diff options
| author | Roger Frank <rfrank@pglaf.org> | 2025-10-15 04:54:01 -0700 |
|---|---|---|
| committer | Roger Frank <rfrank@pglaf.org> | 2025-10-15 04:54:01 -0700 |
| commit | 225c5410157442e1c413a17e5557a710168466e6 (patch) | |
| tree | 80493af7734294946d0717c23a81301817793845 | |
| -rw-r--r-- | .gitattributes | 3 | ||||
| -rw-r--r-- | 18722-8.txt | 3190 | ||||
| -rw-r--r-- | 18722-8.zip | bin | 0 -> 57118 bytes | |||
| -rw-r--r-- | 18722-h.zip | bin | 0 -> 4196883 bytes | |||
| -rw-r--r-- | 18722-h/18722-h.htm | 4570 | ||||
| -rw-r--r-- | 18722-h/images/fig01.jpg | bin | 0 -> 40194 bytes | |||
| -rw-r--r-- | 18722-h/images/fig01large.jpg | bin | 0 -> 166285 bytes | |||
| -rw-r--r-- | 18722-h/images/fig02.jpg | bin | 0 -> 53665 bytes | |||
| -rw-r--r-- | 18722-h/images/fig02large.jpg | bin | 0 -> 218130 bytes | |||
| -rw-r--r-- | 18722-h/images/fig03.jpg | bin | 0 -> 50001 bytes | |||
| -rw-r--r-- | 18722-h/images/fig03large.jpg | bin | 0 -> 231246 bytes | |||
| -rw-r--r-- | 18722-h/images/ill01.jpg | bin | 0 -> 23833 bytes | |||
| -rw-r--r-- | 18722-h/images/ill01large.jpg | bin | 0 -> 734310 bytes | |||
| -rw-r--r-- | 18722-h/images/ill02.jpg | bin | 0 -> 35799 bytes | |||
| -rw-r--r-- | 18722-h/images/ill03.jpg | bin | 0 -> 38268 bytes | |||
| -rw-r--r-- | 18722-h/images/ill04.jpg | bin | 0 -> 38888 bytes | |||
| -rw-r--r-- | 18722-h/images/ill05.jpg | bin | 0 -> 37243 bytes | |||
| -rw-r--r-- | 18722-h/images/ill06.jpg | bin | 0 -> 45002 bytes | |||
| -rw-r--r-- | 18722-h/images/ill07.jpg | bin | 0 -> 49132 bytes | |||
| -rw-r--r-- | 18722-h/images/ill08.jpg | bin | 0 -> 50640 bytes | |||
| -rw-r--r-- | 18722-h/images/ill09.jpg | bin | 0 -> 45729 bytes | |||
| -rw-r--r-- | 18722-h/images/ill10.jpg | bin | 0 -> 37390 bytes | |||
| -rw-r--r-- | 18722-h/images/ill10large.jpg | bin | 0 -> 273955 bytes | |||
| -rw-r--r-- | 18722-h/images/ill11.jpg | bin | 0 -> 36959 bytes | |||
| -rw-r--r-- | 18722-h/images/ill11large.jpg | bin | 0 -> 275466 bytes | |||
| -rw-r--r-- | 18722-h/images/ill12.jpg | bin | 0 -> 60529 bytes | |||
| -rw-r--r-- | 18722-h/images/ill12large.jpg | bin | 0 -> 395310 bytes | |||
| -rw-r--r-- | 18722-h/images/ill13.jpg | bin | 0 -> 27991 bytes | |||
| -rw-r--r-- | 18722-h/images/ill14.jpg | bin | 0 -> 29676 bytes | |||
| -rw-r--r-- | 18722-h/images/ill15.jpg | bin | 0 -> 34377 bytes | |||
| -rw-r--r-- | 18722-h/images/ill16.jpg | bin | 0 -> 35155 bytes | |||
| -rw-r--r-- | 18722-h/images/ill17.jpg | bin | 0 -> 50064 bytes | |||
| -rw-r--r-- | 18722-h/images/ill17large.jpg | bin | 0 -> 342956 bytes | |||
| -rw-r--r-- | 18722-h/images/ill18.jpg | bin | 0 -> 42035 bytes | |||
| -rw-r--r-- | 18722-h/images/ill18large.jpg | bin | 0 -> 306848 bytes | |||
| -rw-r--r-- | 18722-h/images/ill19.jpg | bin | 0 -> 36597 bytes | |||
| -rw-r--r-- | 18722-h/images/ill20.jpg | bin | 0 -> 34139 bytes | |||
| -rw-r--r-- | 18722-h/images/ill21.jpg | bin | 0 -> 39795 bytes | |||
| -rw-r--r-- | 18722-h/images/ill22.jpg | bin | 0 -> 43305 bytes | |||
| -rw-r--r-- | 18722-h/images/ill23.jpg | bin | 0 -> 50892 bytes | |||
| -rw-r--r-- | 18722-h/images/ill23large.jpg | bin | 0 -> 227631 bytes | |||
| -rw-r--r-- | 18722.txt | 3190 | ||||
| -rw-r--r-- | 18722.zip | bin | 0 -> 57108 bytes | |||
| -rw-r--r-- | LICENSE.txt | 11 | ||||
| -rw-r--r-- | README.md | 2 |
45 files changed, 10966 insertions, 0 deletions
diff --git a/.gitattributes b/.gitattributes new file mode 100644 index 0000000..6833f05 --- /dev/null +++ b/.gitattributes @@ -0,0 +1,3 @@ +* text=auto +*.txt text +*.md text diff --git a/18722-8.txt b/18722-8.txt new file mode 100644 index 0000000..3a0a66a --- /dev/null +++ b/18722-8.txt @@ -0,0 +1,3190 @@ +The Project Gutenberg EBook of Transactions of the American Society of +Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard + +This eBook is for the use of anyone anywhere at no cost and with +almost no restrictions whatsoever. You may copy it, give it away or +re-use it under the terms of the Project Gutenberg License included +with this eBook or online at www.gutenberg.org + + +Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 + The New York Tunnel Extension of the Pennsylvania Railroad. + The East River Tunnels. Paper No. 1159 + +Author: James H. Brace, Francis Mason and S. H. Woodard + +Release Date: July 1, 2006 [EBook #18722] + +Language: English + +Character set encoding: ISO-8859-1 + +*** START OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN *** + + + + +Produced by Juliet Sutherland, Taavi Kalju and the Online +Distributed Proofreading Team at http://www.pgdp.net + + + + + + + + + +AMERICAN SOCIETY OF CIVIL ENGINEERS + +INSTITUTED 1852 + + +TRANSACTIONS + +Paper No. 1159 + + +THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA RAILROAD. + +THE EAST RIVER TUNNELS.[A] + +BY JAMES H. BRACE, FRANCIS MASON, AND S. H. WOODARD, MEMBERS, AM. SOC. +C. E. + + +This paper will be limited to a consideration of the construction of the +tunnels, the broader questions of design, etc., having already been +considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C. +E., and Alfred Noble, Past-President, Am. Soc. C. E. + +The location of the section of the work to be considered here is shown +on Plate XIII of Mr. Noble's paper. There are two permanent shafts on +each side of the East River and four single cast-iron tube tunnels, each +about 6,000 ft. long, and consisting of 3,900 ft. between shafts under +the river, and 2,000 ft. in Long Island City, mostly under the depot and +passenger yard of the Long Island Railroad. This tube-tunnel work was +naturally a single job. The contract for its construction was let to S. +Pearson and Son, Incorporated, ground being broken on May 17th, 1904. +Five years later, to a day, the work was finished and received its final +inspection for acceptance by the Railroad Company. + +The contract was of the profit-sharing type, and required an audit, by +the Railroad Company, of the contractor's books, and a careful system of +cost-keeping by the Company's engineers, so that it is possible to +include in the following some of the unit costs of the work. These are +given in two parts: The first is called the unit labor cost, and is the +cost of the labor in the tunnel directly chargeable to the thing +considered. It does not include the labor of operating the plant, nor +watchmen, yardmen, pipemen, and electricians. The second is called "top +charges," a common term, but meaning different things to different +contractors and engineers. Here, it is made to include the cost of the +contractor's staff and roving laborers, such as pipemen, electricians, +and yardmen, the cost of the plant and its operation, and all +miscellaneous expenses, but does not include any contractor's profit, +nor cost of materials entering permanent work. + +The contractor's plant is to be described in a paper by Henry Japp,[B] +M. Am. Soc. C. E., and will not be dealt with here. + +The contractors carried on their work from three different sites. From +permanent shafts, located near the river in Manhattan, four shields were +driven eastward to about the middle of the river; and, from two similar +shafts at the river front in Long Island City, four shields were driven +westward to meet those from Manhattan. From a temporary shaft, near East +Avenue, Long Island City, the land section of about 2,000 ft. was driven +to the river shafts. + +[Footnote A: Presented at the meeting of December 15th, 1909.] + +[Footnote B: _Transactions_, Am. Soc. C. E., Vol. LXIX. p. 1.] + + +TUNNELS FROM EAST AVENUE TO THE RIVER SHAFTS. + +The sinking of the temporary shaft at East Avenue was a fairly simple +matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34 +ft., braced across by heavy timbering, was driven about 28 ft. to rock +as the excavation progressed. Below this, the shaft was sunk into rock, +about 27 ft., without timbering. As soon as the shaft was down, on +September 30th, 1904, bottom headings were started westward in Tunnels +_A_, _B_, and _D_. When these had been driven about half the distance to +the river shafts, soft ground was encountered. (See Station 59, Plate +XIII.) As the ground carried considerable water, it was decided to use +compressed air. Bulkheads were built in the heading, and, with an air +pressure of about 15 lb. per sq. in., the heading was driven through the +soft ground and into rock by ordinary mining methods. The use of +compressed air was then discontinued. West of this soft ground, a top +heading, followed by a bench, was driven to the soft ground at about +Station 66. Tunnel _C_, being higher, was more in soft ground, and at +first it was the intention to delay its excavation until it had been +well drained by the bottom headings in the tunnels on each side. A +little later it was decided to use a shield without compressed air. This +shield had been used in excavating the stations of the Great Northern +and City Tunnel in London. It was rebuilt, its diameter being changed +from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after +it had flattened about 4 in. and had been jacked up three times, the +scheme was abandoned, the shield was removed, and work was continued by +the methods which were being used in the other tunnels. The shield was +rather light, but probably it would have been strong enough had it been +used with compressed air, or had the material passed through been all +earth. Here, there was a narrow concrete cradle in the bottom, with rock +up to about the middle of the tunnel, which was excavated to clear the +shield, and gave no support on its sides. The shield was a cylinder +crushed between forces applied along the top and bottom. + +With the exception of this trial of a shield in Tunnel _C_, and a novel +method in Tunnel _B_, where compressed air, but no shield, was used, the +description of the work in one tunnel will do for all. + +From the bottom headings break-ups were started at several places in +each tunnel where there was ample cover of rock above. Where the roof +was in soft ground, top headings were driven from the points of break-up +and timbered. As soon as the full-sized excavation was completed, the +iron lining was built, usually in short lengths. + +It will be noticed on Plate XIII that there is a depression in the rock +between Station 65 and the river shafts, leaving all the tunnels in soft +ground. As this was directly under the Long Island Railroad passenger +station, it was thought best to use a shield and compressed air. This +was done in Tunnels _A_, _C_, and _D_, one shield being used +successively for all three. It was first erected in Tunnel _D_ at +Station 64 + 47. From there it was driven westward to the river shaft. +It was then taken apart and re-erected in Tunnel _C_ at Station 63 + 63 +and driven westward to the shaft. It was then found that there would not +be time for one shield to do all four lines. The experience in Tunnels +_C_ and _D_ had proven the ground to be much better than had been +expected. There was considerable clay in the sand, and, with the water +blown out by compressed air, it was very stable. A special timbering +method was devised, and Tunnel _B_ was driven from Station 66 + 10 to +the shaft with compressed air, but without a shield. In the meantime the +shield was re-erected in Tunnel _A_ and was shoved through the soft +ground from Station 65 + 48 nearly to the river shaft, where it was +dismantled. + +There was nothing unusual about the shield work; it was about the same +as that under the river, which is fully described elsewhere. In spite of +great care in excavating in front of the shield, and prompt grouting +behind it, there was a small settlement of the building above, amounting +to about 1-1/2 in. in the walls and about 5 in. in the ground floors +which were of concrete laid like a sidewalk directly upon the ground. +Whether this settlement was due to ground lost in the shield work or to +a compacting of the ground on account of its being dried out by +compressed air, it is impossible to say. + +The interesting features of this work from East Avenue to the river +shafts are the mining methods and the building of the iron tube without +a shield. + + +EXCAVATION IN ALL ROCK. + +Where the tunnel was all in good rock two distinct methods were used. +The first was the bottom-heading-and-break-up, and the second, the +top-heading-and-bench method. The first is illustrated by Figs. 1 and 2, +Plate LXIII. The bottom heading, 13 ft. wide and 9 ft. high, having +first been driven, a break-up was started by blasting down the rock, +forming a chamber the full height of the tunnel. The timber platform, +shown in the drawing, was erected in the bottom heading, and extended +through the break-up chamber. The plan was then to drill the entire face +above the bottom heading and blast it down upon the timber staging, thus +maintaining a passage below for the traffic from the heading and +break-ups farther down the line. Starting with the condition indicated +by Plate XIII, the face was drilled, the columns were then taken down +and the muck pile was shoveled through holes in the staging into muck +cars below. The face was then blasted down upon the staging, the drill +columns were set up on the muck pile, and the operation was repeated. +This method has the advantage that the bottom heading can be pushed +through rapidly, and from it the tunnel may be attacked at a number of +points at one time. It was found to be more expensive than the +top-heading-and-bench method, and as soon as the depression in the rock +at about Station 59 was passed, a top heading about 7 ft. high, and +roughly the segment of a 23-ft. circle, was driven to the next soft +ground in each of the four tunnels. The remainder of the section was +taken out in two benches, the first, about 4 ft. high, was kept about +15 ft. ahead of the lower bench, which was about the remaining 11 ft. +high. + + +EXCAVATION IN EARTH AND ROCK. + +About 2,500 ft. of tunnel, the roof of which was in soft ground, was +excavated in normal air by the mining-and-timbering method. In the +greater part of this the rock surface was well above the middle of the +tunnel. The method of timbering and mining, while well enough known, has +not been generally used in the United States. + +[Illustration: PLATE LXIII] + +Starting from the break-up in all rock, as described above, and +illustrated on Plate XIII, when soft ground was approached, a top +heading was driven from the rock into and through the earth. This +heading was about 7 ft. high and about 6 ft. wide. This was done by the +usual post, cap, and poling-board method. The ground was a running sand +with little or no clay, and, at first, considerable water, in places. +All headings required side polings. The roof poling boards were about +2-1/2 or 3 ft. above the outside limit of the tunnel lining, as +illustrated by Figs. 3, 4, and 5, Plate LXIII. The next step was to +place two crown-bars, _AA_, usually about 20 ft. long, under the caps. +Posts were then placed under the bars, and poling boards at right angles +to the axis of the tunnel were then driven out over the bars. As these +polings were being driven, the side polings of the original heading were +removed, and the earth was mined out to the end of these new transverse +polings. Breast boards were set on end under the ends of the transverse +polings when they had been driven out to their limit. Side bars, _BB_, +were then placed as far out as possible and supported on raking posts. +These posts were carried down to rock, if it was near, if not, a sill +was placed. + +A new set of transverse polings was driven over these side bars and the +process was repeated until the sides had been carried down to rock or +down to the elevation of the sills supporting the posts, which were +usually about 4 ft. above the axis of the tunnel. + +The plan then was to excavate the remainder of the section and build the +iron lining in short lengths, gradually transferring the weight of the +roof bars of the iron lining as the posts were taken out. This meant +that not more than four rings, and often only one ring, could be built +before excavation and a short length of cradle became necessary. Before +the posts under the roof bars could be built and the weight transferred +to the iron lining, a grout dam was placed at the leading end of the +iron lining, and grout was brought up to at least 45° from the top. Such +workings were in progress at as many as eight places in one tunnel at +the same time. Where there was only the ordinary ground-water to contend +with, the driving of the top heading drained the ground very thoroughly, +and the enlarging was done easily and without a serious loss of ground. +Under these conditions the surface settlement was from 6 in. to 2 ft. + +Under Borden Avenue, there was more water, which probably came from a +leaky sewer; it was not enough to form a stream, but just kept the +ground thoroughly saturated. There was a continued though hardly +perceptible flow of earth through every crevice in the timbering during +the six or eight weeks between the driving of the top heading and the +placing of the iron lining; and here there was a settlement of from 4 to +8 ft. at the surface. + + +TUNNELING IN COMPRESSED AIR WITHOUT A SHIELD. + +When it became evident that there would not be time for one shield to do +the soft ground portions of all four tunnels under the Long Island +Railroad station, a plan was adopted and used in Tunnel B which, while +not as rapid, turned out to be as cheap as the work done by the shields. +Figs. 6 and 7, Plate LXIII, and Fig. 1, Plate LXIV, illustrate this work +fairly well. The operation of this scheme was about as follows: Having +the iron built up to the face of the full-sized excavation, a hole or +top heading, about 3 ft. wide and 4 or 5 ft. high, was excavated to +about 10 ft. in advance. This was done in a few hours without timbering +of any kind; but, as soon as the hole or heading was 10 ft. out, 6 by +12-in. laggings or polings were put up in the roof, with the rear ends +resting on the iron lining and the leading ends resting on vertical +breast boards. The heading was then widened out rapidly and the lagging +was placed, down to about 45° from the crown. The forward ends of the +laggings were then supported by a timber rib and sill. Protected by this +roof, the full section was excavated, and three rings of the iron lining +were built and grouted, and then the whole process was repeated. + +[Illustration: PLATE LXIV, FIG. 1.--TUNNELING IN COMPRESSED AIR WITHOUT +SHIELD.] + +[Illustration: PLATE LXIV, FIG. 2.--T-HEAD AIR-LOCK.] + +[Illustration: PLATE LXIV, FIG. 3.--CUTTING EDGE OF CAISSON ASSEMBLED.] + +[Illustration: PLATE LXIV, FIG. 4.--CAISSON SUPPORTED ON JACKS AND +BLOCKS.] + + +CONCRETE CRADLES, HAND-PACKED STONE AND GROUTING. + +Had the East Avenue Tunnel been built by shields, as was contemplated at +the time of its design, the space between the limits of excavation +and the iron lining would have been somewhat less than by the method +actually used, especially in the earth portions. This space would have +been filled with grout ejected through the iron lining. The change in +the method of doing the work permitted the use of cheaper material, in +place of part of the grout, and, at the same time, facilitated the work. + +The tube of cast-iron rings is adapted to be built in the tail of the +shield. Where no shield was used, after the excavation was completed and +all loose rock was removed, timbers were fixed across the tunnel from +which semicircular ribs were hung, below which lagging was placed. The +space between this and the rough rock surface was filled with concrete. +This formed a cradle in which the iron tube could be erected, and, at +the same time, occupied space which would have been filled by grout, at +greater cost, had a shield been used. + +As soon as each ring of iron was erected, the space between it and the +roof of the excavation was filled with hand-packed stone. At about every +sixth ring a wall of stone laid in mortar was built between the lining +and the rock to serve as a dam to retain grout. The interstices between +the hand-packed stones were then filled with 1 to 1 grout of cement and +sand, ejected through the iron lining. The concrete cradles averaged +1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70 +per cu. yd., of which $2.25 was for labor and $4.45 was for top charges. +The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost +$2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top +charges. + + +ERECTION OF IRON LINING. + +The contractors planned to erect the iron lining with erectors of the +same pattern as that used on the shield under the river, mounted on a +traveling stage. These will be described in detail in Mr. Japp's paper. +Two of these stages and erectors worked in each tunnel at different +points. The tunnel was attacked from so many points that these erectors +could not be moved from working to working. The result was that about +58% of the lining was built by hand. At first thought, this seems to be +a crude and extravagant method, as the plates weighed about 1 ton each +and about 20,000 were erected by hand. As it turned out, the cost was +not greater than for those erected by machinery, taking into account the +cost of erectors and power. This, however, was largely because the hand +erection reduced the amount of work to be done by the machines so much +that the machines had an undue plant charge. + +The hand erection was very simple. A portable hand-winch, with a 3/8-in. +wire rope, was set in any convenient place. The wire rope was carried to +a snatch-block fastened to the top of the iron previously built; or, +where the roof was in soft ground, the timbering furnished points of +attachment. The end of the wire rope was then hooked to a bolt hole in a +new plate, two men at the winch lifted the plate, and three or four +others swung it into approximate place, and, with the aid of bars and +drift-pins, coaxed it into position and bolted it. Where there was no +timbering above the iron, sometimes the key and adjoining plates were +set on blocking on a timber staging and then jacked up to place. + + +LONG ISLAND SHAFTS. + +The river shafts were designed to serve both as working shafts and as +permanent openings to the tunnels, and were larger and more substantial +than would have been required for construction purposes. Plate X of Mr. +Noble's paper shows their design. They consist of two steel caissons, +each 40 by 74 ft. in plan, with walls 5 ft. thick filled with concrete. +A wall 6 ft. thick separated each shaft into two wells 29 by 30 ft., +each directly over a tunnel. Circular openings for the tunnel, 25 ft. in +diameter, were provided in the sides of the caissons. During the sinking +these were closed by bulkheads of steel plates backed by horizontal +steel girders. The shafts were sunk as pneumatic caissons to a depth of +78 ft. below mean high water. There have been a few caissons which were +larger and were sunk deeper than these, but most large caissons have +been for foundations, such as bridge piers, and have been stopped at or +a little below the surface of the rock. The unusual feature of the +caissons for the Long Island shaft is that they were sunk 54 ft. through +rock. + +It had been hoped that the rock would prove sound enough to permit +stopping the caissons at or a little below the surface and continuing +the excavation without sinking them further; for this reason only the +steel for the lower 40 ft. of the caissons was ordered at first. + +The roof of the working chamber was placed 7 ft. above the cutting edge. +It was a steel floor, designed by the contractors, and consisted of +five steel girders, 6 ft. deep, 29 ft. long, and spaced at 5-ft. +centers. Between were plates curved upward to a radius of 4 ft. Each +working chamber had two shafts, 3 ft. by 5 ft. in cross-section, with a +diaphragm dividing it into two passages, the smaller for men and the +larger for muck buckets. On top of these shafts were Moran locks. +Mounted on top of the caisson was a 5-ton Wilson crane, which would +reach each shaft and also the muck cars standing on tracks on the ground +level beside the caissons. Circular steel buckets, 2 ft. 6 in. in +diameter and 3 ft. high, were used for handling all muck. These were +taken from the bottom of the working chamber, dumped in cars, and +returned to the bottom without unhooking. Work was carried on by three +8-hour shifts per day. The earth excavation was done at the rate of +about 67 cu. yd. per day from one caisson. The rock excavation, +amounting to about 6,200 cu. yd. in each caisson, was done at the rate +of about 44.5 cu. yd. per day. The average rate of lowering, when the +cutting edge of the south caisson was passing through earth, was 0.7 ft. +per day. In rock, the rate was 0.48 ft. per day in the south caisson, +and 0.39 ft. per day in the north caisson. + +At the beginning all lowering was done with sixteen hydraulic jacks. +Temporary brackets were fastened to the outside of the caisson. A +100-ton hydraulic jack was placed under each alternate bracket and under +each of the others there was blocking. The jacks were connected to a +high-pressure pump in the power-house. As the jacks lifted the caisson, +the blocking was set for a lower position, to which the caisson settled +as the jacks were exhausted. After the caisson had penetrated the earth +about 10 ft., the outside brackets were removed and the lowering was +regulated by blocking placed under brackets in the working chamber. The +caisson usually rested on three sets of blockings on each side and two +on each end. The blocking was about 4 ft. inside the cutting edge. In +the rock, as the cutting edge was cleared for a lowering of about 2 ft., +6 by 8-in. oak posts were placed under the cutting-edge angle. When a +sufficient number of posts had been placed, the blocking on which the +caisson had rested was knocked or blasted out, and the rock underneath +was excavated. The blocking was then re-set at a lower elevation. The +posts under the cutting edge were then chopped part way through and the +air pressure was lowered about 10 lb., which increased the net weight to +more than 4,000,000 lb. The posts then gradually crushed and the +caissons settled to the new blocking. The tilt or level of the caisson +was controlled by chopping the posts more on the side which was desired +to move first. + +The caisson nearly always carried a very large net weight, usually about +870 tons. The concrete in the walls, which was added as the caisson was +being sunk, was kept at about the elevation of the ground. There was +generally a depth of from 5 to 20 ft. of water ballast on top of the +roof of the working chamber. The air pressure in the working chamber was +usually much less than the hydrostatic head outside the caisson. For +example, the average air pressure in the south caisson during January, +1906, was 16-1/2 lb., while the average head was 62.5 ft., equivalent to +27 lb. per sq. in. Under these conditions, there was a continued but +small leakage into the caisson of from 15,000 to 20,000 gal. per day. + +In the rock the excavation was always carried from 2 to 5 in. outside +the cutting edge. As soon as the cutting edge was cleared, bags of clay +were placed under it in a well-tiered, solid pile, so that when the +caisson was lowered the bags were cut through and most of the clay, bags +and all, was squeezed back of the cutting edge between the rock and the +caisson. + +Table 1 shows the relation of the final position of the caissons to that +designed. + +The cost of rock excavation in the caisson was $4.48 per cu. yd. for +labor and $10.54 for top charges. + +The bottom of the shaft is an inverted concrete arch, 4 ft. thick, +water-proofed with 6-ply felt and pitch. As soon as the caisson was down +to its final position and the excavation was completed, concrete was +deposited on the uneven rock surfaces, brought up to the line of the +water-proofing, and given a smooth 1-in. mortar coat. The felt was stuck +together in 3-ply mats on the surface with hot coal-tar pitch. These +were rolled and sent down into the working chamber, where they were put +down with cold pitch liquid at 60° Fahr. Each sheet of felt overlapped +the one below 6 in. The water-proofing was covered by a 1-in. mortar +plaster coat, after which the concrete of the 4-ft. inverted arch was +placed. While the water-proofing and concreting were being done, the air +pressure was kept at from 30 to 33 lb. per sq. in., the full hydrostatic +head at the cutting edge. After standing for ten days, the air pressure +was taken off, and the removal of the roof of the working chamber was +begun. The water-proofing was done by the Union Construction and +Waterproofing Company. + +TABLE 1.--RELATION OF THE FINAL POSITION OF THE CAISSONS TO THAT +DESIGNED. + +================================================================ +LOCATION.| LONG ISLAND CITY. | +---------------------------------------------------------------- +Shaft. | North. | South. | +---------------------------------------------------------------- +Corner. | High. | East. | North. | High. | East. | North. | +---------------------------------------------------------------- +Northeast|0.21 ft.|0.08 ft.|0.05 ft.|0.32 ft.|0.15 ft.|0.28 ft.| +Northwest|0.22 " |0.08 " |0.02 " |0.00 " |0.15 " |0.12 " | +Southwest|0.27 " |0.14 " |0.02 " |0.18 " |0.45 " |0.12 " | +Southeast|0.23 " |0.14 " |0.05 " |0.39 " |0.45 " |0.28 " | +================================================================ + +============================================================================= +LOCATION.| MANHATTAN. | +----------------------------------------------------------------------------- +Shaft. | North. | South. | +----------------------------------------------------------------------------- +Corner. | High. | East. | South. | High. | East or West.|North or South.| +----------------------------------------------------------------------------- +Northeast|0.23 ft.|0.74 ft.|0.38 ft.|0.00 ft.|0.06 ft. east.|0.04 ft. south.| +Northwest|0.00 " |0.74 " |0.22 " |0.08 " |0.06 " " |0.13 " north.| +Southwest|0.11 " |0.31 " |0.22 " |0.21 " |0.45 " west.|0.13 " " | +Southeast|0.46 " |0.31 " |0.38 " |0.04 " |0.45 " " |0.04 " south.| +============================================================================= + +The cost of labor in compressed air chargeable to concreting was $3.40 +per cu. yd. + +After the roof of each working chamber had been removed, the shield was +erected on a timber cradle in the bottom of the shaft, in position to be +shoved out of the opening in the west side of the caisson. Temporary +rings of iron lining were erected across the shaft in order to furnish +something for the shield jacks to shove against. + +The roof of the working chamber was then re-erected about 35 ft. above +its original position and about 8 ft. above the tunnel openings. This +time, instead of the two small shafts which were in use during the +sinking of the caisson, a large steel shaft with a T-head lock was +built. This is illustrated in Fig. 2, Plate LXIV. The shaft was 8 ft. in +diameter. Inside there was a ladder and an elevator cage for lowering +and hoisting men and the standard 1-yd. tunnel cars. At the top, forming +the head of the T, there were two standard tunnel locks. + + +MANHATTAN SHAFTS. + +A permanent shaft, similar to the river shafts in Long Island City, was +constructed at Manhattan over each pair of tunnels. Each shaft was +located across two lines, with its longer axis transverse to the +tunnels. Plate XIII shows their relative positions. They were divided +equally by a reinforced concrete partition wall transverse to the line +of the tunnels. On completion, the western portions were turned over to +the contractor for the cross-town tunnels for his exclusive use. + +_South Shaft._--Work on the south shaft was started on June 9th, 1904, +with the sinking of a 16 by 16-ft. test pit in the center of the south +half of the south shaft, which reached disintegrated rock at a depth of +about 20 ft. + +Starting in August, the full shaft area, 74 by 40 ft., was taken out in +an open untimbered cut to the rock, and a 20 by 50-ft. shaft was sunk +through the rock to tunnel grade, leaving a 10 or 12-ft. berm around it. +(Fig. 1, Plate LXX.) + +The erection of the caisson was started, about the middle of January, on +the rock berm surrounding the 20 by 50-ft. shaft and about 15 ft. below +the surface. Fig. 3, Plate LXIV, shows the cutting edge of the caisson +assembled. The excavation of the small shaft had shown that hard rock +and only a very small quantity of water would be encountered, and that +the caisson need be sunk only a short distance below the rock surface. +Therefore, no working-chamber roof was provided, the caisson was built +to a height of only 40 ft., and the circular openings were permanently +closed. + +The assembling of the caisson took 2-1/2 months, and on April 2d +lowering was started. Inverted brackets were bolted temporarily to the +cutting-edge stiffening brackets, and the sinking was carried on by +methods similar to those used at Long Island. The jacks and blocking +supporting the caisson are shown in Fig. 4, Plate LXIV. As soon as the +cutting edge entered the rock, which was drilled about 6 in. outside of +the neat lines, the space surrounding the caisson was back-filled with +clay and muck to steady it and provide skin friction. As the friction +increased, the walls were filled with concrete, and as the caisson +slowly settled, it was checked and guided by blocking. The cutting edge +finally came to rest 31 ft. below mean high water, the sinking having +been accomplished in about seven weeks, at an average rate of 0.50 ft. +per day. + +The final position of the cutting edge in relation to its designed +position is shown in Table 1. + +A berm about 4 ft. wide was left at the foot of the caisson below which +the rock was somewhat fissured and required timbering. The cutting edge +of the caisson was sealed to the rock with grout on the outside and a +concrete base to the caisson walls on the inside, the latter resting on +the 4-ft. berm. Following the completion of the shaft, the permanent +sump was excavated to grade for use during construction. + +_North Shaft._--The north shaft had to be sunk in a very restricted +area. The east side of the caisson cleared an adjoining building at one +point by only 1 ft., while the northwest corner was within the same +distance of the east line of First Avenue. As in the case of the Long +Island shafts, the steelwork for only the lower 40 ft. was ordered at +the start. This height was completely assembled before sinking was +begun. The caisson was lowered in about the same manner as those +previously described. The bearing brackets for the hydraulic jacks were +attached, as at the south shaft, to the inside of the cutting-edge +brackets. The east side of the caisson was in contact with the +foundations of the neighboring building, while the west side was in much +softer material. As a consequence, the west side tended to settle more +rapidly and thus throw the caisson out of level and position. To +counteract that tendency, it was necessary to load the east wall heavily +with cast-iron tunnel sections, in addition to the concrete filling in +the walls. + +Soon after sinking was begun, a small test shaft was sunk to a point +below the elevation of the top of the tunnels. The rock was found to be +sound, hard, and nearly dry. It was then decided to stop the caisson as +soon as a foundation could be secured on sound rock. The latter was +found at a depth of 38 ft. below mean high water. With the cutting edge +seated at that depth, the top of the caisson was only 2 ft. above mean +high water, and as this was insufficient protection against high tides, +a 10-ft. extension was ordered for the top. Work, however, went on +without delay on the remainder of the excavation. The junction between +the cutting edge and the rock was sealed with concrete and grout. The +caisson was lowered at an average rate of 0.53 ft. per day. The size of +the shaft below the cutting edge was 62 ft. 7 in. by 32 ft. The average +rate of excavation during the sinking in soft material was 84 cu. yd. +per day. The average rate of rock excavation below the final position of +the cutting edge was 125 cu. yd. per day. There were night and day +shifts, each working 10 hours. Excavation in earth cost $3.96 per cu. +yd., of which $1.45 was for labor and $2.51 for top charges, etc. The +excavation of rock cost $8.93 per cu. yd., $2.83 being for labor and +$6.10 for top charges. + +The final elevations of the four corners of the cutting edge, together +with their displacement from the desired positions, are shown in Table +1. + + +RIVER TUNNELS. + +The four river tunnels, between the Manhattan and Long Island City +shafts, a distance of about 3,900 ft., were constructed by the shield +method. Eight shields were erected, one on each line in each shaft, the +four from Manhattan working eastward to a junction near the middle of +the river with the four working westward from Long Island City. Toward +the end of the work it was evident that the shields in Tunnels _B_, _C_, +and _D_ would meet in the soft material a short distance east of the +Blackwell's Island Reef if work were continued in all headings. In order +that the junction might be made in firm material, work from Manhattan in +those three tunnels was suspended when the shields reached the edge +of the ledge. The shields in Tunnel _A_ met at a corresponding point +without the suspension of work in either. An average of 1,760 ft. of +tunnel was driven from Manhattan and 2,142 ft. from Long Island City. + +[Illustration: PLATE LXV, FIG. 1.--SHIELD FITTED WITH SECTIONAL SLIDING +HOODS AND SLIDING EXTENSIONS TO THE FLOORS.] + +[Illustration: PLATE LXV, FIG. 2.--SHIELD FITTED WITH FIXED HOODS AND +FIXED EXTENSIONS TO THE FLOORS.] + + +TUNNELS DRIVEN EASTWARD FROM MANHATTAN. + +_Materials and Inception of Work._--The materials encountered are shown +in the profile on Plate XIII, and were similar in all the tunnels. In +general, they were found to be about as indicated in the preliminary +borings. The materials met in Tunnel _A_ may be taken as typical of all. + +From the Manhattan shaft eastward, in succession, there were 123 ft. of +all-rock section, 87 ft. of part earth and part rock, 723 ft. of all +earth, 515 ft. of part rock and part earth, 291 ft. of all rock, and 56 +ft. of part rock and part earth. + +The rock on the Manhattan side was Hudson schist, while that in the reef +was Fordham gneiss. Here, as elsewhere, they resembled each other +closely; the gneiss was slightly the harder, but both were badly seamed +and fissured. Wherever it was encountered in this work, the rock surface +was covered by a deposit of boulders, gravel, and sand, varying in +thickness from 4 to 10 ft. and averaging about 6 ft. + +The slope of the surface of the ledge on the Manhattan side averaged +about 1 vertical to 4 horizontal. The rock near the surface was full of +disintegrated seams, and was badly broken up. It was irregularly +stratified, and dipped toward the west at an angle of about 60 degrees. +Large pieces frequently broke from the face and slid into the shield, +often exposing the sand. The rock surface was very irregular, and was +covered with boulders and detached masses of rock embedded in coarse +sand and gravel. The sand and gravel allowed the air to escape freely. +By the time the shields had entirely cleared the rock, the material in +the face had changed to a fine sand, stratified every few inches by very +thin layers of chocolate-colored clayey material. This is the material +elsewhere referred to as quicksand. As the shield advanced eastward, the +number and thickness of the layers of clay increased until the clay +formed at least 20% of the entire mass, and many of the layers were 2 +in. thick. + +At a distance of about 440 ft. beyond the Manhattan ledge, the material +at the bottom of the face changed suddenly to one in which the layers +of clay composed probably 98% of the whole. The sand layers were not +more than 1/16 in. thick and averaged about 2 in. apart. The surface of +the clay rose gradually for a distance of 40 ft. in Tunnels _A_ and _B_, +and 100 ft. in Tunnels _C_ and _D_, when gravel and boulders appeared at +the bottom of the shield. At that time the clay composed about one-half +of the face. + +The surfaces of both the clay and gravel were irregular, but they rose +gradually. After rock was encountered, the formations of gravel and clay +were roughly parallel to the rock surface. + +As the surface of the rock rose they disappeared in order and were again +encountered when the shields broke out of rock on the east side of the +Blackwell's Island Reef. East of the reef a large quantity of coarse +open sand was present in the gravel formations before the clay appeared +below the top of the cutting edge. In Tunnels _C_ and _D_ this was +especially difficult to handle. It appears to be a reasonable assumption +that the layer of clay was continuous across the reef. Wherever the clay +extended above the top of the shield it reduced the escape of air +materially. It is doubtless largely due to this circumstance that the +part-rock sections in the reef were not the most difficult portions of +the work. + +While sinking the lower portions of the shafts the tunnels were +excavated eastward in the solid rock for a distance of about 60 ft., +where the rock at the top was found to be somewhat disintegrated. This +was as far as it was considered prudent to go with the full-sized +section without air pressure. At about the same time top headings were +excavated westward from the shafts for a distance of 100 ft., and the +headings were enlarged to full size for 50 ft. The object was to avoid +damage to the shaft and interference with the river tunnel when work was +started by the contractor for the cross-town tunnel. + +[Illustration: PLATE LXVI, FIG. 1.--REAR OF SHIELD SHOWING COMPLETE +FITTINGS.] + +[Illustration: PLATE LXVI, FIG. 2.--SHIELD WITH LOWER PORTION OF +BULKHEAD REMOVED.] + +The shields were erected on timber cradles in the shaft, and were shoved +forward to the face of the excavation. Concrete bulkheads, with the +necessary air-locks, were then built across the tunnels behind the +shields. The shields were erected before the dividing walls between the +two contracts were placed. Rings of iron tunnel lining, backed by +timbers spanning the openings on the west side, were erected temporarily +across the shafts in order to afford a bearing for the shield jacks +while shoving into the portals. The movement of the shield eastward was +continued in each tunnel for a distance of about 60 ft., and the +permanent cast-iron tunnel lining was erected as the shield advanced. +Before breaking out of rock, it was necessary to have air pressure in +the tunnels. This required the building of bulkheads with air-locks +inside the cast-iron linings just east of the portals. Before erecting +the bulkheads it was necessary to close the annular space between the +iron tunnel lining and the rock. The space at the portal was filled with +a concrete wall. After about twenty permanent rings had been erected in +each tunnel, two rings were pulled apart at the tail of the shield and a +second masonry wall or dam was built. The space between the two dams was +then filled with grout. To avoid the possibility of pushing the iron +backward after the air pressure was on, rings of segmental plates, 5/8 +in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential +joints in each tunnel between the rings as they were erected. The plates +contained slotted holes to match those in the segments. After the rings +left the shield, the plates were driven outward, and projected about 5 +in. When the tunnel was grouted, the plates were embedded. + +The bulkheads were completed, and the tunnels were put under air +pressure on the following dates: + +Line _D_, on October 5th, 1905; +Line _C_, on November 6th, 1905; +Line _B_, on November 25th, 1905; +Line _A_, on December 1st, 1905. + +This marked the end of the preparatory period. + +In the deepest part of the river, near the pier-head line on the +Manhattan side, there was only 8 ft. of natural cover over the tops of +the tunnels. This cover consisted of the fine sand previously described, +and it was certain that the air would escape freely from the tunnels +through it. To give a greater depth of cover and to check the loss of +air, the contractor prepared to cover the lines of the tunnels with +blankets of clay, which, however, had been provided for in the +specifications. Permits, as described later, were obtained at different +times from the Secretary of War, for dumping clay in varying thicknesses +over the line of work. The dumping for the blanket allowed under the +first permit was completed in February, 1906. The thickness of this +blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan +side. The original blanket was of material advantage, but the depth of +clay was insufficient to stop the loss of air. + +The essential parts of the shields in the four tunnels were exactly +alike. Those in Tunnels _B_ and _D_, however, were originally fitted +with sectional sliding hoods and sliding extensions to the floors of the +working chambers, as shown by Fig. 1, Plate LXV. The shields in Tunnels +_A_ and _C_ were originally fitted with fixed hoods and fixed extensions +to the floors, as shown in Fig. 2, Plate LXV. A full description of the +shields will be found in Mr. Japp's paper. + +The shields in each pair of tunnels were advanced through the solid rock +section about abreast of each other, until test holes from the faces +indicated soft ground within a few feet. As the distance between the +sides of the two tunnels was only 14 ft., it was thought best to let +Tunnels _B_ and _D_ gain a lead of about 100 ft. before Tunnels _A_ and +_C_ opened out into soft ground, in order that a blow from one tunnel +might not extend to the other. Work in Tunnel _C_ was shut down on +December 23d, 1905, after exposing sand to a depth of 3 ft. at the top, +and it remained closed for seven weeks. Work in Tunnel _A_ was suspended +on September 29th, 1905. By the time Tunnel _B_ had made the required +advance, it, together with Tunnels _C_ and _D_, was overtaxing the +capacities of the compressor plant. Only a little work was done in +Tunnel _C_ until July, 1906, and work in Tunnel _A_ was not resumed +until October 22d, 1906. + + +TUNNELS DRIVEN WESTWARD FROM LONG ISLAND CITY. + +_Materials and Inception of the Work._--The materials met in Tunnel A +are typical of all four tunnels. From the Long Island shafts westward, +in succession, there were 124 ft. of all-rock section, 125 ft. of part +rock and part earth section, 22 ft. of all-rock section, 56 ft. of part +rock and part earth section, 387 ft. of all-rock section, 70 ft. of part +earth and part rock section, and 1,333 ft. of all-earth section. + +[Illustration: PLATE LXVII] + +The materials passed through are indicated on Plate XIII. The rock was +similar to that of the Blackwell's Island Reef, and was likewise covered +by a layer of sand and boulders. The remainder of the soft ground was +divided into three classes. The first was a very fine red sand, which +occurred in a layer varying in thickness from 6 ft. to at least 15 ft. +It may have been much deeper above the tunnel. It is the quicksand +usually encountered in all deep foundations in New York City. The +following is the result of the sifting test of this sand: + + Held on No. 30 sieve 0.6% +Passed No. 30, " " No. 40 " 0.4% + " No. 40, " " No. 50 " 0.7% + " No. 50, " " No. 60 " 2.4% + " No. 60, " " No. 80 " 14.9% + " No. 80, " " No. 100 " 54.0% + " No. 100, " " No. 200 " 8.0% + " No. 200 " 19.0% + ------ + 100.0% + +This means that grains of all but 4% of it were less than 0.0071 in. in +diameter. The 19% which passed the No. 200 sieve, the grains of which +were 0.0026 in. or less in diameter, when observed with a microscope +appeared to be perfectly clean grains of quartz; to the eye it looked +like ordinary building sand, sharp, and well graded from large to small +grains. This sand, with a surplus of water, was quick. With the water +blown out of it by air pressure, it is stable, stands up well, and is +very easy to work. It appears to be the same as the reddish quicksand +found in most deep excavations around New York City. + +The second material was pronounced "bull's liver" by the miners as soon +as it was uncovered. "Bull's liver" seems to be a common term among +English-speaking miners the world over. It is doubtful, however, if it +is always applied to the same thing. In this case it consisted of layers +of blue clay and very fine red sand. The clay seemed to be perfectly +pure and entirely free from sand. It would break easily with a clean, +almost crystalline, fracture, and yet it was soft and would work up +easily. The layers of clay varied in thickness from 1/16 in. to 1 in., +while the thickness of the sand layer varied from 1/4 in. to several +inches. The sand was the same as the quicksand already described. + +The "bull's liver" was ideal material in which to work a shield. It +stood up as well and held the air about as well as clay, and was much +easier to handle. + +The third material was a layer of fine gray sand which was encountered +in the top of all the tunnels for about 400 ft. just east of Blackwell's +Island Reef. It was very open, and had grains of rather uniform size. + +During the starting out of the tunnels from the shafts, and for more +than a year afterward, the roof of the working chamber in the caissons +and the locks previously described under the Long Island shafts took the +place of the bulkhead across the tunnels for confining the air pressure. + +The first work in air pressure was to remove the shield plug closing the +opening in the side of the shaft. This being done, the shield was shoved +through the opening, and excavation begun. + +At the start the shields were fitted with movable platforms, but no +hoods of any kind were placed until after the rock excavation was +completed. + + +METHODS OF EXCAVATION. + +The distribution of materials to be excavated, as previously outlined, +divided the excavation into three distinct classes, for which different +methods had to be developed. + +These three classes were: + +_First._--All-rock section. +_Second._--Rock in the bottom, earth in the top. +_Third._--All-earth section. + +The extent of the second and third classes was much greater than that of +the first, and they, of course, determined the use of the shield. +Shields had not previously been used extensively in rock work, either +where the face was wholly or partly in rock, and it was necessary to +develop the methods by experience. The specifications required that +where rock was present in the bottom, a bed of concrete should be laid +in the form of a cradle on which to advance the shield. + +_All Rock._--At different times, three general methods were used for +excavating in all-rock sections. They may be called: The bottom-heading +method; the full-face method; and the center-heading method. + +The bottom-heading method was first tried. A heading, about 8 ft. high +and 12 ft. wide, was driven on the center line, with its bottom as +nearly as possible on the grade line of the bottom of the tunnel. It was +drilled in the ordinary manner by four drills mounted on two columns. +The face of the headings varied from 10 to 30 ft. in advance of the +cutting edge. After driving the heading for about 10 ft., the bottom was +cleared out and a concrete cradle was set. The width of the cradles +varied, but was generally from 8 to 10 ft. + +The excavation was enlarged to full size as the shield advanced, the +drills being mounted in the forward compartments of the shield, as +shown by Fig. 1, Plate LXVII, which represents the conditions after the +opening had been cut in the bulkhead, but before the new methods, +mentioned later, had been developed. + +[Illustration: PLATE LXVIII] + +The sides and top were shot downward into the heading. The area of the +face remaining behind the heading was large, and a great number of holes +and several rounds were required to fire the face to advantage. As soon +as firing was started at the face, the heading was completely blocked, +and operations there had to be suspended until the mucking was nearly +completed. The bottom-heading method was probably as good as any that +could be devised for use with the shields as originally installed. All +the muck had to be taken from the face by hand and handled through the +chutes or doors. By drilling from the shield, some muck was blasted on +to the extensions of the floors and could be handled from the upper +compartments. At best, however, the shield with the closed transverse +bulkhead was a serious obstacle to rapid work in rock sections. + +The full-face method was only used where the rock was not considered +safe for a heading. A cut was fired at the bottom, together with side +holes, in a manner quite similar to that adopted in the first set of +holes for a bottom heading. The cradle was then placed, in lengths of +either 2.5 or 5 ft., after which the remainder of the face was fired in +the same manner as for the bottom-heading method. The closed transverse +bulkhead with air-locks, as shown in Fig. 1, Plate LXVI, was placed in +the shield in the hope that it would only be necessary to maintain the +full air pressure in the working compartments in front of the bulkhead. +It was also thought that some form of bulkhead which could be closed +quickly and tightly would be necessary to prevent flooding the tunnel in +case of blows. While no attempt was ever made to reduce the pressure +behind the shield bulkhead, it was obvious from the experience with +Tunnels _B_ and _D,_ while working in the sand between Manhattan and the +reef, that the plan was not practicable, and that the closed bulkhead in +the bottom was a hindrance instead of a safeguard. As soon as rock was +encountered in those tunnels at the west edge of the reef, the +contractor cut through the bulkheads and altered them, as shown in Fig. +2, Plate LXVI. + +Taking advantage of the experience gained, openings were cut through the +bulkheads in Shields _A_ and _C_, while they were shut down near the +edge of the Manhattan ledge. In erecting the shields at Long Island +City in May and June, 1906, openings were also provided. These shields +had to pass through about 700 ft. of rock at the start, the greater +portion of which was all-rock section. It was at that point that +openings were first used extensively and methods were developed, which +would not have been possible except where ears could be passed through +the shield. The bottom-heading method was first tried, but the working +space in front of the shield was cramped, and but few men could be +employed in loading the cars. To give more room, the heading was +gradually widened. The enlargement at the top, when made from the +shield, blocked all work at the face of the heading while the former +operation was in progress. To reduce the delays, the heading was raised, +thus reducing the quantity of rock left in the top, and the bottom was +taken out as a bench. To avoid blocking the tracks when firing the top, +a heavy timber platform was built out from the floors of the middle +working compartments. Most of the muck from the top was caught on the +platform and dropped into cars below. This method of working is shown by +Fig. 2, Plate LXVII. The platforms were not entirely satisfactory, and, +later, the drills in the heading were turned upward and a top bench was +also drilled and fired, as shown by Fig. 3, Plate LXVII. There was then +so little excavation left in the top that the muck was allowed to fall +on the tracks and was quickly cleared away. The method just outlined is +called the center-heading method, and was the most satisfactory plan +devised for full-rock sections. + +_Excavation in Part Rock and Part Earth._--This was probably the most +difficult work encountered, particularly when the rock was covered with +boulders and coarse sharp sand which permitted a free escape of air. It +was necessary, before removing the rock immediately under the soft +ground, to excavate the earth in advance of the shield to a point beyond +where the rock was to be disturbed, and to support, in some way, the +roof, sides, and face of the opening thus made. The hoods were designed +mainly for the purpose of supporting the roof and the sides. With the +fixed hood it was necessary either to excavate for the distance of the +desired shove in front of it or else to force the hood into the +undisturbed material. To avoid this difficulty, the sliding hoods were +tried as an experiment. + +In using the sliding hood, which will be described in detail in Mr. +Japp's paper, the segments commencing at the top were forced forward by +the screw rod, one at a time, as far as possible into the undisturbed +material. Just enough material was then removed from underneath and in +front of the section to free it, and it was again forced forward. These +operations were repeated until the section had been extended far enough +for a shove. As soon as two or three sections had been pushed forward in +this way, the face near the advance end of the sliding hood was +protected by a breast board set on edge and braced from the face. +Gradually, all the segments were worked forward, and, at the same time, +the whole soft ground face was sheeted with timber. At times polings +were placed over the extended segments in order to make room for a +second shove, as shown on Plate LXVIII. When the shield was advanced the +nuts on the screw rods were loosened and the sections of the hoods were +telescoped on to the shield. The idea was ingenious, but proved +impracticable, because of the unequal relative movements of the top and +bottom of the shield in shoving, bringing transverse strains on the hood +sections. + +[Illustration: PLATE LXIX] + +With the fixed hood, poling boards were used to support the roof and +sides, and the face was supported in the manner described for the +sliding hoods. The polings were usually maple or oak planks, 2 in. +thick, about 8 in. wide, and 6-1/2 ft. long. In advancing the face, the +top board of the old breast was first removed, then the material was +carefully worked out for the length of the poling. The latter was then +placed, with the rear end resting over the hood and the forward end +forced as far as possible into the undisturbed material. When two or +three polings had been placed, a breast board was set. After several +polings were in position, their forward ends were supported by some form +a cantilever attached to the hood. Plate LXIX shows one kind of +supports. In this way all the soft material was excavated down to the +rock surface, and the roof, sides, and face were sheeted with timber. In +shoving, the polings in the roof and sides were lost. It was found that +the breast could usually be advanced 5 ft. with safety. The fixed hood +made it possible to set the face about 7 or 8 ft. in front of the +cutting edge without increasing the length of the polings. This distance +was ample for two shoves, and was generally adopted, although a great +many faces were set for one shove only. + +Fixed hoods were substituted for those of the sliding type, originally +placed on Shields _B_ and _D_ at Manhattan, at about the time the latter +encountered the rock at the reef. + +In placing the polings and breasting, all voids behind them were filled +as far as possible with marsh hay or bags of sawdust or clay. To prevent +loss of air in open material, the joints between the boards were +plastered with clay especially prepared for the purpose in a pug mill. +The sliding extensions to the floors of the working compartments were +often used, in the early part of the work, to support the timber face or +loose rock, as shown in Fig. 1, Plate LXVIII. At such times the front of +the extensions was held tightly against the planking by the pressure of +the floor jacks. While shoving, the pressure on the floor jacks was +gradually released, allowing the floors to slide back into the shield +and still afford support to the face. The extensions also afforded +convenient working platforms. They were subject to severe bending +strains while the shield was being shoved, however, and the cast-iron +rams were frequently broken or jammed. The extensions did not last +beyond the edge of the ledge at Manhattan, nor more than about half +through the rock work at Long Island City. The fixed extensions +originally placed on Shields _A_ and _C_ at Manhattan were not +substantial enough, and lasted only a few days. + +Wherever the rock face was sufficiently sound and high, a bottom heading +was driven some 20 or 30 ft. in advance of the shield. The heading was +driven and the cradle placed independently of the face of the soft +ground above, and in the manner described for all-rock sections. The +remainder of the rock face was removed by firing top and side rounds +into the bottom heading after the soft ground had been excavated. Great +care had to be taken in firing in order not to disturb the timber work +or break the rock away from under the breast boards. If either occurred, +a serious run was likely to follow. The bottom-heading method is shown +by Figs. 1, 2, and 3, Plate LXVIII, and the breasting and poling by Fig. +2, Plate LXX. + +In the early part of the work, where a bottom heading was impracticable, +the soft ground was first excavated as described above, and the rock was +drilled by machines mounted on tripods, and fired as a bench. By this +plan no drilling could be done until the soft ground was removed. This +is called the rock-bench method. + +Later the rock-cut method was devised. Drills were set up on columns in +the bottom compartments of the shield, and the face was drilled while +work was in progress on the soft ground above. The drilling was done +either for a horizontal or vertical cut and side and top rounds. The +drillers were protected while at work by platforms of timber built out +from the floors of the compartments above. This plan, while probably not +quite as economical of explosives, saved nearly all the delay due to +drilling the bench. + +[Illustration: PLATE LXX, FIG. 1.--SMALL SHAFT SUNK TO ROCK.] + +[Illustration: PLATE LXX, FIG. 2.--BREASTING AND POLING IN FRONT OF +SHIELD.] + +[Illustration: PLATE LXX, FIG. 3.--SHUTTERS ON FRONT OF SHIELD.] + +[Illustration: PLATE LXX, FIG. 4.--HYDRAULIC ERECTOR PLACING SEGMENT.] + +_All-Earth Section._--As described by Messrs. Hay and Fitzmaurice, in a +paper on the Blackwall Tunnel,[C] the contractor had used, with marked +success, shutters in the face of the shield for excavating in loose open +material. He naturally adopted the method for the East River work. When +the shields in Tunnels _B_ and _D_, at Manhattan, the first to be driven +through soft ground, reached a point under the actual bulkhead line, +work was partly suspended and shutters were put in place in the face of +the top and center compartments. The shutters in the center compartments +in Shield _D_ are shown in Fig. 3, Plate LXX, while the method of work +with the shutters is shown by Figs. 4, 5, 6, and 7, Plate LXVIII. Fig. 4 +on that plate shows the shield ready for a shove. As the pressure was +applied to the shield jacks, men loosened the nuts on the screws holding +the ends of the shutters, and allowed the latter to slide back into the +working compartments. At the end of the shove, the shutters were in the +position shown in Fig. 5, Plate LXVIII. In preparing for a new shove, +the slides in the shutters were opened, and the material in front was +raked into the shield. At the same time, the shutters were gradually +worked forward. The two upper shutters in a compartment were generally +advanced from 12 to 15 in., after which the muck could be shoveled out +over the bottom shutters, as shown on Fig. 6, Plate LXVIII, and Fig. 3, +Plate LXX. No shutters were placed in the bottom compartments, and as +the air pressure was not generally high enough to keep the face dry at +the bottom, these compartments were pretty well filled with the soft, +wet quicksand. Just before shoving, this material was excavated to a +point where it ran in faster than it could be taken out. Much of the +excavation in the bottom compartment was done by the blow-pipe. During +the shove the material from the bottom compartment often ran back +through the open door in the transverse bulkhead, as shown by Fig. 5, +Plate LXVIII. + +In the Blackwall Tunnel the material was reported to have been loose +enough to keep in close contact with the shutters at all times. In the +East River Tunnels this was not the case. The sand at the top was dry +and would often stand with a vertical face for some hours. In advancing +the shutters, it was difficult to bring them into close contact with the +face at the end of the operation. The soft material at the bottom was +constantly running into the lower compartment and undermining the stiff +dry material at the top. The latter gradually broke away, and, at times, +the actual face was some feet in advance of the shutters. Under those +circumstances, the air escaped freely through the unprotected sand face. +The joints of the shutters were plastered with clay, but this did not +keep the air from passing out through the lower compartments. This +condition facilitated the formation of blows, which were of constant +occurrence where shutters were used in the sand. In Tunnels _B_ and _D_, +at Manhattan, the shutters were used in the above manner clear across to +the reef. In Tunnel _C_, which was considerably behind Tunnels _B_ and +_D_, the shutters, although placed, were never used against the face, +and the excavation was carried on by poling the top and breasting the +face. The change resulted in much better progress and fewer blows. The +excavation through the soft material in Tunnel _C_ had just been +completed when Tunnel _A_ was started, and the gangs of workmen were +exchanged. + +The work in soft ground in Tunnel _A_ thus gained the benefit of the +experience in Tunnel _C_. Shutters were placed only in the top +compartments in this tunnel, and, as in Tunnel _C_, were never used in +contact with the face. The method of work is shown by Figs. 1, 2, and 3, +Plate LXXI. The result was still more rapid progress in Tunnel _A_, and +although the loss of air was fully as great in this tunnel as in the +other three, there was only one blow which caused any considerable loss +of pressure. In Tunnels _A_ and _C_ the diaphragms in the rear of the +center compartments of the lower tiers of working chambers were removed +before the shields entered the soft ground. The change was not of as +much advantage in soft ground as in rock, but it facilitated the removal +of the soft wet sand in the bottom. In Tunnel _A_, after encountering +gravel, a belt conveyor was suspended from the traveling stage with one +end projecting through the opening into the working compartment. The use +of the conveyor made it possible to continue mucking at the face while +the bottom plates of the iron lining were being put in place, and +resulted in a material increase in the rate of progress. + +[Illustration: PLATE LXXI] + +The shutters were not placed on the Long Island shields at all. Just +before the shields passed into all soft ground, a fixed hood was +attached to each. + +The method of working in soft ground from Long Island City is +illustrated by Plate LXXII. The full lines at the face of the shield +show the position of the earth before a shove of the shield, and the +dotted lines show the same after the shove. The face was mined out to +the front of the hood and breasted down to a little below the floor of +the top pockets of the shield. In the middle pocket the earth was +allowed to take its natural slope back on the floor. Toward the rear of +the bottom pockets it was held by stop-planks. The air pressure was +always about equal to the hydrostatic head at the middle of the shield, +so that the face in the upper and middle pockets was dry. In the lower +pockets it was wet, and flowed under the pressure of shoving the shield. +By this method 4,195 lin. ft. of tunnel was excavated by the four Long +Island shields in 120 days, from November 1st, 1907, to March 1st, 1908. +This was an average of 8.74 ft. per day per shield. + +The rate of progress, the nature of the materials, and the methods +adopted are shown in Table 2. + +_Preparations for Junction of Shields._--As previously mentioned, the +Manhattan shields were stopped at the edge of the reef. Before making +the final shove of those shields, special polings were placed with +unusual care. The excavation was bell-shaped to receive the Long Island +shields. The arrangement of the polings is shown by Figs. 4 and 5, Plate +LXXI. After the shields were shoved into final position, as shown at the +right in Fig. 5, the rear end of the polings rested over the cutting +edge and allowed room for the removal of the hood. After the latter had +been accomplished, the temporary bulkheads of concrete and clay bags +were built as a precaution against blows when the shields were close +together. An 8-in. pipe was then driven forward through the bulkhead for +distances varying from 30 to 100 ft., in order to check the alignment +and grade between the two workings before the shields were actually +shoved together. The errors in the surveys were negligible, but here, as +elsewhere, the shields were not exactly in the desired position, and it +took careful handling to bring the cutting edges together. The Long +Island shields were driven to meet those from Manhattan. + +TABLE 2.