summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
authornfenwick <nfenwick@pglaf.org>2025-01-21 17:57:10 -0800
committernfenwick <nfenwick@pglaf.org>2025-01-21 17:57:10 -0800
commit99588c71555f9fc58565456b415cc92c61ec0a13 (patch)
tree876abdb2cbda5dd9bfb1d555cdce8b1412e10b32
parent3dcf36090bff7d969a6be12ad29286b8454fe684 (diff)
NormalizeHEADmain
-rw-r--r--.gitattributes4
-rw-r--r--LICENSE.txt11
-rw-r--r--README.md2
-rw-r--r--old/68464-0.txt6239
-rw-r--r--old/68464-0.zipbin107640 -> 0 bytes
-rw-r--r--old/68464-h.zipbin418600 -> 0 bytes
-rw-r--r--old/68464-h/68464-h.htm7629
-rw-r--r--old/68464-h/images/cover.jpgbin627125 -> 0 bytes
-rw-r--r--old/68464-h/images/i_128.jpgbin63385 -> 0 bytes
9 files changed, 17 insertions, 13868 deletions
diff --git a/.gitattributes b/.gitattributes
new file mode 100644
index 0000000..d7b82bc
--- /dev/null
+++ b/.gitattributes
@@ -0,0 +1,4 @@
+*.txt text eol=lf
+*.htm text eol=lf
+*.html text eol=lf
+*.md text eol=lf
diff --git a/LICENSE.txt b/LICENSE.txt
new file mode 100644
index 0000000..6312041
--- /dev/null
+++ b/LICENSE.txt
@@ -0,0 +1,11 @@
+This eBook, including all associated images, markup, improvements,
+metadata, and any other content or labor, has been confirmed to be
+in the PUBLIC DOMAIN IN THE UNITED STATES.
+
+Procedures for determining public domain status are described in
+the "Copyright How-To" at https://www.gutenberg.org.
+
+No investigation has been made concerning possible copyrights in
+jurisdictions other than the United States. Anyone seeking to utilize
+this eBook outside of the United States should confirm copyright
+status under the laws that apply to them.
diff --git a/README.md b/README.md
new file mode 100644
index 0000000..2cfea77
--- /dev/null
+++ b/README.md
@@ -0,0 +1,2 @@
+Project Gutenberg (https://www.gutenberg.org) public repository for
+eBook #68464 (https://www.gutenberg.org/ebooks/68464)
diff --git a/old/68464-0.txt b/old/68464-0.txt
deleted file mode 100644
index 35da375..0000000
--- a/old/68464-0.txt
+++ /dev/null
@@ -1,6239 +0,0 @@
-The Project Gutenberg eBook of Specifications for street roadway
-pavements, by Samuel Whinery
-
-This eBook is for the use of anyone anywhere in the United States and
-most other parts of the world at no cost and with almost no restrictions
-whatsoever. You may copy it, give it away or re-use it under the terms
-of the Project Gutenberg License included with this eBook or online at
-www.gutenberg.org. If you are not located in the United States, you
-will have to check the laws of the country where you are located before
-using this eBook.
-
-Title: Specifications for street roadway pavements
- with instructions to inspectors on street paving work
-
-Author: Samuel Whinery
-
-Release Date: July 6, 2022 [eBook #68464]
-
-Language: English
-
-Produced by: Richard Tonsing and the Online Distributed Proofreading
- Team at https://www.pgdp.net (This file was produced from
- images generously made available by The Internet Archive)
-
-*** START OF THE PROJECT GUTENBERG EBOOK SPECIFICATIONS FOR STREET
-ROADWAY PAVEMENTS ***
-
-
-
-
-
- SPECIFICATIONS FOR
- STREET ROADWAY PAVEMENTS
-
-
-
-
- McGraw-Hill Book Company
-
- _Publishers of Books for_
-
- Electrical World
- Engineering Record
- Railway Age Gazette
- Signal Engineer
- Electric Railway Journal
- Metallurgical and Chemical Engineering
- The Engineering and Mining Journal
- Engineering News
- American Machinist
- American Engineer
- Coal Age
- Power
-
-
-
-
- SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS
- WITH INSTRUCTIONS TO
- INSPECTORS ON STREET PAVING WORK
-
-
- BY
-
- S. WHINERY
- MEMBER AMERICAN SOCIETY OF CIVIL ENGINEERS
-
-
- SECOND EDITION
-
- REVISED, ENLARGED AND ENTIRELY RESET
-
-
- McGRAW-HILL BOOK COMPANY
- 239 WEST 39TH STREET, NEW YORK
- 6 BOUVERIE STREET, LONDON, E. C.
- 1913
-
-
-
-
- COPYRIGHT, 1913, BY THE
- MCGRAW-HILL BOOK COMPANY
-
-
- THE·MAPLE·PRESS·YORK·PA
-
-
-
-
- PREFACE TO SECOND EDITION
-
-
-In offering to the public a new edition of “Specifications for Street
-Roadway Pavements” the author has taken advantage of the opportunity to
-revise and expand somewhat the matter in the original edition and to add
-thereto Instructions for Inspectors on pavement work.
-
-Since the publication of the original pamphlet in 1907 no little advance
-has been made in the design and construction of street pavements and the
-framing of specifications for that work. Aside from the personal study
-and efforts of individual engineers, the Association for Standardizing
-Paving Specifications, organized in the latter part of 1909, has held
-four important conventions, devoted to the improvement and
-standardization of specifications for street pavements, and its able
-standing Committees have devoted much time and thought to the subject.
-The American Society of Municipal Improvements has also devoted much
-attention to the subject and has adopted standard specifications for
-most of the common kinds of pavement. Other organizations have been
-working along the same lines.
-
-Under these circumstances it might be thought that there is no longer
-any pressing need for the continuance of individual efforts in this
-field, and it has been with some hesitation that the author has returned
-to it. Without venturing to criticise the work done by these public
-organizations it has seemed to the author that there is yet room for
-individual work in this field, if for no other reason than that there
-still remain quite divergent views not only as to the substance, but as
-to the form, scope and phraseology of specifications, and contributions
-based upon some knowledge and experience in street pavement may not be
-without value in reaching final conclusions.
-
-As might be expected experience and observation during the past five
-years have, in a number of particulars, modified the author’s opinions
-and shown where the original specifications offered might be improved
-and enlarged, so that while, in the main, those now offered follow the
-original text, the reader will find not a few changes. There has also
-been added specifications for two comparatively new kinds of roadway
-pavement that have merited attention, and for concrete sidewalk and
-concrete combined curb and gutter.
-
-So far as the author is aware there has not been printed, in America at
-least, any complete and comprehensive code of instructions for pavement
-inspectors, though there appears to be a demand, as there certainly is a
-need, for something of the kind.
-
-Having been asked about a year since to prepare such a set of
-instructions for the use of one American city, the author has rewritten
-parts of them in a more general form, and they are printed (with the
-permission of the engineer for whom they were written) as Part II of
-this edition. While they would need some revision and modification to
-meet the conditions and special specification provisions in any
-particular city, it is thought they may be useful in at least suggesting
-the points to be covered.
-
-
-
-
- CONTENTS
-
-
- PART I
-
- SPECIFICATIONS
-
- =Introductory= PAGE
- Value of general specifications 1
- Theory of specifications 1
- Street paving work 2
- Specifications should be fair and just to contractor 4
- Relations of contractor to municipality 6
- Advertisements for proposals 7
- Instructions to bidders 9
- Relation between specifications and contract 9
- Specifications 9
- Preparation of specifications 9
- Engineer as arbiter 11
- Itemized unit prices 12
-
-
- SPECIFICATIONS
-
- =General= PAGE SECTION
- General description of work 13
- Definitions 14 1
- Changes in plans and specifications 15 3
- Quality of material and work 15 4
- Inspection 15 5
- Injury to persons and property 16 6
- Sanitary and public convenience 16 7–9
- Disorderly employees 17 10
- Order and progress of work 17 11
- Pavement datum 18 12
- City monuments and stakes 18 13
- Old and new material 18 14–15
- Adjusting street structures 18 16
- Connection with existing pavements 19 18
- Measurements and computations 20 21
- Incidental and extra work 20 23–24
- Guaranty 21 25
- Preparing the sub-grade 22 26
- =Foundations=
- Concrete foundations—Portland cement 24 28–29
- Sand 26 30
- Stone 26 31
- Care of materials 27 33
- Ratios 27 34
- Mixing Concrete 28 35
- Placing concrete 29 36
- Setting of concrete 29 37
- Foundation of old paving stone 30 39
- Foundation of broken stone 31 40–41
- =Sheet asphalt pavement=
- General note 33
- Crude and refined asphalts 36 43–46
- Tempering agent 38 47
- Sand 38 48
- Pulverized stone 39 49
- Asphaltic paving cement 39 50
- Composition, surface mixture 40 51
- Base course 42 52–54
- Laying asphalt pavement 42 55–58
- Plant 45 59
- =Asphalt block pavement=
- Sub-grade and foundation 46 60–61
- Asphalt block 46 62
- Composition and quality 46 63–64
- Laying blocks 48 66
- =Granite block pavement=
- Granite blocks 50 71
- Sand cushion 51 72
- Setting blocks 51 73–74
- Filling joints 52 75
- Bridge and crossing stone 55 79
- =Brick pavement=
- Sub-grade and foundation 56 80–81
- Paving brick 56 82–84
- Delivering brick 58 85
- Sand cushion 58 86
- Setting the brick 59 87–89
- Filling the joints 60 90
- =Wood-block pavement=
- Sub-grade and foundation 62 92–93
- Wood-blocks 63 94
- Creosote oil 65 95
- Preservative treatment 65 96
- Laying wood-blocks 66 97
- Filling joints 68 98
- Inspection 68 99
- Expansion joints 68 101
- =Bituminous concrete pavement=
- General note 69
- Sub-grade and foundation 70 103–109
- Bituminous concrete 71 110
- Mixing and laying 73 111–112
- =Hydraulic concrete pavement=
- Sub-grade and foundation 73 113
- Bottom course 74 115
- Top, or surface, course 74 116–120
- Expansion joints 76 121
- Bituminous surface 77 122
- =Experimental or Untried Pavements= 78 123–126
- =Concrete Curb and Gutter=
- General 80 127
- Excavation and drainage 81 128–129
- Concrete 81 130
- Weather 82 132
- Expansion joints 82 133
- Circular corners 83 134
- Steel protection 83 135
- Finishing, forms, etc. 83 136–138
- Payment for 84 139
- =Concrete Sidewalks=
- General note 84
- General dimensions 84 140
- Grading 85 141
- Drainage 85 142–143
- Bottom course 86 144
- Surface course 86 145
- Expansion joints 87 147
- Weather 88 149
- Regrading 88 150
- Repairing defects 88 151
- Measurement and payment 88 152
-
-
- PART II
-
- INSTRUCTIONS TO INSPECTORS
-
- Introductory note 91
- General remarks, inspection and inspectors 91
- General instructions 94 1–13
- Sub-foundation work general 96 14
- curbing 97 15
- rough grading 98 16
- fine grading 98 17
- incidental work 98 18
- concrete foundation 98 19
- quality of materials 98 20
- storing materials 99 21
- proportioning 99 22
- mixing concrete 100 23
- placing concrete 100 24–25
- Old paving stone foundation 101 26
- Broken stone foundation 101 27
- Sheet asphalt pavement 101 28
- inspecting at paving plant 102 29–30
- sand 102 31–33
- refined asphalt and flux 103 34–36
- asphaltic cement 103 37
- ratio, sand and cement 104 38
- mixing 104 39
- records 104 40
- Inspecting on the street 105 41–42
- temperature of mixture 105 43
- preparing street surface 105 44
- laying binder-course 106 45
- laying surface-course 106 46–50
- Asphalt block pavement 107 51–52
- Granite block pavement 108 53
- blocks 108 54
- sand cushion 108 55
- setting the block 108 56
- ramming the blocks 109 57
- filling joints 110 58
- Brick pavement 110
- inspecting the brick 110 60
- sand cushion 111 61
- setting brick 111 62
- rolling 111 63
- filling the joints 112 64–65
- Wood-block pavement 112
- inspection of blocks 112 67
- mortar bed 112 68
- setting blocks 113 69
- filling the joints 113 70
- Bituminous concrete pavement 113 71–72
- Hydraulic concrete pavement 113 73
- foundation 113 74
- surface-course 114 75–77
- expansion joints 114 78
- care of work 114 79
- Concrete combined curb and gutter 114
- concrete 115 81
- removing forms 115 82
- corner protection 115 83
- patching 116 84
- Hydraulic concrete sidewalk 116
- materials 116 86
- drainage 116 87
- two-course work 116 88
- finishing surface 116 89–90
-
-
-
-
- PART I
- SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS
-
-
-
-
- INTRODUCTORY
-
-
-In addition to their value as memoranda and aids in preparing
-specifications for a particular project, carefully prepared general
-specifications, embodying the latest approved practice, sometimes supply
-the most useful and acceptable brief treatises upon any particular
-branch of engineering work. It has been partly with this thought in mind
-that the following set of specifications for standard street pavements
-has been prepared and is now offered to city engineers and municipal
-authorities.
-
-To widen their range and increase their usefulness, copious foot notes
-have been added, referring to alternative requirements and methods of
-construction, and giving some of the reasons for the preference or
-adoption of the construction called for in the specifications. It is
-recognized that in a good many matters of detail embraced in these
-specifications there is difference of opinion among able engineers, many
-of whom are at least as competent as the writer to determine what is
-best. They are not offered in a dogmatic spirit, or with the hope that
-all the provisions found therein will be accepted. If they shall be of
-some assistance in bringing about correct standards for such
-specifications, their preparation will have been justified.
-
-Theoretically, three general classes of engineering specifications may
-be noted. In the first, the aim of the engineer is to specify the end or
-result that it is desired to secure, leaving the contractor free to
-originate and follow the methods by which these results are to be
-attained. In the second the engineer aims to secure the desired end by
-specifying in detail the materials and the methods which in his opinion
-will accomplish the purpose, he himself assuming responsibility for the
-results. Either of these two classes of specifications is permissible,
-and the engineer may choose the one which in his opinion seems best
-adapted to the character of the work to be done, and the conditions
-under which it must be prosecuted.
-
-In the third class of specifications, met with more frequently than they
-should be, the engineer undertakes to prescribe not only the character
-of the materials to be used and the methods to be pursued, but also the
-results to be attained. The position thus assumed is illogical, and
-often unreasonable, and may lead to complications between the engineer
-and the contractor. If a contractor be required to turn out a product
-which shall conform to certain standards, he may properly be given much,
-if not full latitude, as to how the stipulated results shall be secured,
-and may be held fully responsible for the outcome; if on the other hand
-the engineer chooses to specify with more or less minuteness the
-character of the materials to be used and the methods of construction to
-be followed, and enforces compliance therewith, it seems fair and just
-that he should assume responsibility for the results produced, and
-therefore unfair to hold the contractor to responsibility for
-consequences arising from the use of materials and methods which he was
-allowed no choice or latitude in selecting.
-
-In street paving work, of well-known and standard character, the second
-class of specifications seems preferable for a number of reasons, the
-leading one being that the time required to develop the good or bad
-quality of the work must usually extend over a considerable number of
-years, and the conditions to which the pavement may be subjected in the
-meantime are likely to vary so widely that it may be very difficult, if
-not impossible, to prescribe a satisfactory standard of service and
-endurance. Disputes are therefore liable to arise between the
-municipality and the contractor as to the latter’s liability, or
-conditions may make it difficult or impossible to hold the contractor to
-strict account for that liability.
-
-It is believed that in the present state of the art it is entirely
-practicable to so frame specifications for the materials to be used and
-the methods to be followed in the construction of standard street
-pavements, and to so enforce compliance therewith, that the engineer and
-the municipality may safely assume responsibility for the quality of the
-work produced. While it may be true that local conditions sometimes make
-it very difficult to enforce compliance with specifications, the same
-conditions are likely to make it at least equally difficult to secure
-effective responsibility on the part of the contractor for any
-long-period guarantee of the work done by him; and the contractor who
-negligently or purposely violates the specifications during construction
-is not likely to be more faithful or scrupulous in living up to any
-guarantees he may make with regard to the future, even where the terms
-and conditions of such guarantees may be clearly defined and
-indisputable. The writer has discussed the subject of time guarantees as
-applied to street pavements pretty fully in his book, “Municipal Public
-Works,” and the above brief statement seems all that is necessary here.
-
-In conformity with this view of the matter, the following specifications
-aim to set out as definitely and clearly as practicable the requirements
-for the construction of good pavements of the several standard kinds,
-and it is assumed that the engineer will be able to, and will enforce
-them.
-
-It is, however, not infrequently the case that the engineer will be
-called upon to prepare specifications for new, or patented, or
-proprietary pavements advocated by their promoters, the value or
-usefulness of which have not been sufficiently established by
-experience, and for which the data for detailed, definite specifications
-are not yet available.
-
-In such cases the wisest course to follow is to confine the precise
-specifications to the general or standard parts of the work, while
-stipulating only the _results to be attained_ with regard to those
-features of the work that are proprietary or questionable, thus placing
-upon the promoter or his contractors full responsibility for such
-results as are promised or guaranteed. This applies to new or
-comparatively untried materials or processes, whether patented or not.
-
-A proposed form of general specifications to cover such cases is offered
-herein.
-
-It is usually unwise to adopt or to incorporate in the municipal
-specifications those prepared or offered by the promoter or patentee,
-which are often brief, incomplete, and indefinite, and are sometimes
-carefully, and even cunningly, drawn to evade final responsibility.
-
-No attempt has been made to submit specifications for proprietary or
-patented pavements, or those composed wholly or in part of materials
-which are patented or protected by trade-marks. The owners or
-contractors engaged in constructing these pavements, often, if not
-usually, claim the right to dictate the material parts of the
-specifications under which such work shall be done, and the municipal
-engineer who is called upon to construct such pavements, must, in each
-case, determine whether the specifications offered are adequate and
-satisfactory, and the extent to which he feels justified in accepting
-responsibility for the results. Naturally, the contractor or promoter,
-even if competent to prepare specifications, cannot be expected to bind
-himself within closer limits than he thinks necessary to secure the
-work. In many such cases the form of general specifications for “untried
-or experimental pavements” given herein might appropriately be used.
-
-The engineer is, in common with all men, fallible, and he can hardly
-hope, in the preparation of specifications, to make them perfect; to
-cover every item and particular; or to escape some ambiguities of
-expression, and some degree of indefiniteness. The writer can only claim
-that he has aimed, in the light of a considerable experience, to set out
-as fully and definitely as practicable the requirements for the proper
-construction of high-class street pavements, and has endeavored to avoid
-loose or obscure terms and expressions. The ideal specification is one
-that furnishes a wholly sufficient guide to the accomplishment of the
-desired purpose; that provides for every possible contingency which may
-arise, and is couched in language which not only means exactly what it
-was intended to mean, but is incapable of any other interpretation. It
-is needless to say that no example of such a perfect specification can
-be instanced as a model.
-
-It has been the aim to make these specifications fair and just to the
-contractor; that is, to require of him no impracticable or indefinite
-service, or the assumption by him of risks other than those fairly
-involved in the business conduct of the work.
-
-If the plans and specifications for any work which a contractor bids
-upon are so full, specific, and clear, that he may know exactly what he
-will be expected to do, and if they do not require him to assume unusual
-chances and risks, he may intelligently name prices which he believes
-will compensate him for the service. Having done so, his proposal having
-been accepted, and a contract entered into accordingly, the engineer and
-the municipality have a right both in law and equity to demand that he
-will do exactly and fully what he has contracted to do. No excuses on
-his part can be valid and none should be accepted. He may in all
-fairness and justness be required to “toe the mark” strictly. To the
-neglect to recognize and enforce these principles is chargeable the
-greater part of the poor and unsatisfactory work so common in street
-pavement work in our cities. Unexpected contingencies may, of course,
-arise where some changes and concessions may be proper and just, but
-these should be, and usually are, very rare. On the other hand, sweeping
-general clauses in contracts and specifications intended to catch the
-contractor “goin’ or comin’,” unnecessarily stringent stipulations which
-were never intended to be strictly enforced, but were put into the
-specifications with the idea that they would help hold the contractor up
-to a high standard, and “one-sided” contracts intended to give the
-municipality an unfair advantage over the contractor, are as inadvisable
-in policy as they are wrong in principle. Nothing should be put in a
-specification that is not clearly essential to secure the results aimed
-at, and, this having been done, every requirement should be enforced.
-The existence in specifications of requirements that are not intended to
-be enforced, gives the contractor a pretext for neglecting others that
-may be important.
-
-In these specifications will be found a number of details that are often
-not regarded as important and which, when found in paving
-specifications, the contractor is frequently allowed to ignore. In the
-writer’s opinion, based upon his experience in street paving, every one
-of these requirements is essential to the production of high-class work,
-which, it is hardly necessary to argue, is, in the end, the most
-economical work from the standpoint of the municipality.
-
-It may be argued that the adoption and enforcement of these
-specifications would have the effect of raising prices. In many cases
-this would doubtless prove true. Contractors are entitled to a fair and
-reasonable compensation for their services. It is admitted that in some
-cities the prevailing prices for some kinds of pavements are below the
-actual cost of the work if it were done in a proper manner, conforming
-strictly to the specifications. Illogical as it undoubtedly is, the low
-price at which work is taken is sometimes considered a sufficient reason
-for accepting work below standard. The consequence is that bidders not
-only count upon concessions and lax enforcement of the specifications,
-but bid lower and lower, expecting that further concessions will enable
-them to get out with an undeserved profit. This is one of the most
-serious evils in the paving business to-day, and the highest public
-interests demand a thorough reform. Low first cost, desirable as it may
-be, is the poorest economy if it be secured at the sacrifice of the
-quality of the work. If one pavement costs twenty per cent. more than
-another, but renders forty per cent. more service, it is obviously the
-cheaper of the two.
-
-Contractors are prone to contend that this or that provision in a
-specification is unusual, unnecessary or unfair. In dealing with them
-the engineer should bear in mind that no requirement of a specification
-that is clearly and definitely stated, so that the bidder may understand
-exactly what it means and what he will be expected to do, and may frame
-his prices accordingly, can be unreasonable or unfair to the contractor.
-Unusual or unnecessary requirements may result in unwarrantably
-increasing the cost of the work, and this may raise a question between
-the engineer and the municipality employing him, but it can furnish no
-occasion for questions of fairness or unfairness between the contractor
-and the engineer.
-
-The relations that should exist between the contractee and the
-contractor, and the attitude of the engineer toward the contractor have
-been widely discussed and are quite well understood from both the
-ethical and legal standpoint.
-
-It is well to bear in mind that when a contract is duly entered into,
-both the parties thereto are equal before the law. Neither can impose
-upon the other terms or conditions that are not clearly included in or
-to be fairly inferred from the contract itself. The assumption that
-either party has superior or extra rights not expressed or to be fairly
-inferred from the written agreement, or in accordance with the
-established rulings of the courts, is wholly without warrant. The
-smallest contractor is, in this respect, upon an equal footing with the
-largest city government for which he may undertake to do contract work.
-It is not infrequently the case that the city assumes a superior and
-dictatorial attitude not in harmony with these principles, and it is too
-common for the contractor to seek to evade or to escape from clear
-contractural obligations. In neither case is the action warranted by
-fairness, justice, or law.
-
-It should be needless to say that the attitude of the engineer toward
-the contractor should be one of unyielding and uncompromising
-requirement that the contract and specifications shall be fully and
-faithfully complied with, but at the same time one of absolute fairness
-and even helpfulness to the contractor. The ideal relation, which should
-be more commonly attainable than it appears to be, is that of helpful
-cooperation to bring about the results the contract and specifications
-were intended to secure.
-
-In line with the principles here outlined some observations upon the
-preparation of contracts and specifications are appropriate.
-
-It is the general practice to include in and make a part of “The
-Contract” (herein for convenience called The General Contract) all the
-various documents that are supposed to relate directly to the
-transaction as a whole. The separate parts of such a general contract
-may vary in number or character, but the principal ones are the
-following:
-
-1. The advertisement for proposals.
-
-2. Instructions to bidders.
-
-3. The proposal submitted.
-
-4. The contract proper.
-
-5. The specifications.
-
-Each of these should be drawn to cover fully and clearly its appropriate
-purpose or function but _nothing more_. It is not unusual to find, even
-in the instructions to bidders, stipulations that properly belong in the
-contract or specifications, and it is quite common to find in the
-contract proper a lot of matter that properly belongs in the
-specifications only. In such cases there is liable to be more or less
-confusion as to the actual meaning or requirements of the general
-contract as a whole, which may lead to serious misunderstandings and
-complications between the parties thereto. The several documents
-composing the general contract are likely to be prepared by different
-persons, looking at the transaction from different points of view, and
-often not wholly familiar with the scope, intent and language of the
-other documents. There is therefore a possibility, at least, of
-indefinite, if not of conflicting expressions which are open to
-different interpretations, particularly in the light of special or
-unexpected conditions that may arise during the progress of the work or
-the settlement therefor. It would tend to eliminate or avoid the
-possibility of such complications if each of the several documents
-confined itself strictly to its appropriate function in the general
-contract.
-
-Advertisements for proposals may be divided into two general classes.
-The one is brief in form and substance, simply stating that proposals
-for a certain named work will be received at a stated place and time,
-and referring those interested to documents on file at a stated place
-for all further information. This is the general form adopted by the
-United States War Department for the many projects carried out by
-contract under its direction. A sample advertisement taken from a
-current technical journal is as follows;
-
- TREASURY DEPARTMENT, OFFICE OF the Supervising Architect, Washington,
- D. C., October 10, 1912. Sealed Proposals will be received at this
- office until 3 o’clock p. m. on the 1st day of November, 1912, and
- then opened, for an electric passenger elevator in the United States
- post office, Bellingham, Wash., in accordance with the drawing and
- specification, copies of which may be had at this office at the
- discretion of the Supervising Architect. OSCAR WENDEROTH, Supervising
- Architect.
-
-The other general class of advertisement, very commonly used by
-municipal corporations, is much longer and more elaborate, giving a
-condensed statement of the character of the work to be done, the
-conditions under which proposals are invited and will be received, and a
-schedule of the quantities of work involved, together with other
-particulars. A typical example of such an advertisement, taken from the
-same periodical, is here given:
-
- PUMPING MACHINERY—ROSELAND PUMPING STATION
-
- DEPARTMENT OF PUBLIC WORKS
-
- CHICAGO, ILL., October 2, 1912.
-
- Sealed proposals will be received by the City of Chicago until 11 A.
- M. Wednesday, October 30, 1912, at Room 406, City Hall, for furnishing
- and erecting at Roseland Pumping Station one vertical triple expansion
- crank and fly wheel pumping engine of a capacity of twenty-five
- million (25,000,000) gallons per day against a normal head of one
- hundred and forty feet (140′). This proposal also includes the
- dismantling of a similar engine now at Lake View Pumping Station,
- transporting and erecting it at Roseland Pumping Station, together
- with the furnishing and erection of certain auxiliaries and
- appurtenances, according to plans and specifications on file in the
- office of the Department of Public Works of said city, Room 406, City
- Hall.
-
- Proposals must be made out upon blanks furnished at said office, and
- be addressed to said Department, indorsed “Proposals for Pumping
- Machinery, Roseland Pumping Station,” and be accompanied with Five
- Thousand ($5,000) Dollars in money or a certified check for the same
- amount on some responsible bank located and doing business in the City
- of Chicago and made payable to the order of the Commissioner of Public
- Works.
-
- The Commissioner of Public Works reserves the right to reject any or
- all bids. A deposit of One Hundred Dollars ($100) will be required to
- insure safe return of the plans.
-
- No proposal will be considered unless the party offering it shall
- furnish evidence satisfactory to the Commissioner of Public Works of
- his ability, and that he has the necessary facilities together with
- sufficient pecuniary resources to fulfill the conditions of the
- Contract and Specifications, provided such Contract should be awarded
- to him.
-
- Companies or firms bidding will give the individual names as well as
- the name of the firm with their address.
-
- L. E. McGANN,
- _Commissioner of Public Works_.
-
-Such advertisements as this may be required by statutes or ordinances,
-and in that case are, of course, proper and necessary. Even where not so
-required they may be considered advantageous, because they give
-prospective bidders more complete information as to the character and
-magnitude of the work, and may enable them to decide at once whether
-they care to pursue the matter further. But on the whole, the shorter
-form of advertisement, if permissible, seems preferable, because it
-refers the enquirer directly to the original and official sources of
-information, the forms to be used, the contract, specifications and
-estimated quantities of work, exactly as they will and must be presented
-to all bidders, and as they will appear in the subsequent stages of the
-transaction, and leaves, therefore, no room for possible confusion of
-statements between the advertisement and the other documents.
-Furthermore, the cost of the shorter form of advertisement is much less,
-and this is often a matter of some importance.
-
-Instructions to bidders should be confined strictly to such information
-and directions as the bidder may need to properly and intelligently make
-up and submit his proposal in accordance with the requirements relating
-thereto. This should include primarily, a reference to the contract and
-specifications for all general and detailed information about the work
-to be done, but should carefully avoid any statements or language that
-might be construed to add to, take from, limit or modify the contract or
-specifications. Perhaps the briefest and best statement of what this
-document should or should not contain is that it should be so framed
-that, except as a matter of record, its office and usefulness should
-absolutely end with the award and signing of the contract.
-
-No one who is not a lawyer can presume to say just what the contract
-proper should contain or cover, particularly as this may vary with the
-requirements of statutes and ordinances in force in a given city. It
-would seem logical and proper, however, to separate the special
-functions of contracts and specifications in such a way that each should
-cover a distinct field of its own, and be free from encroachment upon
-the proper domain of the other. With such a conception of the proper
-domain of each, one might safely say that the contract should undertake
-to set out only the legal and contractural relations of the parties
-thereto, and should refer to the plans and specifications for all
-detailed instructions as to the actual performance of the work and the
-results to be secured.
-
-In the preparation of specifications for any public work the main points
-to be kept in mind are fulness, definiteness, and exact expression.
-While brevity and conciseness are desirable qualities in any document,
-they should not be secured at the expense of completeness and precision
-of statement. Even the frequent repetition of words, phrases and
-sentences throughout a document, where it is necessary to avoid the
-possibility of misunderstanding or ambiguity, should be resorted to
-freely. Exact description and definition are more important than
-literary style, though they may often be successfully combined. Of
-course, it is not possible or necessary to go into minute detail with
-regard to every part of the work. Certain things may be safely assumed
-to be required by established practice or trade usage. If, for instance,
-it is specified that certain lumber shall be “dressed” this word has a
-well-understood meaning in the trade and it is unnecessary to stipulate
-how the dressing shall be done or its character or quality, though it
-may be necessary to say whether it is to be dressed on one or more
-sides.
-
-The proper preparation of specifications for any work involves a clear,
-distinct and complete conception, determination and design of what is to
-be done; of the conditions that are likely to be met with in carrying it
-out; and of alternate plans that these conditions may necessitate. This
-may not always be possible, for the engineer is not omniscient. But
-careful study and maturity of design will enable him to avoid the great
-majority of such indefinite expressions as “or in such other manner as
-the engineer may direct,” “in accordance with the instructions of the
-engineer,” etc. A great many of the items to which such expressions are
-intended to and do apply in practice, could be definitely settled before
-the specifications are prepared and thus all uncertainty on the part of
-both engineer and contractor be avoided. To illustrate: specifications
-for block pavement commonly stipulate that the blocks shall be set in
-rows running at right angles to the axis of the street, except at street
-intersections, where the engineer may direct them to be laid at a
-different angle. There is usually no good reason why the engineer should
-not determine beforehand at which, if any, street intersections the
-general rule should be changed and so state in the specifications. These
-may be and usually are unimportant matters which may not much affect one
-way or the other the cost to the contractor. But they often prove
-otherwise, and the contractor is entitled to know when he submits his
-proposal just what he will be required to do. Of course it may develop
-during the progress of the work that changes from the original plan will
-become necessary, but these should be provided for in some such definite
-and previously stipulated manner as outlined in Sect. 3 of the following
-specifications.
-
-The practice of inserting, either in the specifications or the contract,
-a clause making the engineer judge and arbiter in any differences that
-may arise between the city and the contractor, and providing that his
-decision in all such cases shall be final, is as unwise as it is often
-illegal. Such clauses are based on the assumption that the engineer is a
-competent as well as a disinterested party in the transaction, an
-assumption that is usually wholly wrong, though to their honor it may be
-said that the confidence thus reposed in engineers is seldom abused. But
-the fact is that the engineer is never actually a disinterested party.
-He is employed and paid by the city to look after its interests, and is
-under no obligations to the contractor other than those named in the
-contract and specifications and his sense of justice, propriety and
-professional honor. He would be recreant to his duty if in all nicely
-balanced matters of doubt he did not espouse the side of his employer.
-Moreover, his personal interests are often involved. Having prepared the
-plans, specifications and estimates for the work, he is naturally and
-properly anxious that it shall be successful and that the cost shall not
-exceed that estimated. Under all these conditions it is hardly possible
-for any human being to be a wholly disinterested and unprejudiced judge.
-No broad-minded and conscientious engineer desires to be placed in such
-a difficult position, and it is as unfair as it is unwise and improper
-to require him to assume it.
-
-There are, however, a number of matters of fact in reference to which it
-is proper and necessary to make the judgment and decision of the
-engineer controlling and final, unless it may be shown that his decision
-is clearly erroneous or affected by improper motives, or by fraud. Some
-one must necessarily be made the immediate and final judge as to whether
-the quality of materials and workmanship is in accordance with the
-requirements of the plans and specifications, and as to the quantity of
-work actually performed, and these duties and responsibilities are very
-properly placed upon the engineer.
-
-It not infrequently occurs that specifications are not drawn as clearly
-as they should be in the matters of methods of measuring the work and of
-applying contract unit prices, and indefiniteness and carelessness in
-this regard are often a source of misunderstanding and dispute between
-the engineer and the contractor. It is a good practice, followed by many
-able engineers, after specifying how a certain part of the work shall be
-done, to state how it shall be measured and paid for at the contract
-unit prices.
-
-In many respects it is desirable that all the work to be done under
-contract should be quite fully itemized, and a unit price named for each
-kind of work. It is the custom in many cities to name only certain
-leading items of the work to be done under a paving contract, as for the
-pavement complete, furnishing and setting new curbing, redressing and
-resetting old curbing, and possibly a few other leading items, and to
-require that all necessary incidental work shall be done by the
-contractor without cost to the city; or, in other words, he must take
-this possible extra work into consideration in naming his unit prices
-for the leading items of the work. As the quantity of this incidental
-work is often not stated, and the contractor has no means of
-ascertaining it, he must guess, as intelligently as he may be able, how
-much he should add to his unit prices to cover its cost. If he is a
-prudent contractor he will be sure to add enough to prevent any possible
-loss on this account. In most cases the quantities of this incidental
-work can be determined and scheduled by the engineer with the more
-important items, and the contractor may be required to name unit prices
-for it. True, there are likely to develop during the progress of the
-work some items that could not be foreseen or that were overlooked. In
-some cities such contingencies are provided for by a clause in the
-contract or specifications scheduling, by name, all the incidental minor
-items of work that experience has shown are likely to be met with in
-street paving contracts, and naming fair unit prices which the
-contractor will be paid for each, should it occur. The contractor may
-then feel assured that however much the quantity of such incidental work
-may vary, he will receive compensation proportionate thereto, and he may
-name his prices for the main items with more confidence. Under such
-conditions it is reasonable to expect closer figures than he would be
-willing to name if an unknown quantity of incidental work for which no
-separate pay is provided had to be taken into consideration.
-
-Sub-division of unit prices is also desirable in order that the engineer
-may be able to analyze and record the elements that make up the
-aggregate cost of the work. Thus, in the case of the construction of a
-new sheet asphalt pavement it is common to ask for a single price for
-the pavement complete, including a five year guarantee. Now the work
-will consist of several distinct operations or kinds of work for each of
-which a separate price might be named:
-
-1. The grading of the street and preparation of the sub-grade. The
-quantity of this work will vary on different streets and is best
-reckoned by the cubic yard of material excavated.
-
-2. A price, either per cubic yard or per square yard for the concrete
-foundation.
-
-3. A price per square yard for the asphalt pavement proper. This might,
-if desired, be sub-divided into separate prices for the base-course and
-the surface-course.
-
-4. A price per square yard for guaranteeing the pavement for five years.
-
-Such sub-division would, it is true, increase the work of final
-computation but if of no other value, the detailed costs would be a
-great aid to the engineer in estimating the reasonable cost of future
-work where the relative quantity of these detailed parts varied.
-
-
-
-
- SPECIFICATIONS
-
-
- For Grading and Paving, or Repaving
-
- with.. ........ ........ .............. .... Pavement
- on a... ......... .......... ...... Foundation, the Roadway
- of..... ........ ........... ............ . ............
- Street, from...... .......... ............. .............
- to. ....... ....... ........... ............ ........
- together with work incidental thereto.
-
-
- GENERAL DESCRIPTION OF WORK
-
-The work embraced in and to be done under this contract consists of
-grading the entire street from curb to curb between the limits named,
-including the removal or readjustment of the pavement now on the
-roadway, setting and resetting curbing, laying or relaying sidewalks
-where required, furnishing all new material and performing all the labor
-required for paving the roadway, together with all incidental work
-necessary to complete the whole in a proper manner, in accordance with
-the contract, the plans on file in the office of the City Engineer,
-these Specifications and the instructions of the City Engineer, herein
-referred to as the Engineer, or his authorized agents.
-
-
- REFERENCES
-
-The numbered divisions of these specifications are herein designated as
-“sections,” each being referred to by the number standing at its
-beginning. Where reference is herein made to any such section number it
-shall be considered equivalent to a quotation of that section.
-
-The plans and drawings relating to this work, on file in the office of
-the City Engineer are designated as ...
-
-=1. Authority.=—Wherever, in these specifications, the words, the City,
-are used, they shall be understood to refer to the duly constituted
-municipal government of the city of ... or its authorized agents, acting
-within the authority specifically conferred upon them by the said
-municipal government.[1]
-
-Wherever, in these specifications, the words, the Engineer, shall be
-used, they shall be understood to refer to the City Engineer of said
-city, or his deputies or assistants, acting within the authority
-conferred upon them by the City Engineer.
-
-But no agent of the city shall have power to revoke, alter, enlarge or
-relax the stipulations or requirements of these specifications, except
-in so far as such authority may be specifically conferred in or by the
-specifications themselves, without the formal authorization so to do,
-conferred by the contract of which these specifications are a part, or
-by ordinance, resolution or other usual official action of the city.[2]
-
-=2. Interpretation.=—In case of any actual or alleged disagreement or
-discrepancy between the contract, these specifications, and the plans
-for the work on file in the office of the Engineer, the language and
-provisions of the contract shall take precedence and prevail; and the
-Engineer shall determine in each case whether the specifications or the
-plans shall be followed.
-
-=3.= The Engineer shall have the right to make such changes in the plans
-and specifications of the work as he may deem necessary or desirable or
-to provide for unexpected conditions or contingencies that may develop
-at any time after the signing of the contract, or during the progress,
-or before the final acceptance of the work; provided that all such
-changes do not involve an aggregate increase or decrease in the cost of
-the work, as shown by his estimates, of more than ten (10) per cent. The
-contractor shall accept such changes when made, as a part of the
-original contract and specifications, subject to all the provisions and
-conditions thereof. But before any such changes shall become valid and
-before the contractor shall begin the particular work involved in such
-changes, the increased or decreased cost of the work by reason of such
-changes, above or below what it would have been under the original plans
-and specifications, shall be agreed upon in writing between the engineer
-and the contractor. And when the whole work, including such changes,
-shall have been completed and accepted by the engineer, the sum or sums
-so agreed upon shall be added to or deducted from the sum that would
-have been due the contractor if no such changes had been made.
-
-=4. Quality of Material and Work.=—The judgment and decision of the
-Engineer as to whether the materials supplied and the work done under
-this contract comply with the requirements of these specifications,
-shall be conclusive and final. No material shall be used in the work
-until it has been examined and approved by the Engineer, or his
-authorized agents. All rejected material must be promptly removed from
-the work and replaced with that which is acceptable to the Engineer, and
-all improper or defective work must be corrected, and, if necessary,
-removed and reconstructed so as to comply with these specifications and
-the instructions of the Engineer.
-
-In all matters of detail not specifically covered by the specifications
-the work shall be well and skillfully done in accordance with the best
-trade or art customs and standards for work of like character and
-purpose.
-
-=5. Inspection.=—The Engineer may provide for the inspection, by
-assistants and inspectors under his direction, of all materials used and
-all work done under this contract. Such inspection may extend to all or
-any part of the work, and to the preparation or manufacture of materials
-to be used, whether within the limits of the work on the street, or at
-any other place. The Engineer and his inspectors shall have free access
-to all parts of the work, including mines, quarries, manufactories, or
-other places where any part of the materials to be used is procured,
-manufactured or prepared. The Contractor shall furnish the Engineer all
-information relating to the work and the material therefor which the
-Engineer may deem necessary or pertinent, and with such samples of
-materials as may be required. The Contractor shall, at his expense,
-supply inspectors with such labor and assistance as may be necessary in
-the handling of materials for proper inspection. Inspectors shall have
-authority to reject defective material and to suspend any work that is
-being improperly done, subject to the final decision of the Engineer.
-Inspectors shall have no authority to permit deviations from, or to
-relax any of the provisions of these specifications without the written
-permission or instruction of the Engineer; nor to delay the Contractor
-by failure to inspect materials and work with reasonable promptness.
-
-The payment of any compensation, whatever may be its character or form,
-or the giving of any gratuity, or the granting of any valuable favor, by
-the Contractor to any inspector, directly or indirectly, is strictly
-prohibited, and any such act on the part of the Contractor will
-constitute a violation of these specifications.[3]
-
-=6. Injuries to Persons and Property.=—The Contractor shall be held
-alone responsible for all injuries to persons, and for all damages to
-the property of the city or others, caused by or resulting from the
-negligence of himself, his employees or agents, during the progress of,
-or connected with the prosecution of the work, whether within the limits
-of the work, or elsewhere. He must restore all injured property,
-including sidewalks, curbing, sodding, pipes, conduits, sewers and other
-public or private property to a condition as good as it was when he
-entered upon the work.
-
-=7. Sanitary Conveniences; Nuisances.=—The Contractor shall provide all
-necessary privy accommodations for the use of his employees on the
-street, and shall maintain the same in a clean and sanitary condition.
-He shall not create nor permit any nuisance to the public or to
-residents in the vicinity of the work.
-
-=8. Public Convenience.=—No material, or other obstruction shall be
-placed within five feet of fire hydrants, which must be at all times
-readily accessible to the Fire Department.
-
-During the progress of the work the convenience of the public and of the
-residents along the street must be provided for as far as practicable.
-Convenient access to driveways, houses and buildings along the street
-must be maintained wherever possible. Temporary approaches to and
-crossings of intersecting streets and sidewalks must be provided and
-kept in good condition, wherever practicable.
-
-=9. Barriers, Lights, Watchmen.=—The Contractor shall provide and
-maintain such fences, barriers, “street closed” signs, red lights, and
-watchmen as may be necessary to prevent avoidable accidents to residents
-and to the public.
-
-=10. Disorderly Employees.=—Disorderly, intemperate, or incompetent
-persons must not be employed, retained, or allowed upon the work.
-Foremen or workmen who neglect or refuse to comply with the instructions
-of the Engineer, shall, at his request, be promptly discharged, and
-shall not thereafter be re-employed without his consent.
-
-=11. Order and Progress of Doing Work.=—The work under this contract
-shall be prosecuted at as many different points, at such times, and in
-such sections along the line of the work, and with such forces as the
-Engineer may from time to time deem necessary, and direct, to secure its
-completion within the contract time. Not more than one thousand (1,000)
-linear feet of the street shall be torn up, obstructed or closed to
-travel at any one time without the written permission of the Engineer.
-Completed portions of the pavement shall be opened to travel as directed
-by the Engineer, but such opening shall not be construed as an
-acceptance by the City of the work done. Where thus opened to public
-travel by the direction of the Engineer, the Contractor will not be held
-responsible for injuries to the work caused by such travel or public
-use, pending the final completion and acceptance of the whole work.
-
-=12. Grade and Contour of Pavement.=—Roadway pavements shall be laid to
-such grades, crown and contour of surface as the plans may show or the
-Engineer may direct, and the surface of the completed pavement shall
-conform accurately to such grades, crown and contour. The designed
-surface of the completed pavement shall be considered as the datum or
-plane of reference in fixing the location or level of the sub-grade, of
-the pavement foundation, and of structures connected therewith. It will
-be hereafter referred to in these specifications as “The pavement
-datum.”
-
-=13. City Monuments or Stakes.=—The Contractor must carefully protect
-from disturbance or injury all city monuments, stakes and benchmarks,
-and shall not excavate nearer than five feet to any of them without the
-permission of the Engineer; or until they have been removed, witnessed,
-or otherwise disposed of by the Engineer.
-
-=14. Old Material.=—All material or structures removed from the street
-and not required for the new construction, but which the city may desire
-to reserve, shall be delivered and neatly piled up in a corporation yard
-or elsewhere, by the Contractor, as the Engineer may direct. Such
-reserved material shall be considered in the custody of the Contractor
-until delivered at the place designated, and he will be held responsible
-for its care and protection, and must make good any losses occasioned by
-damage, theft, or misappropriation while it is on the street or en route
-to the place of storage. If the Contractor shall be required to haul
-such reserved material more than one-half mile, he shall be paid a
-reasonable price, to be agreed upon in advance, for the haul exceeding
-that distance.
-
-Material taken from the work which is to be used in the new construction
-shall be compactly piled where it will least obstruct the sidewalks or
-adjoining sections of the street, and properly protected by the
-Contractor until it is required for use.
-
-All old material removed from the work, including the material excavated
-in preparing the sub-grade, not reserved by the City nor to be used
-again in the work, shall belong to the Contractor and must be removed by
-him from the street as promptly as possible. It must not be placed on
-the sidewalks or adjacent streets, nor on any other street or property
-belonging to the City, nor on the property of private owners, without
-the written consent of the Engineer, or the owner of the property.
-
-=15. Storage of New Material.=—The material for construction when
-brought upon the street shall be neatly piled so as to cause as little
-obstruction to travel as possible, and so that it may be conveniently
-inspected.
-
-=16. Rebuilding and Adjusting Street Structures.=—Catch basins, manhole,
-sewer and water frames and covers, sewer inlets, water pipes and other
-conduits, belonging to the City and within the limits of the work,
-shall, if necessary, be reset to the new lines and grades of the street
-and for this purpose good brick masonry of the original thickness, laid
-in Portland cement mortar shall be used. Great care must be taken to set
-all such structures as project through the pavement exactly to the grade
-and contour of the new street surface, and any defects in the conformity
-of such structures to the pavement datum, discovered at the time, or
-during the progress of the work, or during the guaranty period,
-stipulated in Sec. 25 shall be promptly remedied by the Contractor.
-
-=17. Clean Sidewalks.=—During the progress of the work, the sidewalks
-and portions of the street adjoining the work, or in its vicinity, must
-not be obstructed or littered more than may be absolutely necessary, and
-the adjacent sidewalks must be kept clean.
-
-=18. Connection With Existing Pavements or Streets.=—Wherever a new
-pavement joins or abuts against an existing pavement of a different
-kind, or an unpaved street, either at the end of the new pavement or at
-cross or intersecting streets, a line of stone headers shall be provided
-and set. The stone shall be of sound, hard limestone, sandstone, granite
-or bluestone, free from injurious imperfections. The separate stones
-shall be not less than three (3) feet long, at least eighteen (18)
-inches deep, not less than four and one-half (4½) inches wide at the
-top, nor less than three (3) inches wide at the bottom. The top shall be
-of uniform width for each line of headers, and shall be dressed square
-and even. The ends shall be dressed to secure a joint not wider than
-one-half (½) inch for a depth of six inches from the top, and the sides
-dressed so as to secure good contact and close jointing with the
-pavement. The stones shall be set accurately with their tops at the
-pavement datum, on a bed of concrete nine (9) inches wide and six (6)
-inches deep, and after being set the trench shall be filled and rammed
-full of gravel or crushed stone.
-
-All existing pavements adjoining or abutting against the new pavement,
-with their crosswalks, curbs, and gutters, shall be adjusted, or taken
-up and relaid, to conform to and connect with the pavement datum, to
-such an extent as the Engineer may direct.
-
-Where the new and adjoining pavement are of the same kind, and headers
-are not used, the new and the old pavement must be properly joined and
-connected, as the Engineer may direct.
-
-Stone headers will be paid for by the linear foot at the contract price
-for that item, and the other work embraced in this section will be paid
-for at the contract prices for the several items, where such contract
-prices are provided; otherwise the work shall be considered as
-incidental work and shall be done at the expense of the Contractor.
-
-=19. Curbing to be Completed in Advance.=—The setting of all new curbing
-and guttering and the redressing, resetting or readjustment of all old
-curbing must be completed at least 100 feet in advance of the
-construction of the street foundation.
-
-=20. Final Cleaning Up.=—Immediately after the completion of the work or
-any consecutive portion of it, the Contractor shall remove from it all
-unused material, refuse and dirt placed by him on, or in the vicinity of
-the work, or resulting from its prosecution, and restore the street to a
-condition as clean as before the work was begun; and the new pavement
-shall be properly cleaned.
-
-=21. Measurements and Computations.=—Unless otherwise distinctly
-provided in the contract and specifications, measurements, computations
-and payments will be based upon the actual quantities of completed work,
-customary or conventional methods of measurement and computation to the
-contrary notwithstanding.
-
-The area of street pavement shall be reckoned in square yards of
-completed pavement surface, deducting manholes, inlets and other
-openings in the surface of the pavement having an area of over three (3)
-square feet. Unless separately paid for under the contract, stone
-headers and crosswalks will be measured as a part of the pavement
-surface.
-
-=22.= The price for the pavement per square yard shall, unless otherwise
-stated herein, include the preparation of the sub-foundation, the
-construction of the foundation, the cushion course, and the pavement
-complete, including all the materials and labor required therefor.
-
-=23. Incidental Work at Contractor’s Expense.=—All the work to be done
-by the Contractor for which specific unit prices are not named in the
-contract, specified and enumerated in Sections 4, 5, 6, 7, 8, 9, 12, 13,
-14, 15, 16, 17, 18, 19, and 20, as well as any minor details of work not
-specifically mentioned in the specifications, but obviously necessary
-for the proper completion of the work, shall be considered as
-incidental, and as being a part of and included with the work for which
-prices are named in the contract. The Contractor will not be entitled to
-any extra or additional compensation therefor.
-
-=24. Extra Work.=—The City may require the Contractor to furnish such
-additional materials and to do such additional work, not provided for in
-the contract and these specifications, but which may be found necessary
-or pertinent to the proper prosecution and completion of the work
-embraced in the contract, at prices to be agreed upon in writing, in
-advance. But no work other than that included in the contract and these
-specifications and which is covered by and to be paid for at the prices
-named in the contract, shall be done by the Contractor except upon a
-written order from the Engineer, which order shall describe the work to
-be done and name the compensation agreed upon therefor. In the absence
-of such written order from the Engineer the Contractor will not be
-entitled to payment for any such additional or extra work.
-
-In the same manner the city may omit or dispense with items or parts of
-the work, by previous agreement with the contractor, and a like written
-order by the engineer. But such additions, omissions or alterations
-shall not together increase or decrease the aggregate cost of the whole
-work more than fifteen per cent. (15%). Any changes in the plans,
-specifications, character of material used or method of doing the work
-that may increase or decrease the aggregate cost of the work more than
-fifteen per cent. (15%) may be authorized and validated only by a
-formal, supplemental contract, regularly executed by all the parties to
-the original contract.[4]
-
-=25. Guaranty.=[5]—The Contractor shall guarantee that all the materials
-used and all the work done under this contract shall fully comply with
-the requirements of these specifications, the plans herein before
-referred to and the instructions of the Engineer. Any defects in the
-completed work, or any part of it, or any failure of the work to fully
-perform or endure the service for which it was intended, which, in the
-opinion of the Engineer, are attributable to the use of materials,
-skill, or workmanship not in compliance with the said specifications,
-plans and instructions, within a period of ... years after the date of
-the certificate of completion and acceptance, shall be regarded as prima
-facie and conclusive evidence that the Contractor has failed to comply
-with the said specifications, plans and instructions. And the Contractor
-shall, at his own expense, at such time and in such manner as the
-Engineer may direct, repair or take up and reconstruct any such
-defective work, in full compliance with the original specifications,
-plans and instructions. And as surety for the performance of this
-guaranty the Contractor’s bond, required by the contract, shall remain
-in full force until the expiration of the period of ... years above
-stipulated in this section.
-
-
- PREPARING THE SUB-GRADE
-
-=26. Grading.=—The whole area to be occupied by the pavement and its
-foundation shall be excavated or filled up to a sub-grade at such an
-elevation that after being compacted by the roller, the surface will
-be ... inches below the pavement datum, and truly parallel thereto. In
-excavating, the earth must not be disturbed below the sub-grade. Plowing
-will not be permitted where the depth of earth to be removed is less
-than five (5) inches, and in no case must the plow be allowed to
-penetrate to within less than one inch of the sub-grade. Places that are
-found to be loose, or soft, or composed of unsuitable material, below
-sub-grade, must be dug out and refilled with sand, or other material as
-good as the average of that found on the street.
-
-Where the natural surface of the ground shall be below the sub-grade, or
-shall become so by the removal of old pavement or other structures, it
-must be filled to the sub-grade in layers not exceeding five inches in
-depth, and each layer shall be thoroughly rolled or rammed before the
-next layer is placed upon it, and when the filling is completed the
-filled area must be properly trimmed and compacted by rolling or ramming
-to the true sub-grade, as in excavation. The material excavated from the
-street may be used for such filling, provided it be of suitable quality.
-Where it cannot be thus procured from the street it must be obtained by
-the Contractor elsewhere, in which case the actual quantity so obtained,
-measured after it is compacted in the street, will be paid for at the
-contract price for “earth filling.” The price bid for “earth excavation”
-will be paid for all material excavated above the sub-grade, measured in
-place on the street, which price includes the cost of disposing of the
-excavated material, whether as waste or filling, and of trimming and
-rolling or ramming the sub-grade, and of making it ready for the
-pavement foundation.
-
-After the excavation is completed and the surface neatly trimmed, the
-whole area shall be well compacted by rolling with a roller weighing not
-less than five tons. Areas inaccessible to the roller shall be rammed
-until they are as well compacted as the rolled surface. When the rolling
-is completed the surface must be nowhere more than three-fourths inch
-below, nor more than three-eighths inch above the true sub-grade. If,
-after the rolling is completed and before the pavement foundation is
-laid, the surface shall become disturbed in any way, it must be replaced
-and properly compacted.
-
-Where the soil composing the sub-foundation is found to be wet or
-“springy,” a system of soft tile drains, discharging into the street
-drainage system, shall be constructed by the Contractor, as directed by
-the Engineer. The tile shall be laid in trenches about one foot wide and
-from one to two feet deep. After the tile is in place the trenches shall
-be filled with crushed stone or gravel, well compacted by tamping. The
-tile will be paid for per linear foot at the contract price for the
-same, which price shall include the cost of excavating and refilling the
-trenches with crushed stone.
-
-
- PAVEMENT FOUNDATION
-
-=27.= Pavement foundation shall consist of hydraulic concrete, or of old
-pavement stone relaid, or of broken stone or gravel, as may be herein
-specified, constructed upon the sub-grade.[6]
-
-
- HYDRAULIC CONCRETE FOUNDATION
-
-=28. Concrete.=—Concrete shall be composed of Portland cement, sand,
-broken stone and water.
-
-=29. Portland Cement.=[7]—Portland cement shall be defined as the
-pulverized product resulting from the calcination to incipient fusion of
-an intimate mixture of properly proportioned argillaceous and calcareous
-materials, and to which no addition greater than three per cent. has
-been made subsequent to calcination.
-
-=Specific Gravity.=—The specific gravity of the dry cement at a
-temperature of two hundred and twelve (212) degrees F. shall not be less
-than 3.10.
-
-=Fineness.=—It shall be pulverized to such fineness that not more than
-eight (8) per cent. shall fail to pass a number one hundred (100) sieve
-and not more than twenty-five (25) per cent. shall fail to pass a number
-two hundred (200) sieve.
-
-=Time of Setting.=—At the temperature of sixty (60) degrees F. mortar
-made of neat cement shall not begin to set in less than thirty (30)
-minutes, nor set hard in less than one hour, but must set hard within
-ten (10) hours.
-
-=Strength.=—When thoroughly mixed dry with clean, sharp, moderately
-coarse sand, in the ratio by weight of one part cement to three parts of
-sand, and then made into stiff mortar, briquets made from this mortar
-and exposed for one day to moist air and immersed in water for the
-balance of the periods named below, shall develop a tensile strength per
-square inch not less than the following:
-
- In seven days 175 pounds.
- In twenty-eight days 250 pounds.
-
-=Constancy of Volume.=—When subjected to standard tests for constancy of
-volume, the cement shall show no tendency to swell or crack.
-
-=Composition.=—The cement shall not contain more than one and
-three-fourths (1.75) per cent. of anhydrous sulphuric acid, nor more
-than four (4) per cent. of magnesia.
-
-=Tests.=—Cement tests shall be conducted in accordance with the methods
-recommended by the “Committee on Uniform Tests of Cement” of the
-American Society of Civil Engineers.
-
-=Conditions.=—All cement shall be supplied in original packages with the
-brand of the manufacturer marked on each package. It shall be protected
-during transportation from rain and moisture. It shall be delivered upon
-the work at least ten (10) days (exclusive of Sundays and holidays)
-before it is to be used, in order to allow of proper inspection, and the
-contractor shall furnish all necessary facilities for such inspection.
-Brands of cement without established good reputation, or not heretofore
-used in the City of ... may be rejected; or they will be accepted only
-after they satisfactorily pass the 28–day test. Rejected cement must be
-at once removed from the street.
-
-=30. Sand.=—Sand for concrete shall be composed of grains not softer
-than hard limestone. It shall be moderately coarse and preferably made
-up of grains of varying size producing a mass with low percentage of
-voids. It shall not contain, in all, more than seven (7) per cent. by
-volume of clay, loam, mica scales, silt, or other objectionable
-inorganic matter, nor more than one (1) per cent. of organic matter.
