. per sec., equivalent to 0.00000347 cu. ft. per
+sec. per lin. ft. of tunnel. Of this amount 0.0065 cu. ft. per sec.
+could be accounted for at eight of the cracks showing measurable
+leakage, leaving 0.0032 cu. ft. per sec. or 0.00000081 cu. ft. per sec.
+per lin. ft. of tunnel to be accounted for as general seepage
+distributed over the whole length.
+
+It was not feasible to stop every leak in the tunnel, most of which were
+indicated simply by damp spots on the concrete; a rather simple method
+was devised, however, for stopping the leaks at the eight or ten places
+in each tunnel where water dripped from the arch or flowed down the face
+of the concrete. The worst leak in any tunnel flowed about 0.0023 cu.
+ft. per sec. To stop these leaks, rows of 1-in. holes, at about 4-in.
+centers, were drilled with jap drills through the concrete to the flange
+of the iron. These rows were from 3 to 18 ft. long, extending 1 ft. or
+more beyond the limits of the leak. The bottoms of the holes were
+directly on the caulking groove and the pounding of the drill usually
+drove the caulking back, so that the leak became dry or nearly so after
+the holes were drilled. If left alone the leaks would gradually break
+out again in a few hours or a few days and flow more water than before.
+They were allowed to do this, however, in only a few cases as
+experiments. After the holes were drilled, the bottom 4 in. next the
+flange was filled with soft neat cement mortar. Immediately on top of
+this was placed two plugs of neat cement about 2-1/2 in. long, which
+were 5 or 6 hours old and rather hard. Each was tamped in with a round
+caulking tool of the size of the hole driven with a sledge hammer. On
+top of this were driven in the same way two more plugs of neat cement of
+the same size, which were hard set. These broke up under the blows of
+the hammer, and caulked the hole tight. When finished, the tamping tool
+would ring as though it was in solid rock. Great pressure was exerted on
+the plastic mortar in the bottom of the hole, which resulted in the
+re-caulking of the joint of the iron. No further measurable leakage
+developed in the repaired cracks, during a period of four months, and
+the total leakage has been reduced to about 0.002 cu. ft. per sec. in
+each tunnel, an average of 0.00000051 cu. ft. per sec. per lin. ft.
+
+
+SUMP AND PUMP CHAMBERS.
+
+To take care of the drainage of the tunnels, a sump with a pump chamber
+above it was provided for each pair of tunnels. The sumps were really
+short tunnels underneath the main ones and extending approximately
+between the center lines of the latter. They were 10 ft. 9-1/2 in. in
+outside diameter and 44 ft. long. The water drops directly from the
+drains in the center lines of the tunnels into the sumps. Above the
+sumps and between the tunnels, a pump chamber 19 ft. 5 in. long was
+built. Above the end of the latter, opposite the sump, a cross-passage
+was constructed between the bench walls of the two tunnels. This passage
+gives access from either tunnel through an opening in the floor to the
+pump chamber and through the latter to the sump.
+
+From the preliminary borings it was thought that the sumps were located
+so that the entire construction would be in rock. This proved to be the
+case on Tunnels _C_ and _D_, but not on Tunnels _A_ and _B_. The
+position of the rock surface in the latter is shown by Fig. 3. After the
+excavation was completed in Tunnel _B_, January 1st, 1908, the plates
+were removed from the side of the tunnel at the cross-passage, and a
+drift was driven through the earth above the rock surface across to the
+lining of Tunnel _A_. The heading was timbered as shown by Fig. 3. There
+was practically no loss of air from the drift, but the clay blanket had
+been removed from over this locality and the situation caused some
+anxiety. In order to make the heading as secure as possible, the 24-in.
+I-beams, shown on Fig. 3, were attached to the lining of the two
+tunnels. The beams formed a support for the permanent concrete roof arch
+of the passage, which was placed at once. At the same time plates were
+removed from the bottom in Tunnel _B_ over the site of the sump, and a
+heading was started on the line of the sump toward Tunnel _A_. As soon
+as the heading had been driven beyond the center line of the pump
+chamber, a bottom heading was driven from a break-up westward in the
+pump chamber and a connection was made with the cross-passage. The iron
+lining of the pump chamber was next placed, from the cross-passage
+eastward. The soft ground was excavated directly in advance of the
+lining, and the ground was supported by polings in much the same manner
+as described for shield work. On account of bad ground and seams of sand
+encountered in the rock below the level of the cross-beams, the entire
+west wall of the pump chamber was placed before enlarging the sump to
+full size. This was also judicious, in order to support as far as
+possible the iron lining of the tunnels. The sump was then excavated to
+full size. The iron lining of the sump and the east wall of the pump
+chamber were placed as soon as possible. The voids outside the iron
+lining of the sump and the pump chamber were filled as completely as
+possible with concrete, and then thoroughly grouted. Finally, the
+concrete lining was put in place inside of the iron.