--RATE OF PROGRESS, NATURE OF MATERIALS, AND METHODS ADOPTED IN +CONSTRUCTION OF EAST RIVER TUNNELS. + +LINE A, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +All rock |Bottom heading | 69+39.9 | 69+79 |Aug. 2, '06|Sept 25, '06| + | | | | | | +All rock |Center heading | 69+79 | 70+64 |Sept 25, '06|Nov. 21, '06| + | | | | | | +Earth and rock|Center heading | 70+64 | 71+34 |Nov. 21, '06|Dec. 30, '06| + | | | | | | +Earth and rock|Bottom heading | 71+34 | 71+89 |Dec. 30, '06|Feb. 13, '07| + | | | | | | +All rock |Bottom heading | 71+89 | 72+11 |Feb. 13, '07|Feb. 21, '07| + | | | | | | +Earth and rock|Center heading | 72+11 | 72+67 |Feb. 21, '07|Mar. 19, '07| + | | | | | | +All rock |Center heading | 72+67 | 76+54 |Mar. 19, '07|Sept 6, '07| + | | | | | | +Earth and rock|Going out of rock| 76+54 | 77+24 |Sept 6, '07|Oct. 4, '07| + | | | | | | +All earth |Soft ground | 77+24 | 90+57.3 |Oct. 4, '07|Mar. 26, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +All rock | 54 | 39.1 | 0.724 | | + | | | | | +All rock | 57 | 85 | 1.49 | | + | | | | | +Earth and rock| 39 | 70 | 1.79 | | + | | | | | +Earth and rock| 45 | 55 | 1.22 | | + | | | | | +All rock | 8 | 22 | 2.75 | | + | | | | | +Earth and rock| 26 | 56 | 2.15 | | + | | | | | +All rock | 171 | 387 | 2.26 | | + | | | | | +Earth and rock| 28 | 70 | 2.50 | | + | | | | | +All earth | 174 |1,333.3 | 7.66 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE B, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +All rock |Bottom heading | 69+29.6 | 70+46 |Oct. 16, '06|Nov. 20, '06| + | | | | | | +Earth and rock|Bottom heading | 70+46 | 71+95 |Nov. 20, '06|Feb. 23, '07| + | | | | | | +All rock |Bottom heading | 71+95 | 72+25 |Feb. 23, '07|Mar. 6, '07| + | | | | | | +Earth and rock|Center heading | 72+25 | 72+60 |Mar. 6, '07|Mar. 24, '07| + | | | | | | +All rock |Going out of rock| 72+60 | 76+57 |Mar. 24, '07|Aug. 7, '07| + | | | | | | +Earth and rock|Soft ground | 76+57 | 77+30 |Aug. 7, '07|Sept 5, '07| + | | | | | | +All earth |Soft ground | 77+30 | 90+49.6 |Sept 5, '07|Mar. 19, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +All rock | 35 | 116.4 | 3.33 | | + | | | | | +Earth and rock| 95 | 149 | 1.57 | | + | | | | | +All rock | 11 | 30 | 2.73 | | + | | | | | +Earth and rock| 18 | 35 | 1.94 | | + | | | | | +All rock | 136 | 397 | 2.92 | | + | | | | | +Earth and rock| 29 | 73 | 2.52 | | + | | | | | +All earth | 196 |1,319.6 | 6.73 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE C, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +All rock |Bottom heading | 68+61.9 | 69+93 |June 11, '06|Oct. 16, '06| + | | | | | | +Earth and rock|Bottom heading | 69+93 | 71+65 |Oct. 16, '06|Feb. 7, '07| + | | | | | | +All rock |Bottom heading | 71+65 | 71+91 |Feb. 7, '07|Feb. 13, '07| + | | | | | | +All rock |Center heading | 71+91 | 75+81 |Feb. 13, '07|July 20, '07| + | | | | | | +Earth and rock|Going out of rock| 75+81 | 76+56 |July 20, '07|Aug. 25, '07| + | | | | | | +All earth |Soft ground | 76+56 | 90+44.4 |Aug. 25, '07|Mar. 17, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +All rock | 127 | 131.1 | 1.03 | | + | | | | | +Earth and rock| 114 | 172 | 1.51 | | + | | | | | +All rock | 6 | 26 | 4.33 | | + | | | | | +All rock | 157 | 390 | 2.48 | | + | | | | | +Earth and rock| 36 | 75 | 2.08 | | + | | | | | +All earth | 205 |1,388.4 | 6.77 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE D, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +Rock |Bottom heading | 68+50.6 | 69+77 |June 2, '06|Oct. 24, '06| + | | | | | | +Earth and rock|Bottom heading | 69+77 | 71+22 |Oct. 24, '06|Jan. 13, '06| + | | | | | | +All rock |Bottom heading | 71+23 | 72+00 |Jan. 13, '07|Mar. 3, '07| + | | | | | | +All rock |Center heading | 72+00 | 75+73 |Mar. 3, '07|July 10, '07| + | | | | | | +Earth and rock|Going out of rock| 75+73 | 77+63 |July 10, '07|Sept 25, '07| + | | | | | | +All earth |Soft ground | 77+63 | 90+38.6 |Sept 25, '07|Mar. 7. '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +Rock |144 | 126.4 | 0.87 | | + | | | | | +Earth and rock| 81 | 145 | 1.79 | | + | | | | | +All rock | 49 | 78 | 1.59 | | + | | | | | +All rock |129 | 373 | 2.89 | | + | | | | | +Earth and rock| 77 | 190 | 2.47 | | + | | | | | +All earth |164 |1,275.6 | 7.78 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE A, MANHATTAN. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |108+43 |107+74 |July 20, '05|Aug. 3, '05| +Rock {|Top lift of bench|108+43 |107+74 |Aug. 8, '05|Aug. 23, '05| + {|Bottom lift of |108+43 |107+74 |Aug. 30, '05|Sept 27, '05| + {| bench | | | | | + | | | | | | +Rock {|Bottom heading |107+74 |107+21 |Sept 27, '05|Oct. 23, '05| + {|Bottom heading |107+74 |107+21 |Nov. 30, '05|Dec. 29, '05| + | | | | | | +Mixed |Bottom heading |107+21 |106+99 |Oct. 26, '06|Nov. 20, '06| + | | | | | | +Mixed |Rock bench |106+99 |106+34 |Nov. 20, '06|Jan. 13, '07| + | | | | | | +Earth |Poling and |106+34 | 99+11 |Jan. 13, '07|Apr. 17, '07| + | breasting | | | | | + | | | | | | +Mixed |Rock cut | 99+11 | 93+96 |Apr. 17, '07|Oct. 24, '07| + | | | | | | +Rock |Bottom heading | 93+96 | 93+58 |Oct. 24, '07|Nov. 14, '07| + | | | | | | +Rock |Center heading | 93+58 | 92+42 |Nov. 14, '07|Dec. 27, '07| + | | | | | | +Rock |Bottom heading | 92+42 | 91+05 |Dec. 27, '07|Feb. 24, '08| + | | | | | | +Mixed |Rock cut | 91+05 | 90+57 |Feb. 24, '08|Mar. 20, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| 14} | | {|Excavation in normal air, and before | +Rock {| 15}57| 69 | 1.21 {|advance of shield. | + {| 28} | | {| | + {| | | {| | + | | | | | +Rock {| 26}55| 53 | 0.96 {|Bottom heading timbered to avoid the | + {| 29} | | {|possibility of a break. | + | | | | | +Mixed | 25 | 22 | 0.88 |Bottom heading timbered. | + | | | | | +Mixed | 54 | 65 | 1.20 | | + | | | | | +Earth | 94 | 723 | 7.69 | | + | | | | | + | | | | | +Mixed |190 | 515 | 2.71 | | + | | | | | +Rock | 21 | 38 | 1.81 | | + | | | | | +Rock | 46 | 116 | 2.52 | | + | | | | | +Rock | 59 | 137 | 2.32 | | + | | | | | +Mixed | 25 | 48 | 1.92 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE B, MANHATTAN. +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |108+35 |107+87 |July 6, '05|July 27, '05| + {|Top lift of bench|108+35 |107+87 |Aug. 3, '05|Aug. 14, '05| +Rock {|Bottom lift of | | | | | + {| bench |108+35 |108+15 |Aug. 26, '05|Aug. 30, '05| + {|Bottom lift of | | | | | + {| bench |108+15 |107+87 |Sept 11, '05|Sept 26, '05| + | | | | | | +Rock |Bottom heading |107+87 |107+00 |Oct. 23, '05|Jan. 17, '06| + | | | | | | +Mixed |Bottom heading |107+00 |106+64 |Jan. 17, '06|Feb. 12, '06| + | | | | | | +Mixed |Rock bench |106+64 |106+31 |Feb. 12, '06|Mar. 1, '06| + | | | | | | +Earth |Poling and |106+31 |105+58 |Mar. 1, '06|Apr. 3, '06| + | breasting | | | | | + | | | | | | + |Shutters in | | | | | +Earth | contact with |105+58 | 99+19 |Apr. 9, '06|Nov. 1, '06| + | face | | | | | + | | | | | | +Mixed |Rock bench | 99+19 | 98+44 |Nov. 1. '06|Dec. 29, '06| + | | | | | | +Mixed |Bottom heading | 98+44 | 97+76 |Dec, 29, '06|Feb. 12, '07| + | | | | | | +Mixed |Rock cut | 97+66 | 93+84 |Feb. 12, '07|Aug. 6, '07| + | | | | | | +Rock |Full face | 93+84 | 93+21 |Aug. 6, '07|Sept 2, '07| + | | | | | | +Rock |Center Heading | 93+21 | 92+30 |Sept 2, '07|Oct. 12, '07| + | | | | | | +Rock |Bottom heading | 92+30 | 90+99 |Oct. 12, '07|Dec. 6, '07| + | | | | | | +Mixed |Rock cut | 90+99 | 90+49.6 |Dec. 6, '07|Jan. 3, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| 21} | | {| | + {| 11} | | {| | +Rock {| }51| 48 | 0.94 {|Excavation done in normal air and | + {| 4} | | {|before advance of shield. | + {| } | | {| | + {| 15} | | {| | + | | | | | +Rock | 86 | 87 | 1.01 | | + | | | | | +Mixed | 26 | 36 | 1.38 | | + | | | | | +Mixed | 17 | 33 | 1.94 | | + | | | | | +Earth | | | | | + | 33 | 73 | 2.21 | | + | | | | | + | | | | | +Earth |206 | 639 | 3.10 | | + | | | | | + | | | | | +Mixed | 58 | 75 | 1.30 | | + | | | | | +Mixed | 45 | 68 | 1.51 | | + | | | | | +Mixed |175 | 392 | 2.24 | | + | | | | | +Rock | 27 | 63 | 2.33 | | + | | | | | +Rock | 40 | 91 | 2.28 | | + | | | | | +Rock | 55 | 131 | 2.38 | | + | | | | | +Mixed | 28 | 49.4 | 1.76 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE C, MANHATTAN. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |107+79.03|107+69 |Dec. 20, '04|Dec. 27, '04| + {|Top heading |107+69 |107+23 |Jan. 1, '05|Jan. 15, '05| +Rock {|Excavating bench |107+79 |107+23 |Jan. 21, '05|Feb. 28, '05| + {|Bottom heading |107+23 |106+72 |Mar. 1, '05|Mar. 11, '05| + {|Bottom heading |107+23 |107+15 |Oct. 12, '05|Oct. 27, '05| + {| | | | | | + | | | | | | +Rock |Bottom heading |107+15 |106+62 |Nov. 6, '05|Dec. 2, '05| + | | | | | | + | | | | | | +Mixed |Bottom heading |106+62 |106+55 |Dec. 2, '05|Dec. 23, '05| + | | | | | | + | | | | | | +Mixed |Bottom heading |106+55 |106+17 |Feb. 12, '06|Mar. 22, '06| + | | | | | | +Mixed |Rock cut |106+17 |105+85 |Apr. 2, '06|Apr. 20, '06| + | | | | | | +Mixed |Rock cut |105+85 |105+55 |July 27, '06|Aug. 26, '06| + | | | | | | + | | | | | | +Earth |Breasting and |105+55 | 99+40 |Aug. 26, '06|Jan. 2, '07| + | poling | | | | | + | | | | | | +Mixed |Rock cut | 99+40 | 98+70 |Jan. 2, '07|Feb. 6, '07| + | | | | | | +Rock |Full face | 98+70 | 98+60 |Feb. 6, '07|Feb. 12, '07| + | | | | | | +Mixed |Bottom heading | 98+60 | 98+39 |Feb. 12, '07|Mar. 6, '07| + | | | | | | +Rock |Bottom heading | 98+39 | 98+17 |Mar. 6, '07|Mar. 15, '07| + | | | | | | +Mixed |Rock cut | 98+17 | 95+68 |Mar. 15, '07|July 30, '07| + | | | | | | +Rock |Middle heading | 95+68 | 94+61 |July 30, '07|Aug. 21, '07| + | | | | | | +Mixed |Rock cut | 94+61 | 93+56 |Aug. 21, '07|Oct. 3, '07| + | | | | | | +Rock |Middle heading | 93+56 | 92+73 |Oct. 3, '07|Nov. 11, '07| + | | | | | | +Mixed |Rock cut | 92+73 | 90+55 |Nov. 11, '07|Feb. 13, '08| + | | | | | | +Mixed |Rock cut | 90+55 | 90+44.4 |Feb. 25, '08|Mar. 3, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| 7} | | {|Stopped to brace portal. No work done | + {| 14} | | {|from March 12th to October 11th, 1905,| +Rock {| 38} | 54 | 0.77 {|except a little trimming in September.| + {| 10} | | {|All work up to this date done in | + {| 15} | | {|normal air. Heading advanced to 106+70| + {| } | | {|and bulkheaded. | + | | | | | +Rock | 26 | 53 | 2.04 | | + | | | | | + | | | {|Heading advanced to 106 + 40. Shut | +Mixed | 21 | 7 | 0.33 {|down in order that Line D might have a| + | | | {|lead. | + | | | | | +Mixed | 38 | 38 | 1.00 {|Shut down on account of air shortage. | + | | | | | +Mixed | 18 | 32 | 1.78 |Shut down on account of air shortage. | + | | | | | +Mixed | 30 | 30 | 1.00 |Shut down April 20th to July 27th, | + | | | |1906. | + | | | | | +Earth |127 | 615 | 4.84 | | + | | | | | + | | | | | +Mixed | 35 | 70 | 2.00 | | + | | | | | +Rock | 6 | 10 | 1.66 | | + | | | | | +Mixed | 22 | 21 | 0.95 | | + | | | | | +Rock | 9 | 22 | 2.44 | | + | | | | | +Mixed |110 | 249 | 2.26 |Heading advanced to 97+82. | + | | | | | +Rock | 49 | 107 | 2.18 | " " " 94+35. | + | | | | | +Mixed | 43 | 106 | 2.46 | | + | | | | | +Rock | 39 | 83 | 2.13 | | + | | | | | +Mixed | 94 | 218 | 2.32 |Shut down until Line D shields met. | + | | | | | +Mixed | 6 | 11 | 1.83 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE D, MANHATTAN. +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |107+70.49|107+16 |Dec. 9, '04|Jan. 31, '05|} + {|Removing bench |107+70.49|107+35 |Jan. 1, '05|Jan. 27, '05|} +Rock {|Bottom heading |107+35 |106+80 |Jan. 30, '05|Feb. 10, '05|} + {|Trimming |107+70 |106+80 |Mar. 29, '05|Apr. 12, '05|} + {|Trimming |107+70 |106+80 |Aug. 31, '05|Sept 19, '05|} + | | | | | | +Rock |Bottom heading |106+80 |106+67 |Oct. 5, '05|Nov. 8, '05| + | | | | | | +Mixed |Bottom heading |106+67 |106+39 |Nov. 8, '05|Dec. 23, '05| + | | | | | | + |Sliding hood and | | | | | +Mixed |breasting. Rock |106+29 |105+70 |Dec. 23, '05|Jan. 24, '06| + |bench | | | | | + | | | | | | +Earth |Poling and |105+70 |104+61 |Jan. 24, '06|Feb. 27, '06| + |breasting | | | | | + | | | | | | + | | | | | | +Earth |Poling, breasting|104+61 |103+90 |Mar. 2, '06|Mar. 31, '06| + | and shutters | | | | | + | | | | | | + | | | | | | +Earth |Shutters |103+90 | 99+41 |Apr. 20, '06|Sept 3, '06| + | | | | | | + | | | | | | +Mixed |Bottom bench | 99+41 | 99+17 |Sept 3, '06|Sept 23, '06| + | | | | | | +Mixed |Bottom heading | 99+17 | 98+50 |Oct. 2, '06|Nov. 24, '06| + | | | | | | + | | | | | | +Rock |Bottom heading | 98+50 | 97+72 |Nov. 24, '06|Jan. 16, '07| + | | | | | | +Mixed |Bottom heading | 97+72 | 97+27 |Jan. 16, '07|Feb. 10, '07| + | | | | | | +Mixed |Rock cut | 97+27 | 95+72 |Feb. 10, '07|Apr. 23, '07| + | | | | | | +Rock |Middle heading | 95+72 | 95+57 |Apr. 23, '07|May 11, '07| + | | | | | | +Rock |Middle heading | 95+57 | 94+65 |May 23, '07|June 17, '07| + | | | | | | + | | | | | | +Mixed |Middle heading | 94+65 | 94+41 |June 17, '07|June 25, '07| + | | | | | | +Mixed |Rock cut | 94+41 | 94+03 |June 25, '07|July 13, '07| + | | | | | | +Rock |Middle heading | 94+03 | 92+64 |July 13, '07|Sept 12, '07| + | | | | | | +Mixed |Middle heading | 92+64 | 92+54 |Sept 12, '07|Sept 20, '07| + | | | | | | +Rock |Middle heading | 92+54 | 92+50 |Sept 20, '07|Sept 21, '07| + | | | | | | +Mixed |Rock cut | 92+50 | 90+38.66|Sept 21, '07|Jan. 8, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| | | | | + {| | | | | +Rock {|123 | 90 | 0.73 |In normal air. | + {| | | | | + {| | | | | + | | | | | +Rock | 34 | 13 | 0.40 |Bottom heading timbered. | + | | | | | +Mixed | 45 | 38 | 0.84 | | + | | | | | + | | | | | +Mixed | 32 | 59 | 1.84 | | + | | | | | + | | | | | +Earth | 31 | 109 | 3.41 | | + | | | | | + | | | | | + | | | |Three days' delay to set shutters in | +Earth | 29 | 71 | 2.45 |top. Shut down 20 days to permit | + | | | |consolidation of the river bed and to | + | | | |repair broken plates. | + | | | | | +Earth |136 | 449 | 3.40 |Four days of 136, delay account of | + | | | |flood. | + | | | | | +Mixed | 20 | 24 | 1.20 | | + | | | | | +Mixed | 53 | 67 | 1.27 |Thirteen days' shut-down to put on | + | | | |hood. | + | | | | | +Rock | 53 | 78 | 1.47 | | + | | | | | +Mixed | 25 | 45 | 1.40 | | + | | | | | +Mixed | 72 | 155 | 2.15 | | + | | | | | +Rock | 18 | 15 | 0.83 | | + | | | | | +Rock | 25 | 92 | 3.68 |Twelve days' delay to repair cutting | + | | | |edge. | + | | | | | +Mixed | 8 | 24 | 3.00 | | + | | | | | +Mixed | 18 | 38 | 2.11 | | + | | | | | +Rock | 61 | 139 | 2.28 | | + | | | | | +Mixed | 8 | 10 | 1.25 | | + | | | | | +Rock | 1 | 4 | 4.00 | | + | | | | | +Mixed |109 | 211.34| 1.94 | | +--------------+------+--------+--------+--------------------------------------+ + +Openings were made between the headings as follows: + +Tunnel _D_, February 20th, 1908; +Tunnel _B_, March 3d, 1908; +Tunnel _C_, March 5th, 1908; +Tunnel _A_, March 18th, 1908. + +It was necessary to cut away the projecting floors of the working +compartments before the cutting edges could be shoved together. + +_Contractor's Organization._--Tunnel operations were carried on +continuously for thirteen days out of fourteen, regular work being shut +down for repairs on alternate Sundays. When the required pressure was +more than 32 lb., four gangs of laborers were employed, each gang +working two shifts of 3 hours each, with an intermission of 3 hours +between the shifts. When the pressure was less than 32 lb., three gangs +were employed, each gang covering 8 hours, but with an intermission of +about 1/2 hour in low pressure for lunch. + +_Air Pressures Required._--During the greater portion of the work in +soft ground, pressure was maintained which would about balance the +hydrostatic head at the axis of the tunnel. This required a pressure +varying from 30 to 34 lb. per sq. in. above that of the atmosphere. In +Tunnels _B_ and _D_, at Manhattan, during the work in soft ground, +pressures as high as 37 lb. were maintained for considerable periods of +time; in the firm material near the reef 28 lb. was often sufficient. +While removing the broken plates, the pressure was raised for a short +time to 42 lb., and was maintained between 37-1/2 and 40 lb. for a +little more than one month. + +_Air Supply._--For regular operation the contractor furnished four +compressors on each side of the river, each having a rated capacity of +5,000 cu. ft. of free air per minute delivered at 50 lb. above normal, +when running at the rate of 100 rev. per min. An additional compressor +of the same capacity was supplied on each side of the river, in +compliance with the requirement for 25% excess capacity; the additional +compressors had also high-pressure air cylinders which could be +connected at will, and in which the pressure could be increased to 150 +lb., and the air used to supply rock drills, grouting machines, etc. The +entire combination on each side of the river, therefore, was rated at +25,000 cu. ft. of free air per minute, or a mean of 6,250 cu. ft. per +heading. Its safe working capacity was not far from 20,000 cu. ft. per +min. + +The shields broke through rock surface in Tunnels _B_, _C_, and _D_, at +Manhattan, in November and December, 1905. The consumption of air in the +four tunnels soon exceeded 15,000 cu. ft. for 24 hours, and in Tunnel +_D_, on several occasions, it exceeded 7,000 cu. ft. for a like period. +Blows had become frequent, and it was evident that the air plant was +inadequate for driving four tunnels at once in the open material east of +the Manhattan rock. Work in Tunnel _A_, therefore, was not resumed, +after the suspension on December 29th, for about ten months, and Tunnel +_C_ was also closed down for more than four months of the time between +December, 1905, and July, 1906. During this period the capacity of the +plant was increased from the rated 25,000 cu. ft. of free air per +minute, to 35,000. In Tunnel _D_ the material had gradually become +firmer, with more clay and less escape of air, as the Blackwell's Island +Reef was approached, and, at the end of the period, the rock surface was +within 3 ft. of the top of the shield; in Tunnel _B_, the rock of the +reef was still a little below the shield, but the overlying material +contained a large proportion of clay and held air very well. Tunnel _C_ +was still in open material, but, with two lines safe and with the +increased air plant, it was deemed best to resume work in Tunnel _A_, +which was done on October 23d, 1906. Thenceforward work was continuous +in all headings until the meeting points with the Long Island shields +were reached. + +This period, January to October, 1906, inclusive, was the most strenuous +of the entire work, particularly the first six months. With one and, at +times, two tunnels closed down, the consumption of air in the headings +from Manhattan was an average of more than 20,000 cu. ft. per min. for +periods of from 30 to 60 days; it was often more than 25,000 cu. ft. for +24 hours, with a maximum of nearly 29,000 cu. ft., and doubtless this +was exceeded considerably for shorter periods. On several occasions the +quantity supplied to a single tunnel averaged more than 15,000 cu. ft. +per min. for 24 hours. The greatest averages for 24 hours were obtained +later in Tunnel _A_, after the resumption of work there, and exceeded +19,000 cu. ft., but the conditions in the headings of the other lines +were then so favorable that the work was carried on continuously in all. + +The deficiency in the original plant at Manhattan was so marked, and the +need of driving all headings from Long Island simultaneously so clear, +that it was decided to increase the rated capacity of the Long Island +compressor plant to 45,400 cu. ft. of free air per minute, which was +10,400 cu. ft. greater than the capacity of the Manhattan plant after +the latter had been augmented. + +[Illustration: PLATE LXXII] + +The earth encountered on emerging from rock, when driving westward from +Long Island, was far more compact and less permeable to air than on the +Manhattan side, but for a distance of from 400 to 600 ft. immediately +east of the reef, it was a clean open sand, and, while the shields were +passing through this, the quantity of air supplied to the four headings +seldom fell below 20,000 cu. ft. per min.; it was usually more than +25,000 cu. ft., with a recorded maximum of 33,400 cu. ft. Although this +was greater than ever used on the Manhattan side, it was more uniformly +distributed among the several headings, and in none equalled the maximum +observed on the Manhattan side, the largest having been 12,700 cu. ft. +per min. for 24 hours; it must be remembered, however, that at one time +only two tunnels were in progress in the bad material in the tunnels +from Manhattan. + +From the foregoing experience, it would seem that the plant finally +furnished at Long Island, having a rated capacity of 45,400 cu. ft. of +free air per minute, would have been a reasonable compliance with the +original actual needs on the Manhattan side and _vice versa_; the plant +finally developed on the Manhattan side, having a rated capacity of +35,000 cu. ft. of free air per minute, would have sufficed for the Long +Island side. + +The total quantity of free air compressed for the supply of the working +chambers of the tunnels and the Long Island caissons was 34,109,000,000 +cu. ft., and, in addition, 10,615,000,000 cu. ft. were compressed to +between 80 and 125 lb. for power purposes, of which at least 80% was +exhausted in the compressed-air working chambers. The total supply of +free air to each heading while under pressure, therefore, averaged about +3,550 cu. ft. per min. + +The quantity of air escaping during a sudden blow-out is apparently much +smaller than might be supposed. Investigation of a number of cases, +showing large pressure losses combined with a long stretch of tunnel +supplying a relatively large reservoir of air, disclosed that a maximum +loss of about 220,000 cu. ft. of free air occurred in 10 min. This +averages only a little more than 19,000 cu. ft. per min., the maximum +recorded supply to one tunnel for a period of 24 hours. Of this +quantity, however, probably from 30 to 40% escaped in the first 45 +seconds, while the remainder was a more or less steady loss up to the +time when the supply could be increased sufficiently to maintain the +lowered pressure. Very few blows showed losses approaching this in +quantity, but the inherent inaccuracy of the observations make the +foregoing figures only roughly approximate. + +[Footnote C: _Minutes of Proceedings_, Inst. C. E., Vol. CXXX, p. 50.] + + +SPECIAL DIFFICULTIES. + +The most serious difficulties of the work came near the start. In Tunnel +_D_ blows and falls of sand from the face were frequent after soft +ground was met in the top. About six weeks after entering the full sand +face, and before the shutters had been installed, the shield showed a +decided tendency to settle, carrying the tunnel lining down with it and +resulting in a number of badly broken plates in the bottom of the rings. +Notwithstanding the use of extremely high vertical leads,[D] the sand +was so soft that the settlement of the shield continued for about +fifteen rings, the maximum being nearly 9 in. below grade. The +hydrostatic head at mid-height of the tunnel was 32-1/2 lb., and the +raising of the air pressure to 37 lb., as was done at this time, was +attended with grave danger of serious blows, on account of the recent +disturbance of the natural cover by the pulling and re-driving of piles +in the reconstruction of the Long Island ferry slips directly above. It +dried the face materially, however, and the shield began to rise again, +and had practically regained the grade when the anticipated blow-outs +occurred, culminating with the entrance of rip-rap from the river bed +into the shield and the flooding of the tunnel with 4 ft. of sand and +water at the forward end. The escape of air was very great, and, as a +pressure of more than 28 lb. could not be maintained, the face was +bulkheaded and the tunnel was shut down for three weeks in order to +permit the river bed to consolidate. + +This was the most serious difficulty encountered on any part of the +work, and, coming at the very start, was exceedingly discouraging. +During the shut-down the broken plates were reinforced temporarily with +steel ribs and reinforced concrete (Fig. 1, Plate LXXIII) which, on +completion of the work, were replaced by cast-steel segments, as +described elsewhere. Practically, no further movement of iron took +place, and the loss of grade caused by the settlement of the shield, +which was by far the largest that ever occurred in this work, was not +sufficient to require a change in the designed grade or alignment of the +track. Work was resumed with the shutters in use at the face as an aid +to excavation. The features of extreme seriousness did not recur, but +for two months the escape of air continued to be extremely large, an +average of 15,000 cu. ft. per min. being required on many days during +this period. + +[Illustration: PLATE LXXIII, FIG. 1.--TEMPORARY REINFORCEMENT OF BROKEN +PLATES AND REMOVAL OF A PLATE IN SECTIONS.] + +[Illustration: PLATE LXXIII, FIG. 2.--HEAVY CAST-STEEL PATCH ATTACHED TO +BENT SEGMENT OF CUTTING EDGE.] + +[Illustration: PLATE LXXIII, FIG. 3.--INFLOW OF SOFT CLAY THROUGH +SHIELD.] + +[Illustration: PLATE LXXIII, FIG. 4.--REINFORCEMENT OF BROKEN PLATE WITH +LONG POLT AND TWISTED STEEL RODS.] + +In Tunnel _B_, after passing out from under the bulkhead line, in April, +1906, the loss of air became very great, and blow-outs were of almost +daily occurrence until the end of June. At the time of the blows the +pressure in the tunnel would drop from 2 to 8 lb., and it generally took +some hours to raise the pressure to what it was before the blow. During +that time regular operations were interrupted. In the latter part of +June a permit was obtained allowing the clay blanket to be increased in +thickness up to a depth of water of 27 ft. at mean low tide. The +additional blanket was deposited during the latter part of June and +early in July, and almost entirely stopped the blows. + +By the end of the month the natural clay, previously described, formed +the greater portion of the face, and, from that time forward, played an +important part in reducing the quantity of air required. During April +and the early part of May the work was under the ferry racks of the Long +Island Railroad. The blanket had to be placed by dumping the clay from +wheel-barrows through holes in the decking. + +In Tunnel _A_ a bottom heading had been driven 23 ft. in advance of the +face at the time work was stopped at the end of 1905. During the ten +months of inactivity the seams in the rock above opened. The rock +surface was only from 2 to 4 ft. below the top of the cutting edge for a +distance of about 60 ft. Over the rock there were large boulders +embedded in sharp sand. It was an exceedingly difficult operation to +remove the boulders and place the polings without starting a run. The +open seams over the bottom heading also frequently caused trouble, as +there were numerous slides of rock from the face which broke up the +breasting and allowed the soft material from above to run into the +shield. There were two runs of from 50 to 75 cu. yd. and many smaller +ones. + +[Footnote D: The lead of the shield is the angular divergence of its +axis from the axis of the tunnel and, in this tunnel, was measured as +the offset in 23 ft. It was called + when the shield was pointed upward +from grade, and - when pointed downward.] + + +GUIDING THE SHIELDS. + +Little difficulty was experienced at any time in driving the shield +close to the desired line, but it was much harder to keep it on grade. +In rock section, where the cradle could be set far enough in advance to +become hard before the shield was shoved over it, there was no trouble +whatever. Where the cradle could be placed only a very short time before +it had to take the weight of the shield, the case was quite different. +The shield had a tendency to settle at the cutting edge, and when once +pointed downward it was extremely difficult to change its direction. It +was generally accomplished by embedding railroad rails or heavy oak +plank in the cradle on solid foundation. This often had to be repeated +several times before it was successful. In soft ground it was much +easier to change the direction of the shield, but, owing to the varying +nature of the material, it was sometimes impossible to determine in +advance how the shield should be pointed. It was found by experience at +Manhattan that the iron lining remained in the best position in relation +to grade when the underside of the bottom of the shield at the rear end +was driven on grade of the bottom of the iron, but if the rate of +progress was slow, it was better to drive the shield a little higher. + +In the headings from Long Island, which, as a rule, were in soft ground, +the cutting edges of the shields were kept from 4 to 8 in. higher, with +respect to the grade line, than the rails. The shields would then +usually move parallel to the grade line, though this was modified +considerably by the way the mucking was done and by the stiffness of the +ground at the bottom of the shield. + +On the average, the shields were shoved by from ten to twelve of the +bottom jacks, with a pressure of about 4,000 lb. per sq. in. The jacks +had 9-in. plungers, which made the average total force required to shove +the shield 2,800,000 lb. In the soft ground, where shutters were used, +all of the twenty-seven jacks were frequently used, and on several +occasions the pressure exceeded 6,000 lb. per sq. in. With a unit +pressure of 6,000 lb. per sq. in., the total pressure on the shield with +all twenty-seven jacks in operation was 5,154 tons. + + +INJURIES TO SHIELDS. + +There were only two instances of damage to the essential structural +features of the shields. The most serious was in Tunnel _D_ where the +cutting edge at the bottom of the shield was forced up a slightly +sloping ledge of rock. A bow was formed in the steel casting which was +markedly increased with the next few shoves. Work was suspended, and a +heavy cast-steel patch, filling out the bow, was attached to the bent +segments, as shown in Fig. 2, Plate LXXIII. No further trouble was +experienced with the deformed portion. The other instance was in Tunnel +_B_, from Long Island, where a somewhat similar but less serious +accident occurred and was treated in a like manner. + +_Bulkheads._--At Manhattan, bulkheads had to be built near the shafts +before the tunnels could be put under pressure. After 500 ft. of tunnel +had been built on each line, the second bulkheads were constructed. The +air pressure between the first and second bulkheads was then reduced to +between 15 and 20 lb. When the shields had been advanced for 1,500 ft., +the third set of bulkheads was built. Nearly all the broken plates which +were removed were located between the first and third bulkheads at +Manhattan. Before undertaking this operation, the doors of the locks in +the No. 3 bulkheads were reversed to take pressure from the west. By +this means it was possible to carry on the work of dismantling the +shields under comparatively low pressure simultaneously with the removal +of the broken plates. + +At Long Island City the roofs of the caissons served the purpose of the +No. 1 bulkheads. Two other sets of bulkheads were erected, the first +about 500 ft. and the second about 1,500 ft. from the shafts. + + +SETTLEMENT AT SURFACE OF GROUND. + +The driving of such portions of the river tunnels, with earth top, as +were under the land section, caused a settlement at the surface varying +usually from 3 to 6 in. The three-story brick building at No. 412 East +34th Street required extensive repairs. This building stood over the +section of part earth and part rock excavation where the tunnels broke +out from the Manhattan ledge and where there were a number of runs of +sand into the shield. In fact, the voids made by those runs eventually +worked up to the surface and caused the pavement of the alley between +the buildings to drop 4 or 5 ft. over a considerable area. The tunnels +also passed directly under the ferry bridges and racks of the Long +Island Railroad at East 34th Street. Tunnels _B_ and _D_ were constantly +blowing at the time, and, where progress was slow, caused so much +settlement that one of the racks had to be rebuilt. Tunnel _A_, on the +other hand, where progress was rapid, caused practically no settlement +in the racks. + + +CLAY BLANKET. + +As previously mentioned, clay was dumped over the tunnels in varying +depths at different times. A material was required which would pack +into a compact mass and would not readily erode under the influence of +the tidal currents of the river and the escape of the great volumes of +air which often kept the water in the vicinity of the shields in violent +motion. Suitable clay could not be found in the immediate vicinity of +the work. Materials from Shooter's Island and from Haverstraw were tried +for the purpose. The Government authorities did not approve of the +former, and the greater portion of that used came from the latter point. +Although a number of different permits governing the work were granted, +there were three important ones. The first permit allowed a blanket +which roughly followed the profile of the tunnels, with an average +thickness of 10 ft. on the Manhattan side and somewhat less on the Long +Island City side. The second general permit allowed the blanket to be +built up to a plane 27 ft. below low water. This proved effective in +checking the tendency to blow, but allowed considerable loss of air. +Finally, dumping was allowed over limited and marked areas up to a plane +of 20 ft. below low water. Wherever advantage was taken of this last +authority, the excessive loss of air was almost entirely stopped. After +all the shields had been well advanced out into the river, the blanket +behind them was dredged up, and the clay used over again in advance of +the shield. + +Soundings were taken daily over the shields, and, if marked erosion was +found, clay was dumped into the hole. Whenever a serious blow occurred, +a scowload of clay was dumped over it as soon as possible and without +waiting to make soundings. For the latter purposes a considerable +quantity of clay was placed in storage in the Pidgeon Street slip at +Long Island City, and one or two bottom-dump scows were kept filled +ready for emergencies. Mr. Robert Chalmers, who had charge of the +soundings for the contractor, states that "the depressions in the +blanket caused by erosion due to the escape of air were, as a rule, +roughly circular in plan and of a curved section somewhat flat in the +center." Satisfactory soundings were never obtained in the center of a +violent blow, but the following instance illustrates in a measure what +occurred. Over Tunnel _B_, at Station 102+80, there was normally 36 ft. +of water, 7 ft. of clay blanket, and 20 ft. of natural cover. Air was +escaping at the rate of about 10,000 cu. ft. per min., and small blows +were occurring once or twice daily. On June 22d, soundings showed 54 ft. +of water. A depth of 18 ft. of the river bottom had been eroded in about +two days. On the next day there were taken out of the shield boulders +which had almost certainly been deposited on the natural river bed. Clay +from the blanket also came into the shields on a number of occasions +during or after blows. The most notable occasion was in September, 1907, +when the top of the shield in Tunnel _D_ was emerging from the east side +of Blackwell's Island Reef. The sand in the top was very coarse and +loose, and allowed the air to escape very freely. The fall of a piece of +loose rock from under the breast precipitated a run of sand which was +followed by clay from the blanket, which, in this locality, was largely +the softer redredged material. Mucking out the shield was in progress +when the soft clay started flowing again and forced its way back into +the tunnel for a distance of 20 ft., as shown in Fig. 3, Plate LXXIII. +Ten days of careful and arduous work were required to regain control of +the face and complete the shove, on account of the heavy pressure of the +plastic clay. + +The clay blanket was of the utmost importance to the work throughout, +and it is difficult to see how the tunnels could have been driven +through the soft material on the Manhattan side without it. + +The new material used in the blanket amounted to 283,412 cu. yd., of +which 117,846 cu. yd. were removed from over the completed tunnels and +redeposited in the blanket in advance of the shields. A total of 88,059 +cu. yd. of clay was dumped over blows. The total cost of placing and +removing the blanket was $304,056. + + +IRON LINING. + +The standard cast-iron tunnel lining was of the usual tube type, 23 ft. +in outside diameter. The rings were 30 in. wide, and were composed of +eleven segments and a key. The webs of the segments were 1-1/2 in. thick +in the central portion, increasing to 2-3/8 in. at the roots of the +flanges, which were 11 in. deep, 2-1/4 in. thick at the root, and 1-1/2 +in. at the edge, and were machined on all contact faces. Recesses were +cast in the edge of the flanges, forming a groove, when the lining was +in place, 1-1/2 in. deep and about 3/8 in. wide, to receive the +caulking. The bolt holes were cored in the flanges, and the bosses +facing the holes were not machined. The customary grout hole was tapped +in the center of each plate for a standard 1-1/4-in. pipe. In this work, +experience indicated that the standard pipe thread was too fine, and +that the taper was objectionable. Each segment weighed, approximately, +2,020 lb., and the key weighed 520 lb., the total weight being 9,102 lb. +per lin. ft. of tunnel. Fig. 1 shows the details of the standard heavy +lining. + +In addition to the standard cast-iron lining, cast-steel rings of the +same dimensions were provided for use in a short stretch of the tunnel, +when passing from a rock to a soft ground foundation, where it was +anticipated that unequal settlement and consequent distortion and +increase in stress might occur, but, aside from the small regular drop +of the lining as it passed out of the tail of the shield, no such +settlement was observed. + +Two classes of lighter iron, one with 1-in. web and 8-in. flanges and +the other with 1-1/4-in. web and 9-in. flanges--the former weighing +5,166 lb. per lin. ft. of tunnel and the latter, 6,776 lb.--were +provided for use in the land sections between East Avenue and the Long +Island City shafts. Two weights of extra heavy segments for use at the +bottom of the rings were also furnished. The so-called _XX_ plates had +webs and flanges 1/4 in. thicker than the standard segment and the _YY_ +plates were similarly 1/2 in. heavier. The conditions under which they +were used will be referred to later. All the castings were of the same +general type as shown by Fig. 1. + +Rings tapering 3/4 in. and 1-1/2 in. in width were used for changes in +alignment and grade, the former being used approximately at every fourth +ring on the 1° 30' curves. The 1-1/2-in. tapers were largely used for +changes in grade where it was desired to free the iron from binding on +the tail of the shield. Still wider tapers would have been advantageous +for quick results in this respect. + +No lug was cast on the segments for attachment to the erector, but in +its place the gadget shown on Fig. 4, Plate LXX, was inserted in one of +the pairs of bolt holes near the center of the plate, and was held in +position by the running nut at one end. + +In the beginning it was expected that the natural shape of the rings +would not show more than 1 in. of shortening of the vertical diameter; +this was slightly exceeded, however, the average distortion throughout +the tunnels being 1-7/16 in. The erectors were attached to the shield +and in such a position that they were in the plane of the center of the +ring to be erected when the shove was made without lead and just far +enough to permit placing the segments. If the shield were shoved too +far, a rare occurrence, the erection was inconvenienced. In driving with +high vertical leads, which occurred more frequently, the disadvantage +of placing the erector on the shield was more apparent. Under such +conditions the plane of the erector's motion was acutely inclined to the +plane of the ring, and, after placing the lower portion of the ring, it +was usually necessary to shove the shield a few inches farther in order +to place the upper plates. The practical effect of this action is +referred to later. + +[Illustration: FIG. 1.] + +At first the erection of the iron in the river tunnels interfered +somewhat with the mucking operations, but the length of time required to +complete the latter was ample for the completion of the former; and the +starting of a shove was seldom postponed by reason of the non-completion +of a ring. After the removal of the bottom of the diaphragms, permitting +the muck cars to be run into the shield and beyond, the two operations +were carried on simultaneously without serious interference. The +installation of the belt conveyor for handling the soft ground spoil in +Tunnel _A_ was of special benefit in this respect. + +Preparatory to the final bolt tightening of each ring as erected, a +15-ton draw-jack, consisting of a small pulling-jack inserted in a light +eye-bar chain, was placed on the horizontal diameter, and frequently the +erectors were also used to boost the crown of the iron, the object being +to erect the ring truly circular. Before shoving, a 1-1/4-in. +turn-buckle was also placed on the horizontal diameter in order to +prevent the spreading of the iron, previous to filling the void outside +with grout. The approach of the supports for the upper floor of the +trailing platform necessitated the removal of these turnbuckles from all +but the three leading rings, but if the iron showed a tendency to +continue distortion, they were re-inserted after the passage of the +trailing platform and remained until the arch of the concrete lining was +placed. + +The cost of handling and erecting the iron varied greatly at different +times, averaging, for the river tunnels, $3.32 per ton for the directly +chargeable labor of handling and erecting, to which must be added $7.54 +for "top charges." The cost of repairing broken plates is included in +this figure. + +_Broken Plates._--During the construction of the river section of the +tunnels, a number of segments were found to have been broken while +shoving the shield. The breaks, which with few exceptions were confined +to the three or four bottom plates, almost invariably occurred on the +advanced face of the ring, and rarely extended beyond the bottom of the +flange. A careful study of the breaks and of the shoving records +disclosed several distinct types of fracture and three principal known +causes of breakage by the shield. + +In the first case, the accidental intrusion of foreign material between +the jack head and the iron caused the jack to take its bearings on the +flange above its normal position opposite the web of the ring, and +resulted usually in the breaking out of a piece of the flange or in +several radiating cracks with or without a depression of the flange. +These breaks were very characteristic, and the cause was readily +recognizable, even though the intruding substance was not actually +observed. + +In the second case, the working of a hard piece of metal, such as a +small tool, into the annular space between the iron and the tail of the +shield, where it was caught on the bead and dragged along as the shield +advanced, was the known cause of a number of broken segments. Such +breaks had no particular characteristic, but were usually close above +the line of travel of the lost tool or metal. Their cause was determined +by the finding of a heavy score on the underside of the segment or the +discovery of the tool wedged in the tail of the shield or lying under +the broken plate when it was removed. It is probable that a number of +breaks ascribed to unknown causes should be placed in this class. + +The third cause includes the largest number of breaks, and, while +difficult to define closely, is the most interesting. Broadly speaking, +the breaks resulted from the movements of the shield in relation to the +position of the tunnel lining. While shoving through soft ground, it was +frequently difficult to apply sufficient power to the lower jacks to +complete the full shove of 30 in. on the desired alignment. The shield, +therefore, was driven upward at the beginning of the shove, and, as the +sand packed in front of the shield and more power was required, it was +furnished by applying the upper jacks. The top of the shield was slowly +pushed over, and, at the close of the shove, the desired position had +been obtained; but the shield had been given a rocking motion with a +decided lifting of the tail toward the close of the shove. A similar +lifting of the tail occurred when, with high vertical leads, the top of +the shield was pushed over in order to place the upper plates of the +ring. Again, when the shield was driven above grade and it was desired +to descend, the passage of the shield over the summit produced a like +effect. In all these movements, with the space between the tail of the +shield and the iron packed tight with pugging, the upward thrust of the +shield tended to flatten the iron in the bottom and occasional broken +plates were the result. The free use of the taper rings, placed so as to +relieve the binding of the lining on the tail of the shield, forces the +tunnel to follow the variations in the grade of the shield, but reduces +greatly the injuries to the rings from this action. + +In Tunnel _D_, where very high vertical leads were required through the +soft sand, combined with a marked tendency of the shield to settle, the +shield was badly cramped on the iron and dragged along it at the top. +The bearing of the iron on its soft foundation tended to thrust up the +bottom in this case also, as shown by the opening of the bottom +cross-joints when the bolts were slackened to relieve the strain during +a shove. The anticipated cracks in the crown plates, which have been +more frequently observed in other tunnels, did not occur here, and were +not found elsewhere except in one place in Tunnel _B_ where they were +traced to a similar action of the shield. The cracks resulting from the +movements of the shield, as briefly described above, in this third case +were not confined to any particular type, but occurred more frequently +at the extreme end of the circumferential flange than at any other +point. + +The number of broken plates occurring in the river tunnels was 319, or +0.42% of the total number erected. Of these, 52 were found and removed, +either before or immediately after a shove, by far the greater number +being broken in handling before or during erection. The remaining 267 +are considered below. + +_Repair of Broken Plates._--On the completion of a shove, the tail of +the shield lacked about 5 in. of covering the full width of the last +ring, and the removal of a plate broken during the shove, therefore, +would have exposed the ground at the tail of the shield. With a firm +material in the bottom, this introduced no particular difficulties, and, +under such conditions, a broken plate was usually removed at once. In +the sand, however, and especially on the Manhattan side where it was +quick and flowing, the removal of a plate was attended with some danger, +and such plates were usually left to be removed on the completion of the +tunnel. Many of these had been reinforced by the use of _XX_, _YY_, and +steel segments placed adjacent to the break in the following rings. + +After the meeting of the shields, the postponed replacement of the +broken segments was taken up. The pressure was raised sufficiently to +dry thoroughly the sand outside the segments, which were drilled and +broken out usually in quarters as shown on Fig. 1, Plate LXXIII. A steel +segment was then inserted in the ring and drawn into place by +turnbuckles. The application of the draw-jack, with a pull of about 30 +tons to each end successively, brought the plate to a firm bearing on +the radial joints at the ends. + +Where the broken plate was isolated and was reinforced by steel or extra +heavy segments in the adjacent ring, the crack, if slight, was simply +caulked to insure water-tightness. If, however, the crack was opened or +extended to the web of the plate, the cross-flanges were tied together +by a 1-1/2-in. by 7-ft. bolt, inserted through the bolt holes nearest +the broken flange. The long bolt acted in the nature of a bow string, +and was provided at its ends with two nuts set on opposite sides of the +cross-joints to replace the standard bolts removed for its insertion. +Fig. 4, Plate LXXIII shows one of these bolts in place. In addition, all +broken plates remaining in the tunnel were reinforced with 1-in. +twisted-steel rods in the concrete lining, also shown in Fig. 4, Plate +LXXIII. + +_Special Construction at River Shield Junctions._--Dismantling the +shields was started as soon as they came to rest in their final position +with the cutting edges together. The plans contemplated their entire +removal, with the exception of the cylindrical skins and cast-steel +cutting edges. Inside the former the standard tunnel lining was erected +to within 4 ft. of the heels of the cutting edges. Spanning the latter, +and forming the continuous metal tunnel lining, the special construction +shown by Fig. 2 was built. This consisted of a 1-1/4 in. rolled-steel +ring, 7 ft. long, erected inside the cutting edges, with an annular +clearance of 1 in., and two special cast-iron rings shaped to connect +the rolled-steel ring with the normal lining. One flange of the special +cast-iron rings was of the standard type, the other was returned 9 in. +in the form of a ring, the inside diameter of which was the same as the +outside diameter of the rolled-steel ring to which it was bolted. + +The space between the standard and special construction was of varying +width at the various shields, and was filled with a closure ring cast to +the lengths determined in the field. Fig. 2 shows the completed +construction. + +Hook-bolts, screwed through threaded holes and buried in 1 to 1 Portland +cement grout ejected through similar holes, reinforced the rolled-steel +ring against external water pressure. In two of the tunnels the concrete +lining was carried completely through the junction, and covered the +whole construction, while in the remaining two tunnels it was omitted at +the rolled-steel ring, leaving the latter exposed and set back about 3 +in. from the face of the concrete. + +[Illustration: FIG. 2.] + + +GROUTING. + +Except as previously noted, the voids outside of the tunnel lining were +filled with grout ejected through the grout holes in each segment. The +possibility was always present that Portland cement, if used for grout +in the shield-driven tunnels, would flow forward around the shield and +set hard, "freezing" the shield to the rock or the iron lining, or at +least forming excrescences upon it, which would render its control +difficult. With this in mind, the contractors proposed to substitute an +English Blue Lias lime as a grouting material. Grout of fresh English +lime containing a moderate quantity of water set very rapidly in air to +the consistency of chalk. Its hydraulic properties, however, were +feeble, and in the presence of an excess of water it remained at the +consistency of soft mud. It was not suitable, therefore, as a supporting +material for the tunnel. + +An American lime, made in imitation of the Lias lime, but having greater +hydraulic properties, was tried, but proved unsatisfactory. Two brands +of natural cement were also tried and rejected, but a modified +quick-setting natural cement, manufactured especially for this work, was +eventually made satisfactory, and by far the largest part of the +river-tunnel grouting was done with this material mixed 1 to 1 by +volume. East of the Long Island shafts the work which was built without +shields was grouted principally with Portland cement and sand mixed 1 to +1 by volume. + +In the river tunnels large quantities of the English lime were used neat +as grout over the top of the tunnel in attempts to stop losses of air +through the soft ground. It was not of great efficiency, however, in +this respect until the voids outside of the lining had been filled above +the crown. Its properties of swelling and quick setting in the dry sand +at that point then became of value. The use of dry lime in the face, +where the escaping air would carry it into the voids of the sand and +choke them, was much more promptly efficacious in checking the loss. + +With the exception of the English lime, all grout was mixed 1 to 1 with +sand in a Cockburn continuous-stirring machine operated by a 3-cylinder +air engine. The grout machine was placed on the lower floor of the +trailing platform shown on Plate LXXII, while the materials were placed +on the upper platform, and, together with the water, were fed into the +machine through a hole in the upper floor. The sand was bagged in the +yard, and the cars on which the materials were sent into the tunnels +were lifted by an elevator to the level of the upper floor of the +trailing platform before unloading. + +Great difficulty was experienced in preventing the waste of the fluid +grout ahead of the shield and into the tail through the space between it +and the iron lining. In a full soft ground section, the first condition +did not usually arise. In the full-rock sections the most efficient +method of checking the waste was found to be the construction of dams or +bulkheads outside the lining between it and the rock surface. For this +purpose, at intervals of about 30 ft., the leading ring and the upper +half of the preceding one were disconnected and pulled forward +sufficiently to give access to the exterior. A rough dam of rubble, or +bags of mortar or clay, was then constructed outside the iron, and the +rings were shoved back and connected up. In sections containing both +rock and soft ground, grout dams were built at the cutting edge at +intervals, and were carried up as high as circumstances permitted. + +The annular space at the tail of the shield was at all times supposed to +be packed tight with clay and empty bags, but the pugging was difficult +to maintain against the pressure of the grout. For a time, 1/2-in. +segmental steel plates, slipped down between the jackets and the iron, +were used to retain the pugging, but their displacement resulted in a +number of broken flanges, and their use was abandoned. In their place, +2-in. segmental plates attached to the jack heads were substituted with +more satisfactory results. Notwithstanding these devices, the waste of +grout at the tail was very great. + +The soft ground material on various portions of the work acted very +differently. The clay and "bull's liver" did not cave in upon the iron +lining for several hours after the shield had passed, sometimes not for +a day or more, which permitted the space between it and the iron to be +grouted. The fine gray or beach sand and the quicksand closed in almost +at once. The quicksand has a tendency to fill in under the iron from the +sides and in places to leave a cavity at about the horizontal diameter +which was not filled from above, as the sand, being dried out by the +air, stood up fairly well and did not cave against the iron, except +where nearly horizontal at the top. + +The total quantity of grout used on the work was equivalent in set +volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647 +bbl. were ejected through the iron lining, an average of 14.93 bbl. per +lin. ft. The cost of grout ejected outside of the river tunnels was 93 +cents per bbl. for labor and $2.77 for "top charges." East of the Long +Island shaft the corresponding costs were $0.68 and $1.63, the +difference being partly due to the large percentages of work done in the +normal air at the latter place. + + +CAULKING AND LEAKAGE. + +Up to August, 1907, the joints between the segments of the cast-iron +lining were caulked with iron filings and sal ammoniac, mixed in the +proportion of 400 to 1 by weight. With the air pressure balancing the +hydrostatic head near the tunnel axis, it was difficult to make the +rust-joint caulking tight below the axis against the opposing water +pressure; this form of caulking was also injured in many places by +water dripping from service pipes attached to the tunnel lining. A few +trials of lead wire caulked cold gave such satisfactory results that it +was adopted as a substitute. Pneumatic hammers were used successfully on +the lead caulking, but were only used to a small extent on the rust +borings, which were mostly hand caulked. Immediately before placing the +concrete lining, all leaks, whether in the rust borings or lead, were +repaired with lead, and the remainder of the groove was filled with 1 to +1 Portland cement mortar, leaving the joints absolutely water-tight at +that time. The subsequent development of small seepages through the +concrete would seem to indicate that the repair work should have been +carried on far enough in advance of the concreting to permit the +detection of secondary leaks which might develop slowly. The average +labor cost chargeable against the caulking was 12 cents per lin. ft., to +which should be added 21.8 cents for "top charges." + +Unfortunately, it was necessary to place the greater part of the +concrete lining in the river tunnels during the summer months when the +temperature at the point of work frequently exceeded 85°; and the +temperature of the concrete while setting was much higher. This abnormal +heat, due to chemical action in the cement, soon passed away, and, with +the approach of winter, the contraction of the concrete resulted in +transverse cracks. By the middle of the winter these had developed quite +uniformly at the ends of each 30-ft. section of concrete arch as placed, +and frequently finer cracks showed at about the center of each 30-ft. +section. + +While the temperature of the concrete was falling, a like change was +taking place in the cast-iron lining, with resulting contraction. The +lining had been erected in compressed air, the temperature of which +averaged about 70° in winter and higher in summer. Compressed air having +been taken off in the summer of 1908, the tunnels then acquired the +lower temperature of the surrounding earth, slowly falling until +mid-winter. The contraction of the concrete, firmly bedded around the +flanges of the iron, and showing cracks at fairly uniform intervals, +probably localized the small corresponding movements of the iron near +the concrete cracks, and resulted in a loosening of the caulking at +these points. With the advent of cold weather, damp spots appeared in +numerous places on the concrete, and small seepages showed through quite +regularly at the temperature cracks, in some cases developing +sufficiently to be called leaks. Only a few, however, were measurable in +amount. + +Early in January small brass plugs were firmly set on opposite sides of +a large number of cracks, and caliper readings and air temperature +observations were taken regularly throughout the winter and spring. The +widths of the cracks and the amount of leakage at them increased with +each drop in temperature and decreased as the temperature rose again, +but until spring the width of the cracks did not return to the same +point with each return of temperature. + +The leakage was similar in all four tunnels, but was largest in amount +in Tunnel _D_, where, at the beginning of February, the ordinary flow +was about 0.0097 cu. ft. per sec., equivalent to 0.00000347 cu. ft. per +sec. per lin. ft. of tunnel. Of this amount 0.0065 cu. ft. per sec. +could be accounted for at eight of the cracks showing measurable +leakage, leaving 0.0032 cu. ft. per sec. or 0.00000081 cu. ft. per sec. +per lin. ft. of tunnel to be accounted for as general seepage +distributed over the whole length. + +It was not feasible to stop every leak in the tunnel, most of which were +indicated simply by damp spots on the concrete; a rather simple method +was devised, however, for stopping the leaks at the eight or ten places +in each tunnel where water dripped from the arch or flowed down the face +of the concrete. The worst leak in any tunnel flowed about 0.0023 cu. +ft. per sec. To stop these leaks, rows of 1-in. holes, at about 4-in. +centers, were drilled with jap drills through the concrete to the flange +of the iron. These rows were from 3 to 18 ft. long, extending 1 ft. or +more beyond the limits of the leak. The bottoms of the holes were +directly on the caulking groove and the pounding of the drill usually +drove the caulking back, so that the leak became dry or nearly so after +the holes were drilled. If left alone the leaks would gradually break +out again in a few hours or a few days and flow more water than before. +They were allowed to do this, however, in only a few cases as +experiments. After the holes were drilled, the bottom 4 in. next the +flange was filled with soft neat cement mortar. Immediately on top of +this was placed two plugs of neat cement about 2-1/2 in. long, which +were 5 or 6 hours old and rather hard. Each was tamped in with a round +caulking tool of the size of the hole driven with a sledge hammer. On +top of this were driven in the same way two more plugs of neat cement of +the same size, which were hard set. These broke up under the blows of +the hammer, and caulked the hole tight. When finished, the tamping tool +would ring as though it was in solid rock. Great pressure was exerted on +the plastic mortar in the bottom of the hole, which resulted in the +re-caulking of the joint of the iron. No further measurable leakage +developed in the repaired cracks, during a period of four months, and +the total leakage has been reduced to about 0.002 cu. ft. per sec. in +each tunnel, an average of 0.00000051 cu. ft. per sec. per lin. ft. + + +SUMP AND PUMP CHAMBERS. + +To take care of the drainage of the tunnels, a sump with a pump chamber +above it was provided for each pair of tunnels. The sumps were really +short tunnels underneath the main ones and extending approximately +between the center lines of the latter. They were 10 ft. 9-1/2 in. in +outside diameter and 44 ft. long. The water drops directly from the +drains in the center lines of the tunnels into the sumps. Above the +sumps and between the tunnels, a pump chamber 19 ft. 5 in. long was +built. Above the end of the latter, opposite the sump, a cross-passage +was constructed between the bench walls of the two tunnels. This passage +gives access from either tunnel through an opening in the floor to the +pump chamber and through the latter to the sump. + +From the preliminary borings it was thought that the sumps were located +so that the entire construction would be in rock. This proved to be the +case on Tunnels _C_ and _D_, but not on Tunnels _A_ and _B_. The +position of the rock surface in the latter is shown by Fig. 3. After the +excavation was completed in Tunnel _B_, January 1st, 1908, the plates +were removed from the side of the tunnel at the cross-passage, and a +drift was driven through the earth above the rock surface across to the +lining of Tunnel _A_. The heading was timbered as shown by Fig. 3. There +was practically no loss of air from the drift, but the clay blanket had +been removed from over this locality and the situation caused some +anxiety. In order to make the heading as secure as possible, the 24-in. +I-beams, shown on Fig. 3, were attached to the lining of the two +tunnels. The beams formed a support for the permanent concrete roof arch +of the passage, which was placed at once. At the same time plates were +removed from the bottom in Tunnel _B_ over the site of the sump, and a +heading was started on the line of the sump toward Tunnel _A_. As soon +as the heading had been driven beyond the center line of the pump +chamber, a bottom heading was driven from a break-up westward in the +pump chamber and a connection was made with the cross-passage. The iron +lining of the pump chamber was next placed, from the cross-passage +eastward. The soft ground was excavated directly in advance of the +lining, and the ground was supported by polings in much the same manner +as described for shield work. On account of bad ground and seams of sand +encountered in the rock below the level of the cross-beams, the entire +west wall of the pump chamber was placed before enlarging the sump to +full size. This was also judicious, in order to support as far as +possible the iron lining of the tunnels. The sump was then excavated to +full size. The iron lining of the sump and the east wall of the pump +chamber were placed as soon as possible. The voids outside the iron +lining of the sump and the pump chamber were filled as completely as +possible with concrete, and then thoroughly grouted. Finally, the +concrete lining was put in place inside of the iron. + +As shown by Fig. 3, the excavation of these chambers left a considerable +portion of the iron lining of the tunnels temporarily unsupported on the +lower inner quarter. To guard against distortion, a system of diagonals +and struts was placed as shown. + +The floor of the pump chamber was water-proofed with felt and pitch in a +manner similar to that described for the caissons at Long Island City. +It was not possible to make the felt stick to the vertical walls with +soft pitch, which was the only kind that could be used in compressed +air, and, therefore, the surfaces were water-proofed by a wall of +asphalt brick laid in pitch melting at 60° Fahr. Forms were erected on +the neat line, and the space to the rock was filled with concrete making +a so-called sand-wall similar to that commonly used for water-proofing +with felt and pitch. The bricks were then laid to a height of four or +five courses. The joints were filled with pitch instead of mortar. +Sheets of tin were then placed against the face of the wall and braced +from the concrete forms. As much pitch as possible was then slushed +between the brick and the sand-wall, after which the concrete in the +main wall was filled up to the top of the water-proofing course. The tin +was then withdrawn and the operation repeated. This method was slow and +expensive, but gave good results. Ordinary pitch could not be used on +account of the fumes, which are particularly objectionable in +compressed air. The 60° pitch was slightly heated in the open air before +using. + +[Illustration: FIG. 3.] + +The sump and pump chamber on Tunnels _C_ and _D_ differed from the one +described only in minor details; but, being wholly constructed in rock, +presented fewer difficulties and permitted a complete envelope of +water-proofing to be placed in the top. + + +CONCRETE LINING. + +The placing of concrete inside the iron tube was done by an organization +entirely separate from the tunneling force. A mixing plant was placed in +each of the five shafts. The stone and sand bins discharged directly +into mixers below, which, in turn, discharged into steel side-dump +concrete cars. All concrete was placed in normal air. + +The first step, after the iron lining was scraped clean and washed down +and all leaks were stopped, was the placing of biats, marked _B_ on +Plate LXXIV. These were made up of a 6 by 12-in. yellow pine timber, 17 +ft. long, with two short lengths of the same size spliced to its ends by +pieces of 12-in. channels, 3 ft. 9 in. long, clamped upon the sides. +These biats were placed every 5 ft. along the tunnel in rings having +side keys. Next, a floor, 13 ft. wide, was laid on the biats and two +tracks, of 30-in. gauge and 6-1/2-ft. centers, were laid upon the floor. +There were three stages in the concreting. Fig. 2, Plate LXXIV, shows +the concrete in place at the end of the first, and Fig. 3, Plate LXXIV, +at the end of the second stage. The complete arch above the bench walls +was done in the last operation. + +Two 3 by 10-in. soldiers (_SS_ in Figs. 1 and 2, Plate LXXIV) were +fastened to each