-
-=31. Broken Stone.=—Broken stone for concrete shall be of hard and sound
-limestone or other stone equally hard and durable, broken to a roughly
-cubical form. It shall be screened through efficient revolving screens,
-and only such fragments as have passed through circular screen openings
-two and one-half (2½) inches in diameter, shall be used. If the crushed
-dust and fine fragments be not screened out, the stone must be so
-handled that the fine material will be evenly distributed through the
-mass when it reaches the concrete platform or mixer.[8]
-
-=32. Water.=—Water used for concrete shall be fresh, and reasonably
-clean.
-
-=33. Care and Handling of Concrete Material.=—Cement must not be allowed
-to become wet or damp. It shall be stored until used, whether in
-storehouses or on the street, so that no part of the packages shall be
-nearer than four (4) inches to the ground or pavement, and shall be
-effectually covered so that rain cannot reach it. Sand and stone, if
-stored on the street, shall be on lumber floors.[9] The stone shall be
-thoroughly wetted a sufficient time before being placed in the concrete
-to allow any surplus water to drain away, but shall remain moist where
-it reaches the concrete platform or mixer.
-
-=34. Ratio of Concrete Materials.=—Concrete will be composed of one part
-Portland cement, ... parts of sand and ... parts of broken stone, and
-the proper quantity of water, all measured by volume.[10] The unit of
-measurement shall be the barrel of cement which shall be considered as
-containing four (4) cubic feet. The materials shall each be measured in
-such manner and with such accuracy that the quantities used will not
-vary more than seven (7) per cent. from the quantities required in the
-ratio named above for each batch of concrete.
-
-=35. Mixing Concrete.=—If mixed by hand, concrete shall be mixed on
-platforms of iron or wood of sufficient size to admit of proper
-manipulation of the concrete. The sand shall be first spread evenly over
-the platform and the cement evenly distributed over the sand. These two
-materials shall then be mixed dry until a uniform and homogeneous
-mixture is secured. Sufficient water shall then be added and the mixing
-resumed and continued until a mortar of uniform consistency and texture
-is produced and distributed in an even layer over the platform. The
-stone shall then be distributed over the mortar and mixed therewith
-until the mortar is evenly distributed through the mass and every
-fragment of stone is well coated with mortar, sufficient additional
-water being added as the mixing progresses to produce a rather wet, but
-not sloppy, concrete.[11] Machine mixing of concrete will be preferred,
-provided the machine used secures equal accuracy in the ratios of
-materials and equally as good mixing as prescribed above for
-hand-mixing. Machine-mixed concrete must be delivered from the machine
-upon a wood or metal platform, or directly into barrows.
-
-=36. Placing the Concrete.=—Concrete shall be placed on the sub-grade in
-such a manner as to prevent as far as possible the separation of the
-mortar from the stone. It shall be evenly distributed in a single
-horizontal layer of such depth that, after ramming, it will be not less
-than ... inches thick. Immediately after being so placed it shall be
-well rammed until a compact mass is produced with its upper surface
-parallel to and ... inches below the pavement datum. Depressions that
-may appear during the ramming may be filled with concrete of the same
-composition as used for the foundation, except that smaller-sized stone
-shall be used; mortar alone must not be used for this purpose, nor shall
-the upper surface of the concrete be plastered with mortar. The surface
-of the concrete shall not be broomed or troweled.[12]
-
-=37. Setting of Concrete.=—After the concrete is completed it shall
-remain undisturbed until it be firmly set. The time allowed for setting
-shall not be less than five days, and as much longer as, in the judgment
-of the Engineer, may be necessary, depending upon the temperature of the
-weather and the setting qualities of the cement. During this period no
-hauling or traveling over the concrete must be permitted unless its
-surface be first protected by a covering of plank. The Contractor shall,
-if necessary, keep the concrete moist by wetting it, with hose, or
-otherwise, until twenty-four (24) hours before it is to be covered with
-the pavement surface.
-
-=38. Measurement of Concrete.=—Concrete will be measured and computed in
-cubic yards as found completed on the street, the thickness being taken
-as ... inches. The contract price for concrete foundation covers the
-cost of providing all the materials required, making, placing and
-ramming the concrete, and keeping it moist for the necessary period.
-
-
- FOUNDATION OF OLD PAVING STONE
-
-=39.= Foundations made of old stone paving blocks shall be constructed
-as follows:
-
-Upon the sub-grade prepared as specified in Section 26, shall be spread
-a layer of good sand to an even depth of one and one-half (1½) inches.
-The paving blocks, whether taken up from the street to be paved, or
-brought from other streets or storage yards, shall be cleaned of all
-adhering earth, dirt and street refuse. The blocks shall then be set on
-the bed of sand, on edge, perpendicular to the grade, with their long
-dimension at right angles to the line of the street, in courses composed
-of stones of the same width, extending entirely across and at right
-angles to the axis of the street. Stones in adjoining courses shall
-break joint at least two inches. Joints between courses or stones, or
-along the curbstones, shall not exceed one inch in width. The stone
-shall be fitted closely around manholes or other structures in the
-street. The stones shall be so set in the bed of sand that after being
-rammed as hereafter specified, their tops shall be at the proper grade.
-After being thus set in place the stone shall be rammed with paving
-rammers having wooden faces and weighing not less than thirty (30)
-pounds, so as to force each stone to a good bearing in the sand below,
-and to bring its top to a uniform grade, parallel to and ... inches
-below the pavement datum. No stone shall project more than one-fourth
-(¼) inch above the proper grade, and stones whose tops, after ramming,
-are more than one-half (½) inch below such grade, shall be raised,
-additional sand placed under them, and reset and re-rammed to the proper
-grade and bearing. After the ramming shall have been completed, the
-joints between the stones shall be filled with mortar. The mortar shall
-be composed of Portland cement and sand, complying with the
-specifications for these materials in Sections 29 and 30. One part of
-cement and three parts of sand, by volume, shall be thoroughly mixed
-dry, and then made into mortar with sufficient quantity of water to
-produce a mortar of such consistency that it will just flow freely into
-the joints between the stones. All the joints between the stones must be
-completely filled with this mortar before it has begun to set. The
-mortar filling shall be brought even with, but not above, the tops of
-the stones. After the filling is thus completed, the foundation must
-stand undisturbed until the mortar shall have set firmly, in no case
-less than five days. The mortar must be kept moist during the period
-allowed for setting.[13]
-
-Old stone foundation will be measured in square yards, in place after
-completion. The contract price includes the cost of handling and
-cleaning the stone, supplying and placing the bed of sand, setting and
-ramming the stone, supplying the materials for, making and placing the
-mortar in the joints and watering the street while the mortar is
-setting. Where stone is procured from other streets, or from storage
-yards, the Contractor will be required to load, haul and unload them,
-and will be allowed for this service a price of ... cents per cubic yard
-for loading and unloading, plus ... cents per cubic yard for each
-one-half mile, or fraction thereof, over which they are hauled by the
-nearest practicable route, the measurement to be made after the stone is
-set in the street, without deduction for joints.
-
-=40. Broken Stone Foundation.=—The sub-grade for broken stone foundation
-shall be prepared as specified in Section 26, except that the rolling
-may be omitted at the option of the Contractor. The broken or crushed
-stone shall be of hard, durable stone. The foundation shall have an
-aggregate thickness of ... inches and shall be constructed in two
-courses, as follows:
-
-The broken stone used in the first course shall be of such size that it
-will all pass through a screen having openings three (3) inches in
-diameter, and will all be retained on a screen having openings one (1)
-inch in diameter. This stone shall be evenly spread over the sub-grade
-to such a thickness that after being thoroughly consolidated by rolling,
-its upper surface shall be three-fourths inch below, and parallel to the
-surface of the foundation when completed. It shall then be rolled with a
-road-roller weighing not less than ten (10) tons until the stone is
-thoroughly compacted.
-
-The second course, composed of screenings, all of which shall have
-passed through a screen with openings one inch in diameter, shall then
-be spread over the first course and well raked into the voids of the
-first course. It shall then be thoroughly wetted, and shall be rolled
-with the ten-ton roller until the fine stone is driven into the
-interstices of the first course and the whole thoroughly consolidated,
-the wetting being repeated while the rolling continues. Additional
-screenings shall be added and rolled in where necessary to bring the
-surface to the proper elevation. When completed, the top surface of the
-foundation shall be ... inches below, and parallel to the pavement
-datum. No part of the upper surface of the completed foundation shall
-project more than one-fourth (¼) inch above, nor shall it be more than
-one-half (½) inch below the grade and contour above specified.
-
-Gravel of a quality satisfactory to the Engineer may with his written
-consent be substituted for broken stone. If of assorted sizes, such as
-will compress into a mass having not more than thirty (30) per cent. of
-voids, the foundation may be constructed in a single layer, graded,
-watered and rolled, as prescribed above for broken stone.[14]
-
-=41. Measurement.=—Broken stone and gravel foundation will be measured
-and computed by the cubic yard in the street as completed, without any
-allowance for consolidation by the roller or for settlement into the
-sub-grade, the thickness being taken as ... inches. The contract price
-for it shall cover the cost of supplying the material, placing it on the
-street, and grading, watering and rolling it.
-
-
-
-
- SHEET ASPHALT PAVEMENT
-
-
-_Note._—A number of distinct varieties of asphalt are now used for
-asphalt pavements, either alone or mixed. These different varieties
-differ from each other quite widely in their physical and chemical
-properties. Thus, in the form called “refined asphalt” some of their
-properties are shown by the following table, the data for which is taken
-from the second edition of Richardson’s “The Modern Asphalt Pavement.”
-
- COMPARATIVE PROPERTIES OF DIFFERENT REFINED ASPHALTS
-
- ───────────────────────────────────────────────────────────────────────
- Trinidad, Bermudez, Maracaibo, Calif. Gilsonite,
- average average average of “D” average of
- of two six grade, two
- samples samples average samples
- of two
- samples
- ───────────────────────────────────────────────────────────────────────
- Softens, degrees F. 180 165 225 132 280
- Flows, degrees F. 190 175 236 151 300
- Penetration at 78° F. 7 24 21 48 0
- Loss, heated to 325° 1.1 3.7 3.2 1.7 1.6
- for 7 hours, %.
- Loss, heated to 400° 4.0 8.8 5.5 7.1 2.6
- for 7 hours, %.
- Bitumen soluble in 56.5 95.5 93.9 99.3 99.4
- CS_{2}.
- Inorganic, other than 36.5 2.2 2.9 0.3 0.5
- bitumen.
- Bitumen soluble in 35.6 65.6 51.1 69.6 47.2
- naphtha.
- Bitumen sol. in 98.7 99.0 93.2 95.7 99.8
- carbon
- tetra-chloride.
- Fixed carbon. 10.8 13.7 17.2 17.6 13.2
- ───────────────────────────────────────────────────────────────────────
-
-The practice has been heretofore, and is at the present time, to attempt
-to make specifications for asphalt pavements broad enough to include all
-the various varieties of asphalts, under general requirements which
-shall admit these, and any new varieties that may appear on the market
-suitable for the purpose, the object being to permit a wide range of
-competition. This makes it exceedingly difficult if not impossible to
-frame specifications that shall be sufficiently explicit and at the same
-time sufficiently broad to admit these several differing materials. This
-practice has been adhered to in these specifications, though in this
-respect they are far from satisfactory to the author. So long as it
-continues to be the policy of cities to admit these various varieties of
-bitumen under the same general requirements for crude and refined
-material, such objectionable specifications cannot be avoided. Even with
-the great latitude now provided they exclude some materials with which
-good pavements have been made.
-
-Two remedies for this unsatisfactory condition seem practicable.
-
-1. A city might purchase a sufficient supply of refined asphalt for its
-use after asking for proposals under suitable specifications with
-alternative requirements for the different varieties on the market, and
-after bids are received and the samples accompanying them have been
-properly examined in the laboratory, award contracts for a supply of one
-or more kinds, as might seem best for the interests of the city. Stocks
-of these would be delivered, tested and stored accordingly, in good time
-for the season’s work. Specifications for construction with special
-reference to the kind of asphalt it is proposed to use could then be
-prepared, the contractors to be supplied with asphalt at the city
-storage yard at a stipulated price per ton. This plan would possess a
-number of advantages. A similar plan is quite commonly in use with
-reference to hydraulic cement.
-
-2. Specifications might be framed with special reference to the
-properties and qualities to be possessed by the _asphaltic cement_,
-permitting a liberal range as to the crude and refined bitumens to be
-used in manufacturing this cement. This would be considered, at the
-present time, a radical departure from well established custom, but the
-author sees no reason why it should not be satisfactorily employed.
-
-A sheet asphalt pavement is composed of two essential elements; a
-mineral aggregate made up of sand of assorted sizes and mineral “dust”
-and a bituminous cement. When properly compounded, manipulated and
-compressed these elements make up a bituminous concrete suitable for use
-as a wearing surface for streets and roads.
-
-The character of the sand is important and we have now sufficient
-knowledge from experience to specify a sand that will give,
-approximately, the best results.
-
-The bituminous cement is, however, the element of most importance, and
-upon its suitability for the purpose depends very largely the utility
-and durability of the pavements made with it.
-
-It is important that this asphaltic cement shall possess certain
-properties and qualities, most of which we are now able to define
-satisfactorily, but others require further practical and experimental
-study, and some tests not now in use would doubtless be desirable.
-
-It is not a matter of importance what particular crude or refined
-materials enter into the composition of this cement if the resulting
-product is satisfactory in use. The prime requisite is a paving cement
-that shall possess in a high degree the chemical and physical qualities
-required for making an asphalt pavement of the best quality. If we can
-devise standards and tests that will enable us to secure such a cement
-we need not be concerned about its antecedents.
-
-It would be well worth while for paving engineers and those who have
-laboratory facilities to give attention to this matter. If it shall be
-found practicable to define satisfactorily the qualities the cement
-should possess without reference to the materials from which it is
-compounded, a great advance will have been made, and our asphalt paving
-specifications could not only be greatly simplified, but much greater
-precision and definiteness secured.
-
-While great advances have been made in the art of building sheet asphalt
-pavements and in the framing of specifications for its construction, too
-many of the specifications still in use are antiquated, indefinite and
-unsatisfactory. Some of these contain requirements that, if literally
-enforced, would prevent the attainment of the best results. They are
-largely survivals of the time when little was known either practically
-or technically of the science and art of constructing the pavements,
-outside of the promoters and contractors in the business, who
-consequently dictated, in a large measure, the specifications used. City
-engineers were compelled to rely largely on the presumption that the
-guarantee clauses of the contracts would insure good results, and
-allowed the contractor wide latitude in the conduct of the work.
-
-While there is undoubtedly much yet to learn, even by the experts, in
-the matter of the materials to be used, a quite satisfactory working
-basis has been arrived at, particularly as to the practical side of the
-work, and a large mass of data accumulated by study and experience is
-available to the municipal engineer, and the services of independent
-experts is readily obtainable. There is no longer any good reason,
-therefore, why the character of the materials to be used, the methods
-followed, and the quality of the work secured should not be quite
-definitely and fully specified in the same manner and to the same extent
-as in the case of other kinds of pavement and with equally satisfactory
-results.
-
-
- SPECIFICATIONS
-
-=42. General.=—Asphalt pavement surface shall be laid upon a foundation
-of hydraulic cement concrete, or of stone blocks relaid, over a
-sub-grade, to be constructed in accordance with Articles 26, 28, 29, 30,
-31, 32, 33, 34, 35, 36 and 37.
-
-Asphalt pavement surface shall be constructed in two courses, called the
-base-course and the surface-course. The base-course may be from one (1)
-inch to one and one-half (1½) inches thick, and the surface-course may
-be from one (1) inch to two (2) inches thick, as shall be hereafter
-specified.
-
-=43. Crude Asphalt.=—The cementing element in asphalt pavements shall be
-prepared from crude native, solid asphalts or from the proper
-distillation of crude asphaltic oils.
-
-Crude asphalts as obtained from the mines or natural deposits shall be
-properly refined to drive off water and to separate foreign substances,
-by melting at a temperature not exceeding four hundred and fifty degrees
-F. (450° F.). Crude asphalts of the quality commonly called “glance
-pitch” or “iron pitch” which do not distinctly soften at a temperature
-of two hundred degrees F. (200° F.), and detached or deteriorated
-material from deposits otherwise acceptable will be rejected.
-
-=44. Refined Asphalt.=—Refined asphalt produced from native crude
-asphalt shall be free from water and shall not contain an injurious
-quantity of light oils or foreign matter. It shall not contain more than
-four per cent. (4%) of organic matter nor more than thirty-six per cent.
-(36%) of inorganic matter other than bitumen, and not more than eighteen
-per cent. (18%) of fixed carbon, and not less than fifty-five per cent.
-(55%) of bitumen soluble in cold carbon di-sulphide. Of the bitumen
-soluble in carbon di-sulphide not less than sixty-three per cent. (63%)
-shall be soluble in Pennsylvania petroleum naphtha of specific gravity
-eighty-eight (88) degrees Baume at a temperature of sixty-five degrees
-Fahrenheit (65° F.) and not less than ninety-eight per cent. (98%) shall
-be soluble in chemically pure carbon tetra-chloride. When exposed for
-seven hours to a temperature of three hundred and twenty-five degrees F.
-(325° F.) in a shallow dish the bottom of which is covered with bitumen
-to a depth of three-fourths (¾) inch, the refined asphalt shall not lose
-more than five per cent. (5%) by evaporation.
-
-Asphalts that are injuriously affected, in the pavement, by water (to be
-determined by the test immediately hereinafter described), shall not be
-used except under the conditions specified in Section 45. Cylinders made
-from the surface mixture it is proposed to use, one (1) inch in diameter
-and two (2) inches long, compressed to a density of two and one-tenth
-(2.1), when immersed forty-five (45) days in ten (10) times their volume
-of rain-water, shall retain a sound surface, unchanged and uncorroded by
-the action of the water.
-
-Refined asphalts resulting from the distillation of crude asphaltic oils
-will not be accepted unless the distillation shall have been effected by
-the use of suitable apparatus, at a temperature not exceeding seven
-hundred (700) degrees F. The bitumen must not be over-distilled and “cut
-back” by adding oil. The product, to be acceptable, shall possess the
-following qualities: It shall melt and flow at a temperature not below
-one hundred and forty (140) degrees F., but below a temperature of one
-hundred and eighty (180) degrees F., and when tested in the standard New
-York State closed oil-testing apparatus shall not flash at a temperature
-below four hundred and fifty (450) degrees F. When exposed in a shallow
-dish, the bottom of which is covered to a depth of three-fourths (¾)
-inch with the bitumen, to a temperature of four hundred (400) degrees
-F., for seven (7) hours, it shall not lose by evaporation more than
-seven (7) per cent. by weight. Not less than ninety-eight (98) per cent.
-shall be soluble in cold carbon di-sulphide, and not less than
-sixty-five (65) per cent., nor more than seventy-five (75) per cent. of
-the bitumen shall be soluble in cold Pennsylvania naphtha of gravity
-eighty-eight (88) degrees Baume. Not less than ninety-nine (99) per
-cent. of the bitumen shall be soluble in carbon tetra-chloride, and it
-shall not contain more than sixteen (16) per cent. of fixed carbon.[15]
-
-Bitumens resulting from destructive distillation or from artificial
-oxidation, and bituminous compounds prepared from oil or oil residuums
-heated with sulphur or other substances, or coal or gas tars, will not
-be accepted, nor shall they be mixed with the asphalt used.[16]
-
-=45.= Asphalts that are injuriously affected by water, and those whose
-practical value for making pavements has not been established, in the
-judgment of the City, by sufficient experience, will not be accepted
-except under such special bond and guaranty provisions as the City may
-prescribe.[17]
-
-=46.= Full information as to the source and character of the crude
-asphalt and the method of refining it shall be furnished to the Engineer
-and verified by such evidence as he may require.
-
-=47. Softening or Tempering Agent.=—For softening and tempering refined
-asphalt, petroleum residuum oil or liquid asphalt shall be used. It
-shall be free from water, coke, and other impurities. Its specific
-gravity shall not be below 0.92, nor above 1.04. Its flash test
-(determined in the standard New York State closed oil-testing apparatus)
-shall not be under three hundred and fifty (350) degrees F., and when
-exposed for seven (7) hours to a temperature of three hundred and
-twenty-five (325) degrees F., in a shallow open dish, the bottom of
-which is covered by the oil to a depth of three-fourths (¾) inch, it
-shall not lose more than five (5) per cent. by evaporation. It shall not
-contain more than ten (10) per cent. of paraffine scale.
-
-=48. Sand.=—A superior quality of sand will be required and this must be
-secured, if necessary, by the admixture of two or more sands. The sand
-shall be silicious and so free from organic matter, mica, soft grains,
-and other impurities, that these shall not aggregate more than two (2)
-per cent. of the mass. The grains shall, preferably, be moderately
-“sharp” or angular, and must be of assorted sizes so that the voids in
-the compacted mass of dry sand shall not exceed thirty three (33) per
-cent. A typical sand, to be approximated as closely as practicable, will
-give the following sieve tests, the sieves being used in the order
-named:
-
- 3 per cent. of the whole will pass No. 200 sieve.
- 15 per cent. of the whole will pass No. 100 sieve.
- 18 per cent. of the whole will pass No. 80 sieve.
- 30 per cent. of the whole will pass No. 50 sieve.
- 24 per cent. of the whole will pass No. 30 sieve.
- 10 per cent. of the whole will pass No. 10 sieve.
-
-and none will fail to pass the No. 10 sieve.[18]
-
-=49. Pulverized Stone.=—This may consist of limestone or other sound
-stone or sand, pulverized to such fineness that the whole will pass the
-No. 50 sieve, not more than ten (10) per cent. will be retained on the
-No. 100 sieve, and at least seventy (70) per cent. of it will pass the
-No. 200 sieve. Portland cement may be partly substituted for pulverized
-stone, where the Engineer shall so direct.[19] Portland cement thus used
-will be paid for at the price bid per barrel for the same, in addition
-to the price paid per square yard for the pavement surface. The
-pulverized material must be thoroughly dry when used.
-
-=50. Asphaltic Paving Cement.=—Asphalt Paving Cement shall be prepared
-from the refined asphalt described in Sect. 44 and the tempering agent
-described in Sect. 47. The refined asphalt, together with the asphalt in
-the tempering agent, shall constitute not less than sixty per cent.
-(60%) of the asphaltic cement.
-
-The refined asphalt and the tempering agent shall be mixed and melted
-together at a temperature not below two hundred and seventy-five degrees
-F. (275° F.), and not above three hundred and twenty-five degrees
-Fahrenheit (325° F.), and thoroughly incorporated by agitation until a
-homogeneous cement is produced. The agitation shall be continued until
-the cement is used.
-
-The asphaltic cement at a temperature of seventy-seven degrees F. (77°
-F.) shall be of such consistency as to show a penetration of from forty
-to eighty hundredths of a centimeter, as the engineer may direct for
-each street, when tested with the standard Dow penetration apparatus,
-using a number two cambric needle loaded with one hundred grams. When a
-cement of a consistency satisfactory to the engineer has been produced
-and approved for any street a sample of it shall be kept as a standard
-and all subsequent batches or kettles must be made to conform thereto,
-suitable apparatus and tests being employed to determine the
-correspondence of each new batch with the standard.[20] The asphaltic
-cement when at its melting temperature shall be so viscous that it will
-draw out into moderately long fine threads which shall be free from
-lumps or raggedness and shall possess satisfactory adhesive and
-cementitious qualities.[21]
-
-=51. Composition and Preparation of Asphalt Surface Mixture.=—The
-surface-course shall be composed of the materials specified in Sections
-43, 44, 45, 46, 47, 48, 49, and 50 mixed in such ratios by weight as the
-Engineer may direct or approve. A typical mixture will contain:
-
- Sand 100.0 lbs.
- Pulverized mineral matter passing No. 200 screen, including
- that found in the paving cement 17.5 lbs.
- Pure bitumen (in paving cement) 13.5 lbs.
-
-But the quantities of pulverized stone and of asphaltic cement shall be
-varied as may be found necessary or desirable by the Engineer to suit
-the purity of the asphaltic cement, the character of the sand, the
-climatic conditions, and the varying quantity and character of travel on
-the street to be paved; and Portland cement may be substituted partly or
-wholly for the pulverized stone, when directed by the Engineer. The
-surface-course mixture shall be submitted to the Engineer and approved
-by him before any is laid upon the street.
-
-The mixing shall be accomplished in a mechanical mixing apparatus
-capable of rapidly and effectually incorporating the materials together,
-and each batch must remain in the mixer a sufficient length of time to
-effect a perfect mixture. The sand shall be separately heated and shall
-reach the mixing apparatus at a temperature not above three hundred and
-fifty (350) degrees F., nor below three hundred and twenty (320) degrees
-F. The pulverized stone shall be at such a temperature that when mixed
-with the sand the temperature of the mixed mass shall not be above three
-hundred and fifty (350) degrees F., nor below three hundred and twenty
-(320) degrees F. The sand shall be first placed in the mixer, followed
-by the pulverized stone, and these two materials shall be thoroughly
-mixed together before the asphaltic cement is added. The asphaltic
-cement at a temperature not above three hundred and fifty (350) degrees,
-nor below three hundred (300) degrees F. shall then be added in such a
-way as to evenly distribute it over the sand and pulverized stone, and
-the mixing continued until the materials are thoroughly incorporated
-into a perfectly uniform and homogeneous mass, with the grains of sand
-completely covered with cement. Suitable thermometers shall be
-constantly used to determine the temperatures specified herein. Great
-care must be taken to accurately weigh and proportion the materials
-charged into the mixer.[22]
-
-=52. Stone for Base-course.=—Stone screenings for base-course shall be
-of crushed, hard, durable stone. The portion used shall all be retained
-upon a No. 8 sieve, or screen, and shall all pass a screen having square
-meshes, the linear dimensions of the openings in which are one-half (½)
-inch less than the thickness of the base-course.
-
-=53. Composition of Base-course.=—The base-course shall be composed of
-the crushed stone specified in Section 52, mixed with the asphaltic
-cement, sand and pulverized stone specified in Sections 50, 48 and 49,
-but the asphaltic cement shall be of such hardness as the engineer may
-direct.
-
-A typical base-course mixture will be composed as follows:
-
- Crushed stone 100 lbs.
- Sand 42 lbs.
- Pure bitumen (in asphaltic cement) 7 lbs.
- Pulverized stone 7½ lbs.
-
-But the mixture shall be such that when placed on the street and
-compressed by the roller the mass shall be dense and the voids in the
-stone completely filled; and to accomplish this the quantity of crushed
-stone used in the mixture may be increased or decreased, as the volume
-of its voids may require, in order that they may be completely
-filled.[23]
-
-=54. Mixing the Base-course.=—The materials for the base-course shall be
-heated and mixed in the same general manner as prescribed for the
-surface-course (Sect. 51), the crushed stone being delivered first in
-the mixer. The temperature of the mixture as it comes from the mixer
-being not above three hundred and twenty-five (325) degrees F., nor
-below three hundred (300) degrees F.
-
-=55. Laying Asphalt Pavement, General.=—Asphalt pavement must not be
-laid except when the surface upon which it is to be placed is dry; nor
-when the temperature of the air is below thirty-two (32) degrees F., or,
-if a strong wind prevails, when the temperature of the air is below
-forty (40) degrees F.
-
-The pavement mixture, whether for base- or surface-course, shall be
-taken to the street as soon after it leaves the mixer as practicable.
-When the temperature of the air is below seventy (70) degrees F., the
-loaded vehicles conveying the mixture to the street shall be covered by
-canvas covers to prevent the escape of heat. When unloaded upon the
-street, the temperature of the mass should not be below two hundred and
-eighty (280) degrees F., and any load or portions of a load found under
-two hundred and forty (240) degrees F. must be rejected. After being
-unloaded on the street, the mixture must be shoveled into place in such
-a manner that the whole of it will be moved from the pile into which it
-was unloaded.
-
-=56. Laying the Base-course.=—The base-course will have an average
-thickness of one and one-quarter (1¼) inches after compression. It shall
-be laid directly upon the pavement foundation, which must be free from
-all loose fragments and rubbish and be swept clean in advance of the
-application of the base-course. The base-course mixture shall be spread
-upon the foundation and evenly and regularly graded to such a depth that
-after compression by the roller its surface will be ... inches below,
-and truly parallel to, the pavement datum.
-
-Great care must be taken in handling, spreading and grading the mixture
-to maintain the uniform admixture of the crushed stone throughout the
-mass. The rakes used must have tines wide apart, and the back of the
-rake must be principally used for grading. Immediately after being
-graded, and while still hot, the base-course shall be rolled with an
-asphalt roller weighing not less than five tons, the rolling being
-continued until no further compression takes place.
-
-The base-course must not be laid more than one day’s work in advance of
-the surface-course.
-
-When the base-course is completed it must present a uniform appearance
-and texture over the whole surface, which must conform so truly to the
-designed grade and contour that a twelve-foot template, when applied,
-will show no departure from the true surface greater than one-quarter
-(¼) inch.
-
-=57. Laying the Surface-course.=—In delivering the surface-course
-mixture upon the base-course, care must be taken not to break or disturb
-the latter. Any breaks made in the base-course must be so repaired,
-before the surface-course is spread, as to be equal in density and
-surface to the adjoining base.
-
-Before the surface-course is spread the base-course must be thoroughly
-cleaned and all rubbish, loose material and street dirt removed.
-
-The material for the surface-course shall be so evenly spread and graded
-with asphalt rakes that after it is properly compacted by rolling, the
-surface will coincide with the pavement datum within the limits named
-below. In grading the material, all lumps must be broken up and the
-whole reduced to a finely comminuted mass of equal density throughout.
-Directly after being so graded it shall be rolled with a hand-roller, or
-light steam-roller, to partly compress the material, and, when so
-directed by the Engineer, the surface shall then be ironed with
-smoothing irons heated to a temperature that will melt, but not burn,
-the asphaltic cement. A thin layer of hydraulic cement, just sufficient
-to prevent adhesion between the material and the roller, shall then be
-swept over the surface, which shall at once be thoroughly rolled with a
-ten-ton asphalt roller until the material shall be thoroughly compressed
-and its surface be brought to the exact grade and contour designed for
-the street surface. The work of the ten-ton steam-roller must begin
-before the material has cooled below two hundred (200) degrees F., and
-be continued until the roller makes no further impression upon the
-surface. The first course of the heavy rolling shall be parallel to the
-street beginning at the curb and working toward the center on each side,
-after which it should be diagonally rolled, and also cross-rolled if the
-width of the street permits.[24] Any portions of the surface not
-accessible to the roller shall be tamped with hot tampers until
-compacted equally with the rolled portion. When completed, the surface
-shall have an average thickness of ... inches and must be so free from
-waves or irregularities that a template not less than twelve feet long,
-when applied to the street surface shall nowhere show a divergence from
-the designed true surface of more than three-sixteenths (³⁄₁₆) inch, and
-a template sixteen (16) feet long applied to the gutters shall show no
-divergence from the true gutter grade greater than one-eighth (⅛) inch.
-
-Before the surface-course is placed, all exposed surfaces of curbs,
-crosswalks, manholes, etc., with which the surface-course will be in
-contact, must be well painted with hot paving cement or approved pitch.
-The street shall not be opened to travel until the pavement has become
-cold and hard.
-
-=58. Street Railroad Tracks.=—Where railroad tracks exist on the
-streets, the sub-grade and the pavement foundation shall extend under
-the tracks, uninterrupted except by the ties and other structures
-connected with the track. Where concrete foundation is used, special
-care must be taken with the concrete directly under or around the rails,
-and concrete made of fine crushed stone and a higher ratio of cement and
-sand may be required in contact with the rail. The concrete must be
-thoroughly tamped under and against the rail.
-
-The asphalt surface shall be laid directly against the rails, which, if
-their temperature be under fifty (50) degrees F., shall be heated by
-suitable appliances to a temperature of, or above, sixty (60) degrees F.
-immediately before the asphalt material is placed around the rail. The
-hot asphalt material must be thoroughly tamped against and along the
-rail and under any projecting portions of it, and the surface of the
-pavement must be even with, or slightly (not more than one-eighth (⅛)
-inch) above the top of the rail. Slot-rails will be treated in the same
-manner, subject to such modifications as their forms may
-necessitate.[25]
-
-=59. Plant.=—The plant for making asphalt paving mixtures must be of
-approved modern design, adapted to do the work properly, and equipped
-with efficient machinery. It shall be of sufficient capacity to turn out
-at least twelve hundred square yards of pavement surface daily without
-crowding. Weighing and measuring devices shall be accurate and adapted
-to the purpose, and must be frequently tested and adjusted. Each plant
-must be supplied with the apparatus necessary to make all determinations
-and tests required at the plant to properly conduct the work in
-accordance with these specifications. Steam-rollers must be properly
-balanced and the rolling surface must be true and smooth. All the street
-tools used must be of approved kind and quality and must be kept in good
-working order.
-
-
-
-
- ASPHALT BLOCK PAVEMENT
-
-
-=60. Sub-grade.=—The sub-grade for asphalt block pavement shall be
-prepared as specified in Sect. 26 of these specifications.
-
-=61. Foundation.=—The foundation for asphalt block pavement shall be
-hydraulic concrete or broken stone.[26]
-
-Concrete foundation shall be constructed in accordance with Sections 28
-to 37 inclusive of these specifications and shall have a thickness
-of ... inches.
-
-Broken stone foundation shall be constructed in accordance with Section
-40 of these specifications and shall have a thickness, when completed
-of ... inches.
-
-=62. Asphalt Blocks.=—Asphalt blocks shall be not less than ten (10)
-inches nor more than twelve (12) inches long, not less than four (4) nor
-more than six (6) inches wide and not less than two (2) inches nor more
-than four (4) inches thick. Blocks for the same street must be of the
-same standard size throughout and individual blocks shall not vary in
-any dimension more than three-sixteenths (³⁄₁₆) inch from the standard
-size. Blocks that are chipped, cracked or are otherwise defective shall
-be rejected.
-
-=63. Material and Composition.=—Asphalt paving blocks shall be composed
-of crushed trap rock[27] or equally hard and durable rock, sand,
-pulverized stone and asphaltic cement.
-
-The crushed rock shall be of such sizes that all will pass a screen
-having circular openings one-third (⅓) inch in diameter and that all
-will fail to pass a number ten (No. 10) sieve. The stone shall be
-freshly crushed, free from foreign substances and clean and bright.
-
-The sand shall be clean and sharp and of such sizes that all will pass
-the number ten sieve and not more than five per cent. will pass the
-number two hundred sieve. The grain-size of the sand shall preferably be
-such that at least fifty per cent. (50%) of it will pass the number
-eighty sieve. The screenings from the crushed stone passing the number
-ten sieve may be used in place of sand, or thoroughly mixed with the
-sand to produce a mass of the above composition. The pulverized stone
-shall comply with Section 49 of these specifications. Portland cement
-shall be used in place of not more than ten per cent. of the whole if
-directed by the engineer, in which case the Portland cement will be paid
-for as extra work at the prevailing market price.
-
-The asphaltic cement shall comply with the requirements of Sections 43,
-44, 45, 46, 47 and 50 of these specifications.
-
-=64. Typical Composition.=—A typical composition of the blocks, which
-must be complied with as nearly as practicable, is as follows; (by
-weight)
-
- Bitumen 7%
- Mineral material passing No. 200 sieve 13%
- Mineral material passing No. 80 sieve 9%
- Mineral material passing No. 40 sieve 7%
- Mineral material passing No. 10 sieve 28%
- Mineral material passing No. 3 sieve 36%
- ————
- 100%
-
-=65. Manufacture.=—The crushed rock, sand and pulverized stone shall be
-thoroughly mixed together at a temperature not above three hundred and
-seventy-five degrees Fahrenheit (375° F.) and not below three hundred
-and twenty-five degrees Fahrenheit (325° F.) and the asphaltic cement,
-at a like temperature, added and the mixing continued until a perfectly
-uniform mass is produced, with every fragment of stone completely coated
-with cement.
-
-The hot mixture will then be compressed in molds under a pressure not
-less than four thousand (4000) pounds[28] per square inch, after which
-the blocks will be removed from the molds and allowed to cool, either in
-the air or in water.
-
-The completed blocks after cooling in air shall have a specific gravity
-of not less than 2.5. They shall not absorb, when immersed in water for
-twenty-four hours, more than one-half of one per cent. of water. When
-tested in the standard rattler for testing paving brick the average loss
-by abrasion shall not exceed twelve per cent. (12%) of their original
-weight, after 1800 revolutions of the rattler.
-
-=66. Laying the Blocks.=[29]—The foundation shall be first cleaned of
-dirt, rubbish or loose material.
-
-When the blocks are four (4) inches or less in depth as laid, they shall
-be set upon a bed of mortar made and applied to the foundation in the
-following manner:
-
-The mortar shall be composed of Portland cement and sand, in the ratio
-of one (1) part cement to three (3) parts of sand, thoroughly mixed with
-sufficient water to make a rather soft mortar. This mortar shall be
-spread over the foundation, which shall be previously wetted, in a layer
-approximately one-half (½) inch thick and its top graded by the use of
-templates to a surface at such depth below, and truly parallel to the
-pavement datum, that when the blocks are firmly set in it and rammed
-their tops will be in the true grade and contour of the pavement. The
-mortar shall be made and spread only as required in the progress of
-block laying, and any mortar that has begun to set before the blocks are
-in place and rammed, shall be removed and fresh mortar substituted. The
-blocks shall be set upon this mortar bed with their longest dimension
-across the street, in continuous courses which shall be straight and at
-right angles to the axis of the street. The block layers must stand upon
-the blocks already laid and not upon the mortar. The blocks and the
-courses of blocks shall be set as closely together as practicable.
-Blocks in adjoining courses must break joint not less than four inches.
-Whole blocks only will be used, except as fillers at the ends of the
-courses or in fitting the pavement around manholes or other structures,
-and where thus used the broken ends of the blocks must be dressed to
-make close joints. Unless otherwise permitted, each course must be laid
-continuously across the street without interruption in time. As each
-course is completed the end joints shall be forced close together by the
-use of wedges, levers or mauls. Upon the completion of every third
-course, the courses shall be forced together by placing a timber
-scantling against the face of the last course and striking it with a
-sledge or maul. When the blocks are thus laid, and before the mortar
-under them begins to set, they shall be well rammed to a solid bearing
-in the mortar with a wooden street rammer weighing not less than thirty
-(30) pounds, a two inch plank ten (10) inches wide and three (3) feet
-long being interposed between the block and the rammer and moved about
-so that the whole surface shall be covered and rammed. When the ramming
-is completed, the top of the blocks must conform so closely to the
-pavement datum that when a template or straight-edge is placed upon the
-pavement, its surface shall nowhere depart from the true surface more
-than three-sixteenths (³⁄₁₆) inch. Blocks, or portions of the pavement
-found too high or too low, must be taken up and reset in fresh mortar to
-the true grade. When thus completed to the satisfaction of the Engineer,
-a layer of one-half (½) inch of fine dry sand shall be placed over the
-surface and swept about with brooms until all joints are completely
-filled. The remaining sand shall be removed from the pavement at such
-time as the Engineer may direct.
-
-When the depth of the blocks exceeds four (4) inches, they may be set
-upon a cushion course of sand, as prescribed for brick pavement, Section
-86, the joints to be filled with sand, as specified above in this
-Section.
-
-=67. Railroad Tracks.=—Where railroad tracks exist on the street to be
-paved, the construction shall be the same as prescribed for granite
-block pavement, Section 78.
-
-=68.= The street shall not be opened to travel until the mortar under
-the blocks shall have become fully set, and in no case under five days
-after the blocks are laid.
-
-
-
-
- GRANITE BLOCK PAVEMENT
-
-
-=69.= Granite block pavement shall be laid upon a foundation of
-hydraulic cement concrete.[30]
-
-=70. Sub-grade and Foundation.=—The sub-grade shall be prepared as
-specified in Section 26. The foundation shall be constructed in
-accordance with the requirements of Sections 28 to 38 inclusive.
-
-=71. Granite Blocks.=—The blocks shall be made from sound, durable
-granite, of uniform texture, composition and hardness throughout. No
-outcrop, deteriorated, soft, brittle, or seamy stone shall be used. If
-the blocks are obtained from different quarries, or from different parts
-of the same quarry where the quality or appearance of the rock differs,
-the product of each must be kept separate and laid together on the
-street.[31]
-
-The blocks shall be not less than eight (8) nor more than twelve (12)
-inches long, not less than three and one-half (3½) nor more than four
-and one-half (4½) inches wide, and not less than four and three-quarters
-(4¾) nor more than five and one-quarter (5¼) inches deep.[32] They shall
-be well-shaped, rectangular, with full edges and corners. Their tops
-shall not depart more than one-fourth (¼) inch from a true plane, and
-their sides shall be dressed so that joints between the courses will
-nowhere exceed three-fourths (¾) inch wide, and their ends so that end
-joints shall not exceed one-half (½) inch wide.[33] The size of the
-blocks may be varied where necessary to fit the pavement against or
-around bridge stones or other street structures.
-
-=72. Sand Cushion.=—The foundation shall be cleaned of all dirt and
-rubbish. There shall then be spread evenly over it a layer of clean,
-coarse sand to a uniform depth of one and one-half (1½) inches.
-
-=73. Setting the Blocks.=—The blocks shall be set in this bed of sand
-perpendicular to the street surface, with their length at right angles
-to the street, in courses extending entirely across the street, and at
-right angles to its axis, except at street intersections where the
-courses shall be arranged as the Engineer may direct.[34] Only stones of
-the same width shall be set in the same course. The stones in each
-course, and in adjoining courses, shall be set firmly against each
-other. The blocks shall be set in the sand bed in such a manner that
-their bottom surface shall rest evenly upon the sand and that their tops
-shall be even with each other and to such an elevation that after the
-pavement is rammed, as hereinafter directed, its general surface shall
-conform closely to the pavement datum. Stones in adjoining courses shall
-break joint not less than three (3) inches.
-
-=74. Ramming.=[35]—After the blocks are set each individual block shall
-be thoroughly rammed to give it a firm bearing in the sand and to bring
-its top to the prescribed pavement datum. The rammers used shall have
-wooden faces not more than four inches in diameter, and shall weigh not
-less than thirty (30) pounds. Blocks or sections of blocks whose tops
-under the ramming remain above or sink below the pavement datum shall be
-taken up and reset so that after the ramming is completed their tops
-shall coincide with the pavement datum.
-
-=75. Filling the Joints.=[36]—After the ramming specified in Sect. 74
-shall have been completed, the joints between the paving blocks shall be
-filled in the following manner:
-
-All the joints for a distance of three feet out from the curbstones, and
-three contiguous joints continuous across the street, with the included
-end joints, at intervals of about fifty (50) feet in the length of the
-street, shall be filled with gravel and bituminous paving cement. The
-gravel used shall be of such size that all will pass through a screen
-having five-eighths (⅝) inch meshes, and all will be held on a screen
-having one-fourth (¼) inch meshes. When used, the gravel must be free
-from refuse and street dirt. The bituminous paving cement shall be
-composed by weight of straight-run coal-tar pitch of the hardness
-commonly known as number six, to which has been added and thoroughly
-mixed, while both are in a melted condition, twenty per cent. (20%) by
-weight of refined Trinidad asphalt, or other asphalt, equal for the
-purpose, and twenty per cent. (20%) by weight of Portland cement. These
-ingredients must be thoroughly mixed, and kept agitated until used.[37]
-
-The joints will first be filled with the gravel, which shall be
-perfectly dry, and heated so that when put in the joints it will be at a
-temperature of about three hundred (300) degrees F. The paving cement,
-heated to a temperature of about three hundred (300) degrees F., shall
-be at once, while the gravel is still hot, poured from a spouted vessel
-into the joints until the interstices of the gravel are entirely filled
-to the surface of the pavement, repouring being resorted to to
-accomplish this result whenever necessary.
-
-All the joints in the pavement other than those named above shall then
-be completely filled with Portland cement grout, in the following
-manner:
-
-The grout shall be composed of equal parts by volume of sand (Sect. 30)
-and Portland cement (Sect. 29), a quick-setting cement being preferred.
-The sand and cement shall be first thoroughly mixed dry and then enough
-water added to make a grout of such consistency that it will flow like
-thick cream, and the mixing continued until a homogeneous mass is
-produced and until the grout is applied to the pavement. The grout shall
-be prepared in water-tight boxes of a convenient size. Before applying
-the grout the pavement shall be thoroughly dampened by sprinkling. The
-grout shall be removed from the mixing box and spread over the pavement
-with scoop shovels, in two courses, the first being sufficient to about
-half fill the joints, and the second, which shall be applied before the
-first has begun to set, shall be sufficient to entirely fill the
-remaining space in the joints. As the grout is applied to the pavement
-it shall be swept about with brooms until it all enters the joints.
-
-=76. Order of Work.=—The sand bed shall not be put in place more than
-fifty (50) feet ahead of the block setters. The ramming and filling of
-the joints shall follow closely the block setting, but no ramming shall
-be done within less than six (6) feet of the face of the block setting;
-and the final joint filling shall be kept completed to within
-twenty-five (25) feet of the ramming; except that all the work rammed
-during any day shall have the joint filling completed before the
-cessation of work on that day. The street shall not be opened to travel
-until the grout has thoroughly set.
-
-=77. Fitting Paving Around Other Structures.=—The size of blocks and the
-width of courses shall, as the block laying approaches bridge stones,
-curbs and other structures, or in making closures with other sections of
-pavement, be so selected and adjusted that joints not over
-three-quarters (¾) inch in width shall result, without breaking blocks
-or splitting courses.
-
-=78. Street Railroad Tracks.=—Where railroad tracks exist in the street
-the paving blocks shall be laid against the rail in the following
-manner:
-
-The sub-grade and the pavement foundation shall extend under the rails
-uninterrupted except by the ties or other structures connected with the
-railroad track. For a distance of sixteen (16) inches, on each side of
-the rail, measuring from the center thereof, there shall be spread on
-the pavement foundation a layer of mortar not less than one and one-half
-(1½) inches thick, composed of one (1) part of cement and three (3)
-parts sand, complying with the requirements of Sections 29 and 30. Upon
-this layer of mortar shall be set, against the rail, and on each side of
-it, selected paving blocks, securely bedded in the mortar before it
-shall have begun to set.[38] Alternate blocks shall be long and short so
-as to break joint with the blocks of the adjoining pavement. Selected
-blocks with well dressed top surfaces shall be used and their tops shall
-be set as nearly as practicable at the level of the top of the rail, but
-not so high that the car wheels will ride upon them. In setting the
-blocks they shall be firmly bedded into the mortar by the use of paving
-hammers, but they shall not be thereafter rammed. As the blocks are set,
-any space between the paving blocks and the web of the rail shall be
-filled with mortar of the quality described above. The placing of these
-blocks shall not precede by more than ten (10) feet the block laying on
-the street. Care must be taken not to disturb the bedding of these
-blocks in the laying of the adjoining pavement, or otherwise. The joints
-shall be filled with grout as specified in Sect. 75.
-
-The construction along slot-rails shall be the same as described above,
-except that blocks of special size or shape may be required, as the
-Engineer may direct.
-
-=79. Bridge Stone Crossings.=—Where directed by the Engineer, the old
-bridge stone shall be redressed and relaid, as hereinafter specified for
-new bridge stone, and shall be moved from the point where taken up to
-the point where they are to be relaid, by the Contractor at his expense.
-
-New bridge stone shall be of the same quality of granite as the paving
-blocks and free from imperfections. They shall not be less than three
-and one-half (3½) nor more than six (6) feet long, eighteen (18) inches
-wide and of a uniform thickness not less than six (6) nor more than
-eight (8) inches, but these dimensions may be varied by the Engineer
-where necessary to fit the stone into special locations.
-
-Their top shall be well dressed to a true plane surface not varying in
-evenness more than one-quarter (¼) inch. The sides shall be dressed
-perpendicular to the face so as to joint closely against the paving
-blocks. The ends shall be cut to lines making an angle of from 60° to
-45° with the longitudinal axis of the stones[39] and so dressed and to
-such a bevel that when set in the curved surface of the street, the
-joint between adjoining stones shall not be wider than three-eighths (⅜)
-inch from top to bottom.
-
-Bridge stones shall be set in advance of the block laying, over the
-concrete street foundation, in a bed of sand or gravel in which they
-shall be firmly bedded. Their upper surface shall conform truly to the
-pavement datum. They shall be set accurately to the lines given by the
-Engineer. Where the crosswalk requires more than one width of bridge
-stone, the courses shall be laid parallel to, and at such distance from
-each other as the Engineer may direct, and the space between courses
-shall be filled with paving blocks laid as specified for other parts of
-the street.
-
-
-
-
- BRICK PAVEMENT[40]
-
-
-=80. Sub-grade.=—The sub-grade for brick pavement shall be prepared in
-accordance with Sect. 26, and shall be finished to a surface ... inches
-below and parallel to the pavement datum.
-
-=81. Foundation.=—The foundation for brick pavement shall be of
-hydraulic concrete[41] prepared in accordance with Sections 28 to 37
-inclusive. Its thickness shall be ... inches and its upper surface
-shall, when completed, be parallel to and at a depth below the pavement
-datum equal to the depth of the brick plus one and one-fourth (1¼)
-inches. The surface of the foundation shall not vary more than one-half
-(½) inch above or below that depth.
-
-=82. Paving Brick.=—The linear dimensions of paving brick may vary
-between the following limits: In length, from eight and one-half (8½) to
-nine and one-half (9½) inches; in width, from two and one-fourth (2¼) to
-three and one-half (3½) inches; in depth, from four (4) to four and
-one-eighth (4⅛) inches; but the length shall not be less than two and
-one-half (2½) nor more than three and three-fourths (3¾) times the
-width.[42] The corners shall all be rounded off to a radius of not less
-than one-eighth (⅛) nor more than three-sixteenths (³⁄₁₆) inch. The
-brick for any one contract shall be all of the same kind and of the same
-standard size, and the individual bricks shall not vary in length more
-than three-sixteenths (³⁄₁₆) inch, nor in width more than one-eighth (⅛)
-inch from the size adopted as standard. Raised lugs or letters are
-permissible on one side of each brick but must not project more than
-three-sixteenths (³⁄₁₆) inch from the general surface.[43]
-
-The brick must be specially manufactured for paving purposes. They may
-be made from shale or from suitable clay. In either case the material
-must be thoroughly pulverized, mixed and tempered, and must be free from
-lime nodules or other substances that may disintegrate the brick when
-immersed in water. The brick shall be molded in efficient brick machines
-to a truly rectangular form, free from cracks, flaws and injurious
-laminations. After being dried the brick shall be properly and uniformly
-burned in down-draft kilns. Shale brick shall be burned to the point of
-incipient fusion or vitrification. After the burning is completed, the
-brick shall be allowed to cool with sufficient slowness to insure
-thorough annealing.
-
-The completed brick shall be free from flaws, cracks, ragged corners,
-and from such distortion or warping as will interfere with their utility
-or good appearance in the pavement. Paving brick shall not be
-salt-glazed.
-
-=83.= The brick shall be subjected to the following tests to determine
-their quality:
-
-When broken by the blows of a hammer the brick shall be strong and
-tough. The broken surface shall show a homogeneous composition
-throughout the broken section, free from flaws, injurious laminations,
-nodules and voids, and shall appear to be uniformly burned from surface
-to center.
-
-When subjected to the standard “Rattler” test, in accordance with the
-rules adopted by the National Paving Brick Manufacturers’ Association,
-the average loss in weight shall not exceed eighteen (18) per cent.[44]
-and the loss in weight of any individual brick in the test shall not be
-more than twenty-five (25) per cent. greater than the average loss of
-the whole charge.
-
-When subjected to the absorption test, in accordance with the rules
-adopted by the National Paving Brick Manufacturers’ Association, shale
-bricks shall not absorb more than two (2) per cent. nor less than
-one-half (½) of one per cent. of their weight of water,[45] and clay
-bricks shall not absorb more than six (6) per cent. of their weight of
-water; the absorption of any individual brick shall not be more than
-fifty (50) per cent. greater than the mean absorption of the whole lot
-tested.[46] Brick that do not successfully pass all these tests will not
-be accepted.
-
-=84. Samples.=—Where samples of paving brick have been required and
-submitted by successful bidders, and tested as described above, it will
-be assumed that these samples fairly represent the quality of the brick
-to be subsequently supplied for the work, and brick that do not come up
-to the standard thus established will not be accepted.
-
-=85. Delivering Brick on Street.=—Unless the sidewalks are too narrow to
-permit of it, the brick shall all be delivered upon the street before
-the foundation is constructed, and neatly piled upon the outer edge of
-the sidewalks; occasional openings being left in the piles for the
-accommodation of foot passengers. One-half the brick required shall be
-thus delivered and piled upon each sidewalk. In delivering the bricks
-from these piles to the bricklayers, they must be carried on pallets, or
-other suitable devices must be used to prevent mutilation by rough
-handling; they must not be dumped from wheelbarrows upon freshly-laid
-brick pavement.
-
-If for any reason the bricks are not delivered before the foundation is
-laid, or if the sidewalks are too narrow to permit of the brick being
-stored upon them, they may be delivered over the foundation, but not
-until the concrete has set so hard that it will not be injured by
-transportation over it.
-
-=86. Sand Cushion.=—Directly before the brick are laid into the pavement
-there shall be spread over the foundation a layer of sand one and
-one-half (1½) inches in depth. The sand shall be free from vegetable or
-other refuse matter, and shall not contain more than five (5) per cent.
-of clay and loam. Pebbles and fragments of stone exceeding one-fourth
-inch in diameter must be screened out. When spread on the street the
-sand shall be sufficiently dry to permit of proper gaging by templates,
-as hereinafter described. The sand shall be spread and correctly gaged
-to the proper thickness and surface by the use of templates formed to
-the true designed cross-sectional contour of the pavement. If the width
-of the street between curbs does not exceed twenty-five (25) feet, the
-template shall be made in one length sufficient to cover the full width
-of the street, and its ends shall be so constructed and fitted with iron
-rollers, that it will rest upon and roll along the top of the curb at
-each end; if the width of the street between curbs be not more than
-fifty (50) feet, the template shall be of sufficient length to reach
-from the curb to the middle of the street, and constructed to move on
-rollers on top of the curb at one end and upon a plank six (6) inches
-wide and one and one-half (1½) inches thick laid upon the foundation
-along the center line of the pavement. The template shall be worked
-forward and backward along the line of the street until the surface of
-the sand conforms exactly to the designed contour of the pavement, at a
-depth below the pavement datum equal to the depth of the paving brick
-minus one-fourth (¼) inch. The whole surface shall then be rolled with a
-garden roller not less than thirty-six inches long and not less than
-thirty inches in diameter, weighing not less than three hundred pounds.
-When completed the surface of the sand cushion shall be smooth and
-unbroken, and care must be taken not to disturb it before the bricks are
-set upon it.
-
-=87. Setting the Brick.=—Several courses of brick, aggregating a strip
-having a width of not less than twelve (12) inches nor more than fifteen
-(15) inches on each side of the street, beginning against the curb,
-shall be first laid; the brick being set with their long dimension
-parallel to the curb.[47] The pavement intervening between these gutter
-courses will then be set in courses at right angles to the axis of the
-street, except in street intersections, where the courses shall make an
-angle of forty-five (45) degrees with the axis of the street. The brick
-shall be set upon edge on the sand cushion with their top faces parallel
-to the pavement datum, in straight courses, continuous across the
-street, the long dimension of the brick being parallel to the courses;
-they shall be set as closely together as possible, so that the joints
-both between the courses and between individual bricks shall not exceed
-one-eighth (⅛) inch, where the bricks are without lugs, and not more
-than one-fourth inch where the brick have lugs. Broken bricks and bats
-shall not be used except as closers at the ends of the course and in
-fitting the pavement around manholes, etc., and nothing smaller than
-half-bricks shall be used in either case, and the broken ends must be
-shaped to make reasonably close joints. Filling up with bats must follow
-the brick-laying closely. Brick with lugs shall be laid with the lugs
-all in one direction.
-
-=88. Inspection.=—After the bricks are laid the pavement will be
-inspected by the Engineer, or his agent. He may require that the surface
-shall be previously wetted by sprinklers, or by a sprinkling nozzle, in
-order to detect soft or porous bricks.[48] Defective bricks indicated by
-him shall be removed and replaced by acceptable brick.
-
-=89. Rolling and Ramming.=—The surface of the pavement shall then be
-rolled and rammed in the following manner:
-
-The roller used shall be of the asphalt roller style, driven by steam
-and weighing not less than three and one-half (3½) nor more than five
-(5) tons. The rolling shall begin as near the curb as practicable, the
-roller being operated slowly, parallel to the axis of the street, and
-working outwardly until the center of the street is reached, when the
-roller will proceed to the opposite side of the street and the operation
-proceed as before. After this longitudinal rolling is completed the
-pavement will be continuously rolled a second time, the roller operating
-back and forth at an angle of forty-five degrees to the axis of the
-street, and a third time, the roller operating at right angles to the
-course of the second rolling. After the rolling is thus completed the
-brick in the gutters not reached by the roller shall be rammed with a
-street rammer weighing not less than thirty (30) pounds, a plank not
-less than four (4) feet long, ten (10) to twelve (12) inches wide and
-two (2) inches thick being interposed between the pavement and the
-rammer and moved about so that the whole surface of the gutter shall be
-thoroughly and equally rammed and its surface brought to an even
-junction with the rolled portion of the work.
-
-When the rolling and ramming is thus completed the surface of the
-pavement shall conform so truly to the designed pavement datum that it
-will nowhere depart more than three-sixteenths (³⁄₁₆) inch from properly
-formed templates and straight-edges applied to its surface.
-
-=90. Filling the Joints.=[49]—Directly after the completion of the
-rolling and ramming, the joints between the bricks shall be filled as
-follows:
-
-The joints in the longitudinal gutter courses, and the joints between
-six contiguous courses running across the street, from gutter to gutter,
-in each length of fifty (50) feet of the pavement, shall be filled with
-bituminous cement composed of coal-tar pitch, commercially known as
-Number Four, to which has been added twenty (20) per cent. of refined
-Trinidad asphalt and twenty (20) per cent. of hydraulic cement, all by
-weight. In preparing this bituminous cement, the pitch shall first be
-melted and the asphalt, also melted, added and thoroughly incorporated
-by agitation. The hydraulic cement shall then be added and the whole
-agitated until a complete and uniform mixture results. The bituminous
-cement thus prepared shall while sufficiently hot and liquid to flow
-freely, be poured from a spouted vessel into the joints until they
-appear to be nearly or quite full. After allowing time for the filling
-to subside, the joints will be gone over a second time and completely
-filled.
-
-All the remaining joints in the pavement shall be filled with Portland
-cement grout, as follows:
-
-The grout will be composed of equal parts by volume of sand (Sect. 30)
-and Portland cement (Sect. 29), a quick-setting cement being preferred.