+
+As shown by Fig. 3, the excavation of these chambers left a considerable
+portion of the iron lining of the tunnels temporarily unsupported on the
+lower inner quarter. To guard against distortion, a system of diagonals
+and struts was placed as shown.
+
+The floor of the pump chamber was water-proofed with felt and pitch in a
+manner similar to that described for the caissons at Long Island City.
+It was not possible to make the felt stick to the vertical walls with
+soft pitch, which was the only kind that could be used in compressed
+air, and, therefore, the surfaces were water-proofed by a wall of
+asphalt brick laid in pitch melting at 60 deg. Fahr. Forms were erected on
+the neat line, and the space to the rock was filled with concrete making
+a so-called sand-wall similar to that commonly used for water-proofing
+with felt and pitch. The bricks were then laid to a height of four or
+five courses. The joints were filled with pitch instead of mortar.
+Sheets of tin were then placed against the face of the wall and braced
+from the concrete forms. As much pitch as possible was then slushed
+between the brick and the sand-wall, after which the concrete in the
+main wall was filled up to the top of the water-proofing course. The tin
+was then withdrawn and the operation repeated. This method was slow and
+expensive, but gave good results. Ordinary pitch could not be used on
+account of the fumes, which are particularly objectionable in
+compressed air. The 60 deg. pitch was slightly heated in the open air before
+using.
+
+[Illustration: FIG. 3.]
+
+The sump and pump chamber on Tunnels _C_ and _D_ differed from the one
+described only in minor details; but, being wholly constructed in rock,
+presented fewer difficulties and permitted a complete envelope of
+water-proofing to be placed in the top.
+
+
+CONCRETE LINING.
+
+The placing of concrete inside the iron tube was done by an organization
+entirely separate from the tunneling force. A mixing plant was placed in
+each of the five shafts. The stone and sand bins discharged directly
+into mixers below, which, in turn, discharged into steel side-dump
+concrete cars. All concrete was placed in normal air.
+
+The first step, after the iron lining was scraped clean and washed down
+and all leaks were stopped, was the placing of biats, marked _B_ on
+Plate LXXIV. These were made up of a 6 by 12-in. yellow pine timber, 17
+ft. long, with two short lengths of the same size spliced to its ends by
+pieces of 12-in. channels, 3 ft. 9 in. long, clamped upon the sides.
+These biats were placed every 5 ft. along the tunnel in rings having
+side keys. Next, a floor, 13 ft. wide, was laid on the biats and two
+tracks, of 30-in. gauge and 6-1/2-ft. centers, were laid upon the floor.
+There were three stages in the concreting. Fig. 2, Plate LXXIV, shows
+the concrete in place at the end of the first, and Fig. 3, Plate LXXIV,
+at the end of the second stage. The complete arch above the bench walls
+was done in the last operation.
+
+Two 3 by 10-in. soldiers (_SS_ in Figs. 1 and 2, Plate LXXIV) were
+fastened to each biat and braced across by two horizontal and two
+diagonal braces. To each pair of soldiers a floor template, _T_, was
+then nailed. The form for the center drain was then suspended as shown
+in Fig. 1, Plate LXXIV. Three pieces of shuttering, _FFF_, 20 ft. long,
+were then nailed to the bottom of the soldiers. One is all that would
+have been needed for the first concrete placed, but it was easier to
+place them at this stage than later, when there was less room. Three
+rough shutters were also nailed to the curved portion for the floor
+template. Opposite each biat, a bracket, _bb_, was then nailed, which
+carries a set of rough boards which formed the risers for the duct
+steps. Everything was then ready for concreting except that, where
+refuge niches occurred, a form for the portion of the niche below the
+seat was nailed to the shuttering. This form is shown at _R_ in Fig. 1,
+Plate LXXIV.