biat and braced across by two horizontal and two +diagonal braces. To each pair of soldiers a floor template, _T_, was +then nailed. The form for the center drain was then suspended as shown +in Fig. 1, Plate LXXIV. Three pieces of shuttering, _FFF_, 20 ft. long, +were then nailed to the bottom of the soldiers. One is all that would +have been needed for the first concrete placed, but it was easier to +place them at this stage than later, when there was less room. Three +rough shutters were also nailed to the curved portion for the floor +template. Opposite each biat, a bracket, _bb_, was then nailed, which +carries a set of rough boards which formed the risers for the duct +steps. Everything was then ready for concreting except that, where +refuge niches occurred, a form for the portion of the niche below the +seat was nailed to the shuttering. This form is shown at _R_ in Fig. 1, +Plate LXXIV. + +[Illustration: PLATE LXXIV] + +The concrete was dumped down on each side from side-dump cars standing +on the track, and, falling between the risers for the duct steps, ran or +was shoveled under the forms and down into the bottom. The horizontal +surface on each side the center drain was smoothed off with a shovel. +The workmen became very skillful at this, and got a fairly smooth +surface. This concrete was usually placed in lengths of 45 or 60 ft. +After setting for about 24 hours, the brackets, _bb_, were removed, +together with the shuttering on the steps. The triangular pieces, _t_ in +Fig. 1, Plate LXXIV, were not removed until later. Instead, a board was +laid upon this lower step on which the duct layers could work. This and +the triangular piece were not removed until just before the bench +concrete was placed. This was important, as otherwise the bond between +the old and new concrete would be much impaired by dirt ground into the +surface of the old concrete. The ducts were then laid, as shown in Fig. +2, Plate LXXIV. + +The remaining shutters for the face of the bench walls were then placed. +The remainder of the forms for the refuge niches, _RR_, in Fig. 1, Plate +LXXIV, were nailed to the shutters, the steel beam over the niche was +laid in place, the forms for the ladders, _L_ in Fig. 2, Plate LXXIV, +which occur every 25 ft., were tacked to the shutters, the shutters and +forms were given a coat of creosote oil, and then all was ready for +placing the bench concrete. + +The specifications required a 2-in. mortar face to be placed on all +exposed surfaces and the remainder to be smoothed with a trowel and +straight-edge. After about 48 hours, the biats were blocked up on the +bench, and all forms between the bench walls below the working floor +were removed. + +The centering for the arch concrete consisted of simple 5 by 3-1/2 by +5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at +5-ft. intervals. Each rib was made up of two pieces spliced together at +the top. Two men easily handled one of these pieces. After splicing, the +rib was supported by four hanger-bolts fastened to the iron lining as +shown in Fig. 3, Plate LXXIV. + +In the early part of the work, two additional bolts were used about half +way up on the side between the upper and lower hanger-bolts. It was soon +found that by placing the strut between the tunnel lining and the crown +of the rib, these hanger-bolts could be dispensed with. The lagging was +of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each +piece had three saw cuts on the back, from end to end, allowing it to be +bent to the curve of the arch; it was kept curved by an iron strap +screwed to the back. The arches were put in, either in 15, 30 or 45-ft. +lengths, depending on what was ready for concrete and what could be done +in one continuous working. The rule was that when an arch was begun, the +work must not stop until it was finished. An arch length always ended in +the middle of a ring. The lagging was placed to a height of about 6 ft. +above the bench before any concreting was done. When the concrete had +been brought up to that point, lagging was added, one piece at a time, +just ahead of the concrete, up to the crown, where a space of about 18 +in. was left. When the lagging had reached the upper hanger-bolts, they +were removed, which left only the two bottom bolts fixed in the +concrete. Most of these were unscrewed from the eye and saved, as tin +sleeves were placed around them before concreting. Two cast-iron eyes +were lost for every 5 ft. of tunnel. To place the key concrete, a stage +was set up in the middle of the floor, and, beginning at one end, about +2 ft. of block lagging was placed. Over this, concrete was packed, +filling the key as completely as possible. This was done partly by +shoveling and using a short rammer, and partly by packing with the hands +by the workmen, who wore rubber gloves for the purpose. Another 2 ft. of +lagging was then placed, and the operation was repeated, and thus +working backward, foot by foot, the key was completed. This is the usual +way of keying a concrete arch, but in this case the difficulty was +increased by the flanges of the iron lining. It was practically +impossible to fill all parts of the pockets formed by these flanges. To +meet this difficulty, provision was made for grouting any unfilled +space. As the concrete was being put in, tin pipes were placed with +their tops nearly touching the iron lining, and their bottoms resting on +the lagging. Each pocket was intended to have two of these pipes, one to +grout through and the other to act as a vent for the escape of air. Each +center key ring had six pipes, and each side key had eight. The bottoms +of the pipes were held by a single nail driven half way into the +lagging. This served to keep the pipes in position and to locate them +after the lagging was taken down. + +The cost of labor in the tunnels directly chargeable to concrete was +$1.80 per cu. yd. The top charges, exclusive of the cost of materials +(cement, sand, and stone), amounted to $3.92. + + +ELECTRIC CONDUITS. + +In one bench wall of each tunnel there were fifteen openings for power +cables and in the other, between the river shafts, there were forty +openings for telephone, telegraph, and signal cables. East of the Long +Island shaft, the number of the latter was reduced to twenty-four. The +telephone ducts were all of the four-way type. The specifications +required that the power ducts should have an opening of not less than +3-1/2 in., nor more than 3-7/8 in., and that after laying they should +pass a 4-ft. mandrel, 3-3/8 in. at the leading end and 2-5/8 in. at the +other. The outside dimension was limited between 5 and 5-3/8 in. The +openings of the four-way ducts were required to be not less than 3-3/8 +in., nor more than 3-5/8 in., and after laying to pass a 5-ft. mandrel, +3-1/4 in. at the leading end and 2-1/2 in. at the other. The outside +dimensions were limited between 9 and 9-1/2 in. All were to be laid in +1/4-in. beds of mortar. The specifications were not definite as to the +shape of the opening, but those used were square with corners rounded to +a radius of 3/8 in. The four-ways were 3 ft. long, and the singles, 18 +in. + +A study of the foregoing dimensions will show that the working limits +were narrow. Such narrow limits would not pay for the ordinary conduit +line in a street, where there is more room. In the tunnel greater +liberality meant either reducing the number of conduits or encroaching +on the strength of the concrete tunnel lining. The small difference of +only 1/8 in. in the size of the mandrel, or a clearance of only 1/16 in. +on each side, no doubt did increase the cost of laying somewhat, though +not as much as might at first be supposed. All bottom courses were laid +to a string, in practically perfect line and grade, and all joints were +tested with mandrels which were in all openings, and pulled forward as +each piece of conduit was laid. As the workmen became skillful, the +progress was excellent. + +All costs of labor in the tunnel chargeable to duct laying amounted to +$0.039 per ft. of duct; top charges brought this up to $0.083. + +The serious problem was to guard against grout and mortar running into +the duct opening through the joints from the concrete, which was a +rather wet mixture. Each joint was wrapped, when laid, with canvas, +weighing 10 oz. per sq. yd., dipped in cement grout immediately before +using. These wraps were 6 in. wide, and were cut long enough to go +around the lap about the middle of the duct. As soon as all the ducts +were laid, the entire bank was plastered over with fairly stiff mortar, +which, when properly done, closed all openings. The plastering was not +required by the specifications, but was found by the contractor to +result in a saving in ultimate cost. + +The concrete on the two sides of the bank of ducts was bonded together +by 2 by 1/8-in. steel bonds between the ducts, laid across in horizontal +joints. Both ends were split into two pieces, 1 in. long, one of which +was turned up and the other down. These bonds projected 1-1/2 in. into +the concrete on either side. Where the bond came opposite the risers of +the duct step, against which the ducts were laid, recesses were provided +for the projecting bond. This was done by nailing to the rough shutters +for the steps a form which when removed left a dove-tailed vertical +groove. This form was made in two pieces, one tapering inward and the +other with more taper outward. As the bonds were placed, these grooves +were filled with mortar. + +The ducts usually received their final rodding with the specification +mandrel a month or more after they were laid, after which all openings +into splicing chambers were stopped by wooden plugs, 8 in. long tapering +from 3-3/4 in. at one end to 2-3/4 in. at the other end, and shaped to +fit the opening tightly. At first the plugs were paraffined, to keep +them from swelling and breaking the ducts, but were not successful, as +the paraffin lubricated them so that they would not stay in place. They +were expensive, and there was some swelling in the best that were +obtained. A better plug was made by using no paraffin, but by making six +saw cuts, three horizontal and three vertical, in the larger end, +cutting to within about 2 in. of the smaller end. The swelling of the +wood was then taken up by the saw cuts and the spring of the wood. + +The splicing chambers are at 400-ft. intervals. They are 6 ft. long, 4 +ft. 9 in. high, with a width varying from 3 ft. 2 in. at the top to 1 +ft. 2 in. at the bottom. + + + + + + +End of the Project Gutenberg EBook of Transactions of the American Society +of Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard + +*** END OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN *** + +***** This file should be named 18722-8.txt or 18722-8.zip ***** +This and all associated files of various formats will be found in: + http://www.gutenberg.org/1/8/7/2/18722/ + +Produced by Juliet Sutherland, Taavi Kalju and the Online +Distributed Proofreading Team at http://www.pgdp.net + + +Updated editions will replace the previous one--the old editions +will be renamed. + +Creating the works from public domain print editions means that no +one owns a United States copyright in these works, so the Foundation +(and you!) can copy and distribute it in the United States without +permission and without paying copyright royalties. Special rules, +set forth in the General Terms of Use part of this license, apply to +copying and distributing Project Gutenberg-tm electronic works to +protect the PROJECT GUTENBERG-tm concept and trademark. Project +Gutenberg is a registered trademark, and may not be used if you +charge for the eBooks, unless you receive specific permission. If you +do not charge anything for copies of this eBook, complying with the +rules is very easy. You may use this eBook for nearly any purpose +such as creation of derivative works, reports, performances and +research. They may be modified and printed and given away--you may do +practically ANYTHING with public domain eBooks. Redistribution is +subject to the trademark license, especially commercial +redistribution. + + + +*** START: FULL LICENSE *** + +THE FULL PROJECT GUTENBERG LICENSE +PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK + +To protect the Project Gutenberg-tm mission of promoting the free +distribution of electronic works, by using or distributing this work +(or any other work associated in any way with the phrase "Project +Gutenberg"), you agree to comply with all the terms of the Full Project +Gutenberg-tm License (available with this file or online at +http://gutenberg.org/license). + + +Section 1. General Terms of Use and Redistributing Project Gutenberg-tm +electronic works + +1.A. By reading or using any part of this Project Gutenberg-tm +electronic work, you indicate that you have read, understand, agree to +and accept all the terms of this license and intellectual property +(trademark/copyright) agreement. If you do not agree to abide by all +the terms of this agreement, you must cease using and return or destroy +all copies of Project Gutenberg-tm electronic works in your possession. +If you paid a fee for obtaining a copy of or access to a Project +Gutenberg-tm electronic work and you do not agree to be bound by the +terms of this agreement, you may obtain a refund from the person or +entity to whom you paid the fee as set forth in paragraph 1.E.8. + +1.B. "Project Gutenberg" is a registered trademark. It may only be +used on or associated in any way with an electronic work by people who +agree to be bound by the terms of this agreement. There are a few +things that you can do with most Project Gutenberg-tm electronic works +even without complying with the full terms of this agreement. See +paragraph 1.C below. There are a lot of things you can do with Project +Gutenberg-tm electronic works if you follow the terms of this agreement +and help preserve free future access to Project Gutenberg-tm electronic +works. See paragraph 1.E below. + +1.C. The Project Gutenberg Literary Archive Foundation ("the Foundation" +or PGLAF), owns a compilation copyright in the collection of Project +Gutenberg-tm electronic works. Nearly all the individual works in the +collection are in the public domain in the United States. If an +individual work is in the public domain in the United States and you are +located in the United States, we do not claim a right to prevent you from +copying, distributing, performing, displaying or creating derivative +works based on the work as long as all references to Project Gutenberg +are removed. Of course, we hope that you will support the Project +Gutenberg-tm mission of promoting free access to electronic works by +freely sharing Project Gutenberg-tm works in compliance with the terms of +this agreement for keeping the Project Gutenberg-tm name associated with +the work. You can easily comply with the terms of this agreement by +keeping this work in the same format with its attached full Project +Gutenberg-tm License when you share it without charge with others. + +1.D. The copyright laws of the place where you are located also govern +what you can do with this work. Copyright laws in most countries are in +a constant state of change. If you are outside the United States, check +the laws of your country in addition to the terms of this agreement +before downloading, copying, displaying, performing, distributing or +creating derivative works based on this work or any other Project +Gutenberg-tm work. The Foundation makes no representations concerning +the copyright status of any work in any country outside the United +States. + +1.E. Unless you have removed all references to Project Gutenberg: + +1.E.1. The following sentence, with active links to, or other immediate +access to, the full Project Gutenberg-tm License must appear prominently +whenever any copy of a Project Gutenberg-tm work (any work on which the +phrase "Project Gutenberg" appears, or with which the phrase "Project +Gutenberg" is associated) is accessed, displayed, performed, viewed, +copied or distributed: + +This eBook is for the use of anyone anywhere at no cost and with +almost no restrictions whatsoever. You may copy it, give it away or +re-use it under the terms of the Project Gutenberg License included +with this eBook or online at www.gutenberg.org + +1.E.2. If an individual Project Gutenberg-tm electronic work is derived +from the public domain (does not contain a notice indicating that it is +posted with permission of the copyright holder), the work can be copied +and distributed to anyone in the United States without paying any fees +or charges. If you are redistributing or providing access to a work +with the phrase "Project Gutenberg" associated with or appearing on the +work, you must comply either with the requirements of paragraphs 1.E.1 +through 1.E.7 or obtain permission for the use of the work and the +Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or +1.E.9. + +1.E.3. If an individual Project Gutenberg-tm electronic work is posted +with the permission of the copyright holder, your use and distribution +must comply with both paragraphs 1.E.1 through 1.E.7 and any additional +terms imposed by the copyright holder. Additional terms will be linked +to the Project Gutenberg-tm License for all works posted with the +permission of the copyright holder found at the beginning of this work. + +1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm +License terms from this work, or any files containing a part of this +work or any other work associated with Project Gutenberg-tm. + +1.E.5. Do not copy, display, perform, distribute or redistribute this +electronic work, or any part of this electronic work, without +prominently displaying the sentence set forth in paragraph 1.E.1 with +active links or immediate access to the full terms of the Project +Gutenberg-tm License. + +1.E.6. You may convert to and distribute this work in any binary, +compressed, marked up, nonproprietary or proprietary form, including any +word processing or hypertext form. However, if you provide access to or +distribute copies of a Project Gutenberg-tm work in a format other than +"Plain Vanilla ASCII" or other format used in the official version +posted on the official Project Gutenberg-tm web site (www.gutenberg.org), +you must, at no additional cost, fee or expense to the user, provide a +copy, a means of exporting a copy, or a means of obtaining a copy upon +request, of the work in its original "Plain Vanilla ASCII" or other +form. Any alternate format must include the full Project Gutenberg-tm +License as specified in paragraph 1.E.1. + +1.E.7. Do not charge a fee for access to, viewing, displaying, +performing, copying or distributing any Project Gutenberg-tm works +unless you comply with paragraph 1.E.8 or 1.E.9. + +1.E.8. You may charge a reasonable fee for copies of or providing +access to or distributing Project Gutenberg-tm electronic works provided +that + +- You pay a royalty fee of 20% of the gross profits you derive from + the use of Project Gutenberg-tm works calculated using the method + you already use to calculate your applicable taxes. The fee is + owed to the owner of the Project Gutenberg-tm trademark, but he + has agreed to donate royalties under this paragraph to the + Project Gutenberg Literary Archive Foundation. Royalty payments + must be paid within 60 days following each date on which you + prepare (or are legally required to prepare) your periodic tax + returns. Royalty payments should be clearly marked as such and + sent to the Project Gutenberg Literary Archive Foundation at the + address specified in Section 4, "Information about donations to + the Project Gutenberg Literary Archive Foundation." + +- You provide a full refund of any money paid by a user who notifies + you in writing (or by e-mail) within 30 days of receipt that s/he + does not agree to the terms of the full Project Gutenberg-tm + License. You must require such a user to return or + destroy all copies of the works possessed in a physical medium + and discontinue all use of and all access to other copies of + Project Gutenberg-tm works. + +- You provide, in accordance with paragraph 1.F.3, a full refund of any + money paid for a work or a replacement copy, if a defect in the + electronic work is discovered and reported to you within 90 days + of receipt of the work. + +- You comply with all other terms of this agreement for free + distribution of Project Gutenberg-tm works. + +1.E.9. If you wish to charge a fee or distribute a Project Gutenberg-tm +electronic work or group of works on different terms than are set +forth in this agreement, you must obtain permission in writing from +both the Project Gutenberg Literary Archive Foundation and Michael +Hart, the owner of the Project Gutenberg-tm trademark. Contact the +Foundation as set forth in Section 3 below. + +1.F. + +1.F.1. Project Gutenberg volunteers and employees expend considerable +effort to identify, do copyright research on, transcribe and proofread +public domain works in creating the Project Gutenberg-tm +collection. Despite these efforts, Project Gutenberg-tm electronic +works, and the medium on which they may be stored, may contain +"Defects," such as, but not limited to, incomplete, inaccurate or +corrupt data, transcription errors, a copyright or other intellectual +property infringement, a defective or damaged disk or other medium, a +computer virus, or computer codes that damage or cannot be read by +your equipment. + +1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right +of Replacement or Refund" described in paragraph 1.F.3, the Project +Gutenberg Literary Archive Foundation, the owner of the Project +Gutenberg-tm trademark, and any other party distributing a Project +Gutenberg-tm electronic work under this agreement, disclaim all +liability to you for damages, costs and expenses, including legal +fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT +LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE +PROVIDED IN PARAGRAPH F3. YOU AGREE THAT THE FOUNDATION, THE +TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE +LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR +INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH +DAMAGE. + +1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a +defect in this electronic work within 90 days of receiving it, you can +receive a refund of the money (if any) you paid for it by sending a +written explanation to the person you received the work from. If you +received the work on a physical medium, you must return the medium with +your written explanation. The person or entity that provided you with +the defective work may elect to provide a replacement copy in lieu of a +refund. If you received the work electronically, the person or entity +providing it to you may choose to give you a second opportunity to +receive the work electronically in lieu of a refund. If the second copy +is also defective, you may demand a refund in writing without further +opportunities to fix the problem. + +1.F.4. Except for the limited right of replacement or refund set forth +in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO OTHER +WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO +WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE. + +1.F.5. Some states do not allow disclaimers of certain implied +warranties or the exclusion or limitation of certain types of damages. +If any disclaimer or limitation set forth in this agreement violates the +law of the state applicable to this agreement, the agreement shall be +interpreted to make the maximum disclaimer or limitation permitted by +the applicable state law. The invalidity or unenforceability of any +provision of this agreement shall not void the remaining provisions. + +1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the +trademark owner, any agent or employee of the Foundation, anyone +providing copies of Project Gutenberg-tm electronic works in accordance +with this agreement, and any volunteers associated with the production, +promotion and distribution of Project Gutenberg-tm electronic works, +harmless from all liability, costs and expenses, including legal fees, +that arise directly or indirectly from any of the following which you do +or cause to occur: (a) distribution of this or any Project Gutenberg-tm +work, (b) alteration, modification, or additions or deletions to any +Project Gutenberg-tm work, and (c) any Defect you cause. + + +Section 2. Information about the Mission of Project Gutenberg-tm + +Project Gutenberg-tm is synonymous with the free distribution of +electronic works in formats readable by the widest variety of computers +including obsolete, old, middle-aged and new computers. It exists +because of the efforts of hundreds of volunteers and donations from +people in all walks of life. + +Volunteers and financial support to provide volunteers with the +assistance they need, is critical to reaching Project Gutenberg-tm's +goals and ensuring that the Project Gutenberg-tm collection will +remain freely available for generations to come. In 2001, the Project +Gutenberg Literary Archive Foundation was created to provide a secure +and permanent future for Project Gutenberg-tm and future generations. +To learn more about the Project Gutenberg Literary Archive Foundation +and how your efforts and donations can help, see Sections 3 and 4 +and the Foundation web page at http://www.pglaf.org. + + +Section 3. Information about the Project Gutenberg Literary Archive +Foundation + +The Project Gutenberg Literary Archive Foundation is a non profit +501(c)(3) educational corporation organized under the laws of the +state of Mississippi and granted tax exempt status by the Internal +Revenue Service. The Foundation's EIN or federal tax identification +number is 64-6221541. Its 501(c)(3) letter is posted at +http://pglaf.org/fundraising. Contributions to the Project Gutenberg +Literary Archive Foundation are tax deductible to the full extent +permitted by U.S. federal laws and your state's laws. + +The Foundation's principal office is located at 4557 Melan Dr. S. +Fairbanks, AK, 99712., but its volunteers and employees are scattered +throughout numerous locations. Its business office is located at +809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email +business@pglaf.org. Email contact links and up to date contact +information can be found at the Foundation's web site and official +page at http://pglaf.org + +For additional contact information: + Dr. Gregory B. Newby + Chief Executive and Director + gbnewby@pglaf.org + +Section 4. Information about Donations to the Project Gutenberg +Literary Archive Foundation + +Project Gutenberg-tm depends upon and cannot survive without wide +spread public support and donations to carry out its mission of +increasing the number of public domain and licensed works that can be +freely distributed in machine readable form accessible by the widest +array of equipment including outdated equipment. Many small donations +($1 to $5,000) are particularly important to maintaining tax exempt +status with the IRS. + +The Foundation is committed to complying with the laws regulating +charities and charitable donations in all 50 states of the United +States. Compliance requirements are not uniform and it takes a +considerable effort, much paperwork and many fees to meet and keep up +with these requirements. We do not solicit donations in locations +where we have not received written confirmation of compliance. To +SEND DONATIONS or determine the status of compliance for any +particular state visit http://pglaf.org + +While we cannot and do not solicit contributions from states where we +have not met the solicitation requirements, we know of no prohibition +against accepting unsolicited donations from donors in such states who +approach us with offers to donate. + +International donations are gratefully accepted, but we cannot make +any statements concerning tax treatment of donations received from +outside the United States. U.S. laws alone swamp our small staff. + +Please check the Project Gutenberg Web pages for current donation +methods and addresses. Donations are accepted in a number of other +ways including checks, online payments and credit card +donations. To donate, please visit: http://pglaf.org/donate + + +Section 5. General Information About Project Gutenberg-tm electronic +works. + +Professor Michael S. Hart is the originator of the Project Gutenberg-tm +concept of a library of electronic works that could be freely shared +with anyone. For thirty years, he produced and distributed Project +Gutenberg-tm eBooks with only a loose network of volunteer support. + +Project Gutenberg-tm eBooks are often created from several printed +editions, all of which are confirmed as Public Domain in the U.S. +unless a copyright notice is included. Thus, we do not necessarily +keep eBooks in compliance with any particular paper edition. + +Most people start at our Web site which has the main PG search facility: + + http://www.gutenberg.org + +This Web site includes information about Project Gutenberg-tm, +including how to make donations to the Project Gutenberg Literary +Archive Foundation, how to help produce our new eBooks, and how to +subscribe to our email newsletter to hear about new eBooks. + +*** END: FULL LICENSE *** + diff --git a/18722-8.zip b/18722-8.zip Binary files differnew file mode 100644 index 0000000..f608d00 --- /dev/null +++ b/18722-8.zip diff --git a/18722-h.zip b/18722-h.zip Binary files differnew file mode 100644 index 0000000..d57a897 --- /dev/null +++ b/18722-h.zip diff --git a/18722-h/18722-h.htm b/18722-h/18722-h.htm new file mode 100644 index 0000000..cba86b2 --- /dev/null +++ b/18722-h/18722-h.htm @@ -0,0 +1,4570 @@ +<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN" + "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd"> + +<html xmlns="http://www.w3.org/1999/xhtml"> + <head> + <meta http-equiv="Content-Type" content="text/html;charset=iso-8859-1" /> + <title> + The Project Gutenberg eBook of The New York Tunnel Extension of the Pennsylvania Railroad--The East River Tunnels, by James H. Brace, Francis Mason, and S. H. Woodard + </title> + <style type="text/css"> +/*<![CDATA[ XML blockout */ +<!-- + p { margin-top: .75em; + text-align: justify; + margin-bottom: .75em; + } + h1,h2,h3,h4,h5,h6 { + text-align: center; /* all headings centered */ + clear: both; + } + hr { width: 33%; + margin-top: 2em; + margin-bottom: 2em; + margin-left: auto; + margin-right: auto; + clear: both; + } + + table {margin-left: auto; margin-right: auto;} + a img {border: none; } + + body{margin-left: 10%; + margin-right: 10%; + } + + .pagenum { /* uncomment the next line for invisible page numbers */ + /* visibility: hidden; */ + position: absolute; + left: 1%; + font-size: smaller; + text-align: left; + color: gray; + } /* page numbers */ + + .linenum {position: absolute; top: auto; left: 4%;} /* poetry number */ + .blockquot{margin-left: 5%; margin-right: 10%;} + .sidenote {width: 20%; padding-bottom: .5em; padding-top: .5em; + padding-left: .5em; padding-right: .5em; margin-left: 1em; + float: right; clear: right; margin-top: 1em; + font-size: smaller; color: black; background: #eeeeee; border: dashed 1px;} + + .bb {border-bottom: solid 2px;} + .bbl {border-bottom: solid 2px; border-left: solid 2px;} + .bbr {border-bottom: solid 2px; border-right: solid 2px;} + .bblr {border-bottom: solid 2px; border-right: solid 2px; border-left: solid 2px;} + .bbt {border-bottom: solid 2px; border-top: solid 2px;} + .bbtl {border-bottom: solid 2px; border-top: solid 2px; border-left: solid 2px;} + .bbtr {border-bottom: solid 2px; border-top: solid 2px; border-right: solid 2px;} + .bl {border-left: solid 2px;} + .blr {border-left: solid 2px; border-right: solid 2px;} + .btl {border-top: solid 2px; border-left: solid 2px;} + .btr {border-top: solid 2px; border-right: solid 2px;} + .btlr {border-top: solid 2px; border-left: solid 2px; border-right: solid 2px;} + .bt {border-top: solid 2px;} + .br {border-right: solid 2px;} + .bbox {border: solid 2px;} + .btlw15 {border-top: solid 2px; border-left: solid 2px; width: 15%} + .btw13 {border-top: solid 2px; width: 13%} + + .center {text-align: center;} + .smcap {font-variant: small-caps;} + .u {text-decoration: underline;} + + .caption {font-weight: bold; font-variant: small-caps;} + + .figcenter {margin: auto; text-align: center;} + + .figleft {float: left; clear: left; margin-left: 0; margin-bottom: 1em; margin-top: + 1em; margin-right: 1em; padding: 0; text-align: center;} + + .figright {float: right; clear: right; margin-left: 1em; margin-bottom: 1em; + margin-top: 1em; margin-right: 0; padding: 0; text-align: center;} + + .footnotes {border: dashed 1px;} + .footnote {margin-left: 10%; margin-right: 10%; font-size: 0.9em;} + .footnote .label {position: absolute; right: 84%; text-align: right;} + .fnanchor {vertical-align: super; font-size: .8em; text-decoration: none;} + + .poem {margin-left:10%; margin-right:10%; text-align: left;} + .poem br {display: none;} + .poem .stanza {margin: 1em 0em 1em 0em;} + .poem span.i0 {display: block; margin-left: 0em; padding-left: 3em; text-indent: -3em;} + .poem span.i2 {display: block; margin-left: 2em; padding-left: 3em; text-indent: -3em;} + .poem span.i4 {display: block; margin-left: 4em; padding-left: 3em; text-indent: -3em;} + // --> + /* XML end ]]>*/ + </style> + </head> +<body> + + +<pre> + +The Project Gutenberg EBook of Transactions of the American Society of +Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard + +This eBook is for the use of anyone anywhere at no cost and with +almost no restrictions whatsoever. You may copy it, give it away or +re-use it under the terms of the Project Gutenberg License included +with this eBook or online at www.gutenberg.org + + +Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 + The New York Tunnel Extension of the Pennsylvania Railroad. + The East River Tunnels. Paper No. 1159 + +Author: James H. Brace, Francis Mason and S. H. Woodard + +Release Date: July 1, 2006 [EBook #18722] + +Language: English + +Character set encoding: ISO-8859-1 + +*** START OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN *** + + + + +Produced by Juliet Sutherland, Taavi Kalju and the Online +Distributed Proofreading Team at http://www.pgdp.net + + + + + + +</pre> + + + + +<p><span class='pagenum'><a name="Page_419" id="Page_419">[Pg 419]</a></span></p> + +<h2>AMERICAN SOCIETY OF CIVIL ENGINEERS</h2> + +<h3>INSTITUTED 1852</h3> + +<hr style="width: 45%;" /> + +<h1>TRANSACTIONS</h1> + +<hr style="width: 45%;" /> + +<h3>Paper No. 1159</h3> + + +<h1>THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA RAILROAD.</h1> + +<h1>THE EAST RIVER TUNNELS.<a name="FNanchor_A_1" id="FNanchor_A_1"></a><a href="#Footnote_A_1" class="fnanchor">[A]</a></h1> + +<h2><span class="smcap">By James H. Brace, Francis Mason, and S. H. Woodard, Members, Am. Soc. +C. E.</span></h2> + +<hr style="width: 45%;" /> + +<p>This paper will be limited to a consideration of the construction of the +tunnels, the broader questions of design, etc., having already been +considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C. +E., and Alfred Noble, Past-President, Am. Soc. C. E.</p> + +<p>The location of the section of the work to be considered here is shown +on Plate XIII of Mr. Noble's paper. There are two permanent shafts on +each side of the East River and four single cast-iron tube tunnels, each +about 6,000 ft. long, and consisting of 3,900 ft. between shafts under +the river, and 2,000 ft. in Long Island City, mostly under the depot and +passenger yard of the Long Island Railroad. This tube-tunnel work was +naturally a single job. The contract for its construction was let to S. +Pearson and Son, Incorporated, ground being broken on May 17th, 1904. +Five years later, to a day, the work was finished and received its final +inspection for acceptance by the Railroad Company.</p> + +<p>The contract was of the profit-sharing type, and required an audit, by +the Railroad Company, of the contractor's books, and a careful system of +cost-keeping by the Company's engineers, so that it is possible to +include in the following some of the unit costs of the work. These are +<span class='pagenum'><a name="Page_420" id="Page_420">[Pg 420]</a></span>given in two parts: The first is called the unit labor cost, and is the +cost of the labor in the tunnel directly chargeable to the thing +considered. It does not include the labor of operating the plant, nor +watchmen, yardmen, pipemen, and electricians. The second is called "top +charges," a common term, but meaning different things to different +contractors and engineers. Here, it is made to include the cost of the +contractor's staff and roving laborers, such as pipemen, electricians, +and yardmen, the cost of the plant and its operation, and all +miscellaneous expenses, but does not include any contractor's profit, +nor cost of materials entering permanent work.</p> + +<p>The contractor's plant is to be described in a paper by Henry Japp,<a name="FNanchor_B_2" id="FNanchor_B_2"></a><a href="#Footnote_B_2" class="fnanchor">[B]</a> +M. Am. Soc. C. E., and will not be dealt with here.</p> + +<p>The contractors carried on their work from three different sites. From +permanent shafts, located near the river in Manhattan, four shields were +driven eastward to about the middle of the river; and, from two similar +shafts at the river front in Long Island City, four shields were driven +westward to meet those from Manhattan. From a temporary shaft, near East +Avenue, Long Island City, the land section of about 2,000 ft. was driven +to the river shafts.</p> + + +<h4><span class="smcap">Tunnels From East Avenue To the River Shafts.</span></h4> + +<p>The sinking of the temporary shaft at East Avenue was a fairly simple +matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34 +ft., braced across by heavy timbering, was driven about 28 ft. to rock +as the excavation progressed. Below this, the shaft was sunk into rock, +about 27 ft., without timbering. As soon as the shaft was down, on +September 30th, 1904, bottom headings were started westward in Tunnels +<i>A</i>, <i>B</i>, and <i>D</i>. When these had been driven about half the distance to +the river shafts, soft ground was encountered. (See Station 59, Plate +XIII.) As the ground carried considerable water, it was decided to use +compressed air. Bulkheads were built in the heading, and, with an air +pressure of about 15 lb. per sq. in., the heading was driven through the +soft ground and into rock by ordinary mining methods. The use of +compressed air was then discontinued. West of this soft ground, a top +heading, followed by a bench, was driven to the soft ground at about +Station 66. Tunnel <i>C</i>, being higher, was more in soft ground, and at +first it was the intention to delay its excavation until it had been +<span class='pagenum'><a name="Page_421" id="Page_421">[Pg 421]</a></span>well drained by the bottom headings in the tunnels on each side. A +little later it was decided to use a shield without compressed air. This +shield had been used in excavating the stations of the Great Northern +and City Tunnel in London. It was rebuilt, its diameter being changed +from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after +it had flattened about 4 in. and had been jacked up three times, the +scheme was abandoned, the shield was removed, and work was continued by +the methods which were being used in the other tunnels. The shield was +rather light, but probably it would have been strong enough had it been +used with compressed air, or had the material passed through been all +earth. Here, there was a narrow concrete cradle in the bottom, with rock +up to about the middle of the tunnel, which was excavated to clear the +shield, and gave no support on its sides. The shield was a cylinder +crushed between forces applied along the top and bottom.</p> + +<p>With the exception of this trial of a shield in Tunnel <i>C</i>, and a novel +method in Tunnel <i>B</i>, where compressed air, but no shield, was used, the +description of the work in one tunnel will do for all.</p> + +<p>From the bottom headings break-ups were started at several places in +each tunnel where there was ample cover of rock above. Where the roof +was in soft ground, top headings were driven from the points of break-up +and timbered. As soon as the full-sized excavation was completed, the +iron lining was built, usually in short lengths.</p> + +<p>It will be noticed on Plate XIII that there is a depression in the rock +between Station 65 and the river shafts, leaving all the tunnels in soft +ground. As this was directly under the Long Island Railroad passenger +station, it was thought best to use a shield and compressed air. This +was done in Tunnels <i>A</i>, <i>C</i>, and <i>D</i>, one shield being used +successively for all three. It was first erected in Tunnel <i>D</i> at +Station 64 + 47. From there it was driven westward to the river shaft. +It was then taken apart and re-erected in Tunnel <i>C</i> at Station 63 + 63 +and driven westward to the shaft. It was then found that there would not +be time for one shield to do all four lines. The experience in Tunnels +<i>C</i> and <i>D</i> had proven the ground to be much better than had been +expected. There was considerable clay in the sand, and, with the water +blown out by compressed air, it was very stable. A special timbering +method was devised, and Tunnel <i>B</i> was driven from Station 66 + 10 to +the shaft with compressed air, but without a shield. In the meantime the +shield was re-erected in Tunnel <i>A</i> and was shoved<span class='pagenum'><a name="Page_422" id="Page_422">[Pg 422]</a></span> through the soft +ground from Station 65 + 48 nearly to the river shaft, where it was +dismantled.</p> + +<p>There was nothing unusual about the shield work; it was about the same +as that under the river, which is fully described elsewhere. In spite of +great care in excavating in front of the shield, and prompt grouting +behind it, there was a small settlement of the building above, amounting +to about 1-1/2 in. in the walls and about 5 in. in the ground floors +which were of concrete laid like a sidewalk directly upon the ground. +Whether this settlement was due to ground lost in the shield work or to +a compacting of the ground on account of its being dried out by +compressed air, it is impossible to say.</p> + +<p>The interesting features of this work from East Avenue to the river +shafts are the mining methods and the building of the iron tube without +a shield.</p> + + +<h4><span class="smcap">Excavation In All Rock.</span></h4> + +<p>Where the tunnel was all in good rock two distinct methods were used. +The first was the bottom-heading-and-break-up, and the second, the +top-heading-and-bench method. The first is illustrated by Figs. 1 and 2, +<a href="#ill01">Plate LXIII</a>. The bottom heading, 13 ft. wide and 9 ft. high, having +first been driven, a break-up was started by blasting down the rock, +forming a chamber the full height of the tunnel. The timber platform, +shown in the drawing, was erected in the bottom heading, and extended +through the break-up chamber. The plan was then to drill the entire face +above the bottom heading and blast it down upon the timber staging, thus +maintaining a passage below for the traffic from the heading and +break-ups farther down the line. Starting with the condition indicated +by Plate XIII, the face was drilled, the columns were then taken down +and the muck pile was shoveled through holes in the staging into muck +cars below. The face was then blasted down upon the staging, the drill +columns were set up on the muck pile, and the operation was repeated. +This method has the advantage that the bottom heading can be pushed +through rapidly, and from it the tunnel may be attacked at a number of +points at one time. It was found to be more expensive than the +top-heading-and-bench method, and as soon as the depression in the rock +at about Station 59 was passed, a top heading about 7 ft. high, and +roughly the segment of a 23-ft. circle, was driven to the next soft +ground in each of the four tunnels. The remainder of the section was +taken out in two<span class='pagenum'><a name="Page_423" id="Page_423">[Pg 423]</a></span> benches, the first, about 4 ft. high, was kept about +15 ft. ahead of the lower bench, which was about the remaining 11 ft. +high.</p> + + +<h4><span class="smcap">Excavation in Earth and Rock.</span></h4> + +<p>About 2,500 ft. of tunnel, the roof of which was in soft ground, was +excavated in normal air by the mining-and-timbering method. In the +greater part of this the rock surface was well above the middle of the +tunnel. The method of timbering and mining, while well enough known, has +not been generally used in the United States.</p> + +<div class="figcenter"> + <a id="ill01" name="ill01"></a><a href="images/ill01large.jpg"> + <img src="images/ill01.jpg" + alt="Plate LXIII" + title="Plate LXIII" /></a><br /> + <span class="caption">Plate LXIII</span> +</div> + +<p>Starting from the break-up in all rock, as described above, and +illustrated on Plate XIII, when soft ground was approached, a top +heading was driven from the rock into and through the earth. This +heading was about 7 ft. high and about 6 ft. wide. This was done by the +usual post, cap, and poling-board method. The ground was a running sand +with little or no clay, and, at first, considerable water, in places. +All headings required side polings. The roof poling boards were about +2-1/2 or 3 ft. above the outside limit of the tunnel lining, as +illustrated by Figs. 3, 4, and 5, <a href="#ill01">Plate LXIII</a>. The next step was to +place two crown-bars, <i>AA</i>, usually about 20 ft. long, under the caps. +Posts were then placed under the bars, and poling boards at right angles +to the axis of the tunnel were then driven out over the bars. As these +polings were being driven, the side polings of the original heading were +removed, and the earth was mined out to the end of these new transverse +polings. Breast boards were set on end under the ends of the transverse +polings when they had been driven out to their limit. Side bars, <i>BB</i>, +were then placed as far out as possible and supported on raking posts. +These posts were carried down to rock, if it was near, if not, a sill +was placed.</p> + +<p>A new set of transverse polings was driven over these side bars and the +process was repeated until the sides had been carried down to rock or +down to the elevation of the sills supporting the posts, which were +usually about 4 ft. above the axis of the tunnel.</p> + +<p>The plan then was to excavate the remainder of the section and build the +iron lining in short lengths, gradually transferring the weight of the +roof bars of the iron lining as the posts were taken out. This meant +that not more than four rings, and often only one ring, could be built +before excavation and a short length of cradle became necessary. Before +the posts under the roof bars could be built and the<span class='pagenum'><a name="Page_424" id="Page_424">[Pg 424]</a></span> weight transferred +to the iron lining, a grout dam was placed at the leading end of the +iron lining, and grout was brought up to at least 45° from the top. Such +workings were in progress at as many as eight places in one tunnel at +the same time. Where there was only the ordinary ground-water to contend +with, the driving of the top heading drained the ground very thoroughly, +and the enlarging was done easily and without a serious loss of ground. +Under these conditions the surface settlement was from 6 in. to 2 ft.</p> + +<p>Under Borden Avenue, there was more water, which probably came from a +leaky sewer; it was not enough to form a stream, but just kept the +ground thoroughly saturated. There was a continued though hardly +perceptible flow of earth through every crevice in the timbering during +the six or eight weeks between the driving of the top heading and the +placing of the iron lining; and here there was a settlement of from 4 to +8 ft. at the surface.</p> + + +<h4><span class="smcap">Tunneling in Compressed Air Without a Shield.</span></h4> + +<p>When it became evident that there would not be time for one shield to do +the soft ground portions of all four tunnels under the Long Island +Railroad station, a plan was adopted and used in Tunnel B which, while +not as rapid, turned out to be as cheap as the work done by the shields. +Figs. 6 and 7, <a href="#ill01">Plate LXIII</a>, and <a href="#ill02">Fig. 1, Plate LXIV</a>, illustrate this work +fairly well. The operation of this scheme was about as follows: Having +the iron built up to the face of the full-sized excavation, a hole or +top heading, about 3 ft. wide and 4 or 5 ft. high, was excavated to +about 10 ft. in advance. This was done in a few hours without timbering +of any kind; but, as soon as the hole or heading was 10 ft. out, 6 by +12-in. laggings or polings were put up in the roof, with the rear ends +resting on the iron lining and the leading ends resting on vertical +breast boards. The heading was then widened out rapidly and the lagging +was placed, down to about 45° from the crown. The forward ends of the +laggings were then supported by a timber rib and sill. Protected by this +roof, the full section was excavated, and three rings of the iron lining +were built and grouted, and then the whole process was repeated.</p> + +<div class="figcenter"> + <a id="ill02" name="ill02"> + <img src="images/ill02.jpg" + alt="Plate LXIV, Fig. 1.--Tunneling in Compressed Air Without Shield." + title="Plate LXIV, Fig. 1.--Tunneling in Compressed Air Without Shield." /></a><br /> + <span class="caption">Plate LXIV, Fig. 1.—Tunneling in Compressed Air Without Shield.</span> +</div> + +<div class="figcenter"> + <a id="ill03" name="ill03"> + <img src="images/ill03.jpg" + alt="Plate LXIV, Fig. 2.--T-Head Air-lock." + title="Plate LXIV, Fig. 2.--T-Head Air-lock." /></a><br /> + <span class="caption">Plate LXIV, Fig. 2.—T-Head Air-lock.</span> +</div> + +<div class="figcenter"> + <a id="ill04" name="ill04"> + <img src="images/ill04.jpg" + alt="Plate LXIV, Fig. 3.--Cutting Edge of Caisson Assembled." + title="Plate LXIV, Fig. 3.--Cutting Edge of Caisson Assembled." /></a><br /> + <span class="caption">Plate LXIV, Fig. 3.—Cutting Edge of Caisson Assembled.</span> +</div> + +<div class="figcenter"> + <a id="ill05" name="ill05"> + <img src="images/ill05.jpg" + alt="Plate LXIV, Fig. 4.--Caisson Supported on Jacks and Blocks." + title="Plate LXIV, Fig. 4.--Caisson Supported on Jacks and Blocks." /></a><br /> + <span class="caption">Plate LXIV, Fig. 4.—Caisson Supported on Jacks and Blocks.</span> +</div> + + +<h4><span class="smcap">Concrete Cradles, Hand-Packed Stone and Grouting.</span></h4> + +<p>Had the East Avenue Tunnel been built by shields, as was contemplated at +the time of its design, the space between the limits of<span class='pagenum'><a name="Page_425" id="Page_425">[Pg 425]</a></span> excavation +and the iron lining would have been somewhat less than by the method +actually used, especially in the earth portions. This space would have +been filled with grout ejected through the iron lining. The change in +the method of doing the work permitted the use of cheaper material, in +place of part of the grout, and, at the same time, facilitated the work.</p> + +<p>The tube of cast-iron rings is adapted to be built in the tail of the +shield. Where no shield was used, after the excavation was completed and +all loose rock was removed, timbers were fixed across the tunnel from +which semicircular ribs were hung, below which lagging was placed. The +space between this and the rough rock surface was filled with concrete. +This formed a cradle in which the iron tube could be erected, and, at +the same time, occupied space which would have been filled by grout, at +greater cost, had a shield been used.</p> + +<p>As soon as each ring of iron was erected, the space between it and the +roof of the excavation was filled with hand-packed stone. At about every +sixth ring a wall of stone laid in mortar was built between the lining +and the rock to serve as a dam to retain grout. The interstices between +the hand-packed stones were then filled with 1 to 1 grout of cement and +sand, ejected through the iron lining. The concrete cradles averaged +1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70 +per cu. yd., of which $2.25 was for labor and $4.45 was for top charges. +The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost +$2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top +charges.</p> + + +<h4><span class="smcap">Erection of Iron Lining.</span></h4> + +<p>The contractors planned to erect the iron lining with erectors of the +same pattern as that used on the shield under the river, mounted on a +traveling stage. These will be described in detail in Mr. Japp's paper. +Two of these stages and erectors worked in each tunnel at different +points. The tunnel was attacked from so many points that these erectors +could not be moved from working to working. The result was that about +58% of the lining was built by hand. At first thought, this seems to be +a crude and extravagant method, as the plates weighed about 1 ton each +and about 20,000 were erected by hand. As it turned out, the cost was +not greater than for those erected by machinery, taking into account the +cost of erectors and power. This, however,<span class='pagenum'><a name="Page_426" id="Page_426">[Pg 426]</a></span> was largely because the hand +erection reduced the amount of work to be done by the machines so much +that the machines had an undue plant charge.</p> + +<p>The hand erection was very simple. A portable hand-winch, with a 3/8-in. +wire rope, was set in any convenient place. The wire rope was carried to +a snatch-block fastened to the top of the iron previously built; or, +where the roof was in soft ground, the timbering furnished points of +attachment. The end of the wire rope was then hooked to a bolt hole in a +new plate, two men at the winch lifted the plate, and three or four +others swung it into approximate place, and, with the aid of bars and +drift-pins, coaxed it into position and bolted it. Where there was no +timbering above the iron, sometimes the key and adjoining plates were +set on blocking on a timber staging and then jacked up to place.</p> + + +<h4><span class="smcap">Long Island Shafts.</span></h4> + +<p>The river shafts were designed to serve both as working shafts and as +permanent openings to the tunnels, and were larger and more substantial +than would have been required for construction purposes. Plate X of Mr. +Noble's paper shows their design. They consist of two steel caissons, +each 40 by 74 ft. in plan, with walls 5 ft. thick filled with concrete. +A wall 6 ft. thick separated each shaft into two wells 29 by 30 ft., +each directly over a tunnel. Circular openings for the tunnel, 25 ft. in +diameter, were provided in the sides of the caissons. During the sinking +these were closed by bulkheads of steel plates backed by horizontal +steel girders. The shafts were sunk as pneumatic caissons to a depth of +78 ft. below mean high water. There have been a few caissons which were +larger and were sunk deeper than these, but most large caissons have +been for foundations, such as bridge piers, and have been stopped at or +a little below the surface of the rock. The unusual feature of the +caissons for the Long Island shaft is that they were sunk 54 ft. through +rock.</p> + +<p>It had been hoped that the rock would prove sound enough to permit +stopping the caissons at or a little below the surface and continuing +the excavation without sinking them further; for this reason only the +steel for the lower 40 ft. of the caissons was ordered at first.</p> + +<p>The roof of the working chamber was placed 7 ft. above the cutting edge. +It was a steel floor, designed by the contractors, and consisted<span class='pagenum'><a name="Page_427" id="Page_427">[Pg 427]</a></span> of +five steel girders, 6 ft. deep, 29 ft. long, and spaced at 5-ft. +centers. Between were plates curved upward to a radius of 4 ft. Each +working chamber had two shafts, 3 ft. by 5 ft. in cross-section, with a +diaphragm dividing it into two passages, the smaller for men and the +larger for muck buckets. On top of these shafts were Moran locks. +Mounted on top of the caisson was a 5-ton Wilson crane, which would +reach each shaft and also the muck cars standing on tracks on the ground +level beside the caissons. Circular steel buckets, 2 ft. 6 in. in +diameter and 3 ft. high, were used for handling all muck. These were +taken from the bottom of the working chamber, dumped in cars, and +returned to the bottom without unhooking. Work was carried on by three +8-hour shifts per day. The earth excavation was done at the rate of +about 67 cu. yd. per day from one caisson. The rock excavation, +amounting to about 6,200 cu. yd. in each caisson, was done at the rate +of about 44.5 cu. yd. per day. The average rate of lowering, when the +cutting edge of the south caisson was passing through earth, was 0.7 ft. +per day. In rock, the rate was 0.48 ft. per day in the south caisson, +and 0.39 ft. per day in the north caisson.</p> + +<p>At the beginning all lowering was done with sixteen hydraulic jacks. +Temporary brackets were fastened to the outside of the caisson. A +100-ton hydraulic jack was placed under each alternate bracket and under +each of the others there was blocking. The jacks were connected to a +high-pressure pump in the power-house. As the jacks lifted the caisson, +the blocking was set for a lower position, to which the caisson settled +as the jacks were exhausted. After the caisson had penetrated the earth +about 10 ft., the outside brackets were removed and the lowering was +regulated by blocking placed under brackets in the working chamber. The +caisson usually rested on three sets of blockings on each side and two +on each end. The blocking was about 4 ft. inside the cutting edge. In +the rock, as the cutting edge was cleared for a lowering of about 2 ft., +6 by 8-in. oak posts were placed under the cutting-edge angle. When a +sufficient number of posts had been placed, the blocking on which the +caisson had rested was knocked or blasted out, and the rock underneath +was excavated. The blocking was then re-set at a lower elevation. The +posts under the cutting edge were then chopped part way through and the +air pressure was lowered about 10 lb., which increased the net weight to +more than 4,000,000 lb. The posts then gradually crushed and the +caissons settled to the new block<span class='pagenum'><a name="Page_428" id="Page_428">[Pg 428]</a></span>ing. The tilt or level of the caisson +was controlled by chopping the posts more on the side which was desired +to move first.</p> + +<p>The caisson nearly always carried a very large net weight, usually about +870 tons. The concrete in the walls, which was added as the caisson was +being sunk, was kept at about the elevation of the ground. There was +generally a depth of from 5 to 20 ft. of water ballast on top of the +roof of the working chamber. The air pressure in the working chamber was +usually much less than the hydrostatic head outside the caisson. For +example, the average air pressure in the south caisson during January, +1906, was 16-1/2 lb., while the average head was 62.5 ft., equivalent to +27 lb. per sq. in. Under these conditions, there was a continued but +small leakage into the caisson of from 15,000 to 20,000 gal. per day.</p> + +<p>In the rock the excavation was always carried from 2 to 5 in. outside +the cutting edge. As soon as the cutting edge was cleared, bags of clay +were placed under it in a well-tiered, solid pile, so that when the +caisson was lowered the bags were cut through and most of the clay, bags +and all, was squeezed back of the cutting edge between the rock and the +caisson.</p> + +<p>Table 1 shows the relation of the final position of the caissons to that +designed.</p> + +<p>The cost of rock excavation in the caisson was $4.48 per cu. yd. for +labor and $10.54 for top charges.</p> + +<p>The bottom of the shaft is an inverted concrete arch, 4 ft. thick, +water-proofed with 6-ply felt and pitch. As soon as the caisson was down +to its final position and the excavation was completed, concrete was +deposited on the uneven rock surfaces, brought up to the line of the +water-proofing, and given a smooth 1-in. mortar coat. The felt was stuck +together in 3-ply mats on the surface with hot coal-tar pitch. These +were rolled and sent down into the working chamber, where they were put +down with cold pitch liquid at 60° Fahr. Each sheet of felt overlapped +the one below 6 in. The water-proofing was covered by a 1-in. mortar +plaster coat, after which the concrete of the 4-ft. inverted arch was +placed. While the water-proofing and concreting were being done, the air +pressure was kept at from 30 to 33 lb. per sq. in., the full hydrostatic +head at the cutting edge. After standing for ten days, the air pressure +was taken off, and the removal of the roof of the working chamber was +begun. The water-proofing was done by the Union Construction and +Waterproofing Company.</p> + +<p><span class='pagenum'><a name="Page_429" id="Page_429">[Pg 429]</a></span></p> + +<h4>TABLE 1.—<span class="smcap">Relation of the Final Position of the Caissons to That +Designed.</span></h4> + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' class="btl"><span class="smcap">Location.</span></td> + <td align='center' colspan="6" class="btlr"><span class="smcap">Long Island City.</span></td> +</tr> +<tr> + <td align='center' class="btl">Shaft.</td> + <td align='center' colspan="3" class="btl">North.</td> + <td align='center' colspan="3" class="btlr">South.</td> +</tr> +<tr> + <td align='center' class="btl">Corner.</td> + <td align='center' class="btl">High.</td> + <td align='center' class="btl">East.</td> + <td align='center' class="btl">North.</td> + <td align='center' class="btl">High.</td> + <td align='center' class="btl">East.</td> + <td align='center' class="btlr">North.</td> +</tr> +<tr> + <td align='left' class="btl">Northeast</td> + <td align='left' class="btl">0.21 ft.</td> + <td align='left' class="btl">0.08 ft.</td> + <td align='left' class="btl">0.05 ft.</td> + <td align='left' class="btl">0.32 ft.</td> + <td align='left' class="btl">0.15 ft.</td> + <td align='left' class="btlr">0.28 ft.</td> +</tr> +<tr> + <td align='left' class="bl">Northwest</td> + <td align='left' class="bl">0.22 "</td> + <td align='left' class="bl">0.08 "</td> + <td align='left' class="bl">0.02 "</td> + <td align='left' class="bl">0.00 "</td> + <td align='left' class="bl">0.15 "</td> + <td align='left' class="blr">0.12 "</td> +</tr> +<tr> + <td align='left' class="bl">Southwest</td> + <td align='left' class="bl">0.27 "</td> + <td align='left' class="bl">0.14 "</td> + <td align='left' class="bl">0.02 "</td> + <td align='left' class="bl">0.18 "</td> + <td align='left' class="bl">0.45 "</td> + <td align='left' class="blr">0.12 "</td> +</tr> +<tr> + <td align='left' class="bbl">Southeast</td> + <td align='left' class="bbl">0.23 "</td> + <td align='left' class="bbl">0.14 "</td> + <td align='left' class="bbl">0.05 "</td> + <td align='left' class="bbl">0.39 "</td> + <td align='left' class="bbl">0.45 "</td> + <td align='left' class="bblr">0.28 "</td> +</tr> +</table></div> + +<p> </p> + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' class="btl"><span class="smcap">Location.</span></td> + <td align='center' colspan="6" class="btlr"><span class="smcap">Manhattan.</span></td> +</tr> +<tr> + <td align='center' class="btl">Shaft.</td> + <td align='center' colspan="3" class="btl">North.</td> + <td align='center' colspan="3" class="btlr">South.</td> +</tr> +<tr> + <td align='center' class="btl">Corner.</td> + <td align='center' class="btl">High.</td> + <td align='center' class="btl">East.</td> + <td align='center' class="btl">South.</td> + <td align='center' class="btl">High.</td> + <td align='center' class="btl">East or West.</td> + <td align='center' class="btlr">North or South.</td> +</tr> +<tr> + <td align='left' class="btl">Northeast</td> + <td align='left' class="btl">0.23 ft.</td> + <td align='left' class="btl">0.74 ft.</td> + <td align='left' class="btl">0.38 ft.</td> + <td align='left' class="btl">0.00 ft.</td> + <td align='left' class="btl">0.06 ft. east.</td> + <td align='left' class="btlr">0.04 ft. south.</td> +</tr> +<tr> + <td align='left' class="bl">Northwest</td> + <td align='left' class="bl">0.00 "</td> + <td align='left' class="bl">0.74 "</td> + <td align='left' class="bl">0.22 "</td> + <td align='left' class="bl">0.08 "</td> + <td align='left' class="bl">0.06 " "</td> + <td align='left' class="blr">0.13 " north.</td> +</tr> +<tr> + <td align='left' class="bl">Southwest</td> + <td align='left' class="bl">0.11 "</td> + <td align='left' class="bl">0.31 "</td> + <td align='left' class="bl">0.22 "</td> + <td align='left' class="bl">0.21 "</td> + <td align='left' class="bl">0.45 " west.</td> + <td align='left' class="blr">0.13 " "</td> +</tr> +<tr> + <td align='left' class="bbl">Southeast</td> + <td align='left' class="bbl">0.46 "</td> + <td align='left' class="bbl">0.31 "</td> + <td align='left' class="bbl">0.38 "</td> + <td align='left' class="bbl">0.04 "</td> + <td align='left' class="bbl">0.45 " "</td> + <td align='left' class="bblr">0.04 " south.</td> +</tr> +</table></div> + +<p><span class='pagenum'><a name="Page_430" id="Page_430">[Pg 430]</a></span></p> + +<p>The cost of labor in compressed air chargeable to concreting was $3.40 +per cu. yd.</p> + +<p>After the roof of each working chamber had been removed, the shield was +erected on a timber cradle in the bottom of the shaft, in position to be +shoved out of the opening in the west side of the caisson. Temporary +rings of iron lining were erected across the shaft in order to furnish +something for the shield jacks to shove against.</p> + +<p>The roof of the working chamber was then re-erected about 35 ft. above +its original position and about 8 ft. above the tunnel openings. This +time, instead of the two small shafts which were in use during the +sinking of the caisson, a large steel shaft with a T-head lock was +built. This is illustrated in <a href="#ill03">Fig. 2, Plate LXIV</a>. The shaft was 8 ft. in +diameter. Inside there was a ladder and an elevator cage for lowering +and hoisting men and the standard 1-yd. tunnel cars. At the top, forming +the head of the T, there were two standard tunnel locks.</p> + + +<h4><span class="smcap">Manhattan Shafts.</span></h4> + +<p>A permanent shaft, similar to the river shafts in Long Island City, was +constructed at Manhattan over each pair of tunnels. Each shaft was +located across two lines, with its longer axis transverse to the +tunnels. Plate XIII shows their relative positions. They were divided +equally by a reinforced concrete partition wall transverse to the line +of the tunnels. On completion, the western portions were turned over to +the contractor for the cross-town tunnels for his exclusive use.</p> + +<p><i>South Shaft.</i>—Work on the south shaft was started on June 9th, 1904, +with the sinking of a 16 by 16-ft. test pit in the center of the south +half of the south shaft, which reached disintegrated rock at a depth of +about 20 ft.</p> + +<p>Starting in August, the full shaft area, 74 by 40 ft., was taken out in +an open untimbered cut to the rock, and a 20 by 50-ft. shaft was sunk +through the rock to tunnel grade, leaving a 10 or 12-ft. berm around it. +(<a href="#ill13">Fig. 1, Plate LXX.</a>)</p> + +<p>The erection of the caisson was started, about the middle of January, on +the rock berm surrounding the 20 by 50-ft. shaft and about 15 ft. below +the surface. <a href="#ill04">Fig. 3, Plate LXIV</a>, shows the cutting edge of the caisson +assembled. The excavation of the small<span class='pagenum'><a name="Page_431" id="Page_431">[Pg 431]</a></span> shaft had shown that hard rock +and only a very small quantity of water would be encountered, and that +the caisson need be sunk only a short distance below the rock surface. +Therefore, no working-chamber roof was provided, the caisson was built +to a height of only 40 ft., and the circular openings were permanently +closed.</p> + +<p>The assembling of the caisson took 2-1/2 months, and on April 2d +lowering was started. Inverted brackets were bolted temporarily to the +cutting-edge stiffening brackets, and the sinking was carried on by +methods similar to those used at Long Island. The jacks and blocking +supporting the caisson are shown in <a href="#ill05">Fig. 4, Plate LXIV</a>. As soon as the +cutting edge entered the rock, which was drilled about 6 in. outside of +the neat lines, the space surrounding the caisson was back-filled with +clay and muck to steady it and provide skin friction. As the friction +increased, the walls were filled with concrete, and as the caisson +slowly settled, it was checked and guided by blocking. The cutting edge +finally came to rest 31 ft. below mean high water, the sinking having +been accomplished in about seven weeks, at an average rate of 0.50 ft. +per day.