-The sand and cement shall be first thoroughly mixed dry and then enough
-water added to make a grout of such consistency that it will flow like
-thick cream, and the mixing continued until a homogeneous mass is
-produced and until the grout is applied to the pavement. The grout shall
-be prepared in water-tight boxes of a convenient size. Before applying
-the grout the pavement shall be thoroughly dampened by sprinkling. The
-grout shall be spread over the pavement with scoop shovels, in two
-courses, the first being sufficient to nearly fill the joints, and the
-second, which shall be applied before the first has begun to set, shall
-be sufficient to entirely fill the remaining space in the joints. As
-rapidly as the grout is applied it shall be swept with brooms until it
-all enters the joints.[50]
-
-=91.= Travel must be excluded from the pavement until the grout has set
-firmly; in no case less than five days, and the grout must be kept moist
-during this period.
-
-
-
-
- WOOD-BLOCK PAVEMENT
-
-
-=92. Sub-grade.=—The sub-grade for wood-block pavement shall be prepared
-as specified in Section 26, and shall be finished to a surface ...
-inches below the pavement datum.
-
-=93. Foundation.=—The foundation for wood-block pavement shall be
-Portland cement concrete ... inches thick, prepared as specified in
-Sections 28, 29, 30, 31, 32, 33, 34, 35, 36 and 37. The upper surface of
-the concrete foundation, when completed, shall be at a distance below
-the pavement datum equal to the depth of the blocks to be laid, plus
-one-half (½) inch, and must not vary more than one-fourth (¼) inch above
-or below that depth.
-
-
- MATERIALS
-
-=94. Wood-blocks.=—The wood-blocks may be made of Long-leaved yellow
-pine (Pinus palustrus), Lob-lolly pine (Pinus tæda), Short-leaved pine
-(Pinus echinata), Cuba pine (Pinus heterophylla), Black gum (Nyssa
-sylvatica), Red gum (Liquidambar styraciflua), Norway pine (Pinus
-resinosa), or Tamarack (Larix laricina), or of other species of wood of
-equal strength and toughness and of a texture permitting as satisfactory
-preservative treatment as those herein named. But, as far as
-practicable, only one species of wood shall be used on any one
-contract.[51]
-
-Only wood from live, sound trees shall be used. The lumber from which
-the blocks are cut shall be properly manufactured, free from bark, and
-with full square corners. It shall be free from decay, dottiness,
-brashness, shakes, large season cracks, loose or unsound knots over
-three-fourths (¾) inch in diameter, and all other imperfections which
-may, in the opinion of the Engineer, be detrimental. “Fat” pine
-containing so much resin that it will not take up the specified quantity
-of creosote oil in treatment may be rejected. Second-growth timber, and
-Southern pine showing, outside of a radius of three (3) inches from the
-heart, nine (9) or less annual growth rings to the inch, will not be
-accepted.
-
-The paving blocks made from the lumber hereinbefore specified shall be
-well manufactured and truly rectangular and square edged. Their depth
-(parallel to the fiber) shall be ... inches,[52] their length shall not
-be less than six inches nor more than three times their depth, and their
-width shall be from two and one-half (2½) to three and one-half (3½)
-inches, but at least one-fourth inch less than their depth.
-
-All the blocks for any one contract shall be of the same standard depth
-and width, and the individual blocks shall not vary more than one-eighth
-inch from the designated depth and width.
-
-=95. Creosote Oil.=[53]—The oil used for the preservative treatment of
-the paving blocks shall be coal-tar creosote oil, commonly known as dead
-oil of coal-tar, without admixture or adulteration with other oils or
-tars. Oils produced or resulting from the distillation of water-gas tar,
-blast-furnace tar, producer-tar, lignite-tar, petroleum-oil tar, or
-wood-tar, or, containing an admixture of any of these will not be
-accepted. The creosote oil shall not contain more than five per cent.
-(5%) of tarry matter nor more than two per cent. (2%) of water. Its
-specific gravity at a temperature of 100° F. shall be not below 1.03 nor
-above 1.08. Not less than ninety-nine per cent. (99%) shall be soluble
-in hot benzol. It shall not contain more than eight per cent. (8%) of
-tar acids. When two hundred (200) grams are subjected to distillation at
-gradually increasing temperatures, not more than five per cent. (5%) of
-distillate shall distil over up to a temperature of four hundred degrees
-F. (400° F.), nor more than thirty-five per cent. (35%) shall distil
-over up to a temperature of four hundred and fifty-five degrees F. (455°
-F.), and not more than eighty per cent. (80%) shall distil over up to a
-temperature of six hundred degrees F. (600° F.). After complete
-distillation there shall not remain more than two per cent. of coke. The
-residue remaining, upon sulphonating a portion of the total distillate,
-shall not exceed one per cent. (1%). The above tests shall be made in
-accordance with the methods prescribed in the “Report of the Committee
-on Preservative Treatment of Poles and Cross-arms” of the National
-Electric Light Association, 1911.
-
-=96. Preservative Treatment.=—The paving blocks shall, after they are
-cut to the proper dimensions, be subjected to preservative treatment
-with the creosote oil specified in Section 95.
-
-The contractor may employ any of the standard methods in common use for
-impregnating the blocks, provided that uniform results are attained,
-complying with the following requirements:
-
-The wood shall not be heated during any part of the process to a
-temperature exceeding two hundred and sixty degrees Fahrenheit (260°
-F.).
-
-All parts of every block shall be reached and penetrated by the oil. The
-quantity of oil found in the blocks after treatment shall average not
-less than ... pounds per cubic foot of wood.
-
-The oil in the treating tanks during the process of impregnation shall
-not become diluted with water to the extent of more than five per cent.
-(5%) and if the percentage of water in the oil during the process of
-treatment shall exceed two per cent. (2%) the quantity of the oil to be
-injected in the wood as stipulated hereinbefore shall be increased in a
-like ratio; for example, if the oil in the treating tanks shall be found
-to contain four per cent. (4%) of water the quantity required to be
-found in the blocks after treatment shall be four per cent. (4%) greater
-than herein specified.
-
-The quantity of oil injected shall be determined primarily by tank
-measurements, but shall be verified by actual determination of the
-quantity of oil in the treated blocks by the following method:
-representative treated sample blocks shall be selected and an auger hole
-one inch in diameter bored entirely through the block parallel to the
-fiber, the borings all collected, thoroughly mixed, and the quantity and
-ratio of oil to wood in the borings determined by extracting the oil
-completely with carbon di-sulphide. The center of the auger hole shall
-be located midway between the sides of the block and at a distance from
-the end of the block equal to one-third (⅓) of the length of the block.
-At the time of treatment the blocks shall not be green or saturated with
-water, but they shall, preferably, not be thoroughly seasoned. After
-treatment, and until used, the blocks shall, during dry weather, be
-frequently well drenched with water to prevent excessive drying out and
-cracking.
-
-=97. Laying the Wood-Blocks.=—The concrete foundation shall be cleaned
-and swept to remove all dirt and débris and shall be thoroughly dampened
-immediately in advance of the setting of the blocks. Upon the concrete
-foundation shall be spread a layer of mortar about one-half inch thick,
-made of one part Portland cement and two parts sand with sufficient
-water to make a moderately stiff paste.[54] The mortar shall be
-thoroughly mixed and shall be spread in place over the concrete
-foundation immediately in advance of setting the blocks to such a
-thickness that when the blocks are set and properly tamped their tops
-shall conform accurately to the pavement datum.
-
-Upon this mortar bed the blocks shall be set with their fiber vertical,
-in straight, parallel courses at right angles to the axis of the street,
-except at street intersections where they shall be set at an angle of
-forty-five degrees with the axis of the street. The blocks shall be set
-as close together as practicable. Blocks in adjoining courses shall
-break joint at least three inches. Blocks of such lengths shall be
-selected as to make as little splitting as practicable in filling out
-ends of courses. Where splitting is necessary, no fractional block shall
-be used whose length is not at least equal to its width.
-
-After the blocks are thus set the whole surface of the pavement shall be
-rammed with a rammer weighing not less than twenty pounds, a plank ten
-(10) inches wide, two (2) inches thick and four feet long being
-interposed between the rammer and the pavement and moved about as the
-ramming progresses until the blocks are forced into a firm seat in the
-mortar bed and their tops brought accurately to the pavement datum. The
-ramming shall be completed before the mortar under them has begun to
-set, but no ramming shall be done, during the progress of the work,
-nearer than three feet to the edge of the block setting, except where
-the block setting may be suspended, as at the end of the day’s work,
-when all the blocks then set shall be rammed.
-
-The top surface of the pavement when completed shall conform so truly to
-the pavement datum that correctly formed templates twelve (12) feet long
-applied to the surface shall show at no place a departure of more than
-three-sixteenths (³⁄₁₆) inch therefrom.
-
-=98. Filling the Joints.=—After the block setting is completed,
-perfectly dry, fine sand shall be spread over the pavement surface and
-swept about until every joint into which the sand will penetrate shall
-be completely filled. The remaining sand shall be left upon the pavement
-for such time as the Engineer may direct, when it shall be removed by
-the Contractor.[55]
-
-=99. Inspection.=—The lumber for paving blocks will be inspected before
-it is cut into blocks. The blocks will also be inspected upon delivery
-to the street and as they are laid. Blocks that have, in treatment or
-subsequent handling, developed open season cracks or wind shakes or
-other imperfections that may prevent their durability or usefulness in
-the pavement shall be rejected and removed from the street.
-
-=100. Chamfered Blocks.=—Where wood-block pavement is laid on streets or
-parts of streets having a gradient of more than 3%, the blocks shall not
-be less than four (4) inches long, and the upper side-corners of the
-blocks shall be chamfered to a depth of three-eighths (⅜) inch, the
-chamfered surface to make an angle of 40 degrees with the vertical sides
-of the blocks; or such other construction shall be used as will, in the
-opinion of the Engineer, provide an equally good foot-hold for horses.
-
-=101. Expansion Joints.=—Before the blocks are set there shall be placed
-along and against each curb a board of trapezoidal section having a
-width one inch greater than the depth of the blocks, the upper edge of
-which shall have a thickness of three-eighths (⅜) inch for each ten feet
-or fraction thereof of the width of the street between curbs, and a
-bottom width one-fourth (¼) inch less than the top. The paving blocks at
-the beginning and end of each course shall be set against this board.
-After the ramming of the blocks has been completed, these boards shall
-be carefully withdrawn and the space between the curbs and the paving
-blocks shall be completely filled with the bituminous paving cement
-described in Section 90.
-
-=102.= The street shall not be opened to travel until such time as the
-mortar under the blocks shall have become well set, nor until the
-Engineer shall so direct.
-
-
-
-
- BITUMINOUS CONCRETE PAVEMENT
-
-
-_Note._—The phrase, Bituminous Concrete Pavement, has been applied to a
-large variety of roadway surfaces differing materially from each other
-in composition, construction and utility. Some of these are covered by
-United States patents, the scope and limitations of which are not yet
-fully determined or understood. The necessity of avoiding infringement
-of these patents has to be kept in mind in framing specifications for
-public use, and this consideration does not permit the presentation here
-of specifications which, in the opinion of the author, would secure an
-ideal pavement of this general character.
-
-Bituminous concrete pavements constructed in substantial conformity with
-these specifications have been laid on a number of city and town streets
-and country roads and have proved satisfactory and fairly durable in
-use. It is believed that they do not infringe any existing patents.
-
-Our rather limited experience with pavements of this character seems to
-indicate that if good materials are used and the work properly done,
-they are suitable for use on city streets of light travel, and on
-suburban streets and country roads carrying an amount of travel
-considered heavy for these classes of roadways. Where the results have
-been unsatisfactory, the cause can generally be traced to unsuitable
-materials or unskillful construction, the result of ignorance or
-carelessness on the one hand, or of the attempt to reduce first cost
-below normal figures on the other. Many people are searching for a
-pavement or roadway that will have all the good qualities of the
-standard pavements but can be built about as cheaply as a common macadam
-road. It is possible that something of the kind may be discovered; but
-in the present state of the art it is chimerical. High quality and low
-first cost do not go together in street paving. The question to be
-considered is, rather, how can we invest a dollar in street or road
-building so that it will, in the long run, yield the best return upon
-the investment. The pavement provided for in these specifications is not
-a cheap pavement, but where it is suitable for the conditions to be met,
-it will be well worth its cost.
-
-
- SPECIFICATIONS
-
-=103. Sub-grade.=—The sub-grade except where old pavement is utilized
-for foundation shall be prepared in accordance with Section 26 of these
-general specifications.
-
-=104. Foundation.=[56]—The foundation for bituminous concrete pavement
-shall be a properly prepared old pavement, or hydraulic concrete, or
-compressed broken stone, as determined by the engineer.
-
-=105.= Old macadam pavement or road to be utilized for foundation, shall
-be prepared in the following manner:
-
-All high places or humps shall be dressed down to a plane two (2) inches
-below the pavement datum, the work being done with care so as to disturb
-as little as possible the macadam that is to remain. Depressions in the
-old macadam shall be carefully cleaned out so as to remove all earth and
-other débris and loose material, and filled with hydraulic concrete.
-Newly dug or filled trenches and holes extending through the macadam
-shall be excavated and cleaned out so as to admit the use of at least
-four (4) inches of hydraulic concrete. The hydraulic concrete for thus
-leveling up the roadway shall be composed of one (1) part of approved
-Portland cement, four (4) parts of clean sand and nine (9) parts of
-sound, hard crushed stone, well mixed into a wet concrete. After
-placing, the concrete shall be well tamped so as to form a compact body,
-conforming to a plane two (2) inches below the pavement datum. The
-concrete shall be protected from travel and allowed to become well set
-before the surface of bituminous concrete is applied.
-
-=106.= Old stone block or brick pavement may be utilized for foundation,
-provided that the blocks or bricks do not require to be taken up and
-reset, or, if so taken up and reset, that the joints shall be completely
-filled with grout composed of one (1) part Portland cement and two (2)
-parts of good sand. Depressions, trenches and holes shall be treated as
-specified in Section 105.
-
-=107.= Hydraulic concrete foundation shall be constructed in compliance
-with the requirements of Sections 28, 29, 30, 31, 32, 33, 34, 35, 36 and
-37 of these specifications. Its depth or thickness shall be ... inches.
-
-=108.= Broken stone foundation shall be ... inches in thickness after
-completion. It shall be constructed in accordance with Section 40 of
-these specifications.[57]
-
-=109.= When completed the upper surface of the foundation shall nowhere
-be more than two and one-half (2½) inches nor less than one and
-three-fourths (1¾) inches below the pavement datum. No travel shall be
-permitted upon the foundation until the bituminous concrete shall have
-been laid.
-
-=110. Bituminous Concrete.=—The bituminous concrete shall be composed of
-crushed stone, sand, pulverized stone, and asphaltic cement.
-
-A typical composition for the bituminous concrete, to be as closely
-approximated as practicable, is as follows, the percentages being by
-weight:
-
- Pure bitumen in asphaltic cement. 8.5%
- Pulverized stone passing No. 200 sieve. 8.5%
- Sand passing No. 80 sieve. 10.0%
- Sand passing No. 40 sieve. 23.0%
- Sand and fine stone passing No. 10 sieve. 15.0%
- Crushed stone passing a screen having four meshes to the linear
- inch. 25.0%
- Crushed stone passing a screen having two meshes to the linear
- inch. 10.0%
- ——————
- 100.0%
-
-The crushed stone shall be trap rock, granite, or hard, sound, durable
-limestone. It shall be crushed to such sizes that all will pass through
-a screen with two meshes to the linear inch and shall be of such
-assorted sizes of fragments as will, when incorporated with the sand,
-pulverized stone, and bitumen, produce a mixture substantially
-conforming to the percentages of each named in the preceding paragraph.
-
-The stone shall be freshly crushed, clean and free from clay, loam,
-organic matter and refuse of every kind.
-
-The sand shall be silicious, and free from clay, loam and refuse of all
-kinds. The grains shall be of such sizes that approximately twenty-five
-per cent. (25%) of the whole will pass the number eighty (80) sieve,
-fifty-eight per cent. (58%) shall pass the No. 40 sieve and not more
-than seventeen per cent. (17%) will pass the number 10 sieve, when used
-in the order named. The pulverized stone shall conform to the
-requirements of Sect. 49. Portland Cement may be substituted for not
-more than twenty per cent. (20%) of the pulverized stone if the Engineer
-so directs, in which case the Portland Cement actually so used shall be
-paid for extra at the prevailing market price, to be agreed upon in
-advance. The asphaltic cement shall comply with the requirements of
-Sects. 43, 44, 45, 46, 47, and 50, except that it may have a somewhat
-higher penetration, as may be determined by the Engineer.[58]
-
-=111. Mixing.=—The materials composing the concrete shall all (except
-the pulverized stone and Portland cement) be uniformly heated to a
-temperature not exceeding three hundred and fifty degrees Fahrenheit
-(350° F.) and not below three hundred degrees Fahrenheit (300° F.), and
-while at such temperature shall be incorporated and mixed in a
-mechanical mixer. The stone, sand, and pulverized stone shall be placed
-in the mixer in the order named and well mixed together, after which the
-asphaltic cement shall be added and the mixing continued until each
-fragment is thoroughly coated with cement.
-
-=112. Laying on the Street.=—The mixed concrete shall be taken to the
-street as soon as practicable after leaving the mixer. It shall be
-unloaded on the street, properly spread and truly graded with asphalt
-rakes to such a depth that after compression by rolling it will have a
-thickness of not less than two inches. The concrete when unloaded on the
-street shall be at a temperature not below two hundred and eighty
-degrees Fahrenheit (280° F.). In spreading and grading, all material
-must be moved from the pile into which it was unloaded. As soon as
-practicable after the concrete shall be graded, the surface shall be
-thoroughly rolled with a ten-ton asphalt roller and the rolling
-continued until the roller makes no further impression on the concrete
-surface. When completed the surface must conform closely to the pavement
-datum so that there will be no depressions or elevations exceeding
-one-fourth inch above or below the pavement datum.
-
-
-
-
- HYDRAULIC CONCRETE ROADWAY PAVEMENT[59]
-
-
-=113.= The sub-foundation for hydraulic concrete pavement shall be
-prepared as specified in Section 26.
-
-=114.= The pavement shall be constructed in two courses called the
-bottom course and the top course, as hereinafter specified.[60]
-
-=115. Bottom Course.=—The bottom course shall be four (4) inches in
-thickness[61] and shall be composed of the materials specified in Sects.
-29, 30, and 31. The concrete shall be composed of one part Portland
-cement, three parts sand and six parts of broken stone, and shall be
-mixed and placed as specified in Sects. 35 and 36, but its top surface
-when properly compacted shall be parallel to and not less than two (2)
-nor more than two and one-half (2½) inches below the pavement datum.
-
-=116. Top or Surface Course.=—The top course shall be composed of the
-Portland cement specified in Sect. 29, the sand specified in Sect. 30
-except that it shall be especially clean, and the grains shall be of
-such size that at least seventy-five per cent. (75%) of the mass will
-fail to pass a screen having thirty (30) meshes to the linear inch, and
-shall be of superior quality for making concrete; and of crushed Trap
-Rock,[62] or of stone equally hard, strong and durable.
-
-The trap rock shall be crushed to such sizes that all will pass through
-a screen having meshes one and one-fourth (1¼) inch square and that none
-will pass through a screen having meshes one-half (½) inch square,[63]
-and it shall be free from clay, refuse or other foreign substances.
-
-=117.= The surface-course concrete shall be composed of one part
-Portland cement complying with Sect. 29, one and three-quarters (1¾)
-parts of sand, and, generally, three and one-half (3½) parts of crushed
-stone, but the ratio of crushed stone shall be such that in the
-completed concrete the volume of mortar in the compressed mass shall
-exceed by about fifteen per cent. (15%) the voids in the stone.[64] The
-cement and sand shall be thoroughly mixed together dry, enough clean
-water then added to make a rather wet mortar and the mixing continued
-until the materials are thoroughly incorporated into a homogeneous mass.
-The crushed stone shall then be added, and the mixing continued until
-every fragment of stone is completely covered with mortar. Sufficient
-water shall be added during the mixing, if necessary, to make a “wet”
-concrete, but not so wet that free water will flow from the mixed mass.
-In handling and adding the stone to the mortar care must be taken to
-prevent the stone segregating into masses of different sizes. The
-concrete for the top course shall be made with special care and thorough
-work, the intention being to secure a superior quality of concrete.[65]
-
-=118.= The concrete thus prepared shall be placed upon the bottom course
-before the latter has begun to set[66] and carefully graded so that when
-properly compacted its top surface will coincide with the pavement
-datum. The concrete will then be well rammed by rammers having a face of
-6 by 6 inches and weighing not less than twenty (20) pounds after which
-the surface will be completed by rolling with a power roller of the
-asphalt type weighing not less than five (5) tons.[67] All these
-operations must be completed before any of the concrete in either course
-shall have begun to set. The surface shall not be plastered with neat
-mortar nor shall it be trowelled.
-
-=119.= The completed surface must coincide with the pavement datum to
-the extent that a properly formed template when applied to the surface
-shall show no departure from the pavement datum exceeding
-three-sixteenths (³⁄₁₆) inch.
-
-=120.= After the laying of the pavement has been completed it shall be
-allowed to stand until the concrete of both courses shall be fully set,
-which period shall be not less than ten (10) days, or longer, if
-conditions make a longer time necessary, as the engineer may direct, of
-which he shall be the sole judge. During this period the concrete shall
-be kept in a moist condition throughout, by sprinkling with hose or
-otherwise. No travel shall be allowed upon the street until the engineer
-shall open it for public use. The concrete shall not be laid during rain
-storms or when the thermometer is below forty-five (45) degrees F., and
-in case there may be danger from frost the whole surface of the concrete
-shall be covered by straw or hay. Manure must not be used for this
-purpose.
-
-=121. Expansion Joints.=[68]—An expansion joint along the curbing on
-each side of the street shall be provided in accordance with Sect. 101.
-Expansion joints shall also be provided and constructed as follows:
-Wherever the width of the pavement exceeds twenty (20) feet between
-curbs there shall be a expansion joint along the longitudinal center of
-the street; expansion joints shall also be made, at right angles to the
-street and extending continuously from curb to curb, at distances apart
-not exceeding twenty (20) feet. These expansion joints in the body of
-the pavement shall be made by cutting entirely through both courses of
-concrete along a straight line, using a special straight-edged cutter
-not more than three-sixteenths (³⁄₁₆) inch thick, when the concrete is
-laid in hot weather and not more than three-eighths (⅜) inch thick if
-the concrete is laid when the thermometer is below sixty (60) degrees F.
-The cutting of the expansion joints shall be carefully and skillfully
-done, and after each joint is cut a special T-shaped smoother, the stem
-of which is one inch deep and of the same thickness as the cutter shall
-be worked back and forth in the joint until the edge of the concrete
-adjoining the joint shall be well and smoothly compacted. The smoother
-shall be so formed as to round off the corners of the concrete to a
-circular form having a radius of one-fourth (¼) inch. All these
-operations shall be completed before the concrete has begun to set.
-After the concrete has set and before the street is opened to travel all
-expansion joints shall be poured full of bituminous cement, as specified
-in Section 90.[69]
-
-=122. Bituminous Coating.=[70]—After the concrete shall have become
-fully set as determined by the engineer and before the street is opened
-to travel the whole surface of the pavement shall be covered by a
-finishing coat of bituminous road oil as hereinafter specified.
-
-The road oil shall be prepared from native asphalt or from a crude oil
-having an asphaltic base. Not less than 95 per cent. of the oil shall be
-soluble in cold carbon di-sulphide, and it shall contain not less than
-thirty (30) per cent. of solid asphalt, nor more than ten per cent. of
-fixed carbon. It shall be of such consistency as to flow freely at a
-temperature of seventy-five degrees (75°) F. The oil shall not be
-applied except when the road surface is perfectly dry and when the
-temperature of the air is not below 60° F.
-
-The oil shall be evenly distributed over the whole surface of the street
-at the rate of one-half (½) gallon of oil per square yard of surface,
-and well worked over the surface with squeegees or other suitable
-devices.
-
-Not less than twenty-four hours after the application of the oil the
-surface of the pavement shall be evenly covered to a depth of one-fourth
-inch with clean, dry stone screenings or coarse sand, after which the
-street may be opened to travel.
-
-
-
-
- GENERAL SPECIFICATIONS FOR EXPERIMENTAL OR UNTRIED PAVEMENTS[71]
-
-
-=123.= Contractors or promoters submitting proposals for the
-construction of new, experimental, or special street pavements, the
-merits of which have not been established by experience in the city
-of ..., must submit with their proposal a full and complete set of
-specifications for the construction of the pavement. If contract shall
-be awarded under said proposal, said specifications will be made a part
-of the contract entered into. The Engineer will enforce compliance with
-these specifications, as the construction work proceeds, without
-assuming or incurring any responsibility for the character, quality,
-serviceability or durability of the resulting pavement. But the
-Contractor shall be subject to and shall comply with the requirements
-and stipulations of Sects. 1 to 25, inclusive, of these specifications.
-
-=124. Special Guaranty.=[72]—Inasmuch as the pavement to be constructed
-under the special specifications submitted by the Contractor is more or
-less of an experimental character, having not been heretofore used in
-the city of ... to an extent sufficient to establish its value, the
-Contractor shall be held wholly responsible for the utility,
-serviceability and durability of the pavement so constructed; and he
-shall enter into a guaranty to the effect as follows:
-
-That the pavement will fulfill all the usual and legitimate requirements
-of a satisfactory roadway pavement upon the street upon which it is to
-be laid.
-
-That the pavement will successfully serve and endure the travel to which
-the street may be subjected for a period of ... years next following the
-date of the certificate of its completion and acceptance, and shall be
-in good condition at the end of that period, ordinary and reasonable
-wear and tear, and accidental or other injuries not due to defects in
-the pavement itself, excepted.
-
-That the Contractor will, at his own cost, keep the said pavement in
-satisfactory repair during said period of ... years, and will leave it
-in a condition of satisfactory repair at the end of that period.
-
-That the Engineer, or his successor or successors in office, shall be
-the sole and final judge as to whether the conditions of this guaranty
-shall be, or shall have been complied with.
-
-That in case the pavement shall not, in the judgment of the Engineer,
-fulfill the terms and conditions of this guaranty at any time during
-said period of ... years, or upon its expiration; or in case the
-Contractor shall fail to make all or any of the repairs that may in the
-judgment of the Engineer be or become necessary during said period
-of ... years, within a reasonable period to be determined by the
-Engineer, but not to be less than twenty (20) days after notice to make
-such repairs has been given him by the Engineer, he (the Engineer) may
-proceed to make or to have made such repairs, or to repave the street,
-in any manner that he may deem necessary or advisable, and to charge the
-cost of such repairs or repavement to the Contractor, provided, that the
-sum or sums so charged against the Contractor shall not, in the
-aggregate, be more than the amount paid to the Contractor for the
-construction of the pavement.
-
-=125. Bond.=—The Contractor shall give bond with sureties satisfactory
-to the Engineer in a sum not less than the estimated cost of the
-pavement at the contract prices, the term of the bond to extend over the
-entire period of ... years, for which the pavement is guaranteed.
-
-=126.= During the said period of ... years the Contractor shall, upon
-being notified by the Engineer so to do, make any repairs to the
-pavement that may become necessary by reason of cutting into it for the
-purpose of constructing or repairing pipes, conduits or other
-underground structures, or street railroad tracks, or by reason of
-accidental or unusual causes, or of any causes other than those due, in
-the opinion of the Engineer, to the failure of the pavement to meet and
-fulfill the terms of the guaranty stipulated in Section 124. And for
-making such repairs the Contractor shall be paid the price of ... per
-square yard for the repairs actually so made. Repairs so made shall be
-subject to the terms of the guaranty, stipulated in Section 124, until
-the expiration of the said term of ... years after the date of the
-original certificate of completion and acceptance. In case the
-Contractor shall neglect or fail to make such repairs within a period of
-twenty (20) days after he shall have received notice to do so, the
-Engineer may proceed to make or to have made such repairs, and he shall
-charge to and collect from the Contractor the cost of the repairs so
-made.
-
-
-
-
- HYDRAULIC CONCRETE COMBINED CURB AND GUTTER[73]
-
-
-=127.= Hydraulic concrete combined curb and gutter shall be constructed
-in accordance with general plan No. ... attached to and made a part of
-these specifications, but the rise from the gutter to the top of the
-curb may be varied so as to facilitate drainage.[74]
-
-=128. Excavation.=—All excavation required for the curb and gutter shall
-be completed and trimmed to the proper lines as shown by the drawing.
-The drainage trench under the curb and gutter shown on the drawing shall
-have the top width and general form shown in the drawing but its depth
-may be varied to secure proper drainage, as the engineer may direct,
-provided that its depth below the base of the concrete shall not be less
-than nine inches nor more than two feet.
-
-=129. Broken Stone Drainage.=[75]—After the excavation shall have been
-completed the trench shall be filled up to the level of the base of the
-concrete with sound, durable broken stone, or coarse gravel, from which
-the small fragments shall have been removed by screening over a wire
-screen having openings not less than one inch square. The stone or
-gravel shall be thoroughly tamped in the trench in layers not more than
-six (6) inches thick by the use of rammers weighing not less than thirty
-(30) pounds and having a face area not exceeding thirty-six (36) square
-inches, and its completed top surface shall conform truly to the
-designed base of the concrete. These drains shall be connected at
-suitable intervals with sewers, drains or other outlets to keep them
-free from standing water. The trench filling shall be completed at least
-twenty-five feet in advance of placing the forms for the concrete.
-
-=130. Concrete.=[76]—The concrete shall be made of one (1) part Portland
-cement, one and three-fourths (1¾) parts of sand and three (3) parts of
-crushed stone or clean gravel. The Portland cement shall comply in all
-respects with the requirements of Section 29 of these specifications.
-
-The sand shall be clean, sharp silicious sand made up of grains of such
-size that not more than fifteen per cent. (15%) will pass a number
-thirty (30) sieve. It shall not contain more than five per cent. (5%) of
-clay or loam nor more than two per cent. (2%) of organic matter or other
-refuse. The stone shall be sound, hard, durable, and freshly broken,
-free from clay, loam, organic matter, or other impurities. Trap rock or
-granite will be preferred, but limestone, if hard and sound, may be used
-with the approval of the engineer. Only those fragments of the crushed
-stone that pass a screen with openings three-fourths inch square and
-those that are held on a screen with openings one-fourth inch square
-shall be used in the concrete.
-
-=131. Mixing and Placing Concrete.=—The concrete shall be mixed in
-accordance with Section 35 of these specifications. Very thorough mixing
-will be required.
-
-The mixed concrete shall be handled so as to prevent as far as
-practicable any separation or segregation of the stone and mortar. When
-in place it shall be compacted by tamping and where placed against
-forms, forking or other effective means must be used to bring mortar to
-the surface and to secure complete contact between mortar and forms, so
-as to leave a solid, homogeneous and unbroken surface when the forms are
-removed. Where the concrete may not be laid against forms, all exposed
-surfaces must be troweled to a true surface conforming accurately to the
-lines shown by the plans, templates and straight-edges being used where
-necessary.
-
-=132. Weather.=—Concrete in combined curb and gutter shall not be laid
-in freezing weather nor shall frozen materials be used in the work.
-Completed work must be securely protected from frost for at least seven
-days after it is laid. Any concrete curb and gutter that may become
-frozen within that period shall be wholly removed and replaced with new
-work.
-
-=133. Expansion Joints.=—The combined curb and gutter shall be divided
-into blocks or panels not more than twelve feet long, by clear, open
-expansion joints perpendicular to the face of the curb, extending
-entirely and continuously through the whole mass of the concrete. These
-expansion joints shall be three-eighths inches wide and may be formed
-either by cutting through the completed curb and gutter with a suitable
-tool, or by the use of iron forms or partitions, but in either case the
-corners at the ends of the blocks must be made solid and dense and
-troweled with a suitable tool.
-
-=134. Circular Corners.=—At the intersections of streets, circular
-corners, having a radius equal, generally, to one-fifth of the width of
-the roadway of the narrower street, shall be constructed of the same
-dimensions and quality as on the body of the street, and the curb and
-gutter will be extended along the line of the cross street back to the
-front lot-lines. Properly curved circular curb and gutter shall also be
-constructed at all angles exceeding five degrees in the line of the
-curbing.
-
-=135. Corner Protection.=—Galvanized steel corner protectors or
-nose-pieces shall be used to protect the upper and outer corner of the
-curb at all circular corners and angles in the street. This steel
-protection may be of any pattern or section procurable in the market and
-approved by the engineer. It shall be firmly anchored and secured into
-the concrete.
-
-=136. Finishing.=—After the forms have been removed and before the
-concrete has set up too hard to be affected by the brush, the face and
-top of the curb shall be lightly scrubbed by a suitable wire brush so as
-to completely remove any glazed surface and to produce a surface of
-uniform texture and appearance. Dry cement or neat cement mortar shall
-not be used for dressing up exposed surfaces.[77]
-
-=137. Forms.=—The forms used may be of dressed lumber or of metal as the
-contractor may prefer. But they shall have sufficient strength and
-rigidity to hold the concrete firmly in place, and to preserve the
-correct dimensions, alignment and levels of the curb and gutter.
-
-=138. Protection.=—The completed curb and gutter shall be protected from
-fracture, deformation or spalling until the concrete has fully set. The
-concrete must be kept moist for at least five days after it has been
-laid. Any part of the curb and gutter that shall have become injured
-before it is accepted or the street is opened for travel shall be taken
-up and replaced by the contractor.
-
-=139. Payment.=—Concrete combined curb and gutter will be paid for by
-the linear foot in place, the measurement to be made along the upper and
-outer corner of the curb. The price per linear foot named in the
-contract will cover all the excavation or grading required and all the
-materials and labor, including all necessary forms, for constructing the
-curb and gutter complete. But the crushed stone used for drainage will
-be paid for by the cubic yard measured in place, and steel corner
-protection will be paid for by the linear foot in place, at the prices
-named in the contract.
-
-
-
-
- HYDRAULIC CONCRETE SIDEWALKS
-
-
-_Note._—These specifications conform to the common practice of laying
-the sidewalk in two courses.
-
-In the author’s judgment this is neither necessary nor desirable. He
-believes that it would be better and somewhat cheaper to use a single
-course of concrete four inches in thickness. He suggests for this
-concrete the ratios of one cement, two sand, and three and one-half
-stone, the latter to be crushed to pass a screen with five-eighths inch
-square openings.
-
-Tamping will bring a sufficient quantity of mortar to the surface to
-permit of satisfactory finishing. While the materials for such a single
-course of four inch concrete would cost somewhat more, the saving in
-cost of labor would, at usual prices of material and labor, make the
-single-course construction somewhat cheaper, while the solid four inches
-of richer concrete would make the walk much stronger. In fact, a single
-course of such concrete three inches thick would be sufficient in a
-great majority of cases. While the surface might not have the glazed
-appearance common in the two-course work it would be really better for
-use—a polished and slippery surface on sidewalks is not desirable.
-
-
- SPECIFICATIONS[78]
-
-=140.= The hydraulic concrete sidewalk shall be ... feet in width and
-its outer edge shall be ... feet from the outer face of the street
-curbing. It shall be constructed with two courses of Portland cement
-concrete as hereinafter specified.
-
-=141. Excavation and Grading.=—The ground to be occupied by the sidewalk
-shall be excavated or filled to a sub-grade which after being compacted
-shall be ... inches[79] below the finished surface of the sidewalk. The
-sub-grade shall be neatly dressed to a plane surface sloping downward
-toward the street one-fourth inch in one foot horizontal, and to such
-longitudinal gradients as the engineer may prescribe. The completed
-sub-grade shall project four (4) inches in excavation and eighteen (18)
-inches in embankment on each side beyond the edges of the completed
-sidewalk. After the grading is completed the surface shall be compacted
-by rolling or ramming.
-
-=142. Drainage Course.=—Upon the sub-grade prepared as specified in
-Section 141 a drainage course composed of broken stone, gravel or
-boiler-plant cinders, ... inches[80] in thickness shall be laid. Broken
-stone for this purpose may be of any durable stone crushed to such size
-that all will pass through a screen with two inch openings. Crusher-run
-material may be used unless it contains an excessive quantity of fine
-material. Gravel for the purpose may be any sound durable gravel all of
-which will pass through a two inch screen and be retained upon a
-one-fourth (¼) inch screen. If cinders are used they must be good
-boiler-plant cinders from which the ashes have been screened out. The
-cinders must be thoroughly drenched with water at least one week before
-they are placed in the sidewalk.[81]
-
-=143.= This drainage material shall be placed on the sub-grade and
-properly graded. After grading it shall be thoroughly compacted by
-ramming or rolling, and its surface shall be brought to a plane parallel
-to and ... inches below the designed surface of the sidewalk, after
-which the surface inequalities may be leveled up with screenings or
-small gravel.
-
-The bottom of the drainage course shall be connected with the street
-drains or sewer inlets by three-inch hard drain pipe at such points, not
-more than three hundred feet apart, as will drain all standing water out
-of the drainage course.
-
-=144. Concrete, Bottom Course.=—The bottom course of concrete ...[82]
-inches in depth, shall be constructed and placed in accordance with
-Sections 28, 29, 30, 31, 32, 33, 34, 35 and 36 of these general
-specifications, except that the maximum size of the crushed stone shall
-not exceed one-half the thickness of the bottom course of concrete and
-the concrete shall be uniformly composed of one part Portland cement,
-three parts sand and six parts of crushed stone. Its upper surface shall
-be brought to a plane parallel to and one inch below the designed
-sidewalk surface.
-
-=145. Surface or Finishing Course.=—The surface or finishing course
-shall be of concrete, one inch thick, composed of one part Portland
-cement, one and one-half parts sand and two and one-half parts of hard,
-durable stone, crushed to such sizes that all will pass through a screen
-having openings one-half (½) inch square and none will pass through a
-screen having openings one-eighth (⅛) inch square.[83] This concrete
-shall be made as specified in Sections 28, 29, 30, 31, 32, 33, 34, 35
-and 36 except in the particulars named in the preceding paragraph. Care
-must be taken to make the mixing very thorough. The quantity of water
-used in this concrete shall be just sufficient to make a moderately wet
-mixture, and care shall be taken to make the different batches as nearly
-as practicable of the same consistency.
-
-The surface concrete shall be spread over the bottom-course concrete
-before the latter has begun to set,[84] properly graded, well compacted
-by ramming, and its upper surface brought to the true designed plane and
-surface of the sidewalk by the use of straight-edges and troweling,[85]
-after which the surface shall be lightly gone over with a wire broom or
-brush to slightly roughen the surface. The finished plane of the
-sidewalk shall have a transverse downward slope toward the street of
-one-fourth (¼) inch to one foot of horizontal width. At no place shall
-the thickness of the surface-course be less than three-fourths of one
-inch. The outer top corners of the sidewalk shall be rounded off with a
-suitable tool to a radius of three-fourths (¾) inch.
-
-=146. Forms.=—Substantial and suitable forms of wood or iron shall be
-furnished and used by the contractor to support the concrete until it is
-hard set, when they shall be removed at his expense.
-
-=147. Expansion Joints.=—After the laying of both courses of concrete is
-completed expansion joints at right angles to the sidewalk, and not more
-than four (4) feet apart shall be constructed in the sidewalk in the
-following manner: the joint will be located by a line on the surface of
-the sidewalk and a straight-edged cutting tool one-fourth (¼) inch thick
-will be used to cut entirely through both courses of concrete,
-accurately along the line marked out, entirely across the sidewalk,
-after which a T-shaped trowel or tool shall be used to smooth and
-compact the cut surfaces for a depth of one inch, and to round off the
-corners of the sidewalk blocks to a radius of one-fourth (¼) inch.[86]
-
-Where the ends of the sidewalk abut against the curbing a clear
-expansion joint one and one-fourth (1¼) inches wide shall be left
-between the sidewalk and the curb.
-
-=148.= After the concrete laying is completed it shall be protected from
-use or injury until the concrete is set hard enough to withstand travel,
-and it shall be kept continuously damp for at least five days after the
-concrete is laid.
-
-=149. Weather.=—Concrete in sidewalks shall not be laid in freezing
-weather nor shall frozen materials be used in the work. Completed work
-must be securely protected from frost for at least seven days after the
-concrete is laid. Any concrete sidewalk that shall become frozen within
-that period of time shall be wholly taken up and replaced with new work,
-at the expense of the contractor.
-
-=150. Regrading.=—Directly after the concrete is completed, the forms
-removed, and the work inspected by the engineer, the space between the
-outer edge of the sidewalk and the street curb shall be excavated or
-filled up and dressed to a plane one inch below the top of the sidewalk
-and the top of the street curb; and the space on the inner side of the
-sidewalk shall be graded to a plane one inch below and parallel to the
-surface of the sidewalk for a distance of two feet back from the edge of
-the sidewalk and completed with a slope of one and one-half to one to
-the natural surface of the ground. Where this regrading requires filling
-up the filling material, for a depth of four inches from the surface,
-shall be good, rich surface soil.
-
-=151.= Should any defects due to faulty material or workmanship develop
-in the sidewalk within one year after the completion of the same the
-contractor shall repair or reconstruct all such defective places at his
-expense, doing the work in accordance with these specifications.
-
-=152. Measurement and Payment.=—Concrete sidewalk will be measured and
-paid for by the square foot of completed sidewalk surface, and the unit
-price per square foot shall cover the entire cost of the work, including
-grading, drainage work, all material and labor, forms, and the regrading
-or dressing up after the completion of the concrete work; except that
-the drain pipe used will be paid for per linear foot at the price named
-in the contract which price shall cover the cost of furnishing and
-putting the pipe in place complete.
-
-
-
-
- PART II
- INSTRUCTIONS TO INSPECTORS ON STREET PAVING WORK
-
-
-
-
- INTRODUCTORY NOTE
-
-
-Any general code of instructions for inspectors on street paving work
-must necessarily be little more than tentative or suggestive, as applied
-to any one city.
-
-That here presented is intended for use in connection with the
-specifications in Part I of this book. Different specifications might
-make necessary many changes in the instructions that follow. The local
-or special conditions in any city might also make them inapplicable
-without material modifications and additions.
-
-The author believes that in every city where considerable street
-pavement work is prosecuted and a number of inspectors employed on such
-work, some such code of instructions to inspectors should be formulated
-and used. Even where the inspectors are of high character and fully
-competent, the adoption of a system of rules and regulations relating to
-their work will tend to unify procedure, prevent misunderstandings and
-promote good discipline.
-
-The preparation of such a code of instructions requires no little time
-and thought, especially where there are no precedents to suggest what is
-needed, or to be used as rough patterns. It is with the hope that the
-code here presented may be found useful in this way, even though it may
-be not appropriate for adoption in any given city, that it is offered to
-municipal engineers.
-
-
-
-
- GENERAL REMARKS ABOUT INSPECTION AND INSPECTORS
-
-
-The necessity of having competent and honest inspectors upon any public
-work during its construction need not be here argued. It is generally
-understood and recognized in the case of work carried out by contract.
-Where the contractor is incompetent, careless or unreliable, inspection
-is absolutely necessary if good work is to be secured. Even where the
-contractor thoroughly understands his business and intends to faithfully
-comply with the specifications and to do all his work in a proper
-manner, the inspector cannot safely be dispensed with. The contractor
-cannot at all times be on the work; whatever may be his intention and
-instructions, foremen and laborers cannot be depended upon to exercise
-the proper care and judgment, even where they have no inclination,
-motive or interest to do otherwise, which is not always the case. It
-seems to be deeply and almost irradicably fixed in the mind of the
-average foreman on municipal work that he is expected to show his
-ability and skill by evading or circumventing the strict requirements of
-the specifications and the watchfulness of the municipal agents,
-whatever his employer may _say_ to the contrary. Even when fairly
-careful, honest and conscientious he may need friendly oversight. He is
-naturally and properly anxious to save all the money he can for his
-employer, whether from a desire to loyally serve that employer’s
-interest, or to enhance his reputation for doing work cheaply. He may
-not appreciate the importance of minor requirements of the
-specifications and may believe they can be ignored without real
-detriment to the utility of the completed work. Like other men he may
-sometimes be careless or forgetful, however good his intentions.
-
-These human qualities are not confined to foremen on _contract_ work.
-They are liable if not likely to be found in the foremen on work done
-for the municipality by the direct, or day’s work system. They may be
-encouraged by the impression or belief that they will not be held by the
-municipal authorities to as strict an observance or accountability as
-they would be if the work were being done by a contractor—which is too
-often true. The absence of some of the motives of foremen employed by
-contractors is, therefore, not a sufficient reason for dispensing with
-inspectors on work done by the city direct.
-
-It should be trite to say that inspectors should be chosen with some
-regard to their qualifications for the work they are expected to do. One
-cannot, of course, expect to secure experts for such positions at the
-rate of compensation usually paid; but it is reasonable to require that
-an appointee to such positions shall possess the following
-qualifications:
-
-That he shall be honest, trustworthy and loyal.
-
-That he shall be a man of at least average intelligence and common
-sense.
-
-That he shall have some practical knowledge of or experience in the work
-he is employed to inspect.
-
-That he shall be a man of good personal habits.
-
-That he shall be habitually punctual, industrious, and alert, and shall
-possess a fair share of that quality commonly called “backbone.”
-
-It will not, I am sure, be denied that a very large number of the
-inspectors found upon municipal public work fall short in one or more of
-these qualifications.
-
-Inspectors who habitually expect or accept compensation or gratuities
-from the contractor violate the first requirement, and their number is
-astonishingly large. These are useless, or worse than useless, to the
-municipality. There are not a few contractors who will take advantage of
-the presence on the work of such inspectors to do things that they would
-not do if thrown wholly on their own honor and responsibility.
-Contractors can hardly be blamed for expecting some compensation for the
-money thus exacted or accepted by the inspector from them.
-
-The requirement that the appointee shall have some practical knowledge
-of and experience in the work he is expected to do, while often
-disregarded, is of real importance. Good workmanship embraces many small
-details that are essential, and inferable from the specifications, but
-cannot be stated at length therein, and the inspector should have a good
-working knowledge of these.
-
-Unfortunately, large numbers of inspectors are employed for personal or
-political reasons, or because more competent men are not available. They
-know little or nothing from practical knowledge and experience about the
-work they are assigned to inspect. Efficient service cannot be expected
-from such, even if they possess the other necessary qualifications. The
-obvious remedy, where a sufficient number of qualified inspectors cannot
-be obtained at call, would be to train up a permanent force by having
-the promising tyros serve a sufficient apprenticeship under older and
-more experienced inspectors; but this is seldom done.
-
-Inspectors, whether appointed by the engineer in charge or not, should
-be absolutely under his control, including the power of dismissal
-without unnecessary formalities. Where they are under civil service
-regulations and can be dismissed only upon charges and after a hearing
-before some third person, the obstacles in the way of promptly getting
-rid of an incompetent or unfaithful inspector are often so great as to
-be discouraging if not deterrent. He may be clearly below a reasonable
-standard of honesty or efficiency but it may be very difficult to
-formulate distinct charges and support them with positive evidence.
-Thus, one may be morally certain that an inspector is accepting
-gratuities from a contractor, but unable to prove it by legal evidence.
-If in such cases the judgment and integrity of the responsible engineer
-cannot be trusted, he is not fit, himself, for the position he occupies.
-
-The question of how much authority and power shall be given to the
-inspector is always a troublesome one. If he be too much limited or
-restricted, he cannot properly discharge his duties or command the
-necessary respect from the contractor and his employees; if he be given
-too much authority and is disposed to be arbitrary or unreasonable, the
-contractor may be unjustly treated. So far as the definite requirements
-of the specifications are concerned there can usually be no room for
-going astray, but in the numberless little details not specifically
-covered in the specifications, or where their language and intent is not
-clear, differences and disputes may result which require a degree of
-knowledge and judgment that the inspector may not possess, and where his
-decisions might be against the interests of the municipality or unjust
-to the contractor. In such cases the matter should always be referred to
-the engineer or his assistant.
-
-Where inspectors are employed upon work done directly by the
-municipality the relation between them and the superintendent or foreman
-should be clearly defined and understood. Briefly stated, this relation
-should be the same as that between the inspector and the contractor on
-contract work.
-
-
-
-
- INSTRUCTIONS FOR THE GUIDANCE OF INSPECTORS ON STREET PAVING AND
- INCIDENTAL WORK
-
-
- GENERAL
-
-=1.= The chief duty of the inspector is to see that the work to which he
-is assigned shall be carried out in full and strict accordance with the
-plans and specifications therefor, and with such additional instructions
-as may from time to time be given by the engineer.
-
-=2.= These instructions are intended to supplement but in no case to
-take the place of the specifications for the work, which must be fully
-and strictly complied with, unless they are changed or modified by the
-engineer.
-
-=3.= Wherever the words “_the engineer_” are used in these instructions
-they refer to the chief engineer in charge of the work for the
-municipality, or his authorized deputies or agents.
-
-Wherever the words “_the contractor_” are used they refer to the person,
-or firm, or corporation under contract to perform the work to which you
-are assigned, or his agents or employees engaged upon the work.
-
-=4.= You will report to and be under the exclusive direction and control
-of the engineer.
-
-=5.= Upon being assigned to any work you will obtain copies of the plans
-and specifications under which it is to be done, and will carefully read
-and acquaint yourself with all their provisions and requirements. If any
-part of these plans and specifications are not clearly understood by
-you, you will ask the engineer for explanations and instructions, and
-will be governed thereby. Failure to understand or to be familiar with
-the plans and specifications will in no case be accepted as an excuse
-for not complying with and enforcing them.
-
-You will also obtain, study and familiarize yourself with all the blank
-forms, reports, etc., that are to be used by you on the work, so that
-they may be correctly utilized; you will also obtain a proper supply of
-such apparatus, tools, stationery, etc., as you will need upon the work.
-
-=6.= In inspecting any work done under contract you are to assume that
-the contractor is bound to carry out in good faith the plans and
-specifications attached to his contract, and that he may be, and must
-be, held to a strict compliance with them unless you receive
-instructions to the contrary from the engineer. You will be held
-responsible for the enforcement of these plans and specifications so far
-as they relate to the doing of the work.
-
-=7.= In case the contractor or his agents shall neglect or refuse to
-comply with the plans and specifications or to perform the work in a
-proper manner, or in accordance with the instructions of the engineer,
-you will direct him to suspend the particular work in fault and will
-report all the facts promptly to the engineer and await his
-instructions, which, when received, you will proceed to enforce.
-
-=8.= You will be expected to be upon the work at all times when work is
-in progress, whether during ordinary working or office hours, or not.
-But in case the contractor shall work continuous day and night forces,
-or otherwise so conduct the work as to require the presence of an
-inspector for unusual or unreasonable hours of service, you will notify
-the engineer and ask instructions or assistance. If for any reason you
-are to be unable to be present whenever work is in progress you will
-promptly notify the engineer in time to enable him to supply a
-substitute.
-
-=9.= All reports and records required of you by the engineer must be
-promptly made up and forwarded to him at the time and in the manner he
-may direct. You will promptly acknowledge in person or writing any
-instructions received from the engineer and in case such instructions
-are not clearly understood by you, you will ask for explanation or
-advice.
-
-You will keep a notebook or diary in which all occurrences or matters of
-interest relating to the work will be recorded each day, which book will
-be delivered to the engineer on the completion of the work, or whenever
-your connection therewith may end. All diaries, notebooks and records
-kept on the work are the property of the city.
-
-=10.= While your first duty is to see that the work is done in
-accordance with the plans and specifications, you will, so far as
-consistent with this duty, be considerate of the interests of the
-contractor and facilitate his work as much as practicable. Materials
-should be inspected promptly upon delivery and in such a manner as not
-to delay or discommode the contractor more than is necessary. Errors,
-defects or delinquencies in the work should be detected and called
-attention to promptly, so as to avoid tearing up and re-construction as
-far as practicable.
-
-=11.= Orders and instructions should be given to the contractor or his
-foremen or representatives on the work and not to the laborers, unless
-in urgent cases.
-
-=12.= You shall not at any time, before, during, or after the completion
-of the work, ask or accept from the contractor or any of his agents or
-employees, or from any other person whom you may have reason to believe
-is acting for the contractor, any money, gifts, gratuities or other
-considerations of value, whether as compensation for services rendered
-him or otherwise. The penalty for violation of this rule will be
-dismissal from the service followed by such legal prosecution as the
-engineer may direct. This rule does not apply to the ordinary small
-courtesies common between gentlemen associated in business.
-
-=13.= It is a condition of your employment that your services shall be
-loyal to the interests of the municipality, efficient, and satisfactory
-to the engineer, and that whenever in his opinion your service falls
-short of this standard he may dismiss you at any time, without previous
-notice.
-
-
-
-
- STREET PAVING WORK
-
-
-=14. Sub-foundation.=—The usual procedure in preparing the
-sub-foundation for a pavement is:
-
-The removal of the old pavement if one exists on the street.
-
-The setting of new or the resetting of the old curbing. (If concrete
-combined curb and gutter is used it is not constructed until after the
-rough grading is done.)
-
-The rough grading of the street.
-
-The fine grading of the street.
-
-In this work the main things for the inspector to look after are the
-following:
-
-If an old pavement is to be taken up and any part of it is to be
-reserved for use by the city, see that the material is not injured in
-handling and is disposed of as the specifications or the instructions of
-the engineer require.
-
-=15. Curbing.=—New curb stone should be inspected as soon as practicable
-after it is delivered on the street so that the contractor may have time
-to replace any that may be rejected. Rejected stones should be plainly
-marked on their tops with red paint, and the contractor required to
-remove them from the street. Stones that are defective in dressing
-should be given some distinctive mark and the attention of the
-contractor called to them so that the necessary redressing may be done
-well in advance of the setting, and reinspected.
-
-If the old curb stone is to be redressed and reset, it should be
-inspected as soon as possible after it is taken out and all stones that
-are not suitable for re-use rejected and removed from the work. The
-redressing of the stones should be looked after carefully. The tendency
-in this work is toward the use of old stones that do not, or cannot be
-made to comply with the specifications, and toward laxity in the
-dressing.
-
-=Setting Curbing.=—In the setting of curbing the points to be looked
-after are:
-
-To see that the trenches are excavated to the full dimensions so as to
-provide space for the use of the full quantity required of concrete,
-gravel or broken stone in which the curb is to be embedded.
-
-To see that the stones are set to true grade and alignment.
-
-That the concrete, gravel or crushed stone used is of the proper
-quality, the proper quantity used, and that it is placed and compacted
-so as to fill the spaces designated under and around the stone. The
-tendency of the workmen is to treat these details as unimportant and to
-slight the work.
-
-After the curbing is set any spaces between it and the edge of the
-sidewalk are to be cleaned out, filled and trimmed with Portland cement
-mortar.
-
-=16. Rough Grading.=—If plows and scrapers are used in the rough
-grading, see that they are not allowed to penetrate or to disturb the
-natural soil below the true grade, and to prevent this it is better to
-require that the plowing and scraping shall not approach nearer than one
-or two inches to the true grade.
-
-If embankment or filling is necessary, the filling material must be
-deposited in regular layers not more than six inches deep and each layer
-must be well compacted by rolling or ramming before the next layer is
-applied.
-
-=17. Fine Grading.=—The fine grading (with pick or mattock and shovel),
-to bring the sub-grade to the true grade and contour required, should be
-done with reasonable accuracy and care. Allowance must be made for
-compression under the roller, so that when completed the surface shall
-not vary more than half an inch below nor more than a quarter of an inch
-above the true grade, in order that room for the full thickness of
-concrete foundation may be provided, and no more. Humps, depressions and
-irregularities of the surface are to be avoided. The fine grading will
-be completed by thoroughly rolling or tamping the surface to make the
-soil firm and dense. On some soft or wet, clayey soils, excessive
-rolling may produce a plastic or “liver-like” condition and the rolling
-should be discontinued where such a tendency appears.
-
-=18. Work Incidental to Grading.=—Where it is a part of the contractor’s
-work to reconstruct or readjust catch basins, manholes, covers, and
-other structures, he should be required to keep this work done well in
-advance of the laying of the concrete foundation. If this work is
-delayed until after the main body of the concrete is in place, leaving
-openings to be filled later, hurriedly and perhaps carelessly, it may
-result in weak patches in the concrete around these structures, where,
-in fact, the concrete should be strongest.
-
-
- CONCRETE FOUNDATIONS
-
-=19.= The concrete foundation of a pavement is a most important part of
-the work, and must not be slighted in any way.
-
-=20. Quality of Materials.=—The quality of the materials used for making
-the concrete are fully described in the specifications, and they must be
-substantially and uniformly adhered to.
-
-The Portland cement delivered on the street will presumably have been
-previously inspected and accepted by the engineer, but any change in the
-kind, or brand, or apparent quality of the cement delivered after the
-beginning of the work should not be permitted without the approval of
-the engineer. Barrels or bags of cement not plainly marked with the
-brand, or name of the manufacturer must be rejected. You will frequently
-make balls of stiff mortar from the cement and sand used (1 part cement,
-2 parts sand) and set them aside for observation. If in eight hours
-these balls do not set up hard the fact should be promptly reported to
-the engineer.
-
-The sand and stone will naturally vary slightly from time to time, but
-should not differ materially from the requirements of the specifications
-or the standards adopted by the engineer. Stone or gravel that contains
-any considerable quantity, say more than 5%, of foreign matter, such as
-soil or refuse, should be rejected. Stone containing an excessive
-quantity of fine fragments or screenings bunched together in the pile,
-should be mixed with the mass of larger stone before it is used, so as
-to produce a mass of fairly even composition. Stone that is coated with
-mud, or that is not sound and hard should be thrown out.
-
-Sand that is moderately coarse and does not contain more than 7½% of
-clay or soil, and is free from vegetable refuse, may be used.
-
-=21. Storing Materials.=—Cement stored on the street must be stacked up
-on dry lumber floors at least four inches from the ground and
-effectually covered to protect it from rain or snow. Packages of cement
-which, when turned out for use contain hard lumps should be rejected.
-
-Sand and stone must be stored on tight lumber floors to prevent their
-admixture, when being shoveled up, with street soil or other impurities.
-This requirement must be enforced.
-
-=22. Proportioning Concrete.=—The proportions of cement, sand and stone
-or gravel named in the specifications must be strictly adhered to.
-
-A barrel of Portland cement will be considered as four cubic feet and a
-standard bag of cement as one cubic foot.
-
-It is usual for the contractor to measure the sand and stone by
-wheelbarrow loads. In that case you will measure and determine the
-capacity, in cubic feet, of the convenient or average wheelbarrow load,
-and determine the size and number of loads each of sand and stone
-required for one batch of concrete (if made by hand) and thereafter see
-that the quantities thus determined are used, and the wheelbarrow
-loading uniform. To measure the contents of a wheelbarrow load, use a
-square box holding one cubic foot. It cannot be accurately measured on
-the barrow.