+
+[Illustration: PLATE LXXIV]
+
+The concrete was dumped down on each side from side-dump cars standing
+on the track, and, falling between the risers for the duct steps, ran or
+was shoveled under the forms and down into the bottom. The horizontal
+surface on each side the center drain was smoothed off with a shovel.
+The workmen became very skillful at this, and got a fairly smooth
+surface. This concrete was usually placed in lengths of 45 or 60 ft.
+After setting for about 24 hours, the brackets, _bb_, were removed,
+together with the shuttering on the steps. The triangular pieces, _t_ in
+Fig. 1, Plate LXXIV, were not removed until later. Instead, a board was
+laid upon this lower step on which the duct layers could work. This and
+the triangular piece were not removed until just before the bench
+concrete was placed. This was important, as otherwise the bond between
+the old and new concrete would be much impaired by dirt ground into the
+surface of the old concrete. The ducts were then laid, as shown in Fig.
+2, Plate LXXIV.
+
+The remaining shutters for the face of the bench walls were then placed.
+The remainder of the forms for the refuge niches, _RR_, in Fig. 1, Plate
+LXXIV, were nailed to the shutters, the steel beam over the niche was
+laid in place, the forms for the ladders, _L_ in Fig. 2, Plate LXXIV,
+which occur every 25 ft., were tacked to the shutters, the shutters and
+forms were given a coat of creosote oil, and then all was ready for
+placing the bench concrete.
+
+The specifications required a 2-in. mortar face to be placed on all
+exposed surfaces and the remainder to be smoothed with a trowel and
+straight-edge. After about 48 hours, the biats were blocked up on the
+bench, and all forms between the bench walls below the working floor
+were removed.
+
+The centering for the arch concrete consisted of simple 5 by 3-1/2 by
+5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at
+5-ft. intervals. Each rib was made up of two pieces spliced together at
+the top. Two men easily handled one of these pieces. After splicing, the
+rib was supported by four hanger-bolts fastened to the iron lining as
+shown in Fig. 3, Plate LXXIV.
+
+In the early part of the work, two additional bolts were used about half
+way up on the side between the upper and lower hanger-bolts. It was soon
+found that by placing the strut between the tunnel lining and the crown
+of the rib, these hanger-bolts could be dispensed with. The lagging was
+of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each
+piece had three saw cuts on the back, from end to end, allowing it to be
+bent to the curve of the arch; it was kept curved by an iron strap
+screwed to the back. The arches were put in, either in 15, 30 or 45-ft.
+lengths, depending on what was ready for concrete and what could be done
+in one continuous working. The rule was that when an arch was begun, the
+work must not stop until it was finished. An arch length always ended in
+the middle of a ring. The lagging was placed to a height of about 6 ft.
+above the bench before any concreting was done. When the concrete had
+been brought up to that point, lagging was added, one piece at a time,
+just ahead of the concrete, up to the crown, where a space of about 18
+in. was left. When the lagging had reached the upper hanger-bolts, they
+were removed, which left only the two bottom bolts fixed in the
+concrete. Most of these were unscrewed from the eye and saved, as tin
+sleeves were placed around them before concreting. Two cast-iron eyes
+were lost for every 5 ft. of tunnel. To place the key concrete, a stage
+was set up in the middle of the floor, and, beginning at one end, about
+2 ft. of block lagging was placed. Over this, concrete was packed,
+filling the key as completely as possible. This was done partly by
+shoveling and using a short rammer, and partly by packing with the hands
+by the workmen, who wore rubber gloves for the purpose. Another 2 ft. of
+lagging was then placed, and the operation was repeated, and thus
+working backward, foot by foot, the key was completed. This is the usual
+way of keying a concrete arch, but in this case the difficulty was
+increased by the flanges of the iron lining. It was practically
+impossible to fill all parts of the pockets formed by these flanges. To
+meet this difficulty, provision was made for grouting any unfilled
+space. As the concrete was being put in, tin pipes were placed with
+their tops nearly touching the iron lining, and their bottoms resting on
+the lagging. Each pocket was intended to have two of these pipes, one to
+grout through and the other to act as a vent for the escape of air. Each
+center key ring had six pipes, and each side key had eight. The bottoms
+of the pipes were held by a single nail driven half way into the
+lagging. This served to keep the pipes in position and to locate them
+after the lagging was taken down.