</p> + +<p>The final position of the cutting edge in relation to its designed +position is shown in Table 1.</p> + +<p>A berm about 4 ft. wide was left at the foot of the caisson below which +the rock was somewhat fissured and required timbering. The cutting edge +of the caisson was sealed to the rock with grout on the outside and a +concrete base to the caisson walls on the inside, the latter resting on +the 4-ft. berm. Following the completion of the shaft, the permanent +sump was excavated to grade for use during construction.</p> + +<p><i>North Shaft.</i>—The north shaft had to be sunk in a very restricted +area. The east side of the caisson cleared an adjoining building at one +point by only 1 ft., while the northwest corner was within the same +distance of the east line of First Avenue. As in the case of the Long +Island shafts, the steelwork for only the lower 40 ft. was ordered at +the start. This height was completely assembled before sinking was +begun. The caisson was lowered in about the same manner as those +previously described. The bearing brackets for the hydraulic jacks were +attached, as at the south shaft, to the inside of the cutting-edge +brackets. The east side of the caisson was in contact with the +foundations of the neighboring building, while the west side was in much +softer material. As a consequence, the west side tended to settle more<span class='pagenum'><a name="Page_432" id="Page_432">[Pg 432]</a></span> +rapidly and thus throw the caisson out of level and position. To +counteract that tendency, it was necessary to load the east wall heavily +with cast-iron tunnel sections, in addition to the concrete filling in +the walls.</p> + +<p>Soon after sinking was begun, a small test shaft was sunk to a point +below the elevation of the top of the tunnels. The rock was found to be +sound, hard, and nearly dry. It was then decided to stop the caisson as +soon as a foundation could be secured on sound rock. The latter was +found at a depth of 38 ft. below mean high water. With the cutting edge +seated at that depth, the top of the caisson was only 2 ft. above mean +high water, and as this was insufficient protection against high tides, +a 10-ft. extension was ordered for the top. Work, however, went on +without delay on the remainder of the excavation. The junction between +the cutting edge and the rock was sealed with concrete and grout. The +caisson was lowered at an average rate of 0.53 ft. per day. The size of +the shaft below the cutting edge was 62 ft. 7 in. by 32 ft. The average +rate of excavation during the sinking in soft material was 84 cu. yd. +per day. The average rate of rock excavation below the final position of +the cutting edge was 125 cu. yd. per day. There were night and day +shifts, each working 10 hours. Excavation in earth cost $3.96 per cu. +yd., of which $1.45 was for labor and $2.51 for top charges, etc. The +excavation of rock cost $8.93 per cu. yd., $2.83 being for labor and +$6.10 for top charges.</p> + +<p>The final elevations of the four corners of the cutting edge, together +with their displacement from the desired positions, are shown in Table +1.</p> + + +<h4><span class="smcap">River Tunnels.</span></h4> + +<p>The four river tunnels, between the Manhattan and Long Island City +shafts, a distance of about 3,900 ft., were constructed by the shield +method. Eight shields were erected, one on each line in each shaft, the +four from Manhattan working eastward to a junction near the middle of +the river with the four working westward from Long Island City. Toward +the end of the work it was evident that the shields in Tunnels <i>B</i>, <i>C</i>, +and <i>D</i> would meet in the soft material a short distance east of the +Blackwell's Island Reef if work were continued in all headings. In order +that the junction might be made in firm material, work from Manhattan in +those three tunnels was suspended when the shields<span class='pagenum'><a name="Page_433" id="Page_433">[Pg 433]</a></span> reached the edge +of the ledge. The shields in Tunnel <i>A</i> met at a corresponding point +without the suspension of work in either. An average of 1,760 ft. of +tunnel was driven from Manhattan and 2,142 ft. from Long Island City.</p> + +<div class="figcenter"> + <a id="ill06" name="ill06"> + <img src="images/ill06.jpg" + alt="Plate LXV, Fig. 1.--Shield Fitted with Sectional Sliding Hoods and Sliding Extensions to the Floors." + title="Plate LXV, Fig. 1.--Shield Fitted with Sectional Sliding Hoods and Sliding Extensions to the Floors." /></a><br /> + <span class="caption">Plate LXV, Fig. 1.—Shield Fitted with Sectional Sliding Hoods and Sliding Extensions to the Floors.</span> +</div> + +<div class="figcenter"> + <a id="ill07" name="ill07"> + <img src="images/ill07.jpg" + alt="Plate LXV, Fig. 2.--Shield Fitted with Fixed Hoods and Fixed Extensions to the Floors." + title="Plate LXV, Fig. 2.--Shield Fitted with Fixed Hoods and Fixed Extensions to the Floors." /></a><br /> + <span class="caption">Plate LXV, Fig. 2.—Shield Fitted with Fixed Hoods and Fixed Extensions to the Floors.</span> +</div> + + +<h4><span class="smcap">Tunnels Driven Eastward from Manhattan.</span></h4> + +<p><i>Materials and Inception of Work.</i>—The materials encountered are shown +in the profile on Plate XIII, and were similar in all the tunnels. In +general, they were found to be about as indicated in the preliminary +borings. The materials met in Tunnel <i>A</i> may be taken as typical of all.</p> + +<p>From the Manhattan shaft eastward, in succession, there were 123 ft. of +all-rock section, 87 ft. of part earth and part rock, 723 ft. of all +earth, 515 ft. of part rock and part earth, 291 ft. of all rock, and 56 +ft. of part rock and part earth.</p> + +<p>The rock on the Manhattan side was Hudson schist, while that in the reef +was Fordham gneiss. Here, as elsewhere, they resembled each other +closely; the gneiss was slightly the harder, but both were badly seamed +and fissured. Wherever it was encountered in this work, the rock surface +was covered by a deposit of boulders, gravel, and sand, varying in +thickness from 4 to 10 ft. and averaging about 6 ft.</p> + +<p>The slope of the surface of the ledge on the Manhattan side averaged +about 1 vertical to 4 horizontal. The rock near the surface was full of +disintegrated seams, and was badly broken up. It was irregularly +stratified, and dipped toward the west at an angle of about 60 degrees. +Large pieces frequently broke from the face and slid into the shield, +often exposing the sand. The rock surface was very irregular, and was +covered with boulders and detached masses of rock embedded in coarse +sand and gravel. The sand and gravel allowed the air to escape freely. +By the time the shields had entirely cleared the rock, the material in +the face had changed to a fine sand, stratified every few inches by very +thin layers of chocolate-colored clayey material. This is the material +elsewhere referred to as quicksand. As the shield advanced eastward, the +number and thickness of the layers of clay increased until the clay +formed at least 20% of the entire mass, and many of the layers were 2 +in. thick.</p> + +<p>At a distance of about 440 ft. beyond the Manhattan ledge, the material +at the bottom of the face changed suddenly to one in which<span class='pagenum'><a name="Page_434" id="Page_434">[Pg 434]</a></span> the layers +of clay composed probably 98% of the whole. The sand layers were not +more than 1/16 in. thick and averaged about 2 in. apart. The surface of +the clay rose gradually for a distance of 40 ft. in Tunnels <i>A</i> and <i>B</i>, +and 100 ft. in Tunnels <i>C</i> and <i>D</i>, when gravel and boulders appeared at +the bottom of the shield. At that time the clay composed about one-half +of the face.</p> + +<p>The surfaces of both the clay and gravel were irregular, but they rose +gradually. After rock was encountered, the formations of gravel and clay +were roughly parallel to the rock surface.</p> + +<p>As the surface of the rock rose they disappeared in order and were again +encountered when the shields broke out of rock on the east side of the +Blackwell's Island Reef. East of the reef a large quantity of coarse +open sand was present in the gravel formations before the clay appeared +below the top of the cutting edge. In Tunnels <i>C</i> and <i>D</i> this was +especially difficult to handle. It appears to be a reasonable assumption +that the layer of clay was continuous across the reef. Wherever the clay +extended above the top of the shield it reduced the escape of air +materially. It is doubtless largely due to this circumstance that the +part-rock sections in the reef were not the most difficult portions of +the work.</p> + +<p>While sinking the lower portions of the shafts the tunnels were +excavated eastward in the solid rock for a distance of about 60 ft., +where the rock at the top was found to be somewhat disintegrated. This +was as far as it was considered prudent to go with the full-sized +section without air pressure. At about the same time top headings were +excavated westward from the shafts for a distance of 100 ft., and the +headings were enlarged to full size for 50 ft. The object was to avoid +damage to the shaft and interference with the river tunnel when work was +started by the contractor for the cross-town tunnel.</p> + +<div class="figcenter"> + <a id="ill08" name="ill08"> + <img src="images/ill08.jpg" + alt="Plate LXVI, Fig. 1.--Rear of Shield Showing Complete Fittings." + title="Plate LXVI, Fig. 1.--Rear of Shield Showing Complete Fittings." /></a><br /> + <span class="caption">Plate LXVI, Fig. 1.—Rear of Shield Showing Complete Fittings.</span> +</div> + +<div class="figcenter"> + <a id="ill09" name="ill09"> + <img src="images/ill09.jpg" + alt="Plate LXVI, Fig. 2.--Shield with Lower Portion of Bulkhead Removed." + title="Plate LXVI, Fig. 2.--Shield with Lower Portion of Bulkhead Removed." /></a><br /> + <span class="caption">Plate LXVI, Fig. 2.—Shield with Lower Portion of Bulkhead Removed.</span> +</div> + +<p>The shields were erected on timber cradles in the shaft, and were shoved +forward to the face of the excavation. Concrete bulkheads, with the +necessary air-locks, were then built across the tunnels behind the +shields. The shields were erected before the dividing walls between the +two contracts were placed. Rings of iron tunnel lining, backed by +timbers spanning the openings on the west side, were erected temporarily +across the shafts in order to afford a bearing for the shield jacks +while shoving into the portals. The movement of the shield eastward was +continued in each tunnel for a distance of about 60 ft.,<span class='pagenum'><a name="Page_435" id="Page_435">[Pg 435]</a></span> and the +permanent cast-iron tunnel lining was erected as the shield advanced. +Before breaking out of rock, it was necessary to have air pressure in +the tunnels. This required the building of bulkheads with air-locks +inside the cast-iron linings just east of the portals. Before erecting +the bulkheads it was necessary to close the annular space between the +iron tunnel lining and the rock. The space at the portal was filled with +a concrete wall. After about twenty permanent rings had been erected in +each tunnel, two rings were pulled apart at the tail of the shield and a +second masonry wall or dam was built. The space between the two dams was +then filled with grout. To avoid the possibility of pushing the iron +backward after the air pressure was on, rings of segmental plates, 5/8 +in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential +joints in each tunnel between the rings as they were erected. The plates +contained slotted holes to match those in the segments. After the rings +left the shield, the plates were driven outward, and projected about 5 +in. When the tunnel was grouted, the plates were embedded.</p> + +<p>The bulkheads were completed, and the tunnels were put under air +pressure on the following dates:</p> + +<p> +Line <i>D</i>, on October 5th, 1905;<br /> +Line <i>C</i>, on November 6th, 1905;<br /> +Line <i>B</i>, on November 25th, 1905;<br /> +Line <i>A</i>, on December 1st, 1905.<br /> +</p> + +<p>This marked the end of the preparatory period.</p> + +<p>In the deepest part of the river, near the pier-head line on the +Manhattan side, there was only 8 ft. of natural cover over the tops of +the tunnels. This cover consisted of the fine sand previously described, +and it was certain that the air would escape freely from the tunnels +through it. To give a greater depth of cover and to check the loss of +air, the contractor prepared to cover the lines of the tunnels with +blankets of clay, which, however, had been provided for in the +specifications. Permits, as described later, were obtained at different +times from the Secretary of War, for dumping clay in varying thicknesses +over the line of work. The dumping for the blanket allowed under the +first permit was completed in February, 1906. The thickness of this +blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan +side. The original blanket was of material advantage, but the depth of +clay was insufficient to stop the loss of air.<span class='pagenum'><a name="Page_436" id="Page_436">[Pg 436]</a></span></p> + +<p>The essential parts of the shields in the four tunnels were exactly +alike. Those in Tunnels <i>B</i> and <i>D</i>, however, were originally fitted +with sectional sliding hoods and sliding extensions to the floors of the +working chambers, as shown by <a href="#ill06">Fig. 1, Plate LXV</a>. The shields in Tunnels +<i>A</i> and <i>C</i> were originally fitted with fixed hoods and fixed extensions +to the floors, as shown in <a href="#ill07">Fig. 2, Plate LXV</a>. A full description of the +shields will be found in Mr. Japp's paper.</p> + +<p>The shields in each pair of tunnels were advanced through the solid rock +section about abreast of each other, until test holes from the faces +indicated soft ground within a few feet. As the distance between the +sides of the two tunnels was only 14 ft., it was thought best to let +Tunnels <i>B</i> and <i>D</i> gain a lead of about 100 ft. before Tunnels <i>A</i> and +<i>C</i> opened out into soft ground, in order that a blow from one tunnel +might not extend to the other. Work in Tunnel <i>C</i> was shut down on +December 23d, 1905, after exposing sand to a depth of 3 ft. at the top, +and it remained closed for seven weeks. Work in Tunnel <i>A</i> was suspended +on September 29th, 1905. By the time Tunnel <i>B</i> had made the required +advance, it, together with Tunnels <i>C</i> and <i>D</i>, was overtaxing the +capacities of the compressor plant. Only a little work was done in +Tunnel <i>C</i> until July, 1906, and work in Tunnel <i>A</i> was not resumed +until October 22d, 1906.</p> + + +<h4><span class="smcap">Tunnels Driven Westward from Long Island City.</span></h4> + +<p><i>Materials and Inception of the Work.</i>—The materials met in Tunnel A +are typical of all four tunnels. From the Long Island shafts westward, +in succession, there were 124 ft. of all-rock section, 125 ft. of part +rock and part earth section, 22 ft. of all-rock section, 56 ft. of part +rock and part earth section, 387 ft. of all-rock section, 70 ft. of part +earth and part rock section, and 1,333 ft. of all-earth section.</p> + +<div class="figcenter"> + <a id="ill10" name="ill10"></a><a href="images/ill10large.jpg"> + <img src="images/ill10.jpg" + alt="Plate LXVII" + title="Plate LXVII" /></a><br /> + <span class="caption">Plate LXVII</span> +</div> + +<p>The materials passed through are indicated on Plate XIII. The rock was +similar to that of the Blackwell's Island Reef, and was likewise covered +by a layer of sand and boulders. The remainder of the soft ground was +divided into three classes. The first was a very fine red sand, which +occurred in a layer varying in thickness from 6 ft. to at least 15 ft. +It may have been much deeper above the tunnel. It is the quicksand +usually encountered in all deep foundations in New York City. The +following is the result of the sifting test of this sand:</p> + +<p><span class='pagenum'><a name="Page_437" id="Page_437">[Pg 437]</a></span></p> + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'>Held</td> + <td align='left'>on</td> + <td align='left'>No.</td> + <td align='right'>30</td> + <td align='left'>sieve</td> + <td align='right'>0.6%</td> +</tr> +<tr> + <td align='left'>Passed</td> + <td align='left'>No.</td> + <td align='right'>30,</td> + <td align='center'>"</td> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>40</td> + <td align='center'>"</td> + <td align='right'>0.4%</td> +</tr> +<tr> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>40,</td> + <td align='center'>"</td> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>50</td> + <td align='center'>"</td> + <td align='right'>0.7%</td> +</tr> +<tr> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>50,</td> + <td align='center'>"</td> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>60</td> + <td align='center'>"</td> + <td align='right'>2.4%</td> +</tr> +<tr> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>60,</td> + <td align='center'>"</td> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>80</td> + <td align='center'>"</td> + <td align='right'>14.9%</td> +</tr> +<tr> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>80,</td> + <td align='center'>"</td> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>100</td> + <td align='center'>"</td> + <td align='right'>54.0%</td> +</tr> +<tr> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>100,</td> + <td align='center'>"</td> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>200</td> + <td align='center'>"</td> + <td align='right'>8.0%</td> +</tr> +<tr> + <td align='center'>"</td> + <td align='left'>No.</td> + <td align='right'>200</td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='center'>"</td> + <td align='right' class="bb">19.0%</td> +</tr> +<tr> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='left'></td> + <td align='right'>100.0%</td> +</tr> +</table></div> + +<p>This means that grains of all but 4% of it were less than 0.0071 in. in +diameter. The 19% which passed the No. 200 sieve, the grains of which +were 0.0026 in. or less in diameter, when observed with a microscope +appeared to be perfectly clean grains of quartz; to the eye it looked +like ordinary building sand, sharp, and well graded from large to small +grains. This sand, with a surplus of water, was quick. With the water +blown out of it by air pressure, it is stable, stands up well, and is +very easy to work. It appears to be the same as the reddish quicksand +found in most deep excavations around New York City.</p> + +<p>The second material was pronounced "bull's liver" by the miners as soon +as it was uncovered. "Bull's liver" seems to be a common term among +English-speaking miners the world over. It is doubtful, however, if it +is always applied to the same thing. In this case it consisted of layers +of blue clay and very fine red sand. The clay seemed to be perfectly +pure and entirely free from sand. It would break easily with a clean, +almost crystalline, fracture, and yet it was soft and would work up +easily. The layers of clay varied in thickness from 1/16 in. to 1 in., +while the thickness of the sand layer varied from 1/4 in. to several +inches. The sand was the same as the quicksand already described.</p> + +<p>The "bull's liver" was ideal material in which to work a shield. It +stood up as well and held the air about as well as clay, and was much +easier to handle.</p> + +<p>The third material was a layer of fine gray sand which was encountered +in the top of all the tunnels for about 400 ft. just east of Blackwell's +Island Reef. It was very open, and had grains of rather uniform size.</p> + +<p>During the starting out of the tunnels from the shafts, and for<span class='pagenum'><a name="Page_438" id="Page_438">[Pg 438]</a></span> more +than a year afterward, the roof of the working chamber in the caissons +and the locks previously described under the Long Island shafts took the +place of the bulkhead across the tunnels for confining the air pressure.</p> + +<p>The first work in air pressure was to remove the shield plug closing the +opening in the side of the shaft. This being done, the shield was shoved +through the opening, and excavation begun.</p> + +<p>At the start the shields were fitted with movable platforms, but no +hoods of any kind were placed until after the rock excavation was +completed.</p> + + +<h4><span class="smcap">Methods of Excavation.</span></h4> + +<p>The distribution of materials to be excavated, as previously outlined, +divided the excavation into three distinct classes, for which different +methods had to be developed.</p> + +<p>These three classes were:</p> + +<p> +<i>First.</i>—All-rock section.<br /> +<i>Second.</i>—Rock in the bottom, earth in the top.<br /> +<i>Third.</i>—All-earth section.<br /> +</p> + +<p>The extent of the second and third classes was much greater than that of +the first, and they, of course, determined the use of the shield. +Shields had not previously been used extensively in rock work, either +where the face was wholly or partly in rock, and it was necessary to +develop the methods by experience. The specifications required that +where rock was present in the bottom, a bed of concrete should be laid +in the form of a cradle on which to advance the shield.</p> + +<p><i>All Rock.</i>—At different times, three general methods were used for +excavating in all-rock sections. They may be called: The bottom-heading +method; the full-face method; and the center-heading method.</p> + +<p>The bottom-heading method was first tried. A heading, about 8 ft. high +and 12 ft. wide, was driven on the center line, with its bottom as +nearly as possible on the grade line of the bottom of the tunnel. It was +drilled in the ordinary manner by four drills mounted on two columns. +The face of the headings varied from 10 to 30 ft. in advance of the +cutting edge. After driving the heading for about 10 ft., the bottom was +cleared out and a concrete cradle was set. The width of the cradles +varied, but was generally from 8 to 10 ft.</p> + +<p>The excavation was enlarged to full size as the shield advanced, the +drills being mounted in the forward compartments of the shield, as<span class='pagenum'><a name="Page_439" id="Page_439">[Pg 439]</a></span> +shown by Fig. 1, <a href="#ill10">Plate LXVII</a>, which represents the conditions after the +opening had been cut in the bulkhead, but before the new methods, +mentioned later, had been developed.</p> + +<div class="figcenter"> + <a id="ill11" name="ill11"></a><a href="images/ill11large.jpg"> + <img src="images/ill11.jpg" + alt="Plate LXVIII" + title="Plate LXVIII" /></a><br /> + <span class="caption">Plate LXVIII</span> +</div> + +<p>The sides and top were shot downward into the heading. The area of the +face remaining behind the heading was large, and a great number of holes +and several rounds were required to fire the face to advantage. As soon +as firing was started at the face, the heading was completely blocked, +and operations there had to be suspended until the mucking was nearly +completed. The bottom-heading method was probably as good as any that +could be devised for use with the shields as originally installed. All +the muck had to be taken from the face by hand and handled through the +chutes or doors. By drilling from the shield, some muck was blasted on +to the extensions of the floors and could be handled from the upper +compartments. At best, however, the shield with the closed transverse +bulkhead was a serious obstacle to rapid work in rock sections.</p> + +<p>The full-face method was only used where the rock was not considered +safe for a heading. A cut was fired at the bottom, together with side +holes, in a manner quite similar to that adopted in the first set of +holes for a bottom heading. The cradle was then placed, in lengths of +either 2.5 or 5 ft., after which the remainder of the face was fired in +the same manner as for the bottom-heading method. The closed transverse +bulkhead with air-locks, as shown in <a href="#ill08">Fig. 1, Plate LXVI</a>, was placed in +the shield in the hope that it would only be necessary to maintain the +full air pressure in the working compartments in front of the bulkhead. +It was also thought that some form of bulkhead which could be closed +quickly and tightly would be necessary to prevent flooding the tunnel in +case of blows. While no attempt was ever made to reduce the pressure +behind the shield bulkhead, it was obvious from the experience with +Tunnels <i>B</i> and <i>D,</i> while working in the sand between Manhattan and the +reef, that the plan was not practicable, and that the closed bulkhead in +the bottom was a hindrance instead of a safeguard. As soon as rock was +encountered in those tunnels at the west edge of the reef, the +contractor cut through the bulkheads and altered them, as shown in <a href="#ill09">Fig. +2, Plate LXVI</a>.</p> + +<p>Taking advantage of the experience gained, openings were cut through the +bulkheads in Shields <i>A</i> and <i>C</i>, while they were shut down near the +edge of the Manhattan ledge. In erecting the shields at<span class='pagenum'><a name="Page_440" id="Page_440">[Pg 440]</a></span> Long Island +City in May and June, 1906, openings were also provided. These shields +had to pass through about 700 ft. of rock at the start, the greater +portion of which was all-rock section. It was at that point that +openings were first used extensively and methods were developed, which +would not have been possible except where ears could be passed through +the shield. The bottom-heading method was first tried, but the working +space in front of the shield was cramped, and but few men could be +employed in loading the cars. To give more room, the heading was +gradually widened. The enlargement at the top, when made from the +shield, blocked all work at the face of the heading while the former +operation was in progress. To reduce the delays, the heading was raised, +thus reducing the quantity of rock left in the top, and the bottom was +taken out as a bench. To avoid blocking the tracks when firing the top, +a heavy timber platform was built out from the floors of the middle +working compartments. Most of the muck from the top was caught on the +platform and dropped into cars below. This method of working is shown by +Fig. 2, <a href="#ill10">Plate LXVII</a>. The platforms were not entirely satisfactory, and, +later, the drills in the heading were turned upward and a top bench was +also drilled and fired, as shown by Fig. 3, <a href="#ill10">Plate LXVII</a>. There was then +so little excavation left in the top that the muck was allowed to fall +on the tracks and was quickly cleared away. The method just outlined is +called the center-heading method, and was the most satisfactory plan +devised for full-rock sections.</p> + +<p><i>Excavation in Part Rock and Part Earth.</i>—This was probably the most +difficult work encountered, particularly when the rock was covered with +boulders and coarse sharp sand which permitted a free escape of air. It +was necessary, before removing the rock immediately under the soft +ground, to excavate the earth in advance of the shield to a point beyond +where the rock was to be disturbed, and to support, in some way, the +roof, sides, and face of the opening thus made. The hoods were designed +mainly for the purpose of supporting the roof and the sides. With the +fixed hood it was necessary either to excavate for the distance of the +desired shove in front of it or else to force the hood into the +undisturbed material. To avoid this difficulty, the sliding hoods were +tried as an experiment.</p> + +<p>In using the sliding hood, which will be described in detail in Mr. +Japp's paper, the segments commencing at the top were forced<span class='pagenum'><a name="Page_441" id="Page_441">[Pg 441]</a></span> forward by +the screw rod, one at a time, as far as possible into the undisturbed +material. Just enough material was then removed from underneath and in +front of the section to free it, and it was again forced forward. These +operations were repeated until the section had been extended far enough +for a shove. As soon as two or three sections had been pushed forward in +this way, the face near the advance end of the sliding hood was +protected by a breast board set on edge and braced from the face. +Gradually, all the segments were worked forward, and, at the same time, +the whole soft ground face was sheeted with timber. At times polings +were placed over the extended segments in order to make room for a +second shove, as shown on <a href="#ill11">Plate LXVIII</a>. When the shield was advanced the +nuts on the screw rods were loosened and the sections of the hoods were +telescoped on to the shield. The idea was ingenious, but proved +impracticable, because of the unequal relative movements of the top and +bottom of the shield in shoving, bringing transverse strains on the hood +sections.</p> + +<div class="figcenter"> + <a id="ill12" name="ill12"></a><a href="images/ill12large.jpg"> + <img src="images/ill12.jpg" + alt="Plate LXIX" + title="Plate LXIX" /></a><br /> + <span class="caption">Plate LXIX</span> +</div> + +<p>With the fixed hood, poling boards were used to support the roof and +sides, and the face was supported in the manner described for the +sliding hoods. The polings were usually maple or oak planks, 2 in. +thick, about 8 in. wide, and 6-1/2 ft. long. In advancing the face, the +top board of the old breast was first removed, then the material was +carefully worked out for the length of the poling. The latter was then +placed, with the rear end resting over the hood and the forward end +forced as far as possible into the undisturbed material. When two or +three polings had been placed, a breast board was set. After several +polings were in position, their forward ends were supported by some form +a cantilever attached to the hood. <a href="#ill12">Plate LXIX</a> shows one kind of +supports. In this way all the soft material was excavated down to the +rock surface, and the roof, sides, and face were sheeted with timber. In +shoving, the polings in the roof and sides were lost. It was found that +the breast could usually be advanced 5 ft. with safety. The fixed hood +made it possible to set the face about 7 or 8 ft. in front of the +cutting edge without increasing the length of the polings. This distance +was ample for two shoves, and was generally adopted, although a great +many faces were set for one shove only.</p> + +<p>Fixed hoods were substituted for those of the sliding type, originally +placed on Shields <i>B</i> and <i>D</i> at Manhattan, at about the time the latter +encountered the rock at the reef.<span class='pagenum'><a name="Page_442" id="Page_442">[Pg 442]</a></span></p> + +<p>In placing the polings and breasting, all voids behind them were filled +as far as possible with marsh hay or bags of sawdust or clay. To prevent +loss of air in open material, the joints between the boards were +plastered with clay especially prepared for the purpose in a pug mill. +The sliding extensions to the floors of the working compartments were +often used, in the early part of the work, to support the timber face or +loose rock, as shown in Fig. 1, <a href="#ill11">Plate LXVIII</a>. At such times the front of +the extensions was held tightly against the planking by the pressure of +the floor jacks. While shoving, the pressure on the floor jacks was +gradually released, allowing the floors to slide back into the shield +and still afford support to the face. The extensions also afforded +convenient working platforms. They were subject to severe bending +strains while the shield was being shoved, however, and the cast-iron +rams were frequently broken or jammed. The extensions did not last +beyond the edge of the ledge at Manhattan, nor more than about half +through the rock work at Long Island City. The fixed extensions +originally placed on Shields <i>A</i> and <i>C</i> at Manhattan were not +substantial enough, and lasted only a few days.</p> + +<p>Wherever the rock face was sufficiently sound and high, a bottom heading +was driven some 20 or 30 ft. in advance of the shield. The heading was +driven and the cradle placed independently of the face of the soft +ground above, and in the manner described for all-rock sections. The +remainder of the rock face was removed by firing top and side rounds +into the bottom heading after the soft ground had been excavated. Great +care had to be taken in firing in order not to disturb the timber work +or break the rock away from under the breast boards. If either occurred, +a serious run was likely to follow. The bottom-heading method is shown +by Figs. 1, 2, and 3, <a href="#ill11">Plate LXVIII</a>, and the breasting and poling by <a href="#ill14">Fig. +2, Plate LXX.</a></p> + +<p>In the early part of the work, where a bottom heading was impracticable, +the soft ground was first excavated as described above, and the rock was +drilled by machines mounted on tripods, and fired as a bench. By this +plan no drilling could be done until the soft ground was removed. This +is called the rock-bench method.</p> + +<p>Later the rock-cut method was devised. Drills were set up on columns in +the bottom compartments of the shield, and the face was drilled while +work was in progress on the soft ground above. The drilling was done +either for a horizontal or vertical cut and side and<span class='pagenum'><a name="Page_443" id="Page_443">[Pg 443]</a></span> top rounds. The +drillers were protected while at work by platforms of timber built out +from the floors of the compartments above. This plan, while probably not +quite as economical of explosives, saved nearly all the delay due to +drilling the bench.</p> + +<div class="figcenter"> + <a id="ill13" name="ill13"> + <img src="images/ill13.jpg" + alt="Plate LXX, Fig. 1.--Small Shaft Sunk to Rock." + title="Plate LXX, Fig. 1.--Small Shaft Sunk to Rock." /></a><br /> + <span class="caption">Plate LXX, Fig. 1.—Small Shaft Sunk to Rock.</span> +</div> + +<div class="figcenter"> + <a id="ill14" name="ill14"> + <img src="images/ill14.jpg" + alt="Plate LXX, Fig. 2.--Breasting and Poling in Front of Shield." + title="Plate LXX, Fig. 2.--Breasting and Poling in Front of Shield." /></a><br /> + <span class="caption">Plate LXX, Fig. 2.—Breasting and Poling in Front of Shield.</span> +</div> + +<div class="figcenter"> + <a id="ill15" name="ill15"> + <img src="images/ill15.jpg" + alt="Plate LXX, Fig. 3.--Shutters on Front of Shield." + title="Plate LXX, Fig. 3.--Shutters on Front of Shield." /></a><br /> + <span class="caption">Plate LXX, Fig. 3.—Shutters on Front of Shield.</span> +</div> + +<div class="figcenter"> + <a id="ill16" name="ill16"> + <img src="images/ill16.jpg" + alt="Plate LXX, Fig. 4.--Hydraulic Erector Placing Segment." + title="Plate LXX, Fig. 4.--Hydraulic Erector Placing Segment." /></a><br /> + <span class="caption">Plate LXX, Fig. 4.—Hydraulic Erector Placing Segment.</span> +</div> + +<p><i>All-Earth Section.</i>—As described by Messrs. Hay and Fitzmaurice, in a +paper on the Blackwall Tunnel,<a name="FNanchor_C_3" id="FNanchor_C_3"></a><a href="#Footnote_C_3" class="fnanchor">[C]</a> the contractor had used, with marked +success, shutters in the face of the shield for excavating in loose open +material. He naturally adopted the method for the East River work. When +the shields in Tunnels <i>B</i> and <i>D</i>, at Manhattan, the first to be driven +through soft ground, reached a point under the actual bulkhead line, +work was partly suspended and shutters were put in place in the face of +the top and center compartments. The shutters in the center compartments +in Shield <i>D</i> are shown in <a href="#ill15">Fig. 3, Plate LXX</a>, while the method of work +with the shutters is shown by Figs. 4, 5, 6, and 7, <a href="#ill11">Plate LXVIII</a>. Fig. 4 +on that plate shows the shield ready for a shove. As the pressure was +applied to the shield jacks, men loosened the nuts on the screws holding +the ends of the shutters, and allowed the latter to slide back into the +working compartments. At the end of the shove, the shutters were in the +position shown in Fig. 5, <a href="#ill11">Plate LXVIII</a>. In preparing for a new shove, +the slides in the shutters were opened, and the material in front was +raked into the shield. At the same time, the shutters were gradually +worked forward. The two upper shutters in a compartment were generally +advanced from 12 to 15 in., after which the muck could be shoveled out +over the bottom shutters, as shown on Fig. 6, <a href="#ill11">Plate LXVIII</a>, and <a href="#ill15">Fig. 3, +Plate LXX</a>. No shutters were placed in the bottom compartments, and as +the air pressure was not generally high enough to keep the face dry at +the bottom, these compartments were pretty well filled with the soft, +wet quicksand. Just before shoving, this material was excavated to a +point where it ran in faster than it could be taken out. Much of the +excavation in the bottom compartment was done by the blow-pipe. During +the shove the material from the bottom compartment often ran back +through the open door in the transverse bulkhead, as shown by Fig. 5, +<a href="#ill11">Plate LXVIII</a>.</p> + +<p>In the Blackwall Tunnel the material was reported to have been loose +enough to keep in close contact with the shutters at all times. In the +East River Tunnels this was not the case. The sand at the top<span class='pagenum'><a name="Page_444" id="Page_444">[Pg 444]</a></span> was dry +and would often stand with a vertical face for some hours. In advancing +the shutters, it was difficult to bring them into close contact with the +face at the end of the operation. The soft material at the bottom was +constantly running into the lower compartment and undermining the stiff +dry material at the top. The latter gradually broke away, and, at times, +the actual face was some feet in advance of the shutters. Under those +circumstances, the air escaped freely through the unprotected sand face. +The joints of the shutters were plastered with clay, but this did not +keep the air from passing out through the lower compartments. This +condition facilitated the formation of blows, which were of constant +occurrence where shutters were used in the sand. In Tunnels <i>B</i> and <i>D</i>, +at Manhattan, the shutters were used in the above manner clear across to +the reef. In Tunnel <i>C</i>, which was considerably behind Tunnels <i>B</i> and +<i>D</i>, the shutters, although placed, were never used against the face, +and the excavation was carried on by poling the top and breasting the +face. The change resulted in much better progress and fewer blows. The +excavation through the soft material in Tunnel <i>C</i> had just been +completed when Tunnel <i>A</i> was started, and the gangs of workmen were +exchanged.</p> + +<p>The work in soft ground in Tunnel <i>A</i> thus gained the benefit of the +experience in Tunnel <i>C</i>. Shutters were placed only in the top +compartments in this tunnel, and, as in Tunnel <i>C</i>, were never used in +contact with the face. The method of work is shown by Figs. 1, 2, and 3, +<a href="#ill17">Plate LXXI</a>. The result was still more rapid progress in Tunnel <i>A</i>, and +although the loss of air was fully as great in this tunnel as in the +other three, there was only one blow which caused any considerable loss +of pressure. In Tunnels <i>A</i> and <i>C</i> the diaphragms in the rear of the +center compartments of the lower tiers of working chambers were removed +before the shields entered the soft ground. The change was not of as +much advantage in soft ground as in rock, but it facilitated the removal +of the soft wet sand in the bottom. In Tunnel <i>A</i>, after encountering +gravel, a belt conveyor was suspended from the traveling stage with one +end projecting through the opening into the working compartment. The use +of the conveyor made it possible to continue mucking at the face while +the bottom plates of the iron lining were being put in place, and +resulted in a material increase in the rate of progress.<span class='pagenum'><a name="Page_445" id="Page_445">[Pg 445]</a></span></p> + +<div class="figcenter"> + <a id="ill17" name="ill17"></a><a href="images/ill17large.jpg"> + <img src="images/ill17.jpg" + alt="Plate LXXI" + title="Plate LXXI" /></a><br /> + <span class="caption">Plate LXXI</span> +</div> + +<p>The shutters were not placed on the Long Island shields at all. Just +before the shields passed into all soft ground, a fixed hood was +attached to each.</p> + +<p>The method of working in soft ground from Long Island City is +illustrated by <a href="#ill18">Plate LXXII</a>. The full lines at the face of the shield +show the position of the earth before a shove of the shield, and the +dotted lines show the same after the shove. The face was mined out to +the front of the hood and breasted down to a little below the floor of +the top pockets of the shield. In the middle pocket the earth was +allowed to take its natural slope back on the floor. Toward the rear of +the bottom pockets it was held by stop-planks. The air pressure was +always about equal to the hydrostatic head at the middle of the shield, +so that the face in the upper and middle pockets was dry. In the lower +pockets it was wet, and flowed under the pressure of shoving the shield. +By this method 4,195 lin. ft. of tunnel was excavated by the four Long +Island shields in 120 days, from November 1st, 1907, to March 1st, 1908. +This was an average of 8.74 ft. per day per shield.</p> + +<p>The rate of progress, the nature of the materials, and the methods +adopted are shown in Table 2.</p> + +<p><i>Preparations for Junction of Shields.</i>—As previously mentioned, the +Manhattan shields were stopped at the edge of the reef. Before making +the final shove of those shields, special polings were placed with +unusual care. The excavation was bell-shaped to receive the Long Island +shields. The arrangement of the polings is shown by Figs. 4 and 5, <a href="#ill17">Plate +LXXI</a>. After the shields were shoved into final position, as shown at the +right in Fig. 5, the rear end of the polings rested over the cutting +edge and allowed room for the removal of the hood. After the latter had +been accomplished, the temporary bulkheads of concrete and clay bags +were built as a precaution against blows when the shields were close +together. An 8-in. pipe was then driven forward through the bulkhead for +distances varying from 30 to 100 ft., in order to check the alignment +and grade between the two workings before the shields were actually +shoved together. The errors in the surveys were negligible, but here, as +elsewhere, the shields were not exactly in the desired position, and it +took careful handling to bring the cutting edges together. The Long +Island shields were driven to meet those from Manhattan.</p> + +<p><span class='pagenum'><a name="Page_446" id="Page_446">[Pg 446]</a></span></p> + +<h4>TABLE 2.—<span class="smcap">Rate of Progress, Nature of Materials, and Methods Adopted in +Construction of East River Tunnels.</span></h4> + +<h4><span class="smcap">Line A, Long Island.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">All rock</td> + <td align='left' class="btl">Bottom heading</td> + <td align='left' class="btl">69+39.9</td> + <td align='left' class="btl">69+79</td> + <td align='left' class="btl">Aug. 2, '06</td> + <td align='left' class="btl">Sept 25, '06</td> + <td align='right' class="btl">54 </td> + <td align='right' class="btl">39.1</td> + <td align='right' class="btl">0.724 </td> + <td align='left' class="btl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">69+79</td> + <td align='left' class="bl">70+64</td> + <td align='left' class="bl">Sept 25, '06</td> + <td align='left' class="bl">Nov. 21, '06</td> + <td align='right' class="bl">57 </td> + <td align='right' class="bl">85 </td> + <td align='right' class="bl">1.49 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">70+64</td> + <td align='left' class="bl">71+34</td> + <td align='left' class="bl">Nov. 21, '06</td> + <td align='left' class="bl">Dec. 30, '06</td> + <td align='right' class="bl">39 </td> + <td align='right' class="bl">70 </td> + <td align='right' class="bl">1.79 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">71+34</td> + <td align='left' class="bl">71+89</td> + <td align='left' class="bl">Dec. 30, '06</td> + <td align='left' class="bl">Feb. 13, '07</td> + <td align='right' class="bl">45 </td> + <td align='right' class="bl">55 </td> + <td align='right' class="bl">1.22 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">71+89</td> + <td align='left' class="bl">72+11</td> + <td align='left' class="bl">Feb. 13, '07</td> + <td align='left' class="bl">Feb. 21, '07</td> + <td align='right' class="bl">8 </td> + <td align='right' class="bl">22 </td> + <td align='right' class="bl">2.75 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">72+11</td> + <td align='left' class="bl">72+67</td> + <td align='left' class="bl">Feb. 21, '07</td> + <td align='left' class="bl">Mar. 19, '07</td> + <td align='right' class="bl">26 </td> + <td align='right' class="bl">56 </td> + <td align='right' class="bl">2.15 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">72+67</td> + <td align='left' class="bl">76+54</td> + <td align='left' class="bl">Mar. 19, '07</td> + <td align='left' class="bl">Sept 6, '07</td> + <td align='right' class="bl">171 </td> + <td align='right' class="bl">387 </td> + <td align='right' class="bl">2.26 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Going out of rock</td> + <td align='left' class="bl">76+54</td> + <td align='left' class="bl">77+24</td> + <td align='left' class="bl">Sept 6, '07</td> + <td align='left' class="bl">Oct. 4, '07</td> + <td align='right' class="bl">28 </td> + <td align='right' class="bl">70 </td> + <td align='right' class="bl">2.50 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left' class="bb">All earth</td> + <td align='left' class="bbl">Soft ground</td> + <td align='left' class="bbl">77+24</td> + <td align='left' class="bbl">90+57.3</td> + <td align='left' class="bbl">Oct. 4, '07</td> + <td align='left' class="bbl">Mar. 26, '08</td> + <td align='right' class="bbl">174 </td> + <td align='right' class="bbl">1,333.3</td> + <td align='right' class="bbl">7.66 </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + +<h4><span class="smcap">Line B, Long Island.</span></h4> + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">All rock</td> + <td align='left' class="btl">Bottom heading</td> + <td align='left' class="btl">69+29.6</td> + <td align='left' class="btl">70+46</td> + <td align='left' class="btl">Oct. 16, '06</td> + <td align='left' class="btl">Nov. 20, '06</td> + <td align='right' class="btl">35 </td> + <td align='right' class="btl">116.4</td> + <td align='right' class="btl">3.33 </td> + <td align='left' class="btl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">70+46</td> + <td align='left' class="bl">71+95</td> + <td align='left' class="bl">Nov. 20, '06</td> + <td align='left' class="bl">Feb. 23, '07</td> + <td align='right' class="bl">95 </td> + <td align='right' class="bl">149 </td> + <td align='right' class="bl">1.57 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">71+95</td> + <td align='left' class="bl">72+25</td> + <td align='left' class="bl">Feb. 23, '07</td> + <td align='left' class="bl">Mar. 6, '07</td> + <td align='right' class="bl">11 </td> + <td align='right' class="bl">30 </td> + <td align='right' class="bl">2.73 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">72+25</td> + <td align='left' class="bl">72+60</td> + <td align='left' class="bl">Mar. 6, '07</td> + <td align='left' class="bl">Mar. 24, '07</td> + <td align='right' class="bl">18 </td> + <td align='right' class="bl">35 </td> + <td align='right' class="bl">1.94 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Going out of rock</td> + <td align='left' class="bl">72+60</td> + <td align='left' class="bl">76+57</td> + <td align='left' class="bl">Mar. 24, '07</td> + <td align='left' class="bl">Aug. 7, '07</td> + <td align='right' class="bl">136 </td> + <td align='right' class="bl">397 </td> + <td align='right' class="bl">2.92 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Soft ground</td> + <td align='left' class="bl">76+57</td> + <td align='left' class="bl">77+30</td> + <td align='left' class="bl">Aug. 7, '07</td> + <td align='left' class="bl">Sept 5, '07</td> + <td align='right' class="bl">29 </td> + <td align='right' class="bl">73 </td> + <td align='right' class="bl">2.52 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left' class="bb">All earth</td> + <td align='left' class="bbl">Soft ground</td> + <td align='left' class="bbl">77+30</td> + <td align='left' class="bbl">90+49.6</td> + <td align='left' class="bbl">Sept 5, '07</td> + <td align='left' class="bbl">Mar. 19, '08</td> + <td align='right' class="bbl">196 </td> + <td align='right' class="bbl">1,319.6</td> + <td align='right' class="bbl">6.73 </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + +<p><span class='pagenum'><a name="Page_447" id="Page_447">[Pg 447]</a></span></p> + +<h4><span class="smcap">Line C, Long Island.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">All rock</td> + <td align='left' class="btl">Bottom heading</td> + <td align='left' class="btl">68+61.9</td> + <td align='left' class="btl">69+93</td> + <td align='left' class="btl">June 11, '06</td> + <td align='left' class="btl">Oct. 16, '06</td> + <td align='right' class="btl">127 </td> + <td align='right' class="btl">131.1</td> + <td align='right' class="btl">1.03 </td> + <td align='left' class="btl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">69+93</td> + <td align='left' class="bl">71+65</td> + <td align='left' class="bl">Oct. 16, '06</td> + <td align='left' class="bl">Feb. 7, '07</td> + <td align='right' class="bl">114 </td> + <td align='right' class="bl">172 </td> + <td align='right' class="bl">1.51 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">71+65</td> + <td align='left' class="bl">71+91</td> + <td align='left' class="bl">Feb. 7, '07</td> + <td align='left' class="bl">Feb. 13, '07</td> + <td align='right' class="bl">6 </td> + <td align='right' class="bl">26 </td> + <td align='right' class="bl">4.33 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">71+91</td> + <td align='left' class="bl">75+81</td> + <td align='left' class="bl">Feb. 13, '07</td> + <td align='left' class="bl">July 20, '07</td> + <td align='right' class="bl">157 </td> + <td align='right' class="bl">390 </td> + <td align='right' class="bl">2.48 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Going out of rock</td> + <td align='left' class="bl">75+81</td> + <td align='left' class="bl">76+56</td> + <td align='left' class="bl">July 20, '07</td> + <td align='left' class="bl">Aug. 25, '07</td> + <td align='right' class="bl">36 </td> + <td align='right' class="bl">75 </td> + <td align='right' class="bl">2.08 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left' class="bb">All earth</td> + <td align='left' class="bbl">Soft ground</td> + <td align='left' class="bbl">76+56</td> + <td align='left' class="bbl">90+44.4</td> + <td align='left' class="bbl">Aug. 25, '07</td> + <td align='left' class="bbl">Mar. 17, '08</td> + <td align='right' class="bbl">205 </td> + <td align='right' class="bbl">1,388.4</td> + <td align='right' class="bbl">6.77 </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + + +<h4><span class="smcap">Line D, Long Island.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">Rock</td> + <td align='left' class="btl">Bottom heading</td> + <td align='left' class="btl">68+50.6</td> + <td align='left' class="btl">69+77</td> + <td align='left' class="btl">June 2, '06</td> + <td align='left' class="btl">Oct. 24, '06</td> + <td align='right' class="btl">144 </td> + <td align='right' class="btl">126.4</td> + <td align='right' class="btl">0.87 </td> + <td align='left' class="btl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">69+77</td> + <td align='left' class="bl">71+22</td> + <td align='left' class="bl">Oct. 24, '06</td> + <td align='left' class="bl">Jan. 13, '06</td> + <td align='right' class="bl">81 </td> + <td align='right' class="bl">145 </td> + <td align='right' class="bl">1.79 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Bottom heading</td> + <td align='left' class="bl">71+23</td> + <td align='left' class="bl">72+00</td> + <td align='left' class="bl">Jan. 13, '07</td> + <td align='left' class="bl">Mar. 3, '07</td> + <td align='right' class="bl">49 </td> + <td align='right' class="bl">78 </td> + <td align='right' class="bl">1.59 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>All rock</td> + <td align='left' class="bl">Center heading</td> + <td align='left' class="bl">72+00</td> + <td align='left' class="bl">75+73</td> + <td align='left' class="bl">Mar. 3, '07</td> + <td align='left' class="bl">July 10, '07</td> + <td align='right' class="bl">129 </td> + <td align='right' class="bl">373 </td> + <td align='right' class="bl">2.89 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth and rock</td> + <td align='left' class="bl">Going out of rock</td> + <td align='left' class="bl">75+73</td> + <td align='left' class="bl">77+63</td> + <td align='left' class="bl">July 10, '07</td> + <td align='left' class="bl">Sept 25, '07</td> + <td align='right' class="bl">77 </td> + <td align='right' class="bl">190 </td> + <td align='right' class="bl">2.47 </td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left' class="bb">All earth</td> + <td align='left' class="bbl">Soft ground</td> + <td align='left' class="bbl">77+63</td> + <td align='left' class="bbl">90+38.6</td> + <td align='left' class="bbl">Sept 25, '07</td> + <td align='left' class="bbl">Mar. 7. '08</td> + <td align='right' class="bbl">164 </td> + <td align='right' class="bbl">1,275.6</td> + <td align='right' class="bbl">7.78 </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + +<p><span class='pagenum'><a name="Page_448" id="Page_448">[Pg 448]</a></span></p> + +<h4><span class="smcap">Line A, Manhattan.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl" colspan="3">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">Rock</td> + <td align='left' class="btl">⎧<br />⎨<br />⎩</td> + <td align='left' class="bt">Top heading<br />Top lift of bench<br />Bottom lift of bench</td> + <td align='left' class="btl">108+43<br />108+43<br />108+43</td> + <td align='left' class="btl">107+74<br />107+74<br />107+74</td> + <td align='left' class="btl">July 20, '05<br />Aug. 8, '05<br />Aug. 30, '05</td> + <td align='left' class="btl">Aug. 3, '05<br />Aug. 23, '05<br />Sept 27, '05</td> + <td align='right' class="btl">14<br />15<br />28</td> + <td align='left' class="bt">⎫<br />⎬<br />⎭</td> + <td align='left' class="bt">57</td> + <td align='right' class="btl">69 </td> + <td align='right' class="btl">1.21</td> + <td align='right' class="bt">⎧<br />⎨<br />⎩</td> + <td align='left' class="btlw15">Excavation in normal air, and before advance of shield.</td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl">⎧<br />⎨<br />⎩</td> + <td align='left'>Bottom heading<br />Bottom heading</td> + <td align='left' class="bl">107+74<br />107+74</td> + <td align='left' class="bl">107+21<br />107+21</td> + <td align='left' class="bl">Sept 27, '05<br />Nov. 30, '05</td> + <td align='left' class="bl">Oct. 23, '05<br />Dec. 29, '05</td> + <td align='right' class="bl">26<br />29</td> + <td align='left'>⎫<br />⎬<br />⎭</td> + <td align='left'>55</td> + <td align='right' class="bl">53 </td> + <td align='right' class="bl">0.96</td> + <td align='right'>⎧<br />⎨<br />⎩</td> + <td align='left' class="bl">Bottom heading timbered to avoid the possibility of a break.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">107+21</td> + <td align='left' class="bl">106+99</td> + <td align='left' class="bl">Oct. 26, '06</td> + <td align='left' class="bl">Nov. 20, '06</td> + <td align='right' class="bl">25</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">22 </td> + <td align='right' class="bl">0.88</td> + <td align='left'></td> + <td align='left' class="bl">Bottom heading timbered.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock bench</td> + <td align='left' class="bl">106+99</td> + <td align='left' class="bl">106+34</td> + <td align='left' class="bl">Nov. 20, '06</td> + <td align='left' class="bl">Jan. 13, '07</td> + <td align='right' class="bl">54</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">65 </td> + <td align='right' class="bl">1.20</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Poling and breasting</td> + <td align='left' class="bl">106+34</td> + <td align='left' class="bl">99+11</td> + <td align='left' class="bl">Jan. 13, '07</td> + <td align='left' class="bl">Apr. 17, '07</td> + <td align='right' class="bl">94</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">723 </td> + <td align='right' class="bl">7.69</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">99+11</td> + <td align='left' class="bl">93+96</td> + <td align='left' class="bl">Apr. 17, '07</td> + <td align='left' class="bl">Oct. 24, '07</td> + <td align='right' class="bl">190</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">515 </td> + <td align='right' class="bl">2.71</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">93+96</td> + <td align='left' class="bl">93+58</td> + <td align='left' class="bl">Oct. 24, '07</td> + <td align='left' class="bl">Nov. 14, '07</td> + <td align='right' class="bl">21</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">38 </td> + <td align='right' class="bl">1.81</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Center heading</td> + <td align='left' class="bl">93+58</td> + <td align='left' class="bl">92+42</td> + <td align='left' class="bl">Nov. 14, '07</td> + <td align='left' class="bl">Dec. 27, '07</td> + <td align='right' class="bl">46</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">116 </td> + <td align='right' class="bl">2.52</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">92+42</td> + <td align='left' class="bl">91+05</td> + <td align='left' class="bl">Dec. 27, '07</td> + <td align='left' class="bl">Feb. 24, '08</td> + <td align='right' class="bl">59</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">137 </td> + <td align='right' class="bl">2.32</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left' class="bb">Mixed</td> + <td align='left' class="bbl"> </td> + <td align='left' class="bb">Rock cut</td> + <td align='left' class="bbl">91+05</td> + <td align='left' class="bbl">90+57</td> + <td align='left' class="bbl">Feb. 24, '08</td> + <td align='left' class="bbl">Mar. 20, '08</td> + <td align='right' class="bbl">25</td> + <td align='left' class="bb"> </td> + <td align='left' class="bb"> </td> + <td align='right' class="bbl">48 </td> + <td align='right' class="bbl">1.92</td> + <td align='left' class="bb"> </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + + +<h4><span class="smcap">Line B, Manhattan.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl" colspan="3">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">Rock</td> + <td align='left' class="btl">⎧<br />⎨<br />⎩</td> + <td align='left' class="btw13">Top heading<br />Top lift of bench<br />Bottom lift of bench<br />Bottom lift of bench</td> + <td align='left' class="btl">108+35<br />108+35<br />108+35<br />108+15</td> + <td align='left' class="btl">107+87<br />107+87<br />108+15<br />107+87</td> + <td align='left' class="btl">July 6, '05<br />Aug. 3, '05<br />Aug. 26, '05<br />Sept 11, '05</td> + <td align='left' class="btl">July 27, '05<br />Aug. 14, '05<br />Aug. 30, '05<br />Sept 26, '05</td> + <td align='right' class="btl">21<br />11<br />4<br />15</td> + <td align='left' class="bt">⎫<br />⎬<br />⎭</td> + <td align='left' class="bt">51</td> + <td align='right' class="btl">48 </td> + <td align='right' class="btl">0.94</td> + <td align='left' class="bt">⎧<br />⎨<br />⎩</td> + <td align='left' class="btlw15">Excavation done in normal air and before advance of shield.</td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">107+87</td> + <td align='left' class="bl">107+00</td> + <td align='left' class="bl">Oct. 23, '05</td> + <td align='left' class="bl">Jan. 17, '06</td> + <td align='right' class="bl">86</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">87 </td> + <td align='right' class="bl">1.01</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">107+00</td> + <td align='left' class="bl">106+64</td> + <td align='left' class="bl">Jan. 17, '06</td> + <td align='left' class="bl">Feb. 12, '06</td> + <td align='right' class="bl">26</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">36 </td> + <td align='right' class="bl">1.38</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock bench</td> + <td align='left' class="bl">106+64</td> + <td align='left' class="bl">106+31</td> + <td align='left' class="bl">Feb. 12, '06</td> + <td align='left' class="bl">Mar. 1, '06</td> + <td align='right' class="bl">17</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">33 </td> + <td align='right' class="bl">1.94</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Poling and breasting</td> + <td align='left' class="bl">106+31</td> + <td align='left' class="bl">105+58</td> + <td align='left' class="bl">Mar. 1, '06</td> + <td align='left' class="bl">Apr. 3, '06</td> + <td align='right' class="bl">33</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">73 </td> + <td align='right' class="bl">2.21</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Shutters in contact with face</td> + <td align='left' class="bl">105+58</td> + <td align='left' class="bl">99+19</td> + <td align='left' class="bl">Apr. 9, '06</td> + <td align='left' class="bl">Nov. 1, '06</td> + <td align='right' class="bl">206</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">639 </td> + <td align='right' class="bl">3.10</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock bench</td> + <td align='left' class="bl">99+19</td> + <td align='left' class="bl">98+44</td> + <td align='left' class="bl">Nov. 1. '06</td> + <td align='left' class="bl">Dec. 29, '06</td> + <td align='right' class="bl">58</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">75 </td> + <td align='right' class="bl">1.30</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">98+44</td> + <td align='left' class="bl">97+76</td> + <td align='left' class="bl">Dec, 29, '06</td> + <td align='left' class="bl">Feb. 12, '07</td> + <td align='right' class="bl">45</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">68 </td> + <td align='right' class="bl">1.51</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">97+66</td> + <td align='left' class="bl">93+84</td> + <td align='left' class="bl">Feb. 12, '07</td> + <td align='left' class="bl">Aug. 6, '07</td> + <td align='right' class="bl">175</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">392 </td> + <td align='right' class="bl">2.24</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Full face</td> + <td align='left' class="bl">93+84</td> + <td align='left' class="bl">93+21</td> + <td align='left' class="bl">Aug. 6, '07</td> + <td align='left' class="bl">Sept 2, '07</td> + <td align='right' class="bl">27</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">63 </td> + <td align='right' class="bl">2.33</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Center Heading</td> + <td align='left' class="bl">93+21</td> + <td align='left' class="bl">92+30</td> + <td align='left' class="bl">Sept 2, '07</td> + <td align='left' class="bl">Oct. 12, '07</td> + <td align='right' class="bl">40</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">91 </td> + <td align='right' class="bl">2.28</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">92+30</td> + <td align='left' class="bl">90+99</td> + <td align='left' class="bl">Oct. 12, '07</td> + <td align='left' class="bl">Dec. 6, '07</td> + <td align='right' class="bl">55</td> + <td align='left'></td> + <td align='left'></td> + <td align='right' class="bl">131 </td> + <td align='right' class="bl">2.38</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left' class="bb">Mixed</td> + <td align='left' class="bbl"> </td> + <td align='left' class="bb">Rock cut</td> + <td align='left' class="bbl">90+99</td> + <td align='left' class="bbl">90+49.6</td> + <td align='left' class="bbl">Dec. 6, '07</td> + <td align='left' class="bbl">Jan. 3, '08</td> + <td align='right' class="bbl">28</td> + <td align='left' class="bb"> </td> + <td align='left' class="bb"> </td> + <td align='right' class="bbl">49.4</td> + <td align='right' class="bbl">1.76</td> + <td align='left' class="bb"> </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + +<p><span class='pagenum'><a name="Page_449" id="Page_449">[Pg 449]</a></span></p> + +<h4><span class="smcap">Line C, Manhattan.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="2" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl" colspan="2">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> +</tr> +<tr> + <td align='left' class="bt">Rock</td> + <td align='left' class="btl">⎧<br />⎨<br />⎩</td> + <td align='left' class="bt">Top heading<br />Top heading<br />Excavating bench<br />Bottom heading<br />Bottom heading</td> + <td align='left' class="btl">107+79.03<br />107+69<br />107+79<br />107+23<br />107+23</td> + <td align='left' class="btl">107+69<br />107+23<br />107+23<br />106+72<br />107+15</td> + <td align='left' class="btl">Dec. 20, '04<br />Jan. 1, '05<br />Jan. 21, '05<br />Mar. 1, '05<br />Oct. 12, '05</td> + <td align='left' class="btl">Dec. 27, '04<br />Jan. 15, '05<br />Feb. 28, '05<br />Mar. 11, '05<br />Oct. 27, '05</td> + <td align='right' class="btl">7<br />14<br />38<br />10<br />15</td> + <td align='left' class="bt">⎫<br />⎬<br />⎭</td> + <td align='right' class="btl">54 </td> + <td align='right' class="btl">0.77</td> + <td align='left' class="bt">⎧<br />⎨<br />⎩</td> + <td align='left' class="btlw15">Stopped to brace portal. No work done from March 12th to October 11th, 1905, except a little trimming in September. All work up to this date done in normal air. Heading advanced to 106+70 and bulkheaded.</td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">107+15</td> + <td align='left' class="bl">106+62</td> + <td align='left' class="bl">Nov. 6, '05</td> + <td align='left' class="bl">Dec. 2, '05</td> + <td align='right' class="bl">26</td> + <td align='left'></td> + <td align='right' class="bl">53 </td> + <td align='right' class="bl">2.04</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">106+62</td> + <td align='left' class="bl">106+55</td> + <td align='left' class="bl">Dec. 2, '05</td> + <td align='left' class="bl">Dec. 23, '05</td> + <td align='right' class="bl">21</td> + <td align='left'></td> + <td align='right' class="bl">7 </td> + <td align='right' class="bl">0.33</td> + <td align='left'>⎧<br />⎨<br />⎩</td> + <td align='left' class="bl">Heading advanced to 106 + 40. Shut down in order that Line D might have a lead.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">106+55</td> + <td align='left' class="bl">106+17</td> + <td align='left' class="bl">Feb. 12, '06</td> + <td align='left' class="bl">Mar. 22, '06</td> + <td align='right' class="bl">38</td> + <td align='left'></td> + <td align='right' class="bl">38 </td> + <td align='right' class="bl">1.00</td> + <td align='left'>⎧<br />⎨<br />⎩</td> + <td align='left' class="bl">Shut down on account of air shortage.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">106+17</td> + <td align='left' class="bl">105+85</td> + <td align='left' class="bl">Apr. 2, '06</td> + <td align='left' class="bl">Apr. 20, '06</td> + <td align='right' class="bl">18</td> + <td align='left'></td> + <td align='right' class="bl">32 </td> + <td align='right' class="bl">1.78</td> + <td align='left'></td> + <td align='left' class="bl">Shut down on account of air shortage.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">105+85</td> + <td align='left' class="bl">105+55</td> + <td align='left' class="bl">July 27, '06</td> + <td align='left' class="bl">Aug. 26, '06</td> + <td align='right' class="bl">30</td> + <td align='left'></td> + <td align='right' class="bl">30 </td> + <td align='right' class="bl">1.00</td> + <td align='left'></td> + <td align='left' class="bl">Shut down April 20th to July 27th, 1906.