-
-As a check upon the proportioning of materials, you should occasionally
-keep a record of the quantities of cement, sand and stone used for, say,
-one or two hours, and mark and measure up the quantity of concrete made
-with them, and from this data compute the ratios of the materials used.
-(In ordinary street concrete, proportioned 1:3:6, the volume of rammed
-concrete made will just about equal the volume of the stone used.)
-
-Where the concrete is mixed by a machine with automatic feeding devices,
-reliance must not be placed upon the machine for proper proportioning.
-Frequent tests of the materials used and the volume of concrete turned
-out should be made as described above, and any necessary corrections
-made in the feeding devices of the machine. This test should be made
-daily if practicable. The eye will usually detect any material change in
-the composition of the concrete, and whenever such changes are observed
-the composition ought to be at once checked up by measurement.
-
-=23. Mixing Concrete.=—See that the specifications are followed. Use
-sufficient water to make what is commonly called a wet concrete but not
-so wet that free water will drain from the mixed batch before ramming.
-The test for proper mixing will be that all the fragments of stone are
-completely covered with mortar.
-
-=24. Placing Concrete on Street.=—All concrete must be placed and rammed
-before it begins to stiffen or set. Concrete should be so handled that
-the mortar will segregate or separate from the stone as little as
-possible. When in place on the street it should make a mass of uniform
-consistency and appearance. The concrete should, as soon as placed on
-the street, be graded to a proper thickness and surface, and then well
-compacted by ramming. Insist on good ramming; this part of the work is
-not often properly done. The surface of the concrete should be brought
-to the true grade by proper grading and tamping. Where necessary to
-raise the surface, additional concrete, made of small stone, may be
-applied during the tamping. Neat mortar should not be used for this
-purpose. Sweeping mortar over the surface with street brooms should not
-be permitted—it is useful only to cover up defects and to produce an
-extra smooth surface (which is not usually desirable). To measure the
-thickness of the bed of concrete, lay a straight-edge upon the surface
-with the end of the straight-edge projecting a foot or two beyond the
-edge of the concrete, and measure the space from the lower edge of the
-straight-edge down to the sub-foundation.
-
-Care must be taken to finish the surface of the completed concrete at
-the proper distance below and truly parallel to the grade and contour of
-the finished pavement. This is more important in the case of sheet
-asphalt pavements, since irregularities in the concrete will cause
-variation in the thickness of the finished asphalt surface, which will
-affect the durability of the pavement. The grade stakes for the concrete
-should therefore be carefully set and worked to, and humps or
-depressions between the stakes should be avoided.
-
-=25.= In hot, dry, weather the concrete must be kept damp by watering it
-until it is at least five days old, and horse-travel over it must be
-prohibited until it has set up hard enough not to be injured thereby.
-
-=26. Old Paving Stone Foundations.=—If a foundation is to be made of old
-paving stone blocks reset, the important points to be looked after are,
-
-The preparation of the sub-foundation.
-
-The sand bed.
-
-The setting of the blocks.
-
-The grouting of the blocks.
-
-The sub-foundation should be prepared, where necessary, as stipulated in
-Sects. 16 and 17 of these instructions. This part of the work is likely
-to be carelessly done unless proper work is insisted upon.
-
-The sand used as a cushion course must be of good quality and reasonably
-clean. The use of mixed sand and soil taken from the street excavation
-should not be permitted.
-
-The blocks, after being cleaned from adhering dirt, should be set with
-reasonable care, well bedded in the sand cushion, and laid at such an
-elevation below the completed pavement surface, that after being well
-rammed, the surface will be at the proper elevation below the pavement
-datum.
-
-The grouting of the joints is the most important part of the work. See
-that the mortar is made and used in accordance with the specifications,
-and that the joints are completely filled.
-
-=27. Broken Stone Foundations.=—The specifications for broken stone
-foundations are sufficiently explicit, and compliance should be insisted
-upon. Thorough rolling is especially important.
-
-
- SHEET ASPHALT PAVEMENTS
-
-=28.= The manufacture of the mixture for sheet asphalt pavement, and the
-laying of it on the street, involve a number of separate elements or
-operations. The quality and durability of the pavement will depend
-largely upon the skill, intelligence and accuracy with which each and
-all parts of the work are carried out. The inspector, both at the mixing
-plant and on the street, must give constant and intelligent attention to
-the work.
-
-=29. Inspecting at Paving Plant.=—Inspectors at the plant where the
-asphalt paving mixture is made will be provided with the following
-apparatus:
-
- 1 nest of standard sieves, Nos. 10, 30, 50, 80, 100 and 200
-
- 2 thermometers for sand
-
- 1 tank thermometer
-
- 2 standard flow-plates and one dozen cartridges for same
-
- 1 balance for weighing sand
-
- 6 dishes, glass or porcelain, 4 inches in diameter.
-
-=30.= The more important things for the Plant Inspector to watch during
-the manufacture of asphalt paving mixture are:
-
- _a._ Quality and grading of the sand.
-
- _b._ Temperature of heated sand.
-
- _c._ Uniform quality of the refined asphalt and flux.
-
- _d._ Temperature of melted bitumens.
-
- _e._ Uniform consistency of asphaltic cement.
-
- _f._ Correct ratios of sand and asphaltic cement.
-
- _g._ Thorough mixing of materials.
-
-=31. Sand.=—The general quality and grain-size of the sand, required by
-the specifications, must be closely watched and adhered to.
-
-It is hardly ever possible to secure a natural sand that will conform
-strictly to the theoretical composition, but _substantial_ compliance
-should be required unless the Chief Engineer directs otherwise. After
-any sand has been approved for a given contract or street, all the sand
-thereafter used for that street should conform closely to the standard
-so approved; for any material change in the quality of the sand will
-change the quality of the pavement produced, unless the proportions of
-the other materials are changed accordingly. Any material change in the
-sand should therefore be promptly reported to the Chief Engineer.
-
-=32.= Sand for the sieve tests should be taken from the hot-sand box and
-allowed to become cold. From the sample thus taken, weigh out 50 grams.
-Arrange the nest of sieves with the No. 200 at the bottom followed by
-Nos. 100, No. 80, No. 50, No. 30 and No. 10 at the top.
-
-Place the weighed sample upon the No. 10 sieve and thoroughly shake the
-nest until all the sand that will, has passed through the various
-sieves; then weigh the various portions, beginning with that which has
-passed the No. 200 (deducting in each case the weight of the dish). The
-portion _remaining_ on the No. 200, is the quantity _passing_ the No.
-100, etc. The sum of all these portions should be 50 grams, though it
-will usually be slightly less because of unavoidable waste. In use, keep
-the sieves clean and as free as possible from adhering grains by using a
-bristle brush.
-
-=33. Temperature of the Sand.=—The temperature of the heated sand should
-be frequently noted by plunging the thermometer into the mass. It should
-not fall below 315° F. nor exceed 375° F. It is very important to avoid
-over-hot sand, because, in the mixer, the very thin films of bitumen
-covering the hot-sand grains are readily and quickly scorched by the
-excessive heat in the sand.
-
-=34. Refined Asphalt and Fluxing Oil.=—Unless otherwise notified by the
-Chief Engineer you will assume that the stock of refined asphalt on hand
-at the beginning of the work has been inspected and is satisfactory. You
-will, however, note the appearance of the material and the character and
-marking of the barrels or packages, and will not permit the use of any
-new shipments of materials of different appearance or brand without
-authority from the Chief Engineer. The above instructions apply also to
-the oil used for fluxing.
-
-=35. Ratio of Asphalt and Flux.=—You will frequently note and record the
-weight of asphalt and of flux used in charging the melting tanks.
-
-=36. Temperature in Melting Tanks.=—The melting kettles are usually
-equipped with fixed thermometers, but their reading should be frequently
-checked with your detached tank thermometer. You will see that the
-temperatures in the kettles are kept within the limits named in the
-specifications. See that the melted asphaltic cement is kept constantly
-agitated as required by the specifications.
-
-=37. Uniformity of Asphaltic Cement.=—It is very important that the
-asphaltic cement shall be of uniform composition and consistency, or
-hardness.
-
-When the composition and consistency of the asphaltic cement to be used
-for the surface-course of any street has been determined upon and
-approved by the engineer, you will take out and preserve a sufficiently
-large quantity to be used thereafter as a standard, and each subsequent
-tank of cement, before it is used, should be tested by comparing it with
-this standard in the following manner, using the flow-plate apparatus:
-
-Melt and fill two cartridges with the standard cement, and two with the
-cement to be tested, marking them for identification. When cold,
-carefully remove with a wetted dull knife any surplus cement from the
-ends of the cartridges so as to leave them exactly full and the metal
-ends clean. Immerse them in cold water until they are all of the same
-temperature. Then place and fasten these filled cartridges on the
-grooved plate with their lower ends exactly to the zero line on the
-plate, the standard samples alternating with the new. Then place the
-plate, at an inclination of about 45°, in front of a source of uniformly
-distributed heat, as, for instance, near a steam boiler or large steam
-pipe, or (when the weather is favorable) in the sunshine, facing the
-sun. Leave the plate in this position until the bitumen in the
-cartridges shall have melted and flowed down the grooves an average of
-from four to five inches. Then measure the lengths of flow of each from
-the zero line on the plate. If the average flow of the new samples
-differs more than 5 per cent. from that of the standards, the new cement
-should be regarded as unsatisfactory and should be corrected by adding
-more asphalt or flux, as may be required.
-
-(If a _penetration apparatus_ is supplied or is available, the
-penetration method may be used instead of this flow-method for
-determining the consistency of the cements. Proper instructions for its
-use will accompany the apparatus.)
-
-=38. Ratio of Sand and Cement.=—When the proper ratio of sand and
-asphaltic cement has been determined for any street you will see that
-this ratio is carefully adhered to. The correctness of the weighing
-scales used should be frequently tested.
-
-=39. Mixing.=—When the sand and asphaltic cement are properly mixed the
-appearance of the mass will be perfectly uniform throughout, with every
-grain of sand entirely and evenly coated with cement. The mixing should,
-however, be continued somewhat beyond the attainment of this condition,
-so as to insure thoroughness. After the proper result has been arrived
-at, either the _time_ in the mixer, or the _number of revolutions_ of
-the mixer shaft should be noted and the standard thus determined
-substantially adhered to thereafter. With the standard mixers commonly
-used, the hot sand and the filler (dust) should first be put into the
-mixer and mixed for about fifteen seconds; then the asphaltic cement
-added and the mixing continued as long as necessary (in the usual mixer
-not less than sixty seconds).
-
-=40. Records.=—You will keep complete records of the results of your
-observations and tests in a book which will be provided for the purpose,
-and will make such reports to the Engineer as he may direct.
-
-=41. Inspection on the Street.=—The leading things to be kept in mind by
-the street inspector, in the laying of asphalt pavement on the street,
-are the following:
-
- _a._ Temperature of mixtures when applied to the street.
-
- _b._ Proper preparation of the street surface before material is laid.
-
- _c._ Laying and rolling of the binder-course.
-
- _d._ Laying of the surface-course.
-
- _e._ Rolling the surface-course.
-
-=42. Inspector’s Equipment.=—The inspector will be supplied with the
-following apparatus:
-
- 1 armored thermometer reading from 200° F. to 500° F.
-
- 1 graduated spatula.
-
- 1 twelve-foot straight-edge.
-
- 1 fifty-foot tape line.
-
-=43. Temperature of Mixture.=—If proper care has been taken at the
-mixing plant the mixture will not arrive on the street at too high a
-temperature, and your principal care will be to see that it is not laid
-at too low a temperature. The minimum temperature named in the
-specifications should be adhered to. While the main or interior mass of
-a wagon load may be well above that temperature, the top and outer part
-of the load may be, particularly in cold weather, too cold to be safely
-used. Some of this colder portion may usually be sufficiently reheated
-by mixing it with the hotter material, if properly handled in unloading;
-but any material that is so cold as to be lumpy when unloaded, or, more
-particularly, when being raked out, should be discarded. This applies to
-both surface and binder mixtures.
-
-It must not, however, be overlooked that the different kinds of asphalts
-have different appropriate working temperatures, and for some asphalts
-the minimum temperature named in the specifications may be too low. The
-best practical guide is the manner in which the mixture behaves in
-raking. It must always be so hot that it will, under the rake, break up
-into a uniform, crumbling or powdery mass. If it does not do this it is
-(unless the mixture is excessively rich in bitumen or improperly
-compounded) too cold.
-
-=44. Preparation of Street Surface.=—Before the binder-course is laid,
-all loose material, rubbish, street dirt and other matter foreign to the
-concrete surface must be removed and the concrete surface swept, if
-necessary, to properly clean it, with street brooms. Neither binder nor
-surface mixture shall be laid upon wet surfaces. Before the spreading of
-the surface mixture on the binder the latter must be cleaned of all
-foreign matter and, if necessary, swept. If the binder is covered with
-mud from wagons or other travel, the surface must be scrubbed clean. Any
-part of the binder-course that may have become broken or loosened before
-the surface-course is applied must be taken up and new material laid in
-its place with the same care as the original.
-
-=45. Laying Binder-course.=—The binder mixture must be carefully spread
-and raked to such thickness that after being rolled it will present an
-even, true surface not varying more than one-fourth inch from the
-intended finished surface of the binder. The tendency is to lay the
-binder-course carelessly and to roll it insufficiently. Nearly the same
-care in raking and rolling as for the surface-course, should be insisted
-upon. If the binder is not thoroughly compressed before it becomes cold
-it is likely, in future hot weather, to soften and yield under heavy
-travel and thus to start depressions in the pavement which will increase
-with time.
-
-=46. Laying the Surface-course.=—The requirements of the specifications
-should be rigidly enforced in the laying of the surface-course. Joints
-against a cold edge of previously laid surface must be cut back until
-solid, fully compressed material of full thickness is reached, and the
-raw edge completely but thinly painted with liquid paving cement or
-pitch. No masses or fragments of cold mixture, whether of binder or
-surface, must be allowed to remain on the surface of the binder in
-advance of the placing of the surface-course, to be covered up by the
-latter. Such cold masses will not be compressed by the roller, but will
-later, under a hot sun and heavy travel, yield and start depressions in
-the pavement. The raking out requires to be properly and skilfully done.
-The tines of the rakes must penetrate to the binder, so that the raked
-material will be a uniform mass from top to bottom.
-
-=47. Rolling.=—You will insist upon the rollers being placed upon the
-freshly raked surface just as soon as the material will bear them
-without being squeezed out or displaced laterally. The tendency is to
-keep the rollers off too long, thus permitting the chilling of the
-surface and preventing its proper compression. Do not take the
-contractor’s word as to how soon the rolling may be begun, but have
-trials made until you are able yourself to judge. The rolling by the
-heavy roller should be very thorough: keep the roller at work constantly
-until the surface is too cold to be impressed. In operating the roller
-lengthwise of the street begin at the gutters and work toward the center
-of the street. Cross rolling and diagonal rolling must be insisted upon
-wherever the width of the street will permit it.
-
-=48. Proper Thickness and Surface.=—While the completed surface is still
-warm enough to permit it, measure the thickness of the surface-course by
-forcing the graduated spatula through it to the binder and noting the
-depth of penetration. Also test the trueness of the finished surface
-with the straight-edge, and if found defective in either thickness of
-pavement or trueness of surface, insist on more careful grading and
-raking on the further work. Try the completed gutters with water to see
-that they are so truly laid that puddles of water will not stand in
-them.
-
-=49.= Asphalt surface must not be laid when rain or snow is falling, or
-so long as the street surfaces are wet. Surface mixture raked out and
-caught in a shower before it is well enough rolled to exclude water must
-be taken up and discarded.
-
-Unless unavoidable, neither binder nor surface should be laid when the
-street surface or the air is below 40° F. As a rule, the lower the
-temperature the of air the greater is the care necessary to properly lay
-asphalt pavement.
-
-=50.= Measure each day the area of pavement laid and record that, and
-the quantity (number of batches) of surface mixture used, and note any
-lack of uniformity in the area laid per batch.
-
-
- ASPHALT BLOCK PAVEMENT
-
-=51.= You may assume, unless otherwise instructed, that the Engineer has
-inspected and approved the general character of the blocks already
-delivered for the work, unless their inferiority be obvious, but you
-will be expected to observe them carefully as laid and to reject blocks
-that vary in dimensions from those permitted by the specifications, and
-those that are broken, disfigured or injured. But during the progress of
-the work you will note the character of subsequent deliveries and report
-to the Engineer any apparent change in the quality of the blocks.
-
-The more important points to look after in the laying of the asphalt
-blocks are: the quality and grading of the mortar bed in which the
-blocks are set, and the care and accuracy of the block setting. The
-mortar must be of cement and sand in the ratios specified, and
-sufficient water used to make a medium stiff mortar; the use of merely
-moistened powder must not be permitted; and any mortar that has begun to
-set up before the blocks are laid and rammed must be discarded.
-
-=52.= In setting the blocks the principal requisites are: that they be
-well bedded in the mortar; that they be set so that after ramming their
-tops will be accurately in the pavement datum; that they be set and
-pressed as closely together as possible, levers or mauls being used to
-force them into close contact, both at ends and sides.
-
-
- GRANITE BLOCK PAVING
-
-=53.= Assuming that the foundation has been properly constructed, the
-more important things for the inspector to look after are:
-
-_a._ The quality and shape of the blocks.
-
-_b._ The sand cushion.
-
-_c._ The setting of the blocks.
-
-_d._ The ramming of the blocks.
-
-_e._ The filling of the joints.
-
-=54. The Blocks.=—Assuming that the general _quality_ of the granite has
-been approved, you will need only to observe and reject blocks made from
-soft or weathered or otherwise defective stone. Any material divergence
-of the blocks from the correct form or from the sizes specified as
-permissible will be readily caught by the eye as they are brought to the
-street, and they can then be thrown out. The proper dressing of the
-blocks is important and should be watched carefully. While you are not
-expected to examine each individual block, close observation of the
-blocks as they are handled and laid will enable you to detect and reject
-those that are materially defective in shape or dressing; or excessively
-wide joints will call attention to these defects as the blocks are set.
-
-=55. Sand Cushion.=—The sand used for the cushion bed should be
-moderately coarse and must be fairly clean and pure. The tendency with
-contractors is to use any dirty sand or sandy loam available on the
-street. Such material, especially if it becomes filled with water, will
-yield under the blocks and will not support them properly. The sand bed
-should not vary materially in thickness. It should be laid and graded
-not more than fifty nor less than twenty feet in advance of the setting
-of the blocks.
-
-=56. Setting of the Blocks.=—The blocks should be delivered in front of
-the block setters on the blocks already set. The blocks must be set in
-straight courses from curb to curb, the courses running at right angles
-to the street (except at street intersections). All the blocks in any
-one course must be of the same width. Each block should be so set that
-the whole of its bed will be seated upon sand. The usual practice of
-block setters is to make a bed by drawing the sand into a small ridge
-upon which the outer edge of the block is rested, its weight canting it
-against the course already laid. This usually leaves a cavity under the
-back edge of the block which neither the subsequent joint filling or
-ramming closes up, so that the block may rest permanently on only a part
-of its bed. The practice is so fixed with block setters that it will
-require firmness and persistency to prevent it, but you should insist
-that it be so modified as to give a solid bearing for each block over
-its whole base.
-
-The blocks must be set solidly against each other so as to make the
-joints of the least possible width. Unless close attention is given to
-this the joints are likely to greatly exceed the width permitted by the
-specifications. Care should be taken that the blocks are set truly
-vertical so that their upper face shall be parallel to the plane of the
-street. In setting the blocks their straightest and truest face should
-be placed upward so as to make the surface of the pavement as smooth and
-even as possible. Block setters are often careless about this.
-
-Ordinarily no grade stakes are set for the surface of the pavement and
-templates are seldom used, the block setters using only their eyes to
-make the surface conform to the intended contour of the street. This
-usually results in the completed street being more or less wavy and
-irregular, and in a lack of regular and uniform cross-section in
-different parts of the street, often very perceptible to the eye. Care
-should be taken to avoid this as much as possible. Straight-edges and
-templates, cut to the proper curve for the surface, should be provided
-and used.
-
-=57. Ramming the Blocks.=—This part of the work is likely to be slighted
-unless carefully watched. The important thing is to have each block
-equally and sufficiently rammed to bring it to a firm bearing on the
-sand, as well as to bring its top to the proper grade. The rammers will
-be disposed to touch lightly blocks or areas which if thoroughly rammed
-would be driven below the true surface of the pavement, and subsequent
-travel may force these down, making depressions in the surface. It is a
-very common practice for the men working the rammers to shirk on this
-work by allowing the rammers to fall with little more force than that
-due to their own weight. This should be detected and remedied.
-
-=58. Filling the Joints.=—The specifications are quite full and clear
-regarding this part of the work and little further need be said.
-
-Care is necessary, whether the joints be filled with gravel and
-bituminous cement or with grout, to secure the complete filling of all
-the joints. If the weather is cold at the time the work is done, the
-gravel filling may become so chilled before the bituminous cement is
-poured that it will not flow to the bottom of the joints. For this
-reason it is important that the cement be worked at the highest
-temperature that it will bear without injury.
-
-If grout filling is used care is necessary to make the mortar of the
-right consistency. If too thick it will not flow freely to the bottom of
-the joint; if too thin its strength will be materially reduced.
-Experiments should be made to determine the proper consistency, and when
-this is found, the quantity of water used in making the mortar should be
-determined and thereafter measured out for each batch.
-
-The mortar must be kept constantly stirred until used, otherwise the
-sand is likely to settle to the bottom. Whatever filling is used, a
-second and sometimes a third pouring will be necessary to completely
-fill the joints.
-
-
- BRICK PAVEMENT
-
-=59.= The matters requiring most attention in the construction of brick
-pavement (assuming that the foundation is in place) are the character
-and quality of the brick, the sand cushion, the setting of the brick,
-and the filling of the joints between the brick.
-
-=60. Inspecting the Brick.=—The examination, testing and acceptance, in
-a general way, of the brick to be used for the work will be made in the
-engineer’s office, and your duty will be confined in this matter to
-seeing that the brick delivered and used are in accordance with the
-standard established and the general requirements of the specifications.
-You can best inspect the brick as they are being laid or after they have
-been laid, and before the surface has been rammed or rolled. Presumably
-the brick-setters will discard most of the unsuitable brick during the
-progress of their work, particularly if they are given to understand
-distinctly the defects that will cause rejection.
-
-As the setting is completed, go carefully over the surface of the
-pavement and mark plainly all the bricks that are to be removed for
-defects and see that all such are taken out and replaced with good
-brick. The principal defects that should be observed are: soft or
-underburned bricks; those that are warped or deformed so that they will
-not fit closely to their neighbors, or have warped or ill-shaped tops;
-those that are broken or chipped or show injurious cracks, and those
-that are perceptibly wider or narrower than their neighbors in the same
-course.
-
-Soft or underburned brick may be detected with most certainty by having
-the contractor wet the surface of the pavement by sprinkling. The soft
-brick will absorb more water and remain damp longer than the hard brick
-and can thus be readily detected. This test can be applied, however,
-only to pavements the joints of which are to be filled with grout, as
-bituminous filling should not be applied to brick with wet surfaces, and
-to wait until they become dry after the wetting would delay the work
-unwarrantably.
-
-=61. Sand Cushion.=—See that the sand used is free from foreign matter
-and pebbles, as required by the specifications, and that the sand bed is
-of uniform thickness, correctly gaged, and rolled to the true plane of
-the pavement, additional sand being added or surplus removed where
-necessary to secure this result. See that the cushion is not thereafter
-disturbed or, if disturbed, that it be restored to its original
-condition.
-
-=62. Setting the Brick.=—The bricks are to be set as closely together as
-possible both at sides and ends, so that the joints will not be wider
-than permitted by the specifications. Where the bricks have lugs or
-letters on one side, the lug-sides shall in no case be laid together.
-The courses must be reasonably straight entirely across the street. See
-that the bricks in adjoining courses break joint not less than three
-inches. Brick-setters are likely to be careless about this. Do not
-permit bats to be used except where necessary at the ends of courses or
-to fit the pavement against street railroad rails or around manholes or
-other structures in the street, and insist that this filling in shall
-follow immediately after the brick-setting, and that close fits shall be
-made.
-
-=63. Rolling the Pavement Surface.=—This should be carefully and
-uniformly done so as to insure the even surface and contour of the
-pavement. Do not allow the roller to make sharp turns on the freshly
-laid brick surface as it will disturb and cant the loose brick. The
-roller should run back onto the fully completed pavement to make any
-necessary turns or considerable changes of direction. Quick starts or
-stops of the roller on the fresh-laid brick should be avoided for the
-same reason.
-
-=64. Filling the Joints.=—Whether grout or bituminous filling be used
-the important thing is to get all the joints completely filled. Where
-bituminous cement is used, if the work is done in very cool weather the
-brick is likely to chill the cement before it reaches the bottom of the
-joints unless the cement be applied as hot as possible without injuring
-it, and the pouring be rapidly and carefully done.
-
-If grout filling be used, see that the mortar is made of the proper
-ratio of sand and cement and that it is of the proper consistency to
-just flow into the joints, and that after mixing it is kept stirred
-until used. Repour all joints where necessary to completely fill them.
-
-=65. Gutters and Expansion Joints.=—See that the gutters are laid with
-longitudinal courses of brick and their joints filled with bituminous
-cement as provided in the specifications.
-
-
- WOOD-BLOCK PAVEMENT
-
-=66. Foundation.=—The instructions relating to the preparation of the
-sub-foundation and the concrete foundation already given apply to
-wood-block pavement.
-
-=67. Inspection of Blocks.=—However carefully the lumber may have been
-inspected before its manufacture into blocks, the subsequent seasoning,
-treatment, handling and exposure to the weather will develop many
-defects and you will need to observe the delivered blocks closely,
-either before or after they are set, and reject those that do not comply
-with the specifications. The principal defects that you will be able to
-detect after the blocks are treated are the following: Southern pine
-blocks made of second-growth or inferior wood, partly shown by the
-number of annual growth rings per inch. Blocks having a less number of
-these annual growth rings per inch than is permitted by the
-specifications should be rejected. The treated blocks, especially when
-they are exposed to the weather for some time, are likely to develop
-seasoning cracks, “shakes” and loose knots, not observable in the
-lumber, and blocks showing these to an injurious extent should be
-rejected, though in many cases the defective part may be split off and
-the remainder of the block used for closers. If the blocks have become
-very dry and thoroughly seasoned out, they should be well sprinkled with
-water about twenty-four hours before they are to be set, to forestall
-excessive swelling and “humping” when a rain storm comes upon the new
-pavement.
-
-=68. Mortar Bed.=—It is the common practice in preparing the mortar for
-the mortar bed under the blocks to simply dampen the mixed sand and
-cement so that it may still be spread and handled like damp sand. See
-that sufficient water is used to make a moderately stiff mortar,
-suitable for being worked with a trowel. This mortar should be prepared
-in sufficiently small quantities at a time to insure that it will not
-begin to set before the blocks be placed in it and rammed.
-
-=69. Setting the Blocks.=—The setting of the wooden blocks is a
-comparatively simple operation and the specifications are sufficiently
-full and clear for your guidance. See that the blocks are so set that
-their tops, after the ramming is completed, shall be truly in the
-pavement datum, without humps or depressions.
-
-=70. Filling the Joints.=—See that the sand used is perfectly dry, fine
-and clean, and that it is swept about on the pavement until the joints
-are completely filled.
-
-
- BITUMINOUS CONCRETE PAVEMENT
-
-=71. Preparation of Foundation.=—Where a bituminous concrete wearing
-surface is to be placed upon an old pavement or Macadam road the
-specifications must be closely followed. A good foundation is as
-necessary, if good results are to be attained, as in the case of other
-pavements. The dressing down of high points and the filling up of
-depressions in the old pavement should be carefully done, so that the
-bituminous wearing surface shall be of uniform thickness, and shall be
-rigidly supported at all points.
-
-=72. Bituminous Concrete Surface.=—The instructions given for the
-manufacture and laying of sheet asphalt pavement should be followed here
-insofar as they are applicable.
-
-
- HYDRAULIC CONCRETE ROADWAY PAVEMENT
-
-=73.= Like other structures made of hydraulic concrete, the utility and
-durability of concrete roadway pavement depends largely upon the good
-quality of the materials used and the skill and fidelity with which the
-work is done. It is especially important that the second, or surface,
-course of the concrete shall be made and placed in strict accordance
-with the specifications and that a high degree of _uniformity_ shall be
-secured in the composition, consistency and workmanship of that part of
-the work.
-
-=74. Sub-foundation and Foundation.=—The preparation of the
-sub-foundation will be the same as for other pavements, and the first,
-or foundation course, of concrete, will be constructed as in the case of
-the concrete foundation for other pavements.
-
-=75. Material for Surface-course.=—It may be assumed that, in general,
-the materials intended to be used on the work have been inspected and
-approved by the Engineer, but this should not prevent you from calling
-his attention to any defective or inferior materials that may be
-delivered on the street when the work is begun, or thereafter, and
-preventing the use of any materials that are not fully up to the
-requirements of the specifications.
-
-=76. Mixing the Surface Course.=—See that the cement sand and stone are
-proportioned accurately and that the quantity of water used with each
-batch is measured, so as to make the concrete of uniform consistency. Do
-not permit any defective batches of concrete to be used in the
-surface-course—if suitable for the bottom course they may be used in it.
-Care in this respect is particularly necessary with machine-mixed
-concrete where the machine is not working normally or the men operating
-it are careless or unskillful.
-
-=77. Placing Surface Course Concrete.=—See that the surface course is
-placed, graded and rammed _before the bottom course concrete begins to
-set_. This is imperative. Also that the concrete is distributed and
-graded in such a way as will not separate or segregate the mortar from
-the stone; that the grading of the surface is so accurate that it will
-not be necessary later to add additional concrete to that already graded
-and rammed; that the ramming is thorough and uniform over the whole
-surface, and that the rolling is well done.
-
-=78. Expansion Joints.=—Care should be taken to have the expansion
-joints made as the specifications require. See that they extend entirely
-through both courses of concrete; that the corners are properly
-compacted and troweled; that the joints are kept clean until they are
-filled with the bituminous cement, and are completely filled with the
-cement.
-
-=79. Care of Finished Work.=—Do not permit the completed work to be
-disturbed by travel over it, and see that the concrete is kept moist,
-until it shall be set up hard, and that the street is not opened for
-travel until the engineer so directs.
-
-
- CONCRETE COMBINED CURB AND GUTTER
-
-=80. General.=—The specifications for the construction of Hydraulic
-Concrete Combined Curb and Gutter are quite full and clear and the duty
-of the inspector will consist mainly in seeing that they are faithfully
-carried out.
-
-=81. Concrete.=—As in other concrete construction, the utility of the
-work depends largely on the care and skill with which the concrete is
-made and placed. See that the prescribed quality and ratio of materials
-are used and that the concrete is thoroughly mixed and properly placed
-in the forms and well tamped. Especial care is necessary to secure a
-continuous and satisfactory exposed surface by forking and working the
-mortar into contact with the forms, which must be placed and maintained
-in true line and surface.
-
-[Illustration: Concrete Combined Curb and Gutter]
-
-=82. Removing Forms.=—Good judgment is required as to the proper time to
-remove the forms. They must remain until the concrete has set hard
-enough to be fully self-sustaining, but before it has set so hard that
-the wire brush will have no effect on the surface.
-
-=83. Corner Protection.=—See that the metallic corner or nose piece is
-correctly placed and that it is solidly anchored by and fully embedded
-in the body of the concrete.
-
-=84. Patching.=—The practice of patching up cavities or irregularities
-in the exposed face of the curb and gutter with neat mortar, or dressing
-the surface with dry cement, must not be permitted. If a section of the
-curb is found, when the forms are removed, to be imperfect, the whole
-section must be removed and replaced.
-
-
- HYDRAULIC CEMENT SIDEWALKS
-
-=85. General.=—While the work of constructing concrete sidewalk is
-comparatively simple it is often carelessly and unskillfully done. The
-things that need most attention by the inspector are the following:
-
-=86. Materials.=—The materials used in the work must be fully up to the
-quality called for by the specifications. This applies more particularly
-to the cement and sand. These are not always properly tested by the
-engineer and you should frequently make samples of stiff mortar (1
-cement, 2 sand) and set them aside for observation. If they do not, in
-summer weather, become very hard at the end of nine hours, the fact
-should be reported to the engineer.
-
-=87. Drainage.=—See that the necessary grading is properly done and that
-the drainage course is made of suitable material properly compacted. See
-that drain tiles are properly laid and connected as designed by the
-engineer. If cinders are used for the drainage course, see that they are
-screened to remove ashes and fine material, and that they are thoroughly
-drenched with water at least five days before they are placed in the
-walk.
-
-=88. Two-course Work.=—If the sidewalk is laid in two courses, see that
-the surface-course is put on and tamped before the bottom-course
-concrete has begun to set. This requirement must be strictly enforced.
-
-=89. Finishing the Surface.=—Dry or pure cement must not be used for
-trimming up or smoothing off the surface of the walk. After the surface
-has been properly completed by straight-edge and trowel, see that the
-wire broom is used as directed to remove the glaze and to slightly
-roughen the surface.
-
-See that the expansion joints are made as specified, and that they
-extend entirely through both courses of concrete.
-
-=90.= See that the walk, after completion is properly protected from
-injury and from frost, and that the concrete is kept moist until it
-becomes well set.
-
------
-
-Footnote 1:
-
- In specifications to be used in any particular city the official name
- of the city government, as the City Council, the Commissioners of
- Public Works, etc., should be used instead of this general
- designation.
-
-Footnote 2:
-
- Such a proviso as this seems proper in justice to both the city
- engineer and the contractor; the former should not be held responsible
- for the acts of his assistants when they transcend the authority
- conferred upon them, and the latter should be put upon his guard with
- reference to requirements which he is not satisfied are sanctioned or
- approved by the city engineer.
-
-Footnote 3:
-
- It may be objected that this requirement is unusual and unnecessary,
- since such practices are recognized as wrong, and as presumptive of
- fraud and malpractice on the part both of the contractor and the
- inspector. It cannot, however, be denied that in many cities such
- means are employed by contractors to unduly influence the action of
- inspectors and that not infrequently the latter not only accept, but
- persistently demand, valuable considerations from the contractor.
- Silence of the specifications on this point cannot, of course, be
- construed into consent, but there is no good reason for the silence.
- There should be left no excuse for misconception of the position of
- the city or of the engineer upon this point.
-
-Footnote 4:
-
- This section is intended as much for the control and limitation of
- city officials as of contractors. The practice of carelessly or
- purposely allowing municipal contracts to be expanded greatly beyond
- the stated limits or the original intended volume and cost without
- formal authorization by the proper municipal body in which the power
- to make contracts is lodged, is dangerous and wrong and should be
- prohibited. In one instance coming to the notice of the author a
- contract originally intended to cover $50,000 worth of work was
- expanded by the department head without any authority from the city
- council until the final estimate reached the enormous sum of over
- $400,000.
-
-Footnote 5:
-
- As outlined in the introduction, these specifications are designed to
- secure the construction of the pavement in a proper manner, the city
- assuming responsibility for the character and utility of the work. The
- guarantee here proposed is therefore intended to cover only a proper
- compliance with the specifications, for which the contractor may
- properly be held responsible, and not the sufficiency or utility of
- the work, if constructed according to the specifications. The period
- of guaranty should therefore be short, not exceeding two years.
-
-Footnote 6:
-
- In the great majority of cases the most satisfactory and, in the end,
- the most economical foundation for a pavement is hydraulic cement
- concrete. Old paving-block foundation, if constructed as specified in
- Sect. 36, will give results equally as satisfactory, but if a fair
- market exists for the blocks taken up from the street, it will usually
- be found more economical to sell them and construct a concrete
- foundation for the new pavement. Broken stone or gravel foundations
- may serve the purpose fairly well upon a street of light travel, but
- it should never be used on streets of considerable or heavy travel.
- Its lower first cost is the only thing in its favor, but this will, in
- nearly every case, be more than offset by the better service and
- greater durability of the pavement, even on streets of light travel,
- if laid upon an adequate hydraulic concrete foundation. Proper repairs
- to pavement surfaces cut into for pipe work, etc., are difficult to
- make and hardly ever satisfactory over broken stone foundation for the
- reason that the lack of cohesion in the material allows it to loosen
- or crumble away from under the edge of the pavement surface, and it is
- difficult to restore it to its original solidity and strength. The
- first cost saved by its use is usually not great; for whenever its use
- would be permissible at all, a comparatively thin and lean concrete
- would give better results, at a very slight increase in cost. To
- illustrate: On a suburban street with light travel a concrete
- foundation four inches in thickness, the concrete made with Portland
- cement in the ratio of 1 cement, 4 sand, and 8 stone, would be
- stronger and in every way better than a foundation eight inches in
- depth of broken stone. At the usual prices of materials and labor, the
- former may cost about $0.46 per sq. yd., and the latter about $0.40
- per sq. yd.; but for the latter there would be required ⅑ cu. yd. more
- sub-foundation excavation, worth about four cents, so that the
- equivalent cost would be $0.44 per sq. yd. The difference, two cents
- per sq. yd., is insignificant when compared with the greater value,
- better service, and greater durability of a pavement on the concrete
- foundation. It is sometimes held that the broken stone foundation
- provides necessary sub-drainage. But all the standard pavements are,
- or soon become, impermeable to water from the surface, and seepage
- from the sub-foundation can be better taken care of by the
- sub-drainage specified in Sect. 26, which should usually cost not more
- than five cents per square yard of the pavement; and if drainage be
- required, these sub-drains should be used even with the broken stone
- foundation.
-
- The practice of laying pavement surfaces, particularly those of
- asphalt, upon a foundation of old stone blocks, carelessly reset, with
- the joints unfilled with mortar, is all wrong and should never be
- resorted to. The integrity and durability of an asphalt pavement
- depends largely upon the strength and rigidity of its foundation; to
- lay an asphalt surface, however good, over such an old block
- foundation, is an inexcusable waste of money.
-
- Old stone block and cobble-stone pavements, that have become
- solidified in place by long travel over them, make a good foundation
- for asphalt or other pavements, provided they can be utilized without
- taking up or disturbing the old pavement; but such cases occur so
- rarely that they have not been considered in these specifications.
-
- A thoroughly consolidated old McAdam pavement, if not worn too thin,
- also makes a very satisfactory pavement foundation if it can be used
- undisturbed, or by simply trimming off the high points.
-
- Low places in old pavements, that are otherwise satisfactory for a
- foundation, may be brought to the proper elevation with hydraulic
- concrete. “Binder” material is usually specified for this purpose in
- foundations for asphalt pavements, but hydraulic concrete is both
- better and cheaper.
-
-Footnote 7:
-
- The specifications for Portland cement here given are practically
- those adopted by the “American Society for Testing Materials.”
-
- =Natural Cement.= While these specifications uniformly refer to the
- use of Portland cement, it is not intended to convey the idea that
- natural cement concrete is not suitable for pavement foundations; on
- the contrary, it may be used with entire confidence, as the experience
- in a large number of cities has proven beyond question. Whether
- Portland or natural cement shall be used is usually a question of
- relative cost. At the present very low prices of Portland cement in
- most cities, more strength in pavement foundations can usually be
- obtained per dollar expended for cement, from Portland than from
- natural cement. The specifications for natural cement, as adopted by
- the American Society for Testing Materials differ from those for
- Portland cement in the following particulars:
-
- The =specific gravity= shall not be less than 2.8.
-
- =Fineness.= The residue left on a No. 100 sieve shall not exceed 10
- per cent., and on a No. 200 sieve shall not exceed 30 per cent.
-
- =Setting.= It shall not begin to set in less than ten minutes, nor set
- hard in less than thirty minutes; but shall set hard within three
- hours.
-
- =Tensile Strength= (per sq. in.).
-
- =Neat.= 24 hours in moist air 50 to 100 lbs.
- 7 days (1 day in air, 6 days in water) 100 to 200 lbs.
- 28 days (1 day in air, 27 days in water) 200 to 300 lbs.
-
- =1 part cement, 3 parts sand.=
- 7 days. (1 day in air, 6 days in water) 25 to 75 lbs.
- 28 days. (1 day in air, 27 days in water) 75 to 150 lbs.
-
- =Soundness.= Standard pats kept in air and in water should remain firm
- and hard and show no signs of cracking or disintegration.
-
-Footnote 8:
-
- The frequent requirement that the fine material shall be screened out,
- is not necessary or advisable. Experiments and experience have shown
- conclusively that unless an unusual amount of fine material and “dust”
- be present, or unless this fine material be allowed to separate and
- aggregate in masses by itself, the resulting concrete is improved
- rather than deteriorated by its presence.
-
- Where there is an unusual excess of “dust” in the crushed stone, the
- quantity of sand used in the concrete should be decreased accordingly.
-
-Footnote 9:
-
- Many specifications do not require this and in a number of cities
- where the specifications do require it, contractors habitually neglect
- to comply. When stone and sand are deposited directly upon the earth,
- it is very difficult to avoid taking up earth and mud with the
- materials, particularly when the street is wet and muddy. Lumps of
- soil and débris unquestionably injure the concrete. The cost of
- providing a lumber floor is comparatively small, as the plank may be
- used over and over again. Specifications should, therefore, contain
- this requirement and it should be enforced.
-
-Footnote 10:
-
- The ratios of the materials may appropriately be varied with the
- strength and soundness of the sub-foundation, the amount of travel on
- the street, and with the thickness of foundation it is proposed to
- use. Where good materials are used and the work is properly done, a
- 1:3:5 concrete six inches thick is sufficient for streets of the
- heaviest travel. For streets of light travel a 1:5:9 concrete will
- usually give entirely satisfactory results. The most economical
- thickness for a concrete foundation is an important consideration. The
- strength of concrete may be said to increase, within usual limits of
- practice, with the ratio of cement in it. The strength of concrete
- beams or slabs increases in the ratio of the square of their depth. To
- secure a required amount of strength in a pavement foundation, we may
- therefore vary the richness of the concrete and the depth of the
- foundation so as to secure the requisite strength at the least total
- cost of materials and labor. This will be influenced by the cost of
- materials and labor in each particular locality.
-
- Within certain workable limits there is no reason why the same
- principles of proportioning the strength of a pavement foundation to
- the work required of it should not be applied as are employed in
- designing other engineering structures.
-
- The practice, usual in many cities, of adopting general specifications
- requiring a standard thickness of foundation and composition of
- concrete, and applying these to all streets, regardless of the
- quantity and character of travel which the pavement is expected to
- carry, is illogical and often very wasteful. If such a standard
- foundation is sufficient for the streets of heaviest travel, it is
- obviously a sheer waste of money to use it on the suburban streets
- carrying the lightest travel. It is therefore better in preparing
- standard specifications for pavement in any city to leave blanks for
- the ratios of the concrete and for the thickness of the foundation, to
- be filled in, in each individual case, as the judgment of the engineer
- may dictate.
-
- While it is important that the foundation of any pavement shall be
- adequate, it is inexcusable to waste money in providing superfluous
- strength. For the great majority of suburban streets, carrying but
- little except the local travel, a foundation four inches thick made of
- good Portland cement concrete in the ratios of 1:4:8 will prove
- entirely satisfactory. Hundreds of such streets paved over a
- foundation of that thickness, made of natural cement concrete in the
- ratios of 1:2:4 can be cited where the foundation has proved entirely
- satisfactory.
-
- The character and firmness of the sub-foundation must, of course, be
- taken into consideration in designing the foundation.
-
-Footnote 11:
-
- The routine here described produces better concrete with less
- expenditure of labor, than the one often followed of putting all the
- dry materials on the concrete board before any mixing is begun. The
- writer has proved this from actual records covering a large quantity
- of work.
-
-Footnote 12:
-
- The objections to using mortar for plastering over the concrete are:
- that it is more costly than concrete; that the two materials may,
- under certain conditions, separate and the thin mortar surface break
- up under travel; that, if permitted, the mortar may be used to cover
- up defective concrete, and that in the case of asphalt pavements the
- pavement surface is more likely to “shift” on the smooth surface of
- the mortar than on the rough surface of the concrete. The practice of
- going over the fresh concrete with street brooms should not be
- permitted. The only argument in favor of it is that it may be used to
- conceal defective patches in the concrete.
-
-Footnote 13:
-
- See foot-note[6], p. 23. The cost of filling the joints of old block
- pavement with mortar or grout is considerable. It will hardly ever be
- less than 20 cents and may exceed 35 cents per square yard, depending
- on the volume of joints and the local cost of material and labor. The
- cost of resetting and ramming the blocks with proper care will usually
- be from 10 cents to 12 cents per square yard, so that the cost of the
- foundation, exclusive of the value of the blocks, may vary from 30
- cents to 47 cents per square yard.
-
- As a good concrete foundation 6 inches in depth can be laid for from
- 70 to 90 cents per square yard, it is obvious that if the old blocks
- can be sold for as much as the difference between the cost of the old
- block and the concrete foundation, nothing will be saved by using the
- old block foundation. In at least one city, asphalt pavement has been
- extensively laid over old stone block foundation relaid in a very
- careless manner, the joints being filled usually with the old sand or
- loam found in the street. This practice cannot be too strongly
- condemned. Asphalt pavement surfaces resting on such a foundation are
- necessarily short-lived and unsatisfactory. The practice of opening
- the street to travel for a period after the blocks are relaid and
- before the asphalt surface is applied, helps, under favorable
- conditions, to consolidate the foundation, but does not remove the
- objections to it. If heavy rains intervene, the sub-foundation becomes
- saturated with water, and its resistance so reduced that the stone
- blocks settle out of shape, particularly in soft spots, and they are
- usually hastily raised and reset just before the asphalt surface is
- applied. The result is an insecure foundation fatal to the durability
- and usefulness of the pavement.
-
-Footnote 14:
-
- Where there is a possibility that gravel may be used, the contractor
- should be asked to name prices for the gravel foundation as well as
- the stone foundation, since, unless this be done, the change from the
- one material to the other might be held to be illegal.
-
-Footnote 15:
-
- There has been much discussion as to the suitableness of these oil
- asphalts, called “residual pitches,” for use in making asphalt
- pavements. When properly prepared from suitable asphaltic oils, so as
- to comply with the specifications here given, there can be no doubt
- that good pavements can be made with them. But as they appear on the
- market, being usually produced at different localities and refineries
- from crude oils of differing qualities, distilled by somewhat
- differing methods, and usually at temperatures of from 900 degrees to
- 1200 degrees, they are likely to vary so greatly in quality as to make
- their use inadvisable without careful technical inspection. Unless,
- therefore, the engineer is prepared to make, or to have such
- inspection made, it is hardly wise or safe to permit their use. They
- stand, in this respect, upon a footing different from the better-known
- natural asphalts obtained from large deposits of practically uniform
- character and quality, where the simpler process of refining is less
- likely to effect injuriously the chemical quality of the material.
-
- It may be confidently predicted that any of these “residual pitches”
- which comply with these specifications will, if properly handled, make
- a good pavement.
-
-Footnote 16:
-
- The possibility that some of these compounds or artificial asphalts,
- may be suitable for use in pavements is not denied. But in the absence
- of a fuller knowledge of them than we now have, and in the light of
- present experience, the only safe course is to reject them.
-
-Footnote 17:
-
- It is not intended here to enter into an extended discussion of the
- fact that some asphalts are injuriously affected by water, and the
- bearing which this fact should have upon the selection of an asphalt
- for pavement purposes. There can be no doubt that modern treatment and
- methods of construction have tended to diminish but not wholly to
- prevent the disintegrating effect of water upon pavements made with
- such asphalt, and if the engineer could be certain that his pavements
- would be constructed by contractors guided by long experience and the
- best expert advice, he might perhaps safely disregard this provision.
- Since in practice he can have no such assurance, the provision is a
- wise one and it does not involve any serious or material hardship to
- the contractor.
-
-Footnote 18:
-
- It is now well recognized that the character and quality of the sand
- used is one of the most important elements in determining the utility
- and durability of an asphalt pavement. A satisfactory sand should be
- insisted on, even if it involves a very considerable increase in the
- first cost of the work.
-
- While our knowledge of the subject is not complete, experience seems
- to indicate pretty clearly that a sand of the quality and size-grading
- here specified as typical, may be depended upon to produce a good
- pavement.
-
-Footnote 19:
-
- The use of Portland cement in surface mixtures to be laid on streets
- of heavy travel, or those exposed to damp foundations, is very
- strongly recommended. On streets of the heaviest travel, or where the
- pavement will be exposed to unfavorable conditions of dampness,
- particularly if the pulverized stone is not very finely ground, the
- Portland cement may constitute twenty per cent. of the pulverized
- material, or “dust,” as it is commonly called. Ordinarily from five to
- ten per cent. may be used to advantage on all streets of moderately
- heavy travel.
-
-Footnote 20:
-
- For determining the consistency of individual batches of asphalt
- paving cement with a standard sample, the flow-plate method is most
- convenient and sufficiently accurate. For a description of the latest
- improved form of this apparatus see Engineering News of Aug. 22, 1912,
- p. 347. It can only be used, however, where the cements to be compared
- are of the same general composition—the same refined asphalt and
- tempering agent—as the standard.
-
-Footnote 21:
-
- The practical value of the exact determination of the ductility of
- asphalt paving cements is regarded by the author as not well
- established. It is customary, however, in most recent specifications
- to require it. Some asphaltic cements that have been quite
- successfully used for pavements have not complied with such
- requirements, while good coal-tar pitches will greatly exceed them.
- Where this test is used the usual specification requires that a
- briquette of asphaltic cement having a cross-section of one square
- centimeter, at penetration 50, shall elongate to the extent of not
- less than 20 nor more than 85 centimeters at 77° F. If the asphaltic
- cement varies from 50 penetration an increase or decrease of at least
- 2 centimeters will be required for each five points above or below 50
- penetration (Dow apparatus to be used).
-
-Footnote 22:
-
- It should be noted, in a general way, that there is quite a difference
- in the temperature to which different asphalts may be safely
- subjected.
-
- Trinidad asphalt, and the California residual pitches, will not be
- injured by the higher range of temperatures named in these
- specifications, while Bermudez and some other asphalts should be
- worked at as nearly as possible to the lower range of temperatures
- named. The relative amount of loss of the different asphalts when
- exposed for seven hours to the temperature of 325 degrees (Sect. 44)
- will supply a rough practical guide as to the temperature
- permissible—the greater the loss, the closer should the lower range of
- temperatures be adhered to.
-
-Footnote 23:
-
- The open base-course, or “binder,” composed only of crushed stone,
- coated with pitch or asphaltic cement, extensively and almost
- exclusively used up to a recent date, is no longer advocated by the
- best authorities on asphalt pavements. The aim is now to make the
- base-course as dense and strong as the surface-course.
-
-Footnote 24:
-
- The importance of proper and thorough rolling is not usually fully
- appreciated, and this part of the work is often shirked by the
- contractor. Not only should the heavy roller be at work as soon as the
- material will bear it, but the roller should, when work is progressing
- regularly, be kept at work all the time. It is a safe motto that the
- final rolling cannot be overdone.
-
-Footnote 25:
-
- There is still a wide difference of opinion as to the advisability of
- laying the asphalt surface directly against the rail, many engineers
- preferring to set one or more courses of paving brick, or stone paving
- blocks between the rail and the edge of the asphalt. The writer’s
- experience is to the effect that, if the work is properly done, the
- first-named form of construction is preferable. If the asphalt be laid
- against a rail so cold that the asphalt material in contact with or
- near the rail is chilled before it can be compressed, the work will
- necessarily be unsatisfactory. As to durability, wheels following the
- line of the rail or of the paving blocks will sooner or later form a
- rut in the asphalt which will require repair—and there is not much
- difference in the results. The attempts to prevent the formation of
- ruts by setting blocks alternately as headers and stretchers is not
- always successful, even when the work is well done, and the difficulty
- of properly compressing the tongues of asphalt between the headers is
- so great that it is usually not well done. The asphalt settles under
- travel or is gouged out, leaving a streak of rough pavement, and the
- difficulty and cost of repairs is considerably increased. When paving
- blocks or bricks are used, they should be firmly and carefully set in
- the concrete foundation. Probably the most satisfactory construction
- of this kind consists of two or three lines of the best paving brick
- set with their length parallel to the rail. It is somewhat easier to
- get at and repair rail joints with this construction.
-
-Footnote 26:
-
- The practice of laying asphalt block pavement upon crushed stone, or a
- sand foundation, on streets carrying a considerable travel, is
- inadvisable. See foot-note[6], page 23.
-
-Footnote 27:
-
- Hard limestone may be used where trap is not procurable except at a
- prohibitive cost; but unless the difference in cost is very great the
- trap will be the most economical in the end.
-
-Footnote 28:
-
- The pressure commonly specified is 5000 lbs per. square inch, but
- recent investigations make it doubtful if that pressure is ever
- attained, or is, indeed, practicable with any presses so far
- constructed.
-
-Footnote 29:
-
- Asphalt blocks are now very commonly laid upon their sides, even where
- they are made as thin as two inches, on streets carrying very
- considerable travel. The practice is not to be recommended unless the
- blocks are at least four inches thick. Blocks two inches thick will
- give good service on private driveways and streets of quite light
- travel.
-
-Footnote 30:
-
- Granite block pavement is, as a rule, used upon, and appropriate for
- streets of the heaviest class of travel, and should, therefore, be
- provided with the best and strongest foundation. It is nearly always
- poor economy to lay granite blocks upon a broken stone, gravel, or
- sand foundation.
-
-Footnote 31:
-
- Like other stones, granite from various localities differs widely in
- strength, hardness and brittleness. Great hardness, accompanied with
- comparative brittleness, is not desirable in granite for paving
- blocks. Such material usually polishes by travel and becomes quite
- slippery, and it is likely to become “turtle-backed,” that is, the
- corners are likely to be chipped off or worn off, making the pavement
- very rough and uneven. The quality of the granite to be used in any
- one city is generally determined by the available supply, and
- specifications must be drawn with reference thereto.
-
-Footnote 32:
-
- Except on streets of excessively heavy travel there seems to be no
- good reason for making the blocks more than five inches deep. Blocks
- of this depth are quite sure to become deformed by irregular wear
- before the pavement will need to be renewed.
-
-Footnote 33:
-
- The widths of joints here specified as allowable are based upon the
- assumption that they will be filled with Portland cement grout as
- specified in Sect. 75. If this grout filling is used narrower joints
- are not necessary, as the grout has sufficient strength to support the
- corners of the blocks, and sufficient hardness to resist the wear of
- travel (largely protected as it is by the blocks themselves) and to
- cause the blocks to wear down quite evenly.
-
- In many European cities the specifications require much closer joints.
- The granite there available appears to break out naturally to truer
- lines and better surfaces than that used in the Eastern states, at
- least, so that the cost of dressing the blocks abroad is not as great
- as here.
-
- The City of New York has recently adopted specifications for “Special
- Improved” Granite Block pavement intended to approximate the Liverpool
- standard. These require that the blocks shall be not less than 6 nor
- more than ten inches long, not less than 3½ nor more than 4½ inches
- wide and five inches in depth. “The blocks are to be rectangular with
- tops and sides uniform in thickness, to lay closely, and with fair and
- true surface, free from bunches and so cut or dressed that when laid
- stone to stone the joints shall not exceed ⅜ of one inch. The head of
- the block shall be so cut that it shall not have more than one-quarter
- of an inch depression from a straight-edge laid in any direction
- across the head and held parallel to the general surface of the
- block.” The joints are filled with bituminous cement.
-
- The above specification is very difficult to meet from the granite
- available to New York without excessive and expensive cutting, and
- examination of the pavements laid under these specifications shows
- that the joints greatly exceed the width specified.
-
- It is believed that equally good results may be secured by permitting
- somewhat wider joints filled with grout, and the cost would be
- materially reduced.
-
-Footnote 34:
-
- The most satisfactory arrangement of courses at street intersections
- is that shown by Fig. 14, page 208, Tillson’s Street Pavements and
- Paving Materials, 2d edition.
-
-Footnote 35:
-
- The practice of filling the joints with gravel to a depth of one inch
- or more before the blocks are rammed is of doubtful utility. If the
- blocks are set closely against each other they will be well held in
- place while the ramming proceeds. In practice it is hardly possible to
- closely gage the depth of such preliminary gravel filling, and the top
- or final filling whether of grout or of gravel and bituminous cement,
- is likely to vary greatly in depth, and the lateral support of the
- blocks is thus likely to vary in strength and rigidity.
-
-Footnote 36:
-
- It has been the almost universal custom, in this country at least, to
- fill the joints in granite paving either with gravel alone or with
- gravel and bituminous cement. But the reasons that have led engineers
- to prefer grout filling for brick pavements apply with equal force to
- granite pavement. It makes a stronger and harder filling than the
- gravel and bituminous cement, and gives a better support to the edges
- of the paving blocks, thus tending to prevent chipping and
- “turtle-backing” in the pavement. It is also a materially cheaper
- filling than the gravel and bituminous cement. But to provide for the
- expansion and contraction of the pavement by changes of temperature,
- it is desirable that a strip in the gutters, and an occasional strip
- across the whole street, shall be filled with the more yielding
- material, as specified.
-
-Footnote 37:
-
- The object of adding asphalt and Portland cement is to make the cement
- stronger and less susceptible to changes of temperature. Pure coal-tar
- pitch is very brittle at low temperatures, and is liable to flow from
- the crown of the street to the gutters in hot summer weather. A cement
- made as here specified is not only much stronger and less brittle in
- cold weather, but requires a materially higher temperature to cause it
- to flow than does pure pitch.
-
-Footnote 38:
-
- As the wheels of vehicles frequently follow along the lines of the
- rails, thus concentrating their effect on a narrow strip near the
- rails, and as the continuous joint against the rail makes the pavement
- weaker there, the mortar bed, and the greater care in setting the
- blocks along and near the rail are advisable.
-
-Footnote 39:
-
- If the joints are parallel to the direction of travel on the street
- the wheels of vehicles are more likely to abrade or break off the
- corners of the stone and form incipient ruts.
-
-Footnote 40:
-
- These specifications conform in most particulars to those adopted by
- the “Association for Standardizing Paving Specifications,” and are
- substantially the same as those recommended by the “National Paving
- Brick Manufacturers’ Association” though they differ in some details
- from each. The latest specifications adopted by the Association for
- Standardizing Paving Specifications are very full and satisfactory and
- are to be highly commended.
-
-Footnote 41:
-
- Here again a good concrete foundation is recommended, as being in the
- end the most satisfactory and economical. See foot-note[6], page 23.