+
+The cost of labor in the tunnels directly chargeable to concrete was
+$1.80 per cu. yd. The top charges, exclusive of the cost of materials
+(cement, sand, and stone), amounted to $3.92.
+
+
+ELECTRIC CONDUITS.
+
+In one bench wall of each tunnel there were fifteen openings for power
+cables and in the other, between the river shafts, there were forty
+openings for telephone, telegraph, and signal cables. East of the Long
+Island shaft, the number of the latter was reduced to twenty-four. The
+telephone ducts were all of the four-way type. The specifications
+required that the power ducts should have an opening of not less than
+3-1/2 in., nor more than 3-7/8 in., and that after laying they should
+pass a 4-ft. mandrel, 3-3/8 in. at the leading end and 2-5/8 in. at the
+other. The outside dimension was limited between 5 and 5-3/8 in. The
+openings of the four-way ducts were required to be not less than 3-3/8
+in., nor more than 3-5/8 in., and after laying to pass a 5-ft. mandrel,
+3-1/4 in. at the leading end and 2-1/2 in. at the other. The outside
+dimensions were limited between 9 and 9-1/2 in. All were to be laid in
+1/4-in. beds of mortar. The specifications were not definite as to the
+shape of the opening, but those used were square with corners rounded to
+a radius of 3/8 in. The four-ways were 3 ft. long, and the singles, 18
+in.
+
+A study of the foregoing dimensions will show that the working limits
+were narrow. Such narrow limits would not pay for the ordinary conduit
+line in a street, where there is more room. In the tunnel greater
+liberality meant either reducing the number of conduits or encroaching
+on the strength of the concrete tunnel lining. The small difference of
+only 1/8 in. in the size of the mandrel, or a clearance of only 1/16 in.
+on each side, no doubt did increase the cost of laying somewhat, though
+not as much as might at first be supposed. All bottom courses were laid
+to a string, in practically perfect line and grade, and all joints were
+tested with mandrels which were in all openings, and pulled forward as
+each piece of conduit was laid. As the workmen became skillful, the
+progress was excellent.
+
+All costs of labor in the tunnel chargeable to duct laying amounted to
+$0.039 per ft. of duct; top charges brought this up to $0.083.
+
+The serious problem was to guard against grout and mortar running into
+the duct opening through the joints from the concrete, which was a
+rather wet mixture. Each joint was wrapped, when laid, with canvas,
+weighing 10 oz. per sq. yd., dipped in cement grout immediately before
+using. These wraps were 6 in. wide, and were cut long enough to go
+around the lap about the middle of the duct. As soon as all the ducts
+were laid, the entire bank was plastered over with fairly stiff mortar,
+which, when properly done, closed all openings. The plastering was not
+required by the specifications, but was found by the contractor to
+result in a saving in ultimate cost.
+
+The concrete on the two sides of the bank of ducts was bonded together
+by 2 by 1/8-in. steel bonds between the ducts, laid across in horizontal
+joints. Both ends were split into two pieces, 1 in. long, one of which
+was turned up and the other down. These bonds projected 1-1/2 in. into
+the concrete on either side. Where the bond came opposite the risers of
+the duct step, against which the ducts were laid, recesses were provided
+for the projecting bond. This was done by nailing to the rough shutters
+for the steps a form which when removed left a dove-tailed vertical
+groove. This form was made in two pieces, one tapering inward and the
+other with more taper outward. As the bonds were placed, these grooves
+were filled with mortar.
+
+The ducts usually received their final rodding with the specification
+mandrel a month or more after they were laid, after which all openings
+into splicing chambers were stopped by wooden plugs, 8 in. long tapering
+from 3-3/4 in. at one end to 2-3/4 in. at the other end, and shaped to
+fit the opening tightly. At first the plugs were paraffined, to keep
+them from swelling and breaking the ducts, but were not successful, as
+the paraffin lubricated them so that they would not stay in place. They
+were expensive, and there was some swelling in the best that were
+obtained. A better plug was made by using no paraffin, but by making six
+saw cuts, three horizontal and three vertical, in the larger end,
+cutting to within about 2 in. of the smaller end. The swelling of the
+wood was then taken up by the saw cuts and the spring of the wood.
+
+The splicing chambers are at 400-ft. intervals. They are 6 ft. long, 4
+ft. 9 in. high, with a width varying from 3 ft. 2 in. at the top to 1
+ft. 2 in. at the bottom.