</td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Breasting and poling</td> + <td align='left' class="bl">105+55</td> + <td align='left' class="bl">99+40</td> + <td align='left' class="bl">Aug. 26, '06</td> + <td align='left' class="bl">Jan. 2, '07</td> + <td align='right' class="bl">127</td> + <td align='left'></td> + <td align='right' class="bl">615 </td> + <td align='right' class="bl">4.84</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">99+40</td> + <td align='left' class="bl">98+70</td> + <td align='left' class="bl">Jan. 2, '07</td> + <td align='left' class="bl">Feb. 6, '07</td> + <td align='right' class="bl">35</td> + <td align='left'></td> + <td align='right' class="bl">70 </td> + <td align='right' class="bl">2.00</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Full face</td> + <td align='left' class="bl">98+70</td> + <td align='left' class="bl">98+60</td> + <td align='left' class="bl">Feb. 6, '07</td> + <td align='left' class="bl">Feb. 12, '07</td> + <td align='right' class="bl">6</td> + <td align='left'></td> + <td align='right' class="bl">10 </td> + <td align='right' class="bl">1.66</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">98+60</td> + <td align='left' class="bl">98+39</td> + <td align='left' class="bl">Feb. 12, '07</td> + <td align='left' class="bl">Mar. 6, '07</td> + <td align='right' class="bl">22</td> + <td align='left'></td> + <td align='right' class="bl">21 </td> + <td align='right' class="bl">0.95</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">98+39</td> + <td align='left' class="bl">98+17</td> + <td align='left' class="bl">Mar. 6, '07</td> + <td align='left' class="bl">Mar. 15, '07</td> + <td align='right' class="bl">9</td> + <td align='left'></td> + <td align='right' class="bl">22 </td> + <td align='right' class="bl">2.44</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">98+17</td> + <td align='left' class="bl">95+68</td> + <td align='left' class="bl">Mar. 15, '07</td> + <td align='left' class="bl">July 30, '07</td> + <td align='right' class="bl">110</td> + <td align='left'></td> + <td align='right' class="bl">249 </td> + <td align='right' class="bl">2.26</td> + <td align='left'></td> + <td align='left' class="bl">Heading advanced to 97+82.</td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">95+68</td> + <td align='left' class="bl">94+61</td> + <td align='left' class="bl">July 30, '07</td> + <td align='left' class="bl">Aug. 21, '07</td> + <td align='right' class="bl">49</td> + <td align='left'></td> + <td align='right' class="bl">107 </td> + <td align='right' class="bl">2.18</td> + <td align='left'></td> + <td align='left' class="bl">Heading advanced to 94+35.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">94+61</td> + <td align='left' class="bl">93+56</td> + <td align='left' class="bl">Aug. 21, '07</td> + <td align='left' class="bl">Oct. 3, '07</td> + <td align='right' class="bl">43</td> + <td align='left'></td> + <td align='right' class="bl">106 </td> + <td align='right' class="bl">2.46</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">93+56</td> + <td align='left' class="bl">92+73</td> + <td align='left' class="bl">Oct. 3, '07</td> + <td align='left' class="bl">Nov. 11, '07</td> + <td align='right' class="bl">39</td> + <td align='left'></td> + <td align='right' class="bl">83 </td> + <td align='right' class="bl">2.13</td> + <td align='left'></td> + <td align='left' class="bl"> </td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">92+73</td> + <td align='left' class="bl">90+55</td> + <td align='left' class="bl">Nov. 11, '07</td> + <td align='left' class="bl">Feb. 13, '08</td> + <td align='right' class="bl">94</td> + <td align='left'></td> + <td align='right' class="bl">218 </td> + <td align='right' class="bl">2.32</td> + <td align='left'></td> + <td align='left' class="bl">Shut down until Line D shields met.</td> +</tr> +<tr> + <td align='left' class="bb">Mixed</td> + <td align='left' class="bbl"> </td> + <td align='left' class="bb">Rock cut</td> + <td align='left' class="bbl">90+55</td> + <td align='left' class="bbl">90+44.4</td> + <td align='left' class="bbl">Feb. 25, '08</td> + <td align='left' class="bbl">Mar. 3, '08</td> + <td align='right' class="bbl">6</td> + <td align='left' class="bb"> </td> + <td align='right' class="bbl">11 </td> + <td align='right' class="bbl">1.83</td> + <td align='left' class="bb"> </td> + <td align='left' class="bbl"> </td> +</tr> +</table></div> + +<p><span class='pagenum'><a name="Page_450" id="Page_450">[Pg 450]</a></span></p> + + +<h4><span class="smcap">Line D, Manhattan.</span></h4> + + +<div class='center'> +<table border="0" cellpadding="4" cellspacing="0" summary=""> +<tr> + <td align='center' rowspan="2" class="bt">Material.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Method.</td> + <td align='center' colspan="2" class="btl">Station:</td> + <td align='center' colspan="3" class="btl">Date:</td> + <td align='center' rowspan="2" class="btl">Number<br />of days.</td> + <td align='center' rowspan="2" class="btl">Linear<br />Feet.</td> + <td align='center' rowspan="2" class="btl">Rate of<br />progress in<br />feet per day.</td> + <td align='center' rowspan="2" class="btl" colspan="2">Remarks.</td> +</tr> +<tr> + <td align='center' class="btl">From</td> + <td align='center' class="btl">To</td> + <td align='center' class="btl">From</td> + <td align='center' class="btl" colspan="2">To</td> +</tr> +<tr> + <td align='left' class="bt">Rock</td> + <td align='left' class="btl">⎧<br />⎨<br />⎩</td> + <td align='left' class="btw13">Top heading<br />Removing bench<br />Bottom heading<br />Trimming<br />Trimming</td> + <td align='left' class="btl">107+70.49<br />107+70.49<br />107+35<br />107+70<br />107+70</td> + <td align='left' class="btl">107+16<br />107+35<br />106+80<br />106+80<br />106+80</td> + <td align='left' class="btl">Dec. 9, '04<br />Jan. 1, '05<br />Jan. 30, '05<br />Mar. 29, '05<br />Aug. 31, '05</td> + <td align='left' class="btl">Jan. 31, '05<br />Jan. 27, '05<br />Feb. 10, '05<br />Apr. 12, '05<br />Sept 19, '05</td> + <td align='left' class="bt">⎫<br />⎬<br />⎭</td> + <td align='right' class="btl">123 </td> + <td align='right' class="btl">90 </td> + <td align='right' class="btl">0.73 </td> + <td align='left' class="btl"> </td> + <td align='left' class="btw13">In normal air.</td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">106+80</td> + <td align='left' class="bl">106+67</td> + <td align='left' class="bl">Oct. 5, '05</td> + <td align='left' class="bl">Nov. 8, '05</td> + <td align='left'></td> + <td align='right' class="bl">34 </td> + <td align='right' class="bl">13 </td> + <td align='right' class="bl">0.40 </td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading timbered.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">106+67</td> + <td align='left' class="bl">106+39</td> + <td align='left' class="bl">Nov. 8, '05</td> + <td align='left' class="bl">Dec. 23, '05</td> + <td align='left'></td> + <td align='right' class="bl">45 </td> + <td align='right' class="bl">38 </td> + <td align='right' class="bl">0.84 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Sliding hood and breasting. Rock bench</td> + <td align='left' class="bl">106+29</td> + <td align='left' class="bl">105+70</td> + <td align='left' class="bl">Dec. 23, '05</td> + <td align='left' class="bl">Jan. 24, '06</td> + <td align='left'></td> + <td align='right' class="bl">32 </td> + <td align='right' class="bl">59 </td> + <td align='right' class="bl">1.84 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Poling and breasting</td> + <td align='left' class="bl">105+70</td> + <td align='left' class="bl">104+61</td> + <td align='left' class="bl">Jan. 24, '06</td> + <td align='left' class="bl">Feb. 27, '06</td> + <td align='left'></td> + <td align='right' class="bl">31 </td> + <td align='right' class="bl">109 </td> + <td align='right' class="bl">3.41 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Poling, breasting and shutters</td> + <td align='left' class="bl">104+61</td> + <td align='left' class="bl">103+90</td> + <td align='left' class="bl">Mar. 2, '06</td> + <td align='left' class="bl">Mar. 31, '06</td> + <td align='left'></td> + <td align='right' class="bl">29 </td> + <td align='right' class="bl">71 </td> + <td align='right' class="bl">2.45 </td> + <td align='left' class="bl">⎧<br />⎨<br />⎩</td> + <td align='left'>Three days' delay to set shutters in top. Shut down 20 days to permit consolidation of the river bed and to repair broken plates.</td> +</tr> +<tr> + <td align='left'>Earth</td> + <td align='left' class="bl"> </td> + <td align='left'>Shutters</td> + <td align='left' class="bl">103+90</td> + <td align='left' class="bl">99+41</td> + <td align='left' class="bl">Apr. 20, '06</td> + <td align='left' class="bl">Sept 3, '06</td> + <td align='left'></td> + <td align='right' class="bl">136 </td> + <td align='right' class="bl">449 </td> + <td align='right' class="bl">3.40 </td> + <td align='left' class="bl"> </td> + <td align='left'>Four days of 136, delay account of flood.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom bench</td> + <td align='left' class="bl">99+41</td> + <td align='left' class="bl">99+17</td> + <td align='left' class="bl">Sept 3, '06</td> + <td align='left' class="bl">Sept 23, '06</td> + <td align='left'></td> + <td align='right' class="bl">20 </td> + <td align='right' class="bl">24 </td> + <td align='right' class="bl">1.20 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">99+17</td> + <td align='left' class="bl">98+50</td> + <td align='left' class="bl">Oct. 2, '06</td> + <td align='left' class="bl">Nov. 24, '06</td> + <td align='left'></td> + <td align='right' class="bl">53 </td> + <td align='right' class="bl">67 </td> + <td align='right' class="bl">1.27 </td> + <td align='left' class="bl"> </td> + <td align='left'>Thirteen days' shut-down to put on hood.</td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">98+50</td> + <td align='left' class="bl">97+72</td> + <td align='left' class="bl">Nov. 24, '06</td> + <td align='left' class="bl">Jan. 16, '07</td> + <td align='left'></td> + <td align='right' class="bl">53 </td> + <td align='right' class="bl">78 </td> + <td align='right' class="bl">1.47 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Bottom heading</td> + <td align='left' class="bl">97+72</td> + <td align='left' class="bl">97+27</td> + <td align='left' class="bl">Jan. 16, '07</td> + <td align='left' class="bl">Feb. 10, '07</td> + <td align='left'></td> + <td align='right' class="bl">25 </td> + <td align='right' class="bl">45 </td> + <td align='right' class="bl">1.40 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">97+27</td> + <td align='left' class="bl">95+72</td> + <td align='left' class="bl">Feb. 10, '07</td> + <td align='left' class="bl">Apr. 23, '07</td> + <td align='left'></td> + <td align='right' class="bl">72 </td> + <td align='right' class="bl">155 </td> + <td align='right' class="bl">2.15 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">95+72</td> + <td align='left' class="bl">95+57</td> + <td align='left' class="bl">Apr. 23, '07</td> + <td align='left' class="bl">May 11, '07</td> + <td align='left'></td> + <td align='right' class="bl">18 </td> + <td align='right' class="bl">15 </td> + <td align='right' class="bl">0.83 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">95+57</td> + <td align='left' class="bl">94+65</td> + <td align='left' class="bl">May 23, '07</td> + <td align='left' class="bl">June 17, '07</td> + <td align='left'></td> + <td align='right' class="bl">25 </td> + <td align='right' class="bl">92 </td> + <td align='right' class="bl">3.68 </td> + <td align='left' class="bl"> </td> + <td align='left'>Twelve days' delay to repair cutting edge.</td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">94+65</td> + <td align='left' class="bl">94+41</td> + <td align='left' class="bl">June 17, '07</td> + <td align='left' class="bl">June 25, '07</td> + <td align='left'></td> + <td align='right' class="bl">8 </td> + <td align='right' class="bl">24 </td> + <td align='right' class="bl">3.00 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Rock cut</td> + <td align='left' class="bl">94+41</td> + <td align='left' class="bl">94+03</td> + <td align='left' class="bl">June 25, '07</td> + <td align='left' class="bl">July 13, '07</td> + <td align='left'></td> + <td align='right' class="bl">18 </td> + <td align='right' class="bl">38 </td> + <td align='right' class="bl">2.11 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">94+03</td> + <td align='left' class="bl">92+64</td> + <td align='left' class="bl">July 13, '07</td> + <td align='left' class="bl">Sept 12, '07</td> + <td align='left'></td> + <td align='right' class="bl">61 </td> + <td align='right' class="bl">139 </td> + <td align='right' class="bl">2.28 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Mixed</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">92+64</td> + <td align='left' class="bl">92+54</td> + <td align='left' class="bl">Sept 12, '07</td> + <td align='left' class="bl">Sept 20, '07</td> + <td align='left'></td> + <td align='right' class="bl">8 </td> + <td align='right' class="bl">10 </td> + <td align='right' class="bl">1.25 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left'>Rock</td> + <td align='left' class="bl"> </td> + <td align='left'>Middle heading</td> + <td align='left' class="bl">92+54</td> + <td align='left' class="bl">92+50</td> + <td align='left' class="bl">Sept 20, '07</td> + <td align='left' class="bl">Sept 21, '07</td> + <td align='left'></td> + <td align='right' class="bl">1 </td> + <td align='right' class="bl">4 </td> + <td align='right' class="bl">4.00 </td> + <td align='left' class="bl"> </td> + <td align='left'></td> +</tr> +<tr> + <td align='left' class="bb">Mixed</td> + <td align='left' class="bbl"> </td> + <td align='left' class="bb">Rock cut</td> + <td align='left' class="bbl">92+50</td> + <td align='left' class="bbl">90+38.66</td> + <td align='left' class="bbl">Sept 21, '07</td> + <td align='left' class="bbl">Jan. 8, '08</td> + <td align='left' class="bb"> </td> + <td align='right' class="bbl">109 </td> + <td align='right' class="bbl">211.34</td> + <td align='right' class="bbl">1.94 </td> + <td align='left' class="bbl"> </td> + <td align='left' class="bb"> </td> +</tr> +</table></div> + +<p><span class='pagenum'><a name="Page_451" id="Page_451">[Pg 451]</a></span></p> + +<p>Openings were made between the headings as follows:</p> + +<p> +Tunnel <i>D</i>, February 20th, 1908;<br /> +Tunnel <i>B</i>, March 3d, 1908;<br /> +Tunnel <i>C</i>, March 5th, 1908;<br /> +Tunnel <i>A</i>, March 18th, 1908.<br /> +</p> + +<p>It was necessary to cut away the projecting floors of the working +compartments before the cutting edges could be shoved together.</p> + +<p><i>Contractor's Organization.</i>—Tunnel operations were carried on +continuously for thirteen days out of fourteen, regular work being shut +down for repairs on alternate Sundays. When the required pressure was +more than 32 lb., four gangs of laborers were employed, each gang +working two shifts of 3 hours each, with an intermission of 3 hours +between the shifts. When the pressure was less than 32 lb., three gangs +were employed, each gang covering 8 hours, but with an intermission of +about 1/2 hour in low pressure for lunch.</p> + +<p><i>Air Pressures Required.</i>—During the greater portion of the work in +soft ground, pressure was maintained which would about balance the +hydrostatic head at the axis of the tunnel. This required a pressure +varying from 30 to 34 lb. per sq. in. above that of the atmosphere. In +Tunnels <i>B</i> and <i>D</i>, at Manhattan, during the work in soft ground, +pressures as high as 37 lb. were maintained for considerable periods of +time; in the firm material near the reef 28 lb. was often sufficient. +While removing the broken plates, the pressure was raised for a short +time to 42 lb., and was maintained between 37-1/2 and 40 lb. for a +little more than one month.</p> + +<p><i>Air Supply.</i>—For regular operation the contractor furnished four +compressors on each side of the river, each having a rated capacity of +5,000 cu. ft. of free air per minute delivered at 50 lb. above normal, +when running at the rate of 100 rev. per min. An additional compressor +of the same capacity was supplied on each side of the river, in +compliance with the requirement for 25% excess capacity; the additional +compressors had also high-pressure air cylinders which could be +connected at will, and in which the pressure could be increased to 150 +lb., and the air used to supply rock drills, grouting machines, etc. The +entire combination on each side of the river, therefore, was rated at +25,000 cu. ft. of free air per minute, or a mean of 6,250 cu. ft. per +heading. Its safe working capacity was not far from 20,000 cu. ft. per +min.<span class='pagenum'><a name="Page_452" id="Page_452">[Pg 452]</a></span></p> + +<p>The shields broke through rock surface in Tunnels <i>B</i>, <i>C</i>, and <i>D</i>, at +Manhattan, in November and December, 1905. The consumption of air in the +four tunnels soon exceeded 15,000 cu. ft. for 24 hours, and in Tunnel +<i>D</i>, on several occasions, it exceeded 7,000 cu. ft. for a like period. +Blows had become frequent, and it was evident that the air plant was +inadequate for driving four tunnels at once in the open material east of +the Manhattan rock. Work in Tunnel <i>A</i>, therefore, was not resumed, +after the suspension on December 29th, for about ten months, and Tunnel +<i>C</i> was also closed down for more than four months of the time between +December, 1905, and July, 1906. During this period the capacity of the +plant was increased from the rated 25,000 cu. ft. of free air per +minute, to 35,000. In Tunnel <i>D</i> the material had gradually become +firmer, with more clay and less escape of air, as the Blackwell's Island +Reef was approached, and, at the end of the period, the rock surface was +within 3 ft. of the top of the shield; in Tunnel <i>B</i>, the rock of the +reef was still a little below the shield, but the overlying material +contained a large proportion of clay and held air very well. Tunnel <i>C</i> +was still in open material, but, with two lines safe and with the +increased air plant, it was deemed best to resume work in Tunnel <i>A</i>, +which was done on October 23d, 1906. Thenceforward work was continuous +in all headings until the meeting points with the Long Island shields +were reached.</p> + +<p>This period, January to October, 1906, inclusive, was the most strenuous +of the entire work, particularly the first six months. With one and, at +times, two tunnels closed down, the consumption of air in the headings +from Manhattan was an average of more than 20,000 cu. ft. per min. for +periods of from 30 to 60 days; it was often more than 25,000 cu. ft. for +24 hours, with a maximum of nearly 29,000 cu. ft., and doubtless this +was exceeded considerably for shorter periods. On several occasions the +quantity supplied to a single tunnel averaged more than 15,000 cu. ft. +per min. for 24 hours. The greatest averages for 24 hours were obtained +later in Tunnel <i>A</i>, after the resumption of work there, and exceeded +19,000 cu. ft., but the conditions in the headings of the other lines +were then so favorable that the work was carried on continuously in all.</p> + +<p>The deficiency in the original plant at Manhattan was so marked, and the +need of driving all headings from Long Island simultaneously so clear, +that it was decided to increase the rated capacity of the Long<span class='pagenum'><a name="Page_453" id="Page_453">[Pg 453]</a></span> Island +compressor plant to 45,400 cu. ft. of free air per minute, which was +10,400 cu. ft. greater than the capacity of the Manhattan plant after +the latter had been augmented.</p> + +<div class="figcenter"> + <a id="ill18" name="ill18"></a><a href="images/ill18large.jpg"> + <img src="images/ill18.jpg" + alt="Plate LXXII" + title="Plate LXXII" /></a><br /> + <span class="caption">Plate LXXII</span> +</div> + +<p>The earth encountered on emerging from rock, when driving westward from +Long Island, was far more compact and less permeable to air than on the +Manhattan side, but for a distance of from 400 to 600 ft. immediately +east of the reef, it was a clean open sand, and, while the shields were +passing through this, the quantity of air supplied to the four headings +seldom fell below 20,000 cu. ft. per min.; it was usually more than +25,000 cu. ft., with a recorded maximum of 33,400 cu. ft. Although this +was greater than ever used on the Manhattan side, it was more uniformly +distributed among the several headings, and in none equalled the maximum +observed on the Manhattan side, the largest having been 12,700 cu. ft. +per min. for 24 hours; it must be remembered, however, that at one time +only two tunnels were in progress in the bad material in the tunnels +from Manhattan.</p> + +<p>From the foregoing experience, it would seem that the plant finally +furnished at Long Island, having a rated capacity of 45,400 cu. ft. of +free air per minute, would have been a reasonable compliance with the +original actual needs on the Manhattan side and <i>vice versa</i>; the plant +finally developed on the Manhattan side, having a rated capacity of +35,000 cu. ft. of free air per minute, would have sufficed for the Long +Island side.</p> + +<p>The total quantity of free air compressed for the supply of the working +chambers of the tunnels and the Long Island caissons was 34,109,000,000 +cu. ft., and, in addition, 10,615,000,000 cu. ft. were compressed to +between 80 and 125 lb. for power purposes, of which at least 80% was +exhausted in the compressed-air working chambers. The total supply of +free air to each heading while under pressure, therefore, averaged about +3,550 cu. ft. per min.</p> + +<p>The quantity of air escaping during a sudden blow-out is apparently much +smaller than might be supposed. Investigation of a number of cases, +showing large pressure losses combined with a long stretch of tunnel +supplying a relatively large reservoir of air, disclosed that a maximum +loss of about 220,000 cu. ft. of free air occurred in 10 min. This +averages only a little more than 19,000 cu. ft. per min., the maximum +recorded supply to one tunnel for a period of 24 hours. Of this<span class='pagenum'><a name="Page_454" id="Page_454">[Pg 454]</a></span> +quantity, however, probably from 30 to 40% escaped in the first 45 +seconds, while the remainder was a more or less steady loss up to the +time when the supply could be increased sufficiently to maintain the +lowered pressure. Very few blows showed losses approaching this in +quantity, but the inherent inaccuracy of the observations make the +foregoing figures only roughly approximate.</p> + + + +<h4><span class="smcap">Special Difficulties.</span></h4> + +<p>The most serious difficulties of the work came near the start. In Tunnel +<i>D</i> blows and falls of sand from the face were frequent after soft +ground was met in the top. About six weeks after entering the full sand +face, and before the shutters had been installed, the shield showed a +decided tendency to settle, carrying the tunnel lining down with it and +resulting in a number of badly broken plates in the bottom of the rings. +Notwithstanding the use of extremely high vertical leads,<a name="FNanchor_D_4" id="FNanchor_D_4"></a><a href="#Footnote_D_4" class="fnanchor">[D]</a> the sand +was so soft that the settlement of the shield continued for about +fifteen rings, the maximum being nearly 9 in. below grade. The +hydrostatic head at mid-height of the tunnel was 32-1/2 lb., and the +raising of the air pressure to 37 lb., as was done at this time, was +attended with grave danger of serious blows, on account of the recent +disturbance of the natural cover by the pulling and re-driving of piles +in the reconstruction of the Long Island ferry slips directly above. It +dried the face materially, however, and the shield began to rise again, +and had practically regained the grade when the anticipated blow-outs +occurred, culminating with the entrance of rip-rap from the river bed +into the shield and the flooding of the tunnel with 4 ft. of sand and +water at the forward end. The escape of air was very great, and, as a +pressure of more than 28 lb. could not be maintained, the face was +bulkheaded and the tunnel was shut down for three weeks in order to +permit the river bed to consolidate.</p> + +<p>This was the most serious difficulty encountered on any part of the +work, and, coming at the very start, was exceedingly discouraging. +During the shut-down the broken plates were reinforced temporarily with +steel ribs and reinforced concrete (<a href="#ill19">Fig. 1, Plate LXXIII</a>) which, on +completion of the work, were replaced by cast-steel segments, as +described elsewhere. Practically, no further movement of iron took +place, and the loss of grade caused by the settlement of the shield,<span class='pagenum'><a name="Page_455" id="Page_455">[Pg 455]</a></span> +which was by far the largest that ever occurred in this work, was not +sufficient to require a change in the designed grade or alignment of the +track. Work was resumed with the shutters in use at the face as an aid +to excavation. The features of extreme seriousness did not recur, but +for two months the escape of air continued to be extremely large, an +average of 15,000 cu. ft. per min. being required on many days during +this period.</p> + +<div class="figcenter"> + <a id="ill19" name="ill19"> + <img src="images/ill19.jpg" + alt="Plate LXXIII, Fig. 1.--Temporary Reinforcement of Broken Plates And Removal of a Plate in Sections." + title="Plate LXXIII, Fig. 1.--Temporary Reinforcement of Broken Plates And Removal of a Plate in Sections." /></a><br /> + <span class="caption">Plate LXXIII, Fig. 1.—Temporary Reinforcement of Broken Plates And Removal of a Plate in Sections.</span> +</div> + +<div class="figcenter"> + <a id="ill20" name="ill20"> + <img src="images/ill20.jpg" + alt="Plate LXXIII, Fig. 2.--Heavy Cast-Steel Patch Attached to Bent Segment of Cutting Edge." + title="Plate LXXIII, Fig. 2.--Heavy Cast-Steel Patch Attached to Bent Segment of Cutting Edge." /></a><br /> + <span class="caption">Plate LXXIII, Fig. 2.—Heavy Cast-Steel Patch Attached to Bent Segment of Cutting Edge.</span> +</div> + +<div class="figcenter"> + <a id="ill21" name="ill21"> + <img src="images/ill21.jpg" + alt="Plate LXXIII, Fig. 3.--Inflow of Soft Clay Through Shield." + title="Plate LXXIII, Fig. 3.--Inflow of Soft Clay Through Shield." /></a><br /> + <span class="caption">Plate LXXIII, Fig. 3.—Inflow of Soft Clay Through Shield.</span> +</div> + +<div class="figcenter"> + <a id="ill22" name="ill22"> + <img src="images/ill22.jpg" + alt="Plate LXXIII, Fig. 4.--Reinforcement of Broken Plate with Long Polt and Twisted Steel Rods." + title="Plate LXXIII, Fig. 4.--Reinforcement of Broken Plate with Long Polt and Twisted Steel Rods." /></a><br /> + <span class="caption">Plate LXXIII, Fig. 4.—Reinforcement of Broken Plate with Long Polt and Twisted Steel Rods.</span> +</div> + +<p>In Tunnel <i>B</i>, after passing out from under the bulkhead line, in April, +1906, the loss of air became very great, and blow-outs were of almost +daily occurrence until the end of June. At the time of the blows the +pressure in the tunnel would drop from 2 to 8 lb., and it generally took +some hours to raise the pressure to what it was before the blow. During +that time regular operations were interrupted. In the latter part of +June a permit was obtained allowing the clay blanket to be increased in +thickness up to a depth of water of 27 ft. at mean low tide. The +additional blanket was deposited during the latter part of June and +early in July, and almost entirely stopped the blows.</p> + +<p>By the end of the month the natural clay, previously described, formed +the greater portion of the face, and, from that time forward, played an +important part in reducing the quantity of air required. During April +and the early part of May the work was under the ferry racks of the Long +Island Railroad. The blanket had to be placed by dumping the clay from +wheel-barrows through holes in the decking.</p> + +<p>In Tunnel <i>A</i> a bottom heading had been driven 23 ft. in advance of the +face at the time work was stopped at the end of 1905. During the ten +months of inactivity the seams in the rock above opened. The rock +surface was only from 2 to 4 ft. below the top of the cutting edge for a +distance of about 60 ft. Over the rock there were large boulders +embedded in sharp sand. It was an exceedingly difficult operation to +remove the boulders and place the polings without starting a run. The +open seams over the bottom heading also frequently caused trouble, as +there were numerous slides of rock from the face which broke up the +breasting and allowed the soft material from above to run into the +shield. There were two runs of from 50 to 75 cu. yd. and many smaller +ones.</p> + + + +<h4><span class="smcap">Guiding the Shields.</span></h4> + +<p>Little difficulty was experienced at any time in driving the shield +close to the desired line, but it was much harder to keep it on grade. +In rock section, where the cradle could be set far enough in advance<span class='pagenum'><a name="Page_456" id="Page_456">[Pg 456]</a></span> to +become hard before the shield was shoved over it, there was no trouble +whatever. Where the cradle could be placed only a very short time before +it had to take the weight of the shield, the case was quite different. +The shield had a tendency to settle at the cutting edge, and when once +pointed downward it was extremely difficult to change its direction. It +was generally accomplished by embedding railroad rails or heavy oak +plank in the cradle on solid foundation. This often had to be repeated +several times before it was successful. In soft ground it was much +easier to change the direction of the shield, but, owing to the varying +nature of the material, it was sometimes impossible to determine in +advance how the shield should be pointed. It was found by experience at +Manhattan that the iron lining remained in the best position in relation +to grade when the underside of the bottom of the shield at the rear end +was driven on grade of the bottom of the iron, but if the rate of +progress was slow, it was better to drive the shield a little higher.</p> + +<p>In the headings from Long Island, which, as a rule, were in soft ground, +the cutting edges of the shields were kept from 4 to 8 in. higher, with +respect to the grade line, than the rails. The shields would then +usually move parallel to the grade line, though this was modified +considerably by the way the mucking was done and by the stiffness of the +ground at the bottom of the shield.</p> + +<p>On the average, the shields were shoved by from ten to twelve of the +bottom jacks, with a pressure of about 4,000 lb. per sq. in. The jacks +had 9-in. plungers, which made the average total force required to shove +the shield 2,800,000 lb. In the soft ground, where shutters were used, +all of the twenty-seven jacks were frequently used, and on several +occasions the pressure exceeded 6,000 lb. per sq. in. With a unit +pressure of 6,000 lb. per sq. in., the total pressure on the shield with +all twenty-seven jacks in operation was 5,154 tons.</p> + + +<h4><span class="smcap">Injuries to Shields.</span></h4> + +<p>There were only two instances of damage to the essential structural +features of the shields. The most serious was in Tunnel <i>D</i> where the +cutting edge at the bottom of the shield was forced up a slightly +sloping ledge of rock. A bow was formed in the steel casting which was +markedly increased with the next few shoves. Work was suspended, and a +heavy cast-steel patch, filling out the bow, was attached to the bent +segments, as shown in <a href="#ill20">Fig. 2, Plate LXXIII</a>. No further trouble<span class='pagenum'><a name="Page_457" id="Page_457">[Pg 457]</a></span> was +experienced with the deformed portion. The other instance was in Tunnel +<i>B</i>, from Long Island, where a somewhat similar but less serious +accident occurred and was treated in a like manner.</p> + +<p><i>Bulkheads.</i>—At Manhattan, bulkheads had to be built near the shafts +before the tunnels could be put under pressure. After 500 ft. of tunnel +had been built on each line, the second bulkheads were constructed. The +air pressure between the first and second bulkheads was then reduced to +between 15 and 20 lb. When the shields had been advanced for 1,500 ft., +the third set of bulkheads was built. Nearly all the broken plates which +were removed were located between the first and third bulkheads at +Manhattan. Before undertaking this operation, the doors of the locks in +the No. 3 bulkheads were reversed to take pressure from the west. By +this means it was possible to carry on the work of dismantling the +shields under comparatively low pressure simultaneously with the removal +of the broken plates.</p> + +<p>At Long Island City the roofs of the caissons served the purpose of the +No. 1 bulkheads. Two other sets of bulkheads were erected, the first +about 500 ft. and the second about 1,500 ft. from the shafts.</p> + + +<h4><span class="smcap">Settlement at Surface of Ground.</span></h4> + +<p>The driving of such portions of the river tunnels, with earth top, as +were under the land section, caused a settlement at the surface varying +usually from 3 to 6 in. The three-story brick building at No. 412 East +34th Street required extensive repairs. This building stood over the +section of part earth and part rock excavation where the tunnels broke +out from the Manhattan ledge and where there were a number of runs of +sand into the shield. In fact, the voids made by those runs eventually +worked up to the surface and caused the pavement of the alley between +the buildings to drop 4 or 5 ft. over a considerable area. The tunnels +also passed directly under the ferry bridges and racks of the Long +Island Railroad at East 34th Street. Tunnels <i>B</i> and <i>D</i> were constantly +blowing at the time, and, where progress was slow, caused so much +settlement that one of the racks had to be rebuilt. Tunnel <i>A</i>, on the +other hand, where progress was rapid, caused practically no settlement +in the racks.</p> + + +<h4><span class="smcap">Clay Blanket.</span></h4> + +<p>As previously mentioned, clay was dumped over the tunnels in varying +depths at different times. A material was required which would<span class='pagenum'><a name="Page_458" id="Page_458">[Pg 458]</a></span> pack +into a compact mass and would not readily erode under the influence of +the tidal currents of the river and the escape of the great volumes of +air which often kept the water in the vicinity of the shields in violent +motion. Suitable clay could not be found in the immediate vicinity of +the work. Materials from Shooter's Island and from Haverstraw were tried +for the purpose. The Government authorities did not approve of the +former, and the greater portion of that used came from the latter point. +Although a number of different permits governing the work were granted, +there were three important ones. The first permit allowed a blanket +which roughly followed the profile of the tunnels, with an average +thickness of 10 ft. on the Manhattan side and somewhat less on the Long +Island City side. The second general permit allowed the blanket to be +built up to a plane 27 ft. below low water. This proved effective in +checking the tendency to blow, but allowed considerable loss of air. +Finally, dumping was allowed over limited and marked areas up to a plane +of 20 ft. below low water. Wherever advantage was taken of this last +authority, the excessive loss of air was almost entirely stopped. After +all the shields had been well advanced out into the river, the blanket +behind them was dredged up, and the clay used over again in advance of +the shield.</p> + +<p>Soundings were taken daily over the shields, and, if marked erosion was +found, clay was dumped into the hole. Whenever a serious blow occurred, +a scowload of clay was dumped over it as soon as possible and without +waiting to make soundings. For the latter purposes a considerable +quantity of clay was placed in storage in the Pidgeon Street slip at +Long Island City, and one or two bottom-dump scows were kept filled +ready for emergencies. Mr. Robert Chalmers, who had charge of the +soundings for the contractor, states that "the depressions in the +blanket caused by erosion due to the escape of air were, as a rule, +roughly circular in plan and of a curved section somewhat flat in the +center." Satisfactory soundings were never obtained in the center of a +violent blow, but the following instance illustrates in a measure what +occurred. Over Tunnel <i>B</i>, at Station 102+80, there was normally 36 ft. +of water, 7 ft. of clay blanket, and 20 ft. of natural cover. Air was +escaping at the rate of about 10,000 cu. ft. per min., and small blows +were occurring once or twice daily. On June 22d, soundings showed 54 ft. +of water. A depth of 18 ft. of the river bottom had been eroded in about +two days. On the next day there were taken out of the<span class='pagenum'><a name="Page_459" id="Page_459">[Pg 459]</a></span> shield boulders +which had almost certainly been deposited on the natural river bed. Clay +from the blanket also came into the shields on a number of occasions +during or after blows. The most notable occasion was in September, 1907, +when the top of the shield in Tunnel <i>D</i> was emerging from the east side +of Blackwell's Island Reef. The sand in the top was very coarse and +loose, and allowed the air to escape very freely. The fall of a piece of +loose rock from under the breast precipitated a run of sand which was +followed by clay from the blanket, which, in this locality, was largely +the softer redredged material. Mucking out the shield was in progress +when the soft clay started flowing again and forced its way back into +the tunnel for a distance of 20 ft., as shown in <a href="#ill21">Fig. 3, Plate LXXIII</a>. +Ten days of careful and arduous work were required to regain control of +the face and complete the shove, on account of the heavy pressure of the +plastic clay.</p> + +<p>The clay blanket was of the utmost importance to the work throughout, +and it is difficult to see how the tunnels could have been driven +through the soft material on the Manhattan side without it.</p> + +<p>The new material used in the blanket amounted to 283,412 cu. yd., of +which 117,846 cu. yd. were removed from over the completed tunnels and +redeposited in the blanket in advance of the shields. A total of 88,059 +cu. yd. of clay was dumped over blows. The total cost of placing and +removing the blanket was $304,056.</p> + + +<h4><span class="smcap">Iron Lining.</span></h4> + +<p>The standard cast-iron tunnel lining was of the usual tube type, 23 ft. +in outside diameter. The rings were 30 in. wide, and were composed of +eleven segments and a key. The webs of the segments were 1-1/2 in. thick +in the central portion, increasing to 2-3/8 in. at the roots of the +flanges, which were 11 in. deep, 2-1/4 in. thick at the root, and 1-1/2 +in. at the edge, and were machined on all contact faces. Recesses were +cast in the edge of the flanges, forming a groove, when the lining was +in place, 1-1/2 in. deep and about 3/8 in. wide, to receive the +caulking. The bolt holes were cored in the flanges, and the bosses +facing the holes were not machined. The customary grout hole was tapped +in the center of each plate for a standard 1-1/4-in. pipe. In this work, +experience indicated that the standard pipe thread was too fine, and +that the taper was objectionable. Each segment weighed, approximately, +2,020 lb., and the key weighed 520 lb., the total weight being 9,102 lb. +per<span class='pagenum'><a name="Page_460" id="Page_460">[Pg 460]</a></span> lin. ft. of tunnel. <a href="#fig01">Fig. 1</a> shows the details of the standard heavy +lining.</p> + +<p>In addition to the standard cast-iron lining, cast-steel rings of the +same dimensions were provided for use in a short stretch of the tunnel, +when passing from a rock to a soft ground foundation, where it was +anticipated that unequal settlement and consequent distortion and +increase in stress might occur, but, aside from the small regular drop +of the lining as it passed out of the tail of the shield, no such +settlement was observed.</p> + +<p>Two classes of lighter iron, one with 1-in. web and 8-in. flanges and +the other with 1-1/4-in. web and 9-in. flanges—the former weighing +5,166 lb. per lin. ft. of tunnel and the latter, 6,776 lb.—were +provided for use in the land sections between East Avenue and the Long +Island City shafts. Two weights of extra heavy segments for use at the +bottom of the rings were also furnished. The so-called <i>XX</i> plates had +webs and flanges 1/4 in. thicker than the standard segment and the <i>YY</i> +plates were similarly 1/2 in. heavier. The conditions under which they +were used will be referred to later. All the castings were of the same +general type as shown by <a href="#fig01">Fig. 1</a>.</p> + +<p>Rings tapering 3/4 in. and 1-1/2 in. in width were used for changes in +alignment and grade, the former being used approximately at every fourth +ring on the 1° 30' curves. The 1-1/2-in. tapers were largely used for +changes in grade where it was desired to free the iron from binding on +the tail of the shield. Still wider tapers would have been advantageous +for quick results in this respect.</p> + +<p>No lug was cast on the segments for attachment to the erector, but in +its place the gadget shown on <a href="#ill16">Fig. 4, Plate LXX</a>, was inserted in one of +the pairs of bolt holes near the center of the plate, and was held in +position by the running nut at one end.</p> + +<p>In the beginning it was expected that the natural shape of the rings +would not show more than 1 in. of shortening of the vertical diameter; +this was slightly exceeded, however, the average distortion throughout +the tunnels being 1-7/16 in. The erectors were attached to the shield +and in such a position that they were in the plane of the center of the +ring to be erected when the shove was made without lead and just far +enough to permit placing the segments. If the shield were shoved too +far, a rare occurrence, the erection was inconvenienced. In driving with +high vertical leads, which occurred more frequently, the dis<span class='pagenum'><a name="Page_462" id="Page_462">[Pg 462]</a></span>advantage +of placing the erector on the shield was more apparent. Under such +conditions the plane of the erector's motion was acutely inclined to the +plane of the ring, and, after placing the lower portion of the ring, it +was usually necessary to shove the shield a few inches farther in order +to place the upper plates. The practical effect of this action is +referred to later.</p> + +<div class="figcenter"> + <a id="fig01" name="fig01"></a><a href="images/fig01large.jpg"> + <img src="images/fig01.jpg" + alt="Fig. 1." + title="Fig. 1." /></a><br /> + <span class="caption">Fig. 1.</span> +</div> + +<p>At first the erection of the iron in the river tunnels interfered +somewhat with the mucking operations, but the length of time required to +complete the latter was ample for the completion of the former; and the +starting of a shove was seldom postponed by reason of the non-completion +of a ring. After the removal of the bottom of the diaphragms, permitting +the muck cars to be run into the shield and beyond, the two operations +were carried on simultaneously without serious interference. The +installation of the belt conveyor for handling the soft ground spoil in +Tunnel <i>A</i> was of special benefit in this respect.</p> + +<p>Preparatory to the final bolt tightening of each ring as erected, a +15-ton draw-jack, consisting of a small pulling-jack inserted in a light +eye-bar chain, was placed on the horizontal diameter, and frequently the +erectors were also used to boost the crown of the iron, the object being +to erect the ring truly circular. Before shoving, a 1-1/4-in. +turn-buckle was also placed on the horizontal diameter in order to +prevent the spreading of the iron, previous to filling the void outside +with grout. The approach of the supports for the upper floor of the +trailing platform necessitated the removal of these turnbuckles from all +but the three leading rings, but if the iron showed a tendency to +continue distortion, they were re-inserted after the passage of the +trailing platform and remained until the arch of the concrete lining was +placed.</p> + +<p>The cost of handling and erecting the iron varied greatly at different +times, averaging, for the river tunnels, $3.32 per ton for the directly +chargeable labor of handling and erecting, to which must be added $7.54 +for "top charges." The cost of repairing broken plates is included in +this figure.</p> + +<p><i>Broken Plates.</i>—During the construction of the river section of the +tunnels, a number of segments were found to have been broken while +shoving the shield. The breaks, which with few exceptions were confined +to the three or four bottom plates, almost invariably occurred on the +advanced face of the ring, and rarely extended beyond the bottom<span class='pagenum'><a name="Page_463" id="Page_463">[Pg 463]</a></span> of the +flange. A careful study of the breaks and of the shoving records +disclosed several distinct types of fracture and three principal known +causes of breakage by the shield.</p> + +<p>In the first case, the accidental intrusion of foreign material between +the jack head and the iron caused the jack to take its bearings on the +flange above its normal position opposite the web of the ring, and +resulted usually in the breaking out of a piece of the flange or in +several radiating cracks with or without a depression of the flange. +These breaks were very characteristic, and the cause was readily +recognizable, even though the intruding substance was not actually +observed.</p> + +<p>In the second case, the working of a hard piece of metal, such as a +small tool, into the annular space between the iron and the tail of the +shield, where it was caught on the bead and dragged along as the shield +advanced, was the known cause of a number of broken segments. Such +breaks had no particular characteristic, but were usually close above +the line of travel of the lost tool or metal. Their cause was determined +by the finding of a heavy score on the underside of the segment or the +discovery of the tool wedged in the tail of the shield or lying under +the broken plate when it was removed. It is probable that a number of +breaks ascribed to unknown causes should be placed in this class.</p> + +<p>The third cause includes the largest number of breaks, and, while +difficult to define closely, is the most interesting. Broadly speaking, +the breaks resulted from the movements of the shield in relation to the +position of the tunnel lining. While shoving through soft ground, it was +frequently difficult to apply sufficient power to the lower jacks to +complete the full shove of 30 in. on the desired alignment. The shield, +therefore, was driven upward at the beginning of the shove, and, as the +sand packed in front of the shield and more power was required, it was +furnished by applying the upper jacks. The top of the shield was slowly +pushed over, and, at the close of the shove, the desired position had +been obtained; but the shield had been given a rocking motion with a +decided lifting of the tail toward the close of the shove. A similar +lifting of the tail occurred when, with high vertical leads, the top of +the shield was pushed over in order to place the upper plates of the +ring. Again, when the shield was driven above grade and it was desired +to descend, the passage of the shield over the summit pro<span class='pagenum'><a name="Page_464" id="Page_464">[Pg 464]</a></span>duced a like +effect. In all these movements, with the space between the tail of the +shield and the iron packed tight with pugging, the upward thrust of the +shield tended to flatten the iron in the bottom and occasional broken +plates were the result. The free use of the taper rings, placed so as to +relieve the binding of the lining on the tail of the shield, forces the +tunnel to follow the variations in the grade of the shield, but reduces +greatly the injuries to the rings from this action.</p> + +<p>In Tunnel <i>D</i>, where very high vertical leads were required through the +soft sand, combined with a marked tendency of the shield to settle, the +shield was badly cramped on the iron and dragged along it at the top. +The bearing of the iron on its soft foundation tended to thrust up the +bottom in this case also, as shown by the opening of the bottom +cross-joints when the bolts were slackened to relieve the strain during +a shove. The anticipated cracks in the crown plates, which have been +more frequently observed in other tunnels, did not occur here, and were +not found elsewhere except in one place in Tunnel <i>B</i> where they were +traced to a similar action of the shield. The cracks resulting from the +movements of the shield, as briefly described above, in this third case +were not confined to any particular type, but occurred more frequently +at the extreme end of the circumferential flange than at any other +point.</p> + +<p>The number of broken plates occurring in the river tunnels was 319, or +0.42% of the total number erected. Of these, 52 were found and removed, +either before or immediately after a shove, by far the greater number +being broken in handling before or during erection. The remaining 267 +are considered below.</p> + +<p><i>Repair of Broken Plates.</i>—On the completion of a shove, the tail of +the shield lacked about 5 in. of covering the full width of the last +ring, and the removal of a plate broken during the shove, therefore, +would have exposed the ground at the tail of the shield. With a firm +material in the bottom, this introduced no particular difficulties, and, +under such conditions, a broken plate was usually removed at once. In +the sand, however, and especially on the Manhattan side where it was +quick and flowing, the removal of a plate was attended with some danger, +and such plates were usually left to be removed on the completion of the +tunnel. Many of these had been reinforced by the use of <i>XX</i>, <i>YY</i>, and +steel segments placed adjacent to the break in the following rings.</p> + +<p>After the meeting of the shields, the postponed replacement of the<span class='pagenum'><a name="Page_465" id="Page_465">[Pg 465]</a></span> +broken segments was taken up. The pressure was raised sufficiently to +dry thoroughly the sand outside the segments, which were drilled and +broken out usually in quarters as shown on <a href="#ill19">Fig. 1, Plate LXXIII</a>. A steel +segment was then inserted in the ring and drawn into place by +turnbuckles. The application of the draw-jack, with a pull of about 30 +tons to each end successively, brought the plate to a firm bearing on +the radial joints at the ends.</p> + +<p>Where the broken plate was isolated and was reinforced by steel or extra +heavy segments in the adjacent ring, the crack, if slight, was simply +caulked to insure water-tightness. If, however, the crack was opened or +extended to the web of the plate, the cross-flanges were tied together +by a 1-1/2-in. by 7-ft. bolt, inserted through the bolt holes nearest +the broken flange. The long bolt acted in the nature of a bow string, +and was provided at its ends with two nuts set on opposite sides of the +cross-joints to replace the standard bolts removed for its insertion. +<a href="#ill22">Fig. 4, Plate LXXIII</a> shows one of these bolts in place. In addition, all +broken plates remaining in the tunnel were reinforced with 1-in. +twisted-steel rods in the concrete lining, also shown in <a href="#ill22">Fig. 4, Plate +LXXIII</a>.</p> + +<p><i>Special Construction at River Shield Junctions.</i>—Dismantling the +shields was started as soon as they came to rest in their final position +with the cutting edges together. The plans contemplated their entire +removal, with the exception of the cylindrical skins and cast-steel +cutting edges. Inside the former the standard tunnel lining was erected +to within 4 ft. of the heels of the cutting edges. Spanning the latter, +and forming the continuous metal tunnel lining, the special construction +shown by <a href="#fig02">Fig. 2</a> was built. This consisted of a 1-1/4 in. rolled-steel +ring, 7 ft. long, erected inside the cutting edges, with an annular +clearance of 1 in., and two special cast-iron rings shaped to connect +the rolled-steel ring with the normal lining. One flange of the special +cast-iron rings was of the standard type, the other was returned 9 in. +in the form of a ring, the inside diameter of which was the same as the +outside diameter of the rolled-steel ring to which it was bolted.</p> + +<p>The space between the standard and special construction was of varying +width at the various shields, and was filled with a closure ring cast to +the lengths determined in the field. <a href="#fig02">Fig. 2</a> shows the completed +construction.<span class='pagenum'><a name="Page_466" id="Page_466">[Pg 466]</a></span></p> + +<p>Hook-bolts, screwed through threaded holes and buried in 1 to 1 Portland +cement grout ejected through similar holes, reinforced the rolled-steel +ring against external water pressure. In two of the tunnels the concrete +lining was carried completely through the junction, and covered the +whole construction, while in the remaining two tunnels it was omitted at +the rolled-steel ring, leaving the latter exposed and set back about 3 +in. from the face of the concrete.</p> + +<div class="figcenter"> + <a id="fig02" name="fig02"></a><a href="images/fig02large.jpg"> + <img src="images/fig02.jpg" + alt="Fig. 2." + title="Fig. 2." /></a><br /> + <span class="caption">Fig. 2.</span> +</div> + + +<h4><span class="smcap">Grouting.</span></h4> + +<p>Except as previously noted, the voids outside of the tunnel lining were +filled with grout ejected through the grout holes in each segment. The +possibility was always present that Portland cement, if used for grout +in the shield-driven tunnels, would flow forward around the shield and +set hard, "freezing" the shield to the rock or the iron lining, or at +least forming excrescences upon it, which would render its control +difficult. With this in mind, the contractors proposed to substitute an +English Blue Lias lime as a grouting material. Grout of fresh English +lime containing a moderate quantity of water set very rapidly in air to +the consistency of chalk. Its hydraulic properties, however,<span class='pagenum'><a name="Page_467" id="Page_467">[Pg 467]</a></span> were +feeble, and in the presence of an excess of water it remained at the +consistency of soft mud. It was not suitable, therefore, as a supporting +material for the tunnel.</p> + +<p>An American lime, made in imitation of the Lias lime, but having greater +hydraulic properties, was tried, but proved unsatisfactory. Two brands +of natural cement were also tried and rejected, but a modified +quick-setting natural cement, manufactured especially for this work, was +eventually made satisfactory, and by far the largest part of the +river-tunnel grouting was done with this material mixed 1 to 1 by +volume. East of the Long Island shafts the work which was built without +shields was grouted principally with Portland cement and sand mixed 1 to +1 by volume.</p> + +<p>In the river tunnels large quantities of the English lime were used neat +as grout over the top of the tunnel in attempts to stop losses of air +through the soft ground. It was not of great efficiency, however, in +this respect until the voids outside of the lining had been filled above +the crown. Its properties of swelling and quick setting in the dry sand +at that point then became of value. The use of dry lime in the face, +where the escaping air would carry it into the voids of the sand and +choke them, was much more promptly efficacious in checking the loss.</p> + +<p>With the exception of the English lime, all grout was mixed 1 to 1 with +sand in a Cockburn continuous-stirring machine operated by a 3-cylinder +air engine. The grout machine was placed on the lower floor of the +trailing platform shown on <a href="#ill18">Plate LXXII</a>, while the materials were placed +on the upper platform, and, together with the water, were fed into the +machine through a hole in the upper floor. The sand was bagged in the +yard, and the cars on which the materials were sent into the tunnels +were lifted by an elevator to the level of the upper floor of the +trailing platform before unloading.</p> + +<p>Great difficulty was experienced in preventing the waste of the fluid +grout ahead of the shield and into the tail through the space between it +and the iron lining. In a full soft ground section, the first condition +did not usually arise. In the full-rock sections the most efficient +method of checking the waste was found to be the construction of dams or +bulkheads outside the lining between it and the rock surface. For this +purpose, at intervals of about 30 ft., the leading ring and the upper +half of the preceding one were disconnected and pulled forward +sufficiently to give access to the exterior. A rough dam of rubble, or<span class='pagenum'><a name="Page_468" id="Page_468">[Pg 468]</a></span> +bags of mortar or clay, was then constructed outside the iron, and the +rings were shoved back and connected up. In sections containing both +rock and soft ground, grout dams were built at the cutting edge at +intervals, and were carried up as high as circumstances permitted.</p> + +<p>The annular space at the tail of the shield was at all times supposed to +be packed tight with clay and empty bags, but the pugging was difficult +to maintain against the pressure of the grout. For a time, 1/2-in. +segmental steel plates, slipped down between the jackets and the iron, +were used to retain the pugging, but their displacement resulted in a +number of broken flanges, and their use was abandoned. In their place, +2-in. segmental plates attached to the jack heads were substituted with +more satisfactory results. Notwithstanding these devices, the waste of +grout at the tail was very great.</p> + +<p>The soft ground material on various portions of the work acted very +differently. The clay and "bull's liver" did not cave in upon the iron +lining for several hours after the shield had passed, sometimes not for +a day or more, which permitted the space between it and the iron to be +grouted. The fine gray or beach sand and the quicksand closed in almost +at once. The quicksand has a tendency to fill in under the iron from the +sides and in places to leave a cavity at about the horizontal diameter +which was not filled from above, as the sand, being dried out by the +air, stood up fairly well and did not cave against the iron, except +where nearly horizontal at the top.</p> + +<p>The total quantity of grout used on the work was equivalent in set +volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647 +bbl. were ejected through the iron lining, an average of 14.93 bbl. per +lin. ft. The cost of grout ejected outside of the river tunnels was 93 +cents per bbl. for labor and $2.77 for "top charges." East of the Long +Island shaft the corresponding costs were $0.68 and $1.63, the +difference being partly due to the large percentages of work done in the +normal air at the latter place.</p> + + +<h4><span class="smcap">Caulking and Leakage.</span></h4> + +<p>Up to August, 1907, the joints between the segments of the cast-iron +lining were caulked with iron filings and sal ammoniac, mixed in the +proportion of 400 to 1 by weight. With the air pressure balancing the +hydrostatic head near the tunnel axis, it was difficult to make the +rust-joint caulking tight below the axis against the opposing water +pressure;<span class='pagenum'><a name="Page_469" id="Page_469">[Pg 469]</a></span> this form of caulking was also injured in many places by +water dripping from service pipes attached to the tunnel lining. A few +trials of lead wire caulked cold gave such satisfactory results that it +was adopted as a substitute. Pneumatic hammers were used successfully on +the lead caulking, but were only used to a small extent on the rust +borings, which were mostly hand caulked. Immediately before placing the +concrete lining, all leaks, whether in the rust borings or lead, were +repaired with lead, and the remainder of the groove was filled with 1 to +1 Portland cement mortar, leaving the joints absolutely water-tight at +that time. The subsequent development of small seepages through the +concrete would seem to indicate that the repair work should have been +carried on far enough in advance of the concreting to permit the +detection of secondary leaks which might develop slowly. The average +labor cost chargeable against the caulking was 12 cents per lin. ft., to +which should be added 21.8 cents for "top charges."</p> + +<p>Unfortunately, it was necessary to place the greater part of the +concrete lining in the river tunnels during the summer months when the +temperature at the point of work frequently exceeded 85°; and the +temperature of the concrete while setting was much higher. This abnormal +heat, due to chemical action in the cement, soon passed away, and, with +the approach of winter, the contraction of the concrete resulted in +transverse cracks. By the middle of the winter these had developed quite +uniformly at the ends of each 30-ft. section of concrete arch as placed, +and frequently finer cracks showed at about the center of each 30-ft. +section.</p> + +<p>While the temperature of the concrete was falling, a like change was +taking place in the cast-iron lining, with resulting contraction. The +lining had been erected in compressed air, the temperature of which +averaged about 70° in winter and higher in summer. Compressed air having +been taken off in the summer of 1908, the tunnels then acquired the +lower temperature of the surrounding earth, slowly falling until +mid-winter. The contraction of the concrete, firmly bedded around the +flanges of the iron, and showing cracks at fairly uniform intervals, +probably localized the small corresponding movements of the iron near +the concrete cracks, and resulted in a loosening of the caulking at +these points. With the advent of cold weather, damp spots appeared in +numerous places on the concrete, and small seepages showed through quite +regularly at the temperature cracks, in some cases developing<span class='pagenum'><a name="Page_470" id="Page_470">[Pg 470]</a></span> +sufficiently to be called leaks. Only a few, however, were measurable in +amount.</p> + +<p>Early in January small brass plugs were firmly set on opposite sides of +a large number of cracks, and caliper readings and air temperature +observations were taken regularly throughout the winter and spring. The +widths of the cracks and the amount of leakage at them increased with +each drop in temperature and decreased as the temperature rose again, +but until spring the width of the cracks did not return to the same +point with each return of temperature.</p> + +<p>The leakage was similar in all four tunnels, but was largest in amount +in Tunnel <i>D</i>, where, at the beginning of February, the ordinary flow +was about 0.0097 cu. ft. per sec., equivalent to 0.00000347 cu. ft. per +sec. per lin. ft. of tunnel. Of this amount 0.0065 cu. ft. per sec. +could be accounted for at eight of the cracks showing measurable +leakage, leaving 0.0032 cu. ft. per sec. or 0.00000081 cu. ft. per sec. +per lin. ft. of tunnel to be accounted for as general seepage +distributed over the whole length.</p> + +<p>It was not feasible to stop every leak in the tunnel, most of which were +indicated simply by damp spots on the concrete; a rather simple method +was devised, however, for stopping the leaks at the eight or ten places +in each tunnel where water dripped from the arch or flowed down the face +of the concrete. The worst leak in any tunnel flowed about 0.0023 cu. +ft. per sec. To stop these leaks, rows of 1-in. holes, at about 4-in. +centers, were drilled with jap drills through the concrete to the flange +of the iron. These rows were from 3 to 18 ft. long, extending 1 ft. or +more beyond the limits of the leak. The bottoms of the holes were +directly on the caulking groove and the pounding of the drill usually +drove the caulking back, so that the leak became dry or nearly so after +the holes were drilled. If left alone the leaks would gradually break +out again in a few hours or a few days and flow more water than before. +They were allowed to do this, however, in only a few cases as +experiments. After the holes were drilled, the bottom 4 in. next the +flange was filled with soft neat cement mortar. Immediately on top of +this was placed two plugs of neat cement about 2-1/2 in. long, which +were 5 or 6 hours old and rather hard. Each was tamped in with a round +caulking tool of the size of the hole driven with a sledge hammer. On +top of this were driven in the same way two more plugs of neat cement of +the same size, which were hard set.<span class='pagenum'><a name="Page_471" id="Page_471">[Pg 471]</a></span> These broke up under the blows of +the hammer, and caulked the hole tight. When finished, the tamping tool +would ring as though it was in solid rock. Great pressure was exerted on +the plastic mortar in the bottom of the hole, which resulted in the +re-caulking of the joint of the iron. No further measurable leakage +developed in the repaired cracks, during a period of four months, and +the total leakage has been reduced to about 0.002 cu. ft. per sec. in +each tunnel, an average of 0.00000051 cu. ft. per sec. per lin. ft.</p> + + +<h4><span class="smcap">Sump and Pump Chambers.</span></h4> + +<p>To take care of the drainage of the tunnels, a sump with a pump chamber +above it was provided for each pair of tunnels. The sumps were really +short tunnels underneath the main ones and extending approximately +between the center lines of the latter. They were 10 ft. 9-1/2 in. in +outside diameter and 44 ft. long. The water drops directly from the +drains in the center lines of the tunnels into the sumps. Above the +sumps and between the tunnels, a pump chamber 19 ft. 5 in. long was +built. Above the end of the latter, opposite the sump, a cross-passage +was constructed between the bench walls of the two tunnels. This passage +gives access from either tunnel through an opening in the floor to the +pump chamber and through the latter to the sump.</p> + +<p>From the preliminary borings it was thought that the sumps were located +so that the entire construction would be in rock. This proved to be the +case on Tunnels <i>C</i> and <i>D</i>, but not on Tunnels <i>A</i> and <i>B</i>. The +position of the rock surface in the latter is shown by <a href="#fig03">Fig. 3</a>. After the +excavation was completed in Tunnel <i>B</i>, January 1st, 1908, the plates +were removed from the side of the tunnel at the cross-passage, and a +drift was driven through the earth above the rock surface across to the +lining of Tunnel <i>A</i>. The heading was timbered as shown by <a href="#fig03">Fig. 3</a>. There +was practically no loss of air from the drift, but the clay blanket had +been removed from over this locality and the situation caused some +anxiety. In order to make the heading as secure as possible, the 24-in. +I-beams, shown on <a href="#fig03">Fig. 3</a>, were attached to the lining of the two +tunnels. The beams formed a support for the permanent concrete roof arch +of the passage, which was placed at once. At the same time plates were +removed from the bottom in Tunnel <i>B</i> over the site of the sump, and a +heading was started on the line of the sump<span class='pagenum'><a name="Page_472" id="Page_472">[Pg 472]</a></span> toward Tunnel <i>A</i>. As soon +as the heading had been driven beyond the center line of the pump +chamber, a bottom heading was driven from a break-up westward in the +pump chamber and a connection was made with the cross-passage. The iron +lining of the pump chamber was next placed, from the cross-passage +eastward. The soft ground was excavated directly in advance of the +lining, and the ground was supported by polings in much the same manner +as described for shield work. On account of bad ground and seams of sand +encountered in the rock below the level of the cross-beams, the entire +west wall of the pump chamber was placed before enlarging the sump to +full size. This was also judicious, in order to support as far as +possible the iron lining of the tunnels. The sump was then excavated to +full size. The iron lining of the sump and the east wall of the pump +chamber were placed as soon as possible. The voids outside the iron +lining of the sump and the pump chamber were filled as completely as +possible with concrete, and then thoroughly grouted. Finally, the +concrete lining was put in place inside of the iron.