-
-Footnote 42:
-
- The Association for Standardizing Paving Specifications (New Orleans
- meeting) adopted a standard size for paving bricks and blocks as
- follows: Paving brick, 8½ inches long, 2½ inches wide and 4 inches in
- depth. Paving blocks 8½ inches long, 3½ inches wide and 4 inches deep.
- There seems to be no sufficient reason for confining the brick to
- these dimensions.
-
-Footnote 43:
-
- The specifications of the Association for Standardizing Paving
- Specifications require that all paving brick shall have lugs on one
- side, and allow a projection of ¼ inch from the face of the brick. The
- object is to provide a wider joint between the bricks in order to
- facilitate the filling of the joints. The author does not believe
- these lugs necessary, nor that brick without lugs, but otherwise
- acceptable, should be excluded. It is certain that many of the best
- brick pavements ever constructed have been built of bricks without
- lugs. If lugs are required they should preferably not project more
- than one-eighth inch. The same reasons that make narrow joints
- desirable in other block pavements apply equally to brick pavements.
-
-Footnote 44:
-
- The A. S. P. S. Specifications permit a loss of 22% with the block
- size, but do not name a permissible loss for “brick” size.
-
-Footnote 45:
-
- Absorption of less than one-half of one per cent., usually indicates
- that a shale brick has been over-burned, resulting in increased
- brittleness.
-
-Footnote 46:
-
- The absorption test is falling into disfavor, particularly with the
- manufacturers. The author believes that it possesses a distinct value
- and should be retained.
-
-Footnote 47:
-
- The object of this is to make a gutter offering less obstruction to
- the flow of water.
-
-Footnote 48:
-
- This is the simplest and most effective way to detect soft and
- underburned brick.
-
-Footnote 49:
-
- _If the joints are to be filled with bituminous cement_, substitute
- for sections 90 and 91 the following:
-
- Directly after the completion of the rolling and ramming, all the
- joints in the brick pavement and between it and the curbing, manholes
- or other structures, shall be filled with a bituminous cement in the
- following manner:
-
- The bituminous cement shall be composed, by weight, of one hundred
- (100) parts of straight-run coal-tar pitch commercially known as
- number four and twenty (20) parts of refined Trinidad asphalt melted
- and thoroughly mixed together at a temperature of about 350° F., to
- which shall be added twenty (20) parts of dry Portland cement, which
- shall be thoroughly incorporated with the hot bitumen until a
- homogeneous mass is produced, and kept agitated so as to prevent
- settlement or separation until the cement is used. If another asphalt
- is used instead of Trinidad the quantity added to the pitch must be
- sufficient so that the cement will not flow at a temperature lower
- than one hundred and twenty-five degrees Fahrenheit (125° F.). This
- cement while at a temperature of about 325 degrees F. shall then be
- poured from a spouted vessel into all joints and vacancies in the
- pavement until they are completely filled, repouring being resorted to
- if necessary to accomplish the complete filling of the joints. After
- the joints are thus filled a layer of sand one-half inch thick will be
- spread over the whole surface of the pavement and allowed to remain
- until the engineer shall direct its removal.
-
-Footnote 50:
-
- The bituminous-cement joints are principally for the purpose of
- providing for the expansion of the pavement in very hot weather.
-
- Experience seems to have proved that cement grout is, everything
- considered, the best and cheapest filling for the joints in brick
- pavement. If the filling is properly done, the edges of the brick are
- supported and the corners do not chip off. With the expansion joints
- provided at intervals by the bituminous-filled joints, the curbs will
- not be forced out of line, nor will the pavement be raised from its
- sand bed by expansion, causing the rumbling sound sometimes noticed.
-
- Where grout filling is used there seems to be no necessity for
- covering the surface of the pavement with sand, as is usually done,
- provided the grout is kept damp.
-
-Footnote 51:
-
- Since immunity from early natural decay is secured by preservative
- treatment, the important requisite for wood paving blocks is capacity
- to withstand the wear and tear of the travel on the street. We have as
- yet no very satisfactory data as to the ability of the various species
- of wood to endure the somewhat peculiar and special duty to which
- paving blocks are subjected.
-
- The test which seems to most nearly approach to what is wanted is that
- of crushing strength, when the force is applied to the end of the
- sample, parallel to its fibers; but this does not embrace the effect
- of impact to which paving blocks are subjected under street travel.
- Whether this may be considered a function of the end-crushing strength
- or not is an open question, though there seems good reason to believe
- that it will prove to be so; and if so, there is no good reason why
- woods of substantially equal strength under the end-crushing test
- should not show about the same endurance under street travel,
- independent of the element of natural durability, which is practically
- eliminated by preservative treatment.
-
- The end-crushing strength per square inch of some of the kinds of
- timber named as acceptable is about as follows:
-
- Southern long-leaved yellow pine 6900 lbs.
- Lob-lolly pine 6500 lbs.
- Short-leaved pine 5900 lbs.
- Cuban pine 7900 lbs.
- Norway pine 6700 lbs.
- Red gum 7100 lbs.
-
- It was formerly very customary to specify that only Southern
- long-leaved yellow pine might be used for paving blocks, though this
- requirement was seldom strictly enforced. The fact is, that with the
- exception of the test based upon the number of growth rings per inch,
- it requires an expert knowledge, acquired only by long experience, to
- distinguish with certainty the species of Southern pine from the
- appearance of the lumber alone. It is now almost impossible to obtain
- in the market shipments of strictly long-leaved yellow pine, and while
- that wood is undoubtedly superior to the other pine timbers for paving
- blocks it seems useless to specify its exclusive use, or to propose
- specifications designed to exclude lumber made from other species of
- pine. It was doubtless the recognition of this situation that
- influenced the Association for Standardizing Paving Specifications, at
- its last (New Orleans) convention to adopt a specification which
- practically admits everything known in the market as “Southern yellow
- pine” having annual growth rings averaging less than eight to the inch
- and excluding all timber having less than six rings to the inch.
- Within these limits these specifications practically admit all pine
- lumber shipped from Southern mills.
-
- The specifications here proposed, by limiting the number of growth
- rings to nine per inch, would not confine the lumber to true
- long-leaved yellow pine, but would secure a more mature and solid
- quality of lumber. It is true, however, that both these specifications
- and those adopted by the A. S. P. C. exclude most “Cuban pine” lumber
- which is very rapid growing, the growth rings often numbering but
- three or four to the inch, though the strength of the wood from this
- species indicates that it may safely be used for pavement.
-
-Footnote 52:
-
- The question of the most economical depth for wood paving blocks is as
- yet unsettled. In New York City, blocks 3½ inches in depth are adopted
- as the standard and are being used on streets of the heaviest travel,
- the practice of Berlin, Paris and other foreign cities being thus
- followed. The arguments in favor of these short blocks are lower first
- cost, and that, with much deeper blocks, the usual uneven wear of a
- wood pavement will make it so rough as to require removal before the
- blocks are worn down so as to be split up and dislodged from their
- places. While reliable data on these points are wanting, it seems to
- the writer very unwise to use such short blocks on streets of heavy
- travel, and he would recommend that the minimum length for use on such
- streets be 4½ inches, and he would prefer 5 inches.
-
- On streets of light travel a length of 3½ inches should be
- satisfactory.
-
- Recent observations on heavy travelled streets in New York indicate
- that when long-leaved yellow pine blocks become worn down to a
- remaining depth of about 2⅛ inches they split up into fine slivers and
- the pavement goes to pieces.
-
-Footnote 53:
-
- Most of the more recent specifications require the use of a heavy oil,
- said to be composed of creosote oil with an admixture of refined tar,
- on the ground that the tar is necessary as a water-proofing agent to
- prevent the creosote oil from being dissolved out by water or
- evaporated into the air. It is claimed that if moisture can thus be
- excluded from entering the wood, decay will be prevented, even in the
- absence of the antiseptic elements of creosote oil. It is not intended
- to discuss this matter at length here. We know from long experience
- that genuine creosote oil is the best preservative of wood so far
- found; also that creosoted piles have stood in tidal waters,
- alternately exposed to water and air, for twenty-five years and still
- retain sufficient creosote oil to resist the Teredo—a very severe
- test. Why experiment with a comparatively untried material,
- particularly when it costs as much as the genuine creosote oil, is
- rather more difficult to force into the wood, and has some admitted
- objectionable qualities?
-
-Footnote 54:
-
- It is a common practice of contractors in some cities, in the laying
- of both wood-block and asphalt block pavement, where a mortar bed is
- called for, to substitute a bed of mixed sand and cement, dampened
- only to such a degree as will make the mass pulverulent like damp
- sand, the claim being made that ordinary mortar cannot be spread and
- gaged properly. This claim is unfounded. The objection to the practice
- is that the dampened mixture does not contain sufficient water to
- cause the cement to set, and with the practically water-tight paving
- surface, does not receive, even in rainy weather, the necessary amount
- of water. If the weather be dry, the small quantity of moisture in the
- mixture quickly evaporates, leaving the so-called mortar bed not much
- better than a layer of sand alone. The writer has found such alleged
- mortar dry and unset two weeks after the pavement had been completed.
- If real mortar is not to be used, a layer of sand might almost as well
- be substituted at first.
-
-Footnote 55:
-
- In a number of cities the specifications require the joints in
- wood-block pavement to be filled with Portland cement grout. If the
- blocks are set as closely together as they should be, the joints will
- be so narrow that no grout, thick enough in consistency to be of
- value, will enter them, except for a short distance down from the top,
- the remaining depth of the joints remaining unfilled. An examination
- of any well-laid wood-block pavement soon after it has been attempted
- to fill the joints with grout will verify this statement. Furthermore,
- the oil which exudes from the blocks, acting on the thin films of
- grout, seems to deteriorate the mortar and to render it practically
- inert. On the contrary, fine dry sand will readily run into and
- completely fill the joints, and under travel the joints will soon
- become impervious to water. The sand filling is therefore regarded as
- better, and it costs less than the grout filling.
-
-Footnote 56:
-
- Wherever an old pavement or macadam road can be utilized it makes an
- excellent foundation for a pavement of this kind, provided it is not
- in too dilapidated a condition, extends from curb to curb, and its
- surface conforms near enough to the desired street surface so that the
- necessary changes and repairs will not be too expensive. Where the new
- pavement is expected to carry quite a heavy travel it is not advisable
- to use plain crushed stone for filling depressions and leveling up the
- surface. It is difficult, even where proper care is used, to make such
- patches of broken stone as firm and strong as the adjoining old
- pavement, which is a necessary condition to secure satisfactory
- results; for if the masses of broken stone yield under travel, slight
- depressions will form over them in the bituminous surface, which will
- in time become holes requiring repairs. The 1:4:9 concrete specified
- for this work is not very much more expensive than plain broken stone,
- it will not shift or break up under travel, and will in the end prove
- a better investment.
-
-Footnote 57:
-
- Where a new foundation is required broken stone or macadam is most
- frequently used for bituminous concrete pavements. Unless such
- foundations are constructed in the same way and with about the same
- care as is necessary for a macadam road it is liable to prove
- unsatisfactory. Under the very heavy wheel loads that may occasionally
- pass over the streets, imperfectly compacted broken stone is likely to
- shift sufficiently to start incipient ruts which will enlarge and in
- time necessitate expensive repairs. Such conditions are frequently
- seen on bituminous concrete pavements subjected to heavy travel. These
- pavements, like sheet asphalt pavements, require a foundation that
- will be absolutely unyielding under travel. For this reason a concrete
- foundation will generally be found more economical in the long run
- than a broken stone foundation. The increased first cost per square
- yard is not very great and this additional money will in most cases
- prove a good investment. At the usual prices of material and labor a
- square yard of 4 inch concrete should cost about 50 cents, while a
- properly constructed broken stone foundation 6 inches thick (which
- would not nearly equal in strength and rigidity 4 inches of concrete)
- would cost about 45 cents per square yard. Considering the much
- greater durability and lower cost of repairs of the pavement on the
- concrete foundation, this small additional cost is not worth
- consideration. While the specifications are made to cover the three
- kinds of foundation, it is assumed that the kind of foundation to be
- used will be decided in advance, and that the part of these
- specifications relating to the others kinds of foundation will, in
- actual use be omitted.
-
-Footnote 58:
-
- A bituminous cement composed largely of coal-tar pitch has heretofore
- been most used in pavements of this character. It is not denied that
- very good pavements have been, and can be built with this material,
- but the superiority of the asphaltic cement here specified is so great
- that it is true economy to use it. The difference in cost at
- prevailing prices of material will be ten to twelve cents per square
- yard. The greater durability and serviceability of the pavement made
- with the asphaltic cement will, particularly on streets of
- comparatively heavy travel, far more than justify this additional
- cost.
-
-Footnote 59:
-
- Hydraulic concrete pavement is to be recommended only for country
- roadways and for city streets of very moderate travel. While our
- experience with this kind of pavement is yet limited there is reason
- to believe from the nature of the material that it will not prove to
- be a satisfactory or economical pavement for streets of heavy travel.
- But in all cities and towns there are many residence streets where the
- travel is very light, and yet where a permanent pavement is wanted and
- warranted. For these, it is believed that a properly constructed
- concrete pavement will prove very satisfactory and durable, and the
- low cost at which it can be constructed should make it very attractive
- to city officials and property owners. The author has advocated its
- use under such conditions for many years (see Engineering News, July
- 21st, 1904). Like other composite pavements its utility and durability
- will depend largely upon the good quality of the materials used and
- the skill and thoroughness with which the work is done.
-
- The specifications here offered are the result of the observation and
- experience of the author, and it is believed that pavements laid in
- accordance with them will give very satisfactory results.
-
-Footnote 60:
-
- A number of engineers advocate the construction of concrete pavement
- in one homogeneous course, and quite a number of pavements have been
- constructed in this way.
-
- Like any other composite pavement, it is called upon to perform two
- functions; to safely sustain the weight of loads passing over it, and
- to resist wear and abrasion of its surface. A material and form of
- construction that meets the first requirement may not meet the second.
- Experience has proved that ordinary 1:3:6 concrete makes an entirely
- satisfactory foundation for any pavement, but it lacks the hardness
- and strength to successfully resist the surface abrasion of travel. To
- secure this quality a richer and harder concrete is called for, but it
- is unnecessary that the foundation should be equally hard. To
- construct the pavement in two courses as here specified would seem to
- be the logical way, especially as it decreases the total cost, and
- should make a more durable pavement.
-
-Footnote 61:
-
- Some engineers advocate a greater total thickness of the pavement than
- is here specified (6 inches). Considering that this pavement should
- never be used on heavy traveled streets, a total thickness of concrete
- of six inches will have ample strength to carry the loads to which it
- will be subjected. If so, it is a useless waste of money to increase
- the thickness of the concrete.
-
-Footnote 62:
-
- The use of limestone for the top course (unless it is of very superior
- quality) is not advisable or economical unless the cost of trap rock
- is so high as to be prohibitive, which, considering its superior
- durability under the wear of travel, will not often be the case.
-
-Footnote 63:
-
- It is advisable to remove the screenings from this surface mixture for
- two reasons: first, to secure greater uniformity of composition. If
- the screenings are allowed to remain in the aggregate, there is danger
- of segregation into patches of different sized aggregate and different
- ratios of materials, which it is very important to avoid, and second,
- the small fragments of stone are more likely to be crushed under the
- concentrated weight of wheels than the larger masses, and to thus
- start disintegration. Lack of uniformity in the composition and
- homogeneity in this surface-course concrete is especially to be
- guarded against, otherwise the surface of the pavement will wear
- unevenly and depressions and ruts are likely to result.
-
-Footnote 64:
-
- The ideal composition of this surface-course concrete is one where the
- stone forms the largest possible part of the mass consistent with
- sufficient mortar to fill the voids and thoroughly bind the fragments
- of stone together.
-
-Footnote 65:
-
- The importance of securing high quality and great uniformity in the
- surface course cannot be urged too strongly.
-
-Footnote 66:
-
- This requirement must be strictly enforced. Otherwise there will be
- danger that the two courses may not properly adhere to each other. It
- is the writer’s experience that if this rule is observed there will be
- no danger of the two courses separating.
-
-Footnote 67:
-
- The purpose of this rolling is mainly to evenly compress the mass and
- thus secure its uniform density. It also produces a truer surface than
- can usually be secured by ramming alone.
-
-Footnote 68:
-
- Among engineers there is quite a wide difference of opinion as to the
- proper spacing of expansion joints, and, in fact, as to the necessity
- or advisability of providing them at all. It has been suggested that
- it might be better to omit them entirely, allowing the pavement to
- form its own expansion joints by cracking along lines where natural
- forces dictate. Such cracks by their irregularity give a bad
- appearance to the surface, but observation seems to indicate that the
- edges of these natural joints wear as well as those made by expansion
- joints. Further observation and experience is needed in the matter. In
- most concrete it is known that some contraction takes place during the
- setting of the cement, regardless of temperature changes, and cracking
- is probably due as much to this permanent contraction as to that
- caused by low temperature. The coefficient of expansion of concrete by
- heat is variable but so small that expansion joints ⅛ inch wide every
- fifty feet along the street should provide for temperature changes.
-
-Footnote 69:
-
- If the expansion joints are not thus filled with bituminous cement
- they will become filled and packed with incompressible stone, sand,
- etc., that will not permit expansion.
-
-Footnote 70:
-
- The practical value of oiling concrete pavements has not yet been
- determined by sufficient experience. There is reason, however, to
- believe that the slight coating of bitumen will materially preserve
- the surface from abrasion and that its benefit will thus be greater
- than its cost. It will also tend to prevent the very slight dust that
- might otherwise exist on the pavement.
-
-Footnote 71:
-
- In this class of pavements the contractor or promoter may properly be
- required to assume responsibility for the character and utility of the
- work produced, and the municipal authorities should assume no part of
- such responsibility.
-
-Footnote 72:
-
- Upon the general subject of time guarantees of municipal work, see
- Chapter XI, “Municipal Public Works,” by the author.
-
-Footnote 73:
-
- Concrete combined curb and gutter is suitable for use on the great
- majority of residence streets, and others where the travel is not
- excessive, or where it will not be subjected to specially severe use,
- as on business streets where heavy vehicles are likely to be often
- backed against the curb. If properly constructed it will have
- sufficient hardness and strength to withstand all ordinary usage; it
- makes a better appearance, particularly on residence streets, than any
- other kind of curbing, is durable, and is usually less expensive than
- any other suitable, equally durable and equally well-finished curbing
- of natural stone, since the gutter displaces an equal area of
- pavement.
-
-Footnote 74:
-
- The sketch here presented conforms pretty closely to usual practice
- except in the width of the gutter. It is not uncommon to make the
- gutter from two to three feet wide. This is not necessary or
- desirable. A width of 15 to 18 inches forms a sufficient gutter to
- carry away all drainage except during very heavy rainfalls. Where the
- gutter projects out into the street sufficiently far to be exposed to
- large numbers of heavily loaded wheels the outer corner is likely to
- become broken off or unduly abraded.
-
-Footnote 75:
-
- Curbing of all kinds is more likely to be injured by freezing and the
- heaving of frost under and around it than from any other cause. Good
- drainage is the best protection against such injury. It is important
- that these drains shall be connected with sewers, drains or other
- outlets, so that water will not stand in them.
-
-Footnote 76:
-
- The most notable departure of these specifications from usual practice
- is the use of a solid body of rich, homogeneous concrete for the whole
- section of the structure, thus avoiding the use of two courses and
- qualities of concrete—the core concrete and the facing. The most
- common cause of failure of concrete curbs and gutters is the
- separation, more or less, of the facing from the core concrete.
- Without doubt this can be prevented by the use of proper materials,
- careful work, and the strict observance of the rule that the facing
- course must be applied before the core concrete has begun to set. But
- it is difficult to always secure these favorable conditions.
- Computation will show that the difference in cost of materials,
- between the usual two-course construction and a single body of rich
- concrete throughout, is not very great, while the saving in cost of
- labor is so considerable as to make the actual difference in cost of
- the two types very small. There can be no doubt that the simpler
- construction and the consequent greater certainty of securing a
- durable and satisfactory job is greatly in favor of the construction
- here recommended.
-
-Footnote 77:
-
- The appearance of “hair cracks” on the surface of rich concrete,
- finished by troweling, and the blotched appearance of the surface of
- concrete curbing, are usually caused by improper finishing. The glazed
- surface produced by troweling, particularly where pure, dry cement or
- neat mortar is applied is almost sure to develop hair cracks, and the
- varying texture of the surface is likely to absorb water unevenly and
- thus produce, in time, the unevenly colored or blotched surface so
- often seen.
-
-Footnote 78:
-
- The utility and durability of hydraulic concrete sidewalks depends
- largely on the quality of materials and workmanship employed in the
- work. Too frequently, specifications for this work are not
- sufficiently full, or not prepared with the requisite care, or the
- work is not properly supervised or inspected while in progress. The
- aggregate importance and cost of this sidewalk work in our cities
- warrants more care and attention than it generally receives.
-
-Footnote 79:
-
- Determined by the thickness of the drainage course adopted.
-
-Footnote 80:
-
- It is customary in many cities to require that the drainage course
- under the concrete shall have a depth of twelve or more inches. This
- deep-drainage is designed to prevent the heaving of the sidewalk by
- freezing. Experience seems to prove that this is not necessary,
- particularly if tile drains are provided to carry off the water from
- the drainage course, as specified. Comparatively dry material, even
- earth, does not heave with freezing; on the other hand, if the
- material and the trench in which it is placed is wholly or partly
- filled with water, heaving is liable to occur in severe freezing
- weather, whatever the depth of the drainage course. Experience has
- proven, however, that four inches of drainage material is sufficient
- if the water is drained out of it, while if allowed to stand saturated
- with water, deeper drainage will give little if any better results.
- Where the soil is sandy or the natural drainage is otherwise good, no
- drainage course is necessary.
-
-Footnote 81:
-
- Except in the matter of low first cost cinders are not desirable for
- the drainage course. In time, this material is likely to slack, or
- decompose, and shrink in volume more or less and to allow the sidewalk
- to settle. The hollow sound one often notices when walking over a
- sidewalk and the cracks that frequently appear, are usually caused by
- the irregular settlement of the drainage course. The object of wetting
- down the cinders several days before they are used is to cause as much
- as possible of this slacking to take place before the cinders are used
- in the drainage course.
-
-Footnote 82:
-
- There is a good deal of diversity of practice in the thickness of the
- concrete to be used. For all ordinary sidewalks three inches of bottom
- course and one inch of surface-course are ample, and in many cases the
- thickness of the surface course has been reduced to one-half inch with
- satisfactory results. Three-fourths inch of surface-course, if fairly
- uniform in thickness and of good quality, will generally be ample for
- ordinary sidewalks.
-
-Footnote 83:
-
- It is customary to make the surface-course concrete much richer than
- this, but it is not necessary if the materials are good and the work
- well done.
-
-Footnote 84:
-
- This requirement is very important and should be strictly enforced,
- otherwise there is danger that by the action of water, frost, and
- time, the two courses may separate and the surface-course break up—a
- condition not infrequently observed.
-
-Footnote 85:
-
- The troweling not only helps to secure a true surface, but tends to
- produce a dense surface on the concrete; but it is not desirable that
- this surface shall be smooth and glassy, hence the slight roughening
- of the surface with a wire brush.
-
-Footnote 86:
-
- Care must be taken to make and leave these expansion joints open to
- their full width entirely through the concrete. The practice of
- forming these expansion joints by partitions of iron plate, against
- which the blocks of sidewalk are built is not advised, for the reason
- that they are likely to prevent the thorough compression of the
- concrete surface against or near the plates.
-
-------------------------------------------------------------------------
-
-
-
-
- TRANSCRIBER’S NOTES
-
-
- 1. Silently corrected obvious typographical errors and variations in
- spelling.
- 2. Retained archaic, non-standard, and uncertain spellings as printed.
- 3. Re-indexed footnotes using numbers and collected together at the end
- of the last chapter.
- 4. Enclosed italics font in _underscores_.
- 5. Enclosed bold font in =equals=.
- 6. Denoted subscripts by an underscore before a series of subscripted
- characters enclosed in curly braces, e.g. H_{2}O.
-
-*** END OF THE PROJECT GUTENBERG EBOOK SPECIFICATIONS FOR STREET
-ROADWAY PAVEMENTS ***
-
-Updated editions will replace the previous one--the old editions will
-be renamed.
-
-Creating the works from print editions not protected by U.S. copyright
-law means that no one owns a United States copyright in these works,
-so the Foundation (and you!) can copy and distribute it in the
-United States without permission and without paying copyright
-royalties. Special rules, set forth in the General Terms of Use part
-of this license, apply to copying and distributing Project
-Gutenberg-tm electronic works to protect the PROJECT GUTENBERG-tm
-concept and trademark. Project Gutenberg is a registered trademark,
-and may not be used if you charge for an eBook, except by following
-the terms of the trademark license, including paying royalties for use
-of the Project Gutenberg trademark. If you do not charge anything for
-copies of this eBook, complying with the trademark license is very
-easy. You may use this eBook for nearly any purpose such as creation
-of derivative works, reports, performances and research. Project
-Gutenberg eBooks may be modified and printed and given away--you may
-do practically ANYTHING in the United States with eBooks not protected
-by U.S. copyright law. Redistribution is subject to the trademark
-license, especially commercial redistribution.
-
-START: FULL LICENSE
-
-THE FULL PROJECT GUTENBERG LICENSE
-PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK
-
-To protect the Project Gutenberg-tm mission of promoting the free
-distribution of electronic works, by using or distributing this work
-(or any other work associated in any way with the phrase "Project
-Gutenberg"), you agree to comply with all the terms of the Full
-Project Gutenberg-tm License available with this file or online at
-www.gutenberg.org/license.
-
-Section 1. General Terms of Use and Redistributing Project
-Gutenberg-tm electronic works
-
-1.A. By reading or using any part of this Project Gutenberg-tm
-electronic work, you indicate that you have read, understand, agree to
-and accept all the terms of this license and intellectual property
-(trademark/copyright) agreement. If you do not agree to abide by all
-the terms of this agreement, you must cease using and return or
-destroy all copies of Project Gutenberg-tm electronic works in your
-possession. If you paid a fee for obtaining a copy of or access to a
-Project Gutenberg-tm electronic work and you do not agree to be bound
-by the terms of this agreement, you may obtain a refund from the
-person or entity to whom you paid the fee as set forth in paragraph
-1.E.8.
-
-1.B. "Project Gutenberg" is a registered trademark. It may only be
-used on or associated in any way with an electronic work by people who
-agree to be bound by the terms of this agreement. There are a few
-things that you can do with most Project Gutenberg-tm electronic works
-even without complying with the full terms of this agreement. See
-paragraph 1.C below. There are a lot of things you can do with Project
-Gutenberg-tm electronic works if you follow the terms of this
-agreement and help preserve free future access to Project Gutenberg-tm
-electronic works. See paragraph 1.E below.
-
-1.C. The Project Gutenberg Literary Archive Foundation ("the
-Foundation" or PGLAF), owns a compilation copyright in the collection
-of Project Gutenberg-tm electronic works. Nearly all the individual
-works in the collection are in the public domain in the United
-States. If an individual work is unprotected by copyright law in the
-United States and you are located in the United States, we do not
-claim a right to prevent you from copying, distributing, performing,
-displaying or creating derivative works based on the work as long as
-all references to Project Gutenberg are removed. Of course, we hope
-that you will support the Project Gutenberg-tm mission of promoting
-free access to electronic works by freely sharing Project Gutenberg-tm
-works in compliance with the terms of this agreement for keeping the
-Project Gutenberg-tm name associated with the work. You can easily
-comply with the terms of this agreement by keeping this work in the
-same format with its attached full Project Gutenberg-tm License when
-you share it without charge with others.
-
-1.D. The copyright laws of the place where you are located also govern
-what you can do with this work. Copyright laws in most countries are
-in a constant state of change. If you are outside the United States,
-check the laws of your country in addition to the terms of this
-agreement before downloading, copying, displaying, performing,
-distributing or creating derivative works based on this work or any
-other Project Gutenberg-tm work. The Foundation makes no
-representations concerning the copyright status of any work in any
-country other than the United States.
-
-1.E. Unless you have removed all references to Project Gutenberg:
-
-1.E.1. The following sentence, with active links to, or other
-immediate access to, the full Project Gutenberg-tm License must appear
-prominently whenever any copy of a Project Gutenberg-tm work (any work
-on which the phrase "Project Gutenberg" appears, or with which the
-phrase "Project Gutenberg" is associated) is accessed, displayed,
-performed, viewed, copied or distributed:
-
- This eBook is for the use of anyone anywhere in the United States and
- most other parts of the world at no cost and with almost no
- restrictions whatsoever. You may copy it, give it away or re-use it
- under the terms of the Project Gutenberg License included with this
- eBook or online at www.gutenberg.org. If you are not located in the
- United States, you will have to check the laws of the country where
- you are located before using this eBook.
-
-1.E.2. If an individual Project Gutenberg-tm electronic work is
-derived from texts not protected by U.S. copyright law (does not
-contain a notice indicating that it is posted with permission of the
-copyright holder), the work can be copied and distributed to anyone in
-the United States without paying any fees or charges. If you are
-redistributing or providing access to a work with the phrase "Project
-Gutenberg" associated with or appearing on the work, you must comply
-either with the requirements of paragraphs 1.E.1 through 1.E.7 or
-obtain permission for the use of the work and the Project Gutenberg-tm
-trademark as set forth in paragraphs 1.E.8 or 1.E.9.
-
-1.E.3. If an individual Project Gutenberg-tm electronic work is posted
-with the permission of the copyright holder, your use and distribution
-must comply with both paragraphs 1.E.1 through 1.E.7 and any
-additional terms imposed by the copyright holder. Additional terms
-will be linked to the Project Gutenberg-tm License for all works
-posted with the permission of the copyright holder found at the
-beginning of this work.
-
-1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm
-License terms from this work, or any files containing a part of this
-work or any other work associated with Project Gutenberg-tm.
-
-1.E.5. Do not copy, display, perform, distribute or redistribute this
-electronic work, or any part of this electronic work, without
-prominently displaying the sentence set forth in paragraph 1.E.1 with
-active links or immediate access to the full terms of the Project
-Gutenberg-tm License.
-
-1.E.6. You may convert to and distribute this work in any binary,
-compressed, marked up, nonproprietary or proprietary form, including
-any word processing or hypertext form. However, if you provide access
-to or distribute copies of a Project Gutenberg-tm work in a format
-other than "Plain Vanilla ASCII" or other format used in the official
-version posted on the official Project Gutenberg-tm website
-(www.gutenberg.org), you must, at no additional cost, fee or expense
-to the user, provide a copy, a means of exporting a copy, or a means
-of obtaining a copy upon request, of the work in its original "Plain
-Vanilla ASCII" or other form. Any alternate format must include the
-full Project Gutenberg-tm License as specified in paragraph 1.E.1.
-
-1.E.7. Do not charge a fee for access to, viewing, displaying,
-performing, copying or distributing any Project Gutenberg-tm works
-unless you comply with paragraph 1.E.8 or 1.E.9.
-
-1.E.8. You may charge a reasonable fee for copies of or providing
-access to or distributing Project Gutenberg-tm electronic works
-provided that:
-
-* You pay a royalty fee of 20% of the gross profits you derive from
- the use of Project Gutenberg-tm works calculated using the method
- you already use to calculate your applicable taxes. The fee is owed
- to the owner of the Project Gutenberg-tm trademark, but he has
- agreed to donate royalties under this paragraph to the Project
- Gutenberg Literary Archive Foundation. Royalty payments must be paid
- within 60 days following each date on which you prepare (or are
- legally required to prepare) your periodic tax returns. Royalty
- payments should be clearly marked as such and sent to the Project
- Gutenberg Literary Archive Foundation at the address specified in
- Section 4, "Information about donations to the Project Gutenberg
- Literary Archive Foundation."
-
-* You provide a full refund of any money paid by a user who notifies
- you in writing (or by e-mail) within 30 days of receipt that s/he
- does not agree to the terms of the full Project Gutenberg-tm
- License. You must require such a user to return or destroy all
- copies of the works possessed in a physical medium and discontinue
- all use of and all access to other copies of Project Gutenberg-tm
- works.
-
-* You provide, in accordance with paragraph 1.F.3, a full refund of
- any money paid for a work or a replacement copy, if a defect in the
- electronic work is discovered and reported to you within 90 days of
- receipt of the work.
-
-* You comply with all other terms of this agreement for free
- distribution of Project Gutenberg-tm works.
-
-1.E.9. If you wish to charge a fee or distribute a Project
-Gutenberg-tm electronic work or group of works on different terms than
-are set forth in this agreement, you must obtain permission in writing
-from the Project Gutenberg Literary Archive Foundation, the manager of
-the Project Gutenberg-tm trademark. Contact the Foundation as set
-forth in Section 3 below.
-
-1.F.
-
-1.F.1. Project Gutenberg volunteers and employees expend considerable
-effort to identify, do copyright research on, transcribe and proofread
-works not protected by U.S. copyright law in creating the Project
-Gutenberg-tm collection. Despite these efforts, Project Gutenberg-tm
-electronic works, and the medium on which they may be stored, may
-contain "Defects," such as, but not limited to, incomplete, inaccurate
-or corrupt data, transcription errors, a copyright or other
-intellectual property infringement, a defective or damaged disk or
-other medium, a computer virus, or computer codes that damage or
-cannot be read by your equipment.
-
-1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
-of Replacement or Refund" described in paragraph 1.F.3, the Project
-Gutenberg Literary Archive Foundation, the owner of the Project
-Gutenberg-tm trademark, and any other party distributing a Project
-Gutenberg-tm electronic work under this agreement, disclaim all
-liability to you for damages, costs and expenses, including legal
-fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
-LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
-PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE FOUNDATION, THE
-TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
-LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
-INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
-DAMAGE.
-
-1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
-defect in this electronic work within 90 days of receiving it, you can
-receive a refund of the money (if any) you paid for it by sending a
-written explanation to the person you received the work from. If you
-received the work on a physical medium, you must return the medium
-with your written explanation. The person or entity that provided you
-with the defective work may elect to provide a replacement copy in
-lieu of a refund. If you received the work electronically, the person
-or entity providing it to you may choose to give you a second
-opportunity to receive the work electronically in lieu of a refund. If
-the second copy is also defective, you may demand a refund in writing
-without further opportunities to fix the problem.
-
-1.F.4. Except for the limited right of replacement or refund set forth
-in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO
-OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT
-LIMITED TO WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.
-
-1.F.5. Some states do not allow disclaimers of certain implied
-warranties or the exclusion or limitation of certain types of
-damages. If any disclaimer or limitation set forth in this agreement
-violates the law of the state applicable to this agreement, the
-agreement shall be interpreted to make the maximum disclaimer or
-limitation permitted by the applicable state law. The invalidity or
-unenforceability of any provision of this agreement shall not void the
-remaining provisions.
-
-1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the
-trademark owner, any agent or employee of the Foundation, anyone
-providing copies of Project Gutenberg-tm electronic works in
-accordance with this agreement, and any volunteers associated with the
-production, promotion and distribution of Project Gutenberg-tm
-electronic works, harmless from all liability, costs and expenses,
-including legal fees, that arise directly or indirectly from any of
-the following which you do or cause to occur: (a) distribution of this
-or any Project Gutenberg-tm work, (b) alteration, modification, or
-additions or deletions to any Project Gutenberg-tm work, and (c) any
-Defect you cause.
-
-Section 2. Information about the Mission of Project Gutenberg-tm
-
-Project Gutenberg-tm is synonymous with the free distribution of
-electronic works in formats readable by the widest variety of
-computers including obsolete, old, middle-aged and new computers. It
-exists because of the efforts of hundreds of volunteers and donations
-from people in all walks of life.
-
-Volunteers and financial support to provide volunteers with the
-assistance they need are critical to reaching Project Gutenberg-tm's
-goals and ensuring that the Project Gutenberg-tm collection will
-remain freely available for generations to come. In 2001, the Project
-Gutenberg Literary Archive Foundation was created to provide a secure
-and permanent future for Project Gutenberg-tm and future
-generations. To learn more about the Project Gutenberg Literary
-Archive Foundation and how your efforts and donations can help, see
-Sections 3 and 4 and the Foundation information page at
-www.gutenberg.org
-
-Section 3. Information about the Project Gutenberg Literary
-Archive Foundation
-
-The Project Gutenberg Literary Archive Foundation is a non-profit
-501(c)(3) educational corporation organized under the laws of the
-state of Mississippi and granted tax exempt status by the Internal
-Revenue Service. The Foundation's EIN or federal tax identification
-number is 64-6221541. Contributions to the Project Gutenberg Literary
-Archive Foundation are tax deductible to the full extent permitted by
-U.S. federal laws and your state's laws.
-
-The Foundation's business office is located at 809 North 1500 West,
-Salt Lake City, UT 84116, (801) 596-1887. Email contact links and up
-to date contact information can be found at the Foundation's website
-and official page at www.gutenberg.org/contact
-
-Section 4. Information about Donations to the Project Gutenberg
-Literary Archive Foundation
-
-Project Gutenberg-tm depends upon and cannot survive without
-widespread public support and donations to carry out its mission of
-increasing the number of public domain and licensed works that can be
-freely distributed in machine-readable form accessible by the widest
-array of equipment including outdated equipment. Many small donations
-($1 to $5,000) are particularly important to maintaining tax exempt
-status with the IRS.
-
-The Foundation is committed to complying with the laws regulating
-charities and charitable donations in all 50 states of the United
-States. Compliance requirements are not uniform and it takes a
-considerable effort, much paperwork and many fees to meet and keep up
-with these requirements. We do not solicit donations in locations
-where we have not received written confirmation of compliance. To SEND
-DONATIONS or determine the status of compliance for any particular
-state visit www.gutenberg.org/donate
-
-While we cannot and do not solicit contributions from states where we
-have not met the solicitation requirements, we know of no prohibition
-against accepting unsolicited donations from donors in such states who
-approach us with offers to donate.
-
-International donations are gratefully accepted, but we cannot make
-any statements concerning tax treatment of donations received from
-outside the United States. U.S. laws alone swamp our small staff.
-
-Please check the Project Gutenberg web pages for current donation
-methods and addresses. Donations are accepted in a number of other
-ways including checks, online payments and credit card donations. To
-donate, please visit: www.gutenberg.org/donate
-
-Section 5. General Information About Project Gutenberg-tm electronic works
-
-Professor Michael S. Hart was the originator of the Project
-Gutenberg-tm concept of a library of electronic works that could be
-freely shared with anyone. For forty years, he produced and
-distributed Project Gutenberg-tm eBooks with only a loose network of
-volunteer support.
-
-Project Gutenberg-tm eBooks are often created from several printed
-editions, all of which are confirmed as not protected by copyright in
-the U.S. unless a copyright notice is included. Thus, we do not
-necessarily keep eBooks in compliance with any particular paper
-edition.
-
-Most people start at our website which has the main PG search
-facility: www.gutenberg.org
-
-This website includes information about Project Gutenberg-tm,
-including how to make donations to the Project Gutenberg Literary
-Archive Foundation, how to help produce our new eBooks, and how to
-subscribe to our email newsletter to hear about new eBooks.
diff --git a/old/68464-0.zip b/old/68464-0.zip
deleted file mode 100644
index 9b104a3..0000000
--- a/old/68464-0.zip
+++ /dev/null
Binary files differ
diff --git a/old/68464-h.zip b/old/68464-h.zip
deleted file mode 100644
index cff90e9..0000000
--- a/old/68464-h.zip
+++ /dev/null
Binary files differ
diff --git a/old/68464-h/68464-h.htm b/old/68464-h/68464-h.htm
deleted file mode 100644
index 69940e8..0000000
--- a/old/68464-h/68464-h.htm
+++ /dev/null
@@ -1,7629 +0,0 @@
-<!DOCTYPE html>
-<html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en" lang="en">
- <head>
- <meta charset="utf-8" />
- <title>The Project Gutenberg eBook of Specifications For Street Roadway Pavements, by S. Whinery</title>
- <link rel="icon" href="images/cover.jpg" type="image/x-cover" />
- <style> /* <![CDATA[ */
- body { margin-left: 8%; margin-right: 10%; }
- h1 { text-align: center; font-weight: bold; font-size: xx-large; }
- h2 { text-align: center; font-weight: bold; font-size: x-large; }
- h3 { text-align: center; font-weight: bold; font-size: large; }
- h4 { text-align: center; font-weight: bold; font-size: 1.0em; }
- .pageno { right: 1%; font-size: x-small; background-color: inherit; color: silver;
- text-indent: 0em; text-align: right; position: absolute;
- border: thin solid silver; padding: .1em .2em; font-style: normal;
- font-variant: normal; font-weight: normal; text-decoration: none; }
- p { text-indent: 0; margin-top: 0.5em; margin-bottom: 0.5em; text-align: justify; }
- sup { vertical-align: top; font-size: 0.6em; }
- .sc { font-variant: small-caps; }
- .large { font-size: large; }
- .xlarge { font-size: x-large; }
- .small { font-size: small; }
- .xsmall { font-size: x-small; }
- .lg-container-b { text-align: center; }
- .x-ebookmaker .lg-container-b { clear: both; }
- .lg-container-r { text-align: right; }
- .x-ebookmaker .lg-container-r { clear: both; }
- .linegroup { display: inline-block; text-align: justify; }
- .x-ebookmaker .linegroup { display: block; margin-left: 1.5em; }
- .linegroup .group { margin: 1em auto; }
- .linegroup .line { text-indent: -3em; padding-left: 3em; }
- div.linegroup > :first-child { margin-top: 0; }
- .linegroup .in8 { padding-left: 7.0em; }
- .dl_1 dd { text-align: justify; padding-top: .5em; padding-left: .5em;
- margin-left: 3.2em; text-indent: -1em; }
- .dl_1 dt { float: left; clear: left; text-align: right; width: 2.0em;
- padding-top: .5em; padding-right: .5em; }
- .dl_2 dd { text-align: justify; padding-top: .5em; padding-left: .5em;
- margin-left: 2.7em; text-indent: -1em; }
- .dl_2 dt { float: left; clear: left; text-align: right; width: 1.5em;
- padding-top: .5em; padding-right: .5em; }
- .ol_1 li {padding-left: 1em; text-indent: -1em; }
- .x-ebookmaker .dl_1 dt { float: left; clear: left; text-align: right;
- width: 2.0em; padding-top: .5em; padding-right: .5em; }
- .x-ebookmaker .dl_2 dt { float: left; clear: left; text-align: right;
- width: 1.5em; padding-top: .5em; padding-right: .5em; }
- dl.dl_1 { margin-top: .5em; margin-bottom: .5em; }
- dl.dl_2 { margin-top: .5em; margin-bottom: .5em; }
- ol.ol_1 {padding-left: 0; margin-left: 2.78%; margin-top: .5em;
- margin-bottom: .5em; list-style-type: decimal; }
- div.footnote > :first-child { margin-top: 1em; }
- div.footnote p { text-indent: 1em; margin-top: 0.25em; margin-bottom: 0.25em; }
- div.pbb { page-break-before: always; }
- hr.pb { border: none; border-bottom: thin solid; margin-bottom: 1em; }
- .x-ebookmaker hr.pb { display: none; }
- .chapter { clear: both; page-break-before: always; }
- .figcenter { clear: both; max-width: 100%; margin: 2em auto; text-align: center; }
- div.figcenter p { text-align: center; text-indent: 0; }
- .figcenter img { max-width: 100%; height: auto; }
- .id001 { width:80%; }
- .x-ebookmaker .id001 { margin-left:10%; width:80%; }
- .ic001 { width:100%; }
- .ig001 { width:100%; }
- .table0 { margin: auto; margin-top: 2em; }
- .table1 { margin: auto; }
- .bbt { border-bottom: thin solid; }
- .nf-center { text-align: center; }
- .nf-center-c0 { text-align: justify; margin: 0.5em 0; }
- .c000 { margin-top: 0.5em; margin-bottom: 0.5em; }
- .c001 { margin-top: 4em; }
- .c002 { margin-top: 1em; }
- .c003 { page-break-before: always; margin-top: 4em; }
- .c004 { margin-top: 2em; }
- .c005 { page-break-before:auto; margin-top: 4em; }
- .c006 { margin-top: 2em; text-indent: 1em; margin-bottom: 0.25em; }
- .c007 { text-indent: 1em; margin-top: 0.25em; margin-bottom: 0.25em; }
- .c008 { text-align: center; }
- .c009 { vertical-align: top; text-align: justify; text-indent: -1em;
- padding-left: 1em; padding-right: 1em; }
- .c010 { vertical-align: bottom; text-align: right; padding-right: 1em; }
- .c011 { vertical-align: bottom; text-align: right; }
- .c012 { margin-left: 2.78%; text-indent: 1em; margin-top: 0.25em;
- margin-bottom: 0.25em; }
- .c013 { margin-left: 2.78%; }
- .c014 { page-break-before: auto; margin-top: 2em; }
- .c015 { margin-top: 1em; text-indent: 1em; margin-bottom: 0.25em; }
- .c016 { text-decoration: none; }
- .c017 { vertical-align: top; text-align: right; }
- .c018 { vertical-align: top; text-align: right; padding-right: 1em; }
- .c019 { vertical-align: top; text-align: center; padding-right: 1em; }
- .c020 { vertical-align: top; text-align: center; }
- .c021 { text-indent: 0; margin-top: 0.25em; margin-bottom: 0.25em; }
- .c022 { border: none; border-bottom: thin solid; width: 10%; margin-left: 0;
- margin-top: 1em; text-align: justify; }
- div.tnotes { padding-left:1em;padding-right:1em;background-color:#E3E4FA;
- border:thin solid silver; margin:2em 10% 0 10%; font-family: Georgia, serif;
- clear: both; }
- .covernote { visibility: hidden; display: none; }
- div.tnotes p { text-align: justify; }
- .x-ebookmaker .covernote { visibility: visible; display: block; }
- .figcenter {font-size: .9em; page-break-inside: avoid; max-width: 100%; }
- .x-ebookmaker img {max-height: 30em; max-width: 100%; }
- .footnote {font-size: .9em; }
- div.footnote p {text-indent: 2em; margin-bottom: .5em; }
- .chapter { clear: both; page-break-before: always; }
- .ol_1 li {font-size: .9em; }
- .x-ebookmaker .ol_1 li {padding-left: 1em; text-indent: 0em; }
- body {font-family: Georgia, serif; text-align: justify; }
- table {font-size: .9em; padding: 1.5em .5em 1em; page-break-inside: avoid;
- clear: both; }
- div.titlepage {text-align: center; page-break-before: always;
- page-break-after: always; }
- div.titlepage p {text-align: center; text-indent: 0em; font-weight: bold;
- line-height: 1.5; margin-top: 3em; }
- .ph1 { text-indent: 0em; font-weight: bold; font-size: xx-large;
- margin: .67em auto; page-break-before: always; }
- .ph2 { text-indent: 0em; font-weight: bold; font-size: x-large; margin: .75em auto;
- page-break-before: always; }
- .border {border-style: double;border-width: 4px; }
- .x-ebookmaker p.dropcap:first-letter { float: left; }
- /* ]]> */ </style>
- </head>
- <body>
-<p style='text-align:center; font-size:1.2em; font-weight:bold'>The Project Gutenberg eBook of Specifications for street roadway pavements, by Samuel Whinery</p>
-<div style='display:block; margin:1em 0'>
-This eBook is for the use of anyone anywhere in the United States and
-most other parts of the world at no cost and with almost no restrictions
-whatsoever. You may copy it, give it away or re-use it under the terms
-of the Project Gutenberg License included with this eBook or online
-at <a href="https://www.gutenberg.org">www.gutenberg.org</a>. If you
-are not located in the United States, you will have to check the laws of the
-country where you are located before using this eBook.
-</div>
-
-<p style='display:block; margin-top:1em; margin-bottom:0; margin-left:2em; text-indent:-2em'>Title: Specifications for street roadway pavements</p>
-<p style='display:block; margin-left:2em; text-indent:0; margin-top:0; margin-bottom:1em;'>with instructions to inspectors on street paving work</p>
-<p style='display:block; margin-top:1em; margin-bottom:0; margin-left:2em; text-indent:-2em'>Author: Samuel Whinery</p>
-<p style='display:block; text-indent:0; margin:1em 0'>Release Date: July 6, 2022 [eBook #68464]</p>
-<p style='display:block; text-indent:0; margin:1em 0'>Language: English</p>
- <p style='display:block; margin-top:1em; margin-bottom:0; margin-left:2em; text-indent:-2em; text-align:left'>Produced by: Richard Tonsing and the Online Distributed Proofreading Team at https://www.pgdp.net (This file was produced from images generously made available by The Internet Archive)</p>
-<div style='margin-top:2em; margin-bottom:4em'>*** START OF THE PROJECT GUTENBERG EBOOK SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS ***</div>
-
-<div class='tnotes covernote'>
-
-<p class='c000'><strong>Transcriber’s Note:</strong></p>
-
-<p class='c000'>The cover image was created by the transcriber and is placed in the public domain.</p>
-
-</div>
-
-<div class='chapter ph1'>
-
-<div class='nf-center-c0'>
-<div class='nf-center c001'>
- <div>SPECIFICATIONS FOR</div>
- <div>STREET ROADWAY PAVEMENTS</div>
- </div>
-</div>
-
-</div>
-
-<div class='border'>
-
-<div class='nf-center-c0'>
-<div class='nf-center c001'>
- <div><span class='xlarge'>McGraw-Hill Book Company</span></div>
- <div class='c002'><i>Publishers of Books for</i></div>
- </div>
-</div>
-
-<div class='lg-container-b'>
- <div class='linegroup'>
- <div class='group'>
- <div class='line'>Electrical World</div>
- <div class='line'>Engineering Record</div>
- <div class='line'>Railway Age Gazette</div>
- <div class='line'>Signal Engineer</div>
- <div class='line'>Electric Railway Journal</div>
- <div class='line'>Metallurgical and Chemical Engineering</div>
- <div class='line'>The Engineering and Mining Journal</div>
- <div class='line'>Engineering News</div>
- <div class='line'>American Machinist</div>
- <div class='line'>American Engineer</div>
- <div class='line'>Coal Age</div>
- <div class='line'>Power</div>
- </div>
- </div>
-</div>
-
-</div>
-
-<div class='titlepage'>
-
-<div>
- <h1 class='c003'>SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS<br /> <span class='small'>WITH INSTRUCTIONS TO</span><br /> <span class='xlarge'>INSPECTORS ON STREET PAVING WORK</span></h1>
-</div>
-
-<div class='nf-center-c0'>
-<div class='nf-center c004'>
- <div>BY</div>
- <div class='c002'><span class='large'>S. WHINERY</span></div>
- <div><span class='xsmall'>MEMBER AMERICAN SOCIETY OF CIVIL ENGINEERS</span></div>
- <div class='c004'><span class='sc'>Second Edition</span></div>
- <div class='c002'><span class='sc'>Revised, Enlarged and Entirely Reset</span></div>
- <div class='c004'><span class='large'>McGRAW-HILL BOOK COMPANY</span></div>
- <div>239 WEST 39TH STREET, NEW YORK</div>
- <div>6 BOUVERIE STREET, LONDON, E. C.</div>
- <div>1913</div>
- </div>
-</div>
-
-</div>
-
-<div class='nf-center-c0'>
-<div class='nf-center c001'>
- <div><span class='small'><span class='sc'>Copyright, 1913, by the</span></span></div>
- <div><span class='small'><span class='sc'>McGraw-Hill Book Company</span></span></div>
- <div class='c004'><span class='small'>THE·MAPLE·PRESS·YORK·PA</span></div>
- </div>
-</div>
-
-<div class='chapter'>
- <span class='pageno' id='Page_v'>v</span>
- <h2 class='c005'>PREFACE TO SECOND EDITION</h2>
-</div>
-
-<p class='c006'>In offering to the public a new edition of “Specifications for
-Street Roadway Pavements” the author has taken advantage of
-the opportunity to revise and expand somewhat the matter in the
-original edition and to add thereto Instructions for Inspectors on
-pavement work.</p>
-
-<p class='c007'>Since the publication of the original pamphlet in 1907 no little
-advance has been made in the design and construction of street
-pavements and the framing of specifications for that work. Aside
-from the personal study and efforts of individual engineers, the
-Association for Standardizing Paving Specifications, organized in
-the latter part of 1909, has held four important conventions, devoted
-to the improvement and standardization of specifications for street
-pavements, and its able standing Committees have devoted much
-time and thought to the subject. The American Society of Municipal
-Improvements has also devoted much attention to the subject
-and has adopted standard specifications for most of the common
-kinds of pavement. Other organizations have been working along
-the same lines.</p>
-
-<p class='c007'>Under these circumstances it might be thought that there is no
-longer any pressing need for the continuance of individual efforts in
-this field, and it has been with some hesitation that the author has
-returned to it. Without venturing to criticise the work done by
-these public organizations it has seemed to the author that there is
-yet room for individual work in this field, if for no other reason
-than that there still remain quite divergent views not only as to
-the substance, but as to the form, scope and phraseology of specifications,
-and contributions based upon some knowledge and experience
-in street pavement may not be without value in reaching
-final conclusions.</p>
-
-<p class='c007'>As might be expected experience and observation during the past
-five years have, in a number of particulars, modified the author’s
-opinions and shown where the original specifications offered might
-be improved and enlarged, so that while, in the main, those now
-offered follow the original text, the reader will find not a few changes.