+
+
+
+
+
+
+End of the Project Gutenberg EBook of Transactions of the American Society
+of Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard
+
+*** END OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN ***
+
+***** This file should be named 18722.txt or 18722.zip *****
+This and all associated files of various formats will be found in:
+ http://www.gutenberg.org/1/8/7/2/18722/
+
+Produced by Juliet Sutherland, Taavi Kalju and the Online
+Distributed Proofreading Team at http://www.pgdp.net
+
+
+Updated editions will replace the previous one--the old editions
+will be renamed.
+
+Creating the works from public domain print editions means that no
+one owns a United States copyright in these works, so the Foundation
+(and you!) can copy and distribute it in the United States without
+permission and without paying copyright royalties. Special rules,
+set forth in the General Terms of Use part of this license, apply to
+copying and distributing Project Gutenberg-tm electronic works to
+protect the PROJECT GUTENBERG-tm concept and trademark. Project
+Gutenberg is a registered trademark, and may not be used if you
+charge for the eBooks, unless you receive specific permission. If you
+do not charge anything for copies of this eBook, complying with the
+rules is very easy. You may use this eBook for nearly any purpose
+such as creation of derivative works, reports, performances and
+research. They may be modified and printed and given away--you may do
+practically ANYTHING with public domain eBooks. Redistribution is
+subject to the trademark license, especially commercial
+redistribution.
+
+
+
+*** START: FULL LICENSE ***
+
+THE FULL PROJECT GUTENBERG LICENSE
+PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK
+
+To protect the Project Gutenberg-tm mission of promoting the free
+distribution of electronic works, by using or distributing this work
+(or any other work associated in any way with the phrase "Project
+Gutenberg"), you agree to comply with all the terms of the Full Project
+Gutenberg-tm License (available with this file or online at
+http://gutenberg.org/license).
+
+
+Section 1. General Terms of Use and Redistributing Project Gutenberg-tm
+electronic works
+
+1.A. By reading or using any part of this Project Gutenberg-tm
+electronic work, you indicate that you have read, understand, agree to
+and accept all the terms of this license and intellectual property
+(trademark/copyright) agreement. If you do not agree to abide by all
+the terms of this agreement, you must cease using and return or destroy
+all copies of Project Gutenberg-tm electronic works in your possession.
+If you paid a fee for obtaining a copy of or access to a Project
+Gutenberg-tm electronic work and you do not agree to be bound by the
+terms of this agreement, you may obtain a refund from the person or
+entity to whom you paid the fee as set forth in paragraph 1.E.8.
+
+1.B. "Project Gutenberg" is a registered trademark. It may only be
+used on or associated in any way with an electronic work by people who
+agree to be bound by the terms of this agreement. There are a few
+things that you can do with most Project Gutenberg-tm electronic works
+even without complying with the full terms of this agreement. See
+paragraph 1.C below. There are a lot of things you can do with Project
+Gutenberg-tm electronic works if you follow the terms of this agreement
+and help preserve free future access to Project Gutenberg-tm electronic
+works. See paragraph 1.E below.
+
+1.C. The Project Gutenberg Literary Archive Foundation ("the Foundation"
+or PGLAF), owns a compilation copyright in the collection of Project
+Gutenberg-tm electronic works. Nearly all the individual works in the
+collection are in the public domain in the United States. If an
+individual work is in the public domain in the United States and you are
+located in the United States, we do not claim a right to prevent you from
+copying, distributing, performing, displaying or creating derivative
+works based on the work as long as all references to Project Gutenberg
+are removed. Of course, we hope that you will support the Project
+Gutenberg-tm mission of promoting free access to electronic works by
+freely sharing Project Gutenberg-tm works in compliance with the terms of
+this agreement for keeping the Project Gutenberg-tm name associated with
+the work. You can easily comply with the terms of this agreement by
+keeping this work in the same format with its attached full Project
+Gutenberg-tm License when you share it without charge with others.
+
+1.D. The copyright laws of the place where you are located also govern
+what you can do with this work. Copyright laws in most countries are in
+a constant state of change. If you are outside the United States, check
+the laws of your country in addition to the terms of this agreement
+before downloading, copying, displaying, performing, distributing or
+creating derivative works based on this work or any other Project
+Gutenberg-tm work. The Foundation makes no representations concerning
+the copyright status of any work in any country outside the United
+States.