</p> + +<p>As shown by <a href="#fig03">Fig. 3</a>, the excavation of these chambers left a considerable +portion of the iron lining of the tunnels temporarily unsupported on the +lower inner quarter. To guard against distortion, a system of diagonals +and struts was placed as shown.</p> + +<p>The floor of the pump chamber was water-proofed with felt and pitch in a +manner similar to that described for the caissons at Long Island City. +It was not possible to make the felt stick to the vertical walls with +soft pitch, which was the only kind that could be used in compressed +air, and, therefore, the surfaces were water-proofed by a wall of +asphalt brick laid in pitch melting at 60° Fahr. Forms were erected on +the neat line, and the space to the rock was filled with concrete making +a so-called sand-wall similar to that commonly used for water-proofing +with felt and pitch. The bricks were then laid to a height of four or +five courses. The joints were filled with pitch instead of mortar. +Sheets of tin were then placed against the face of the wall and braced +from the concrete forms. As much pitch as possible was then slushed +between the brick and the sand-wall, after which the concrete in the +main wall was filled up to the top of the water-proofing course. The tin +was then withdrawn and the operation repeated. This method was slow and +expensive, but gave good results. Ordinary pitch could not be used on +account of the fumes, which are<span class='pagenum'><a name="Page_474" id="Page_474">[Pg 474]</a></span> particularly objectionable in +compressed air. The 60° pitch was slightly heated in the open air before +using.</p> + +<div class="figcenter"> + <a id="fig03" name="fig03"></a><a href="images/fig03large.jpg"> + <img src="images/fig03.jpg" + alt="Fig. 3." + title="Fig. 3." /></a><br /> + <span class="caption">Fig. 3.</span> +</div> + +<p>The sump and pump chamber on Tunnels <i>C</i> and <i>D</i> differed from the one +described only in minor details; but, being wholly constructed in rock, +presented fewer difficulties and permitted a complete envelope of +water-proofing to be placed in the top.</p> + + +<h4><span class="smcap">Concrete Lining.</span></h4> + +<p>The placing of concrete inside the iron tube was done by an organization +entirely separate from the tunneling force. A mixing plant was placed in +each of the five shafts. The stone and sand bins discharged directly +into mixers below, which, in turn, discharged into steel side-dump +concrete cars. All concrete was placed in normal air.</p> + +<p>The first step, after the iron lining was scraped clean and washed down +and all leaks were stopped, was the placing of biats, marked <i>B</i> on +<a href="#ill23">Plate LXXIV</a>. These were made up of a 6 by 12-in. yellow pine timber, 17 +ft. long, with two short lengths of the same size spliced to its ends by +pieces of 12-in. channels, 3 ft. 9 in. long, clamped upon the sides. +These biats were placed every 5 ft. along the tunnel in rings having +side keys. Next, a floor, 13 ft. wide, was laid on the biats and two +tracks, of 30-in. gauge and 6-1/2-ft. centers, were laid upon the floor. +There were three stages in the concreting. Fig. 2, <a href="#ill23">Plate LXXIV</a>, shows +the concrete in place at the end of the first, and Fig. 3, <a href="#ill23">Plate LXXIV</a>, +at the end of the second stage. The complete arch above the bench walls +was done in the last operation.</p> + +<p>Two 3 by 10-in. soldiers (<i>SS</i> in Figs. 1 and 2, <a href="#ill23">Plate LXXIV</a>) were +fastened to each biat and braced across by two horizontal and two +diagonal braces. To each pair of soldiers a floor template, <i>T</i>, was +then nailed. The form for the center drain was then suspended as shown +in Fig. 1, <a href="#ill23">Plate LXXIV</a>. Three pieces of shuttering, <i>FFF</i>, 20 ft. long, +were then nailed to the bottom of the soldiers. One is all that would +have been needed for the first concrete placed, but it was easier to +place them at this stage than later, when there was less room. Three +rough shutters were also nailed to the curved portion for the floor +template. Opposite each biat, a bracket, <i>bb</i>, was then nailed, which +carries a set of rough boards which formed the risers for the duct +steps. Everything was then ready for concreting except that, where +refuge niches occurred, a<span class='pagenum'><a name="Page_475" id="Page_475">[Pg 475]</a></span> form for the portion of the niche below the +seat was nailed to the shuttering. This form is shown at <i>R</i> in Fig. 1, +<a href="#ill23">Plate LXXIV</a>.</p> + +<div class="figcenter"> + <a id="ill23" name="ill23"></a><a href="images/ill23large.jpg"> + <img src="images/ill23.jpg" + alt="Plate LXXIV" + title="Plate LXXIV" /></a><br /> + <span class="caption">Plate LXXIV</span> +</div> + +<p>The concrete was dumped down on each side from side-dump cars standing +on the track, and, falling between the risers for the duct steps, ran or +was shoveled under the forms and down into the bottom. The horizontal +surface on each side the center drain was smoothed off with a shovel. +The workmen became very skillful at this, and got a fairly smooth +surface. This concrete was usually placed in lengths of 45 or 60 ft. +After setting for about 24 hours, the brackets, <i>bb</i>, were removed, +together with the shuttering on the steps. The triangular pieces, <i>t</i> in +Fig. 1, <a href="#ill23">Plate LXXIV</a>, were not removed until later. Instead, a board was +laid upon this lower step on which the duct layers could work. This and +the triangular piece were not removed until just before the bench +concrete was placed. This was important, as otherwise the bond between +the old and new concrete would be much impaired by dirt ground into the +surface of the old concrete. The ducts were then laid, as shown in Fig. +2, <a href="#ill23">Plate LXXIV</a>.</p> + +<p>The remaining shutters for the face of the bench walls were then placed. +The remainder of the forms for the refuge niches, <i>RR</i>, in Fig. 1, <a href="#ill23">Plate +LXXIV</a>, were nailed to the shutters, the steel beam over the niche was +laid in place, the forms for the ladders, <i>L</i> in Fig. 2, <a href="#ill23">Plate LXXIV</a>, +which occur every 25 ft., were tacked to the shutters, the shutters and +forms were given a coat of creosote oil, and then all was ready for +placing the bench concrete.</p> + +<p>The specifications required a 2-in. mortar face to be placed on all +exposed surfaces and the remainder to be smoothed with a trowel and +straight-edge. After about 48 hours, the biats were blocked up on the +bench, and all forms between the bench walls below the working floor +were removed.</p> + +<p>The centering for the arch concrete consisted of simple 5 by 3-1/2 by +5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at +5-ft. intervals. Each rib was made up of two pieces spliced together at +the top. Two men easily handled one of these pieces. After splicing, the +rib was supported by four hanger-bolts fastened to the iron lining as +shown in Fig. 3, <a href="#ill23">Plate LXXIV</a>.</p> + +<p>In the early part of the work, two additional bolts were used about half +way up on the side between the upper and lower hanger-bolts. It was soon +found that by placing the strut between the tunnel lining<span class='pagenum'><a name="Page_476" id="Page_476">[Pg 476]</a></span> and the crown +of the rib, these hanger-bolts could be dispensed with. The lagging was +of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each +piece had three saw cuts on the back, from end to end, allowing it to be +bent to the curve of the arch; it was kept curved by an iron strap +screwed to the back. The arches were put in, either in 15, 30 or 45-ft. +lengths, depending on what was ready for concrete and what could be done +in one continuous working. The rule was that when an arch was begun, the +work must not stop until it was finished. An arch length always ended in +the middle of a ring. The lagging was placed to a height of about 6 ft. +above the bench before any concreting was done. When the concrete had +been brought up to that point, lagging was added, one piece at a time, +just ahead of the concrete, up to the crown, where a space of about 18 +in. was left. When the lagging had reached the upper hanger-bolts, they +were removed, which left only the two bottom bolts fixed in the +concrete. Most of these were unscrewed from the eye and saved, as tin +sleeves were placed around them before concreting. Two cast-iron eyes +were lost for every 5 ft. of tunnel. To place the key concrete, a stage +was set up in the middle of the floor, and, beginning at one end, about +2 ft. of block lagging was placed. Over this, concrete was packed, +filling the key as completely as possible. This was done partly by +shoveling and using a short rammer, and partly by packing with the hands +by the workmen, who wore rubber gloves for the purpose. Another 2 ft. of +lagging was then placed, and the operation was repeated, and thus +working backward, foot by foot, the key was completed. This is the usual +way of keying a concrete arch, but in this case the difficulty was +increased by the flanges of the iron lining. It was practically +impossible to fill all parts of the pockets formed by these flanges. To +meet this difficulty, provision was made for grouting any unfilled +space. As the concrete was being put in, tin pipes were placed with +their tops nearly touching the iron lining, and their bottoms resting on +the lagging. Each pocket was intended to have two of these pipes, one to +grout through and the other to act as a vent for the escape of air. Each +center key ring had six pipes, and each side key had eight. The bottoms +of the pipes were held by a single nail driven half way into the +lagging. This served to keep the pipes in position and to locate them +after the lagging was taken down.</p> + +<p>The cost of labor in the tunnels directly chargeable to concrete was<span class='pagenum'><a name="Page_477" id="Page_477">[Pg 477]</a></span> +$1.80 per cu. yd. The top charges, exclusive of the cost of materials +(cement, sand, and stone), amounted to $3.92.</p> + + +<h4><span class="smcap">Electric Conduits.</span></h4> + +<p>In one bench wall of each tunnel there were fifteen openings for power +cables and in the other, between the river shafts, there were forty +openings for telephone, telegraph, and signal cables. East of the Long +Island shaft, the number of the latter was reduced to twenty-four. The +telephone ducts were all of the four-way type. The specifications +required that the power ducts should have an opening of not less than +3-1/2 in., nor more than 3-7/8 in., and that after laying they should +pass a 4-ft. mandrel, 3-3/8 in. at the leading end and 2-5/8 in. at the +other. The outside dimension was limited between 5 and 5-3/8 in. The +openings of the four-way ducts were required to be not less than 3-3/8 +in., nor more than 3-5/8 in., and after laying to pass a 5-ft. mandrel, +3-1/4 in. at the leading end and 2-1/2 in. at the other. The outside +dimensions were limited between 9 and 9-1/2 in. All were to be laid in +1/4-in. beds of mortar. The specifications were not definite as to the +shape of the opening, but those used were square with corners rounded to +a radius of 3/8 in. The four-ways were 3 ft. long, and the singles, 18 +in.</p> + +<p>A study of the foregoing dimensions will show that the working limits +were narrow. Such narrow limits would not pay for the ordinary conduit +line in a street, where there is more room. In the tunnel greater +liberality meant either reducing the number of conduits or encroaching +on the strength of the concrete tunnel lining. The small difference of +only 1/8 in. in the size of the mandrel, or a clearance of only 1/16 in. +on each side, no doubt did increase the cost of laying somewhat, though +not as much as might at first be supposed. All bottom courses were laid +to a string, in practically perfect line and grade, and all joints were +tested with mandrels which were in all openings, and pulled forward as +each piece of conduit was laid. As the workmen became skillful, the +progress was excellent.</p> + +<p>All costs of labor in the tunnel chargeable to duct laying amounted to +$0.039 per ft. of duct; top charges brought this up to $0.083.</p> + +<p>The serious problem was to guard against grout and mortar running into +the duct opening through the joints from the concrete, which was a +rather wet mixture. Each joint was wrapped, when laid, with canvas, +weighing 10 oz. per sq. yd., dipped in cement grout immediately before<span class='pagenum'><a name="Page_478" id="Page_478">[Pg 478]</a></span> +using. These wraps were 6 in. wide, and were cut long enough to go +around the lap about the middle of the duct. As soon as all the ducts +were laid, the entire bank was plastered over with fairly stiff mortar, +which, when properly done, closed all openings. The plastering was not +required by the specifications, but was found by the contractor to +result in a saving in ultimate cost.</p> + +<p>The concrete on the two sides of the bank of ducts was bonded together +by 2 by 1/8-in. steel bonds between the ducts, laid across in horizontal +joints. Both ends were split into two pieces, 1 in. long, one of which +was turned up and the other down. These bonds projected 1-1/2 in. into +the concrete on either side. Where the bond came opposite the risers of +the duct step, against which the ducts were laid, recesses were provided +for the projecting bond. This was done by nailing to the rough shutters +for the steps a form which when removed left a dove-tailed vertical +groove. This form was made in two pieces, one tapering inward and the +other with more taper outward. As the bonds were placed, these grooves +were filled with mortar.</p> + +<p>The ducts usually received their final rodding with the specification +mandrel a month or more after they were laid, after which all openings +into splicing chambers were stopped by wooden plugs, 8 in. long tapering +from 3-3/4 in. at one end to 2-3/4 in. at the other end, and shaped to +fit the opening tightly. At first the plugs were paraffined, to keep +them from swelling and breaking the ducts, but were not successful, as +the paraffin lubricated them so that they would not stay in place. They +were expensive, and there was some swelling in the best that were +obtained. A better plug was made by using no paraffin, but by making six +saw cuts, three horizontal and three vertical, in the larger end, +cutting to within about 2 in. of the smaller end. The swelling of the +wood was then taken up by the saw cuts and the spring of the wood.</p> + +<p>The splicing chambers are at 400-ft. intervals. They are 6 ft. long, 4 +ft. 9 in. high, with a width varying from 3 ft. 2 in. at the top to 1 +ft. 2 in. at the bottom.</p> + +<div class="footnotes"><h3>FOOTNOTES:</h3> + +<div class="footnote"><p><a name="Footnote_A_1" id="Footnote_A_1"></a><a href="#FNanchor_A_1"><span class="label">[A]</span></a> Presented at the meeting of December 15th, 1909.</p></div> + +<div class="footnote"><p><a name="Footnote_B_2" id="Footnote_B_2"></a><a href="#FNanchor_B_2"><span class="label">[B]</span></a> <i>Transactions</i>, Am. Soc. C. E., Vol. LXIX. p. 1.</p></div> + +<div class="footnote"><p><a name="Footnote_C_3" id="Footnote_C_3"></a><a href="#FNanchor_C_3"><span class="label">[C]</span></a> <i>Minutes of Proceedings</i>, Inst. C. E., Vol. CXXX, p. 50.</p></div> + +<div class="footnote"><p><a name="Footnote_D_4" id="Footnote_D_4"></a><a href="#FNanchor_D_4"><span class="label">[D]</span></a> The lead of the shield is the angular divergence of its +axis from the axis of the tunnel and, in this tunnel, was measured as +the offset in 23 ft. It was called + when the shield was pointed upward +from grade, and - when pointed downward.</p></div> +</div> + + + + + + + + + +<pre> + + + + + +End of the Project Gutenberg EBook of Transactions of the American Society +of Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard + +*** END OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN *** + +***** This file should be named 18722-h.htm or 18722-h.zip ***** +This and all associated files of various formats will be found in: + http://www.gutenberg.org/1/8/7/2/18722/ + +Produced by Juliet Sutherland, Taavi Kalju and the Online +Distributed Proofreading Team at http://www.pgdp.net + + +Updated editions will replace the previous one--the old editions +will be renamed. + +Creating the works from public domain print editions means that no +one owns a United States copyright in these works, so the Foundation +(and you!) can copy and distribute it in the United States without +permission and without paying copyright royalties. Special rules, +set forth in the General Terms of Use part of this license, apply to +copying and distributing Project Gutenberg-tm electronic works to +protect the PROJECT GUTENBERG-tm concept and trademark. Project +Gutenberg is a registered trademark, and may not be used if you +charge for the eBooks, unless you receive specific permission. If you +do not charge anything for copies of this eBook, complying with the +rules is very easy. You may use this eBook for nearly any purpose +such as creation of derivative works, reports, performances and +research. They may be modified and printed and given away--you may do +practically ANYTHING with public domain eBooks. Redistribution is +subject to the trademark license, especially commercial +redistribution. + + + +*** START: FULL LICENSE *** + +THE FULL PROJECT GUTENBERG LICENSE +PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK + +To protect the Project Gutenberg-tm mission of promoting the free +distribution of electronic works, by using or distributing this work +(or any other work associated in any way with the phrase "Project +Gutenberg"), you agree to comply with all the terms of the Full Project +Gutenberg-tm License (available with this file or online at +http://gutenberg.org/license). + + +Section 1. General Terms of Use and Redistributing Project Gutenberg-tm +electronic works + +1.A. By reading or using any part of this Project Gutenberg-tm +electronic work, you indicate that you have read, understand, agree to +and accept all the terms of this license and intellectual property +(trademark/copyright) agreement. If you do not agree to abide by all +the terms of this agreement, you must cease using and return or destroy +all copies of Project Gutenberg-tm electronic works in your possession. +If you paid a fee for obtaining a copy of or access to a Project +Gutenberg-tm electronic work and you do not agree to be bound by the +terms of this agreement, you may obtain a refund from the person or +entity to whom you paid the fee as set forth in paragraph 1.E.8. + +1.B. "Project Gutenberg" is a registered trademark. It may only be +used on or associated in any way with an electronic work by people who +agree to be bound by the terms of this agreement. There are a few +things that you can do with most Project Gutenberg-tm electronic works +even without complying with the full terms of this agreement. See +paragraph 1.C below. There are a lot of things you can do with Project +Gutenberg-tm electronic works if you follow the terms of this agreement +and help preserve free future access to Project Gutenberg-tm electronic +works. See paragraph 1.E below. + +1.C. The Project Gutenberg Literary Archive Foundation ("the Foundation" +or PGLAF), owns a compilation copyright in the collection of Project +Gutenberg-tm electronic works. Nearly all the individual works in the +collection are in the public domain in the United States. If an +individual work is in the public domain in the United States and you are +located in the United States, we do not claim a right to prevent you from +copying, distributing, performing, displaying or creating derivative +works based on the work as long as all references to Project Gutenberg +are removed. Of course, we hope that you will support the Project +Gutenberg-tm mission of promoting free access to electronic works by +freely sharing Project Gutenberg-tm works in compliance with the terms of +this agreement for keeping the Project Gutenberg-tm name associated with +the work. You can easily comply with the terms of this agreement by +keeping this work in the same format with its attached full Project +Gutenberg-tm License when you share it without charge with others. + +1.D. The copyright laws of the place where you are located also govern +what you can do with this work. Copyright laws in most countries are in +a constant state of change. If you are outside the United States, check +the laws of your country in addition to the terms of this agreement +before downloading, copying, displaying, performing, distributing or +creating derivative works based on this work or any other Project +Gutenberg-tm work. The Foundation makes no representations concerning +the copyright status of any work in any country outside the United +States. + +1.E. Unless you have removed all references to Project Gutenberg: + +1.E.1. The following sentence, with active links to, or other immediate +access to, the full Project Gutenberg-tm License must appear prominently +whenever any copy of a Project Gutenberg-tm work (any work on which the +phrase "Project Gutenberg" appears, or with which the phrase "Project +Gutenberg" is associated) is accessed, displayed, performed, viewed, +copied or distributed: + +This eBook is for the use of anyone anywhere at no cost and with +almost no restrictions whatsoever. You may copy it, give it away or +re-use it under the terms of the Project Gutenberg License included +with this eBook or online at www.gutenberg.org + +1.E.2. If an individual Project Gutenberg-tm electronic work is derived +from the public domain (does not contain a notice indicating that it is +posted with permission of the copyright holder), the work can be copied +and distributed to anyone in the United States without paying any fees +or charges. If you are redistributing or providing access to a work +with the phrase "Project Gutenberg" associated with or appearing on the +work, you must comply either with the requirements of paragraphs 1.E.1 +through 1.E.7 or obtain permission for the use of the work and the +Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or +1.E.9. + +1.E.3. If an individual Project Gutenberg-tm electronic work is posted +with the permission of the copyright holder, your use and distribution +must comply with both paragraphs 1.E.1 through 1.E.7 and any additional +terms imposed by the copyright holder. Additional terms will be linked +to the Project Gutenberg-tm License for all works posted with the +permission of the copyright holder found at the beginning of this work. + +1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm +License terms from this work, or any files containing a part of this +work or any other work associated with Project Gutenberg-tm. + +1.E.5. Do not copy, display, perform, distribute or redistribute this +electronic work, or any part of this electronic work, without +prominently displaying the sentence set forth in paragraph 1.E.1 with +active links or immediate access to the full terms of the Project +Gutenberg-tm License. + +1.E.6. You may convert to and distribute this work in any binary, +compressed, marked up, nonproprietary or proprietary form, including any +word processing or hypertext form. However, if you provide access to or +distribute copies of a Project Gutenberg-tm work in a format other than +"Plain Vanilla ASCII" or other format used in the official version +posted on the official Project Gutenberg-tm web site (www.gutenberg.org), +you must, at no additional cost, fee or expense to the user, provide a +copy, a means of exporting a copy, or a means of obtaining a copy upon +request, of the work in its original "Plain Vanilla ASCII" or other +form. Any alternate format must include the full Project Gutenberg-tm +License as specified in paragraph 1.E.1. + +1.E.7. Do not charge a fee for access to, viewing, displaying, +performing, copying or distributing any Project Gutenberg-tm works +unless you comply with paragraph 1.E.8 or 1.E.9. + +1.E.8. You may charge a reasonable fee for copies of or providing +access to or distributing Project Gutenberg-tm electronic works provided +that + +- You pay a royalty fee of 20% of the gross profits you derive from + the use of Project Gutenberg-tm works calculated using the method + you already use to calculate your applicable taxes. The fee is + owed to the owner of the Project Gutenberg-tm trademark, but he + has agreed to donate royalties under this paragraph to the + Project Gutenberg Literary Archive Foundation. Royalty payments + must be paid within 60 days following each date on which you + prepare (or are legally required to prepare) your periodic tax + returns. Royalty payments should be clearly marked as such and + sent to the Project Gutenberg Literary Archive Foundation at the + address specified in Section 4, "Information about donations to + the Project Gutenberg Literary Archive Foundation." + +- You provide a full refund of any money paid by a user who notifies + you in writing (or by e-mail) within 30 days of receipt that s/he + does not agree to the terms of the full Project Gutenberg-tm + License. You must require such a user to return or + destroy all copies of the works possessed in a physical medium + and discontinue all use of and all access to other copies of + Project Gutenberg-tm works. + +- You provide, in accordance with paragraph 1.F.3, a full refund of any + money paid for a work or a replacement copy, if a defect in the + electronic work is discovered and reported to you within 90 days + of receipt of the work. + +- You comply with all other terms of this agreement for free + distribution of Project Gutenberg-tm works. + +1.E.9. If you wish to charge a fee or distribute a Project Gutenberg-tm +electronic work or group of works on different terms than are set +forth in this agreement, you must obtain permission in writing from +both the Project Gutenberg Literary Archive Foundation and Michael +Hart, the owner of the Project Gutenberg-tm trademark. Contact the +Foundation as set forth in Section 3 below. + +1.F. + +1.F.1. Project Gutenberg volunteers and employees expend considerable +effort to identify, do copyright research on, transcribe and proofread +public domain works in creating the Project Gutenberg-tm +collection. Despite these efforts, Project Gutenberg-tm electronic +works, and the medium on which they may be stored, may contain +"Defects," such as, but not limited to, incomplete, inaccurate or +corrupt data, transcription errors, a copyright or other intellectual +property infringement, a defective or damaged disk or other medium, a +computer virus, or computer codes that damage or cannot be read by +your equipment. + +1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right +of Replacement or Refund" described in paragraph 1.F.3, the Project +Gutenberg Literary Archive Foundation, the owner of the Project +Gutenberg-tm trademark, and any other party distributing a Project +Gutenberg-tm electronic work under this agreement, disclaim all +liability to you for damages, costs and expenses, including legal +fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT +LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE +PROVIDED IN PARAGRAPH F3. YOU AGREE THAT THE FOUNDATION, THE +TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE +LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR +INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH +DAMAGE. + +1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a +defect in this electronic work within 90 days of receiving it, you can +receive a refund of the money (if any) you paid for it by sending a +written explanation to the person you received the work from. If you +received the work on a physical medium, you must return the medium with +your written explanation. The person or entity that provided you with +the defective work may elect to provide a replacement copy in lieu of a +refund. If you received the work electronically, the person or entity +providing it to you may choose to give you a second opportunity to +receive the work electronically in lieu of a refund. If the second copy +is also defective, you may demand a refund in writing without further +opportunities to fix the problem. + +1.F.4. Except for the limited right of replacement or refund set forth +in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO OTHER +WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO +WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE. + +1.F.5. Some states do not allow disclaimers of certain implied +warranties or the exclusion or limitation of certain types of damages. +If any disclaimer or limitation set forth in this agreement violates the +law of the state applicable to this agreement, the agreement shall be +interpreted to make the maximum disclaimer or limitation permitted by +the applicable state law. The invalidity or unenforceability of any +provision of this agreement shall not void the remaining provisions. + +1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the +trademark owner, any agent or employee of the Foundation, anyone +providing copies of Project Gutenberg-tm electronic works in accordance +with this agreement, and any volunteers associated with the production, +promotion and distribution of Project Gutenberg-tm electronic works, +harmless from all liability, costs and expenses, including legal fees, +that arise directly or indirectly from any of the following which you do +or cause to occur: (a) distribution of this or any Project Gutenberg-tm +work, (b) alteration, modification, or additions or deletions to any +Project Gutenberg-tm work, and (c) any Defect you cause. + + +Section 2. Information about the Mission of Project Gutenberg-tm + +Project Gutenberg-tm is synonymous with the free distribution of +electronic works in formats readable by the widest variety of computers +including obsolete, old, middle-aged and new computers. It exists +because of the efforts of hundreds of volunteers and donations from +people in all walks of life. + +Volunteers and financial support to provide volunteers with the +assistance they need, is critical to reaching Project Gutenberg-tm's +goals and ensuring that the Project Gutenberg-tm collection will +remain freely available for generations to come. In 2001, the Project +Gutenberg Literary Archive Foundation was created to provide a secure +and permanent future for Project Gutenberg-tm and future generations. +To learn more about the Project Gutenberg Literary Archive Foundation +and how your efforts and donations can help, see Sections 3 and 4 +and the Foundation web page at http://www.pglaf.org. + + +Section 3. Information about the Project Gutenberg Literary Archive +Foundation + +The Project Gutenberg Literary Archive Foundation is a non profit +501(c)(3) educational corporation organized under the laws of the +state of Mississippi and granted tax exempt status by the Internal +Revenue Service. The Foundation's EIN or federal tax identification +number is 64-6221541. Its 501(c)(3) letter is posted at +http://pglaf.org/fundraising. Contributions to the Project Gutenberg +Literary Archive Foundation are tax deductible to the full extent +permitted by U.S. federal laws and your state's laws. + +The Foundation's principal office is located at 4557 Melan Dr. S. +Fairbanks, AK, 99712., but its volunteers and employees are scattered +throughout numerous locations. Its business office is located at +809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email +business@pglaf.org. Email contact links and up to date contact +information can be found at the Foundation's web site and official +page at http://pglaf.org + +For additional contact information: + Dr. Gregory B. Newby + Chief Executive and Director + gbnewby@pglaf.org + +Section 4. Information about Donations to the Project Gutenberg +Literary Archive Foundation + +Project Gutenberg-tm depends upon and cannot survive without wide +spread public support and donations to carry out its mission of +increasing the number of public domain and licensed works that can be +freely distributed in machine readable form accessible by the widest +array of equipment including outdated equipment. Many small donations +($1 to $5,000) are particularly important to maintaining tax exempt +status with the IRS. + +The Foundation is committed to complying with the laws regulating +charities and charitable donations in all 50 states of the United +States. Compliance requirements are not uniform and it takes a +considerable effort, much paperwork and many fees to meet and keep up +with these requirements. We do not solicit donations in locations +where we have not received written confirmation of compliance. To +SEND DONATIONS or determine the status of compliance for any +particular state visit http://pglaf.org + +While we cannot and do not solicit contributions from states where we +have not met the solicitation requirements, we know of no prohibition +against accepting unsolicited donations from donors in such states who +approach us with offers to donate. + +International donations are gratefully accepted, but we cannot make +any statements concerning tax treatment of donations received from +outside the United States. U.S. laws alone swamp our small staff. + +Please check the Project Gutenberg Web pages for current donation +methods and addresses. Donations are accepted in a number of other +ways including checks, online payments and credit card +donations. To donate, please visit: http://pglaf.org/donate + + +Section 5. General Information About Project Gutenberg-tm electronic +works. + +Professor Michael S. Hart is the originator of the Project Gutenberg-tm +concept of a library of electronic works that could be freely shared +with anyone. For thirty years, he produced and distributed Project +Gutenberg-tm eBooks with only a loose network of volunteer support. + +Project Gutenberg-tm eBooks are often created from several printed +editions, all of which are confirmed as Public Domain in the U.S. +unless a copyright notice is included. Thus, we do not necessarily +keep eBooks in compliance with any particular paper edition. + +Most people start at our Web site which has the main PG search facility: + + http://www.gutenberg.org + +This Web site includes information about Project Gutenberg-tm, +including how to make donations to the Project Gutenberg Literary +Archive Foundation, how to help produce our new eBooks, and how to +subscribe to our email newsletter to hear about new eBooks. + +*** END: FULL LICENSE *** + + + +</pre> + +</body> +</html> + diff --git a/18722-h/images/fig01.jpg b/18722-h/images/fig01.jpg Binary files differnew file mode 100644 index 0000000..00c8335 --- /dev/null +++ b/18722-h/images/fig01.jpg diff --git a/18722-h/images/fig01large.jpg b/18722-h/images/fig01large.jpg Binary files differnew file mode 100644 index 0000000..7646769 --- /dev/null +++ b/18722-h/images/fig01large.jpg diff --git a/18722-h/images/fig02.jpg b/18722-h/images/fig02.jpg Binary files differnew file mode 100644 index 0000000..3194e93 --- /dev/null +++ b/18722-h/images/fig02.jpg diff --git a/18722-h/images/fig02large.jpg b/18722-h/images/fig02large.jpg Binary files differnew file mode 100644 index 0000000..39da6e9 --- /dev/null +++ b/18722-h/images/fig02large.jpg diff --git a/18722-h/images/fig03.jpg b/18722-h/images/fig03.jpg Binary files differnew file mode 100644 index 0000000..7fb0fad --- /dev/null +++ b/18722-h/images/fig03.jpg diff --git a/18722-h/images/fig03large.jpg b/18722-h/images/fig03large.jpg Binary files differnew file mode 100644 index 0000000..0693eed --- /dev/null +++ b/18722-h/images/fig03large.jpg diff --git a/18722-h/images/ill01.jpg b/18722-h/images/ill01.jpg Binary files differnew file mode 100644 index 0000000..89f47e6 --- /dev/null +++ b/18722-h/images/ill01.jpg diff --git a/18722-h/images/ill01large.jpg b/18722-h/images/ill01large.jpg Binary files differnew file mode 100644 index 0000000..b698ac6 --- /dev/null +++ b/18722-h/images/ill01large.jpg diff --git a/18722-h/images/ill02.jpg b/18722-h/images/ill02.jpg Binary files differnew file mode 100644 index 0000000..f7ca16b --- /dev/null +++ b/18722-h/images/ill02.jpg diff --git a/18722-h/images/ill03.jpg b/18722-h/images/ill03.jpg Binary files differnew file mode 100644 index 0000000..c62b98b --- /dev/null +++ b/18722-h/images/ill03.jpg diff --git a/18722-h/images/ill04.jpg b/18722-h/images/ill04.jpg Binary files differnew file mode 100644 index 0000000..3f812db --- /dev/null +++ b/18722-h/images/ill04.jpg diff --git a/18722-h/images/ill05.jpg b/18722-h/images/ill05.jpg Binary files differnew file mode 100644 index 0000000..636db3e --- /dev/null +++ b/18722-h/images/ill05.jpg diff --git a/18722-h/images/ill06.jpg b/18722-h/images/ill06.jpg Binary files differnew file mode 100644 index 0000000..b02d53d --- /dev/null +++ b/18722-h/images/ill06.jpg diff --git a/18722-h/images/ill07.jpg b/18722-h/images/ill07.jpg Binary files differnew file mode 100644 index 0000000..a5b2e1e --- /dev/null +++ b/18722-h/images/ill07.jpg diff --git a/18722-h/images/ill08.jpg b/18722-h/images/ill08.jpg Binary files differnew file mode 100644 index 0000000..155432e --- /dev/null +++ b/18722-h/images/ill08.jpg diff --git a/18722-h/images/ill09.jpg b/18722-h/images/ill09.jpg Binary files differnew file mode 100644 index 0000000..c1ca0b3 --- /dev/null +++ b/18722-h/images/ill09.jpg diff --git a/18722-h/images/ill10.jpg b/18722-h/images/ill10.jpg Binary files differnew file mode 100644 index 0000000..e9a4b10 --- /dev/null +++ b/18722-h/images/ill10.jpg diff --git a/18722-h/images/ill10large.jpg b/18722-h/images/ill10large.jpg Binary files differnew file mode 100644 index 0000000..963c431 --- /dev/null +++ b/18722-h/images/ill10large.jpg diff --git a/18722-h/images/ill11.jpg b/18722-h/images/ill11.jpg Binary files differnew file mode 100644 index 0000000..836607a --- /dev/null +++ b/18722-h/images/ill11.jpg diff --git a/18722-h/images/ill11large.jpg b/18722-h/images/ill11large.jpg Binary files differnew file mode 100644 index 0000000..4217789 --- /dev/null +++ b/18722-h/images/ill11large.jpg diff --git a/18722-h/images/ill12.jpg b/18722-h/images/ill12.jpg Binary files differnew file mode 100644 index 0000000..baa017a --- /dev/null +++ b/18722-h/images/ill12.jpg diff --git a/18722-h/images/ill12large.jpg b/18722-h/images/ill12large.jpg Binary files differnew file mode 100644 index 0000000..aa2d408 --- /dev/null +++ b/18722-h/images/ill12large.jpg diff --git a/18722-h/images/ill13.jpg b/18722-h/images/ill13.jpg Binary files differnew file mode 100644 index 0000000..1deb651 --- /dev/null +++ b/18722-h/images/ill13.jpg diff --git a/18722-h/images/ill14.jpg b/18722-h/images/ill14.jpg Binary files differnew file mode 100644 index 0000000..5486245 --- /dev/null +++ b/18722-h/images/ill14.jpg diff --git a/18722-h/images/ill15.jpg b/18722-h/images/ill15.jpg Binary files differnew file mode 100644 index 0000000..7c00ff8 --- /dev/null +++ b/18722-h/images/ill15.jpg diff --git a/18722-h/images/ill16.jpg b/18722-h/images/ill16.jpg Binary files differnew file mode 100644 index 0000000..4423d34 --- /dev/null +++ b/18722-h/images/ill16.jpg diff --git a/18722-h/images/ill17.jpg b/18722-h/images/ill17.jpg Binary files differnew file mode 100644 index 0000000..9170e7d --- /dev/null +++ b/18722-h/images/ill17.jpg diff --git a/18722-h/images/ill17large.jpg b/18722-h/images/ill17large.jpg Binary files differnew file mode 100644 index 0000000..8047f84 --- /dev/null +++ b/18722-h/images/ill17large.jpg diff --git a/18722-h/images/ill18.jpg b/18722-h/images/ill18.jpg Binary files differnew file mode 100644 index 0000000..27c35b1 --- /dev/null +++ b/18722-h/images/ill18.jpg diff --git a/18722-h/images/ill18large.jpg b/18722-h/images/ill18large.jpg Binary files differnew file mode 100644 index 0000000..532f654 --- /dev/null +++ b/18722-h/images/ill18large.jpg diff --git a/18722-h/images/ill19.jpg b/18722-h/images/ill19.jpg Binary files differnew file mode 100644 index 0000000..8b502b2 --- /dev/null +++ b/18722-h/images/ill19.jpg diff --git a/18722-h/images/ill20.jpg b/18722-h/images/ill20.jpg Binary files differnew file mode 100644 index 0000000..58b2231 --- /dev/null +++ b/18722-h/images/ill20.jpg diff --git a/18722-h/images/ill21.jpg b/18722-h/images/ill21.jpg Binary files differnew file mode 100644 index 0000000..79725e0 --- /dev/null +++ b/18722-h/images/ill21.jpg diff --git a/18722-h/images/ill22.jpg b/18722-h/images/ill22.jpg Binary files differnew file mode 100644 index 0000000..da6745b --- /dev/null +++ b/18722-h/images/ill22.jpg diff --git a/18722-h/images/ill23.jpg b/18722-h/images/ill23.jpg Binary files differnew file mode 100644 index 0000000..735ff61 --- /dev/null +++ b/18722-h/images/ill23.jpg diff --git a/18722-h/images/ill23large.jpg b/18722-h/images/ill23large.jpg Binary files differnew file mode 100644 index 0000000..2b04fad --- /dev/null +++ b/18722-h/images/ill23large.jpg diff --git a/18722.txt b/18722.txt new file mode 100644 index 0000000..1b681b5 --- /dev/null +++ b/18722.txt @@ -0,0 +1,3190 @@ +The Project Gutenberg EBook of Transactions of the American Society of +Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard + +This eBook is for the use of anyone anywhere at no cost and with +almost no restrictions whatsoever. You may copy it, give it away or +re-use it under the terms of the Project Gutenberg License included +with this eBook or online at www.gutenberg.org + + +Title: Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 + The New York Tunnel Extension of the Pennsylvania Railroad. + The East River Tunnels. Paper No. 1159 + +Author: James H. Brace, Francis Mason and S. H. Woodard + +Release Date: July 1, 2006 [EBook #18722] + +Language: English + +Character set encoding: ASCII + +*** START OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN *** + + + + +Produced by Juliet Sutherland, Taavi Kalju and the Online +Distributed Proofreading Team at http://www.pgdp.net + + + + + + + + + +AMERICAN SOCIETY OF CIVIL ENGINEERS + +INSTITUTED 1852 + + +TRANSACTIONS + +Paper No. 1159 + + +THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA RAILROAD. + +THE EAST RIVER TUNNELS.[A] + +BY JAMES H. BRACE, FRANCIS MASON, AND S. H. WOODARD, MEMBERS, AM. SOC. +C. E. + + +This paper will be limited to a consideration of the construction of the +tunnels, the broader questions of design, etc., having already been +considered in papers by Brig.-Gen. Charles W. Raymond, M. Am. Soc. C. +E., and Alfred Noble, Past-President, Am. Soc. C. E. + +The location of the section of the work to be considered here is shown +on Plate XIII of Mr. Noble's paper. There are two permanent shafts on +each side of the East River and four single cast-iron tube tunnels, each +about 6,000 ft. long, and consisting of 3,900 ft. between shafts under +the river, and 2,000 ft. in Long Island City, mostly under the depot and +passenger yard of the Long Island Railroad. This tube-tunnel work was +naturally a single job. The contract for its construction was let to S. +Pearson and Son, Incorporated, ground being broken on May 17th, 1904. +Five years later, to a day, the work was finished and received its final +inspection for acceptance by the Railroad Company. + +The contract was of the profit-sharing type, and required an audit, by +the Railroad Company, of the contractor's books, and a careful system of +cost-keeping by the Company's engineers, so that it is possible to +include in the following some of the unit costs of the work. These are +given in two parts: The first is called the unit labor cost, and is the +cost of the labor in the tunnel directly chargeable to the thing +considered. It does not include the labor of operating the plant, nor +watchmen, yardmen, pipemen, and electricians. The second is called "top +charges," a common term, but meaning different things to different +contractors and engineers. Here, it is made to include the cost of the +contractor's staff and roving laborers, such as pipemen, electricians, +and yardmen, the cost of the plant and its operation, and all +miscellaneous expenses, but does not include any contractor's profit, +nor cost of materials entering permanent work. + +The contractor's plant is to be described in a paper by Henry Japp,[B] +M. Am. Soc. C. E., and will not be dealt with here. + +The contractors carried on their work from three different sites. From +permanent shafts, located near the river in Manhattan, four shields were +driven eastward to about the middle of the river; and, from two similar +shafts at the river front in Long Island City, four shields were driven +westward to meet those from Manhattan. From a temporary shaft, near East +Avenue, Long Island City, the land section of about 2,000 ft. was driven +to the river shafts. + +[Footnote A: Presented at the meeting of December 15th, 1909.] + +[Footnote B: _Transactions_, Am. Soc. C. E., Vol. LXIX. p. 1.] + + +TUNNELS FROM EAST AVENUE TO THE RIVER SHAFTS. + +The sinking of the temporary shaft at East Avenue was a fairly simple +matter. Rough 6 by 12-in. sheet-piling, forming a rectangle, 127 by 34 +ft., braced across by heavy timbering, was driven about 28 ft. to rock +as the excavation progressed. Below this, the shaft was sunk into rock, +about 27 ft., without timbering. As soon as the shaft was down, on +September 30th, 1904, bottom headings were started westward in Tunnels +_A_, _B_, and _D_. When these had been driven about half the distance to +the river shafts, soft ground was encountered. (See Station 59, Plate +XIII.) As the ground carried considerable water, it was decided to use +compressed air. Bulkheads were built in the heading, and, with an air +pressure of about 15 lb. per sq. in., the heading was driven through the +soft ground and into rock by ordinary mining methods. The use of +compressed air was then discontinued. West of this soft ground, a top +heading, followed by a bench, was driven to the soft ground at about +Station 66. Tunnel _C_, being higher, was more in soft ground, and at +first it was the intention to delay its excavation until it had been +well drained by the bottom headings in the tunnels on each side. A +little later it was decided to use a shield without compressed air. This +shield had been used in excavating the stations of the Great Northern +and City Tunnel in London. It was rebuilt, its diameter being changed +from 24 ft. 8-1/2 in. to 23 ft. 5-1/4 in. It proved too weak, and after +it had flattened about 4 in. and had been jacked up three times, the +scheme was abandoned, the shield was removed, and work was continued by +the methods which were being used in the other tunnels. The shield was +rather light, but probably it would have been strong enough had it been +used with compressed air, or had the material passed through been all +earth. Here, there was a narrow concrete cradle in the bottom, with rock +up to about the middle of the tunnel, which was excavated to clear the +shield, and gave no support on its sides. The shield was a cylinder +crushed between forces applied along the top and bottom. + +With the exception of this trial of a shield in Tunnel _C_, and a novel +method in Tunnel _B_, where compressed air, but no shield, was used, the +description of the work in one tunnel will do for all. + +From the bottom headings break-ups were started at several places in +each tunnel where there was ample cover of rock above. Where the roof +was in soft ground, top headings were driven from the points of break-up +and timbered. As soon as the full-sized excavation was completed, the +iron lining was built, usually in short lengths. + +It will be noticed on Plate XIII that there is a depression in the rock +between Station 65 and the river shafts, leaving all the tunnels in soft +ground. As this was directly under the Long Island Railroad passenger +station, it was thought best to use a shield and compressed air. This +was done in Tunnels _A_, _C_, and _D_, one shield being used +successively for all three. It was first erected in Tunnel _D_ at +Station 64 + 47. From there it was driven westward to the river shaft. +It was then taken apart and re-erected in Tunnel _C_ at Station 63 + 63 +and driven westward to the shaft. It was then found that there would not +be time for one shield to do all four lines. The experience in Tunnels +_C_ and _D_ had proven the ground to be much better than had been +expected. There was considerable clay in the sand, and, with the water +blown out by compressed air, it was very stable. A special timbering +method was devised, and Tunnel _B_ was driven from Station 66 + 10 to +the shaft with compressed air, but without a shield. In the meantime the +shield was re-erected in Tunnel _A_ and was shoved through the soft +ground from Station 65 + 48 nearly to the river shaft, where it was +dismantled. + +There was nothing unusual about the shield work; it was about the same +as that under the river, which is fully described elsewhere. In spite of +great care in excavating in front of the shield, and prompt grouting +behind it, there was a small settlement of the building above, amounting +to about 1-1/2 in. in the walls and about 5 in. in the ground floors +which were of concrete laid like a sidewalk directly upon the ground. +Whether this settlement was due to ground lost in the shield work or to +a compacting of the ground on account of its being dried out by +compressed air, it is impossible to say. + +The interesting features of this work from East Avenue to the river +shafts are the mining methods and the building of the iron tube without +a shield. + + +EXCAVATION IN ALL ROCK. + +Where the tunnel was all in good rock two distinct methods were used. +The first was the bottom-heading-and-break-up, and the second, the +top-heading-and-bench method. The first is illustrated by Figs. 1 and 2, +Plate LXIII. The bottom heading, 13 ft. wide and 9 ft. high, having +first been driven, a break-up was started by blasting down the rock, +forming a chamber the full height of the tunnel. The timber platform, +shown in the drawing, was erected in the bottom heading, and extended +through the break-up chamber. The plan was then to drill the entire face +above the bottom heading and blast it down upon the timber staging, thus +maintaining a passage below for the traffic from the heading and +break-ups farther down the line. Starting with the condition indicated +by Plate XIII, the face was drilled, the columns were then taken down +and the muck pile was shoveled through holes in the staging into muck +cars below. The face was then blasted down upon the staging, the drill +columns were set up on the muck pile, and the operation was repeated. +This method has the advantage that the bottom heading can be pushed +through rapidly, and from it the tunnel may be attacked at a number of +points at one time. It was found to be more expensive than the +top-heading-and-bench method, and as soon as the depression in the rock +at about Station 59 was passed, a top heading about 7 ft. high, and +roughly the segment of a 23-ft. circle, was driven to the next soft +ground in each of the four tunnels. The remainder of the section was +taken out in two benches, the first, about 4 ft. high, was kept about +15 ft. ahead of the lower bench, which was about the remaining 11 ft. +high. + + +EXCAVATION IN EARTH AND ROCK. + +About 2,500 ft. of tunnel, the roof of which was in soft ground, was +excavated in normal air by the mining-and-timbering method. In the +greater part of this the rock surface was well above the middle of the +tunnel. The method of timbering and mining, while well enough known, has +not been generally used in the United States. + +[Illustration: PLATE LXIII] + +Starting from the break-up in all rock, as described above, and +illustrated on Plate XIII, when soft ground was approached, a top +heading was driven from the rock into and through the earth. This +heading was about 7 ft. high and about 6 ft. wide. This was done by the +usual post, cap, and poling-board method. The ground was a running sand +with little or no clay, and, at first, considerable water, in places. +All headings required side polings. The roof poling boards were about +2-1/2 or 3 ft. above the outside limit of the tunnel lining, as +illustrated by Figs. 3, 4, and 5, Plate LXIII. The next step was to +place two crown-bars, _AA_, usually about 20 ft. long, under the caps. +Posts were then placed under the bars, and poling boards at right angles +to the axis of the tunnel were then driven out over the bars. As these +polings were being driven, the side polings of the original heading were +removed, and the earth was mined out to the end of these new transverse +polings. Breast boards were set on end under the ends of the transverse +polings when they had been driven out to their limit. Side bars, _BB_, +were then placed as far out as possible and supported on raking posts. +These posts were carried down to rock, if it was near, if not, a sill +was placed. + +A new set of transverse polings was driven over these side bars and the +process was repeated until the sides had been carried down to rock or +down to the elevation of the sills supporting the posts, which were +usually about 4 ft. above the axis of the tunnel. + +The plan then was to excavate the remainder of the section and build the +iron lining in short lengths, gradually transferring the weight of the +roof bars of the iron lining as the posts were taken out. This meant +that not more than four rings, and often only one ring, could be built +before excavation and a short length of cradle became necessary. Before +the posts under the roof bars could be built and the weight transferred +to the iron lining, a grout dam was placed at the leading end of the +iron lining, and grout was brought up to at least 45 deg. from the top. Such +workings were in progress at as many as eight places in one tunnel at +the same time. Where there was only the ordinary ground-water to contend +with, the driving of the top heading drained the ground very thoroughly, +and the enlarging was done easily and without a serious loss of ground. +Under these conditions the surface settlement was from 6 in. to 2 ft. + +Under Borden Avenue, there was more water, which probably came from a +leaky sewer; it was not enough to form a stream, but just kept the +ground thoroughly saturated. There was a continued though hardly +perceptible flow of earth through every crevice in the timbering during +the six or eight weeks between the driving of the top heading and the +placing of the iron lining; and here there was a settlement of from 4 to +8 ft. at the surface. + + +TUNNELING IN COMPRESSED AIR WITHOUT A SHIELD. + +When it became evident that there would not be time for one shield to do +the soft ground portions of all four tunnels under the Long Island +Railroad station, a plan was adopted and used in Tunnel B which, while +not as rapid, turned out to be as cheap as the work done by the shields. +Figs. 6 and 7, Plate LXIII, and Fig. 1, Plate LXIV, illustrate this work +fairly well. The operation of this scheme was about as follows: Having +the iron built up to the face of the full-sized excavation, a hole or +top heading, about 3 ft. wide and 4 or 5 ft. high, was excavated to +about 10 ft. in advance. This was done in a few hours without timbering +of any kind; but, as soon as the hole or heading was 10 ft. out, 6 by +12-in. laggings or polings were put up in the roof, with the rear ends +resting on the iron lining and the leading ends resting on vertical +breast boards. The heading was then widened out rapidly and the lagging +was placed, down to about 45 deg. from the crown. The forward ends of the +laggings were then supported by a timber rib and sill. Protected by this +roof, the full section was excavated, and three rings of the iron lining +were built and grouted, and then the whole process was repeated. + +[Illustration: PLATE LXIV, FIG. 1.--TUNNELING IN COMPRESSED AIR WITHOUT +SHIELD.] + +[Illustration: PLATE LXIV, FIG. 2.--T-HEAD AIR-LOCK.] + +[Illustration: PLATE LXIV, FIG. 3.--CUTTING EDGE OF CAISSON ASSEMBLED.] + +[Illustration: PLATE LXIV, FIG. 4.--CAISSON SUPPORTED ON JACKS AND +BLOCKS.] + + +CONCRETE CRADLES, HAND-PACKED STONE AND GROUTING. + +Had the East Avenue Tunnel been built by shields, as was contemplated at +the time of its design, the space between the limits of excavation +and the iron lining would have been somewhat less than by the method +actually used, especially in the earth portions. This space would have +been filled with grout ejected through the iron lining. The change in +the method of doing the work permitted the use of cheaper material, in +place of part of the grout, and, at the same time, facilitated the work. + +The tube of cast-iron rings is adapted to be built in the tail of the +shield. Where no shield was used, after the excavation was completed and +all loose rock was removed, timbers were fixed across the tunnel from +which semicircular ribs were hung, below which lagging was placed. The +space between this and the rough rock surface was filled with concrete. +This formed a cradle in which the iron tube could be erected, and, at +the same time, occupied space which would have been filled by grout, at +greater cost, had a shield been used. + +As soon as each ring of iron was erected, the space between it and the +roof of the excavation was filled with hand-packed stone. At about every +sixth ring a wall of stone laid in mortar was built between the lining +and the rock to serve as a dam to retain grout. The interstices between +the hand-packed stones were then filled with 1 to 1 grout of cement and +sand, ejected through the iron lining. The concrete cradles averaged +1.05 cu. yd. per ft. of tunnel, and cost, exclusive of materials, $6.70 +per cu. yd., of which $2.25 was for labor and $4.45 was for top charges. +The hand-packed stone averaged 1-1/2 cu. yd. per ft. of tunnel, and cost +$2.42 per cu. yd., of which $0.98 was for labor and $1.44 was for top +charges. + + +ERECTION OF IRON LINING. + +The contractors planned to erect the iron lining with erectors of the +same pattern as that used on the shield under the river, mounted on a +traveling stage. These will be described in detail in Mr. Japp's paper. +Two of these stages and erectors worked in each tunnel at different +points. The tunnel was attacked from so many points that these erectors +could not be moved from working to working. The result was that about +58% of the lining was built by hand. At first thought, this seems to be +a crude and extravagant method, as the plates weighed about 1 ton each +and about 20,000 were erected by hand. As it turned out, the cost was +not greater than for those erected by machinery, taking into account the +cost of erectors and power. This, however, was largely because the hand +erection reduced the amount of work to be done by the machines so much +that the machines had an undue plant charge. + +The hand erection was very simple. A portable hand-winch, with a 3/8-in. +wire rope, was set in any convenient place. The wire rope was carried to +a snatch-block fastened to the top of the iron previously built; or, +where the roof was in soft ground, the timbering furnished points of +attachment. The end of the wire rope was then hooked to a bolt hole in a +new plate, two men at the winch lifted the plate, and three or four +others swung it into approximate place, and, with the aid of bars and +drift-pins, coaxed it into position and bolted it. Where there was no +timbering above the iron, sometimes the key and adjoining plates were +set on blocking on a timber staging and then jacked up to place. + + +LONG ISLAND SHAFTS. + +The river shafts were designed to serve both as working shafts and as +permanent openings to the tunnels, and were larger and more substantial +than would have been required for construction purposes. Plate X of Mr. +Noble's paper shows their design. They consist of two steel caissons, +each 40 by 74 ft. in plan, with walls 5 ft. thick filled with concrete. +A wall 6 ft. thick separated each shaft into two wells 29 by 30 ft., +each directly over a tunnel. Circular openings for the tunnel, 25 ft. in +diameter, were provided in the sides of the caissons. During the sinking +these were closed by bulkheads of steel plates backed by horizontal +steel girders. The shafts were sunk as pneumatic caissons to a depth of +78 ft. below mean high water. There have been a few caissons which were +larger and were sunk deeper than these, but most large caissons have +been for foundations, such as bridge piers, and have been stopped at or +a little below the surface of the rock. The unusual feature of the +caissons for the Long Island shaft is that they were sunk 54 ft. through +rock. + +It had been hoped that the rock would prove sound enough to permit +stopping the caissons at or a little below the surface and continuing +the excavation without sinking them further; for this reason only the +steel for the lower 40 ft. of the caissons was ordered at first. + +The roof of the working chamber was placed 7 ft. above the cutting edge. +It was a steel floor, designed by the contractors, and consisted of +five steel girders, 6 ft. deep, 29 ft. long, and spaced at 5-ft. +centers. Between were plates curved upward to a radius of 4 ft. Each +working chamber had two shafts, 3 ft. by 5 ft. in cross-section, with a +diaphragm dividing it into two passages, the smaller for men and the +larger for muck buckets. On top of these shafts were Moran locks. +Mounted on top of the caisson was a 5-ton Wilson crane, which would +reach each shaft and also the muck cars standing on tracks on the ground +level beside the caissons. Circular steel buckets, 2 ft. 6 in. in +diameter and 3 ft. high, were used for handling all muck. These were +taken from the bottom of the working chamber, dumped in cars, and +returned to the bottom without unhooking. Work was carried on by three +8-hour shifts per day. The earth excavation was done at the rate of +about 67 cu. yd. per day from one caisson. The rock excavation, +amounting to about 6,200 cu. yd. in each caisson, was done at the rate +of about 44.5 cu. yd. per day. The average rate of lowering, when the +cutting edge of the south caisson was passing through earth, was 0.7 ft. +per day. In rock, the rate was 0.48 ft. per day in the south caisson, +and 0.39 ft. per day in the north caisson. + +At the beginning all lowering was done with sixteen hydraulic jacks. +Temporary brackets were fastened to the outside of the caisson. A +100-ton hydraulic jack was placed under each alternate bracket and under +each of the others there was blocking. The jacks were connected to a +high-pressure pump in the power-house. As the jacks lifted the caisson, +the blocking was set for a lower position, to which the caisson settled +as the jacks were exhausted. After the caisson had penetrated the earth +about 10 ft., the outside brackets were removed and the lowering was +regulated by blocking placed under brackets in the working chamber. The +caisson usually rested on three sets of blockings on each side and two +on each end. The blocking was about 4 ft. inside the cutting edge. In +the rock, as the cutting edge was cleared for a lowering of about 2 ft., +6 by 8-in. oak posts were placed under the cutting-edge angle. When a +sufficient number of posts had been placed, the blocking on which the +caisson had rested was knocked or blasted out, and the rock underneath +was excavated. The blocking was then re-set at a lower elevation. The +posts under the cutting edge were then chopped part way through and the +air pressure was lowered about 10 lb., which increased the net weight to +more than 4,000,000 lb. The posts then gradually crushed and the +caissons settled to the new blocking. The tilt or level of the caisson +was controlled by chopping the posts more on the side which was desired +to move first. + +The caisson nearly always carried a very large net weight, usually about +870 tons. The concrete in the walls, which was added as the caisson was +being sunk, was kept at about the elevation of the ground. There was +generally a depth of from 5 to 20 ft. of water ballast on top of the +roof of the working chamber. The air pressure in the working chamber was +usually much less than the hydrostatic head outside the caisson. For +example, the average air pressure in the south caisson during January, +1906, was 16-1/2 lb., while the average head was 62.5 ft., equivalent to +27 lb. per sq. in. Under these conditions, there was a continued but +small leakage into the caisson of from 15,000 to 20,000 gal. per day. + +In the rock the excavation was always carried from 2 to 5 in. outside +the cutting edge. As soon as the cutting edge was cleared, bags of clay +were placed under it in a well-tiered, solid pile, so that when the +caisson was lowered the bags were cut through and most of the clay, bags +and all, was squeezed back of the cutting edge between the rock and the +caisson. + +Table 1 shows the relation of the final position of the caissons to that +designed. + +The cost of rock excavation in the caisson was $4.48 per cu. yd. for +labor and $10.54 for top charges. + +The bottom of the shaft is an inverted concrete arch, 4 ft. thick, +water-proofed with 6-ply felt and pitch. As soon as the caisson was down +to its final position and the excavation was completed, concrete was +deposited on the uneven rock surfaces, brought up to the line of the +water-proofing, and given a smooth 1-in. mortar coat. The felt was stuck +together in 3-ply mats on the surface with hot coal-tar pitch. These +were rolled and sent down into the working chamber, where they were put +down with cold pitch liquid at 60 deg. Fahr. Each sheet of felt overlapped +the one below 6 in. The water-proofing was covered by a 1-in. mortar +plaster coat, after which the concrete of the 4-ft. inverted arch was +placed. While the water-proofing and concreting were being done, the air +pressure was kept at from 30 to 33 lb. per sq. in., the full hydrostatic +head at the cutting edge. After standing for ten days, the air pressure +was taken off, and the removal of the roof of the working chamber was +begun. The water-proofing was done by the Union Construction and +Waterproofing Company. + +TABLE 1.--RELATION OF THE FINAL POSITION OF THE CAISSONS TO THAT +DESIGNED. + +================================================================ +LOCATION.| LONG ISLAND CITY. | +---------------------------------------------------------------- +Shaft. | North. | South. | +---------------------------------------------------------------- +Corner. | High. | East. | North. | High. | East. | North. | +---------------------------------------------------------------- +Northeast|0.21 ft.|0.08 ft.|0.05 ft.|0.32 ft.|0.15 ft.|0.28 ft.| +Northwest|0.22 " |0.08 " |0.02 " |0.00 " |0.15 " |0.12 " | +Southwest|0.27 " |0.14 " |0.02 " |0.18 " |0.45 " |0.12 " | +Southeast|0.23 " |0.14 " |0.05 " |0.39 " |0.45 " |0.28 " | +================================================================ + +============================================================================= +LOCATION.| MANHATTAN. | +----------------------------------------------------------------------------- +Shaft. | North. | South. | +----------------------------------------------------------------------------- +Corner. | High. | East. | South. | High. | East or West.|North or South.| +----------------------------------------------------------------------------- +Northeast|0.23 ft.|0.74 ft.|0.38 ft.|0.00 ft.|0.06 ft. east.|0.04 ft. south.| +Northwest|0.00 " |0.74 " |0.22 " |0.08 " |0.06 " " |0.13 " north.| +Southwest|0.11 " |0.31 " |0.22 " |0.21 " |0.45 " west.|0.13 " " | +Southeast|0.46 " |0.31 " |0.38 " |0.04 " |0.45 " " |0.04 " south.