-<span class='pageno' id='Page_vi'>vi</span>There has also been added specifications for two comparatively new
-kinds of roadway pavement that have merited attention, and for
-concrete sidewalk and concrete combined curb and gutter.</p>
-
-<p class='c007'>So far as the author is aware there has not been printed, in
-America at least, any complete and comprehensive code of instructions
-for pavement inspectors, though there appears to be a demand,
-as there certainly is a need, for something of the kind.</p>
-
-<p class='c007'>Having been asked about a year since to prepare such a set of
-instructions for the use of one American city, the author has rewritten
-parts of them in a more general form, and they are printed
-(with the permission of the engineer for whom they were written)
-as Part II of this edition. While they would need some revision and
-modification to meet the conditions and special specification provisions
-in any particular city, it is thought they may be useful in
-at least suggesting the points to be covered.</p>
-
-<div class='chapter'>
- <span class='pageno' id='Page_vii'>vii</span>
- <h2 class='c005'>CONTENTS</h2>
-</div>
-
-<table class='table0'>
- <tr><td class='c008' colspan='4'>PART I</td></tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr><td class='c008' colspan='4'>SPECIFICATIONS</td></tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Introductory</strong></td>
- <td class='c010'><span class='sc'>Page</span></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Value of general specifications</td>
- <td class='c010'><a href='#Page_1'>1</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Theory of specifications</td>
- <td class='c010'><a href='#Page_1'>1</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Street paving work</td>
- <td class='c010'><a href='#Page_2'>2</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Specifications should be fair and just to contractor</td>
- <td class='c010'><a href='#Page_4'>4</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Relations of contractor to municipality</td>
- <td class='c010'><a href='#Page_6'>6</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Advertisements for proposals</td>
- <td class='c010'><a href='#Page_7'>7</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Instructions to bidders</td>
- <td class='c010'><a href='#Page_9'>9</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Relation between specifications and contract</td>
- <td class='c010'><a href='#Page_9'>9</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Specifications</td>
- <td class='c010'><a href='#Page_9'>9</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Preparation of specifications</td>
- <td class='c010'><a href='#Page_9'>9</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Engineer as arbiter</td>
- <td class='c010'><a href='#Page_11'>11</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Itemized unit prices</td>
- <td class='c010'><a href='#Page_12'>12</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr><td class='c008' colspan='4'>SPECIFICATIONS</td></tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>General</strong></td>
- <td class='c010'><span class='sc'>Page</span></td>
- <td class='c011'><span class='sc'>Section</span></td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General description of work</td>
- <td class='c010'><a href='#Page_13'>13</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Definitions</td>
- <td class='c010'><a href='#Page_14'>14</a></td>
- <td class='c011'>1</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Changes in plans and specifications</td>
- <td class='c010'><a href='#Page_15'>15</a></td>
- <td class='c011'>3</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Quality of material and work</td>
- <td class='c010'><a href='#Page_15'>15</a></td>
- <td class='c011'>4</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Inspection</td>
- <td class='c010'><a href='#Page_15'>15</a></td>
- <td class='c011'>5</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Injury to persons and property</td>
- <td class='c010'><a href='#Page_16'>16</a></td>
- <td class='c011'>6</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sanitary and public convenience</td>
- <td class='c010'><a href='#Page_16'>16</a></td>
- <td class='c011'>7–9</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Disorderly employees</td>
- <td class='c010'><a href='#Page_17'>17</a></td>
- <td class='c011'>10</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Order and progress of work</td>
- <td class='c010'><a href='#Page_17'>17</a></td>
- <td class='c011'>11</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Pavement datum</td>
- <td class='c010'><a href='#Page_18'>18</a></td>
- <td class='c011'>12</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>City monuments and stakes</td>
- <td class='c010'><a href='#Page_18'>18</a></td>
- <td class='c011'>13</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Old and new material</td>
- <td class='c010'><a href='#Page_18'>18</a></td>
- <td class='c011'>14–15</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Adjusting street structures</td>
- <td class='c010'><a href='#Page_18'>18</a></td>
- <td class='c011'>16</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Connection with existing pavements</td>
- <td class='c010'><a href='#Page_19'>19</a></td>
- <td class='c011'>18</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Measurements and computations</td>
- <td class='c010'><a href='#Page_20'>20</a></td>
- <td class='c011'>21</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Incidental and extra work</td>
- <td class='c010'><a href='#Page_20'>20</a></td>
- <td class='c011'>23–24</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Guaranty</td>
- <td class='c010'><a href='#Page_21'>21</a></td>
- <td class='c011'>25</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Preparing the sub-grade</td>
- <td class='c010'><a href='#Page_22'>22</a></td>
- <td class='c011'>26</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Foundations</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Concrete foundations—Portland cement</td>
- <td class='c010'><a href='#Page_24'>24</a></td>
- <td class='c011'>28–29</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Sand</td>
- <td class='c010'><a href='#Page_26'>26</a></td>
- <td class='c011'>30</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Stone</td>
- <td class='c010'><a href='#Page_26'>26</a></td>
- <td class='c011'>31</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Care of materials</td>
- <td class='c010'><a href='#Page_27'>27</a></td>
- <td class='c011'>33</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Ratios</td>
- <td class='c010'><a href='#Page_27'>27</a></td>
- <td class='c011'>34</td>
- </tr>
- <tr>
- <td class='c009'><span class='pageno' id='Page_viii'>viii</span>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Mixing Concrete</td>
- <td class='c010'><a href='#Page_28'>28</a></td>
- <td class='c011'>35</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Placing concrete</td>
- <td class='c010'><a href='#Page_29'>29</a></td>
- <td class='c011'>36</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;Setting of concrete</td>
- <td class='c010'><a href='#Page_29'>29</a></td>
- <td class='c011'>37</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Foundation of old paving stone</td>
- <td class='c010'><a href='#Page_30'>30</a></td>
- <td class='c011'>39</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Foundation of broken stone</td>
- <td class='c010'><a href='#Page_31'>31</a></td>
- <td class='c011'>40–41</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Sheet asphalt pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General note</td>
- <td class='c010'><a href='#Page_33'>33</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Crude and refined asphalts</td>
- <td class='c010'><a href='#Page_36'>36</a></td>
- <td class='c011'>43–46</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Tempering agent</td>
- <td class='c010'><a href='#Page_38'>38</a></td>
- <td class='c011'>47</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sand</td>
- <td class='c010'><a href='#Page_38'>38</a></td>
- <td class='c011'>48</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Pulverized stone</td>
- <td class='c010'><a href='#Page_39'>39</a></td>
- <td class='c011'>49</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Asphaltic paving cement</td>
- <td class='c010'><a href='#Page_39'>39</a></td>
- <td class='c011'>50</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Composition, surface mixture</td>
- <td class='c010'><a href='#Page_40'>40</a></td>
- <td class='c011'>51</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Base course</td>
- <td class='c010'><a href='#Page_42'>42</a></td>
- <td class='c011'>52–54</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Laying asphalt pavement</td>
- <td class='c010'><a href='#Page_42'>42</a></td>
- <td class='c011'>55–58</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Plant</td>
- <td class='c010'><a href='#Page_45'>45</a></td>
- <td class='c011'>59</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Asphalt block pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sub-grade and foundation</td>
- <td class='c010'><a href='#Page_46'>46</a></td>
- <td class='c011'>60–61</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Asphalt block</td>
- <td class='c010'><a href='#Page_46'>46</a></td>
- <td class='c011'>62</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Composition and quality</td>
- <td class='c010'><a href='#Page_46'>46</a></td>
- <td class='c011'>63–64</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Laying blocks</td>
- <td class='c010'><a href='#Page_48'>48</a></td>
- <td class='c011'>66</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Granite block pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Granite blocks</td>
- <td class='c010'><a href='#Page_50'>50</a></td>
- <td class='c011'>71</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sand cushion</td>
- <td class='c010'><a href='#Page_51'>51</a></td>
- <td class='c011'>72</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Setting blocks</td>
- <td class='c010'><a href='#Page_51'>51</a></td>
- <td class='c011'>73–74</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Filling joints</td>
- <td class='c010'><a href='#Page_52'>52</a></td>
- <td class='c011'>75</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Bridge and crossing stone</td>
- <td class='c010'><a href='#Page_55'>55</a></td>
- <td class='c011'>79</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Brick pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sub-grade and foundation</td>
- <td class='c010'><a href='#Page_56'>56</a></td>
- <td class='c011'>80–81</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Paving brick</td>
- <td class='c010'><a href='#Page_56'>56</a></td>
- <td class='c011'>82–84</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Delivering brick</td>
- <td class='c010'><a href='#Page_58'>58</a></td>
- <td class='c011'>85</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sand cushion</td>
- <td class='c010'><a href='#Page_58'>58</a></td>
- <td class='c011'>86</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Setting the brick</td>
- <td class='c010'><a href='#Page_59'>59</a></td>
- <td class='c011'>87–89</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Filling the joints</td>
- <td class='c010'><a href='#Page_60'>60</a></td>
- <td class='c011'>90</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Wood-block pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sub-grade and foundation</td>
- <td class='c010'><a href='#Page_62'>62</a></td>
- <td class='c011'>92–93</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Wood-blocks</td>
- <td class='c010'><a href='#Page_63'>63</a></td>
- <td class='c011'>94</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Creosote oil</td>
- <td class='c010'><a href='#Page_65'>65</a></td>
- <td class='c011'>95</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Preservative treatment</td>
- <td class='c010'><a href='#Page_65'>65</a></td>
- <td class='c011'>96</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Laying wood-blocks</td>
- <td class='c010'><a href='#Page_66'>66</a></td>
- <td class='c011'>97</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Filling joints</td>
- <td class='c010'><a href='#Page_68'>68</a></td>
- <td class='c011'>98</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Inspection</td>
- <td class='c010'><a href='#Page_68'>68</a></td>
- <td class='c011'>99</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Expansion joints</td>
- <td class='c010'><a href='#Page_68'>68</a></td>
- <td class='c011'>101</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Bituminous concrete pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General note</td>
- <td class='c010'><a href='#Page_69'>69</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sub-grade and foundation</td>
- <td class='c010'><a href='#Page_70'>70</a></td>
- <td class='c011'>103–109</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Bituminous concrete</td>
- <td class='c010'><a href='#Page_71'>71</a></td>
- <td class='c011'>110</td>
- </tr>
- <tr>
- <td class='c009'><span class='pageno' id='Page_ix'>ix</span>&#160;</td>
- <td class='c009'>Mixing and laying</td>
- <td class='c010'><a href='#Page_73'>73</a></td>
- <td class='c011'>111–112</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Hydraulic concrete pavement</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sub-grade and foundation</td>
- <td class='c010'><a href='#Page_73'>73</a></td>
- <td class='c011'>113</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Bottom course</td>
- <td class='c010'><a href='#Page_74'>74</a></td>
- <td class='c011'>115</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Top, or surface, course</td>
- <td class='c010'><a href='#Page_74'>74</a></td>
- <td class='c011'>116–120</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Expansion joints</td>
- <td class='c010'><a href='#Page_76'>76</a></td>
- <td class='c011'>121</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Bituminous surface</td>
- <td class='c010'><a href='#Page_77'>77</a></td>
- <td class='c011'>122</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Experimental or Untried Pavements</strong></td>
- <td class='c010'><a href='#Page_78'>78</a></td>
- <td class='c011'>123–126</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Concrete Curb and Gutter</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General</td>
- <td class='c010'><a href='#Page_80'>80</a></td>
- <td class='c011'>127</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Excavation and drainage</td>
- <td class='c010'><a href='#Page_81'>81</a></td>
- <td class='c011'>128–129</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Concrete</td>
- <td class='c010'><a href='#Page_81'>81</a></td>
- <td class='c011'>130</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Weather</td>
- <td class='c010'><a href='#Page_82'>82</a></td>
- <td class='c011'>132</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Expansion joints</td>
- <td class='c010'><a href='#Page_82'>82</a></td>
- <td class='c011'>133</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Circular corners</td>
- <td class='c010'><a href='#Page_83'>83</a></td>
- <td class='c011'>134</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Steel protection</td>
- <td class='c010'><a href='#Page_83'>83</a></td>
- <td class='c011'>135</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Finishing, forms, etc.</td>
- <td class='c010'><a href='#Page_83'>83</a></td>
- <td class='c011'>136–138</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Payment for</td>
- <td class='c010'><a href='#Page_84'>84</a></td>
- <td class='c011'>139</td>
- </tr>
- <tr>
- <td class='c009' colspan='2'><strong>Concrete Sidewalks</strong></td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General note</td>
- <td class='c010'><a href='#Page_84'>84</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General dimensions</td>
- <td class='c010'><a href='#Page_84'>84</a></td>
- <td class='c011'>140</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Grading</td>
- <td class='c010'><a href='#Page_85'>85</a></td>
- <td class='c011'>141</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Drainage</td>
- <td class='c010'><a href='#Page_85'>85</a></td>
- <td class='c011'>142–143</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Bottom course</td>
- <td class='c010'><a href='#Page_86'>86</a></td>
- <td class='c011'>144</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Surface course</td>
- <td class='c010'><a href='#Page_86'>86</a></td>
- <td class='c011'>145</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Expansion joints</td>
- <td class='c010'><a href='#Page_87'>87</a></td>
- <td class='c011'>147</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Weather</td>
- <td class='c010'><a href='#Page_88'>88</a></td>
- <td class='c011'>149</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Regrading</td>
- <td class='c010'><a href='#Page_88'>88</a></td>
- <td class='c011'>150</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Repairing defects</td>
- <td class='c010'><a href='#Page_88'>88</a></td>
- <td class='c011'>151</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Measurement and payment</td>
- <td class='c010'><a href='#Page_88'>88</a></td>
- <td class='c011'>152</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr><td class='c008' colspan='4'>PART II</td></tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr><td class='c008' colspan='4'>INSTRUCTIONS TO INSPECTORS</td></tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c010'>&#160;</td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Introductory note</td>
- <td class='c010'><a href='#Page_91'>91</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General remarks, inspection and inspectors</td>
- <td class='c010'><a href='#Page_91'>91</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>General instructions</td>
- <td class='c010'><a href='#Page_94'>94</a></td>
- <td class='c011'>1–13</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sub-foundation work general</td>
- <td class='c010'><a href='#Page_96'>96</a></td>
- <td class='c011'>14</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;curbing</td>
- <td class='c010'><a href='#Page_97'>97</a></td>
- <td class='c011'>15</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;rough grading</td>
- <td class='c010'><a href='#Page_98'>98</a></td>
- <td class='c011'>16</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;fine grading</td>
- <td class='c010'><a href='#Page_98'>98</a></td>
- <td class='c011'>17</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;incidental work</td>
- <td class='c010'><a href='#Page_98'>98</a></td>
- <td class='c011'>18</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;concrete foundation</td>
- <td class='c010'><a href='#Page_98'>98</a></td>
- <td class='c011'>19</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;quality of materials</td>
- <td class='c010'><a href='#Page_98'>98</a></td>
- <td class='c011'>20</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;storing materials</td>
- <td class='c010'><a href='#Page_99'>99</a></td>
- <td class='c011'>21</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;proportioning</td>
- <td class='c010'><a href='#Page_99'>99</a></td>
- <td class='c011'>22</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;mixing concrete</td>
- <td class='c010'><a href='#Page_100'>100</a></td>
- <td class='c011'>23</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;&#8196;placing concrete</td>
- <td class='c010'><a href='#Page_100'>100</a></td>
- <td class='c011'>24–25</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Old paving stone foundation</td>
- <td class='c010'><a href='#Page_101'>101</a></td>
- <td class='c011'>26</td>
- </tr>
- <tr>
- <td class='c009'><span class='pageno' id='Page_x'>x</span>&#160;</td>
- <td class='c009'>Broken stone foundation</td>
- <td class='c010'><a href='#Page_101'>101</a></td>
- <td class='c011'>27</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Sheet asphalt pavement</td>
- <td class='c010'><a href='#Page_101'>101</a></td>
- <td class='c011'>28</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;inspecting at paving plant</td>
- <td class='c010'><a href='#Page_102'>102</a></td>
- <td class='c011'>29–30</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;sand</td>
- <td class='c010'><a href='#Page_102'>102</a></td>
- <td class='c011'>31–33</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;refined asphalt and flux</td>
- <td class='c010'><a href='#Page_103'>103</a></td>
- <td class='c011'>34–36</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;asphaltic cement</td>
- <td class='c010'><a href='#Page_103'>103</a></td>
- <td class='c011'>37</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;ratio, sand and cement</td>
- <td class='c010'><a href='#Page_104'>104</a></td>
- <td class='c011'>38</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;mixing</td>
- <td class='c010'><a href='#Page_104'>104</a></td>
- <td class='c011'>39</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;records</td>
- <td class='c010'><a href='#Page_104'>104</a></td>
- <td class='c011'>40</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Inspecting on the street</td>
- <td class='c010'><a href='#Page_105'>105</a></td>
- <td class='c011'>41–42</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;temperature of mixture</td>
- <td class='c010'><a href='#Page_105'>105</a></td>
- <td class='c011'>43</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;preparing street surface</td>
- <td class='c010'><a href='#Page_105'>105</a></td>
- <td class='c011'>44</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;laying binder-course</td>
- <td class='c010'><a href='#Page_106'>106</a></td>
- <td class='c011'>45</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;laying surface-course</td>
- <td class='c010'><a href='#Page_106'>106</a></td>
- <td class='c011'>46–50</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Asphalt block pavement</td>
- <td class='c010'><a href='#Page_107'>107</a></td>
- <td class='c011'>51–52</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Granite block pavement</td>
- <td class='c010'><a href='#Page_108'>108</a></td>
- <td class='c011'>53</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;blocks</td>
- <td class='c010'><a href='#Page_108'>108</a></td>
- <td class='c011'>54</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;sand cushion</td>
- <td class='c010'><a href='#Page_108'>108</a></td>
- <td class='c011'>55</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;setting the block</td>
- <td class='c010'><a href='#Page_108'>108</a></td>
- <td class='c011'>56</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;ramming the blocks</td>
- <td class='c010'><a href='#Page_109'>109</a></td>
- <td class='c011'>57</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;filling joints</td>
- <td class='c010'><a href='#Page_110'>110</a></td>
- <td class='c011'>58</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Brick pavement</td>
- <td class='c010'><a href='#Page_110'>110</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;inspecting the brick</td>
- <td class='c010'><a href='#Page_110'>110</a></td>
- <td class='c011'>60</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;sand cushion</td>
- <td class='c010'><a href='#Page_111'>111</a></td>
- <td class='c011'>61</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;setting brick</td>
- <td class='c010'><a href='#Page_111'>111</a></td>
- <td class='c011'>62</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;rolling</td>
- <td class='c010'><a href='#Page_111'>111</a></td>
- <td class='c011'>63</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;filling the joints</td>
- <td class='c010'><a href='#Page_112'>112</a></td>
- <td class='c011'>64–65</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Wood-block pavement</td>
- <td class='c010'><a href='#Page_112'>112</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;inspection of blocks</td>
- <td class='c010'><a href='#Page_112'>112</a></td>
- <td class='c011'>67</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;mortar bed</td>
- <td class='c010'><a href='#Page_112'>112</a></td>
- <td class='c011'>68</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;setting blocks</td>
- <td class='c010'><a href='#Page_113'>113</a></td>
- <td class='c011'>69</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;filling the joints</td>
- <td class='c010'><a href='#Page_113'>113</a></td>
- <td class='c011'>70</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Bituminous concrete pavement</td>
- <td class='c010'><a href='#Page_113'>113</a></td>
- <td class='c011'>71–72</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Hydraulic concrete pavement</td>
- <td class='c010'><a href='#Page_113'>113</a></td>
- <td class='c011'>73</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;foundation</td>
- <td class='c010'><a href='#Page_113'>113</a></td>
- <td class='c011'>74</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;surface-course</td>
- <td class='c010'><a href='#Page_114'>114</a></td>
- <td class='c011'>75–77</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;expansion joints</td>
- <td class='c010'><a href='#Page_114'>114</a></td>
- <td class='c011'>78</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;care of work</td>
- <td class='c010'><a href='#Page_114'>114</a></td>
- <td class='c011'>79</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Concrete combined curb and gutter</td>
- <td class='c010'><a href='#Page_114'>114</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;concrete</td>
- <td class='c010'><a href='#Page_115'>115</a></td>
- <td class='c011'>81</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;removing forms</td>
- <td class='c010'><a href='#Page_115'>115</a></td>
- <td class='c011'>82</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;corner protection</td>
- <td class='c010'><a href='#Page_115'>115</a></td>
- <td class='c011'>83</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;patching</td>
- <td class='c010'><a href='#Page_116'>116</a></td>
- <td class='c011'>84</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>Hydraulic concrete sidewalk</td>
- <td class='c010'><a href='#Page_116'>116</a></td>
- <td class='c011'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;materials</td>
- <td class='c010'><a href='#Page_116'>116</a></td>
- <td class='c011'>86</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;drainage</td>
- <td class='c010'><a href='#Page_116'>116</a></td>
- <td class='c011'>87</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;two-course work</td>
- <td class='c010'><a href='#Page_116'>116</a></td>
- <td class='c011'>88</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c009'>&#8196;&#8196;&#8196;&#8196;finishing surface</td>
- <td class='c010'><a href='#Page_116'>116</a></td>
- <td class='c011'>89–90</td>
- </tr>
-</table>
-
-<div class='chapter'>
- <h2 class='c005'>PART I<br /> SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS</h2>
-</div>
-
-<div>
- <span class='pageno' id='Page_1'>1</span>
- <h3 class='c003'>INTRODUCTORY</h3>
-</div>
-
-<p class='c006'>In addition to their value as memoranda and aids in preparing
-specifications for a particular project, carefully prepared general
-specifications, embodying the latest approved practice, sometimes
-supply the most useful and acceptable brief treatises upon any particular
-branch of engineering work. It has been partly with this
-thought in mind that the following set of specifications for standard
-street pavements has been prepared and is now offered to city
-engineers and municipal authorities.</p>
-
-<p class='c007'>To widen their range and increase their usefulness, copious foot
-notes have been added, referring to alternative requirements and
-methods of construction, and giving some of the reasons for the
-preference or adoption of the construction called for in the specifications.
-It is recognized that in a good many matters of detail
-embraced in these specifications there is difference of opinion among
-able engineers, many of whom are at least as competent as the
-writer to determine what is best. They are not offered in a dogmatic
-spirit, or with the hope that all the provisions found therein will be
-accepted. If they shall be of some assistance in bringing about
-correct standards for such specifications, their preparation will have
-been justified.</p>
-
-<p class='c007'>Theoretically, three general classes of engineering specifications
-may be noted. In the first, the aim of the engineer is to specify the
-end or result that it is desired to secure, leaving the contractor free
-to originate and follow the methods by which these results are to be
-attained. In the second the engineer aims to secure the desired
-end by specifying in detail the materials and the methods which
-in his opinion will accomplish the purpose, he himself assuming
-responsibility for the results. Either of these two classes of specifications
-is permissible, and the engineer may choose the one which
-in his opinion seems best adapted to the character of the work to
-be done, and the conditions under which it must be prosecuted.</p>
-
-<p class='c007'>In the third class of specifications, met with more frequently
-than they should be, the engineer undertakes to prescribe not only
-the character of the materials to be used and the methods to be
-pursued, but also the results to be attained. The position thus
-assumed is illogical, and often unreasonable, and may lead to complications
-<span class='pageno' id='Page_2'>2</span>between the engineer and the contractor. If a contractor
-be required to turn out a product which shall conform to certain
-standards, he may properly be given much, if not full latitude, as
-to how the stipulated results shall be secured, and may be held fully
-responsible for the outcome; if on the other hand the engineer
-chooses to specify with more or less minuteness the character of the
-materials to be used and the methods of construction to be followed,
-and enforces compliance therewith, it seems fair and just that he
-should assume responsibility for the results produced, and therefore
-unfair to hold the contractor to responsibility for consequences
-arising from the use of materials and methods which he was allowed
-no choice or latitude in selecting.</p>
-
-<p class='c007'>In street paving work, of well-known and standard character,
-the second class of specifications seems preferable for a number of
-reasons, the leading one being that the time required to develop
-the good or bad quality of the work must usually extend over a considerable
-number of years, and the conditions to which the pavement
-may be subjected in the meantime are likely to vary so widely that
-it may be very difficult, if not impossible, to prescribe a satisfactory
-standard of service and endurance. Disputes are therefore liable
-to arise between the municipality and the contractor as to the latter’s
-liability, or conditions may make it difficult or impossible to hold
-the contractor to strict account for that liability.</p>
-
-<p class='c007'>It is believed that in the present state of the art it is entirely
-practicable to so frame specifications for the materials to be used
-and the methods to be followed in the construction of standard street
-pavements, and to so enforce compliance therewith, that the engineer
-and the municipality may safely assume responsibility for the quality
-of the work produced. While it may be true that local conditions
-sometimes make it very difficult to enforce compliance with specifications,
-the same conditions are likely to make it at least equally
-difficult to secure effective responsibility on the part of the contractor
-for any long-period guarantee of the work done by him;
-and the contractor who negligently or purposely violates the specifications
-during construction is not likely to be more faithful or
-scrupulous in living up to any guarantees he may make with regard
-to the future, even where the terms and conditions of such guarantees
-may be clearly defined and indisputable. The writer has discussed
-the subject of time guarantees as applied to street pavements
-pretty fully in his book, “Municipal Public Works,” and the above
-brief statement seems all that is necessary here.</p>
-
-<p class='c007'><span class='pageno' id='Page_3'>3</span>In conformity with this view of the matter, the following specifications
-aim to set out as definitely and clearly as practicable the
-requirements for the construction of good pavements of the several
-standard kinds, and it is assumed that the engineer will be able to,
-and will enforce them.</p>
-
-<p class='c007'>It is, however, not infrequently the case that the engineer will be
-called upon to prepare specifications for new, or patented, or proprietary
-pavements advocated by their promoters, the value or
-usefulness of which have not been sufficiently established by experience,
-and for which the data for detailed, definite specifications
-are not yet available.</p>
-
-<p class='c007'>In such cases the wisest course to follow is to confine the precise
-specifications to the general or standard parts of the work, while
-stipulating only the <i>results to be attained</i> with regard to those features
-of the work that are proprietary or questionable, thus placing upon
-the promoter or his contractors full responsibility for such results
-as are promised or guaranteed. This applies to new or comparatively
-untried materials or processes, whether patented or not.</p>
-
-<p class='c007'>A proposed form of general specifications to cover such cases is
-offered herein.</p>
-
-<p class='c007'>It is usually unwise to adopt or to incorporate in the municipal
-specifications those prepared or offered by the promoter or patentee,
-which are often brief, incomplete, and indefinite, and are sometimes
-carefully, and even cunningly, drawn to evade final responsibility.</p>
-
-<p class='c007'>No attempt has been made to submit specifications for proprietary
-or patented pavements, or those composed wholly or in part of
-materials which are patented or protected by trade-marks. The
-owners or contractors engaged in constructing these pavements,
-often, if not usually, claim the right to dictate the material parts
-of the specifications under which such work shall be done, and the
-municipal engineer who is called upon to construct such pavements,
-must, in each case, determine whether the specifications offered are
-adequate and satisfactory, and the extent to which he feels justified
-in accepting responsibility for the results. Naturally, the contractor
-or promoter, even if competent to prepare specifications, cannot
-be expected to bind himself within closer limits than he thinks
-necessary to secure the work. In many such cases the form of general
-specifications for “untried or experimental pavements” given
-herein might appropriately be used.</p>
-
-<p class='c007'>The engineer is, in common with all men, fallible, and he can
-hardly hope, in the preparation of specifications, to make them
-<span class='pageno' id='Page_4'>4</span>perfect; to cover every item and particular; or to escape some
-ambiguities of expression, and some degree of indefiniteness. The
-writer can only claim that he has aimed, in the light of a considerable
-experience, to set out as fully and definitely as practicable
-the requirements for the proper construction of high-class street
-pavements, and has endeavored to avoid loose or obscure terms and
-expressions. The ideal specification is one that furnishes a wholly
-sufficient guide to the accomplishment of the desired purpose; that
-provides for every possible contingency which may arise, and is
-couched in language which not only means exactly what it was
-intended to mean, but is incapable of any other interpretation. It
-is needless to say that no example of such a perfect specification
-can be instanced as a model.</p>
-
-<p class='c007'>It has been the aim to make these specifications fair and just
-to the contractor; that is, to require of him no impracticable or
-indefinite service, or the assumption by him of risks other than those
-fairly involved in the business conduct of the work.</p>
-
-<p class='c007'>If the plans and specifications for any work which a contractor
-bids upon are so full, specific, and clear, that he may know exactly
-what he will be expected to do, and if they do not require him to
-assume unusual chances and risks, he may intelligently name prices
-which he believes will compensate him for the service. Having
-done so, his proposal having been accepted, and a contract entered
-into accordingly, the engineer and the municipality have a right
-both in law and equity to demand that he will do exactly and fully
-what he has contracted to do. No excuses on his part can be valid
-and none should be accepted. He may in all fairness and justness
-be required to “toe the mark” strictly. To the neglect to recognize
-and enforce these principles is chargeable the greater part of the
-poor and unsatisfactory work so common in street pavement work
-in our cities. Unexpected contingencies may, of course, arise where
-some changes and concessions may be proper and just, but these
-should be, and usually are, very rare. On the other hand, sweeping
-general clauses in contracts and specifications intended to catch the
-contractor “goin’ or comin’,” unnecessarily stringent stipulations
-which were never intended to be strictly enforced, but were put into
-the specifications with the idea that they would help hold the contractor
-up to a high standard, and “one-sided” contracts intended
-to give the municipality an unfair advantage over the contractor,
-are as inadvisable in policy as they are wrong in principle. Nothing
-should be put in a specification that is not clearly essential to secure
-<span class='pageno' id='Page_5'>5</span>the results aimed at, and, this having been done, every requirement
-should be enforced. The existence in specifications of requirements
-that are not intended to be enforced, gives the contractor a pretext
-for neglecting others that may be important.</p>
-
-<p class='c007'>In these specifications will be found a number of details that
-are often not regarded as important and which, when found in paving
-specifications, the contractor is frequently allowed to ignore.
-In the writer’s opinion, based upon his experience in street paving,
-every one of these requirements is essential to the production of
-high-class work, which, it is hardly necessary to argue, is, in the end,
-the most economical work from the standpoint of the municipality.</p>
-
-<p class='c007'>It may be argued that the adoption and enforcement of these
-specifications would have the effect of raising prices. In many cases
-this would doubtless prove true. Contractors are entitled to a fair
-and reasonable compensation for their services. It is admitted that
-in some cities the prevailing prices for some kinds of pavements
-are below the actual cost of the work if it were done in a proper
-manner, conforming strictly to the specifications. Illogical as it
-undoubtedly is, the low price at which work is taken is sometimes
-considered a sufficient reason for accepting work below standard.
-The consequence is that bidders not only count upon concessions
-and lax enforcement of the specifications, but bid lower and lower,
-expecting that further concessions will enable them to get out with
-an undeserved profit. This is one of the most serious evils in the
-paving business to-day, and the highest public interests demand a
-thorough reform. Low first cost, desirable as it may be, is the
-poorest economy if it be secured at the sacrifice of the quality of the
-work. If one pavement costs twenty per cent. more than another,
-but renders forty per cent. more service, it is obviously the cheaper
-of the two.</p>
-
-<p class='c007'>Contractors are prone to contend that this or that provision
-in a specification is unusual, unnecessary or unfair. In dealing with
-them the engineer should bear in mind that no requirement of a
-specification that is clearly and definitely stated, so that the bidder
-may understand exactly what it means and what he will be expected
-to do, and may frame his prices accordingly, can be unreasonable
-or unfair to the contractor. Unusual or unnecessary requirements
-may result in unwarrantably increasing the cost of the work, and
-this may raise a question between the engineer and the municipality
-employing him, but it can furnish no occasion for questions of fairness
-or unfairness between the contractor and the engineer.</p>
-
-<p class='c007'><span class='pageno' id='Page_6'>6</span>The relations that should exist between the contractee and the
-contractor, and the attitude of the engineer toward the contractor
-have been widely discussed and are quite well understood from both
-the ethical and legal standpoint.</p>
-
-<p class='c007'>It is well to bear in mind that when a contract is duly entered
-into, both the parties thereto are equal before the law. Neither can
-impose upon the other terms or conditions that are not clearly included
-in or to be fairly inferred from the contract itself. The
-assumption that either party has superior or extra rights not expressed
-or to be fairly inferred from the written agreement, or in
-accordance with the established rulings of the courts, is wholly
-without warrant. The smallest contractor is, in this respect, upon
-an equal footing with the largest city government for which he may
-undertake to do contract work. It is not infrequently the case that
-the city assumes a superior and dictatorial attitude not in harmony
-with these principles, and it is too common for the contractor to seek
-to evade or to escape from clear contractural obligations. In neither
-case is the action warranted by fairness, justice, or law.</p>
-
-<p class='c007'>It should be needless to say that the attitude of the engineer
-toward the contractor should be one of unyielding and uncompromising
-requirement that the contract and specifications shall be
-fully and faithfully complied with, but at the same time one of
-absolute fairness and even helpfulness to the contractor. The ideal
-relation, which should be more commonly attainable than it appears
-to be, is that of helpful cooperation to bring about the results the
-contract and specifications were intended to secure.</p>
-
-<p class='c007'>In line with the principles here outlined some observations upon
-the preparation of contracts and specifications are appropriate.</p>
-
-<p class='c007'>It is the general practice to include in and make a part of “The
-Contract” (herein for convenience called The General Contract)
-all the various documents that are supposed to relate directly to
-the transaction as a whole. The separate parts of such a general
-contract may vary in number or character, but the principal ones
-are the following:</p>
-
-<p class='c007'>1. The advertisement for proposals.</p>
-
-<p class='c007'>2. Instructions to bidders.</p>
-
-<p class='c007'>3. The proposal submitted.</p>
-
-<p class='c007'>4. The contract proper.</p>
-
-<p class='c007'>5. The specifications.</p>
-
-<p class='c007'>Each of these should be drawn to cover fully and clearly its
-appropriate purpose or function but <i>nothing more</i>. It is not unusual
-<span class='pageno' id='Page_7'>7</span>to find, even in the instructions to bidders, stipulations that properly
-belong in the contract or specifications, and it is quite common to
-find in the contract proper a lot of matter that properly belongs in
-the specifications only. In such cases there is liable to be more or
-less confusion as to the actual meaning or requirements of the
-general contract as a whole, which may lead to serious misunderstandings
-and complications between the parties thereto. The
-several documents composing the general contract are likely to be
-prepared by different persons, looking at the transaction from
-different points of view, and often not wholly familiar with the scope,
-intent and language of the other documents. There is therefore
-a possibility, at least, of indefinite, if not of conflicting expressions
-which are open to different interpretations, particularly in the
-light of special or unexpected conditions that may arise during the
-progress of the work or the settlement therefor. It would tend to
-eliminate or avoid the possibility of such complications if each of
-the several documents confined itself strictly to its appropriate
-function in the general contract.</p>
-
-<p class='c007'>Advertisements for proposals may be divided into two general
-classes. The one is brief in form and substance, simply stating
-that proposals for a certain named work will be received at a stated
-place and time, and referring those interested to documents on file
-at a stated place for all further information. This is the general
-form adopted by the United States War Department for the many
-projects carried out by contract under its direction. A sample
-advertisement taken from a current technical journal is as follows;</p>
-
-<p class='c012'>TREASURY DEPARTMENT, OFFICE OF
-the Supervising Architect, Washington, D. C.,
-October 10, 1912. Sealed Proposals will be received
-at this office until 3 o’clock p. m. on the 1st day of
-November, 1912, and then opened, for an electric
-passenger elevator in the United States post office,
-Bellingham, Wash., in accordance with the drawing
-and specification, copies of which may be had at this
-office at the discretion of the Supervising Architect.
-OSCAR WENDEROTH, Supervising Architect.</p>
-
-<p class='c007'>The other general class of advertisement, very commonly used
-by municipal corporations, is much longer and more elaborate,
-giving a condensed statement of the character of the work to be
-done, the conditions under which proposals are invited and will be
-received, and a schedule of the quantities of work involved, together
-<span class='pageno' id='Page_8'>8</span>with other particulars. A typical example of such an advertisement,
-taken from the same periodical, is here given:</p>
-
-<div class='nf-center-c0'>
-<div class='nf-center c013'>
- <div>PUMPING MACHINERY—ROSELAND PUMPING STATION</div>
- <div class='c002'>DEPARTMENT OF PUBLIC WORKS</div>
- </div>
-</div>
-
-<div class='lg-container-r c013'>
- <div class='linegroup'>
- <div class='group'>
- <div class='line'><span class='sc'>Chicago, Ill.</span>, October 2, 1912.</div>
- </div>
- </div>
-</div>
-
-<p class='c012'>Sealed proposals will be received by the City of
-Chicago until 11 A. M. Wednesday, October 30,
-1912, at Room 406, City Hall, for furnishing and
-erecting at Roseland Pumping Station one vertical
-triple expansion crank and fly wheel pumping engine
-of a capacity of twenty-five million (25,000,000) gallons
-per day against a normal head of one hundred
-and forty feet (140′). This proposal also includes
-the dismantling of a similar engine now at Lake View
-Pumping Station, transporting and erecting it at
-Roseland Pumping Station, together with the furnishing
-and erection of certain auxiliaries and appurtenances,
-according to plans and specifications on file in
-the office of the Department of Public Works of said
-city, Room 406, City Hall.</p>
-
-<p class='c012'>Proposals must be made out upon blanks furnished
-at said office, and be addressed to said Department,
-indorsed “Proposals for Pumping Machinery, Roseland
-Pumping Station,” and be accompanied with
-Five Thousand ($5,000) Dollars in money or a certified
-check for the same amount on some responsible
-bank located and doing business in the City of Chicago
-and made payable to the order of the Commissioner
-of Public Works.</p>
-
-<p class='c012'>The Commissioner of Public Works reserves the
-right to reject any or all bids. A deposit of One
-Hundred Dollars ($100) will be required to insure
-safe return of the plans.</p>
-
-<p class='c012'>No proposal will be considered unless the party
-offering it shall furnish evidence satisfactory to the
-Commissioner of Public Works of his ability, and
-that he has the necessary facilities together with
-sufficient pecuniary resources to fulfill the conditions
-of the Contract and Specifications, provided such
-Contract should be awarded to him.</p>
-
-<p class='c012'>Companies or firms bidding will give the individual
-names as well as the name of the firm with their
-address.</p>
-
-<div class='lg-container-r c013'>
- <div class='linegroup'>
- <div class='group'>
- <div class='line in8'>L. E. McGANN,</div>
- <div class='line'><i>Commissioner of Public Works</i>.</div>
- </div>
- </div>
-</div>
-
-<p class='c007'><span class='pageno' id='Page_9'>9</span>Such advertisements as this may be required by statutes or ordinances,
-and in that case are, of course, proper and necessary. Even
-where not so required they may be considered advantageous, because
-they give prospective bidders more complete information as
-to the character and magnitude of the work, and may enable them
-to decide at once whether they care to pursue the matter further.
-But on the whole, the shorter form of advertisement, if permissible,
-seems preferable, because it refers the enquirer directly to the original
-and official sources of information, the forms to be used, the contract,
-specifications and estimated quantities of work, exactly as
-they will and must be presented to all bidders, and as they will appear
-in the subsequent stages of the transaction, and leaves, therefore,
-no room for possible confusion of statements between the
-advertisement and the other documents. Furthermore, the cost
-of the shorter form of advertisement is much less, and this is often
-a matter of some importance.</p>
-
-<p class='c007'>Instructions to bidders should be confined strictly to such information
-and directions as the bidder may need to properly and
-intelligently make up and submit his proposal in accordance with
-the requirements relating thereto. This should include primarily,
-a reference to the contract and specifications for all general and detailed
-information about the work to be done, but should carefully
-avoid any statements or language that might be construed to add
-to, take from, limit or modify the contract or specifications. Perhaps
-the briefest and best statement of what this document should
-or should not contain is that it should be so framed that, except as
-a matter of record, its office and usefulness should absolutely end
-with the award and signing of the contract.</p>
-
-<p class='c007'>No one who is not a lawyer can presume to say just what the contract
-proper should contain or cover, particularly as this may vary
-with the requirements of statutes and ordinances in force in a given
-city. It would seem logical and proper, however, to separate the
-special functions of contracts and specifications in such a way that
-each should cover a distinct field of its own, and be free from encroachment
-upon the proper domain of the other. With such a
-conception of the proper domain of each, one might safely say that
-the contract should undertake to set out only the legal and contractural
-relations of the parties thereto, and should refer to the
-plans and specifications for all detailed instructions as to the actual
-performance of the work and the results to be secured.</p>
-
-<p class='c007'>In the preparation of specifications for any public work the main
-<span class='pageno' id='Page_10'>10</span>points to be kept in mind are fulness, definiteness, and exact expression.
-While brevity and conciseness are desirable qualities
-in any document, they should not be secured at the expense of completeness
-and precision of statement. Even the frequent repetition
-of words, phrases and sentences throughout a document, where
-it is necessary to avoid the possibility of misunderstanding or ambiguity,
-should be resorted to freely. Exact description and definition
-are more important than literary style, though they may often
-be successfully combined. Of course, it is not possible or necessary
-to go into minute detail with regard to every part of the work.
-Certain things may be safely assumed to be required by established
-practice or trade usage. If, for instance, it is specified that certain
-lumber shall be “dressed” this word has a well-understood meaning
-in the trade and it is unnecessary to stipulate how the dressing shall
-be done or its character or quality, though it may be necessary to
-say whether it is to be dressed on one or more sides.</p>
-
-<p class='c007'>The proper preparation of specifications for any work involves
-a clear, distinct and complete conception, determination and design
-of what is to be done; of the conditions that are likely to be met with
-in carrying it out; and of alternate plans that these conditions may
-necessitate. This may not always be possible, for the engineer is
-not omniscient. But careful study and maturity of design will
-enable him to avoid the great majority of such indefinite expressions
-as “or in such other manner as the engineer may direct,” “in
-accordance with the instructions of the engineer,” etc. A great
-many of the items to which such expressions are intended to and
-do apply in practice, could be definitely settled before the specifications
-are prepared and thus all uncertainty on the part of both engineer
-and contractor be avoided. To illustrate: specifications for
-block pavement commonly stipulate that the blocks shall be set
-in rows running at right angles to the axis of the street, except at
-street intersections, where the engineer may direct them to be laid
-at a different angle. There is usually no good reason why the engineer
-should not determine beforehand at which, if any, street intersections
-the general rule should be changed and so state in the specifications.
-These may be and usually are unimportant matters which
-may not much affect one way or the other the cost to the contractor.
-But they often prove otherwise, and the contractor is entitled to
-know when he submits his proposal just what he will be required to
-do. Of course it may develop during the progress of the work that
-changes from the original plan will become necessary, but these should
-<span class='pageno' id='Page_11'>11</span>be provided for in some such definite and previously stipulated
-manner as outlined in Sect. 3 of the following specifications.</p>
-
-<p class='c007'>The practice of inserting, either in the specifications or the contract,
-a clause making the engineer judge and arbiter in any differences
-that may arise between the city and the contractor, and providing
-that his decision in all such cases shall be final, is as unwise
-as it is often illegal. Such clauses are based on the assumption that
-the engineer is a competent as well as a disinterested party in the
-transaction, an assumption that is usually wholly wrong, though to
-their honor it may be said that the confidence thus reposed in engineers
-is seldom abused. But the fact is that the engineer is
-never actually a disinterested party. He is employed and paid by
-the city to look after its interests, and is under no obligations to the
-contractor other than those named in the contract and specifications
-and his sense of justice, propriety and professional honor. He
-would be recreant to his duty if in all nicely balanced matters of
-doubt he did not espouse the side of his employer. Moreover, his
-personal interests are often involved. Having prepared the plans,
-specifications and estimates for the work, he is naturally and properly
-anxious that it shall be successful and that the cost shall not exceed
-that estimated. Under all these conditions it is hardly possible
-for any human being to be a wholly disinterested and unprejudiced
-judge. No broad-minded and conscientious engineer desires to
-be placed in such a difficult position, and it is as unfair as it is unwise
-and improper to require him to assume it.</p>
-
-<p class='c007'>There are, however, a number of matters of fact in reference to
-which it is proper and necessary to make the judgment and decision
-of the engineer controlling and final, unless it may be shown that
-his decision is clearly erroneous or affected by improper motives,
-or by fraud. Some one must necessarily be made the immediate
-and final judge as to whether the quality of materials and workmanship
-is in accordance with the requirements of the plans and
-specifications, and as to the quantity of work actually performed,
-and these duties and responsibilities are very properly placed upon
-the engineer.</p>
-
-<p class='c007'>It not infrequently occurs that specifications are not drawn as
-clearly as they should be in the matters of methods of measuring
-the work and of applying contract unit prices, and indefiniteness
-and carelessness in this regard are often a source of misunderstanding
-and dispute between the engineer and the contractor. It is a
-good practice, followed by many able engineers, after specifying
-<span class='pageno' id='Page_12'>12</span>how a certain part of the work shall be done, to state how it shall
-be measured and paid for at the contract unit prices.</p>
-
-<p class='c007'>In many respects it is desirable that all the work to be done under
-contract should be quite fully itemized, and a unit price named for
-each kind of work. It is the custom in many cities to name only
-certain leading items of the work to be done under a paving contract,
-as for the pavement complete, furnishing and setting new
-curbing, redressing and resetting old curbing, and possibly a few
-other leading items, and to require that all necessary incidental
-work shall be done by the contractor without cost to the city; or, in
-other words, he must take this possible extra work into consideration
-in naming his unit prices for the leading items of the work.
-As the quantity of this incidental work is often not stated, and the
-contractor has no means of ascertaining it, he must guess, as intelligently
-as he may be able, how much he should add to his unit prices
-to cover its cost. If he is a prudent contractor he will be sure to
-add enough to prevent any possible loss on this account. In most
-cases the quantities of this incidental work can be determined and
-scheduled by the engineer with the more important items, and the
-contractor may be required to name unit prices for it. True, there
-are likely to develop during the progress of the work some items
-that could not be foreseen or that were overlooked. In some cities
-such contingencies are provided for by a clause in the contract or
-specifications scheduling, by name, all the incidental minor items
-of work that experience has shown are likely to be met with in street paving
-contracts, and naming fair unit prices which the contractor
-will be paid for each, should it occur. The contractor may then
-feel assured that however much the quantity of such incidental
-work may vary, he will receive compensation proportionate thereto,
-and he may name his prices for the main items with more confidence.
-Under such conditions it is reasonable to expect closer figures than
-he would be willing to name if an unknown quantity of incidental
-work for which no separate pay is provided had to be taken into
-consideration.</p>
-
-<p class='c007'>Sub-division of unit prices is also desirable in order that the engineer
-may be able to analyze and record the elements that make up
-the aggregate cost of the work. Thus, in the case of the construction
-of a new sheet asphalt pavement it is common to ask for a single
-price for the pavement complete, including a five year guarantee.
-Now the work will consist of several distinct operations or kinds
-of work for each of which a separate price might be named:</p>
-
-<p class='c007'><span class='pageno' id='Page_13'>13</span>1. The grading of the street and preparation of the sub-grade.
-The quantity of this work will vary on different streets and is best
-reckoned by the cubic yard of material excavated.</p>
-
-<p class='c007'>2. A price, either per cubic yard or per square yard for the concrete
-foundation.</p>
-
-<p class='c007'>3. A price per square yard for the asphalt pavement proper. This
-might, if desired, be sub-divided into separate prices for the base-course and the surface-course.</p>
-
-<p class='c007'>4. A price per square yard for guaranteeing the pavement for
-five years.</p>
-
-<p class='c007'>Such sub-division would, it is true, increase the work of final computation
-but if of no other value, the detailed costs would be a great
-aid to the engineer in estimating the reasonable cost of future work
-where the relative quantity of these detailed parts varied.</p>
-
-<h3 class='c003'>SPECIFICATIONS</h3>
-
-<div class='nf-center-c0'>
-<div class='nf-center c004'>
- <div>For Grading and Paving, or Repaving</div>
- </div>
-</div>
-
-<div class='lg-container-b'>
- <div class='linegroup'>
- <div class='group'>
- <div class='line'>with.. ........ ........ .............. .... Pavement</div>
- <div class='line'>on a... ......... .......... ...... Foundation, the Roadway</div>
- <div class='line'>of..... ........ ........... ............ . ............</div>
- <div class='line'>Street, from...... .......... ............. .............</div>
- <div class='line'>to. ....... ....... ........... ............ ........</div>
- <div class='line'>together with work incidental thereto.</div>
- </div>
- </div>
-</div>
-
-<h4 class='c014'>GENERAL DESCRIPTION OF WORK</h4>
-
-<p class='c015'>The work embraced in and to be done under this contract consists
-of grading the entire street from curb to curb between the
-limits named, including the removal or readjustment of the pavement
-now on the roadway, setting and resetting curbing, laying
-or relaying sidewalks where required, furnishing all new material
-and performing all the labor required for paving the roadway,
-together with all incidental work necessary to complete the whole
-in a proper manner, in accordance with the contract, the plans on
-<span class='pageno' id='Page_14'>14</span>file in the office of the City Engineer, these Specifications and the
-instructions of the City Engineer, herein referred to as the Engineer,
-or his authorized agents.</p>
-
-<h4 class='c014'>REFERENCES</h4>
-
-<p class='c015'>The numbered divisions of these specifications are herein designated
-as “sections,” each being referred to by the number standing
-at its beginning. Where reference is herein made to any such section
-number it shall be considered equivalent to a quotation of that
-section.</p>
-
-<p class='c007'>The plans and drawings relating to this work, on file in the
-office of the City Engineer are designated as&#160;...</p>
-
-<p class='c007'><strong>1. Authority.</strong>—Wherever, in these specifications, the words, the
-City, are used, they shall be understood to refer to the duly constituted
-municipal government of the city of&#160;...
-or its authorized agents, acting within the authority specifically conferred
-upon them by the said municipal government.<a id='r1'></a><a href='#f1' class='c016'><sup>[1]</sup></a></p>
-
-<p class='c007'>Wherever, in these specifications, the words, the Engineer, shall
-be used, they shall be understood to refer to the City Engineer
-of said city, or his deputies or assistants, acting within the authority
-conferred upon them by the City Engineer.</p>
-
-<p class='c007'>But no agent of the city shall have power to revoke, alter, enlarge
-or relax the stipulations or requirements of these specifications,
-except in so far as such authority may be specifically conferred in
-or by the specifications themselves, without the formal authorization
-so to do, conferred by the contract of which these specifications
-are a part, or by ordinance, resolution or other usual official action
-of the city.<a id='r2'></a><a href='#f2' class='c016'><sup>[2]</sup></a></p>
-
-<p class='c007'><strong>2. Interpretation.</strong>—In case of any actual or alleged disagreement
-or discrepancy between the contract, these specifications, and the
-plans for the work on file in the office of the Engineer, the language
-<span class='pageno' id='Page_15'>15</span>and provisions of the contract shall take precedence and prevail;
-and the Engineer shall determine in each case whether the specifications
-or the plans shall be followed.</p>
-
-<p class='c007'><strong>3.</strong> The Engineer shall have the right to make such changes in the
-plans and specifications of the work as he may deem necessary or
-desirable or to provide for unexpected conditions or contingencies
-that may develop at any time after the signing of the contract, or
-during the progress, or before the final acceptance of the work;
-provided that all such changes do not involve an aggregate increase
-or decrease in the cost of the work, as shown by his estimates, of
-more than ten (10) per cent. The contractor shall accept such
-changes when made, as a part of the original contract and specifications,
-subject to all the provisions and conditions thereof. But
-before any such changes shall become valid and before the contractor
-shall begin the particular work involved in such changes, the
-increased or decreased cost of the work by reason of such changes,
-above or below what it would have been under the original plans
-and specifications, shall be agreed upon in writing between the
-engineer and the contractor. And when the whole work, including
-such changes, shall have been completed and accepted by the
-engineer, the sum or sums so agreed upon shall be added to or
-deducted from the sum that would have been due the contractor
-if no such changes had been made.</p>
-
-<p class='c007'><strong>4. Quality of Material and Work.</strong>—The judgment and decision
-of the Engineer as to whether the materials supplied and the work
-done under this contract comply with the requirements of these
-specifications, shall be conclusive and final. No material shall be
-used in the work until it has been examined and approved by the
-Engineer, or his authorized agents. All rejected material must be
-promptly removed from the work and replaced with that which is
-acceptable to the Engineer, and all improper or defective work must
-be corrected, and, if necessary, removed and reconstructed so as to
-comply with these specifications and the instructions of the Engineer.</p>
-
-<p class='c007'>In all matters of detail not specifically covered by the specifications
-the work shall be well and skillfully done in accordance with
-the best trade or art customs and standards for work of like character
-and purpose.</p>
-
-<p class='c007'><strong>5. Inspection.</strong>—The Engineer may provide for the inspection, by
-assistants and inspectors under his direction, of all materials used
-and all work done under this contract. Such inspection may extend
-to all or any part of the work, and to the preparation or manufacture
-<span class='pageno' id='Page_16'>16</span>of materials to be used, whether within the limits of the work on the
-street, or at any other place. The Engineer and his inspectors shall
-have free access to all parts of the work, including mines, quarries,
-manufactories, or other places where any part of the materials to be
-used is procured, manufactured or prepared. The Contractor shall
-furnish the Engineer all information relating to the work and the
-material therefor which the Engineer may deem necessary or pertinent,
-and with such samples of materials as may be required. The
-Contractor shall, at his expense, supply inspectors with such labor
-and assistance as may be necessary in the handling of materials
-for proper inspection. Inspectors shall have authority to reject
-defective material and to suspend any work that is being improperly
-done, subject to the final decision of the Engineer. Inspectors shall
-have no authority to permit deviations from, or to relax any of the
-provisions of these specifications without the written permission or
-instruction of the Engineer; nor to delay the Contractor by failure
-to inspect materials and work with reasonable promptness.</p>
-
-<p class='c007'>The payment of any compensation, whatever may be its character
-or form, or the giving of any gratuity, or the granting of any
-valuable favor, by the Contractor to any inspector, directly or
-indirectly, is strictly prohibited, and any such act on the part of
-the Contractor will constitute a violation of these specifications.<a id='r3'></a><a href='#f3' class='c016'><sup>[3]</sup></a></p>
-
-<p class='c007'><strong>6. Injuries to Persons and Property.</strong>—The Contractor shall be
-held alone responsible for all injuries to persons, and for all damages
-to the property of the city or others, caused by or resulting from the
-negligence of himself, his employees or agents, during the progress
-of, or connected with the prosecution of the work, whether within
-the limits of the work, or elsewhere. He must restore all injured
-property, including sidewalks, curbing, sodding, pipes, conduits,
-sewers and other public or private property to a condition as good
-as it was when he entered upon the work.</p>
-
-<p class='c007'><strong>7. Sanitary Conveniences; Nuisances.</strong>—The Contractor shall
-<span class='pageno' id='Page_17'>17</span>provide all necessary privy accommodations for the use of his employees
-on the street, and shall maintain the same in a clean and
-sanitary condition. He shall not create nor permit any nuisance
-to the public or to residents in the vicinity of the work.</p>
-
-<p class='c007'><strong>8. Public Convenience.</strong>—No material, or other obstruction
-shall be placed within five feet of fire hydrants, which must be at
-all times readily accessible to the Fire Department.</p>
-
-<p class='c007'>During the progress of the work the convenience of the public
-and of the residents along the street must be provided for as far as
-practicable. Convenient access to driveways, houses and buildings
-along the street must be maintained wherever possible. Temporary
-approaches to and crossings of intersecting streets and sidewalks
-must be provided and kept in good condition, wherever
-practicable.</p>
-
-<p class='c007'><strong>9. Barriers, Lights, Watchmen.</strong>—The Contractor shall provide
-and maintain such fences, barriers, “street closed” signs, red lights,
-and watchmen as may be necessary to prevent avoidable accidents
-to residents and to the public.</p>
-
-<p class='c007'><strong>10. Disorderly Employees.</strong>—Disorderly, intemperate, or incompetent
-persons must not be employed, retained, or allowed upon
-the work. Foremen or workmen who neglect or refuse to comply
-with the instructions of the Engineer, shall, at his request, be
-promptly discharged, and shall not thereafter be re-employed
-without his consent.</p>
-
-<p class='c007'><strong>11. Order and Progress of Doing Work.</strong>—The work under this contract
-shall be prosecuted at as many different points, at such times,
-and in such sections along the line of the work, and with such forces
-as the Engineer may from time to time deem necessary, and direct,
-to secure its completion within the contract time. Not more than
-one thousand (1,000) linear feet of the street shall be torn up, obstructed
-or closed to travel at any one time without the written permission
-of the Engineer. Completed portions of the pavement
-shall be opened to travel as directed by the Engineer, but such
-opening shall not be construed as an acceptance by the City of the
-work done. Where thus opened to public travel by the direction
-of the Engineer, the Contractor will not be held responsible for injuries
-to the work caused by such travel or public use, pending the
-final completion and acceptance of the whole work.</p>
-
-<p class='c007'><strong>12. Grade and Contour of Pavement.</strong>—Roadway pavements
-shall be laid to such grades, crown and contour of surface as the plans
-may show or the Engineer may direct, and the surface of the completed
-<span class='pageno' id='Page_18'>18</span>pavement shall conform accurately to such grades, crown
-and contour. The designed surface of the completed pavement
-shall be considered as the datum or plane of reference in fixing the
-location or level of the sub-grade, of the pavement foundation, and
-of structures connected therewith. It will be hereafter referred to
-in these specifications as “The pavement datum.”</p>
-
-<p class='c007'><strong>13. City Monuments or Stakes.</strong>—The Contractor must carefully
-protect from disturbance or injury all city monuments, stakes and
-benchmarks, and shall not excavate nearer than five feet to any of
-them without the permission of the Engineer; or until they have
-been removed, witnessed, or otherwise disposed of by the Engineer.</p>
-
-<p class='c007'><strong>14. Old Material.</strong>—All material or structures removed from the
-street and not required for the new construction, but which the city
-may desire to reserve, shall be delivered and neatly piled up in a
-corporation yard or elsewhere, by the Contractor, as the Engineer
-may direct. Such reserved material shall be considered in the
-custody of the Contractor until delivered at the place designated,
-and he will be held responsible for its care and protection, and must
-make good any losses occasioned by damage, theft, or misappropriation
-while it is on the street or en route to the place of storage.
-If the Contractor shall be required to haul such reserved material
-more than one-half mile, he shall be paid a reasonable price, to be
-agreed upon in advance, for the haul exceeding that distance.</p>
-
-<p class='c007'>Material taken from the work which is to be used in the new construction
-shall be compactly piled where it will least obstruct the
-sidewalks or adjoining sections of the street, and properly protected
-by the Contractor until it is required for use.</p>
-
-<p class='c007'>All old material removed from the work, including the material
-excavated in preparing the sub-grade, not reserved by the City nor
-to be used again in the work, shall belong to the Contractor and
-must be removed by him from the street as promptly as possible.
-It must not be placed on the sidewalks or adjacent streets, nor on
-any other street or property belonging to the City, nor on the property
-of private owners, without the written consent of the Engineer,
-or the owner of the property.</p>
-
-<p class='c007'><strong>15. Storage of New Material.</strong>—The material for construction
-when brought upon the street shall be neatly piled so as to cause as
-little obstruction to travel as possible, and so that it may be
-conveniently inspected.</p>
-
-<p class='c007'><strong>16. Rebuilding and Adjusting Street Structures.</strong>—Catch basins,
-manhole, sewer and water frames and covers, sewer inlets, water
-<span class='pageno' id='Page_19'>19</span>pipes and other conduits, belonging to the City and within the limits
-of the work, shall, if necessary, be reset to the new lines and grades
-of the street and for this purpose good brick masonry of the original
-thickness, laid in Portland cement mortar shall be used. Great
-care must be taken to set all such structures as project through
-the pavement exactly to the grade and contour of the new street
-surface, and any defects in the conformity of such structures to
-the pavement datum, discovered at the time, or during the progress
-of the work, or during the guaranty period, stipulated in Sec. 25
-shall be promptly remedied by the Contractor.</p>
-
-<p class='c007'><strong>17. Clean Sidewalks.</strong>—During the progress of the work, the
-sidewalks and portions of the street adjoining the work, or in its
-vicinity, must not be obstructed or littered more than may be absolutely
-necessary, and the adjacent sidewalks must be kept clean.</p>
-
-<p class='c007'><strong>18. Connection With Existing Pavements or Streets.</strong>—Wherever
-a new pavement joins or abuts against an existing pavement of a
-different kind, or an unpaved street, either at the end of the new
-pavement or at cross or intersecting streets, a line of stone headers
-shall be provided and set. The stone shall be of sound, hard limestone,
-sandstone, granite or bluestone, free from injurious imperfections.
-The separate stones shall be not less than three (3) feet
-long, at least eighteen (18) inches deep, not less than four and one-half
-(4½) inches wide at the top, nor less than three (3) inches
-wide at the bottom. The top shall be of uniform width for each
-line of headers, and shall be dressed square and even. The ends
-shall be dressed to secure a joint not wider than one-half (½) inch
-for a depth of six inches from the top, and the sides dressed so as to
-secure good contact and close jointing with the pavement. The
-stones shall be set accurately with their tops at the pavement datum,
-on a bed of concrete nine (9) inches wide and six (6) inches deep,
-and after being set the trench shall be filled and rammed full of
-gravel or crushed stone.</p>
-
-<p class='c007'>All existing pavements adjoining or abutting against the new
-pavement, with their crosswalks, curbs, and gutters, shall be adjusted,
-or taken up and relaid, to conform to and connect with the
-pavement datum, to such an extent as the Engineer may direct.</p>
-
-<p class='c007'>Where the new and adjoining pavement are of the same kind,
-and headers are not used, the new and the old pavement must be
-properly joined and connected, as the Engineer may direct.</p>
-
-<p class='c007'>Stone headers will be paid for by the linear foot at the contract
-price for that item, and the other work embraced in this section
-<span class='pageno' id='Page_20'>20</span>will be paid for at the contract prices for the several items, where
-such contract prices are provided; otherwise the work shall be considered
-as incidental work and shall be done at the expense of the
-Contractor.</p>
-
-<p class='c007'><strong>19. Curbing to be Completed in Advance.</strong>—The setting of all
-new curbing and guttering and the redressing, resetting or readjustment
-of all old curbing must be completed at least 100 feet in advance
-of the construction of the street foundation.</p>
-
-<p class='c007'><strong>20. Final Cleaning Up.</strong>—Immediately after the completion of
-the work or any consecutive portion of it, the Contractor shall remove
-from it all unused material, refuse and dirt placed by him
-on, or in the vicinity of the work, or resulting from its prosecution,
-and restore the street to a condition as clean as before the work was
-begun; and the new pavement shall be properly cleaned.</p>
-
-<p class='c007'><strong>21. Measurements and Computations.</strong>—Unless otherwise distinctly
-provided in the contract and specifications, measurements,
-computations and payments will be based upon the actual quantities
-of completed work, customary or conventional methods of measurement
-and computation to the contrary notwithstanding.</p>
-
-<p class='c007'>The area of street pavement shall be reckoned in square yards
-of completed pavement surface, deducting manholes, inlets and other
-openings in the surface of the pavement having an area of over
-three (3) square feet. Unless separately paid for under the contract,
-stone headers and crosswalks will be measured as a part of the
-pavement surface.</p>
-
-<p class='c007'><strong>22.</strong> The price for the pavement per square yard shall, unless
-otherwise stated herein, include the preparation of the sub-foundation,
-the construction of the foundation, the cushion course, and
-the pavement complete, including all the materials and labor required
-therefor.</p>
-
-<p class='c007'><strong>23. Incidental Work at Contractor’s Expense.</strong>—All the work to be
-done by the Contractor for which specific unit prices are not named
-in the contract, specified and enumerated in Sections 4, 5, 6, 7, 8, 9,
-12, 13, 14, 15, 16, 17, 18, 19, and 20, as well as any minor details
-of work not specifically mentioned in the specifications, but obviously
-necessary for the proper completion of the work, shall be considered
-as incidental, and as being a part of and included with the work
-for which prices are named in the contract. The Contractor will
-not be entitled to any extra or additional compensation therefor.</p>
-
-<p class='c007'><strong>24. Extra Work.</strong>—The City may require the Contractor to
-furnish such additional materials and to do such additional work,
-<span class='pageno' id='Page_21'>21</span>not provided for in the contract and these specifications, but which
-may be found necessary or pertinent to the proper prosecution and
-completion of the work embraced in the contract, at prices to be
-agreed upon in writing, in advance. But no work other than that
-included in the contract and these specifications and which is covered
-by and to be paid for at the prices named in the contract, shall be
-done by the Contractor except upon a written order from the Engineer,
-which order shall describe the work to be done and name
-the compensation agreed upon therefor. In the absence of such
-written order from the Engineer the Contractor will not be entitled
-to payment for any such additional or extra work.</p>
-
-<p class='c007'>In the same manner the city may omit or dispense with items or
-parts of the work, by previous agreement with the contractor, and
-a like written order by the engineer. But such additions, omissions
-or alterations shall not together increase or decrease the aggregate
-cost of the whole work more than fifteen per cent. (15%). Any
-changes in the plans, specifications, character of material used or
-method of doing the work that may increase or decrease the aggregate
-cost of the work more than fifteen per cent. (15%) may be
-authorized and validated only by a formal, supplemental contract,
-regularly executed by all the parties to the original contract.<a id='r4'></a><a href='#f4' class='c016'><sup>[4]</sup></a></p>
-
-<p class='c007'><strong>25. Guaranty.</strong><a id='r5'></a><a href='#f5' class='c016'><sup>[5]</sup></a>—The Contractor shall guarantee that all the materials
-used and all the work done under this contract shall fully
-comply with the requirements of these specifications, the plans
-herein before referred to and the instructions of the Engineer. Any
-defects in the completed work, or any part of it, or any failure of the
-work to fully perform or endure the service for which it was intended,
-<span class='pageno' id='Page_22'>22</span>which, in the opinion of the Engineer, are attributable to the use
-of materials, skill, or workmanship not in compliance with the said
-specifications, plans and instructions, within a period of&#160;...