+
+1.E. Unless you have removed all references to Project Gutenberg:
+
+1.E.1. The following sentence, with active links to, or other immediate
+access to, the full Project Gutenberg-tm License must appear prominently
+whenever any copy of a Project Gutenberg-tm work (any work on which the
+phrase "Project Gutenberg" appears, or with which the phrase "Project
+Gutenberg" is associated) is accessed, displayed, performed, viewed,
+copied or distributed:
+
+This eBook is for the use of anyone anywhere at no cost and with
+almost no restrictions whatsoever. You may copy it, give it away or
+re-use it under the terms of the Project Gutenberg License included
+with this eBook or online at www.gutenberg.org
+
+1.E.2. If an individual Project Gutenberg-tm electronic work is derived
+from the public domain (does not contain a notice indicating that it is
+posted with permission of the copyright holder), the work can be copied
+and distributed to anyone in the United States without paying any fees
+or charges. If you are redistributing or providing access to a work
+with the phrase "Project Gutenberg" associated with or appearing on the
+work, you must comply either with the requirements of paragraphs 1.E.1
+through 1.E.7 or obtain permission for the use of the work and the
+Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or
+1.E.9.
+
+1.E.3. If an individual Project Gutenberg-tm electronic work is posted
+with the permission of the copyright holder, your use and distribution
+must comply with both paragraphs 1.E.1 through 1.E.7 and any additional
+terms imposed by the copyright holder. Additional terms will be linked
+to the Project Gutenberg-tm License for all works posted with the
+permission of the copyright holder found at the beginning of this work.
+
+1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm
+License terms from this work, or any files containing a part of this
+work or any other work associated with Project Gutenberg-tm.
+
+1.E.5. Do not copy, display, perform, distribute or redistribute this
+electronic work, or any part of this electronic work, without
+prominently displaying the sentence set forth in paragraph 1.E.1 with
+active links or immediate access to the full terms of the Project
+Gutenberg-tm License.
+
+1.E.6. You may convert to and distribute this work in any binary,
+compressed, marked up, nonproprietary or proprietary form, including any
+word processing or hypertext form. However, if you provide access to or
+distribute copies of a Project Gutenberg-tm work in a format other than
+"Plain Vanilla ASCII" or other format used in the official version
+posted on the official Project Gutenberg-tm web site (www.gutenberg.org),
+you must, at no additional cost, fee or expense to the user, provide a
+copy, a means of exporting a copy, or a means of obtaining a copy upon
+request, of the work in its original "Plain Vanilla ASCII" or other
+form. Any alternate format must include the full Project Gutenberg-tm
+License as specified in paragraph 1.E.1.
+
+1.E.7. Do not charge a fee for access to, viewing, displaying,
+performing, copying or distributing any Project Gutenberg-tm works
+unless you comply with paragraph 1.E.8 or 1.E.9.
+
+1.E.8. You may charge a reasonable fee for copies of or providing
+access to or distributing Project Gutenberg-tm electronic works provided
+that
+
+- You pay a royalty fee of 20% of the gross profits you derive from
+ the use of Project Gutenberg-tm works calculated using the method
+ you already use to calculate your applicable taxes. The fee is
+ owed to the owner of the Project Gutenberg-tm trademark, but he
+ has agreed to donate royalties under this paragraph to the
+ Project Gutenberg Literary Archive Foundation. Royalty payments
+ must be paid within 60 days following each date on which you
+ prepare (or are legally required to prepare) your periodic tax
+ returns. Royalty payments should be clearly marked as such and
+ sent to the Project Gutenberg Literary Archive Foundation at the
+ address specified in Section 4, "Information about donations to
+ the Project Gutenberg Literary Archive Foundation."
+
+- You provide a full refund of any money paid by a user who notifies
+ you in writing (or by e-mail) within 30 days of receipt that s/he
+ does not agree to the terms of the full Project Gutenberg-tm
+ License. You must require such a user to return or
+ destroy all copies of the works possessed in a physical medium
+ and discontinue all use of and all access to other copies of
+ Project Gutenberg-tm works.
+
+- You provide, in accordance with paragraph 1.F.3, a full refund of any
+ money paid for a work or a replacement copy, if a defect in the
+ electronic work is discovered and reported to you within 90 days
+ of receipt of the work.