| +============================================================================= + +The cost of labor in compressed air chargeable to concreting was $3.40 +per cu. yd. + +After the roof of each working chamber had been removed, the shield was +erected on a timber cradle in the bottom of the shaft, in position to be +shoved out of the opening in the west side of the caisson. Temporary +rings of iron lining were erected across the shaft in order to furnish +something for the shield jacks to shove against. + +The roof of the working chamber was then re-erected about 35 ft. above +its original position and about 8 ft. above the tunnel openings. This +time, instead of the two small shafts which were in use during the +sinking of the caisson, a large steel shaft with a T-head lock was +built. This is illustrated in Fig. 2, Plate LXIV. The shaft was 8 ft. in +diameter. Inside there was a ladder and an elevator cage for lowering +and hoisting men and the standard 1-yd. tunnel cars. At the top, forming +the head of the T, there were two standard tunnel locks. + + +MANHATTAN SHAFTS. + +A permanent shaft, similar to the river shafts in Long Island City, was +constructed at Manhattan over each pair of tunnels. Each shaft was +located across two lines, with its longer axis transverse to the +tunnels. Plate XIII shows their relative positions. They were divided +equally by a reinforced concrete partition wall transverse to the line +of the tunnels. On completion, the western portions were turned over to +the contractor for the cross-town tunnels for his exclusive use. + +_South Shaft._--Work on the south shaft was started on June 9th, 1904, +with the sinking of a 16 by 16-ft. test pit in the center of the south +half of the south shaft, which reached disintegrated rock at a depth of +about 20 ft. + +Starting in August, the full shaft area, 74 by 40 ft., was taken out in +an open untimbered cut to the rock, and a 20 by 50-ft. shaft was sunk +through the rock to tunnel grade, leaving a 10 or 12-ft. berm around it. +(Fig. 1, Plate LXX.) + +The erection of the caisson was started, about the middle of January, on +the rock berm surrounding the 20 by 50-ft. shaft and about 15 ft. below +the surface. Fig. 3, Plate LXIV, shows the cutting edge of the caisson +assembled. The excavation of the small shaft had shown that hard rock +and only a very small quantity of water would be encountered, and that +the caisson need be sunk only a short distance below the rock surface. +Therefore, no working-chamber roof was provided, the caisson was built +to a height of only 40 ft., and the circular openings were permanently +closed. + +The assembling of the caisson took 2-1/2 months, and on April 2d +lowering was started. Inverted brackets were bolted temporarily to the +cutting-edge stiffening brackets, and the sinking was carried on by +methods similar to those used at Long Island. The jacks and blocking +supporting the caisson are shown in Fig. 4, Plate LXIV. As soon as the +cutting edge entered the rock, which was drilled about 6 in. outside of +the neat lines, the space surrounding the caisson was back-filled with +clay and muck to steady it and provide skin friction. As the friction +increased, the walls were filled with concrete, and as the caisson +slowly settled, it was checked and guided by blocking. The cutting edge +finally came to rest 31 ft. below mean high water, the sinking having +been accomplished in about seven weeks, at an average rate of 0.50 ft. +per day. + +The final position of the cutting edge in relation to its designed +position is shown in Table 1. + +A berm about 4 ft. wide was left at the foot of the caisson below which +the rock was somewhat fissured and required timbering. The cutting edge +of the caisson was sealed to the rock with grout on the outside and a +concrete base to the caisson walls on the inside, the latter resting on +the 4-ft. berm. Following the completion of the shaft, the permanent +sump was excavated to grade for use during construction. + +_North Shaft._--The north shaft had to be sunk in a very restricted +area. The east side of the caisson cleared an adjoining building at one +point by only 1 ft., while the northwest corner was within the same +distance of the east line of First Avenue. As in the case of the Long +Island shafts, the steelwork for only the lower 40 ft. was ordered at +the start. This height was completely assembled before sinking was +begun. The caisson was lowered in about the same manner as those +previously described. The bearing brackets for the hydraulic jacks were +attached, as at the south shaft, to the inside of the cutting-edge +brackets. The east side of the caisson was in contact with the +foundations of the neighboring building, while the west side was in much +softer material. As a consequence, the west side tended to settle more +rapidly and thus throw the caisson out of level and position. To +counteract that tendency, it was necessary to load the east wall heavily +with cast-iron tunnel sections, in addition to the concrete filling in +the walls. + +Soon after sinking was begun, a small test shaft was sunk to a point +below the elevation of the top of the tunnels. The rock was found to be +sound, hard, and nearly dry. It was then decided to stop the caisson as +soon as a foundation could be secured on sound rock. The latter was +found at a depth of 38 ft. below mean high water. With the cutting edge +seated at that depth, the top of the caisson was only 2 ft. above mean +high water, and as this was insufficient protection against high tides, +a 10-ft. extension was ordered for the top. Work, however, went on +without delay on the remainder of the excavation. The junction between +the cutting edge and the rock was sealed with concrete and grout. The +caisson was lowered at an average rate of 0.53 ft. per day. The size of +the shaft below the cutting edge was 62 ft. 7 in. by 32 ft. The average +rate of excavation during the sinking in soft material was 84 cu. yd. +per day. The average rate of rock excavation below the final position of +the cutting edge was 125 cu. yd. per day. There were night and day +shifts, each working 10 hours. Excavation in earth cost $3.96 per cu. +yd., of which $1.45 was for labor and $2.51 for top charges, etc. The +excavation of rock cost $8.93 per cu. yd., $2.83 being for labor and +$6.10 for top charges. + +The final elevations of the four corners of the cutting edge, together +with their displacement from the desired positions, are shown in Table +1. + + +RIVER TUNNELS. + +The four river tunnels, between the Manhattan and Long Island City +shafts, a distance of about 3,900 ft., were constructed by the shield +method. Eight shields were erected, one on each line in each shaft, the +four from Manhattan working eastward to a junction near the middle of +the river with the four working westward from Long Island City. Toward +the end of the work it was evident that the shields in Tunnels _B_, _C_, +and _D_ would meet in the soft material a short distance east of the +Blackwell's Island Reef if work were continued in all headings. In order +that the junction might be made in firm material, work from Manhattan in +those three tunnels was suspended when the shields reached the edge +of the ledge. The shields in Tunnel _A_ met at a corresponding point +without the suspension of work in either. An average of 1,760 ft. of +tunnel was driven from Manhattan and 2,142 ft. from Long Island City. + +[Illustration: PLATE LXV, FIG. 1.--SHIELD FITTED WITH SECTIONAL SLIDING +HOODS AND SLIDING EXTENSIONS TO THE FLOORS.] + +[Illustration: PLATE LXV, FIG. 2.--SHIELD FITTED WITH FIXED HOODS AND +FIXED EXTENSIONS TO THE FLOORS.] + + +TUNNELS DRIVEN EASTWARD FROM MANHATTAN. + +_Materials and Inception of Work._--The materials encountered are shown +in the profile on Plate XIII, and were similar in all the tunnels. In +general, they were found to be about as indicated in the preliminary +borings. The materials met in Tunnel _A_ may be taken as typical of all. + +From the Manhattan shaft eastward, in succession, there were 123 ft. of +all-rock section, 87 ft. of part earth and part rock, 723 ft. of all +earth, 515 ft. of part rock and part earth, 291 ft. of all rock, and 56 +ft. of part rock and part earth. + +The rock on the Manhattan side was Hudson schist, while that in the reef +was Fordham gneiss. Here, as elsewhere, they resembled each other +closely; the gneiss was slightly the harder, but both were badly seamed +and fissured. Wherever it was encountered in this work, the rock surface +was covered by a deposit of boulders, gravel, and sand, varying in +thickness from 4 to 10 ft. and averaging about 6 ft. + +The slope of the surface of the ledge on the Manhattan side averaged +about 1 vertical to 4 horizontal. The rock near the surface was full of +disintegrated seams, and was badly broken up. It was irregularly +stratified, and dipped toward the west at an angle of about 60 degrees. +Large pieces frequently broke from the face and slid into the shield, +often exposing the sand. The rock surface was very irregular, and was +covered with boulders and detached masses of rock embedded in coarse +sand and gravel. The sand and gravel allowed the air to escape freely. +By the time the shields had entirely cleared the rock, the material in +the face had changed to a fine sand, stratified every few inches by very +thin layers of chocolate-colored clayey material. This is the material +elsewhere referred to as quicksand. As the shield advanced eastward, the +number and thickness of the layers of clay increased until the clay +formed at least 20% of the entire mass, and many of the layers were 2 +in. thick. + +At a distance of about 440 ft. beyond the Manhattan ledge, the material +at the bottom of the face changed suddenly to one in which the layers +of clay composed probably 98% of the whole. The sand layers were not +more than 1/16 in. thick and averaged about 2 in. apart. The surface of +the clay rose gradually for a distance of 40 ft. in Tunnels _A_ and _B_, +and 100 ft. in Tunnels _C_ and _D_, when gravel and boulders appeared at +the bottom of the shield. At that time the clay composed about one-half +of the face. + +The surfaces of both the clay and gravel were irregular, but they rose +gradually. After rock was encountered, the formations of gravel and clay +were roughly parallel to the rock surface. + +As the surface of the rock rose they disappeared in order and were again +encountered when the shields broke out of rock on the east side of the +Blackwell's Island Reef. East of the reef a large quantity of coarse +open sand was present in the gravel formations before the clay appeared +below the top of the cutting edge. In Tunnels _C_ and _D_ this was +especially difficult to handle. It appears to be a reasonable assumption +that the layer of clay was continuous across the reef. Wherever the clay +extended above the top of the shield it reduced the escape of air +materially. It is doubtless largely due to this circumstance that the +part-rock sections in the reef were not the most difficult portions of +the work. + +While sinking the lower portions of the shafts the tunnels were +excavated eastward in the solid rock for a distance of about 60 ft., +where the rock at the top was found to be somewhat disintegrated. This +was as far as it was considered prudent to go with the full-sized +section without air pressure. At about the same time top headings were +excavated westward from the shafts for a distance of 100 ft., and the +headings were enlarged to full size for 50 ft. The object was to avoid +damage to the shaft and interference with the river tunnel when work was +started by the contractor for the cross-town tunnel. + +[Illustration: PLATE LXVI, FIG. 1.--REAR OF SHIELD SHOWING COMPLETE +FITTINGS.] + +[Illustration: PLATE LXVI, FIG. 2.--SHIELD WITH LOWER PORTION OF +BULKHEAD REMOVED.] + +The shields were erected on timber cradles in the shaft, and were shoved +forward to the face of the excavation. Concrete bulkheads, with the +necessary air-locks, were then built across the tunnels behind the +shields. The shields were erected before the dividing walls between the +two contracts were placed. Rings of iron tunnel lining, backed by +timbers spanning the openings on the west side, were erected temporarily +across the shafts in order to afford a bearing for the shield jacks +while shoving into the portals. The movement of the shield eastward was +continued in each tunnel for a distance of about 60 ft., and the +permanent cast-iron tunnel lining was erected as the shield advanced. +Before breaking out of rock, it was necessary to have air pressure in +the tunnels. This required the building of bulkheads with air-locks +inside the cast-iron linings just east of the portals. Before erecting +the bulkheads it was necessary to close the annular space between the +iron tunnel lining and the rock. The space at the portal was filled with +a concrete wall. After about twenty permanent rings had been erected in +each tunnel, two rings were pulled apart at the tail of the shield and a +second masonry wall or dam was built. The space between the two dams was +then filled with grout. To avoid the possibility of pushing the iron +backward after the air pressure was on, rings of segmental plates, 5/8 +in. thick and 13-7/8 in. wide, were inserted in eighteen circumferential +joints in each tunnel between the rings as they were erected. The plates +contained slotted holes to match those in the segments. After the rings +left the shield, the plates were driven outward, and projected about 5 +in. When the tunnel was grouted, the plates were embedded. + +The bulkheads were completed, and the tunnels were put under air +pressure on the following dates: + +Line _D_, on October 5th, 1905; +Line _C_, on November 6th, 1905; +Line _B_, on November 25th, 1905; +Line _A_, on December 1st, 1905. + +This marked the end of the preparatory period. + +In the deepest part of the river, near the pier-head line on the +Manhattan side, there was only 8 ft. of natural cover over the tops of +the tunnels. This cover consisted of the fine sand previously described, +and it was certain that the air would escape freely from the tunnels +through it. To give a greater depth of cover and to check the loss of +air, the contractor prepared to cover the lines of the tunnels with +blankets of clay, which, however, had been provided for in the +specifications. Permits, as described later, were obtained at different +times from the Secretary of War, for dumping clay in varying thicknesses +over the line of work. The dumping for the blanket allowed under the +first permit was completed in February, 1906. The thickness of this +blanket varied considerably, but averaged 10 or 12 ft. on the Manhattan +side. The original blanket was of material advantage, but the depth of +clay was insufficient to stop the loss of air. + +The essential parts of the shields in the four tunnels were exactly +alike. Those in Tunnels _B_ and _D_, however, were originally fitted +with sectional sliding hoods and sliding extensions to the floors of the +working chambers, as shown by Fig. 1, Plate LXV. The shields in Tunnels +_A_ and _C_ were originally fitted with fixed hoods and fixed extensions +to the floors, as shown in Fig. 2, Plate LXV. A full description of the +shields will be found in Mr. Japp's paper. + +The shields in each pair of tunnels were advanced through the solid rock +section about abreast of each other, until test holes from the faces +indicated soft ground within a few feet. As the distance between the +sides of the two tunnels was only 14 ft., it was thought best to let +Tunnels _B_ and _D_ gain a lead of about 100 ft. before Tunnels _A_ and +_C_ opened out into soft ground, in order that a blow from one tunnel +might not extend to the other. Work in Tunnel _C_ was shut down on +December 23d, 1905, after exposing sand to a depth of 3 ft. at the top, +and it remained closed for seven weeks. Work in Tunnel _A_ was suspended +on September 29th, 1905. By the time Tunnel _B_ had made the required +advance, it, together with Tunnels _C_ and _D_, was overtaxing the +capacities of the compressor plant. Only a little work was done in +Tunnel _C_ until July, 1906, and work in Tunnel _A_ was not resumed +until October 22d, 1906. + + +TUNNELS DRIVEN WESTWARD FROM LONG ISLAND CITY. + +_Materials and Inception of the Work._--The materials met in Tunnel A +are typical of all four tunnels. From the Long Island shafts westward, +in succession, there were 124 ft. of all-rock section, 125 ft. of part +rock and part earth section, 22 ft. of all-rock section, 56 ft. of part +rock and part earth section, 387 ft. of all-rock section, 70 ft. of part +earth and part rock section, and 1,333 ft. of all-earth section. + +[Illustration: PLATE LXVII] + +The materials passed through are indicated on Plate XIII. The rock was +similar to that of the Blackwell's Island Reef, and was likewise covered +by a layer of sand and boulders. The remainder of the soft ground was +divided into three classes. The first was a very fine red sand, which +occurred in a layer varying in thickness from 6 ft. to at least 15 ft. +It may have been much deeper above the tunnel. It is the quicksand +usually encountered in all deep foundations in New York City. The +following is the result of the sifting test of this sand: + + Held on No. 30 sieve 0.6% +Passed No. 30, " " No. 40 " 0.4% + " No. 40, " " No. 50 " 0.7% + " No. 50, " " No. 60 " 2.4% + " No. 60, " " No. 80 " 14.9% + " No. 80, " " No. 100 " 54.0% + " No. 100, " " No. 200 " 8.0% + " No. 200 " 19.0% + ------ + 100.0% + +This means that grains of all but 4% of it were less than 0.0071 in. in +diameter. The 19% which passed the No. 200 sieve, the grains of which +were 0.0026 in. or less in diameter, when observed with a microscope +appeared to be perfectly clean grains of quartz; to the eye it looked +like ordinary building sand, sharp, and well graded from large to small +grains. This sand, with a surplus of water, was quick. With the water +blown out of it by air pressure, it is stable, stands up well, and is +very easy to work. It appears to be the same as the reddish quicksand +found in most deep excavations around New York City. + +The second material was pronounced "bull's liver" by the miners as soon +as it was uncovered. "Bull's liver" seems to be a common term among +English-speaking miners the world over. It is doubtful, however, if it +is always applied to the same thing. In this case it consisted of layers +of blue clay and very fine red sand. The clay seemed to be perfectly +pure and entirely free from sand. It would break easily with a clean, +almost crystalline, fracture, and yet it was soft and would work up +easily. The layers of clay varied in thickness from 1/16 in. to 1 in., +while the thickness of the sand layer varied from 1/4 in. to several +inches. The sand was the same as the quicksand already described. + +The "bull's liver" was ideal material in which to work a shield. It +stood up as well and held the air about as well as clay, and was much +easier to handle. + +The third material was a layer of fine gray sand which was encountered +in the top of all the tunnels for about 400 ft. just east of Blackwell's +Island Reef. It was very open, and had grains of rather uniform size. + +During the starting out of the tunnels from the shafts, and for more +than a year afterward, the roof of the working chamber in the caissons +and the locks previously described under the Long Island shafts took the +place of the bulkhead across the tunnels for confining the air pressure. + +The first work in air pressure was to remove the shield plug closing the +opening in the side of the shaft. This being done, the shield was shoved +through the opening, and excavation begun. + +At the start the shields were fitted with movable platforms, but no +hoods of any kind were placed until after the rock excavation was +completed. + + +METHODS OF EXCAVATION. + +The distribution of materials to be excavated, as previously outlined, +divided the excavation into three distinct classes, for which different +methods had to be developed. + +These three classes were: + +_First._--All-rock section. +_Second._--Rock in the bottom, earth in the top. +_Third._--All-earth section. + +The extent of the second and third classes was much greater than that of +the first, and they, of course, determined the use of the shield. +Shields had not previously been used extensively in rock work, either +where the face was wholly or partly in rock, and it was necessary to +develop the methods by experience. The specifications required that +where rock was present in the bottom, a bed of concrete should be laid +in the form of a cradle on which to advance the shield. + +_All Rock._--At different times, three general methods were used for +excavating in all-rock sections. They may be called: The bottom-heading +method; the full-face method; and the center-heading method. + +The bottom-heading method was first tried. A heading, about 8 ft. high +and 12 ft. wide, was driven on the center line, with its bottom as +nearly as possible on the grade line of the bottom of the tunnel. It was +drilled in the ordinary manner by four drills mounted on two columns. +The face of the headings varied from 10 to 30 ft. in advance of the +cutting edge. After driving the heading for about 10 ft., the bottom was +cleared out and a concrete cradle was set. The width of the cradles +varied, but was generally from 8 to 10 ft. + +The excavation was enlarged to full size as the shield advanced, the +drills being mounted in the forward compartments of the shield, as +shown by Fig. 1, Plate LXVII, which represents the conditions after the +opening had been cut in the bulkhead, but before the new methods, +mentioned later, had been developed. + +[Illustration: PLATE LXVIII] + +The sides and top were shot downward into the heading. The area of the +face remaining behind the heading was large, and a great number of holes +and several rounds were required to fire the face to advantage. As soon +as firing was started at the face, the heading was completely blocked, +and operations there had to be suspended until the mucking was nearly +completed. The bottom-heading method was probably as good as any that +could be devised for use with the shields as originally installed. All +the muck had to be taken from the face by hand and handled through the +chutes or doors. By drilling from the shield, some muck was blasted on +to the extensions of the floors and could be handled from the upper +compartments. At best, however, the shield with the closed transverse +bulkhead was a serious obstacle to rapid work in rock sections. + +The full-face method was only used where the rock was not considered +safe for a heading. A cut was fired at the bottom, together with side +holes, in a manner quite similar to that adopted in the first set of +holes for a bottom heading. The cradle was then placed, in lengths of +either 2.5 or 5 ft., after which the remainder of the face was fired in +the same manner as for the bottom-heading method. The closed transverse +bulkhead with air-locks, as shown in Fig. 1, Plate LXVI, was placed in +the shield in the hope that it would only be necessary to maintain the +full air pressure in the working compartments in front of the bulkhead. +It was also thought that some form of bulkhead which could be closed +quickly and tightly would be necessary to prevent flooding the tunnel in +case of blows. While no attempt was ever made to reduce the pressure +behind the shield bulkhead, it was obvious from the experience with +Tunnels _B_ and _D,_ while working in the sand between Manhattan and the +reef, that the plan was not practicable, and that the closed bulkhead in +the bottom was a hindrance instead of a safeguard. As soon as rock was +encountered in those tunnels at the west edge of the reef, the +contractor cut through the bulkheads and altered them, as shown in Fig. +2, Plate LXVI. + +Taking advantage of the experience gained, openings were cut through the +bulkheads in Shields _A_ and _C_, while they were shut down near the +edge of the Manhattan ledge. In erecting the shields at Long Island +City in May and June, 1906, openings were also provided. These shields +had to pass through about 700 ft. of rock at the start, the greater +portion of which was all-rock section. It was at that point that +openings were first used extensively and methods were developed, which +would not have been possible except where ears could be passed through +the shield. The bottom-heading method was first tried, but the working +space in front of the shield was cramped, and but few men could be +employed in loading the cars. To give more room, the heading was +gradually widened. The enlargement at the top, when made from the +shield, blocked all work at the face of the heading while the former +operation was in progress. To reduce the delays, the heading was raised, +thus reducing the quantity of rock left in the top, and the bottom was +taken out as a bench. To avoid blocking the tracks when firing the top, +a heavy timber platform was built out from the floors of the middle +working compartments. Most of the muck from the top was caught on the +platform and dropped into cars below. This method of working is shown by +Fig. 2, Plate LXVII. The platforms were not entirely satisfactory, and, +later, the drills in the heading were turned upward and a top bench was +also drilled and fired, as shown by Fig. 3, Plate LXVII. There was then +so little excavation left in the top that the muck was allowed to fall +on the tracks and was quickly cleared away. The method just outlined is +called the center-heading method, and was the most satisfactory plan +devised for full-rock sections. + +_Excavation in Part Rock and Part Earth._--This was probably the most +difficult work encountered, particularly when the rock was covered with +boulders and coarse sharp sand which permitted a free escape of air. It +was necessary, before removing the rock immediately under the soft +ground, to excavate the earth in advance of the shield to a point beyond +where the rock was to be disturbed, and to support, in some way, the +roof, sides, and face of the opening thus made. The hoods were designed +mainly for the purpose of supporting the roof and the sides. With the +fixed hood it was necessary either to excavate for the distance of the +desired shove in front of it or else to force the hood into the +undisturbed material. To avoid this difficulty, the sliding hoods were +tried as an experiment. + +In using the sliding hood, which will be described in detail in Mr. +Japp's paper, the segments commencing at the top were forced forward by +the screw rod, one at a time, as far as possible into the undisturbed +material. Just enough material was then removed from underneath and in +front of the section to free it, and it was again forced forward. These +operations were repeated until the section had been extended far enough +for a shove. As soon as two or three sections had been pushed forward in +this way, the face near the advance end of the sliding hood was +protected by a breast board set on edge and braced from the face. +Gradually, all the segments were worked forward, and, at the same time, +the whole soft ground face was sheeted with timber. At times polings +were placed over the extended segments in order to make room for a +second shove, as shown on Plate LXVIII. When the shield was advanced the +nuts on the screw rods were loosened and the sections of the hoods were +telescoped on to the shield. The idea was ingenious, but proved +impracticable, because of the unequal relative movements of the top and +bottom of the shield in shoving, bringing transverse strains on the hood +sections. + +[Illustration: PLATE LXIX] + +With the fixed hood, poling boards were used to support the roof and +sides, and the face was supported in the manner described for the +sliding hoods. The polings were usually maple or oak planks, 2 in. +thick, about 8 in. wide, and 6-1/2 ft. long. In advancing the face, the +top board of the old breast was first removed, then the material was +carefully worked out for the length of the poling. The latter was then +placed, with the rear end resting over the hood and the forward end +forced as far as possible into the undisturbed material. When two or +three polings had been placed, a breast board was set. After several +polings were in position, their forward ends were supported by some form +a cantilever attached to the hood. Plate LXIX shows one kind of +supports. In this way all the soft material was excavated down to the +rock surface, and the roof, sides, and face were sheeted with timber. In +shoving, the polings in the roof and sides were lost. It was found that +the breast could usually be advanced 5 ft. with safety. The fixed hood +made it possible to set the face about 7 or 8 ft. in front of the +cutting edge without increasing the length of the polings. This distance +was ample for two shoves, and was generally adopted, although a great +many faces were set for one shove only. + +Fixed hoods were substituted for those of the sliding type, originally +placed on Shields _B_ and _D_ at Manhattan, at about the time the latter +encountered the rock at the reef. + +In placing the polings and breasting, all voids behind them were filled +as far as possible with marsh hay or bags of sawdust or clay. To prevent +loss of air in open material, the joints between the boards were +plastered with clay especially prepared for the purpose in a pug mill. +The sliding extensions to the floors of the working compartments were +often used, in the early part of the work, to support the timber face or +loose rock, as shown in Fig. 1, Plate LXVIII. At such times the front of +the extensions was held tightly against the planking by the pressure of +the floor jacks. While shoving, the pressure on the floor jacks was +gradually released, allowing the floors to slide back into the shield +and still afford support to the face. The extensions also afforded +convenient working platforms. They were subject to severe bending +strains while the shield was being shoved, however, and the cast-iron +rams were frequently broken or jammed. The extensions did not last +beyond the edge of the ledge at Manhattan, nor more than about half +through the rock work at Long Island City. The fixed extensions +originally placed on Shields _A_ and _C_ at Manhattan were not +substantial enough, and lasted only a few days. + +Wherever the rock face was sufficiently sound and high, a bottom heading +was driven some 20 or 30 ft. in advance of the shield. The heading was +driven and the cradle placed independently of the face of the soft +ground above, and in the manner described for all-rock sections. The +remainder of the rock face was removed by firing top and side rounds +into the bottom heading after the soft ground had been excavated. Great +care had to be taken in firing in order not to disturb the timber work +or break the rock away from under the breast boards. If either occurred, +a serious run was likely to follow. The bottom-heading method is shown +by Figs. 1, 2, and 3, Plate LXVIII, and the breasting and poling by Fig. +2, Plate LXX. + +In the early part of the work, where a bottom heading was impracticable, +the soft ground was first excavated as described above, and the rock was +drilled by machines mounted on tripods, and fired as a bench. By this +plan no drilling could be done until the soft ground was removed. This +is called the rock-bench method. + +Later the rock-cut method was devised. Drills were set up on columns in +the bottom compartments of the shield, and the face was drilled while +work was in progress on the soft ground above. The drilling was done +either for a horizontal or vertical cut and side and top rounds. The +drillers were protected while at work by platforms of timber built out +from the floors of the compartments above. This plan, while probably not +quite as economical of explosives, saved nearly all the delay due to +drilling the bench. + +[Illustration: PLATE LXX, FIG. 1.--SMALL SHAFT SUNK TO ROCK.] + +[Illustration: PLATE LXX, FIG. 2.--BREASTING AND POLING IN FRONT OF +SHIELD.] + +[Illustration: PLATE LXX, FIG. 3.--SHUTTERS ON FRONT OF SHIELD.] + +[Illustration: PLATE LXX, FIG. 4.--HYDRAULIC ERECTOR PLACING SEGMENT.] + +_All-Earth Section._--As described by Messrs. Hay and Fitzmaurice, in a +paper on the Blackwall Tunnel,[C] the contractor had used, with marked +success, shutters in the face of the shield for excavating in loose open +material. He naturally adopted the method for the East River work. When +the shields in Tunnels _B_ and _D_, at Manhattan, the first to be driven +through soft ground, reached a point under the actual bulkhead line, +work was partly suspended and shutters were put in place in the face of +the top and center compartments. The shutters in the center compartments +in Shield _D_ are shown in Fig. 3, Plate LXX, while the method of work +with the shutters is shown by Figs. 4, 5, 6, and 7, Plate LXVIII. Fig. 4 +on that plate shows the shield ready for a shove. As the pressure was +applied to the shield jacks, men loosened the nuts on the screws holding +the ends of the shutters, and allowed the latter to slide back into the +working compartments. At the end of the shove, the shutters were in the +position shown in Fig. 5, Plate LXVIII. In preparing for a new shove, +the slides in the shutters were opened, and the material in front was +raked into the shield. At the same time, the shutters were gradually +worked forward. The two upper shutters in a compartment were generally +advanced from 12 to 15 in., after which the muck could be shoveled out +over the bottom shutters, as shown on Fig. 6, Plate LXVIII, and Fig. 3, +Plate LXX. No shutters were placed in the bottom compartments, and as +the air pressure was not generally high enough to keep the face dry at +the bottom, these compartments were pretty well filled with the soft, +wet quicksand. Just before shoving, this material was excavated to a +point where it ran in faster than it could be taken out. Much of the +excavation in the bottom compartment was done by the blow-pipe. During +the shove the material from the bottom compartment often ran back +through the open door in the transverse bulkhead, as shown by Fig. 5, +Plate LXVIII. + +In the Blackwall Tunnel the material was reported to have been loose +enough to keep in close contact with the shutters at all times. In the +East River Tunnels this was not the case. The sand at the top was dry +and would often stand with a vertical face for some hours. In advancing +the shutters, it was difficult to bring them into close contact with the +face at the end of the operation. The soft material at the bottom was +constantly running into the lower compartment and undermining the stiff +dry material at the top. The latter gradually broke away, and, at times, +the actual face was some feet in advance of the shutters. Under those +circumstances, the air escaped freely through the unprotected sand face. +The joints of the shutters were plastered with clay, but this did not +keep the air from passing out through the lower compartments. This +condition facilitated the formation of blows, which were of constant +occurrence where shutters were used in the sand. In Tunnels _B_ and _D_, +at Manhattan, the shutters were used in the above manner clear across to +the reef. In Tunnel _C_, which was considerably behind Tunnels _B_ and +_D_, the shutters, although placed, were never used against the face, +and the excavation was carried on by poling the top and breasting the +face. The change resulted in much better progress and fewer blows. The +excavation through the soft material in Tunnel _C_ had just been +completed when Tunnel _A_ was started, and the gangs of workmen were +exchanged. + +The work in soft ground in Tunnel _A_ thus gained the benefit of the +experience in Tunnel _C_. Shutters were placed only in the top +compartments in this tunnel, and, as in Tunnel _C_, were never used in +contact with the face. The method of work is shown by Figs. 1, 2, and 3, +Plate LXXI. The result was still more rapid progress in Tunnel _A_, and +although the loss of air was fully as great in this tunnel as in the +other three, there was only one blow which caused any considerable loss +of pressure. In Tunnels _A_ and _C_ the diaphragms in the rear of the +center compartments of the lower tiers of working chambers were removed +before the shields entered the soft ground. The change was not of as +much advantage in soft ground as in rock, but it facilitated the removal +of the soft wet sand in the bottom. In Tunnel _A_, after encountering +gravel, a belt conveyor was suspended from the traveling stage with one +end projecting through the opening into the working compartment. The use +of the conveyor made it possible to continue mucking at the face while +the bottom plates of the iron lining were being put in place, and +resulted in a material increase in the rate of progress. + +[Illustration: PLATE LXXI] + +The shutters were not placed on the Long Island shields at all. Just +before the shields passed into all soft ground, a fixed hood was +attached to each. + +The method of working in soft ground from Long Island City is +illustrated by Plate LXXII. The full lines at the face of the shield +show the position of the earth before a shove of the shield, and the +dotted lines show the same after the shove. The face was mined out to +the front of the hood and breasted down to a little below the floor of +the top pockets of the shield. In the middle pocket the earth was +allowed to take its natural slope back on the floor. Toward the rear of +the bottom pockets it was held by stop-planks. The air pressure was +always about equal to the hydrostatic head at the middle of the shield, +so that the face in the upper and middle pockets was dry. In the lower +pockets it was wet, and flowed under the pressure of shoving the shield. +By this method 4,195 lin. ft. of tunnel was excavated by the four Long +Island shields in 120 days, from November 1st, 1907, to March 1st, 1908. +This was an average of 8.74 ft. per day per shield. + +The rate of progress, the nature of the materials, and the methods +adopted are shown in Table 2. + +_Preparations for Junction of Shields._--As previously mentioned, the +Manhattan shields were stopped at the edge of the reef. Before making +the final shove of those shields, special polings were placed with +unusual care. The excavation was bell-shaped to receive the Long Island +shields. The arrangement of the polings is shown by Figs. 4 and 5, Plate +LXXI. After the shields were shoved into final position, as shown at the +right in Fig. 5, the rear end of the polings rested over the cutting +edge and allowed room for the removal of the hood. After the latter had +been accomplished, the temporary bulkheads of concrete and clay bags +were built as a precaution against blows when the shields were close +together. An 8-in. pipe was then driven forward through the bulkhead for +distances varying from 30 to 100 ft., in order to check the alignment +and grade between the two workings before the shields were actually +shoved together. The errors in the surveys were negligible, but here, as +elsewhere, the shields were not exactly in the desired position, and it +took careful handling to bring the cutting edges together. The Long +Island shields were driven to meet those from Manhattan. + +TABLE 2.--RATE OF PROGRESS, NATURE OF MATERIALS, AND METHODS ADOPTED IN +CONSTRUCTION OF EAST RIVER TUNNELS. + +LINE A, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +All rock |Bottom heading | 69+39.9 | 69+79 |Aug. 2, '06|Sept 25, '06| + | | | | | | +All rock |Center heading | 69+79 | 70+64 |Sept 25, '06|Nov. 21, '06| + | | | | | | +Earth and rock|Center heading | 70+64 | 71+34 |Nov. 21, '06|Dec. 30, '06| + | | | | | | +Earth and rock|Bottom heading | 71+34 | 71+89 |Dec. 30, '06|Feb. 13, '07| + | | | | | | +All rock |Bottom heading | 71+89 | 72+11 |Feb. 13, '07|Feb. 21, '07| + | | | | | | +Earth and rock|Center heading | 72+11 | 72+67 |Feb. 21, '07|Mar. 19, '07| + | | | | | | +All rock |Center heading | 72+67 | 76+54 |Mar. 19, '07|Sept 6, '07| + | | | | | | +Earth and rock|Going out of rock| 76+54 | 77+24 |Sept 6, '07|Oct. 4, '07| + | | | | | | +All earth |Soft ground | 77+24 | 90+57.3 |Oct. 4, '07|Mar. 26, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +All rock | 54 | 39.1 | 0.724 | | + | | | | | +All rock | 57 | 85 | 1.49 | | + | | | | | +Earth and rock| 39 | 70 | 1.79 | | + | | | | | +Earth and rock| 45 | 55 | 1.22 | | + | | | | | +All rock | 8 | 22 | 2.75 | | + | | | | | +Earth and rock| 26 | 56 | 2.15 | | + | | | | | +All rock | 171 | 387 | 2.26 | | + | | | | | +Earth and rock| 28 | 70 | 2.50 | | + | | | | | +All earth | 174 |1,333.3 | 7.66 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE B, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +All rock |Bottom heading | 69+29.6 | 70+46 |Oct. 16, '06|Nov. 20, '06| + | | | | | | +Earth and rock|Bottom heading | 70+46 | 71+95 |Nov. 20, '06|Feb. 23, '07| + | | | | | | +All rock |Bottom heading | 71+95 | 72+25 |Feb. 23, '07|Mar. 6, '07| + | | | | | | +Earth and rock|Center heading | 72+25 | 72+60 |Mar. 6, '07|Mar. 24, '07| + | | | | | | +All rock |Going out of rock| 72+60 | 76+57 |Mar. 24, '07|Aug. 7, '07| + | | | | | | +Earth and rock|Soft ground | 76+57 | 77+30 |Aug. 7, '07|Sept 5, '07| + | | | | | | +All earth |Soft ground | 77+30 | 90+49.6 |Sept 5, '07|Mar. 19, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +All rock | 35 | 116.4 | 3.33 | | + | | | | | +Earth and rock| 95 | 149 | 1.57 | | + | | | | | +All rock | 11 | 30 | 2.73 | | + | | | | | +Earth and rock| 18 | 35 | 1.94 | | + | | | | | +All rock | 136 | 397 | 2.92 | | + | | | | | +Earth and rock| 29 | 73 | 2.52 | | + | | | | | +All earth | 196 |1,319.6 | 6.73 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE C, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +All rock |Bottom heading | 68+61.9 | 69+93 |June 11, '06|Oct. 16, '06| + | | | | | | +Earth and rock|Bottom heading | 69+93 | 71+65 |Oct. 16, '06|Feb. 7, '07| + | | | | | | +All rock |Bottom heading | 71+65 | 71+91 |Feb. 7, '07|Feb. 13, '07| + | | | | | | +All rock |Center heading | 71+91 | 75+81 |Feb. 13, '07|July 20, '07| + | | | | | | +Earth and rock|Going out of rock| 75+81 | 76+56 |July 20, '07|Aug. 25, '07| + | | | | | | +All earth |Soft ground | 76+56 | 90+44.4 |Aug. 25, '07|Mar. 17, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +All rock | 127 | 131.1 | 1.03 | | + | | | | | +Earth and rock| 114 | 172 | 1.51 | | + | | | | | +All rock | 6 | 26 | 4.33 | | + | | | | | +All rock | 157 | 390 | 2.48 | | + | | | | | +Earth and rock| 36 | 75 | 2.08 | | + | | | | | +All earth | 205 |1,388.4 | 6.77 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE D, LONG ISLAND. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ +Rock |Bottom heading | 68+50.6 | 69+77 |June 2, '06|Oct. 24, '06| + | | | | | | +Earth and rock|Bottom heading | 69+77 | 71+22 |Oct. 24, '06|Jan. 13, '06| + | | | | | | +All rock |Bottom heading | 71+23 | 72+00 |Jan. 13, '07|Mar. 3, '07| + | | | | | | +All rock |Center heading | 72+00 | 75+73 |Mar. 3, '07|July 10, '07| + | | | | | | +Earth and rock|Going out of rock| 75+73 | 77+63 |July 10, '07|Sept 25, '07| + | | | | | | +All earth |Soft ground | 77+63 | 90+38.6 |Sept 25, '07|Mar. 7. '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ +Rock |144 | 126.4 | 0.87 | | + | | | | | +Earth and rock| 81 | 145 | 1.79 | | + | | | | | +All rock | 49 | 78 | 1.59 | | + | | | | | +All rock |129 | 373 | 2.89 | | + | | | | | +Earth and rock| 77 | 190 | 2.47 | | + | | | | | +All earth |164 |1,275.6 | 7.78 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE A, MANHATTAN. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |108+43 |107+74 |July 20, '05|Aug. 3, '05| +Rock {|Top lift of bench|108+43 |107+74 |Aug. 8, '05|Aug. 23, '05| + {|Bottom lift of |108+43 |107+74 |Aug. 30, '05|Sept 27, '05| + {| bench | | | | | + | | | | | | +Rock {|Bottom heading |107+74 |107+21 |Sept 27, '05|Oct. 23, '05| + {|Bottom heading |107+74 |107+21 |Nov. 30, '05|Dec. 29, '05| + | | | | | | +Mixed |Bottom heading |107+21 |106+99 |Oct. 26, '06|Nov. 20, '06| + | | | | | | +Mixed |Rock bench |106+99 |106+34 |Nov. 20, '06|Jan. 13, '07| + | | | | | | +Earth |Poling and |106+34 | 99+11 |Jan. 13, '07|Apr. 17, '07| + | breasting | | | | | + | | | | | | +Mixed |Rock cut | 99+11 | 93+96 |Apr. 17, '07|Oct. 24, '07| + | | | | | | +Rock |Bottom heading | 93+96 | 93+58 |Oct. 24, '07|Nov. 14, '07| + | | | | | | +Rock |Center heading | 93+58 | 92+42 |Nov. 14, '07|Dec. 27, '07| + | | | | | | +Rock |Bottom heading | 92+42 | 91+05 |Dec. 27, '07|Feb. 24, '08| + | | | | | | +Mixed |Rock cut | 91+05 | 90+57 |Feb. 24, '08|Mar. 20, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| 14} | | {|Excavation in normal air, and before | +Rock {| 15}57| 69 | 1.21 {|advance of shield. | + {| 28} | | {| | + {| | | {| | + | | | | | +Rock {| 26}55| 53 | 0.96 {|Bottom heading timbered to avoid the | + {| 29} | | {|possibility of a break. | + | | | | | +Mixed | 25 | 22 | 0.88 |Bottom heading timbered. | + | | | | | +Mixed | 54 | 65 | 1.20 | | + | | | | | +Earth | 94 | 723 | 7.69 | | + | | | | | + | | | | | +Mixed |190 | 515 | 2.71 | | + | | | | | +Rock | 21 | 38 | 1.81 | | + | | | | | +Rock | 46 | 116 | 2.52 | | + | | | | | +Rock | 59 | 137 | 2.32 | | + | | | | | +Mixed | 25 | 48 | 1.92 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE B, MANHATTAN. +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |108+35 |107+87 |July 6, '05|July 27, '05| + {|Top lift of bench|108+35 |107+87 |Aug. 3, '05|Aug. 14, '05| +Rock {|Bottom lift of | | | | | + {| bench |108+35 |108+15 |Aug. 26, '05|Aug. 30, '05| + {|Bottom lift of | | | | | + {| bench |108+15 |107+87 |Sept 11, '05|Sept 26, '05| + | | | | | | +Rock |Bottom heading |107+87 |107+00 |Oct. 23, '05|Jan. 17, '06| + | | | | | | +Mixed |Bottom heading |107+00 |106+64 |Jan. 17, '06|Feb. 12, '06| + | | | | | | +Mixed |Rock bench |106+64 |106+31 |Feb. 12, '06|Mar. 1, '06| + | | | | | | +Earth |Poling and |106+31 |105+58 |Mar. 1, '06|Apr. 3, '06| + | breasting | | | | | + | | | | | | + |Shutters in | | | | | +Earth | contact with |105+58 | 99+19 |Apr. 9, '06|Nov. 1, '06| + | face | | | | | + | | | | | | +Mixed |Rock bench | 99+19 | 98+44 |Nov. 1. '06|Dec. 29, '06| + | | | | | | +Mixed |Bottom heading | 98+44 | 97+76 |Dec, 29, '06|Feb. 12, '07| + | | | | | | +Mixed |Rock cut | 97+66 | 93+84 |Feb. 12, '07|Aug. 6, '07| + | | | | | | +Rock |Full face | 93+84 | 93+21 |Aug. 6, '07|Sept 2, '07| + | | | | | | +Rock |Center Heading | 93+21 | 92+30 |Sept 2, '07|Oct. 12, '07| + | | | | | | +Rock |Bottom heading | 92+30 | 90+99 |Oct. 12, '07|Dec. 6, '07| + | | | | | | +Mixed |Rock cut | 90+99 | 90+49.6 |Dec. 6, '07|Jan. 3, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| 21} | | {| | + {| 11} | | {| | +Rock {| }51| 48 | 0.94 {|Excavation done in normal air and | + {| 4} | | {|before advance of shield. | + {| } | | {| | + {| 15} | | {| | + | | | | | +Rock | 86 | 87 | 1.01 | | + | | | | | +Mixed | 26 | 36 | 1.38 | | + | | | | | +Mixed | 17 | 33 | 1.94 | | + | | | | | +Earth | | | | | + | 33 | 73 | 2.21 | | + | | | | | + | | | | | +Earth |206 | 639 | 3.10 | | + | | | | | + | | | | | +Mixed | 58 | 75 | 1.30 | | + | | | | | +Mixed | 45 | 68 | 1.51 | | + | | | | | +Mixed |175 | 392 | 2.24 | | + | | | | | +Rock | 27 | 63 | 2.33 | | + | | | | | +Rock | 40 | 91 | 2.28 | | + | | | | | +Rock | 55 | 131 | 2.38 | | + | | | | | +Mixed | 28 | 49.4 | 1.76 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE C, MANHATTAN. + +--------------+-----------------+-------------------+-------------------------+ + | | Station: | Date: | + | |---------+---------+------------+------------+ + | | | | | | + Material. | Method. | From | To | From | To | +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |107+79.03|107+69 |Dec. 20, '04|Dec. 27, '04| + {|Top heading |107+69 |107+23 |Jan. 1, '05|Jan. 15, '05| +Rock {|Excavating bench |107+79 |107+23 |Jan. 21, '05|Feb. 28, '05| + {|Bottom heading |107+23 |106+72 |Mar. 1, '05|Mar. 11, '05| + {|Bottom heading |107+23 |107+15 |Oct. 12, '05|Oct. 27, '05| + {| | | | | | + | | | | | | +Rock |Bottom heading |107+15 |106+62 |Nov. 6, '05|Dec. 2, '05| + | | | | | | + | | | | | | +Mixed |Bottom heading |106+62 |106+55 |Dec. 2, '05|Dec. 23, '05| + | | | | | | + | | | | | | +Mixed |Bottom heading |106+55 |106+17 |Feb. 12, '06|Mar. 22, '06| + | | | | | | +Mixed |Rock cut |106+17 |105+85 |Apr. 2, '06|Apr. 20, '06| + | | | | | | +Mixed |Rock cut |105+85 |105+55 |July 27, '06|Aug. 26, '06| + | | | | | | + | | | | | | +Earth |Breasting and |105+55 | 99+40 |Aug. 26, '06|Jan. 2, '07| + | poling | | | | | + | | | | | | +Mixed |Rock cut | 99+40 | 98+70 |Jan. 2, '07|Feb. 6, '07| + | | | | | | +Rock |Full face | 98+70 | 98+60 |Feb. 6, '07|Feb. 12, '07| + | | | | | | +Mixed |Bottom heading | 98+60 | 98+39 |Feb. 12, '07|Mar. 6, '07| + | | | | | | +Rock |Bottom heading | 98+39 | 98+17 |Mar. 6, '07|Mar. 15, '07| + | | | | | | +Mixed |Rock cut | 98+17 | 95+68 |Mar. 15, '07|July 30, '07| + | | | | | | +Rock |Middle heading | 95+68 | 94+61 |July 30, '07|Aug. 21, '07| + | | | | | | +Mixed |Rock cut | 94+61 | 93+56 |Aug. 21, '07|Oct. 3, '07| + | | | | | | +Rock |Middle heading | 93+56 | 92+73 |Oct. 3, '07|Nov. 11, '07| + | | | | | | +Mixed |Rock cut | 92+73 | 90+55 |Nov. 11, '07|Feb. 13, '08| + | | | | | | +Mixed |Rock cut | 90+55 | 90+44.4 |Feb. 25, '08|Mar. 3, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| 7} | | {|Stopped to brace portal. No work done | + {| 14} | | {|from March 12th to October 11th, 1905,| +Rock {| 38} | 54 | 0.77 {|except a little trimming in September.| + {| 10} | | {|All work up to this date done in | + {| 15} | | {|normal air. Heading advanced to 106+70| + {| } | | {|and bulkheaded. | + | | | | | +Rock | 26 | 53 | 2.04 | | + | | | | | + | | | {|Heading advanced to 106 + 40. Shut | +Mixed | 21 | 7 | 0.33 {|down in order that Line D might have a| + | | | {|lead. | + | | | | | +Mixed | 38 | 38 | 1.00 {|Shut down on account of air shortage. | + | | | | | +Mixed | 18 | 32 | 1.78 |Shut down on account of air shortage. | + | | | | | +Mixed | 30 | 30 | 1.00 |Shut down April 20th to July 27th, | + | | | |1906. | + | | | | | +Earth |127 | 615 | 4.84 | | + | | | | | + | | | | | +Mixed | 35 | 70 | 2.00 | | + | | | | | +Rock | 6 | 10 | 1.66 | | + | | | | | +Mixed | 22 | 21 | 0.95 | | + | | | | | +Rock | 9 | 22 | 2.44 | | + | | | | | +Mixed |110 | 249 | 2.26 |Heading advanced to 97+82. | + | | | | | +Rock | 49 | 107 | 2.18 | " " " 94+35. | + | | | | | +Mixed | 43 | 106 | 2.46 | | + | | | | | +Rock | 39 | 83 | 2.13 | | + | | | | | +Mixed | 94 | 218 | 2.32 |Shut down until Line D shields met. | + | | | | | +Mixed | 6 | 11 | 1.83 | | +--------------+------+--------+--------+--------------------------------------+ + + +LINE D, MANHATTAN. +--------------+-----------------+---------+---------+------------+------------+ + {|Top heading |107+70.49|107+16 |Dec. 9, '04|Jan. 31, '05|} + {|Removing bench |107+70.49|107+35 |Jan. 1, '05|Jan. 27, '05|} +Rock {|Bottom heading |107+35 |106+80 |Jan. 30, '05|Feb. 10, '05|} + {|Trimming |107+70 |106+80 |Mar. 29, '05|Apr. 12, '05|} + {|Trimming |107+70 |106+80 |Aug. 31, '05|Sept 19, '05|} + | | | | | | +Rock |Bottom heading |106+80 |106+67 |Oct. 5, '05|Nov. 8, '05| + | | | | | | +Mixed |Bottom heading |106+67 |106+39 |Nov. 8, '05|Dec. 23, '05| + | | | | | | + |Sliding hood and | | | | | +Mixed |breasting. Rock |106+29 |105+70 |Dec. 23, '05|Jan. 24, '06| + |bench | | | | | + | | | | | | +Earth |Poling and |105+70 |104+61 |Jan. 24, '06|Feb. 27, '06| + |breasting | | | | | + | | | | | | + | | | | | | +Earth |Poling, breasting|104+61 |103+90 |Mar. 2, '06|Mar. 31, '06| + | and shutters | | | | | + | | | | | | + | | | | | | +Earth |Shutters |103+90 | 99+41 |Apr. 20, '06|Sept 3, '06| + | | | | | | + | | | | | | +Mixed |Bottom bench | 99+41 | 99+17 |Sept 3, '06|Sept 23, '06| + | | | | | | +Mixed |Bottom heading | 99+17 | 98+50 |Oct. 2, '06|Nov. 24, '06| + | | | | | | + | | | | | | +Rock |Bottom heading | 98+50 | 97+72 |Nov. 24, '06|Jan. 16, '07| + | | | | | | +Mixed |Bottom heading | 97+72 | 97+27 |Jan. 16, '07|Feb. 10, '07| + | | | | | | +Mixed |Rock cut | 97+27 | 95+72 |Feb. 10, '07|Apr. 23, '07| + | | | | | | +Rock |Middle heading | 95+72 | 95+57 |Apr. 23, '07|May 11, '07| + | | | | | | +Rock |Middle heading | 95+57 | 94+65 |May 23, '07|June 17, '07| + | | | | | | + | | | | | | +Mixed |Middle heading | 94+65 | 94+41 |June 17, '07|June 25, '07| + | | | | | | +Mixed |Rock cut | 94+41 | 94+03 |June 25, '07|July 13, '07| + | | | | | | +Rock |Middle heading | 94+03 | 92+64 |July 13, '07|Sept 12, '07| + | | | | | | +Mixed |Middle heading | 92+64 | 92+54 |Sept 12, '07|Sept 20, '07| + | | | | | | +Rock |Middle heading | 92+54 | 92+50 |Sept 20, '07|Sept 21, '07| + | | | | | | +Mixed |Rock cut | 92+50 | 90+38.66|Sept 21, '07|Jan. 8, '08| +--------------+-----------------+---------+---------+------------+------------+ + +--------------+------+--------+--------+--------------------------------------+ + | | |Rate of | | + |Number| |progress| | + | of | Linear |in feet | | + Material. | days.| feet. |per day.| Remarks | +--------------+------+--------+--------+--------------------------------------+ + {| | | | | + {| | | | | +Rock {|123 | 90 | 0.73 |In normal air. | + {| | | | | + {| | | | | + | | | | | +Rock | 34 | 13 | 0.40 |Bottom heading timbered. | + | | | | | +Mixed | 45 | 38 | 0.84 | | + | | | | | + | | | | | +Mixed | 32 | 59 | 1.84 | | + | | | | | + | | | | | +Earth | 31 | 109 | 3.41 | | + | | | | | + | | | | | + | | | |Three days' delay to set shutters in | +Earth | 29 | 71 | 2.45 |top. Shut down 20 days to permit | + | | | |consolidation of the river bed and to | + | | | |repair broken plates. | + | | | | | +Earth |136 | 449 | 3.40 |Four days of 136, delay account of | + | | | |flood. | + | | | | | +Mixed | 20 | 24 | 1.20 | | + | | | | | +Mixed | 53 | 67 | 1.27 |Thirteen days' shut-down to put on | + | | | |hood. | + | | | | | +Rock | 53 | 78 | 1.47 | | + | | | | | +Mixed | 25 | 45 | 1.40 | | + | | | | | +Mixed | 72 | 155 | 2.15 | | + | | | | | +Rock | 18 | 15 | 0.83 | | + | | | | | +Rock | 25 | 92 | 3.68 |Twelve days' delay to repair cutting | + | | | |edge. | + | | | | | +Mixed | 8 | 24 | 3.00 | | + | | | | | +Mixed | 18 | 38 | 2.11 | | + | | | | | +Rock | 61 | 139 | 2.28 | | + | | | | | +Mixed | 8 | 10 | 1.25 | | + | | | | | +Rock | 1 | 4 | 4.00 | | + | | | | | +Mixed |109 | 211.34| 1.94 | | +--------------+------+--------+--------+--------------------------------------+ + +Openings were made between the headings as follows: + +Tunnel _D_, February 20th, 1908; +Tunnel _B_, March 3d, 1908; +Tunnel _C_, March 5th, 1908; +Tunnel _A_, March 18th, 1908. + +It was necessary to cut away the projecting floors of the working +compartments before the cutting edges could be shoved together. + +_Contractor's Organization._--Tunnel operations were carried on +continuously for thirteen days out of fourteen, regular work being shut +down for repairs on alternate Sundays. When the required pressure was +more than 32 lb., four gangs of laborers were employed, each gang +working two shifts of 3 hours each, with an intermission of 3 hours +between the shifts. When the pressure was less than 32 lb., three gangs +were employed, each gang covering 8 hours, but with an intermission of +about 1/2 hour in low pressure for lunch. + +_Air Pressures Required._--During the greater portion of the work in +soft ground, pressure was maintained which would about balance the +hydrostatic head at the axis of the tunnel. This required a pressure +varying from 30 to 34 lb. per sq. in. above that of the atmosphere. In +Tunnels _B_ and _D_, at Manhattan, during the work in soft ground, +pressures as high as 37 lb. were maintained for considerable periods of +time; in the firm material near the reef 28 lb. was often sufficient. +While removing the broken plates, the pressure was raised for a short +time to 42 lb., and was maintained between 37-1/2 and 40 lb. for a +little more than one month. + +_Air Supply._--For regular operation the contractor furnished four +compressors on each side of the river, each having a rated capacity of +5,000 cu. ft. of free air per minute delivered at 50 lb. above normal, +when running at the rate of 100 rev. per min. An additional compressor +of the same capacity was supplied on each side of the river, in +compliance with the requirement for 25% excess capacity; the additional +compressors had also high-pressure air cylinders which could be +connected at will, and in which the pressure could be increased to 150 +lb., and the air used to supply rock drills, grouting machines, etc. The +entire combination on each side of the river, therefore, was rated at +25,000 cu. ft. of free air per minute, or a mean of 6,250 cu. ft. per +heading. Its safe working capacity was not far from 20,000 cu. ft. per +min. + +The shields broke through rock surface in Tunnels _B_, _C_, and _D_, at +Manhattan, in November and December, 1905. The consumption of air in the +four tunnels soon exceeded 15,000 cu. ft. for 24 hours, and in Tunnel +_D_, on several occasions, it exceeded 7,000 cu. ft. for a like period. +Blows had become frequent, and it was evident that the air plant was +inadequate for driving four tunnels at once in the open material east of +the Manhattan rock. Work in Tunnel _A_, therefore, was not resumed, +after the suspension on December 29th, for about ten months, and Tunnel +_C_ was also closed down for more than four months of the time between +December, 1905, and July, 1906. During this period the capacity of the +plant was increased from the rated 25,000 cu. ft. of free air per +minute, to 35,000. In Tunnel _D_ the material had gradually become +firmer, with more clay and less escape of air, as the Blackwell's Island +Reef was approached, and, at the end of the period, the rock surface was +within 3 ft. of the top of the shield; in Tunnel _B_, the rock of the +reef was still a little below the shield, but the overlying material +contained a large proportion of clay and held air very well. Tunnel _C_ +was still in open material, but, with two lines safe and with the +increased air plant, it was deemed best to resume work in Tunnel _A_, +which was done on October 23d, 1906. Thenceforward work was continuous +in all headings until the meeting points with the Long Island shields +were reached. + +This period, January to October, 1906, inclusive, was the most strenuous +of the entire work, particularly the first six months. With one and, at +times, two tunnels closed down, the consumption of air in the headings +from Manhattan was an average of more than 20,000 cu. ft. per min. for +periods of from 30 to 60 days; it was often more than 25,000 cu. ft. for +24 hours, with a maximum of nearly 29,000 cu. ft., and doubtless this +was exceeded considerably for shorter periods. On several occasions the +quantity supplied to a single tunnel averaged more than 15,000 cu. ft. +per min. for 24 hours. The greatest averages for 24 hours were obtained +later in Tunnel _A_, after the resumption of work there, and exceeded +19,000 cu. ft., but the conditions in the headings of the other lines +were then so favorable that the work was carried on continuously in all. + +The deficiency in the original plant at Manhattan was so marked, and the +need of driving all headings from Long Island simultaneously so clear, +that it was decided to increase the rated capacity of the Long Island +compressor plant to 45,400 cu. ft. of free air per minute, which was +10,400 cu. ft. greater than the capacity of the Manhattan plant after +the latter had been augmented. + +[Illustration: PLATE LXXII] + +The earth encountered on emerging from rock, when driving westward from +Long Island, was far more compact and less permeable to air than on the +Manhattan side, but for a distance of from 400 to 600 ft. immediately +east of the reef, it was a clean open sand, and, while the shields were +passing through this, the quantity of air supplied to the four headings +seldom fell below 20,000 cu. ft. per min.; it was usually more than +25,000 cu. ft., with a recorded maximum of 33,400 cu. ft. Although this +was greater than ever used on the Manhattan side, it was more uniformly +distributed among the several headings, and in none equalled the maximum +observed on the Manhattan side, the largest having been 12,700 cu. ft. +per min. for 24 hours; it must be remembered, however, that at one time +only two tunnels were in progress in the bad material in the tunnels +from Manhattan. + +From the foregoing experience, it would seem that the plant finally +furnished at Long Island, having a rated capacity of 45,400 cu. ft. of +free air per minute, would have been a reasonable compliance with the +original actual needs on the Manhattan side and _vice versa_; the plant +finally developed on the Manhattan side, having a rated capacity of +35,000 cu. ft. of free air per minute, would have sufficed for the Long +Island side. + +The total quantity of free air compressed for the supply of the working +chambers of the tunnels and the Long Island caissons was 34,109,000,000 +cu. ft., and, in addition, 10,615,000,000 cu. ft. were compressed to +between 80 and 125 lb. for power purposes, of which at least 80% was +exhausted in the compressed-air working chambers. The total supply of +free air to each heading while under pressure, therefore, averaged about +3,550 cu. ft. per min. + +The quantity of air escaping during a sudden blow-out is apparently much +smaller than might be supposed. Investigation of a number of cases, +showing large pressure losses combined with a long stretch of tunnel +supplying a relatively large reservoir of air, disclosed that a maximum +loss of about 220,000 cu. ft. of free air occurred in 10 min. This +averages only a little more than 19,000 cu. ft. per min., the maximum +recorded supply to one tunnel for a period of 24 hours. Of this +quantity, however, probably from 30 to 40% escaped in the first 45 +seconds, while the remainder was a more or less steady loss up to the +time when the supply could be increased sufficiently to maintain the +lowered pressure. Very few blows showed losses approaching this in +quantity, but the inherent inaccuracy of the observations make the +foregoing figures only roughly approximate. + +[Footnote C: _Minutes of Proceedings_, Inst. C. E., Vol. CXXX, p. 50.] + + +SPECIAL DIFFICULTIES. + +The most serious difficulties of the work came near the start. In Tunnel +_D_ blows and falls of sand from the face were frequent after soft +ground was met in the top. About six weeks after entering the full sand +face, and before the shutters had been installed, the shield showed a +decided tendency to settle, carrying the tunnel lining down with it and +resulting in a number of badly broken plates in the bottom of the rings. +Notwithstanding the use of extremely high vertical leads,[D] the sand +was so soft that the settlement of the shield continued for about +fifteen rings, the maximum being nearly 9 in. below grade. The +hydrostatic head at mid-height of the tunnel was 32-1/2 lb., and the +raising of the air pressure to 37 lb., as was done at this time, was +attended with grave danger of serious blows, on account of the recent +disturbance of the natural cover by the pulling and re-driving of piles +in the reconstruction of the Long Island ferry slips directly above. It +dried the face materially, however, and the shield began to rise again, +and had practically regained the grade when the anticipated blow-outs +occurred, culminating with the entrance of rip-rap from the river bed +into the shield and the flooding of the tunnel with 4 ft. of sand and +water at the forward end. The escape of air was very great, and, as a +pressure of more than 28 lb. could not be maintained, the face was +bulkheaded and the tunnel was shut down for three weeks in order to +permit the river bed to consolidate. + +This was the most serious difficulty encountered on any part of the +work, and, coming at the very start, was exceedingly discouraging. +During the shut-down the broken plates were reinforced temporarily with +steel ribs and reinforced concrete (Fig. 1, Plate LXXIII) which, on +completion of the work, were replaced by cast-steel segments, as +described elsewhere. Practically, no further movement of iron took +place, and the loss of grade caused by the settlement of the shield, +which was by far the largest that ever occurred in this work, was not +sufficient to require a change in the designed grade or alignment of the +track. Work was resumed with the shutters in use at the face as an aid +to excavation. The features of extreme seriousness did not recur, but +for two months the escape of air continued to be extremely large, an +average of 15,000 cu. ft. per min. being required on many days during +this period. + +[Illustration: PLATE LXXIII, FIG. 1.--TEMPORARY REINFORCEMENT OF BROKEN +PLATES AND REMOVAL OF A PLATE IN SECTIONS.] + +[Illustration: PLATE LXXIII, FIG. 2.--HEAVY CAST-STEEL PATCH ATTACHED TO +BENT SEGMENT OF CUTTING EDGE.] + +[Illustration: PLATE LXXIII, FIG. 3.--INFLOW OF SOFT CLAY THROUGH +SHIELD.] + +[Illustration: PLATE LXXIII, FIG. 4.