-years after the date of the certificate of completion and
-acceptance, shall be regarded as prima facie and conclusive evidence
-that the Contractor has failed to comply with the said specifications,
-plans and instructions. And the Contractor shall, at his own expense,
-at such time and in such manner as the Engineer may direct,
-repair or take up and reconstruct any such defective work, in full
-compliance with the original specifications, plans and instructions.
-And as surety for the performance of this guaranty the Contractor’s
-bond, required by the contract, shall remain in full force until the
-expiration of the period of&#160;... years above stipulated
-in this section.</p>
-
-<h4 class='c014'>PREPARING THE SUB-GRADE</h4>
-
-<p class='c015'><strong>26. Grading.</strong>—The whole area to be occupied by the pavement
-and its foundation shall be excavated or filled up to a sub-grade at
-such an elevation that after being compacted by the roller, the
-surface will be&#160;... inches below the pavement datum, and truly
-parallel thereto. In excavating, the earth must not be disturbed
-below the sub-grade. Plowing will not be permitted where the depth
-of earth to be removed is less than five (5) inches, and in no case must
-the plow be allowed to penetrate to within less than one inch of the
-sub-grade. Places that are found to be loose, or soft, or composed
-of unsuitable material, below sub-grade, must be dug out and refilled
-with sand, or other material as good as the average of that found on
-the street.</p>
-
-<p class='c007'>Where the natural surface of the ground shall be below the sub-grade,
-or shall become so by the removal of old pavement or other
-structures, it must be filled to the sub-grade in layers not exceeding
-five inches in depth, and each layer shall be thoroughly rolled or
-rammed before the next layer is placed upon it, and when the filling
-is completed the filled area must be properly trimmed and compacted
-by rolling or ramming to the true sub-grade, as in excavation.
-The material excavated from the street may be used for such filling,
-provided it be of suitable quality. Where it cannot be thus procured
-from the street it must be obtained by the Contractor elsewhere, in
-which case the actual quantity so obtained, measured after it is compacted
-in the street, will be paid for at the contract price for “earth
-<span class='pageno' id='Page_23'>23</span>filling.” The price bid for “earth excavation” will be paid for all
-material excavated above the sub-grade, measured in place on the
-street, which price includes the cost of disposing of the excavated
-material, whether as waste or filling, and of trimming and rolling
-or ramming the sub-grade, and of making it ready for the pavement
-foundation.</p>
-
-<p class='c007'>After the excavation is completed and the surface neatly trimmed,
-the whole area shall be well compacted by rolling with a roller weighing
-not less than five tons. Areas inaccessible to the roller shall
-be rammed until they are as well compacted as the rolled surface.
-When the rolling is completed the surface must be nowhere more
-than three-fourths inch below, nor more than three-eighths inch
-above the true sub-grade. If, after the rolling is completed and
-before the pavement foundation is laid, the surface shall become
-disturbed in any way, it must be replaced and properly compacted.</p>
-
-<p class='c007'>Where the soil composing the sub-foundation is found to be wet
-or “springy,” a system of soft tile drains, discharging into the street
-drainage system, shall be constructed by the Contractor, as directed
-by the Engineer. The tile shall be laid in trenches about one foot
-wide and from one to two feet deep. After the tile is in place the
-trenches shall be filled with crushed stone or gravel, well compacted
-by tamping. The tile will be paid for per linear foot at the contract
-price for the same, which price shall include the cost of excavating
-and refilling the trenches with crushed stone.</p>
-
-<h4 class='c014'>PAVEMENT FOUNDATION</h4>
-
-<p class='c015'><strong>27.</strong> Pavement foundation shall consist of hydraulic concrete,
-or of old pavement stone relaid, or of broken stone or gravel, as
-may be herein specified, constructed upon the sub-grade.<a id='r6'></a><a href='#f6' class='c016'><sup>[6]</sup></a></p>
-
-<div>
- <span class='pageno' id='Page_24'>24</span>
- <h4 class='c014'>HYDRAULIC CONCRETE FOUNDATION</h4>
-</div>
-
-<p class='c015'><strong>28. Concrete.</strong>—Concrete shall be composed of Portland cement,
-sand, broken stone and water.</p>
-
-<p class='c007'><strong>29. Portland Cement.</strong><a id='r7'></a><a href='#f7' class='c016'><sup>[7]</sup></a>—Portland cement shall be defined as the
-<span class='pageno' id='Page_25'>25</span>pulverized product resulting from the calcination to incipient fusion
-of an intimate mixture of properly proportioned argillaceous and
-calcareous materials, and to which no addition greater than three
-per cent. has been made subsequent to calcination.</p>
-
-<p class='c007'><strong>Specific Gravity.</strong>—The specific gravity of the dry cement at a
-temperature of two hundred and twelve (212) degrees F. shall not
-be less than 3.10.</p>
-
-<p class='c007'><strong>Fineness.</strong>—It shall be pulverized to such fineness that not more
-than eight (8) per cent. shall fail to pass a number one hundred
-(100) sieve and not more than twenty-five (25) per cent. shall fail
-to pass a number two hundred (200) sieve.</p>
-
-<p class='c007'><strong>Time of Setting.</strong>—At the temperature of sixty (60) degrees F.
-mortar made of neat cement shall not begin to set in less than thirty
-(30) minutes, nor set hard in less than one hour, but must set hard
-within ten (10) hours.</p>
-
-<p class='c007'><strong>Strength.</strong>—When thoroughly mixed dry with clean, sharp, moderately
-coarse sand, in the ratio by weight of one part cement to
-three parts of sand, and then made into stiff mortar, briquets
-made from this mortar and exposed for one day to moist air and
-immersed in water for the balance of the periods named below,
-<span class='pageno' id='Page_26'>26</span>shall develop a tensile strength per square inch not less than the
-following:</p>
-
-<table class='table1'>
- <tr>
- <td class='c009'>In seven days</td>
- <td class='c017'>175 pounds.</td>
- </tr>
- <tr>
- <td class='c009'>In twenty-eight days</td>
- <td class='c017'>250 pounds.</td>
- </tr>
-</table>
-
-<p class='c007'><strong>Constancy of Volume.</strong>—When subjected to standard tests for
-constancy of volume, the cement shall show no tendency to swell
-or crack.</p>
-
-<p class='c007'><strong>Composition.</strong>—The cement shall not contain more than one and
-three-fourths (1.75) per cent. of anhydrous sulphuric acid, nor more
-than four (4) per cent. of magnesia.</p>
-
-<p class='c007'><strong>Tests.</strong>—Cement tests shall be conducted in accordance with the
-methods recommended by the “Committee on Uniform Tests of
-Cement” of the American Society of Civil Engineers.</p>
-
-<p class='c007'><strong>Conditions.</strong>—All cement shall be supplied in original packages
-with the brand of the manufacturer marked on each package. It
-shall be protected during transportation from rain and moisture.
-It shall be delivered upon the work at least ten (10) days (exclusive
-of Sundays and holidays) before it is to be used, in order to
-allow of proper inspection, and the contractor shall furnish all
-necessary facilities for such inspection. Brands of cement without
-established good reputation, or not heretofore used in the City of&#160;... may be rejected; or they will be accepted
-only after they satisfactorily pass the 28–day test. Rejected cement
-must be at once removed from the street.</p>
-
-<p class='c007'><strong>30. Sand.</strong>—Sand for concrete shall be composed of grains not
-softer than hard limestone. It shall be moderately coarse and
-preferably made up of grains of varying size producing a mass with
-low percentage of voids. It shall not contain, in all, more than
-seven (7) per cent. by volume of clay, loam, mica scales, silt, or other
-objectionable inorganic matter, nor more than one (1) per cent. of
-organic matter.</p>
-
-<p class='c007'><strong>31. Broken Stone.</strong>—Broken stone for concrete shall be of hard and
-sound limestone or other stone equally hard and durable, broken to
-a roughly cubical form. It shall be screened through efficient
-revolving screens, and only such fragments as have passed through
-circular screen openings two and one-half (2½) inches in diameter,
-shall be used. If the crushed dust and fine fragments be not
-screened out, the stone must be so handled that the fine material
-<span class='pageno' id='Page_27'>27</span>will be evenly distributed through the mass when it reaches the
-concrete platform or mixer.<a id='r8'></a><a href='#f8' class='c016'><sup>[8]</sup></a></p>
-
-<p class='c007'><strong>32. Water.</strong>—Water used for concrete shall be fresh, and reasonably
-clean.</p>
-
-<p class='c007'><strong>33. Care and Handling of Concrete Material.</strong>—Cement must
-not be allowed to become wet or damp. It shall be stored until
-used, whether in storehouses or on the street, so that no part of the
-packages shall be nearer than four (4) inches to the ground or pavement,
-and shall be effectually covered so that rain cannot reach it.
-Sand and stone, if stored on the street, shall be on lumber floors.<a id='r9'></a><a href='#f9' class='c016'><sup>[9]</sup></a>
-The stone shall be thoroughly wetted a sufficient time before being
-placed in the concrete to allow any surplus water to drain away,
-but shall remain moist where it reaches the concrete platform or
-mixer.</p>
-
-<p class='c007'><strong>34. Ratio of Concrete Materials.</strong>—Concrete will be composed of
-one part Portland cement,&#160;... parts of sand and&#160;... parts of broken stone, and the proper quantity
-of water, all measured by volume.<a id='r10'></a><a href='#f10' class='c016'><sup>[10]</sup></a> The unit of measurement shall
-<span class='pageno' id='Page_28'>28</span>be the barrel of cement which shall be considered as containing four
-(4) cubic feet. The materials shall each be measured in such manner
-and with such accuracy that the quantities used will not vary more
-than seven (7) per cent. from the quantities required in the ratio
-named above for each batch of concrete.</p>
-
-<p class='c007'><strong>35. Mixing Concrete.</strong>—If mixed by hand, concrete shall be mixed
-on platforms of iron or wood of sufficient size to admit of proper
-manipulation of the concrete. The sand shall be first spread evenly
-over the platform and the cement evenly distributed over the sand.
-These two materials shall then be mixed dry until a uniform and
-homogeneous mixture is secured. Sufficient water shall then be
-added and the mixing resumed and continued until a mortar of
-uniform consistency and texture is produced and distributed in an
-even layer over the platform. The stone shall then be distributed
-over the mortar and mixed therewith until the mortar is evenly
-distributed through the mass and every fragment of stone is well
-coated with mortar, sufficient additional water being added as
-the mixing progresses to produce a rather wet, but not sloppy,
-concrete.<a id='r11'></a><a href='#f11' class='c016'><sup>[11]</sup></a> Machine mixing of concrete will be preferred, provided
-<span class='pageno' id='Page_29'>29</span>the machine used secures equal accuracy in the ratios of materials
-and equally as good mixing as prescribed above for hand-mixing.
-Machine-mixed concrete must be delivered from the machine upon
-a wood or metal platform, or directly into barrows.</p>
-
-<p class='c007'><strong>36. Placing the Concrete.</strong>—Concrete shall be placed on the sub-grade
-in such a manner as to prevent as far as possible the separation
-of the mortar from the stone. It shall be evenly distributed in a
-single horizontal layer of such depth that, after ramming, it will be
-not less than&#160;... inches thick. Immediately after being
-so placed it shall be well rammed until a compact mass is produced
-with its upper surface parallel to and&#160;... inches
-below the pavement datum. Depressions that may appear
-during the ramming may be filled with concrete of the same
-composition as used for the foundation, except that smaller-sized
-stone shall be used; mortar alone must not be used for this
-purpose, nor shall the upper surface of the concrete be plastered
-with mortar. The surface of the concrete shall not be broomed or
-troweled.<a id='r12'></a><a href='#f12' class='c016'><sup>[12]</sup></a></p>
-
-<p class='c007'><strong>37. Setting of Concrete.</strong>—After the concrete is completed it
-shall remain undisturbed until it be firmly set. The time allowed
-for setting shall not be less than five days, and as much longer as,
-in the judgment of the Engineer, may be necessary, depending
-upon the temperature of the weather and the setting qualities of
-the cement. During this period no hauling or traveling over the
-concrete must be permitted unless its surface be first protected by
-a covering of plank. The Contractor shall, if necessary, keep the
-concrete moist by wetting it, with hose, or otherwise, until
-twenty-four (24) hours before it is to be covered with the pavement
-surface.</p>
-
-<p class='c007'><strong>38. Measurement of Concrete.</strong>—Concrete will be measured and
-computed in cubic yards as found completed on the street, the thickness
-<span class='pageno' id='Page_30'>30</span>being taken as&#160;... inches. The contract price
-for concrete foundation covers the cost of providing all the materials
-required, making, placing and ramming the concrete, and keeping
-it moist for the necessary period.</p>
-
-<h4 class='c014'>FOUNDATION OF OLD PAVING STONE</h4>
-
-<p class='c015'><strong>39.</strong> Foundations made of old stone paving blocks shall be constructed
-as follows:</p>
-
-<p class='c007'>Upon the sub-grade prepared as specified in Section 26, shall be
-spread a layer of good sand to an even depth of one and one-half
-(1½) inches. The paving blocks, whether taken up from the street
-to be paved, or brought from other streets or storage yards, shall
-be cleaned of all adhering earth, dirt and street refuse. The blocks
-shall then be set on the bed of sand, on edge, perpendicular to
-the grade, with their long dimension at right angles to the line of the
-street, in courses composed of stones of the same width, extending
-entirely across and at right angles to the axis of the street. Stones
-in adjoining courses shall break joint at least two inches. Joints
-between courses or stones, or along the curbstones, shall not exceed
-one inch in width. The stone shall be fitted closely around manholes
-or other structures in the street. The stones shall be so set
-in the bed of sand that after being rammed as hereafter specified,
-their tops shall be at the proper grade. After being thus set in
-place the stone shall be rammed with paving rammers having
-wooden faces and weighing not less than thirty (30) pounds, so as
-to force each stone to a good bearing in the sand below, and to
-bring its top to a uniform grade, parallel to and&#160;...
-inches below the pavement datum. No stone shall project more
-than one-fourth (¼) inch above the proper grade, and stones
-whose tops, after ramming, are more than one-half (½) inch below
-such grade, shall be raised, additional sand placed under them, and
-reset and re-rammed to the proper grade and bearing. After the
-ramming shall have been completed, the joints between the stones
-shall be filled with mortar. The mortar shall be composed of Portland
-cement and sand, complying with the specifications for these
-materials in Sections 29 and 30. One part of cement and three
-parts of sand, by volume, shall be thoroughly mixed dry, and then
-made into mortar with sufficient quantity of water to produce a
-mortar of such consistency that it will just flow freely into the joints
-between the stones. All the joints between the stones must be
-<span class='pageno' id='Page_31'>31</span>completely filled with this mortar before it has begun to set. The
-mortar filling shall be brought even with, but not above, the tops
-of the stones. After the filling is thus completed, the foundation
-must stand undisturbed until the mortar shall have set firmly, in
-no case less than five days. The mortar must be kept moist during
-the period allowed for setting.<a id='r13'></a><a href='#f13' class='c016'><sup>[13]</sup></a></p>
-
-<p class='c007'>Old stone foundation will be measured in square yards, in place
-after completion. The contract price includes the cost of handling
-and cleaning the stone, supplying and placing the bed of sand, setting
-and ramming the stone, supplying the materials for, making and
-placing the mortar in the joints and watering the street while the
-mortar is setting. Where stone is procured from other streets, or
-from storage yards, the Contractor will be required to load, haul
-and unload them, and will be allowed for this service a price of&#160;... cents per cubic yard for loading and unloading, plus&#160;...
-cents per cubic yard for each one-half mile, or fraction thereof, over
-which they are hauled by the nearest practicable route, the measurement
-to be made after the stone is set in the street, without
-deduction for joints.</p>
-
-<p class='c007'><strong>40. Broken Stone Foundation.</strong>—The sub-grade for broken stone
-foundation shall be prepared as specified in Section 26, except that
-<span class='pageno' id='Page_32'>32</span>the rolling may be omitted at the option of the Contractor. The
-broken or crushed stone shall be of hard, durable stone. The
-foundation shall have an aggregate thickness of&#160;... inches and
-shall be constructed in two courses, as follows:</p>
-
-<p class='c007'>The broken stone used in the first course shall be of such size
-that it will all pass through a screen having openings three (3)
-inches in diameter, and will all be retained on a screen having
-openings one (1) inch in diameter. This stone shall be evenly
-spread over the sub-grade to such a thickness that after being
-thoroughly consolidated by rolling, its upper surface shall be three-fourths
-inch below, and parallel to the surface of the foundation
-when completed. It shall then be rolled with a road-roller weighing
-not less than ten (10) tons until the stone is thoroughly compacted.</p>
-
-<p class='c007'>The second course, composed of screenings, all of which shall
-have passed through a screen with openings one inch in diameter,
-shall then be spread over the first course and well raked into the
-voids of the first course. It shall then be thoroughly wetted, and
-shall be rolled with the ten-ton roller until the fine stone is driven
-into the interstices of the first course and the whole thoroughly
-consolidated, the wetting being repeated while the rolling continues.
-Additional screenings shall be added and rolled in where necessary
-to bring the surface to the proper elevation. When completed, the
-top surface of the foundation shall be&#160;... inches below,
-and parallel to the pavement datum. No part of the upper surface
-of the completed foundation shall project more than one-fourth (¼)
-inch above, nor shall it be more than one-half (½) inch below the
-grade and contour above specified.</p>
-
-<p class='c007'>Gravel of a quality satisfactory to the Engineer may with his
-written consent be substituted for broken stone. If of assorted
-sizes, such as will compress into a mass having not more than thirty
-(30) per cent. of voids, the foundation may be constructed in a
-single layer, graded, watered and rolled, as prescribed above for
-broken stone.<a id='r14'></a><a href='#f14' class='c016'><sup>[14]</sup></a></p>
-
-<p class='c007'><strong>41. Measurement.</strong>—Broken stone and gravel foundation will be
-measured and computed by the cubic yard in the street as completed,
-without any allowance for consolidation by the roller or for settlement
-into the sub-grade, the thickness being taken as&#160;...
-<span class='pageno' id='Page_33'>33</span>inches. The contract price for it shall cover the cost of
-supplying the material, placing it on the street, and grading,
-watering and rolling it.</p>
-
-<h3 class='c003'>SHEET ASPHALT PAVEMENT</h3>
-
-<p class='c006'><i>Note.</i>—A number of distinct varieties of asphalt are now used for
-asphalt pavements, either alone or mixed. These different varieties differ
-from each other quite widely in their physical and chemical properties.
-Thus, in the form called “refined asphalt” some of their properties are
-shown by the following table, the data for which is taken from the second
-edition of Richardson’s “The Modern Asphalt Pavement.”</p>
-
-<table class='table1'>
- <tr><th class='c008' colspan='6'>COMPARATIVE PROPERTIES OF DIFFERENT REFINED ASPHALTS</th></tr>
- <tr>
- <td class='bbt c009'>&#160;</td>
- <td class='bbt c018'>&#160;</td>
- <td class='bbt c018'>&#160;</td>
- <td class='bbt c018'>&#160;</td>
- <td class='bbt c018'>&#160;</td>
- <td class='bbt c017'>&#160;</td>
- </tr>
- <tr>
- <th class='bbt c009'></th>
- <th class='bbt c019'>Trinidad, average</th>
- <th class='bbt c019'>Bermudez, average of two samples</th>
- <th class='bbt c019'>Maracaibo, average of six samples</th>
- <th class='bbt c019'>Calif. “D” grade, average of two samples</th>
- <th class='bbt c020'>Gilsonite, average of two samples</th>
- </tr>
- <tr>
- <td class='c009'>Softens, degrees F.</td>
- <td class='c018'>180</td>
- <td class='c018'>165</td>
- <td class='c018'>225</td>
- <td class='c018'>132</td>
- <td class='c017'>280</td>
- </tr>
- <tr>
- <td class='c009'>Flows, degrees F.</td>
- <td class='c018'>190</td>
- <td class='c018'>175</td>
- <td class='c018'>236</td>
- <td class='c018'>151</td>
- <td class='c017'>300</td>
- </tr>
- <tr>
- <td class='c009'>Penetration at 78° F.</td>
- <td class='c018'>7</td>
- <td class='c018'>24</td>
- <td class='c018'>21</td>
- <td class='c018'>48</td>
- <td class='c017'>0</td>
- </tr>
- <tr>
- <td class='c009'>Loss, heated to 325° for 7 hours, %.</td>
- <td class='c018'>1.1</td>
- <td class='c018'>3.7</td>
- <td class='c018'>3.2</td>
- <td class='c018'>1.7</td>
- <td class='c017'>1.6</td>
- </tr>
- <tr>
- <td class='c009'>Loss, heated to 400° for 7 hours, %.</td>
- <td class='c018'>4.0</td>
- <td class='c018'>8.8</td>
- <td class='c018'>5.5</td>
- <td class='c018'>7.1</td>
- <td class='c017'>2.6</td>
- </tr>
- <tr>
- <td class='c009'>Bitumen soluble in CS<sub>2</sub>.</td>
- <td class='c018'>56.5</td>
- <td class='c018'>95.5</td>
- <td class='c018'>93.9</td>
- <td class='c018'>99.3</td>
- <td class='c017'>99.4</td>
- </tr>
- <tr>
- <td class='c009'>Inorganic, other than bitumen.</td>
- <td class='c018'>36.5</td>
- <td class='c018'>2.2</td>
- <td class='c018'>2.9</td>
- <td class='c018'>0.3</td>
- <td class='c017'>0.5</td>
- </tr>
- <tr>
- <td class='c009'>Bitumen soluble in naphtha.</td>
- <td class='c018'>35.6</td>
- <td class='c018'>65.6</td>
- <td class='c018'>51.1</td>
- <td class='c018'>69.6</td>
- <td class='c017'>47.2</td>
- </tr>
- <tr>
- <td class='c009'>Bitumen sol. in carbon tetra-chloride.</td>
- <td class='c018'>98.7</td>
- <td class='c018'>99.0</td>
- <td class='c018'>93.2</td>
- <td class='c018'>95.7</td>
- <td class='c017'>99.8</td>
- </tr>
- <tr>
- <td class='bbt c009'>Fixed carbon.</td>
- <td class='bbt c018'>10.8</td>
- <td class='bbt c018'>13.7</td>
- <td class='bbt c018'>17.2</td>
- <td class='bbt c018'>17.6</td>
- <td class='bbt c017'>13.2</td>
- </tr>
-</table>
-
-<p class='c007'>The practice has been heretofore, and is at the present time, to attempt
-to make specifications for asphalt pavements broad enough to include all
-<span class='pageno' id='Page_34'>34</span>the various varieties of asphalts, under general requirements which shall
-admit these, and any new varieties that may appear on the market
-suitable for the purpose, the object being to permit a wide range of competition.
-This makes it exceedingly difficult if not impossible to frame
-specifications that shall be sufficiently explicit and at the same time
-sufficiently broad to admit these several differing materials. This practice
-has been adhered to in these specifications, though in this respect they are
-far from satisfactory to the author. So long as it continues to be the policy
-of cities to admit these various varieties of bitumen under the same
-general requirements for crude and refined material, such objectionable
-specifications cannot be avoided. Even with the great latitude now
-provided they exclude some materials with which good pavements have
-been made.</p>
-
-<p class='c007'>Two remedies for this unsatisfactory condition seem practicable.</p>
-
-<p class='c007'>1. A city might purchase a sufficient supply of refined asphalt for its
-use after asking for proposals under suitable specifications with alternative
-requirements for the different varieties on the market, and after bids are
-received and the samples accompanying them have been properly examined
-in the laboratory, award contracts for a supply of one or more
-kinds, as might seem best for the interests of the city. Stocks of these
-would be delivered, tested and stored accordingly, in good time for the
-season’s work. Specifications for construction with special reference to the
-kind of asphalt it is proposed to use could then be prepared, the contractors
-to be supplied with asphalt at the city storage yard at a stipulated
-price per ton. This plan would possess a number of advantages. A
-similar plan is quite commonly in use with reference to hydraulic cement.</p>
-
-<p class='c007'>2. Specifications might be framed with special reference to the properties
-and qualities to be possessed by the <i>asphaltic cement</i>, permitting a liberal
-range as to the crude and refined bitumens to be used in manufacturing
-this cement. This would be considered, at the present time, a radical
-departure from well established custom, but the author sees no reason
-why it should not be satisfactorily employed.</p>
-
-<p class='c007'>A sheet asphalt pavement is composed of two essential elements; a
-mineral aggregate made up of sand of assorted sizes and mineral “dust”
-and a bituminous cement. When properly compounded, manipulated
-and compressed these elements make up a bituminous concrete suitable
-for use as a wearing surface for streets and roads.</p>
-
-<p class='c007'>The character of the sand is important and we have now sufficient
-knowledge from experience to specify a sand that will give, approximately,
-the best results.</p>
-
-<p class='c007'>The bituminous cement is, however, the element of most importance,
-and upon its suitability for the purpose depends very largely the utility
-and durability of the pavements made with it.</p>
-
-<p class='c007'>It is important that this asphaltic cement shall possess certain properties
-and qualities, most of which we are now able to define satisfactorily, but
-<span class='pageno' id='Page_35'>35</span>others require further practical and experimental study, and some tests
-not now in use would doubtless be desirable.</p>
-
-<p class='c007'>It is not a matter of importance what particular crude or refined
-materials enter into the composition of this cement if the resulting product
-is satisfactory in use. The prime requisite is a paving cement that shall
-possess in a high degree the chemical and physical qualities required for
-making an asphalt pavement of the best quality. If we can devise
-standards and tests that will enable us to secure such a cement we need not
-be concerned about its antecedents.</p>
-
-<p class='c007'>It would be well worth while for paving engineers and those who have
-laboratory facilities to give attention to this matter. If it shall be found
-practicable to define satisfactorily the qualities the cement should possess
-without reference to the materials from which it is compounded, a great
-advance will have been made, and our asphalt paving specifications
-could not only be greatly simplified, but much greater precision and definiteness
-secured.</p>
-
-<p class='c007'>While great advances have been made in the art of building sheet
-asphalt pavements and in the framing of specifications for its construction,
-too many of the specifications still in use are antiquated, indefinite and
-unsatisfactory. Some of these contain requirements that, if literally
-enforced, would prevent the attainment of the best results. They are
-largely survivals of the time when little was known either practically or
-technically of the science and art of constructing the pavements, outside
-of the promoters and contractors in the business, who consequently
-dictated, in a large measure, the specifications used. City engineers were
-compelled to rely largely on the presumption that the guarantee clauses
-of the contracts would insure good results, and allowed the contractor
-wide latitude in the conduct of the work.</p>
-
-<p class='c007'>While there is undoubtedly much yet to learn, even by the experts, in
-the matter of the materials to be used, a quite satisfactory working basis
-has been arrived at, particularly as to the practical side of the work, and
-a large mass of data accumulated by study and experience is available to
-the municipal engineer, and the services of independent experts is readily
-obtainable. There is no longer any good reason, therefore, why the
-character of the materials to be used, the methods followed, and the quality
-of the work secured should not be quite definitely and fully specified in
-the same manner and to the same extent as in the case of other kinds of
-pavement and with equally satisfactory results.</p>
-
-<h4 class='c014'>SPECIFICATIONS</h4>
-
-<p class='c015'><strong>42. General.</strong>—Asphalt pavement surface shall be laid upon a
-foundation of hydraulic cement concrete, or of stone blocks relaid,
-over a sub-grade, to be constructed in accordance with Articles 26,
-28, 29, 30, 31, 32, 33, 34, 35, 36 and 37.</p>
-
-<p class='c007'><span class='pageno' id='Page_36'>36</span>Asphalt pavement surface shall be constructed in two courses,
-called the base-course and the surface-course. The base-course may
-be from one (1) inch to one and one-half (1½) inches thick, and
-the surface-course may be from one (1) inch to two (2) inches thick,
-as shall be hereafter specified.</p>
-
-<p class='c007'><strong>43. Crude Asphalt.</strong>—The cementing element in asphalt pavements
-shall be prepared from crude native, solid asphalts or from the
-proper distillation of crude asphaltic oils.</p>
-
-<p class='c007'>Crude asphalts as obtained from the mines or natural deposits
-shall be properly refined to drive off water and to separate foreign
-substances, by melting at a temperature not exceeding four hundred
-and fifty degrees F. (450° F.). Crude asphalts of the quality
-commonly called “glance pitch” or “iron pitch” which do not
-distinctly soften at a temperature of two hundred degrees F. (200°
-F.), and detached or deteriorated material from deposits otherwise
-acceptable will be rejected.</p>
-
-<p class='c007'><strong>44. Refined Asphalt.</strong>—Refined asphalt produced from native
-crude asphalt shall be free from water and shall not contain an injurious
-quantity of light oils or foreign matter. It shall not contain
-more than four per cent. (4%) of organic matter nor more than thirty-six
-per cent. (36%) of inorganic matter other than bitumen, and not
-more than eighteen per cent. (18%) of fixed carbon, and not less than
-fifty-five per cent. (55%) of bitumen soluble in cold carbon di-sulphide.
-Of the bitumen soluble in carbon di-sulphide not less than
-sixty-three per cent. (63%) shall be soluble in Pennsylvania petroleum
-naphtha of specific gravity eighty-eight (88) degrees Baume at a
-temperature of sixty-five degrees Fahrenheit (65° F.) and not less
-than ninety-eight per cent. (98%) shall be soluble in chemically pure
-carbon tetra-chloride. When exposed for seven hours to a temperature
-of three hundred and twenty-five degrees F. (325° F.) in a shallow
-dish the bottom of which is covered with bitumen to a depth of
-three-fourths (¾) inch, the refined asphalt shall not lose more than
-five per cent. (5%) by evaporation.</p>
-
-<p class='c007'>Asphalts that are injuriously affected, in the pavement, by water
-(to be determined by the test immediately hereinafter described),
-shall not be used except under the conditions specified in Section 45.
-Cylinders made from the surface mixture it is proposed to use, one
-(1) inch in diameter and two (2) inches long, compressed to a
-density of two and one-tenth (2.1), when immersed forty-five
-(45) days in ten (10) times their volume of rain-water, shall retain a
-sound surface, unchanged and uncorroded by the action of the water.</p>
-
-<p class='c007'><span class='pageno' id='Page_37'>37</span>Refined asphalts resulting from the distillation of crude asphaltic
-oils will not be accepted unless the distillation shall have been effected
-by the use of suitable apparatus, at a temperature not exceeding
-seven hundred (700) degrees F. The bitumen must not be over-distilled
-and “cut back” by adding oil. The product, to be acceptable,
-shall possess the following qualities: It shall melt and flow at
-a temperature not below one hundred and forty (140) degrees F., but
-below a temperature of one hundred and eighty (180) degrees F.,
-and when tested in the standard New York State closed oil-testing
-apparatus shall not flash at a temperature below four hundred and
-fifty (450) degrees F. When exposed in a shallow dish, the bottom
-of which is covered to a depth of three-fourths (¾) inch with the
-bitumen, to a temperature of four hundred (400) degrees F., for
-seven (7) hours, it shall not lose by evaporation more than seven (7)
-per cent. by weight. Not less than ninety-eight (98) per cent. shall
-be soluble in cold carbon di-sulphide, and not less than sixty-five
-(65) per cent., nor more than seventy-five (75) per cent. of the
-bitumen shall be soluble in cold Pennsylvania naphtha of gravity
-eighty-eight (88) degrees Baume. Not less than ninety-nine (99)
-per cent. of the bitumen shall be soluble in carbon tetra-chloride,
-and it shall not contain more than sixteen (16) per cent. of fixed
-carbon.<a id='r15'></a><a href='#f15' class='c016'><sup>[15]</sup></a></p>
-
-<p class='c007'>Bitumens resulting from destructive distillation or from artificial
-oxidation, and bituminous compounds prepared from oil or oil
-residuums heated with sulphur or other substances, or coal or gas
-<span class='pageno' id='Page_38'>38</span>tars, will not be accepted, nor shall they be mixed with the asphalt
-used.<a id='r16'></a><a href='#f16' class='c016'><sup>[16]</sup></a></p>
-
-<p class='c007'><strong>45.</strong> Asphalts that are injuriously affected by water, and those
-whose practical value for making pavements has not been established,
-in the judgment of the City, by sufficient experience, will not
-be accepted except under such special bond and guaranty provisions
-as the City may prescribe.<a id='r17'></a><a href='#f17' class='c016'><sup>[17]</sup></a></p>
-
-<p class='c007'><strong>46.</strong> Full information as to the source and character of the crude
-asphalt and the method of refining it shall be furnished to the
-Engineer and verified by such evidence as he may require.</p>
-
-<p class='c007'><strong>47. Softening or Tempering Agent.</strong>—For softening and tempering
-refined asphalt, petroleum residuum oil or liquid asphalt shall be
-used. It shall be free from water, coke, and other impurities. Its
-specific gravity shall not be below 0.92, nor above 1.04. Its flash
-test (determined in the standard New York State closed oil-testing
-apparatus) shall not be under three hundred and fifty (350) degrees
-F., and when exposed for seven (7) hours to a temperature of three
-hundred and twenty-five (325) degrees F., in a shallow open dish,
-the bottom of which is covered by the oil to a depth of three-fourths
-(¾) inch, it shall not lose more than five (5) per cent. by
-evaporation. It shall not contain more than ten (10) per cent. of
-paraffine scale.</p>
-
-<p class='c007'><strong>48. Sand.</strong>—A superior quality of sand will be required and this
-must be secured, if necessary, by the admixture of two or more sands.
-The sand shall be silicious and so free from organic matter, mica,
-soft grains, and other impurities, that these shall not aggregate
-more than two (2) per cent. of the mass. The grains shall, preferably,
-be moderately “sharp” or angular, and must be of assorted
-sizes so that the voids in the compacted mass of dry sand shall not
-<span class='pageno' id='Page_39'>39</span>exceed thirty three (33) per cent. A typical sand, to be approximated
-as closely as practicable, will give the following sieve tests,
-the sieves being used in the order named:</p>
-
-<table class='table1'>
- <tr>
- <td class='c018'>3</td>
- <td class='c009'>per cent. of the whole will pass No.</td>
- <td class='c017'>200 sieve.</td>
- </tr>
- <tr>
- <td class='c018'>15</td>
- <td class='c009'>per cent. of the whole will pass No.</td>
- <td class='c017'>100 sieve.</td>
- </tr>
- <tr>
- <td class='c018'>18</td>
- <td class='c009'>per cent. of the whole will pass No.</td>
- <td class='c017'>80 sieve.</td>
- </tr>
- <tr>
- <td class='c018'>30</td>
- <td class='c009'>per cent. of the whole will pass No.</td>
- <td class='c017'>50 sieve.</td>
- </tr>
- <tr>
- <td class='c018'>24</td>
- <td class='c009'>per cent. of the whole will pass No.</td>
- <td class='c017'>30 sieve.</td>
- </tr>
- <tr>
- <td class='c018'>10</td>
- <td class='c009'>per cent. of the whole will pass No.</td>
- <td class='c017'>10 sieve.</td>
- </tr>
-</table>
-
-<p class='c021'>and none will fail to pass the No. 10 sieve.<a id='r18'></a><a href='#f18' class='c016'><sup>[18]</sup></a></p>
-
-<p class='c007'><strong>49. Pulverized Stone.</strong>—This may consist of limestone or other
-sound stone or sand, pulverized to such fineness that the whole will
-pass the No. 50 sieve, not more than ten (10) per cent. will be retained
-on the No. 100 sieve, and at least seventy (70) per cent. of it
-will pass the No. 200 sieve. Portland cement may be partly
-substituted for pulverized stone, where the Engineer shall so direct.<a id='r19'></a><a href='#f19' class='c016'><sup>[19]</sup></a>
-Portland cement thus used will be paid for at the price bid per barrel
-for the same, in addition to the price paid per square yard for the
-pavement surface. The pulverized material must be thoroughly
-dry when used.</p>
-
-<p class='c007'><strong>50. Asphaltic Paving Cement.</strong>—Asphalt Paving Cement shall be
-prepared from the refined asphalt described in Sect. 44 and the
-tempering agent described in Sect. 47. The refined asphalt, together
-with the asphalt in the tempering agent, shall constitute not less
-than sixty per cent. (60%) of the asphaltic cement.</p>
-
-<p class='c007'>The refined asphalt and the tempering agent shall be mixed and
-<span class='pageno' id='Page_40'>40</span>melted together at a temperature not below two hundred and seventy-five
-degrees F. (275° F.), and not above three hundred and twenty-five
-degrees Fahrenheit (325° F.), and thoroughly incorporated by
-agitation until a homogeneous cement is produced. The agitation
-shall be continued until the cement is used.</p>
-
-<p class='c007'>The asphaltic cement at a temperature of seventy-seven degrees
-F. (77° F.) shall be of such consistency as to show a penetration of
-from forty to eighty hundredths of a centimeter, as the engineer
-may direct for each street, when tested with the standard Dow
-penetration apparatus, using a number two cambric needle loaded
-with one hundred grams. When a cement of a consistency satisfactory
-to the engineer has been produced and approved for any
-street a sample of it shall be kept as a standard and all subsequent
-batches or kettles must be made to conform thereto, suitable apparatus
-and tests being employed to determine the correspondence
-of each new batch with the standard.<a id='r20'></a><a href='#f20' class='c016'><sup>[20]</sup></a> The asphaltic cement when
-at its melting temperature shall be so viscous that it will draw out
-into moderately long fine threads which shall be free from lumps
-or raggedness and shall possess satisfactory adhesive and cementitious
-qualities.<a id='r21'></a><a href='#f21' class='c016'><sup>[21]</sup></a></p>
-
-<p class='c007'><strong>51. Composition and Preparation of Asphalt Surface Mixture.</strong>—The
-surface-course shall be composed of the materials specified in
-Sections 43, 44, 45, 46, 47, 48, 49, and 50 mixed in such ratios by
-weight as the Engineer may direct or approve. A typical mixture
-will contain:</p>
-
-<table class='table1'>
- <tr><td class='c008' colspan='2'><span class='pageno' id='Page_41'>41</span></td></tr>
- <tr>
- <td class='c009'>Sand</td>
- <td class='c011'>100.0 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Pulverized mineral matter passing No. 200 screen, including that found in the paving cement</td>
- <td class='c011'>17.5 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Pure bitumen (in paving cement)</td>
- <td class='c011'>13.5 lbs.</td>
- </tr>
-</table>
-
-<p class='c021'>But the quantities of pulverized stone and of asphaltic cement shall
-be varied as may be found necessary or desirable by the Engineer
-to suit the purity of the asphaltic cement, the character of the sand,
-the climatic conditions, and the varying quantity and character of
-travel on the street to be paved; and Portland cement may be substituted
-partly or wholly for the pulverized stone, when directed
-by the Engineer. The surface-course mixture shall be submitted
-to the Engineer and approved by him before any is laid upon the
-street.</p>
-
-<p class='c007'>The mixing shall be accomplished in a mechanical mixing
-apparatus capable of rapidly and effectually incorporating the materials
-together, and each batch must remain in the mixer a sufficient
-length of time to effect a perfect mixture. The sand shall be
-separately heated and shall reach the mixing apparatus at a temperature
-not above three hundred and fifty (350) degrees F., nor
-below three hundred and twenty (320) degrees F. The pulverized
-stone shall be at such a temperature that when mixed with
-the sand the temperature of the mixed mass shall not be above
-three hundred and fifty (350) degrees F., nor below three hundred
-and twenty (320) degrees F. The sand shall be first placed
-in the mixer, followed by the pulverized stone, and these two
-materials shall be thoroughly mixed together before the asphaltic
-cement is added. The asphaltic cement at a temperature not above
-three hundred and fifty (350) degrees, nor below three hundred
-(300) degrees F. shall then be added in such a way as to evenly
-distribute it over the sand and pulverized stone, and the mixing
-continued until the materials are thoroughly incorporated into a
-perfectly uniform and homogeneous mass, with the grains of sand
-completely covered with cement. Suitable thermometers shall be
-constantly used to determine the temperatures specified herein.
-Great care must be taken to accurately weigh and proportion the
-materials charged into the mixer.<a id='r22'></a><a href='#f22' class='c016'><sup>[22]</sup></a></p>
-
-<p class='c007'><span class='pageno' id='Page_42'>42</span><strong>52. Stone for Base-course.</strong>—Stone screenings for base-course
-shall be of crushed, hard, durable stone. The portion used shall
-all be retained upon a No. 8 sieve, or screen, and shall all pass a
-screen having square meshes, the linear dimensions of the openings
-in which are one-half (½) inch less than the thickness of the
-base-course.</p>
-
-<p class='c007'><strong>53. Composition of Base-course.</strong>—The base-course shall be
-composed of the crushed stone specified in Section 52, mixed with
-the asphaltic cement, sand and pulverized stone specified in Sections
-50, 48 and 49, but the asphaltic cement shall be of such hardness as
-the engineer may direct.</p>
-
-<p class='c007'>A typical base-course mixture will be composed as follows:</p>
-
-<table class='table1'>
- <tr>
- <td class='c009'>Crushed stone</td>
- <td class='c018'>100</td>
- <td class='c020'>lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Sand</td>
- <td class='c018'>42</td>
- <td class='c020'>lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Pure bitumen (in asphaltic cement)</td>
- <td class='c018'>7</td>
- <td class='c020'>lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Pulverized stone</td>
- <td class='c018'>7½</td>
- <td class='c020'>lbs.</td>
- </tr>
-</table>
-
-<p class='c021'>But the mixture shall be such that when placed on the street and
-compressed by the roller the mass shall be dense and the voids in
-the stone completely filled; and to accomplish this the quantity of
-crushed stone used in the mixture may be increased or decreased,
-as the volume of its voids may require, in order that they may be
-completely filled.<a id='r23'></a><a href='#f23' class='c016'><sup>[23]</sup></a></p>
-
-<p class='c007'><strong>54. Mixing the Base-course.</strong>—The materials for the base-course
-shall be heated and mixed in the same general manner as prescribed
-for the surface-course (Sect. 51), the crushed stone being delivered
-first in the mixer. The temperature of the mixture as it comes
-from the mixer being not above three hundred and twenty-five
-(325) degrees F., nor below three hundred (300) degrees F.</p>
-
-<p class='c007'><strong>55. Laying Asphalt Pavement, General.</strong>—Asphalt pavement
-must not be laid except when the surface upon which it is to be placed
-<span class='pageno' id='Page_43'>43</span>is dry; nor when the temperature of the air is below thirty-two (32)
-degrees F., or, if a strong wind prevails, when the temperature of
-the air is below forty (40) degrees F.</p>
-
-<p class='c007'>The pavement mixture, whether for base- or surface-course,
-shall be taken to the street as soon after it leaves the mixer as practicable.
-When the temperature of the air is below seventy (70)
-degrees F., the loaded vehicles conveying the mixture to the street
-shall be covered by canvas covers to prevent the escape of heat.
-When unloaded upon the street, the temperature of the mass should
-not be below two hundred and eighty (280) degrees F., and any
-load or portions of a load found under two hundred and forty (240)
-degrees F. must be rejected. After being unloaded on the street,
-the mixture must be shoveled into place in such a manner that the
-whole of it will be moved from the pile into which it was unloaded.</p>
-
-<p class='c007'><strong>56. Laying the Base-course.</strong>—The base-course will have an
-average thickness of one and one-quarter (1¼) inches after compression.
-It shall be laid directly upon the pavement foundation, which
-must be free from all loose fragments and rubbish and be swept clean
-in advance of the application of the base-course. The base-course
-mixture shall be spread upon the foundation and evenly and regularly
-graded to such a depth that after compression by the roller
-its surface will be&#160;... inches below, and truly parallel
-to, the pavement datum.</p>
-
-<p class='c007'>Great care must be taken in handling, spreading and grading
-the mixture to maintain the uniform admixture of the crushed stone
-throughout the mass. The rakes used must have tines wide apart,
-and the back of the rake must be principally used for grading.
-Immediately after being graded, and while still hot, the base-course
-shall be rolled with an asphalt roller weighing not less than five
-tons, the rolling being continued until no further compression takes
-place.</p>
-
-<p class='c007'>The base-course must not be laid more than one day’s work in
-advance of the surface-course.</p>
-
-<p class='c007'>When the base-course is completed it must present a uniform
-appearance and texture over the whole surface, which must conform
-so truly to the designed grade and contour that a twelve-foot template,
-when applied, will show no departure from the true surface
-greater than one-quarter (¼) inch.</p>
-
-<p class='c007'><strong>57. Laying the Surface-course.</strong>—In delivering the surface-course
-mixture upon the base-course, care must be taken not to
-break or disturb the latter. Any breaks made in the base-course
-<span class='pageno' id='Page_44'>44</span>must be so repaired, before the surface-course is spread, as to be
-equal in density and surface to the adjoining base.</p>
-
-<p class='c007'>Before the surface-course is spread the base-course must be
-thoroughly cleaned and all rubbish, loose material and street dirt
-removed.</p>
-
-<p class='c007'>The material for the surface-course shall be so evenly spread
-and graded with asphalt rakes that after it is properly compacted
-by rolling, the surface will coincide with the pavement datum
-within the limits named below. In grading the material, all lumps
-must be broken up and the whole reduced to a finely comminuted
-mass of equal density throughout. Directly after being so graded
-it shall be rolled with a hand-roller, or light steam-roller, to partly
-compress the material, and, when so directed by the Engineer, the
-surface shall then be ironed with smoothing irons heated to a temperature
-that will melt, but not burn, the asphaltic cement. A
-thin layer of hydraulic cement, just sufficient to prevent adhesion
-between the material and the roller, shall then be swept over the
-surface, which shall at once be thoroughly rolled with a ten-ton
-asphalt roller until the material shall be thoroughly compressed
-and its surface be brought to the exact grade and contour designed
-for the street surface. The work of the ten-ton steam-roller must
-begin before the material has cooled below two hundred (200)
-degrees F., and be continued until the roller makes no further
-impression upon the surface. The first course of the heavy rolling
-shall be parallel to the street beginning at the curb and working
-toward the center on each side, after which it should be diagonally
-rolled, and also cross-rolled if the width of the street permits.<a id='r24'></a><a href='#f24' class='c016'><sup>[24]</sup></a> Any
-portions of the surface not accessible to the roller shall be tamped
-with hot tampers until compacted equally with the rolled portion.
-When completed, the surface shall have an average thickness of&#160;... inches and must be so free from waves or irregularities
-that a template not less than twelve feet long, when applied
-to the street surface shall nowhere show a divergence from the
-designed true surface of more than three-sixteenths (³⁄₁₆) inch,
-and a template sixteen (16) feet long applied to the gutters shall
-show no divergence from the true gutter grade greater than one-eighth
-(⅛) inch.</p>
-
-<p class='c007'><span class='pageno' id='Page_45'>45</span>Before the surface-course is placed, all exposed surfaces of curbs,
-crosswalks, manholes, etc., with which the surface-course will
-be in contact, must be well painted with hot paving cement or
-approved pitch. The street shall not be opened to travel until the
-pavement has become cold and hard.</p>
-
-<p class='c007'><strong>58. Street Railroad Tracks.</strong>—Where railroad tracks exist on the
-streets, the sub-grade and the pavement foundation shall extend
-under the tracks, uninterrupted except by the ties and other structures
-connected with the track. Where concrete foundation is used,
-special care must be taken with the concrete directly under or around
-the rails, and concrete made of fine crushed stone and a higher ratio of
-cement and sand may be required in contact with the rail. The
-concrete must be thoroughly tamped under and against the rail.</p>
-
-<p class='c007'>The asphalt surface shall be laid directly against the rails, which,
-if their temperature be under fifty (50) degrees F., shall be heated
-by suitable appliances to a temperature of, or above, sixty (60)
-degrees F. immediately before the asphalt material is placed around
-the rail. The hot asphalt material must be thoroughly tamped
-against and along the rail and under any projecting portions of it,
-and the surface of the pavement must be even with, or slightly
-(not more than one-eighth (⅛) inch) above the top of the rail.
-Slot-rails will be treated in the same manner, subject to such modifications
-as their forms may necessitate.<a id='r25'></a><a href='#f25' class='c016'><sup>[25]</sup></a></p>
-
-<p class='c007'><strong>59. Plant.</strong>—The plant for making asphalt paving mixtures must
-<span class='pageno' id='Page_46'>46</span>be of approved modern design, adapted to do the work properly, and
-equipped with efficient machinery. It shall be of sufficient capacity
-to turn out at least twelve hundred square yards of pavement surface
-daily without crowding. Weighing and measuring devices shall be
-accurate and adapted to the purpose, and must be frequently tested
-and adjusted. Each plant must be supplied with the apparatus
-necessary to make all determinations and tests required at the plant
-to properly conduct the work in accordance with these specifications.
-Steam-rollers must be properly balanced and the rolling surface
-must be true and smooth. All the street tools used must be of
-approved kind and quality and must be kept in good working order.</p>
-
-<h3 class='c003'>ASPHALT BLOCK PAVEMENT</h3>
-
-<p class='c006'><strong>60. Sub-grade.</strong>—The sub-grade for asphalt block pavement shall
-be prepared as specified in Sect. 26 of these specifications.</p>
-
-<p class='c007'><strong>61. Foundation.</strong>—The foundation for asphalt block pavement
-shall be hydraulic concrete or broken stone.<a id='r26'></a><a href='#f26' class='c016'><sup>[26]</sup></a></p>
-
-<p class='c007'>Concrete foundation shall be constructed in accordance with
-Sections 28 to 37 inclusive of these specifications and shall have a
-thickness of&#160;... inches.</p>
-
-<p class='c007'>Broken stone foundation shall be constructed in accordance with
-Section 40 of these specifications and shall have a thickness, when
-completed of&#160;... inches.</p>
-
-<p class='c007'><strong>62. Asphalt Blocks.</strong>—Asphalt blocks shall be not less than ten
-(10) inches nor more than twelve (12) inches long, not less than
-four (4) nor more than six (6) inches wide and not less than two (2)
-inches nor more than four (4) inches thick. Blocks for the same
-street must be of the same standard size throughout and individual
-blocks shall not vary in any dimension more than three-sixteenths
-(³⁄₁₆) inch from the standard size. Blocks that are chipped, cracked
-or are otherwise defective shall be rejected.</p>
-
-<p class='c007'><strong>63. Material and Composition.</strong>—Asphalt paving blocks shall be
-<span class='pageno' id='Page_47'>47</span>composed of crushed trap rock<a id='r27'></a><a href='#f27' class='c016'><sup>[27]</sup></a> or equally hard and durable rock,
-sand, pulverized stone and asphaltic cement.</p>
-
-<p class='c007'>The crushed rock shall be of such sizes that all will pass a screen
-having circular openings one-third (⅓) inch in diameter and that
-all will fail to pass a number ten (No. 10) sieve. The stone shall be
-freshly crushed, free from foreign substances and clean and bright.</p>
-
-<p class='c007'>The sand shall be clean and sharp and of such sizes that all will
-pass the number ten sieve and not more than five per cent. will pass
-the number two hundred sieve. The grain-size of the sand shall
-preferably be such that at least fifty per cent. (50%) of it will pass
-the number eighty sieve. The screenings from the crushed stone
-passing the number ten sieve may be used in place of sand, or
-thoroughly mixed with the sand to produce a mass of the above
-composition. The pulverized stone shall comply with Section 49
-of these specifications. Portland cement shall be used in place of
-not more than ten per cent. of the whole if directed by the engineer,
-in which case the Portland cement will be paid for as extra work at
-the prevailing market price.</p>
-
-<p class='c007'>The asphaltic cement shall comply with the requirements of
-Sections 43, 44, 45, 46, 47 and 50 of these specifications.</p>
-
-<p class='c007'><strong>64. Typical Composition.</strong>—A typical composition of the blocks,
-which must be complied with as nearly as practicable, is as follows;
-(by weight)</p>
-
-<table class='table1'>
- <tr>
- <td class='c009'>Bitumen</td>
- <td class='c018'>&#160;</td>
- <td class='c017'>7%</td>
- </tr>
- <tr>
- <td class='c009'>Mineral material passing No.</td>
- <td class='c018'>200 sieve</td>
- <td class='c017'>13%</td>
- </tr>
- <tr>
- <td class='c009'>Mineral material passing No.</td>
- <td class='c018'>80 sieve</td>
- <td class='c017'>9%</td>
- </tr>
- <tr>
- <td class='c009'>Mineral material passing No.</td>
- <td class='c018'>40 sieve</td>
- <td class='c017'>7%</td>
- </tr>
- <tr>
- <td class='c009'>Mineral material passing No.</td>
- <td class='c018'>10 sieve</td>
- <td class='c017'>28%</td>
- </tr>
- <tr>
- <td class='c009'>Mineral material passing No.</td>
- <td class='c018'>3 sieve</td>
- <td class='c017'>36%</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>&#160;</td>
- <td class='c017'><hr /></td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>&#160;</td>
- <td class='c017'>100%</td>
- </tr>
-</table>
-
-<p class='c007'><strong>65. Manufacture.</strong>—The crushed rock, sand and pulverized stone
-shall be thoroughly mixed together at a temperature not above
-three hundred and seventy-five degrees Fahrenheit (375° F.) and
-not below three hundred and twenty-five degrees Fahrenheit
-(325° F.) and the asphaltic cement, at a like temperature, added
-<span class='pageno' id='Page_48'>48</span>and the mixing continued until a perfectly uniform mass is produced,
-with every fragment of stone completely coated with cement.</p>
-
-<p class='c007'>The hot mixture will then be compressed in molds under a pressure
-not less than four thousand (4000) pounds<a id='r28'></a><a href='#f28' class='c016'><sup>[28]</sup></a> per square inch, after
-which the blocks will be removed from the molds and allowed to
-cool, either in the air or in water.</p>
-
-<p class='c007'>The completed blocks after cooling in air shall have a specific
-gravity of not less than 2.5. They shall not absorb, when immersed
-in water for twenty-four hours, more than one-half of one per cent.
-of water. When tested in the standard rattler for testing paving
-brick the average loss by abrasion shall not exceed twelve per cent.
-(12%) of their original weight, after 1800 revolutions of the rattler.</p>
-
-<p class='c007'><strong>66. Laying the Blocks.</strong><a id='r29'></a><a href='#f29' class='c016'><sup>[29]</sup></a>—The foundation shall be first cleaned of
-dirt, rubbish or loose material.</p>
-
-<p class='c007'>When the blocks are four (4) inches or less in depth as laid, they
-shall be set upon a bed of mortar made and applied to the foundation
-in the following manner:</p>
-
-<p class='c007'>The mortar shall be composed of Portland cement and sand,
-in the ratio of one (1) part cement to three (3) parts of sand, thoroughly
-mixed with sufficient water to make a rather soft mortar.
-This mortar shall be spread over the foundation, which shall be
-previously wetted, in a layer approximately one-half (½) inch
-thick and its top graded by the use of templates to a surface at such
-depth below, and truly parallel to the pavement datum, that when
-the blocks are firmly set in it and rammed their tops will be in the
-true grade and contour of the pavement. The mortar shall be made
-and spread only as required in the progress of block laying, and any
-mortar that has begun to set before the blocks are in place and
-rammed, shall be removed and fresh mortar substituted. The blocks
-shall be set upon this mortar bed with their longest dimension across
-the street, in continuous courses which shall be straight and at right
-angles to the axis of the street. The block layers must stand upon
-the blocks already laid and not upon the mortar. The blocks and
-the courses of blocks shall be set as closely together as practicable.
-<span class='pageno' id='Page_49'>49</span>Blocks in adjoining courses must break joint not less than four
-inches. Whole blocks only will be used, except as fillers at the ends
-of the courses or in fitting the pavement around manholes or other
-structures, and where thus used the broken ends of the blocks must
-be dressed to make close joints. Unless otherwise permitted, each
-course must be laid continuously across the street without interruption
-in time. As each course is completed the end joints shall
-be forced close together by the use of wedges, levers or mauls.