+
+- You comply with all other terms of this agreement for free
+ distribution of Project Gutenberg-tm works.
+
+1.E.9. If you wish to charge a fee or distribute a Project Gutenberg-tm
+electronic work or group of works on different terms than are set
+forth in this agreement, you must obtain permission in writing from
+both the Project Gutenberg Literary Archive Foundation and Michael
+Hart, the owner of the Project Gutenberg-tm trademark. Contact the
+Foundation as set forth in Section 3 below.
+
+1.F.
+
+1.F.1. Project Gutenberg volunteers and employees expend considerable
+effort to identify, do copyright research on, transcribe and proofread
+public domain works in creating the Project Gutenberg-tm
+collection. Despite these efforts, Project Gutenberg-tm electronic
+works, and the medium on which they may be stored, may contain
+"Defects," such as, but not limited to, incomplete, inaccurate or
+corrupt data, transcription errors, a copyright or other intellectual
+property infringement, a defective or damaged disk or other medium, a
+computer virus, or computer codes that damage or cannot be read by
+your equipment.
+
+1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
+of Replacement or Refund" described in paragraph 1.F.3, the Project
+Gutenberg Literary Archive Foundation, the owner of the Project
+Gutenberg-tm trademark, and any other party distributing a Project
+Gutenberg-tm electronic work under this agreement, disclaim all
+liability to you for damages, costs and expenses, including legal
+fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
+LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
+PROVIDED IN PARAGRAPH F3. YOU AGREE THAT THE FOUNDATION, THE
+TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
+LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
+INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
+DAMAGE.
+
+1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
+defect in this electronic work within 90 days of receiving it, you can
+receive a refund of the money (if any) you paid for it by sending a
+written explanation to the person you received the work from. If you
+received the work on a physical medium, you must return the medium with
+your written explanation. The person or entity that provided you with
+the defective work may elect to provide a replacement copy in lieu of a
+refund. If you received the work electronically, the person or entity
+providing it to you may choose to give you a second opportunity to
+receive the work electronically in lieu of a refund. If the second copy
+is also defective, you may demand a refund in writing without further
+opportunities to fix the problem.
+
+1.F.4. Except for the limited right of replacement or refund set forth
+in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO OTHER
+WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO
+WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE.
+
+1.F.5. Some states do not allow disclaimers of certain implied
+warranties or the exclusion or limitation of certain types of damages.
+If any disclaimer or limitation set forth in this agreement violates the
+law of the state applicable to this agreement, the agreement shall be
+interpreted to make the maximum disclaimer or limitation permitted by
+the applicable state law. The invalidity or unenforceability of any
+provision of this agreement shall not void the remaining provisions.
+
+1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the
+trademark owner, any agent or employee of the Foundation, anyone
+providing copies of Project Gutenberg-tm electronic works in accordance
+with this agreement, and any volunteers associated with the production,
+promotion and distribution of Project Gutenberg-tm electronic works,
+harmless from all liability, costs and expenses, including legal fees,
+that arise directly or indirectly from any of the following which you do
+or cause to occur: (a) distribution of this or any Project Gutenberg-tm
+work, (b) alteration, modification, or additions or deletions to any
+Project Gutenberg-tm work, and (c) any Defect you cause.
+
+
+Section 2. Information about the Mission of Project Gutenberg-tm
+
+Project Gutenberg-tm is synonymous with the free distribution of
+electronic works in formats readable by the widest variety of computers
+including obsolete, old, middle-aged and new computers. It exists
+because of the efforts of hundreds of volunteers and donations from
+people in all walks of life.
+
+Volunteers and financial support to provide volunteers with the
+assistance they need, is critical to reaching Project Gutenberg-tm's
+goals and ensuring that the Project Gutenberg-tm collection will
+remain freely available for generations to come. In 2001, the Project
+Gutenberg Literary Archive Foundation was created to provide a secure
+and permanent future for Project Gutenberg-tm and future generations.
+To learn more about the Project Gutenberg Literary Archive Foundation
+and how your efforts and donations can help, see Sections 3 and 4
+and the Foundation web page at http://www.pglaf.org.