--REINFORCEMENT OF BROKEN PLATE WITH +LONG POLT AND TWISTED STEEL RODS.] + +In Tunnel _B_, after passing out from under the bulkhead line, in April, +1906, the loss of air became very great, and blow-outs were of almost +daily occurrence until the end of June. At the time of the blows the +pressure in the tunnel would drop from 2 to 8 lb., and it generally took +some hours to raise the pressure to what it was before the blow. During +that time regular operations were interrupted. In the latter part of +June a permit was obtained allowing the clay blanket to be increased in +thickness up to a depth of water of 27 ft. at mean low tide. The +additional blanket was deposited during the latter part of June and +early in July, and almost entirely stopped the blows. + +By the end of the month the natural clay, previously described, formed +the greater portion of the face, and, from that time forward, played an +important part in reducing the quantity of air required. During April +and the early part of May the work was under the ferry racks of the Long +Island Railroad. The blanket had to be placed by dumping the clay from +wheel-barrows through holes in the decking. + +In Tunnel _A_ a bottom heading had been driven 23 ft. in advance of the +face at the time work was stopped at the end of 1905. During the ten +months of inactivity the seams in the rock above opened. The rock +surface was only from 2 to 4 ft. below the top of the cutting edge for a +distance of about 60 ft. Over the rock there were large boulders +embedded in sharp sand. It was an exceedingly difficult operation to +remove the boulders and place the polings without starting a run. The +open seams over the bottom heading also frequently caused trouble, as +there were numerous slides of rock from the face which broke up the +breasting and allowed the soft material from above to run into the +shield. There were two runs of from 50 to 75 cu. yd. and many smaller +ones. + +[Footnote D: The lead of the shield is the angular divergence of its +axis from the axis of the tunnel and, in this tunnel, was measured as +the offset in 23 ft. It was called + when the shield was pointed upward +from grade, and - when pointed downward.] + + +GUIDING THE SHIELDS. + +Little difficulty was experienced at any time in driving the shield +close to the desired line, but it was much harder to keep it on grade. +In rock section, where the cradle could be set far enough in advance to +become hard before the shield was shoved over it, there was no trouble +whatever. Where the cradle could be placed only a very short time before +it had to take the weight of the shield, the case was quite different. +The shield had a tendency to settle at the cutting edge, and when once +pointed downward it was extremely difficult to change its direction. It +was generally accomplished by embedding railroad rails or heavy oak +plank in the cradle on solid foundation. This often had to be repeated +several times before it was successful. In soft ground it was much +easier to change the direction of the shield, but, owing to the varying +nature of the material, it was sometimes impossible to determine in +advance how the shield should be pointed. It was found by experience at +Manhattan that the iron lining remained in the best position in relation +to grade when the underside of the bottom of the shield at the rear end +was driven on grade of the bottom of the iron, but if the rate of +progress was slow, it was better to drive the shield a little higher. + +In the headings from Long Island, which, as a rule, were in soft ground, +the cutting edges of the shields were kept from 4 to 8 in. higher, with +respect to the grade line, than the rails. The shields would then +usually move parallel to the grade line, though this was modified +considerably by the way the mucking was done and by the stiffness of the +ground at the bottom of the shield. + +On the average, the shields were shoved by from ten to twelve of the +bottom jacks, with a pressure of about 4,000 lb. per sq. in. The jacks +had 9-in. plungers, which made the average total force required to shove +the shield 2,800,000 lb. In the soft ground, where shutters were used, +all of the twenty-seven jacks were frequently used, and on several +occasions the pressure exceeded 6,000 lb. per sq. in. With a unit +pressure of 6,000 lb. per sq. in., the total pressure on the shield with +all twenty-seven jacks in operation was 5,154 tons. + + +INJURIES TO SHIELDS. + +There were only two instances of damage to the essential structural +features of the shields. The most serious was in Tunnel _D_ where the +cutting edge at the bottom of the shield was forced up a slightly +sloping ledge of rock. A bow was formed in the steel casting which was +markedly increased with the next few shoves. Work was suspended, and a +heavy cast-steel patch, filling out the bow, was attached to the bent +segments, as shown in Fig. 2, Plate LXXIII. No further trouble was +experienced with the deformed portion. The other instance was in Tunnel +_B_, from Long Island, where a somewhat similar but less serious +accident occurred and was treated in a like manner. + +_Bulkheads._--At Manhattan, bulkheads had to be built near the shafts +before the tunnels could be put under pressure. After 500 ft. of tunnel +had been built on each line, the second bulkheads were constructed. The +air pressure between the first and second bulkheads was then reduced to +between 15 and 20 lb. When the shields had been advanced for 1,500 ft., +the third set of bulkheads was built. Nearly all the broken plates which +were removed were located between the first and third bulkheads at +Manhattan. Before undertaking this operation, the doors of the locks in +the No. 3 bulkheads were reversed to take pressure from the west. By +this means it was possible to carry on the work of dismantling the +shields under comparatively low pressure simultaneously with the removal +of the broken plates. + +At Long Island City the roofs of the caissons served the purpose of the +No. 1 bulkheads. Two other sets of bulkheads were erected, the first +about 500 ft. and the second about 1,500 ft. from the shafts. + + +SETTLEMENT AT SURFACE OF GROUND. + +The driving of such portions of the river tunnels, with earth top, as +were under the land section, caused a settlement at the surface varying +usually from 3 to 6 in. The three-story brick building at No. 412 East +34th Street required extensive repairs. This building stood over the +section of part earth and part rock excavation where the tunnels broke +out from the Manhattan ledge and where there were a number of runs of +sand into the shield. In fact, the voids made by those runs eventually +worked up to the surface and caused the pavement of the alley between +the buildings to drop 4 or 5 ft. over a considerable area. The tunnels +also passed directly under the ferry bridges and racks of the Long +Island Railroad at East 34th Street. Tunnels _B_ and _D_ were constantly +blowing at the time, and, where progress was slow, caused so much +settlement that one of the racks had to be rebuilt. Tunnel _A_, on the +other hand, where progress was rapid, caused practically no settlement +in the racks. + + +CLAY BLANKET. + +As previously mentioned, clay was dumped over the tunnels in varying +depths at different times. A material was required which would pack +into a compact mass and would not readily erode under the influence of +the tidal currents of the river and the escape of the great volumes of +air which often kept the water in the vicinity of the shields in violent +motion. Suitable clay could not be found in the immediate vicinity of +the work. Materials from Shooter's Island and from Haverstraw were tried +for the purpose. The Government authorities did not approve of the +former, and the greater portion of that used came from the latter point. +Although a number of different permits governing the work were granted, +there were three important ones. The first permit allowed a blanket +which roughly followed the profile of the tunnels, with an average +thickness of 10 ft. on the Manhattan side and somewhat less on the Long +Island City side. The second general permit allowed the blanket to be +built up to a plane 27 ft. below low water. This proved effective in +checking the tendency to blow, but allowed considerable loss of air. +Finally, dumping was allowed over limited and marked areas up to a plane +of 20 ft. below low water. Wherever advantage was taken of this last +authority, the excessive loss of air was almost entirely stopped. After +all the shields had been well advanced out into the river, the blanket +behind them was dredged up, and the clay used over again in advance of +the shield. + +Soundings were taken daily over the shields, and, if marked erosion was +found, clay was dumped into the hole. Whenever a serious blow occurred, +a scowload of clay was dumped over it as soon as possible and without +waiting to make soundings. For the latter purposes a considerable +quantity of clay was placed in storage in the Pidgeon Street slip at +Long Island City, and one or two bottom-dump scows were kept filled +ready for emergencies. Mr. Robert Chalmers, who had charge of the +soundings for the contractor, states that "the depressions in the +blanket caused by erosion due to the escape of air were, as a rule, +roughly circular in plan and of a curved section somewhat flat in the +center." Satisfactory soundings were never obtained in the center of a +violent blow, but the following instance illustrates in a measure what +occurred. Over Tunnel _B_, at Station 102+80, there was normally 36 ft. +of water, 7 ft. of clay blanket, and 20 ft. of natural cover. Air was +escaping at the rate of about 10,000 cu. ft. per min., and small blows +were occurring once or twice daily. On June 22d, soundings showed 54 ft. +of water. A depth of 18 ft. of the river bottom had been eroded in about +two days. On the next day there were taken out of the shield boulders +which had almost certainly been deposited on the natural river bed. Clay +from the blanket also came into the shields on a number of occasions +during or after blows. The most notable occasion was in September, 1907, +when the top of the shield in Tunnel _D_ was emerging from the east side +of Blackwell's Island Reef. The sand in the top was very coarse and +loose, and allowed the air to escape very freely. The fall of a piece of +loose rock from under the breast precipitated a run of sand which was +followed by clay from the blanket, which, in this locality, was largely +the softer redredged material. Mucking out the shield was in progress +when the soft clay started flowing again and forced its way back into +the tunnel for a distance of 20 ft., as shown in Fig. 3, Plate LXXIII. +Ten days of careful and arduous work were required to regain control of +the face and complete the shove, on account of the heavy pressure of the +plastic clay. + +The clay blanket was of the utmost importance to the work throughout, +and it is difficult to see how the tunnels could have been driven +through the soft material on the Manhattan side without it. + +The new material used in the blanket amounted to 283,412 cu. yd., of +which 117,846 cu. yd. were removed from over the completed tunnels and +redeposited in the blanket in advance of the shields. A total of 88,059 +cu. yd. of clay was dumped over blows. The total cost of placing and +removing the blanket was $304,056. + + +IRON LINING. + +The standard cast-iron tunnel lining was of the usual tube type, 23 ft. +in outside diameter. The rings were 30 in. wide, and were composed of +eleven segments and a key. The webs of the segments were 1-1/2 in. thick +in the central portion, increasing to 2-3/8 in. at the roots of the +flanges, which were 11 in. deep, 2-1/4 in. thick at the root, and 1-1/2 +in. at the edge, and were machined on all contact faces. Recesses were +cast in the edge of the flanges, forming a groove, when the lining was +in place, 1-1/2 in. deep and about 3/8 in. wide, to receive the +caulking. The bolt holes were cored in the flanges, and the bosses +facing the holes were not machined. The customary grout hole was tapped +in the center of each plate for a standard 1-1/4-in. pipe. In this work, +experience indicated that the standard pipe thread was too fine, and +that the taper was objectionable. Each segment weighed, approximately, +2,020 lb., and the key weighed 520 lb., the total weight being 9,102 lb. +per lin. ft. of tunnel. Fig. 1 shows the details of the standard heavy +lining. + +In addition to the standard cast-iron lining, cast-steel rings of the +same dimensions were provided for use in a short stretch of the tunnel, +when passing from a rock to a soft ground foundation, where it was +anticipated that unequal settlement and consequent distortion and +increase in stress might occur, but, aside from the small regular drop +of the lining as it passed out of the tail of the shield, no such +settlement was observed. + +Two classes of lighter iron, one with 1-in. web and 8-in. flanges and +the other with 1-1/4-in. web and 9-in. flanges--the former weighing +5,166 lb. per lin. ft. of tunnel and the latter, 6,776 lb.--were +provided for use in the land sections between East Avenue and the Long +Island City shafts. Two weights of extra heavy segments for use at the +bottom of the rings were also furnished. The so-called _XX_ plates had +webs and flanges 1/4 in. thicker than the standard segment and the _YY_ +plates were similarly 1/2 in. heavier. The conditions under which they +were used will be referred to later. All the castings were of the same +general type as shown by Fig. 1. + +Rings tapering 3/4 in. and 1-1/2 in. in width were used for changes in +alignment and grade, the former being used approximately at every fourth +ring on the 1 deg. 30' curves. The 1-1/2-in. tapers were largely used for +changes in grade where it was desired to free the iron from binding on +the tail of the shield. Still wider tapers would have been advantageous +for quick results in this respect. + +No lug was cast on the segments for attachment to the erector, but in +its place the gadget shown on Fig. 4, Plate LXX, was inserted in one of +the pairs of bolt holes near the center of the plate, and was held in +position by the running nut at one end. + +In the beginning it was expected that the natural shape of the rings +would not show more than 1 in. of shortening of the vertical diameter; +this was slightly exceeded, however, the average distortion throughout +the tunnels being 1-7/16 in. The erectors were attached to the shield +and in such a position that they were in the plane of the center of the +ring to be erected when the shove was made without lead and just far +enough to permit placing the segments. If the shield were shoved too +far, a rare occurrence, the erection was inconvenienced. In driving with +high vertical leads, which occurred more frequently, the disadvantage +of placing the erector on the shield was more apparent. Under such +conditions the plane of the erector's motion was acutely inclined to the +plane of the ring, and, after placing the lower portion of the ring, it +was usually necessary to shove the shield a few inches farther in order +to place the upper plates. The practical effect of this action is +referred to later. + +[Illustration: FIG. 1.] + +At first the erection of the iron in the river tunnels interfered +somewhat with the mucking operations, but the length of time required to +complete the latter was ample for the completion of the former; and the +starting of a shove was seldom postponed by reason of the non-completion +of a ring. After the removal of the bottom of the diaphragms, permitting +the muck cars to be run into the shield and beyond, the two operations +were carried on simultaneously without serious interference. The +installation of the belt conveyor for handling the soft ground spoil in +Tunnel _A_ was of special benefit in this respect. + +Preparatory to the final bolt tightening of each ring as erected, a +15-ton draw-jack, consisting of a small pulling-jack inserted in a light +eye-bar chain, was placed on the horizontal diameter, and frequently the +erectors were also used to boost the crown of the iron, the object being +to erect the ring truly circular. Before shoving, a 1-1/4-in. +turn-buckle was also placed on the horizontal diameter in order to +prevent the spreading of the iron, previous to filling the void outside +with grout. The approach of the supports for the upper floor of the +trailing platform necessitated the removal of these turnbuckles from all +but the three leading rings, but if the iron showed a tendency to +continue distortion, they were re-inserted after the passage of the +trailing platform and remained until the arch of the concrete lining was +placed. + +The cost of handling and erecting the iron varied greatly at different +times, averaging, for the river tunnels, $3.32 per ton for the directly +chargeable labor of handling and erecting, to which must be added $7.54 +for "top charges." The cost of repairing broken plates is included in +this figure. + +_Broken Plates._--During the construction of the river section of the +tunnels, a number of segments were found to have been broken while +shoving the shield. The breaks, which with few exceptions were confined +to the three or four bottom plates, almost invariably occurred on the +advanced face of the ring, and rarely extended beyond the bottom of the +flange. A careful study of the breaks and of the shoving records +disclosed several distinct types of fracture and three principal known +causes of breakage by the shield. + +In the first case, the accidental intrusion of foreign material between +the jack head and the iron caused the jack to take its bearings on the +flange above its normal position opposite the web of the ring, and +resulted usually in the breaking out of a piece of the flange or in +several radiating cracks with or without a depression of the flange. +These breaks were very characteristic, and the cause was readily +recognizable, even though the intruding substance was not actually +observed. + +In the second case, the working of a hard piece of metal, such as a +small tool, into the annular space between the iron and the tail of the +shield, where it was caught on the bead and dragged along as the shield +advanced, was the known cause of a number of broken segments. Such +breaks had no particular characteristic, but were usually close above +the line of travel of the lost tool or metal. Their cause was determined +by the finding of a heavy score on the underside of the segment or the +discovery of the tool wedged in the tail of the shield or lying under +the broken plate when it was removed. It is probable that a number of +breaks ascribed to unknown causes should be placed in this class. + +The third cause includes the largest number of breaks, and, while +difficult to define closely, is the most interesting. Broadly speaking, +the breaks resulted from the movements of the shield in relation to the +position of the tunnel lining. While shoving through soft ground, it was +frequently difficult to apply sufficient power to the lower jacks to +complete the full shove of 30 in. on the desired alignment. The shield, +therefore, was driven upward at the beginning of the shove, and, as the +sand packed in front of the shield and more power was required, it was +furnished by applying the upper jacks. The top of the shield was slowly +pushed over, and, at the close of the shove, the desired position had +been obtained; but the shield had been given a rocking motion with a +decided lifting of the tail toward the close of the shove. A similar +lifting of the tail occurred when, with high vertical leads, the top of +the shield was pushed over in order to place the upper plates of the +ring. Again, when the shield was driven above grade and it was desired +to descend, the passage of the shield over the summit produced a like +effect. In all these movements, with the space between the tail of the +shield and the iron packed tight with pugging, the upward thrust of the +shield tended to flatten the iron in the bottom and occasional broken +plates were the result. The free use of the taper rings, placed so as to +relieve the binding of the lining on the tail of the shield, forces the +tunnel to follow the variations in the grade of the shield, but reduces +greatly the injuries to the rings from this action. + +In Tunnel _D_, where very high vertical leads were required through the +soft sand, combined with a marked tendency of the shield to settle, the +shield was badly cramped on the iron and dragged along it at the top. +The bearing of the iron on its soft foundation tended to thrust up the +bottom in this case also, as shown by the opening of the bottom +cross-joints when the bolts were slackened to relieve the strain during +a shove. The anticipated cracks in the crown plates, which have been +more frequently observed in other tunnels, did not occur here, and were +not found elsewhere except in one place in Tunnel _B_ where they were +traced to a similar action of the shield. The cracks resulting from the +movements of the shield, as briefly described above, in this third case +were not confined to any particular type, but occurred more frequently +at the extreme end of the circumferential flange than at any other +point. + +The number of broken plates occurring in the river tunnels was 319, or +0.42% of the total number erected. Of these, 52 were found and removed, +either before or immediately after a shove, by far the greater number +being broken in handling before or during erection. The remaining 267 +are considered below. + +_Repair of Broken Plates._--On the completion of a shove, the tail of +the shield lacked about 5 in. of covering the full width of the last +ring, and the removal of a plate broken during the shove, therefore, +would have exposed the ground at the tail of the shield. With a firm +material in the bottom, this introduced no particular difficulties, and, +under such conditions, a broken plate was usually removed at once. In +the sand, however, and especially on the Manhattan side where it was +quick and flowing, the removal of a plate was attended with some danger, +and such plates were usually left to be removed on the completion of the +tunnel. Many of these had been reinforced by the use of _XX_, _YY_, and +steel segments placed adjacent to the break in the following rings. + +After the meeting of the shields, the postponed replacement of the +broken segments was taken up. The pressure was raised sufficiently to +dry thoroughly the sand outside the segments, which were drilled and +broken out usually in quarters as shown on Fig. 1, Plate LXXIII. A steel +segment was then inserted in the ring and drawn into place by +turnbuckles. The application of the draw-jack, with a pull of about 30 +tons to each end successively, brought the plate to a firm bearing on +the radial joints at the ends. + +Where the broken plate was isolated and was reinforced by steel or extra +heavy segments in the adjacent ring, the crack, if slight, was simply +caulked to insure water-tightness. If, however, the crack was opened or +extended to the web of the plate, the cross-flanges were tied together +by a 1-1/2-in. by 7-ft. bolt, inserted through the bolt holes nearest +the broken flange. The long bolt acted in the nature of a bow string, +and was provided at its ends with two nuts set on opposite sides of the +cross-joints to replace the standard bolts removed for its insertion. +Fig. 4, Plate LXXIII shows one of these bolts in place. In addition, all +broken plates remaining in the tunnel were reinforced with 1-in. +twisted-steel rods in the concrete lining, also shown in Fig. 4, Plate +LXXIII. + +_Special Construction at River Shield Junctions._--Dismantling the +shields was started as soon as they came to rest in their final position +with the cutting edges together. The plans contemplated their entire +removal, with the exception of the cylindrical skins and cast-steel +cutting edges. Inside the former the standard tunnel lining was erected +to within 4 ft. of the heels of the cutting edges. Spanning the latter, +and forming the continuous metal tunnel lining, the special construction +shown by Fig. 2 was built. This consisted of a 1-1/4 in. rolled-steel +ring, 7 ft. long, erected inside the cutting edges, with an annular +clearance of 1 in., and two special cast-iron rings shaped to connect +the rolled-steel ring with the normal lining. One flange of the special +cast-iron rings was of the standard type, the other was returned 9 in. +in the form of a ring, the inside diameter of which was the same as the +outside diameter of the rolled-steel ring to which it was bolted. + +The space between the standard and special construction was of varying +width at the various shields, and was filled with a closure ring cast to +the lengths determined in the field. Fig. 2 shows the completed +construction. + +Hook-bolts, screwed through threaded holes and buried in 1 to 1 Portland +cement grout ejected through similar holes, reinforced the rolled-steel +ring against external water pressure. In two of the tunnels the concrete +lining was carried completely through the junction, and covered the +whole construction, while in the remaining two tunnels it was omitted at +the rolled-steel ring, leaving the latter exposed and set back about 3 +in. from the face of the concrete. + +[Illustration: FIG. 2.] + + +GROUTING. + +Except as previously noted, the voids outside of the tunnel lining were +filled with grout ejected through the grout holes in each segment. The +possibility was always present that Portland cement, if used for grout +in the shield-driven tunnels, would flow forward around the shield and +set hard, "freezing" the shield to the rock or the iron lining, or at +least forming excrescences upon it, which would render its control +difficult. With this in mind, the contractors proposed to substitute an +English Blue Lias lime as a grouting material. Grout of fresh English +lime containing a moderate quantity of water set very rapidly in air to +the consistency of chalk. Its hydraulic properties, however, were +feeble, and in the presence of an excess of water it remained at the +consistency of soft mud. It was not suitable, therefore, as a supporting +material for the tunnel. + +An American lime, made in imitation of the Lias lime, but having greater +hydraulic properties, was tried, but proved unsatisfactory. Two brands +of natural cement were also tried and rejected, but a modified +quick-setting natural cement, manufactured especially for this work, was +eventually made satisfactory, and by far the largest part of the +river-tunnel grouting was done with this material mixed 1 to 1 by +volume. East of the Long Island shafts the work which was built without +shields was grouted principally with Portland cement and sand mixed 1 to +1 by volume. + +In the river tunnels large quantities of the English lime were used neat +as grout over the top of the tunnel in attempts to stop losses of air +through the soft ground. It was not of great efficiency, however, in +this respect until the voids outside of the lining had been filled above +the crown. Its properties of swelling and quick setting in the dry sand +at that point then became of value. The use of dry lime in the face, +where the escaping air would carry it into the voids of the sand and +choke them, was much more promptly efficacious in checking the loss. + +With the exception of the English lime, all grout was mixed 1 to 1 with +sand in a Cockburn continuous-stirring machine operated by a 3-cylinder +air engine. The grout machine was placed on the lower floor of the +trailing platform shown on Plate LXXII, while the materials were placed +on the upper platform, and, together with the water, were fed into the +machine through a hole in the upper floor. The sand was bagged in the +yard, and the cars on which the materials were sent into the tunnels +were lifted by an elevator to the level of the upper floor of the +trailing platform before unloading. + +Great difficulty was experienced in preventing the waste of the fluid +grout ahead of the shield and into the tail through the space between it +and the iron lining. In a full soft ground section, the first condition +did not usually arise. In the full-rock sections the most efficient +method of checking the waste was found to be the construction of dams or +bulkheads outside the lining between it and the rock surface. For this +purpose, at intervals of about 30 ft., the leading ring and the upper +half of the preceding one were disconnected and pulled forward +sufficiently to give access to the exterior. A rough dam of rubble, or +bags of mortar or clay, was then constructed outside the iron, and the +rings were shoved back and connected up. In sections containing both +rock and soft ground, grout dams were built at the cutting edge at +intervals, and were carried up as high as circumstances permitted. + +The annular space at the tail of the shield was at all times supposed to +be packed tight with clay and empty bags, but the pugging was difficult +to maintain against the pressure of the grout. For a time, 1/2-in. +segmental steel plates, slipped down between the jackets and the iron, +were used to retain the pugging, but their displacement resulted in a +number of broken flanges, and their use was abandoned. In their place, +2-in. segmental plates attached to the jack heads were substituted with +more satisfactory results. Notwithstanding these devices, the waste of +grout at the tail was very great. + +The soft ground material on various portions of the work acted very +differently. The clay and "bull's liver" did not cave in upon the iron +lining for several hours after the shield had passed, sometimes not for +a day or more, which permitted the space between it and the iron to be +grouted. The fine gray or beach sand and the quicksand closed in almost +at once. The quicksand has a tendency to fill in under the iron from the +sides and in places to leave a cavity at about the horizontal diameter +which was not filled from above, as the sand, being dried out by the +air, stood up fairly well and did not cave against the iron, except +where nearly horizontal at the top. + +The total quantity of grout used on the work was equivalent in set +volume to 249,647 bbl. of 1 to 1 Portland cement grout, of which 233,647 +bbl. were ejected through the iron lining, an average of 14.93 bbl. per +lin. ft. The cost of grout ejected outside of the river tunnels was 93 +cents per bbl. for labor and $2.77 for "top charges." East of the Long +Island shaft the corresponding costs were $0.68 and $1.63, the +difference being partly due to the large percentages of work done in the +normal air at the latter place. + + +CAULKING AND LEAKAGE. + +Up to August, 1907, the joints between the segments of the cast-iron +lining were caulked with iron filings and sal ammoniac, mixed in the +proportion of 400 to 1 by weight. With the air pressure balancing the +hydrostatic head near the tunnel axis, it was difficult to make the +rust-joint caulking tight below the axis against the opposing water +pressure; this form of caulking was also injured in many places by +water dripping from service pipes attached to the tunnel lining. A few +trials of lead wire caulked cold gave such satisfactory results that it +was adopted as a substitute. Pneumatic hammers were used successfully on +the lead caulking, but were only used to a small extent on the rust +borings, which were mostly hand caulked. Immediately before placing the +concrete lining, all leaks, whether in the rust borings or lead, were +repaired with lead, and the remainder of the groove was filled with 1 to +1 Portland cement mortar, leaving the joints absolutely water-tight at +that time. The subsequent development of small seepages through the +concrete would seem to indicate that the repair work should have been +carried on far enough in advance of the concreting to permit the +detection of secondary leaks which might develop slowly. The average +labor cost chargeable against the caulking was 12 cents per lin. ft., to +which should be added 21.8 cents for "top charges." + +Unfortunately, it was necessary to place the greater part of the +concrete lining in the river tunnels during the summer months when the +temperature at the point of work frequently exceeded 85 deg.; and the +temperature of the concrete while setting was much higher. This abnormal +heat, due to chemical action in the cement, soon passed away, and, with +the approach of winter, the contraction of the concrete resulted in +transverse cracks. By the middle of the winter these had developed quite +uniformly at the ends of each 30-ft. section of concrete arch as placed, +and frequently finer cracks showed at about the center of each 30-ft. +section. + +While the temperature of the concrete was falling, a like change was +taking place in the cast-iron lining, with resulting contraction. The +lining had been erected in compressed air, the temperature of which +averaged about 70 deg. in winter and higher in summer. Compressed air having +been taken off in the summer of 1908, the tunnels then acquired the +lower temperature of the surrounding earth, slowly falling until +mid-winter. The contraction of the concrete, firmly bedded around the +flanges of the iron, and showing cracks at fairly uniform intervals, +probably localized the small corresponding movements of the iron near +the concrete cracks, and resulted in a loosening of the caulking at +these points. With the advent of cold weather, damp spots appeared in +numerous places on the concrete, and small seepages showed through quite +regularly at the temperature cracks, in some cases developing +sufficiently to be called leaks. Only a few, however, were measurable in +amount. + +Early in January small brass plugs were firmly set on opposite sides of +a large number of cracks, and caliper readings and air temperature +observations were taken regularly throughout the winter and spring. The +widths of the cracks and the amount of leakage at them increased with +each drop in temperature and decreased as the temperature rose again, +but until spring the width of the cracks did not return to the same +point with each return of temperature. + +The leakage was similar in all four tunnels, but was largest in amount +in Tunnel _D_, where, at the beginning of February, the ordinary flow +was about 0.0097 cu. ft. per sec., equivalent to 0.00000347 cu. ft. per +sec. per lin. ft. of tunnel. Of this amount 0.0065 cu. ft. per sec. +could be accounted for at eight of the cracks showing measurable +leakage, leaving 0.0032 cu. ft. per sec. or 0.00000081 cu. ft. per sec. +per lin. ft. of tunnel to be accounted for as general seepage +distributed over the whole length. + +It was not feasible to stop every leak in the tunnel, most of which were +indicated simply by damp spots on the concrete; a rather simple method +was devised, however, for stopping the leaks at the eight or ten places +in each tunnel where water dripped from the arch or flowed down the face +of the concrete. The worst leak in any tunnel flowed about 0.0023 cu. +ft. per sec. To stop these leaks, rows of 1-in. holes, at about 4-in. +centers, were drilled with jap drills through the concrete to the flange +of the iron. These rows were from 3 to 18 ft. long, extending 1 ft. or +more beyond the limits of the leak. The bottoms of the holes were +directly on the caulking groove and the pounding of the drill usually +drove the caulking back, so that the leak became dry or nearly so after +the holes were drilled. If left alone the leaks would gradually break +out again in a few hours or a few days and flow more water than before. +They were allowed to do this, however, in only a few cases as +experiments. After the holes were drilled, the bottom 4 in. next the +flange was filled with soft neat cement mortar. Immediately on top of +this was placed two plugs of neat cement about 2-1/2 in. long, which +were 5 or 6 hours old and rather hard. Each was tamped in with a round +caulking tool of the size of the hole driven with a sledge hammer. On +top of this were driven in the same way two more plugs of neat cement of +the same size, which were hard set. These broke up under the blows of +the hammer, and caulked the hole tight. When finished, the tamping tool +would ring as though it was in solid rock. Great pressure was exerted on +the plastic mortar in the bottom of the hole, which resulted in the +re-caulking of the joint of the iron. No further measurable leakage +developed in the repaired cracks, during a period of four months, and +the total leakage has been reduced to about 0.002 cu. ft. per sec. in +each tunnel, an average of 0.00000051 cu. ft. per sec. per lin. ft. + + +SUMP AND PUMP CHAMBERS. + +To take care of the drainage of the tunnels, a sump with a pump chamber +above it was provided for each pair of tunnels. The sumps were really +short tunnels underneath the main ones and extending approximately +between the center lines of the latter. They were 10 ft. 9-1/2 in. in +outside diameter and 44 ft. long. The water drops directly from the +drains in the center lines of the tunnels into the sumps. Above the +sumps and between the tunnels, a pump chamber 19 ft. 5 in. long was +built. Above the end of the latter, opposite the sump, a cross-passage +was constructed between the bench walls of the two tunnels. This passage +gives access from either tunnel through an opening in the floor to the +pump chamber and through the latter to the sump. + +From the preliminary borings it was thought that the sumps were located +so that the entire construction would be in rock. This proved to be the +case on Tunnels _C_ and _D_, but not on Tunnels _A_ and _B_. The +position of the rock surface in the latter is shown by Fig. 3. After the +excavation was completed in Tunnel _B_, January 1st, 1908, the plates +were removed from the side of the tunnel at the cross-passage, and a +drift was driven through the earth above the rock surface across to the +lining of Tunnel _A_. The heading was timbered as shown by Fig. 3. There +was practically no loss of air from the drift, but the clay blanket had +been removed from over this locality and the situation caused some +anxiety. In order to make the heading as secure as possible, the 24-in. +I-beams, shown on Fig. 3, were attached to the lining of the two +tunnels. The beams formed a support for the permanent concrete roof arch +of the passage, which was placed at once. At the same time plates were +removed from the bottom in Tunnel _B_ over the site of the sump, and a +heading was started on the line of the sump toward Tunnel _A_. As soon +as the heading had been driven beyond the center line of the pump +chamber, a bottom heading was driven from a break-up westward in the +pump chamber and a connection was made with the cross-passage. The iron +lining of the pump chamber was next placed, from the cross-passage +eastward. The soft ground was excavated directly in advance of the +lining, and the ground was supported by polings in much the same manner +as described for shield work. On account of bad ground and seams of sand +encountered in the rock below the level of the cross-beams, the entire +west wall of the pump chamber was placed before enlarging the sump to +full size. This was also judicious, in order to support as far as +possible the iron lining of the tunnels. The sump was then excavated to +full size. The iron lining of the sump and the east wall of the pump +chamber were placed as soon as possible. The voids outside the iron +lining of the sump and the pump chamber were filled as completely as +possible with concrete, and then thoroughly grouted. Finally, the +concrete lining was put in place inside of the iron. + +As shown by Fig. 3, the excavation of these chambers left a considerable +portion of the iron lining of the tunnels temporarily unsupported on the +lower inner quarter. To guard against distortion, a system of diagonals +and struts was placed as shown. + +The floor of the pump chamber was water-proofed with felt and pitch in a +manner similar to that described for the caissons at Long Island City. +It was not possible to make the felt stick to the vertical walls with +soft pitch, which was the only kind that could be used in compressed +air, and, therefore, the surfaces were water-proofed by a wall of +asphalt brick laid in pitch melting at 60 deg. Fahr. Forms were erected on +the neat line, and the space to the rock was filled with concrete making +a so-called sand-wall similar to that commonly used for water-proofing +with felt and pitch. The bricks were then laid to a height of four or +five courses. The joints were filled with pitch instead of mortar. +Sheets of tin were then placed against the face of the wall and braced +from the concrete forms. As much pitch as possible was then slushed +between the brick and the sand-wall, after which the concrete in the +main wall was filled up to the top of the water-proofing course. The tin +was then withdrawn and the operation repeated. This method was slow and +expensive, but gave good results. Ordinary pitch could not be used on +account of the fumes, which are particularly objectionable in +compressed air. The 60 deg. pitch was slightly heated in the open air before +using. + +[Illustration: FIG. 3.] + +The sump and pump chamber on Tunnels _C_ and _D_ differed from the one +described only in minor details; but, being wholly constructed in rock, +presented fewer difficulties and permitted a complete envelope of +water-proofing to be placed in the top. + + +CONCRETE LINING. + +The placing of concrete inside the iron tube was done by an organization +entirely separate from the tunneling force. A mixing plant was placed in +each of the five shafts. The stone and sand bins discharged directly +into mixers below, which, in turn, discharged into steel side-dump +concrete cars. All concrete was placed in normal air. + +The first step, after the iron lining was scraped clean and washed down +and all leaks were stopped, was the placing of biats, marked _B_ on +Plate LXXIV. These were made up of a 6 by 12-in. yellow pine timber, 17 +ft. long, with two short lengths of the same size spliced to its ends by +pieces of 12-in. channels, 3 ft. 9 in. long, clamped upon the sides. +These biats were placed every 5 ft. along the tunnel in rings having +side keys. Next, a floor, 13 ft. wide, was laid on the biats and two +tracks, of 30-in. gauge and 6-1/2-ft. centers, were laid upon the floor. +There were three stages in the concreting. Fig. 2, Plate LXXIV, shows +the concrete in place at the end of the first, and Fig. 3, Plate LXXIV, +at the end of the second stage. The complete arch above the bench walls +was done in the last operation. + +Two 3 by 10-in. soldiers (_SS_ in Figs. 1 and 2, Plate LXXIV) were +fastened to each biat and braced across by two horizontal and two +diagonal braces. To each pair of soldiers a floor template, _T_, was +then nailed. The form for the center drain was then suspended as shown +in Fig. 1, Plate LXXIV. Three pieces of shuttering, _FFF_, 20 ft. long, +were then nailed to the bottom of the soldiers. One is all that would +have been needed for the first concrete placed, but it was easier to +place them at this stage than later, when there was less room. Three +rough shutters were also nailed to the curved portion for the floor +template. Opposite each biat, a bracket, _bb_, was then nailed, which +carries a set of rough boards which formed the risers for the duct +steps. Everything was then ready for concreting except that, where +refuge niches occurred, a form for the portion of the niche below the +seat was nailed to the shuttering. This form is shown at _R_ in Fig. 1, +Plate LXXIV. + +[Illustration: PLATE LXXIV] + +The concrete was dumped down on each side from side-dump cars standing +on the track, and, falling between the risers for the duct steps, ran or +was shoveled under the forms and down into the bottom. The horizontal +surface on each side the center drain was smoothed off with a shovel. +The workmen became very skillful at this, and got a fairly smooth +surface. This concrete was usually placed in lengths of 45 or 60 ft. +After setting for about 24 hours, the brackets, _bb_, were removed, +together with the shuttering on the steps. The triangular pieces, _t_ in +Fig. 1, Plate LXXIV, were not removed until later. Instead, a board was +laid upon this lower step on which the duct layers could work. This and +the triangular piece were not removed until just before the bench +concrete was placed. This was important, as otherwise the bond between +the old and new concrete would be much impaired by dirt ground into the +surface of the old concrete. The ducts were then laid, as shown in Fig. +2, Plate LXXIV. + +The remaining shutters for the face of the bench walls were then placed. +The remainder of the forms for the refuge niches, _RR_, in Fig. 1, Plate +LXXIV, were nailed to the shutters, the steel beam over the niche was +laid in place, the forms for the ladders, _L_ in Fig. 2, Plate LXXIV, +which occur every 25 ft., were tacked to the shutters, the shutters and +forms were given a coat of creosote oil, and then all was ready for +placing the bench concrete. + +The specifications required a 2-in. mortar face to be placed on all +exposed surfaces and the remainder to be smoothed with a trowel and +straight-edge. After about 48 hours, the biats were blocked up on the +bench, and all forms between the bench walls below the working floor +were removed. + +The centering for the arch concrete consisted of simple 5 by 3-1/2 by +5/16-in. steel-angle arch ribs, curved to the proper radius, spaced at +5-ft. intervals. Each rib was made up of two pieces spliced together at +the top. Two men easily handled one of these pieces. After splicing, the +rib was supported by four hanger-bolts fastened to the iron lining as +shown in Fig. 3, Plate LXXIV. + +In the early part of the work, two additional bolts were used about half +way up on the side between the upper and lower hanger-bolts. It was soon +found that by placing the strut between the tunnel lining and the crown +of the rib, these hanger-bolts could be dispensed with. The lagging was +of 3-in. dressed yellow pine, 12 in. wide, and in 15-ft. lengths. Each +piece had three saw cuts on the back, from end to end, allowing it to be +bent to the curve of the arch; it was kept curved by an iron strap +screwed to the back. The arches were put in, either in 15, 30 or 45-ft. +lengths, depending on what was ready for concrete and what could be done +in one continuous working. The rule was that when an arch was begun, the +work must not stop until it was finished. An arch length always ended in +the middle of a ring. The lagging was placed to a height of about 6 ft. +above the bench before any concreting was done. When the concrete had +been brought up to that point, lagging was added, one piece at a time, +just ahead of the concrete, up to the crown, where a space of about 18 +in. was left. When the lagging had reached the upper hanger-bolts, they +were removed, which left only the two bottom bolts fixed in the +concrete. Most of these were unscrewed from the eye and saved, as tin +sleeves were placed around them before concreting. Two cast-iron eyes +were lost for every 5 ft. of tunnel. To place the key concrete, a stage +was set up in the middle of the floor, and, beginning at one end, about +2 ft. of block lagging was placed. Over this, concrete was packed, +filling the key as completely as possible. This was done partly by +shoveling and using a short rammer, and partly by packing with the hands +by the workmen, who wore rubber gloves for the purpose. Another 2 ft. of +lagging was then placed, and the operation was repeated, and thus +working backward, foot by foot, the key was completed. This is the usual +way of keying a concrete arch, but in this case the difficulty was +increased by the flanges of the iron lining. It was practically +impossible to fill all parts of the pockets formed by these flanges. To +meet this difficulty, provision was made for grouting any unfilled +space. As the concrete was being put in, tin pipes were placed with +their tops nearly touching the iron lining, and their bottoms resting on +the lagging. Each pocket was intended to have two of these pipes, one to +grout through and the other to act as a vent for the escape of air. Each +center key ring had six pipes, and each side key had eight. The bottoms +of the pipes were held by a single nail driven half way into the +lagging. This served to keep the pipes in position and to locate them +after the lagging was taken down. + +The cost of labor in the tunnels directly chargeable to concrete was +$1.80 per cu. yd. The top charges, exclusive of the cost of materials +(cement, sand, and stone), amounted to $3.92. + + +ELECTRIC CONDUITS. + +In one bench wall of each tunnel there were fifteen openings for power +cables and in the other, between the river shafts, there were forty +openings for telephone, telegraph, and signal cables. East of the Long +Island shaft, the number of the latter was reduced to twenty-four. The +telephone ducts were all of the four-way type. The specifications +required that the power ducts should have an opening of not less than +3-1/2 in., nor more than 3-7/8 in., and that after laying they should +pass a 4-ft. mandrel, 3-3/8 in. at the leading end and 2-5/8 in. at the +other. The outside dimension was limited between 5 and 5-3/8 in. The +openings of the four-way ducts were required to be not less than 3-3/8 +in., nor more than 3-5/8 in., and after laying to pass a 5-ft. mandrel, +3-1/4 in. at the leading end and 2-1/2 in. at the other. The outside +dimensions were limited between 9 and 9-1/2 in. All were to be laid in +1/4-in. beds of mortar. The specifications were not definite as to the +shape of the opening, but those used were square with corners rounded to +a radius of 3/8 in. The four-ways were 3 ft. long, and the singles, 18 +in. + +A study of the foregoing dimensions will show that the working limits +were narrow. Such narrow limits would not pay for the ordinary conduit +line in a street, where there is more room. In the tunnel greater +liberality meant either reducing the number of conduits or encroaching +on the strength of the concrete tunnel lining. The small difference of +only 1/8 in. in the size of the mandrel, or a clearance of only 1/16 in. +on each side, no doubt did increase the cost of laying somewhat, though +not as much as might at first be supposed. All bottom courses were laid +to a string, in practically perfect line and grade, and all joints were +tested with mandrels which were in all openings, and pulled forward as +each piece of conduit was laid. As the workmen became skillful, the +progress was excellent. + +All costs of labor in the tunnel chargeable to duct laying amounted to +$0.039 per ft. of duct; top charges brought this up to $0.083. + +The serious problem was to guard against grout and mortar running into +the duct opening through the joints from the concrete, which was a +rather wet mixture. Each joint was wrapped, when laid, with canvas, +weighing 10 oz. per sq. yd., dipped in cement grout immediately before +using. These wraps were 6 in. wide, and were cut long enough to go +around the lap about the middle of the duct. As soon as all the ducts +were laid, the entire bank was plastered over with fairly stiff mortar, +which, when properly done, closed all openings. The plastering was not +required by the specifications, but was found by the contractor to +result in a saving in ultimate cost. + +The concrete on the two sides of the bank of ducts was bonded together +by 2 by 1/8-in. steel bonds between the ducts, laid across in horizontal +joints. Both ends were split into two pieces, 1 in. long, one of which +was turned up and the other down. These bonds projected 1-1/2 in. into +the concrete on either side. Where the bond came opposite the risers of +the duct step, against which the ducts were laid, recesses were provided +for the projecting bond. This was done by nailing to the rough shutters +for the steps a form which when removed left a dove-tailed vertical +groove. This form was made in two pieces, one tapering inward and the +other with more taper outward. As the bonds were placed, these grooves +were filled with mortar. + +The ducts usually received their final rodding with the specification +mandrel a month or more after they were laid, after which all openings +into splicing chambers were stopped by wooden plugs, 8 in. long tapering +from 3-3/4 in. at one end to 2-3/4 in. at the other end, and shaped to +fit the opening tightly. At first the plugs were paraffined, to keep +them from swelling and breaking the ducts, but were not successful, as +the paraffin lubricated them so that they would not stay in place. They +were expensive, and there was some swelling in the best that were +obtained. A better plug was made by using no paraffin, but by making six +saw cuts, three horizontal and three vertical, in the larger end, +cutting to within about 2 in. of the smaller end. The swelling of the +wood was then taken up by the saw cuts and the spring of the wood. + +The splicing chambers are at 400-ft. intervals. They are 6 ft. long, 4 +ft. 9 in. high, with a width varying from 3 ft. 2 in. at the top to 1 +ft. 2 in. at the bottom. + + + + + + +End of the Project Gutenberg EBook of Transactions of the American Society +of Civil Engineers, vol. LXVIII, Sept. 1910, by James H. Brace, Francis Mason and S. H. Woodard + +*** END OF THIS PROJECT GUTENBERG EBOOK TRANSACTIONS OF THE AMERICAN *** + +***** This file should be named 18722.txt or 18722.zip ***** +This and all associated files of various formats will be found in: + http://www.gutenberg.org/1/8/7/2/18722/ + +Produced by Juliet Sutherland, Taavi Kalju and the Online +Distributed Proofreading Team at http://www.pgdp.net + + +Updated editions will replace the previous one--the old editions +will be renamed. + +Creating the works from public domain print editions means that no +one owns a United States copyright in these works, so the Foundation +(and you!) can copy and distribute it in the United States without +permission and without paying copyright royalties. Special rules, +set forth in the General Terms of Use part of this license, apply to +copying and distributing Project Gutenberg-tm electronic works to +protect the PROJECT GUTENBERG-tm concept and trademark. Project +Gutenberg is a registered trademark, and may not be used if you +charge for the eBooks, unless you receive specific permission. If you +do not charge anything for copies of this eBook, complying with the +rules is very easy. You may use this eBook for nearly any purpose +such as creation of derivative works, reports, performances and +research. They may be modified and printed and given away--you may do +practically ANYTHING with public domain eBooks. Redistribution is +subject to the trademark license, especially commercial +redistribution. + + + +*** START: FULL LICENSE *** + +THE FULL PROJECT GUTENBERG LICENSE +PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK + +To protect the Project Gutenberg-tm mission of promoting the free +distribution of electronic works, by using or distributing this work +(or any other work associated in any way with the phrase "Project +Gutenberg"), you agree to comply with all the terms of the Full Project +Gutenberg-tm License (available with this file or online at +http://gutenberg.org/license). + + +Section 1. General Terms of Use and Redistributing Project Gutenberg-tm +electronic works + +1.A. By reading or using any part of this Project Gutenberg-tm +electronic work, you indicate that you have read, understand, agree to +and accept all the terms of this license and intellectual property +(trademark/copyright) agreement. If you do not agree to abide by all +the terms of this agreement, you must cease using and return or destroy +all copies of Project Gutenberg-tm electronic works in your possession. +If you paid a fee for obtaining a copy of or access to a Project +Gutenberg-tm electronic work and you do not agree to be bound by the +terms of this agreement, you may obtain a refund from the person or +entity to whom you paid the fee as set forth in paragraph 1.E.8. + +1.B. "Project Gutenberg" is a registered trademark. It may only be +used on or associated in any way with an electronic work by people who +agree to be bound by the terms of this agreement. There are a few +things that you can do with most Project Gutenberg-tm electronic works +even without complying with the full terms of this agreement. See +paragraph 1.C below. There are a lot of things you can do with Project +Gutenberg-tm electronic works if you follow the terms of this agreement +and help preserve free future access to Project Gutenberg-tm electronic +works. See paragraph 1.E below. + +1.C. The Project Gutenberg Literary Archive Foundation ("the Foundation" +or PGLAF), owns a compilation copyright in the collection of Project +Gutenberg-tm electronic works. Nearly all the individual works in the +collection are in the public domain in the United States. If an +individual work is in the public domain in the United States and you are +located in the United States, we do not claim a right to prevent you from +copying, distributing, performing, displaying or creating derivative +works based on the work as long as all references to Project Gutenberg +are removed. Of course, we hope that you will support the Project +Gutenberg-tm mission of promoting free access to electronic works by +freely sharing Project Gutenberg-tm works in compliance with the terms of +this agreement for keeping the Project Gutenberg-tm name associated with +the work. You can easily comply with the terms of this agreement by +keeping this work in the same format with its attached full Project +Gutenberg-tm License when you share it without charge with others. + +1.D. The copyright laws of the place where you are located also govern +what you can do with this work. Copyright laws in most countries are in +a constant state of change. If you are outside the United States, check +the laws of your country in addition to the terms of this agreement +before downloading, copying, displaying, performing, distributing or +creating derivative works based on this work or any other Project +Gutenberg-tm work. The Foundation makes no representations concerning +the copyright status of any work in any country outside the United +States. + +1.E. Unless you have removed all references to Project Gutenberg: + +1.E.1. The following sentence, with active links to, or other immediate +access to, the full Project Gutenberg-tm License must appear prominently +whenever any copy of a Project Gutenberg-tm work (any work on which the +phrase "Project Gutenberg" appears, or with which the phrase "Project +Gutenberg" is associated) is accessed, displayed, performed, viewed, +copied or distributed: + +This eBook is for the use of anyone anywhere at no cost and with +almost no restrictions whatsoever. You may copy it, give it away or +re-use it under the terms of the Project Gutenberg License included +with this eBook or online at www.gutenberg.org + +1.E.2. If an individual Project Gutenberg-tm electronic work is derived +from the public domain (does not contain a notice indicating that it is +posted with permission of the copyright holder), the work can be copied +and distributed to anyone in the United States without paying any fees +or charges. If you are redistributing or providing access to a work +with the phrase "Project Gutenberg" associated with or appearing on the +work, you must comply either with the requirements of paragraphs 1.E.1 +through 1.E.7 or obtain permission for the use of the work and the +Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or +1.E.9. + +1.E.3. If an individual Project Gutenberg-tm electronic work is posted +with the permission of the copyright holder, your use and distribution +must comply with both paragraphs 1.E.1 through 1.E.7 and any additional +terms imposed by the copyright holder. Additional terms will be linked +to the Project Gutenberg-tm License for all works posted with the +permission of the copyright holder found at the beginning of this work. + +1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm +License terms from this work, or any files containing a part of this +work or any other work associated with Project Gutenberg-tm. + +1.E.5. Do not copy, display, perform, distribute or redistribute this +electronic work, or any part of this electronic work, without +prominently displaying the sentence set forth in paragraph 1.E.1 with +active links or immediate access to the full terms of the Project +Gutenberg-tm License. + +1.E.6. You may convert to and distribute this work in any binary, +compressed, marked up, nonproprietary or proprietary form, including any +word processing or hypertext form. However, if you provide access to or +distribute copies of a Project Gutenberg-tm work in a format other than +"Plain Vanilla ASCII" or other format used in the official version +posted on the official Project Gutenberg-tm web site (www.gutenberg.org), +you must, at no additional cost, fee or expense to the user, provide a +copy, a means of exporting a copy, or a means of obtaining a copy upon +request, of the work in its original "Plain Vanilla ASCII" or other +form. Any alternate format must include the full Project Gutenberg-tm +License as specified in paragraph 1.E.1. + +1.E.7. Do not charge a fee for access to, viewing, displaying, +performing, copying or distributing any Project Gutenberg-tm works +unless you comply with paragraph 1.E.8 or 1.E.9. + +1.E.8. You may charge a reasonable fee for copies of or providing +access to or distributing Project Gutenberg-tm electronic works provided +that + +- You pay a royalty fee of 20% of the gross profits you derive from + the use of Project Gutenberg-tm works calculated using the method + you already use to calculate your applicable taxes. The fee is + owed to the owner of the Project Gutenberg-tm trademark, but he + has agreed to donate royalties under this paragraph to the + Project Gutenberg Literary Archive Foundation. Royalty payments + must be paid within 60 days following each date on which you + prepare (or are legally required to prepare) your periodic tax + returns. Royalty payments should be clearly marked as such and + sent to the Project Gutenberg Literary Archive Foundation at the + address specified in Section 4, "Information about donations to + the Project Gutenberg Literary Archive Foundation." + +- You provide a full refund of any money paid by a user who notifies + you in writing (or by e-mail) within 30 days of receipt that s/he + does not agree to the terms of the full Project Gutenberg-tm + License. You must require such a user to return or + destroy all copies of the works possessed in a physical medium + and discontinue all use of and all access to other copies of + Project Gutenberg-tm works. + +- You provide, in accordance with paragraph 1.F.3, a full refund of any + money paid for a work or a replacement copy, if a defect in the + electronic work is discovered and reported to you within 90 days + of receipt of the work. + +- You comply with all other terms of this agreement for free + distribution of Project Gutenberg-tm works. + +1.E.9. If you wish to charge a fee or distribute a Project Gutenberg-tm +electronic work or group of works on different terms than are set +forth in this agreement, you must obtain permission in writing from +both the Project Gutenberg Literary Archive Foundation and Michael +Hart, the owner of the Project Gutenberg-tm trademark. Contact the +Foundation as set forth in Section 3 below. + +1.F. + +1.F.1. Project Gutenberg volunteers and employees expend considerable +effort to identify, do copyright research on, transcribe and proofread +public domain works in creating the Project Gutenberg-tm +collection. Despite these efforts, Project Gutenberg-tm electronic +works, and the medium on which they may be stored, may contain +"Defects," such as, but not limited to, incomplete, inaccurate or +corrupt data, transcription errors, a copyright or other intellectual +property infringement, a defective or damaged disk or other medium, a +computer virus, or computer codes that damage or cannot be read by +your equipment. + +1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right +of Replacement or Refund" described in paragraph 1.F.3, the Project +Gutenberg Literary Archive Foundation, the owner of the Project +Gutenberg-tm trademark, and any other party distributing a Project +Gutenberg-tm electronic work under this agreement, disclaim all +liability to you for damages, costs and expenses, including legal +fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT +LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE +PROVIDED IN PARAGRAPH F3. YOU AGREE THAT THE FOUNDATION, THE +TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE +LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR +INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH +DAMAGE. + +1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a +defect in this electronic work within 90 days of receiving it, you can +receive a refund of the money (if any) you paid for it by sending a +written explanation to the person you received the work from. If you +received the work on a physical medium, you must return the medium with +your written explanation. The person or entity that provided you with +the defective work may elect to provide a replacement copy in lieu of a +refund. If you received the work electronically, the person or entity +providing it to you may choose to give you a second opportunity to +receive the work electronically in lieu of a refund. If the second copy +is also defective, you may demand a refund in writing without further +opportunities to fix the problem. + +1.F.4. Except for the limited right of replacement or refund set forth +in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO OTHER +WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO +WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE. + +1.F.5. Some states do not allow disclaimers of certain implied +warranties or the exclusion or limitation of certain types of damages. +If any disclaimer or limitation set forth in this agreement violates the +law of the state applicable to this agreement, the agreement shall be +interpreted to make the maximum disclaimer or limitation permitted by +the applicable state law. The invalidity or unenforceability of any +provision of this agreement shall not void the remaining provisions. + +1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the +trademark owner, any agent or employee of the Foundation, anyone +providing copies of Project Gutenberg-tm electronic works in accordance +with this agreement, and any volunteers associated with the production, +promotion and distribution of Project Gutenberg-tm electronic works, +harmless from all liability, costs and expenses, including legal fees, +that arise directly or indirectly from any of the following which you do +or cause to occur: (a) distribution of this or any Project Gutenberg-tm +work, (b) alteration, modification, or additions or deletions to any +Project Gutenberg-tm work, and (c) any Defect you cause. + + +Section 2. Information about the Mission of Project Gutenberg-tm + +Project Gutenberg-tm is synonymous with the free distribution of +electronic works in formats readable by the widest variety of computers +including obsolete, old, middle-aged and new computers. It exists +because of the efforts of hundreds of volunteers and donations from +people in all walks of life. + +Volunteers and financial support to provide volunteers with the +assistance they need, is critical to reaching Project Gutenberg-tm's +goals and ensuring that the Project Gutenberg-tm collection will +remain freely available for generations to come. In 2001, the Project +Gutenberg Literary Archive Foundation was created to provide a secure +and permanent future for Project Gutenberg-tm and future generations. +To learn more about the Project Gutenberg Literary Archive Foundation +and how your efforts and donations can help, see Sections 3 and 4 +and the Foundation web page at http://www.pglaf.org. + + +Section 3. Information about the Project Gutenberg Literary Archive +Foundation + +The Project Gutenberg Literary Archive Foundation is a non profit +501(c)(3) educational corporation organized under the laws of the +state of Mississippi and granted tax exempt status by the Internal +Revenue Service. The Foundation's EIN or federal tax identification +number is 64-6221541. Its 501(c)(3) letter is posted at +http://pglaf.org/fundraising. Contributions to the Project Gutenberg +Literary Archive Foundation are tax deductible to the full extent +permitted by U.S. federal laws and your state's laws. + +The Foundation's principal office is located at 4557 Melan Dr. S. +Fairbanks, AK, 99712., but its volunteers and employees are scattered +throughout numerous locations. Its business office is located at +809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email +business@pglaf.org. Email contact links and up to date contact +information can be found at the Foundation's web site and official +page at http://pglaf.org + +For additional contact information: + Dr. Gregory B. Newby + Chief Executive and Director + gbnewby@pglaf.org + +Section 4. Information about Donations to the Project Gutenberg +Literary Archive Foundation + +Project Gutenberg-tm depends upon and cannot survive without wide +spread public support and donations to carry out its mission of +increasing the number of public domain and licensed works that can be +freely distributed in machine readable form accessible by the widest +array of equipment including outdated equipment. Many small donations +($1 to $5,000) are particularly important to maintaining tax exempt +status with the IRS. + +The Foundation is committed to complying with the laws regulating +charities and charitable donations in all 50 states of the United +States. Compliance requirements are not uniform and it takes a +considerable effort, much paperwork and many fees to meet and keep up +with these requirements. We do not solicit donations in locations +where we have not received written confirmation of compliance. To +SEND DONATIONS or determine the status of compliance for any +particular state visit http://pglaf.org + +While we cannot and do not solicit contributions from states where we +have not met the solicitation requirements, we know of no prohibition +against accepting unsolicited donations from donors in such states who +approach us with offers to donate. + +International donations are gratefully accepted, but we cannot make +any statements concerning tax treatment of donations received from +outside the United States. U.S. laws alone swamp our small staff. + +Please check the Project Gutenberg Web pages for current donation +methods and addresses. Donations are accepted in a number of other +ways including checks, online payments and credit card +donations. To donate, please visit: http://pglaf.org/donate + + +Section 5. General Information About Project Gutenberg-tm electronic +works. + +Professor Michael S. Hart is the originator of the Project Gutenberg-tm +concept of a library of electronic works that could be freely shared +with anyone. For thirty years, he produced and distributed Project +Gutenberg-tm eBooks with only a loose network of volunteer support. + +Project Gutenberg-tm eBooks are often created from several printed +editions, all of which are confirmed as Public Domain in the U.S. +unless a copyright notice is included. Thus, we do not necessarily +keep eBooks in compliance with any particular paper edition. + +Most people start at our Web site which has the main PG search facility: + + http://www.gutenberg.org + +This Web site includes information about Project Gutenberg-tm, +including how to make donations to the Project Gutenberg Literary +Archive Foundation, how to help produce our new eBooks, and how to +subscribe to our email newsletter to hear about new eBooks. + +*** END: FULL LICENSE *** + diff --git a/18722.zip b/18722.zip Binary files differnew file mode 100644 index 0000000..96a45a0 --- /dev/null +++ b/18722.zip diff --git a/LICENSE.txt b/LICENSE.txt new file mode 100644 index 0000000..6312041 --- /dev/null +++ b/LICENSE.txt @@ -0,0 +1,11 @@ +This eBook, including all associated images, markup, improvements, +metadata, and any other content or labor, has been confirmed to be +in the PUBLIC DOMAIN IN THE UNITED STATES. + +Procedures for determining public domain status are described in +the "Copyright How-To" at https://www.gutenberg.org. + +No investigation has been made concerning possible copyrights in +jurisdictions other than the United States. Anyone seeking to utilize +this eBook outside of the United States should confirm copyright +status under the laws that apply to them. diff --git a/README.md b/README.md new file mode 100644 index 0000000..a66bea5 --- /dev/null +++ b/README.md @@ -0,0 +1,2 @@ +Project Gutenberg (https://www.gutenberg.org) public repository for +eBook #18722 (https://www.gutenberg.org/ebooks/18722) |