+
+
+Section 3. Information about the Project Gutenberg Literary Archive
+Foundation
+
+The Project Gutenberg Literary Archive Foundation is a non profit
+501(c)(3) educational corporation organized under the laws of the
+state of Mississippi and granted tax exempt status by the Internal
+Revenue Service. The Foundation's EIN or federal tax identification
+number is 64-6221541. Its 501(c)(3) letter is posted at
+http://pglaf.org/fundraising. Contributions to the Project Gutenberg
+Literary Archive Foundation are tax deductible to the full extent
+permitted by U.S. federal laws and your state's laws.
+
+The Foundation's principal office is located at 4557 Melan Dr. S.
+Fairbanks, AK, 99712., but its volunteers and employees are scattered
+throughout numerous locations. Its business office is located at
+809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email
+business@pglaf.org. Email contact links and up to date contact
+information can be found at the Foundation's web site and official
+page at http://pglaf.org
+
+For additional contact information:
+ Dr. Gregory B. Newby
+ Chief Executive and Director
+ gbnewby@pglaf.org
+
+Section 4. Information about Donations to the Project Gutenberg
+Literary Archive Foundation
+
+Project Gutenberg-tm depends upon and cannot survive without wide
+spread public support and donations to carry out its mission of
+increasing the number of public domain and licensed works that can be
+freely distributed in machine readable form accessible by the widest
+array of equipment including outdated equipment. Many small donations
+($1 to $5,000) are particularly important to maintaining tax exempt
+status with the IRS.
+
+The Foundation is committed to complying with the laws regulating
+charities and charitable donations in all 50 states of the United
+States. Compliance requirements are not uniform and it takes a
+considerable effort, much paperwork and many fees to meet and keep up
+with these requirements. We do not solicit donations in locations
+where we have not received written confirmation of compliance. To
+SEND DONATIONS or determine the status of compliance for any
+particular state visit http://pglaf.org
+
+While we cannot and do not solicit contributions from states where we
+have not met the solicitation requirements, we know of no prohibition
+against accepting unsolicited donations from donors in such states who
+approach us with offers to donate.
+
+International donations are gratefully accepted, but we cannot make
+any statements concerning tax treatment of donations received from
+outside the United States. U.S. laws alone swamp our small staff.
+
+Please check the Project Gutenberg Web pages for current donation
+methods and addresses. Donations are accepted in a number of other
+ways including checks, online payments and credit card
+donations. To donate, please visit: http://pglaf.org/donate
+
+
+Section 5. General Information About Project Gutenberg-tm electronic
+works.
+
+Professor Michael S. Hart is the originator of the Project Gutenberg-tm
+concept of a library of electronic works that could be freely shared
+with anyone. For thirty years, he produced and distributed Project
+Gutenberg-tm eBooks with only a loose network of volunteer support.
+
+Project Gutenberg-tm eBooks are often created from several printed
+editions, all of which are confirmed as Public Domain in the U.S.
+unless a copyright notice is included. Thus, we do not necessarily
+keep eBooks in compliance with any particular paper edition.
+
+Most people start at our Web site which has the main PG search facility:
+
+ http://www.gutenberg.org
+
+This Web site includes information about Project Gutenberg-tm,
+including how to make donations to the Project Gutenberg Literary
+Archive Foundation, how to help produce our new eBooks, and how to
+subscribe to our email newsletter to hear about new eBooks.
+
+*** END: FULL LICENSE ***
+
diff --git a/18722.zip b/18722.zip
new file mode 100644
index 0000000..96a45a0
--- /dev/null
+++ b/18722.zip
Binary files differ
diff --git a/LICENSE.txt b/LICENSE.txt
new file mode 100644
index 0000000..6312041
--- /dev/null
+++ b/LICENSE.txt
@@ -0,0 +1,11 @@
+This eBook, including all associated images, markup, improvements,
+metadata, and any other content or labor, has been confirmed to be
+in the PUBLIC DOMAIN IN THE UNITED STATES.
+
+Procedures for determining public domain status are described in
+the "Copyright How-To" at https://www.gutenberg.org.
+
+No investigation has been made concerning possible copyrights in
+jurisdictions other than the United States. Anyone seeking to utilize
+this eBook outside of the United States should confirm copyright
+status under the laws that apply to them.
diff --git a/README.md b/README.md
new file mode 100644
index 0000000..a66bea5
--- /dev/null
+++ b/README.md
@@ -0,0 +1,2 @@
+Project Gutenberg (https://www.gutenberg.org) public repository for
+eBook #18722 (https://www.gutenberg.org/ebooks/18722)