-Upon the completion of every third course, the courses shall be forced
-together by placing a timber scantling against the face of the last
-course and striking it with a sledge or maul. When the blocks are
-thus laid, and before the mortar under them begins to set, they shall
-be well rammed to a solid bearing in the mortar with a wooden
-street rammer weighing not less than thirty (30) pounds, a two inch
-plank ten (10) inches wide and three (3) feet long being interposed
-between the block and the rammer and moved about so that the whole
-surface shall be covered and rammed. When the ramming is completed,
-the top of the blocks must conform so closely to the pavement
-datum that when a template or straight-edge is placed upon the
-pavement, its surface shall nowhere depart from the true surface
-more than three-sixteenths (³⁄₁₆) inch. Blocks, or portions of the
-pavement found too high or too low, must be taken up and reset in
-fresh mortar to the true grade. When thus completed to the
-satisfaction of the Engineer, a layer of one-half (½) inch of fine
-dry sand shall be placed over the surface and swept about with
-brooms until all joints are completely filled. The remaining sand
-shall be removed from the pavement at such time as the Engineer
-may direct.</p>
-
-<p class='c007'>When the depth of the blocks exceeds four (4) inches, they may
-be set upon a cushion course of sand, as prescribed for brick pavement,
-Section 86, the joints to be filled with sand, as specified above
-in this Section.</p>
-
-<p class='c007'><strong>67. Railroad Tracks.</strong>—Where railroad tracks exist on the street to
-be paved, the construction shall be the same as prescribed for
-granite block pavement, Section 78.</p>
-
-<p class='c007'><strong>68.</strong> The street shall not be opened to travel until the mortar
-under the blocks shall have become fully set, and in no case under
-five days after the blocks are laid.</p>
-
-<div>
- <span class='pageno' id='Page_50'>50</span>
- <h3 class='c003'>GRANITE BLOCK PAVEMENT</h3>
-</div>
-
-<p class='c006'><strong>69.</strong> Granite block pavement shall be laid upon a foundation of
-hydraulic cement concrete.<a id='r30'></a><a href='#f30' class='c016'><sup>[30]</sup></a></p>
-
-<p class='c007'><strong>70. Sub-grade and Foundation.</strong>—The sub-grade shall be prepared
-as specified in Section 26. The foundation shall be constructed
-in accordance with the requirements of Sections 28 to 38
-inclusive.</p>
-
-<p class='c007'><strong>71. Granite Blocks.</strong>—The blocks shall be made from sound,
-durable granite, of uniform texture, composition and hardness
-throughout. No outcrop, deteriorated, soft, brittle, or seamy stone
-shall be used. If the blocks are obtained from different quarries,
-or from different parts of the same quarry where the quality or
-appearance of the rock differs, the product of each must be kept
-separate and laid together on the street.<a id='r31'></a><a href='#f31' class='c016'><sup>[31]</sup></a></p>
-
-<p class='c007'>The blocks shall be not less than eight (8) nor more than twelve
-(12) inches long, not less than three and one-half (3½) nor more
-than four and one-half (4½) inches wide, and not less than four
-and three-quarters (4¾) nor more than five and one-quarter
-(5¼) inches deep.<a id='r32'></a><a href='#f32' class='c016'><sup>[32]</sup></a> They shall be well-shaped, rectangular, with
-full edges and corners. Their tops shall not depart more than one-fourth
-(¼) inch from a true plane, and their sides shall be dressed
-so that joints between the courses will nowhere exceed three-fourths
-(¾) inch wide, and their ends so that end joints shall not exceed
-<span class='pageno' id='Page_51'>51</span>one-half (½) inch wide.<a id='r33'></a><a href='#f33' class='c016'><sup>[33]</sup></a> The size of the blocks may be varied
-where necessary to fit the pavement against or around bridge stones
-or other street structures.</p>
-
-<p class='c007'><strong>72. Sand Cushion.</strong>—The foundation shall be cleaned of all dirt
-and rubbish. There shall then be spread evenly over it a layer of
-clean, coarse sand to a uniform depth of one and one-half (1½)
-inches.</p>
-
-<p class='c007'><strong>73. Setting the Blocks.</strong>—The blocks shall be set in this bed of
-sand perpendicular to the street surface, with their length at right
-angles to the street, in courses extending entirely across the street,
-and at right angles to its axis, except at street intersections where
-the courses shall be arranged as the Engineer may direct.<a id='r34'></a><a href='#f34' class='c016'><sup>[34]</sup></a> Only
-stones of the same width shall be set in the same course. The stones
-in each course, and in adjoining courses, shall be set firmly against
-each other. The blocks shall be set in the sand bed in such a manner
-<span class='pageno' id='Page_52'>52</span>that their bottom surface shall rest evenly upon the sand and
-that their tops shall be even with each other and to such an elevation
-that after the pavement is rammed, as hereinafter directed, its general
-surface shall conform closely to the pavement datum. Stones
-in adjoining courses shall break joint not less than three (3) inches.</p>
-
-<p class='c007'><strong>74. Ramming.</strong><a id='r35'></a><a href='#f35' class='c016'><sup>[35]</sup></a>—After the blocks are set each individual block
-shall be thoroughly rammed to give it a firm bearing in the sand
-and to bring its top to the prescribed pavement datum. The rammers
-used shall have wooden faces not more than four inches in
-diameter, and shall weigh not less than thirty (30) pounds. Blocks
-or sections of blocks whose tops under the ramming remain above
-or sink below the pavement datum shall be taken up and reset so
-that after the ramming is completed their tops shall coincide with
-the pavement datum.</p>
-
-<p class='c007'><strong>75. Filling the Joints.</strong><a id='r36'></a><a href='#f36' class='c016'><sup>[36]</sup></a>—After the ramming specified in Sect. 74
-shall have been completed, the joints between the paving blocks
-shall be filled in the following manner:</p>
-
-<p class='c007'>All the joints for a distance of three feet out from the curbstones,
-and three contiguous joints continuous across the street, with the
-included end joints, at intervals of about fifty (50) feet in the
-length of the street, shall be filled with gravel and bituminous
-paving cement. The gravel used shall be of such size that all will
-pass through a screen having five-eighths (⅝) inch meshes, and
-all will be held on a screen having one-fourth (¼) inch meshes.
-When used, the gravel must be free from refuse and street dirt.
-<span class='pageno' id='Page_53'>53</span>The bituminous paving cement shall be composed by weight of
-straight-run coal-tar pitch of the hardness commonly known as
-number six, to which has been added and thoroughly mixed, while
-both are in a melted condition, twenty per cent. (20%) by weight
-of refined Trinidad asphalt, or other asphalt, equal for the purpose,
-and twenty per cent. (20%) by weight of Portland cement. These
-ingredients must be thoroughly mixed, and kept agitated until
-used.<a id='r37'></a><a href='#f37' class='c016'><sup>[37]</sup></a></p>
-
-<p class='c007'>The joints will first be filled with the gravel, which shall be perfectly
-dry, and heated so that when put in the joints it will be at a
-temperature of about three hundred (300) degrees F. The paving
-cement, heated to a temperature of about three hundred (300)
-degrees F., shall be at once, while the gravel is still hot, poured
-from a spouted vessel into the joints until the interstices of the gravel
-are entirely filled to the surface of the pavement, repouring being
-resorted to to accomplish this result whenever necessary.</p>
-
-<p class='c007'>All the joints in the pavement other than those named above
-shall then be completely filled with Portland cement grout, in the
-following manner:</p>
-
-<p class='c007'>The grout shall be composed of equal parts by volume of sand
-(Sect. 30) and Portland cement (Sect. 29), a quick-setting cement
-being preferred. The sand and cement shall be first thoroughly
-mixed dry and then enough water added to make a grout of such
-consistency that it will flow like thick cream, and the mixing continued
-until a homogeneous mass is produced and until the grout
-is applied to the pavement. The grout shall be prepared in water-tight
-boxes of a convenient size. Before applying the grout the
-pavement shall be thoroughly dampened by sprinkling. The grout
-shall be removed from the mixing box and spread over the pavement
-with scoop shovels, in two courses, the first being sufficient
-to about half fill the joints, and the second, which shall be applied
-before the first has begun to set, shall be sufficient to entirely fill
-the remaining space in the joints. As the grout is applied to the
-pavement it shall be swept about with brooms until it all enters
-the joints.</p>
-
-<p class='c007'><span class='pageno' id='Page_54'>54</span><strong>76. Order of Work.</strong>—The sand bed shall not be put in place more
-than fifty (50) feet ahead of the block setters. The ramming and
-filling of the joints shall follow closely the block setting, but no ramming
-shall be done within less than six (6) feet of the face of the
-block setting; and the final joint filling shall be kept completed to
-within twenty-five (25) feet of the ramming; except that all the
-work rammed during any day shall have the joint filling completed
-before the cessation of work on that day. The street shall not be
-opened to travel until the grout has thoroughly set.</p>
-
-<p class='c007'><strong>77. Fitting Paving Around Other Structures.</strong>—The size of blocks
-and the width of courses shall, as the block laying approaches bridge
-stones, curbs and other structures, or in making closures with other
-sections of pavement, be so selected and adjusted that joints not
-over three-quarters (¾) inch in width shall result, without breaking
-blocks or splitting courses.</p>
-
-<p class='c007'><strong>78. Street Railroad Tracks.</strong>—Where railroad tracks exist in the
-street the paving blocks shall be laid against the rail in the following
-manner:</p>
-
-<p class='c007'>The sub-grade and the pavement foundation shall extend under
-the rails uninterrupted except by the ties or other structures connected
-with the railroad track. For a distance of sixteen (16)
-inches, on each side of the rail, measuring from the center thereof,
-there shall be spread on the pavement foundation a layer of mortar
-not less than one and one-half (1½) inches thick, composed of one
-(1) part of cement and three (3) parts sand, complying with the
-requirements of Sections 29 and 30. Upon this layer of mortar shall
-be set, against the rail, and on each side of it, selected paving
-blocks, securely bedded in the mortar before it shall have begun to
-set.<a id='r38'></a><a href='#f38' class='c016'><sup>[38]</sup></a> Alternate blocks shall be long and short so as to break joint
-with the blocks of the adjoining pavement. Selected blocks with
-well dressed top surfaces shall be used and their tops shall be set
-as nearly as practicable at the level of the top of the rail, but not so
-high that the car wheels will ride upon them. In setting the blocks
-they shall be firmly bedded into the mortar by the use of paving
-hammers, but they shall not be thereafter rammed. As the blocks
-are set, any space between the paving blocks and the web of the rail
-shall be filled with mortar of the quality described above. The
-<span class='pageno' id='Page_55'>55</span>placing of these blocks shall not precede by more than ten (10)
-feet the block laying on the street. Care must be taken not to
-disturb the bedding of these blocks in the laying of the adjoining
-pavement, or otherwise. The joints shall be filled with grout as
-specified in Sect. 75.</p>
-
-<p class='c007'>The construction along slot-rails shall be the same as described
-above, except that blocks of special size or shape may be required,
-as the Engineer may direct.</p>
-
-<p class='c007'><strong>79. Bridge Stone Crossings.</strong>—Where directed by the Engineer,
-the old bridge stone shall be redressed and relaid, as hereinafter
-specified for new bridge stone, and shall be moved from the point
-where taken up to the point where they are to be relaid, by the
-Contractor at his expense.</p>
-
-<p class='c007'>New bridge stone shall be of the same quality of granite as the
-paving blocks and free from imperfections. They shall not be less
-than three and one-half (3½) nor more than six (6) feet long,
-eighteen (18) inches wide and of a uniform thickness not less than
-six (6) nor more than eight (8) inches, but these dimensions may
-be varied by the Engineer where necessary to fit the stone into
-special locations.</p>
-
-<p class='c007'>Their top shall be well dressed to a true plane surface not varying
-in evenness more than one-quarter (¼) inch. The sides shall be
-dressed perpendicular to the face so as to joint closely against the
-paving blocks. The ends shall be cut to lines making an angle of
-from 60° to 45° with the longitudinal axis of the stones<a id='r39'></a><a href='#f39' class='c016'><sup>[39]</sup></a> and so
-dressed and to such a bevel that when set in the curved surface
-of the street, the joint between adjoining stones shall not be wider
-than three-eighths (⅜) inch from top to bottom.</p>
-
-<p class='c007'>Bridge stones shall be set in advance of the block laying, over the
-concrete street foundation, in a bed of sand or gravel in which they
-shall be firmly bedded. Their upper surface shall conform truly
-to the pavement datum. They shall be set accurately to the lines
-given by the Engineer. Where the crosswalk requires more than
-one width of bridge stone, the courses shall be laid parallel to, and
-at such distance from each other as the Engineer may direct, and
-the space between courses shall be filled with paving blocks laid as
-specified for other parts of the street.</p>
-
-<div>
- <span class='pageno' id='Page_56'>56</span>
- <h3 class='c003'>BRICK PAVEMENT<a id='r40'></a><a href='#f40' class='c016'><sup>[40]</sup></a></h3>
-</div>
-
-<p class='c006'><strong>80. Sub-grade.</strong>—The sub-grade for brick pavement shall be prepared
-in accordance with Sect. 26, and shall be finished to a surface&#160;... inches below and parallel to the pavement datum.</p>
-
-<p class='c007'><strong>81. Foundation.</strong>—The foundation for brick pavement shall be of
-hydraulic concrete<a id='r41'></a><a href='#f41' class='c016'><sup>[41]</sup></a> prepared in accordance with Sections 28 to 37
-inclusive. Its thickness shall be&#160;... inches and its upper
-surface shall, when completed, be parallel to and at a depth below
-the pavement datum equal to the depth of the brick plus one and
-one-fourth (1¼) inches. The surface of the foundation shall not
-vary more than one-half (½) inch above or below that depth.</p>
-
-<p class='c007'><strong>82. Paving Brick.</strong>—The linear dimensions of paving brick may
-vary between the following limits: In length, from eight and one-half
-(8½) to nine and one-half (9½) inches; in width, from two
-and one-fourth (2¼) to three and one-half (3½) inches; in depth,
-from four (4) to four and one-eighth (4⅛) inches; but the length
-shall not be less than two and one-half (2½) nor more than three
-and three-fourths (3¾) times the width.<a id='r42'></a><a href='#f42' class='c016'><sup>[42]</sup></a> The corners shall all
-be rounded off to a radius of not less than one-eighth (⅛) nor more
-than three-sixteenths (³⁄₁₆) inch. The brick for any one contract
-shall be all of the same kind and of the same standard size, and the individual
-bricks shall not vary in length more than three-sixteenths
-(³⁄₁₆) inch, nor in width more than one-eighth (⅛) inch from the
-size adopted as standard. Raised lugs or letters are permissible on
-one side of each brick but must not project more than three-sixteenths
-(³⁄₁₆) inch from the general surface.<a id='r43'></a><a href='#f43' class='c016'><sup>[43]</sup></a></p>
-
-<p class='c007'><span class='pageno' id='Page_57'>57</span>The brick must be specially manufactured for paving purposes.
-They may be made from shale or from suitable clay. In either case
-the material must be thoroughly pulverized, mixed and tempered,
-and must be free from lime nodules or other substances that may
-disintegrate the brick when immersed in water. The brick shall be
-molded in efficient brick machines to a truly rectangular form, free
-from cracks, flaws and injurious laminations. After being dried
-the brick shall be properly and uniformly burned in down-draft
-kilns. Shale brick shall be burned to the point of incipient
-fusion or vitrification. After the burning is completed, the brick
-shall be allowed to cool with sufficient slowness to insure thorough
-annealing.</p>
-
-<p class='c007'>The completed brick shall be free from flaws, cracks, ragged
-corners, and from such distortion or warping as will interfere with
-their utility or good appearance in the pavement. Paving brick
-shall not be salt-glazed.</p>
-
-<p class='c007'><strong>83.</strong> The brick shall be subjected to the following tests to determine
-their quality:</p>
-
-<p class='c007'>When broken by the blows of a hammer the brick shall be strong
-and tough. The broken surface shall show a homogeneous composition
-throughout the broken section, free from flaws, injurious
-laminations, nodules and voids, and shall appear to be uniformly
-burned from surface to center.</p>
-
-<p class='c007'>When subjected to the standard “Rattler” test, in accordance
-with the rules adopted by the National Paving Brick Manufacturers’
-Association, the average loss in weight shall not exceed eighteen (18)
-per cent.<a id='r44'></a><a href='#f44' class='c016'><sup>[44]</sup></a> and the loss in weight of any individual brick in the test
-shall not be more than twenty-five (25) per cent. greater than the
-average loss of the whole charge.</p>
-
-<p class='c007'>When subjected to the absorption test, in accordance with the
-rules adopted by the National Paving Brick Manufacturers’ Association,
-shale bricks shall not absorb more than two (2) per cent. nor
-<span class='pageno' id='Page_58'>58</span>less than one-half (½) of one per cent. of their weight of water,<a id='r45'></a><a href='#f45' class='c016'><sup>[45]</sup></a> and
-clay bricks shall not absorb more than six (6) per cent. of their
-weight of water; the absorption of any individual brick shall not
-be more than fifty (50) per cent. greater than the mean absorption
-of the whole lot tested.<a id='r46'></a><a href='#f46' class='c016'><sup>[46]</sup></a> Brick that do not successfully pass all these
-tests will not be accepted.</p>
-
-<p class='c007'><strong>84. Samples.</strong>—Where samples of paving brick have been required
-and submitted by successful bidders, and tested as described above,
-it will be assumed that these samples fairly represent the quality of
-the brick to be subsequently supplied for the work, and brick that
-do not come up to the standard thus established will not be accepted.</p>
-
-<p class='c007'><strong>85. Delivering Brick on Street.</strong>—Unless the sidewalks are too
-narrow to permit of it, the brick shall all be delivered upon the
-street before the foundation is constructed, and neatly piled upon
-the outer edge of the sidewalks; occasional openings being left in
-the piles for the accommodation of foot passengers. One-half the
-brick required shall be thus delivered and piled upon each sidewalk.
-In delivering the bricks from these piles to the bricklayers, they must
-be carried on pallets, or other suitable devices must be used to prevent
-mutilation by rough handling; they must not be dumped from
-wheelbarrows upon freshly-laid brick pavement.</p>
-
-<p class='c007'>If for any reason the bricks are not delivered before the foundation
-is laid, or if the sidewalks are too narrow to permit of the
-brick being stored upon them, they may be delivered over the foundation,
-but not until the concrete has set so hard that it will not be
-injured by transportation over it.</p>
-
-<p class='c007'><strong>86. Sand Cushion.</strong>—Directly before the brick are laid into the
-pavement there shall be spread over the foundation a layer of sand
-one and one-half (1½) inches in depth. The sand shall be free
-from vegetable or other refuse matter, and shall not contain more
-than five (5) per cent. of clay and loam. Pebbles and fragments
-of stone exceeding one-fourth inch in diameter must be screened out.
-When spread on the street the sand shall be sufficiently dry to permit
-of proper gaging by templates, as hereinafter described. The
-sand shall be spread and correctly gaged to the proper thickness
-and surface by the use of templates formed to the true designed
-<span class='pageno' id='Page_59'>59</span>cross-sectional contour of the pavement. If the width of the street
-between curbs does not exceed twenty-five (25) feet, the template
-shall be made in one length sufficient to cover the full width of the
-street, and its ends shall be so constructed and fitted with iron rollers,
-that it will rest upon and roll along the top of the curb at each end;
-if the width of the street between curbs be not more than fifty (50)
-feet, the template shall be of sufficient length to reach from the
-curb to the middle of the street, and constructed to move on rollers
-on top of the curb at one end and upon a plank six (6) inches wide
-and one and one-half (1½) inches thick laid upon the foundation
-along the center line of the pavement. The template shall be worked
-forward and backward along the line of the street until the surface
-of the sand conforms exactly to the designed contour of the pavement,
-at a depth below the pavement datum equal to the depth of
-the paving brick minus one-fourth (¼) inch. The whole surface
-shall then be rolled with a garden roller not less than thirty-six
-inches long and not less than thirty inches in diameter, weighing
-not less than three hundred pounds. When completed the surface
-of the sand cushion shall be smooth and unbroken, and care must be
-taken not to disturb it before the bricks are set upon it.</p>
-
-<p class='c007'><strong>87. Setting the Brick.</strong>—Several courses of brick, aggregating a
-strip having a width of not less than twelve (12) inches nor more
-than fifteen (15) inches on each side of the street, beginning against
-the curb, shall be first laid; the brick being set with their long dimension
-parallel to the curb.<a id='r47'></a><a href='#f47' class='c016'><sup>[47]</sup></a> The pavement intervening between
-these gutter courses will then be set in courses at right angles to the
-axis of the street, except in street intersections, where the courses
-shall make an angle of forty-five (45) degrees with the axis of the
-street. The brick shall be set upon edge on the sand cushion with
-their top faces parallel to the pavement datum, in straight courses,
-continuous across the street, the long dimension of the brick being
-parallel to the courses; they shall be set as closely together as possible,
-so that the joints both between the courses and between individual
-bricks shall not exceed one-eighth (⅛) inch, where the bricks are
-without lugs, and not more than one-fourth inch where the brick
-have lugs. Broken bricks and bats shall not be used except as
-closers at the ends of the course and in fitting the pavement around
-manholes, etc., and nothing smaller than half-bricks shall be used in
-either case, and the broken ends must be shaped to make reasonably
-<span class='pageno' id='Page_60'>60</span>close joints. Filling up with bats must follow the brick-laying
-closely. Brick with lugs shall be laid with the lugs all in one
-direction.</p>
-
-<p class='c007'><strong>88. Inspection.</strong>—After the bricks are laid the pavement will be
-inspected by the Engineer, or his agent. He may require that the
-surface shall be previously wetted by sprinklers, or by a sprinkling
-nozzle, in order to detect soft or porous bricks.<a id='r48'></a><a href='#f48' class='c016'><sup>[48]</sup></a> Defective bricks
-indicated by him shall be removed and replaced by acceptable
-brick.</p>
-
-<p class='c007'><strong>89. Rolling and Ramming.</strong>—The surface of the pavement shall
-then be rolled and rammed in the following manner:</p>
-
-<p class='c007'>The roller used shall be of the asphalt roller style, driven by
-steam and weighing not less than three and one-half (3½) nor more
-than five (5) tons. The rolling shall begin as near the curb as
-practicable, the roller being operated slowly, parallel to the axis
-of the street, and working outwardly until the center of the street
-is reached, when the roller will proceed to the opposite side of the
-street and the operation proceed as before. After this longitudinal
-rolling is completed the pavement will be continuously rolled a
-second time, the roller operating back and forth at an angle of
-forty-five degrees to the axis of the street, and a third time, the
-roller operating at right angles to the course of the second rolling.
-After the rolling is thus completed the brick in the gutters not
-reached by the roller shall be rammed with a street rammer weighing
-not less than thirty (30) pounds, a plank not less than four (4)
-feet long, ten (10) to twelve (12) inches wide and two (2) inches
-thick being interposed between the pavement and the rammer and
-moved about so that the whole surface of the gutter shall be thoroughly
-and equally rammed and its surface brought to an even
-junction with the rolled portion of the work.</p>
-
-<p class='c007'>When the rolling and ramming is thus completed the surface
-of the pavement shall conform so truly to the designed pavement
-datum that it will nowhere depart more than three-sixteenths (³⁄₁₆)
-inch from properly formed templates and straight-edges applied to
-its surface.</p>
-
-<p class='c007'><strong>90. Filling the Joints.</strong><a id='r49'></a><a href='#f49' class='c016'><sup>[49]</sup></a>—Directly after the completion of the rolling
-<span class='pageno' id='Page_61'>61</span>and ramming, the joints between the bricks shall be filled as follows:</p>
-
-<p class='c007'>The joints in the longitudinal gutter courses, and the joints
-between six contiguous courses running across the street, from
-gutter to gutter, in each length of fifty (50) feet of the pavement,
-shall be filled with bituminous cement composed of coal-tar pitch,
-commercially known as Number Four, to which has been added
-twenty (20) per cent. of refined Trinidad asphalt and twenty (20)
-per cent. of hydraulic cement, all by weight. In preparing this
-bituminous cement, the pitch shall first be melted and the asphalt,
-also melted, added and thoroughly incorporated by agitation. The
-hydraulic cement shall then be added and the whole agitated until
-a complete and uniform mixture results. The bituminous cement
-thus prepared shall while sufficiently hot and liquid to flow freely,
-be poured from a spouted vessel into the joints until they appear
-to be nearly or quite full. After allowing time for the filling to
-subside, the joints will be gone over a second time and completely
-filled.</p>
-
-<p class='c007'>All the remaining joints in the pavement shall be filled with
-Portland cement grout, as follows:</p>
-
-<p class='c007'>The grout will be composed of equal parts by volume of sand
-(Sect. 30) and Portland cement (Sect. 29), a quick-setting cement
-being preferred. The sand and cement shall be first thoroughly
-mixed dry and then enough water added to make a grout of such
-consistency that it will flow like thick cream, and the mixing continued
-until a homogeneous mass is produced and until the grout
-<span class='pageno' id='Page_62'>62</span>is applied to the pavement. The grout shall be prepared in water-tight
-boxes of a convenient size. Before applying the grout the
-pavement shall be thoroughly dampened by sprinkling. The grout
-shall be spread over the pavement with scoop shovels, in two
-courses, the first being sufficient to nearly fill the joints, and the
-second, which shall be applied before the first has begun to set,
-shall be sufficient to entirely fill the remaining space in the joints.
-As rapidly as the grout is applied it shall be swept with brooms until
-it all enters the joints.<a id='r50'></a><a href='#f50' class='c016'><sup>[50]</sup></a></p>
-
-<p class='c007'><strong>91.</strong> Travel must be excluded from the pavement until the grout
-has set firmly; in no case less than five days, and the grout must
-be kept moist during this period.</p>
-
-<h3 class='c003'>WOOD-BLOCK PAVEMENT</h3>
-
-<p class='c006'><strong>92. Sub-grade.</strong>—The sub-grade for wood-block pavement shall
-be prepared as specified in Section 26, and shall be finished to a
-surface&#160;... inches below the pavement datum.</p>
-
-<p class='c007'><strong>93. Foundation.</strong>—The foundation for wood-block pavement shall
-be Portland cement concrete&#160;... inches thick, prepared
-as specified in Sections 28, 29, 30, 31, 32, 33, 34, 35, 36 and 37.
-The upper surface of the concrete foundation, when completed, shall
-be at a distance below the pavement datum equal to the depth of
-the blocks to be laid, plus one-half (½) inch, and must not vary
-more than one-fourth (¼) inch above or below that depth.</p>
-
-<div>
- <span class='pageno' id='Page_63'>63</span>
- <h4 class='c014'>MATERIALS</h4>
-</div>
-
-<p class='c015'><strong>94. Wood-blocks.</strong>—The wood-blocks may be made of Long-leaved
-yellow pine (Pinus palustrus), Lob-lolly pine (Pinus tæda),
-Short-leaved pine (Pinus echinata), Cuba pine (Pinus heterophylla),
-Black gum (Nyssa sylvatica), Red gum (Liquidambar styraciflua),
-Norway pine (Pinus resinosa), or Tamarack (Larix laricina), or of
-other species of wood of equal strength and toughness and of a
-texture permitting as satisfactory preservative treatment as those
-herein named. But, as far as practicable, only one species of wood
-shall be used on any one contract.<a id='r51'></a><a href='#f51' class='c016'><sup>[51]</sup></a></p>
-
-<p class='c007'><span class='pageno' id='Page_64'>64</span>Only wood from live, sound trees shall be used. The lumber from
-which the blocks are cut shall be properly manufactured, free from
-bark, and with full square corners. It shall be free from decay,
-dottiness, brashness, shakes, large season cracks, loose or unsound
-knots over three-fourths (¾) inch in diameter, and all other imperfections
-which may, in the opinion of the Engineer, be detrimental.
-“Fat” pine containing so much resin that it will not take
-up the specified quantity of creosote oil in treatment may be rejected.
-Second-growth timber, and Southern pine showing, outside of a
-radius of three (3) inches from the heart, nine (9) or less annual
-growth rings to the inch, will not be accepted.</p>
-
-<p class='c007'>The paving blocks made from the lumber hereinbefore specified
-shall be well manufactured and truly rectangular and square edged.
-Their depth (parallel to the fiber) shall be&#160;... inches,<a id='r52'></a><a href='#f52' class='c016'><sup>[52]</sup></a>
-their length shall not be less than six inches nor more than three
-times their depth, and their width shall be from two and one-half
-(2½) to three and one-half (3½) inches, but at least one-fourth
-inch less than their depth.</p>
-
-<p class='c007'><span class='pageno' id='Page_65'>65</span>All the blocks for any one contract shall be of the same standard
-depth and width, and the individual blocks shall not vary more
-than one-eighth inch from the designated depth and width.</p>
-
-<p class='c007'><strong>95. Creosote Oil.</strong><a id='r53'></a><a href='#f53' class='c016'><sup>[53]</sup></a>—The oil used for the preservative treatment
-of the paving blocks shall be coal-tar creosote oil, commonly known
-as dead oil of coal-tar, without admixture or adulteration with other
-oils or tars. Oils produced or resulting from the distillation of
-water-gas tar, blast-furnace tar, producer-tar, lignite-tar, petroleum-oil
-tar, or wood-tar, or, containing an admixture of any of these will
-not be accepted. The creosote oil shall not contain more than five
-per cent. (5%) of tarry matter nor more than two per cent. (2%) of
-water. Its specific gravity at a temperature of 100° F. shall be
-not below 1.03 nor above 1.08. Not less than ninety-nine per cent.
-(99%) shall be soluble in hot benzol. It shall not contain more than
-eight per cent. (8%) of tar acids. When two hundred (200) grams
-are subjected to distillation at gradually increasing temperatures,
-not more than five per cent. (5%) of distillate shall distil over up
-to a temperature of four hundred degrees F. (400° F.), nor more
-than thirty-five per cent. (35%) shall distil over up to a temperature
-of four hundred and fifty-five degrees F. (455° F.), and not more
-than eighty per cent. (80%) shall distil over up to a temperature of
-six hundred degrees F. (600° F.). After complete distillation there
-shall not remain more than two per cent. of coke. The residue
-remaining, upon sulphonating a portion of the total distillate, shall
-not exceed one per cent. (1%). The above tests shall be made in
-accordance with the methods prescribed in the “Report of the
-Committee on Preservative Treatment of Poles and Cross-arms”
-of the National Electric Light Association, 1911.</p>
-
-<p class='c007'><strong>96. Preservative Treatment.</strong>—The paving blocks shall, after
-<span class='pageno' id='Page_66'>66</span>they are cut to the proper dimensions, be subjected to preservative
-treatment with the creosote oil specified in Section 95.</p>
-
-<p class='c007'>The contractor may employ any of the standard methods in
-common use for impregnating the blocks, provided that uniform
-results are attained, complying with the following requirements:</p>
-
-<p class='c007'>The wood shall not be heated during any part of the process to a
-temperature exceeding two hundred and sixty degrees Fahrenheit
-(260° F.).</p>
-
-<p class='c007'>All parts of every block shall be reached and penetrated by the oil.
-The quantity of oil found in the blocks after treatment shall average
-not less than&#160;... pounds per cubic foot of wood.</p>
-
-<p class='c007'>The oil in the treating tanks during the process of impregnation
-shall not become diluted with water to the extent of more than five
-per cent. (5%) and if the percentage of water in the oil during the
-process of treatment shall exceed two per cent. (2%) the quantity
-of the oil to be injected in the wood as stipulated hereinbefore shall
-be increased in a like ratio; for example, if the oil in the treating
-tanks shall be found to contain four per cent. (4%) of water the
-quantity required to be found in the blocks after treatment shall be
-four per cent. (4%) greater than herein specified.</p>
-
-<p class='c007'>The quantity of oil injected shall be determined primarily by
-tank measurements, but shall be verified by actual determination
-of the quantity of oil in the treated blocks by the following method:
-representative treated sample blocks shall be selected and an auger
-hole one inch in diameter bored entirely through the block parallel
-to the fiber, the borings all collected, thoroughly mixed, and the
-quantity and ratio of oil to wood in the borings determined by
-extracting the oil completely with carbon di-sulphide. The center
-of the auger hole shall be located midway between the sides of the
-block and at a distance from the end of the block equal to one-third
-(⅓) of the length of the block. At the time of treatment the blocks
-shall not be green or saturated with water, but they shall, preferably,
-not be thoroughly seasoned. After treatment, and until used, the
-blocks shall, during dry weather, be frequently well drenched
-with water to prevent excessive drying out and cracking.</p>
-
-<p class='c007'><strong>97. Laying the Wood-Blocks.</strong>—The concrete foundation shall be
-cleaned and swept to remove all dirt and débris and shall be thoroughly
-dampened immediately in advance of the setting of the
-blocks. Upon the concrete foundation shall be spread a layer of
-mortar about one-half inch thick, made of one part Portland cement
-and two parts sand with sufficient water to make a moderately stiff
-<span class='pageno' id='Page_67'>67</span>paste.<a id='r54'></a><a href='#f54' class='c016'><sup>[54]</sup></a> The mortar shall be thoroughly mixed and shall be spread
-in place over the concrete foundation immediately in advance of
-setting the blocks to such a thickness that when the blocks are set
-and properly tamped their tops shall conform accurately to the
-pavement datum.</p>
-
-<p class='c007'>Upon this mortar bed the blocks shall be set with their fiber
-vertical, in straight, parallel courses at right angles to the axis of
-the street, except at street intersections where they shall be set at an
-angle of forty-five degrees with the axis of the street. The blocks
-shall be set as close together as practicable. Blocks in adjoining
-courses shall break joint at least three inches. Blocks of such lengths
-shall be selected as to make as little splitting as practicable in filling
-out ends of courses. Where splitting is necessary, no fractional
-block shall be used whose length is not at least equal to its width.</p>
-
-<p class='c007'>After the blocks are thus set the whole surface of the pavement
-shall be rammed with a rammer weighing not less than twenty
-pounds, a plank ten (10) inches wide, two (2) inches thick and four
-feet long being interposed between the rammer and the pavement
-and moved about as the ramming progresses until the blocks are
-forced into a firm seat in the mortar bed and their tops brought
-accurately to the pavement datum. The ramming shall be completed
-before the mortar under them has begun to set, but no ramming
-shall be done, during the progress of the work, nearer than three
-feet to the edge of the block setting, except where the block setting
-may be suspended, as at the end of the day’s work, when all the
-blocks then set shall be rammed.</p>
-
-<p class='c007'>The top surface of the pavement when completed shall conform so
-truly to the pavement datum that correctly formed templates twelve
-(12) feet long applied to the surface shall show at no place a departure
-of more than three-sixteenths (³⁄₁₆) inch therefrom.</p>
-
-<p class='c007'><span class='pageno' id='Page_68'>68</span><strong>98. Filling the Joints.</strong>—After the block setting is completed,
-perfectly dry, fine sand shall be spread over the pavement surface
-and swept about until every joint into which the sand will penetrate
-shall be completely filled. The remaining sand shall be left
-upon the pavement for such time as the Engineer may direct, when
-it shall be removed by the Contractor.<a id='r55'></a><a href='#f55' class='c016'><sup>[55]</sup></a></p>
-
-<p class='c007'><strong>99. Inspection.</strong>—The lumber for paving blocks will be inspected
-before it is cut into blocks. The blocks will also be inspected
-upon delivery to the street and as they are laid. Blocks that have,
-in treatment or subsequent handling, developed open season cracks
-or wind shakes or other imperfections that may prevent their durability
-or usefulness in the pavement shall be rejected and removed
-from the street.</p>
-
-<p class='c007'><strong>100. Chamfered Blocks.</strong>—Where wood-block pavement is laid
-on streets or parts of streets having a gradient of more than 3%,
-the blocks shall not be less than four (4) inches long, and the upper
-side-corners of the blocks shall be chamfered to a depth of three-eighths
-(⅜) inch, the chamfered surface to make an angle of 40
-degrees with the vertical sides of the blocks; or such other construction
-shall be used as will, in the opinion of the Engineer, provide
-an equally good foot-hold for horses.</p>
-
-<p class='c007'><strong>101. Expansion Joints.</strong>—Before the blocks are set there shall
-be placed along and against each curb a board of trapezoidal section
-having a width one inch greater than the depth of the blocks, the
-upper edge of which shall have a thickness of three-eighths (⅜)
-inch for each ten feet or fraction thereof of the width of the street
-between curbs, and a bottom width one-fourth (¼) inch less
-than the top. The paving blocks at the beginning and end of
-each course shall be set against this board. After the ramming
-of the blocks has been completed, these boards shall be carefully
-<span class='pageno' id='Page_69'>69</span>withdrawn and the space between the curbs and the paving blocks
-shall be completely filled with the bituminous paving cement
-described in Section 90.</p>
-
-<p class='c007'><strong>102.</strong> The street shall not be opened to travel until such time as
-the mortar under the blocks shall have become well set, nor until
-the Engineer shall so direct.</p>
-
-<h3 class='c003'>BITUMINOUS CONCRETE PAVEMENT</h3>
-
-<p class='c006'><i>Note.</i>—The phrase, Bituminous Concrete Pavement, has been applied
-to a large variety of roadway surfaces differing materially from each other
-in composition, construction and utility. Some of these are covered by
-United States patents, the scope and limitations of which are not yet fully
-determined or understood. The necessity of avoiding infringement of
-these patents has to be kept in mind in framing specifications for public
-use, and this consideration does not permit the presentation here of specifications
-which, in the opinion of the author, would secure an ideal pavement
-of this general character.</p>
-
-<p class='c007'>Bituminous concrete pavements constructed in substantial conformity
-with these specifications have been laid on a number of city and town
-streets and country roads and have proved satisfactory and fairly durable
-in use. It is believed that they do not infringe any existing patents.</p>
-
-<p class='c007'>Our rather limited experience with pavements of this character seems to
-indicate that if good materials are used and the work properly done, they
-are suitable for use on city streets of light travel, and on suburban streets
-and country roads carrying an amount of travel considered heavy for
-these classes of roadways. Where the results have been unsatisfactory,
-the cause can generally be traced to unsuitable materials or unskillful
-construction, the result of ignorance or carelessness on the one hand, or of
-the attempt to reduce first cost below normal figures on the other. Many
-people are searching for a pavement or roadway that will have all the good
-qualities of the standard pavements but can be built about as cheaply as
-a common macadam road. It is possible that something of the kind may
-be discovered; but in the present state of the art it is chimerical. High
-quality and low first cost do not go together in street paving. The
-question to be considered is, rather, how can we invest a dollar in street
-or road building so that it will, in the long run, yield the best return upon
-the investment. The pavement provided for in these specifications is
-not a cheap pavement, but where it is suitable for the conditions to be
-met, it will be well worth its cost.</p>
-
-<div>
- <span class='pageno' id='Page_70'>70</span>
- <h4 class='c014'>SPECIFICATIONS</h4>
-</div>
-
-<p class='c015'><strong>103. Sub-grade.</strong>—The sub-grade except where old pavement is
-utilized for foundation shall be prepared in accordance with Section
-26 of these general specifications.</p>
-
-<p class='c007'><strong>104. Foundation.</strong><a id='r56'></a><a href='#f56' class='c016'><sup>[56]</sup></a>—The foundation for bituminous concrete
-pavement shall be a properly prepared old pavement, or hydraulic
-concrete, or compressed broken stone, as determined by the engineer.</p>
-
-<p class='c007'><strong>105.</strong> Old macadam pavement or road to be utilized for foundation,
-shall be prepared in the following manner:</p>
-
-<p class='c007'>All high places or humps shall be dressed down to a plane two (2)
-inches below the pavement datum, the work being done with care
-so as to disturb as little as possible the macadam that is to remain.
-Depressions in the old macadam shall be carefully cleaned out so
-as to remove all earth and other débris and loose material, and
-filled with hydraulic concrete. Newly dug or filled trenches and
-holes extending through the macadam shall be excavated and
-cleaned out so as to admit the use of at least four (4) inches of
-hydraulic concrete. The hydraulic concrete for thus leveling
-up the roadway shall be composed of one (1) part of approved
-Portland cement, four (4) parts of clean sand and nine (9) parts
-of sound, hard crushed stone, well mixed into a wet concrete. After
-placing, the concrete shall be well tamped so as to form a compact
-body, conforming to a plane two (2) inches below the pavement
-datum. The concrete shall be protected from travel and allowed
-to become well set before the surface of bituminous concrete is
-applied.</p>
-
-<p class='c007'><strong>106.</strong> Old stone block or brick pavement may be utilized for
-foundation, provided that the blocks or bricks do not require to
-<span class='pageno' id='Page_71'>71</span>be taken up and reset, or, if so taken up and reset, that the joints
-shall be completely filled with grout composed of one (1) part Portland
-cement and two (2) parts of good sand. Depressions, trenches
-and holes shall be treated as specified in Section 105.</p>
-
-<p class='c007'><strong>107.</strong> Hydraulic concrete foundation shall be constructed in compliance
-with the requirements of Sections 28, 29, 30, 31, 32, 33,
-34, 35, 36 and 37 of these specifications. Its depth or thickness
-shall be&#160;... inches.</p>
-
-<p class='c007'><strong>108.</strong> Broken stone foundation shall be&#160;... inches in
-thickness after completion. It shall be constructed in accordance
-with Section 40 of these specifications.<a id='r57'></a><a href='#f57' class='c016'><sup>[57]</sup></a></p>
-
-<p class='c007'><strong>109.</strong> When completed the upper surface of the foundation shall
-nowhere be more than two and one-half (2½) inches nor less
-than one and three-fourths (1¾) inches below the pavement datum.
-No travel shall be permitted upon the foundation until the bituminous
-concrete shall have been laid.</p>
-
-<p class='c007'><strong>110. Bituminous Concrete.</strong>—The bituminous concrete shall be
-composed of crushed stone, sand, pulverized stone, and asphaltic
-cement.</p>
-
-<p class='c007'>A typical composition for the bituminous concrete, to be as
-closely approximated as practicable, is as follows, the percentages
-being by weight:</p>
-
-<table class='table1'>
- <tr><td class='c008' colspan='2'><span class='pageno' id='Page_72'>72</span></td></tr>
- <tr>
- <td class='c009'>Pure bitumen in asphaltic cement.</td>
- <td class='c011'>8.5%</td>
- </tr>
- <tr>
- <td class='c009'>Pulverized stone passing No. 200 sieve.</td>
- <td class='c011'>8.5%</td>
- </tr>
- <tr>
- <td class='c009'>Sand passing No. 80 sieve.</td>
- <td class='c011'>10.0%</td>
- </tr>
- <tr>
- <td class='c009'>Sand passing No. 40 sieve.</td>
- <td class='c011'>23.0%</td>
- </tr>
- <tr>
- <td class='c009'>Sand and fine stone passing No. 10 sieve.</td>
- <td class='c011'>15.0%</td>
- </tr>
- <tr>
- <td class='c009'>Crushed stone passing a screen having four meshes to the linear inch.</td>
- <td class='c011'>25.0%</td>
- </tr>
- <tr>
- <td class='c009'>Crushed stone passing a screen having two meshes to the linear inch.</td>
- <td class='c011'>10.0%</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c011'><hr /></td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c011'>100.0%</td>
- </tr>
-</table>
-
-<p class='c007'>The crushed stone shall be trap rock, granite, or hard, sound,
-durable limestone. It shall be crushed to such sizes that all will
-pass through a screen with two meshes to the linear inch and shall
-be of such assorted sizes of fragments as will, when incorporated with
-the sand, pulverized stone, and bitumen, produce a mixture substantially
-conforming to the percentages of each named in the
-preceding paragraph.</p>
-
-<p class='c007'>The stone shall be freshly crushed, clean and free from clay, loam,
-organic matter and refuse of every kind.</p>
-
-<p class='c007'>The sand shall be silicious, and free from clay, loam and refuse
-of all kinds. The grains shall be of such sizes that approximately
-twenty-five per cent. (25%) of the whole will pass the number
-eighty (80) sieve, fifty-eight per cent. (58%) shall pass the No. 40
-sieve and not more than seventeen per cent. (17%) will pass the
-number 10 sieve, when used in the order named. The pulverized
-stone shall conform to the requirements of Sect. 49. Portland
-Cement may be substituted for not more than twenty per cent.
-(20%) of the pulverized stone if the Engineer so directs, in which
-case the Portland Cement actually so used shall be paid for extra
-at the prevailing market price, to be agreed upon in advance. The
-asphaltic cement shall comply with the requirements of Sects. 43, 44,
-45, 46, 47, and 50, except that it may have a somewhat higher
-penetration, as may be determined by the Engineer.<a id='r58'></a><a href='#f58' class='c016'><sup>[58]</sup></a></p>
-
-<p class='c007'><span class='pageno' id='Page_73'>73</span><strong>111. Mixing.</strong>—The materials composing the concrete shall all
-(except the pulverized stone and Portland cement) be uniformly
-heated to a temperature not exceeding three hundred and fifty
-degrees Fahrenheit (350° F.) and not below three hundred degrees
-Fahrenheit (300° F.), and while at such temperature shall be
-incorporated and mixed in a mechanical mixer. The stone, sand,
-and pulverized stone shall be placed in the mixer in the order named
-and well mixed together, after which the asphaltic cement shall be
-added and the mixing continued until each fragment is thoroughly
-coated with cement.</p>
-
-<p class='c007'><strong>112. Laying on the Street.</strong>—The mixed concrete shall be taken to
-the street as soon as practicable after leaving the mixer. It shall be
-unloaded on the street, properly spread and truly graded with
-asphalt rakes to such a depth that after compression by rolling it will
-have a thickness of not less than two inches. The concrete when
-unloaded on the street shall be at a temperature not below two
-hundred and eighty degrees Fahrenheit (280° F.). In spreading
-and grading, all material must be moved from the pile into which
-it was unloaded. As soon as practicable after the concrete shall
-be graded, the surface shall be thoroughly rolled with a ten-ton
-asphalt roller and the rolling continued until the roller makes no
-further impression on the concrete surface. When completed the
-surface must conform closely to the pavement datum so that there
-will be no depressions or elevations exceeding one-fourth inch above
-or below the pavement datum.</p>
-
-<h3 class='c003'>HYDRAULIC CONCRETE ROADWAY PAVEMENT<a id='r59'></a><a href='#f59' class='c016'><sup>[59]</sup></a></h3>
-
-<p class='c006'><strong>113.</strong> The sub-foundation for hydraulic concrete pavement shall
-be prepared as specified in Section 26.</p>
-
-<p class='c007'><span class='pageno' id='Page_74'>74</span><strong>114.</strong> The pavement shall be constructed in two courses called
-the bottom course and the top course, as hereinafter specified.<a id='r60'></a><a href='#f60' class='c016'><sup>[60]</sup></a></p>
-
-<p class='c007'><strong>115. Bottom Course.</strong>—The bottom course shall be four (4)
-inches in thickness<a id='r61'></a><a href='#f61' class='c016'><sup>[61]</sup></a> and shall be composed of the materials specified
-in Sects. 29, 30, and 31. The concrete shall be composed of
-one part Portland cement, three parts sand and six parts of broken
-stone, and shall be mixed and placed as specified in Sects. 35 and 36,
-but its top surface when properly compacted shall be parallel to
-and not less than two (2) nor more than two and one-half (2½)
-inches below the pavement datum.</p>
-
-<p class='c007'><strong>116. Top or Surface Course.</strong>—The top course shall be composed
-of the Portland cement specified in Sect. 29, the sand specified in
-Sect. 30 except that it shall be especially clean, and the grains
-shall be of such size that at least seventy-five per cent. (75%) of
-the mass will fail to pass a screen having thirty (30) meshes to the
-<span class='pageno' id='Page_75'>75</span>linear inch, and shall be of superior quality for making concrete;
-and of crushed Trap Rock,<a id='r62'></a><a href='#f62' class='c016'><sup>[62]</sup></a> or of stone equally hard, strong and
-durable.</p>
-
-<p class='c007'>The trap rock shall be crushed to such sizes that all will pass
-through a screen having meshes one and one-fourth (1¼) inch
-square and that none will pass through a screen having meshes
-one-half (½) inch square,<a id='r63'></a><a href='#f63' class='c016'><sup>[63]</sup></a> and it shall be free from clay, refuse or
-other foreign substances.</p>
-
-<p class='c007'><strong>117.</strong> The surface-course concrete shall be composed of one part
-Portland cement complying with Sect. 29, one and three-quarters
-(1¾) parts of sand, and, generally, three and one-half
-(3½) parts of crushed stone, but the ratio of crushed stone shall
-be such that in the completed concrete the volume of mortar in
-the compressed mass shall exceed by about fifteen per cent. (15%)
-the voids in the stone.<a id='r64'></a><a href='#f64' class='c016'><sup>[64]</sup></a> The cement and sand shall be thoroughly
-mixed together dry, enough clean water then added to make a
-rather wet mortar and the mixing continued until the materials
-are thoroughly incorporated into a homogeneous mass. The crushed
-stone shall then be added, and the mixing continued until every
-fragment of stone is completely covered with mortar. Sufficient
-water shall be added during the mixing, if necessary, to make a
-“wet” concrete, but not so wet that free water will flow from the
-mixed mass. In handling and adding the stone to the mortar
-care must be taken to prevent the stone segregating into masses
-of different sizes. The concrete for the top course shall be made
-<span class='pageno' id='Page_76'>76</span>with special care and thorough work, the intention being to secure
-a superior quality of concrete.<a id='r65'></a><a href='#f65' class='c016'><sup>[65]</sup></a></p>
-
-<p class='c007'><strong>118.</strong> The concrete thus prepared shall be placed upon the bottom
-course before the latter has begun to set<a id='r66'></a><a href='#f66' class='c016'><sup>[66]</sup></a> and carefully graded
-so that when properly compacted its top surface will coincide with
-the pavement datum. The concrete will then be well rammed by
-rammers having a face of 6 by 6 inches and weighing not less than
-twenty (20) pounds after which the surface will be completed by
-rolling with a power roller of the asphalt type weighing not less than
-five (5) tons.<a id='r67'></a><a href='#f67' class='c016'><sup>[67]</sup></a> All these operations must be completed before any of
-the concrete in either course shall have begun to set. The surface
-shall not be plastered with neat mortar nor shall it be trowelled.</p>
-
-<p class='c007'><strong>119.</strong> The completed surface must coincide with the pavement
-datum to the extent that a properly formed template when applied
-to the surface shall show no departure from the pavement datum
-exceeding three-sixteenths (³⁄₁₆) inch.</p>
-
-<p class='c007'><strong>120.</strong> After the laying of the pavement has been completed it
-shall be allowed to stand until the concrete of both courses shall be
-fully set, which period shall be not less than ten (10) days, or longer, if
-conditions make a longer time necessary, as the engineer may direct,
-of which he shall be the sole judge. During this period the concrete
-shall be kept in a moist condition throughout, by sprinkling with
-hose or otherwise. No travel shall be allowed upon the street until
-the engineer shall open it for public use. The concrete shall not
-be laid during rain storms or when the thermometer is below forty-five
-(45) degrees F., and in case there may be danger from frost the
-whole surface of the concrete shall be covered by straw or hay.
-Manure must not be used for this purpose.</p>
-
-<p class='c007'><strong>121. Expansion Joints.</strong><a id='r68'></a><a href='#f68' class='c016'><sup>[68]</sup></a>—An expansion joint along the curbing on
-each side of the street shall be provided in accordance with Sect. 101.
-<span class='pageno' id='Page_77'>77</span>Expansion joints shall also be provided and constructed as follows:
-Wherever the width of the pavement exceeds twenty (20) feet between
-curbs there shall be a expansion joint along the longitudinal center
-of the street; expansion joints shall also be made, at right angles to
-the street and extending continuously from curb to curb, at distances
-apart not exceeding twenty (20) feet. These expansion joints in the
-body of the pavement shall be made by cutting entirely through both
-courses of concrete along a straight line, using a special straight-edged
-cutter not more than three-sixteenths (³⁄₁₆) inch thick, when
-the concrete is laid in hot weather and not more than three-eighths
-(⅜) inch thick if the concrete is laid when the thermometer is below
-sixty (60) degrees F. The cutting of the expansion joints shall be
-carefully and skillfully done, and after each joint is cut a special T-shaped
-smoother, the stem of which is one inch deep and of the same
-thickness as the cutter shall be worked back and forth in the joint
-until the edge of the concrete adjoining the joint shall be well and
-smoothly compacted. The smoother shall be so formed as to round
-off the corners of the concrete to a circular form having a radius of
-one-fourth (¼) inch. All these operations shall be completed
-before the concrete has begun to set. After the concrete has set and
-before the street is opened to travel all expansion joints shall be
-poured full of bituminous cement, as specified in Section 90.<a id='r69'></a><a href='#f69' class='c016'><sup>[69]</sup></a></p>
-
-<p class='c007'><strong>122. Bituminous Coating.</strong><a id='r70'></a><a href='#f70' class='c016'><sup>[70]</sup></a>—After the concrete shall have become
-fully set as determined by the engineer and before the street is
-<span class='pageno' id='Page_78'>78</span>opened to travel the whole surface of the pavement shall be covered
-by a finishing coat of bituminous road oil as hereinafter specified.</p>
-
-<p class='c007'>The road oil shall be prepared from native asphalt or from a crude
-oil having an asphaltic base. Not less than 95 per cent. of the oil
-shall be soluble in cold carbon di-sulphide, and it shall contain not
-less than thirty (30) per cent. of solid asphalt, nor more than ten per
-cent. of fixed carbon. It shall be of such consistency as to flow freely
-at a temperature of seventy-five degrees (75°) F. The oil shall not
-be applied except when the road surface is perfectly dry and when
-the temperature of the air is not below 60° F.</p>
-
-<p class='c007'>The oil shall be evenly distributed over the whole surface of the
-street at the rate of one-half (½) gallon of oil per square yard of
-surface, and well worked over the surface with squeegees or other
-suitable devices.</p>
-
-<p class='c007'>Not less than twenty-four hours after the application of the oil
-the surface of the pavement shall be evenly covered to a depth of one-fourth
-inch with clean, dry stone screenings or coarse sand, after
-which the street may be opened to travel.</p>
-
-<h3 class='c003'>GENERAL SPECIFICATIONS FOR EXPERIMENTAL OR UNTRIED PAVEMENTS<a id='r71'></a><a href='#f71' class='c016'><sup>[71]</sup></a></h3>
-
-<p class='c006'><strong>123.</strong> Contractors or promoters submitting proposals for the construction
-of new, experimental, or special street pavements, the
-merits of which have not been established by experience in the city
-of&#160;..., must submit with their
-proposal a full and complete set of specifications for the construction
-of the pavement. If contract shall be awarded under said proposal,
-said specifications will be made a part of the contract entered into.
-The Engineer will enforce compliance with these specifications, as
-the construction work proceeds, without assuming or incurring any
-responsibility for the character, quality, serviceability or durability
-of the resulting pavement. But the Contractor shall be subject
-to and shall comply with the requirements and stipulations of Sects.
-1 to 25, inclusive, of these specifications.</p>
-
-<p class='c007'><strong>124. Special Guaranty.</strong><a id='r72'></a><a href='#f72' class='c016'><sup>[72]</sup></a>—Inasmuch as the pavement to be constructed
-<span class='pageno' id='Page_79'>79</span>under the special specifications submitted by the Contractor
-is more or less of an experimental character, having not been heretofore
-used in the city of&#160;... to an extent
-sufficient to establish its value, the Contractor shall be held wholly
-responsible for the utility, serviceability and durability of the pavement
-so constructed; and he shall enter into a guaranty to the effect
-as follows:</p>
-
-<p class='c007'>That the pavement will fulfill all the usual and legitimate requirements
-of a satisfactory roadway pavement upon the street
-upon which it is to be laid.</p>
-
-<p class='c007'>That the pavement will successfully serve and endure the travel
-to which the street may be subjected for a period of&#160;...
-years next following the date of the certificate of its completion and
-acceptance, and shall be in good condition at the end of that period,
-ordinary and reasonable wear and tear, and accidental or other injuries
-not due to defects in the pavement itself, excepted.</p>
-
-<p class='c007'>That the Contractor will, at his own cost, keep the said pavement
-in satisfactory repair during said period of&#160;...
-years, and will leave it in a condition of satisfactory repair at the
-end of that period.</p>
-
-<p class='c007'>That the Engineer, or his successor or successors in office, shall
-be the sole and final judge as to whether the conditions of this guaranty
-shall be, or shall have been complied with.</p>
-
-<p class='c007'>That in case the pavement shall not, in the judgment of the
-Engineer, fulfill the terms and conditions of this guaranty at any
-time during said period of&#160;... years, or upon
-its expiration; or in case the Contractor shall fail to make all or any
-of the repairs that may in the judgment of the Engineer be or become
-necessary during said period of&#160;... years,
-within a reasonable period to be determined by the Engineer, but
-not to be less than twenty (20) days after notice to make such
-repairs has been given him by the Engineer, he (the Engineer) may
-proceed to make or to have made such repairs, or to repave the
-street, in any manner that he may deem necessary or advisable, and
-to charge the cost of such repairs or repavement to the Contractor,
-provided, that the sum or sums so charged against the Contractor
-shall not, in the aggregate, be more than the amount paid to the
-Contractor for the construction of the pavement.</p>
-
-<p class='c007'><strong>125. Bond.</strong>—The Contractor shall give bond with sureties satisfactory
-to the Engineer in a sum not less than the estimated cost of
-the pavement at the contract prices, the term of the bond to extend
-<span class='pageno' id='Page_80'>80</span>over the entire period of&#160;... years, for which the
-pavement is guaranteed.</p>
-
-<p class='c007'><strong>126.</strong> During the said period of&#160;... years the
-Contractor shall, upon being notified by the Engineer so to do, make
-any repairs to the pavement that may become necessary by reason
-of cutting into it for the purpose of constructing or repairing pipes,
-conduits or other underground structures, or street railroad tracks,
-or by reason of accidental or unusual causes, or of any causes other
-than those due, in the opinion of the Engineer, to the failure of the
-pavement to meet and fulfill the terms of the guaranty stipulated
-in Section 124. And for making such repairs the Contractor shall
-be paid the price of&#160;... per square yard for
-the repairs actually so made. Repairs so made shall be subject to
-the terms of the guaranty, stipulated in Section 124, until the expiration
-of the said term of&#160;... years after the date
-of the original certificate of completion and acceptance. In case
-the Contractor shall neglect or fail to make such repairs within a
-period of twenty (20) days after he shall have received notice to do
-so, the Engineer may proceed to make or to have made such repairs,
-and he shall charge to and collect from the Contractor the cost of
-the repairs so made.</p>
-
-<h3 class='c003'>HYDRAULIC CONCRETE COMBINED CURB AND GUTTER<a id='r73'></a><a href='#f73' class='c016'><sup>[73]</sup></a></h3>
-
-<p class='c006'><strong>127.</strong> Hydraulic concrete combined curb and gutter shall be constructed
-in accordance with general plan No.&#160;... attached to
-and made a part of these specifications, but the rise from the gutter
-to the top of the curb may be varied so as to facilitate drainage.<a id='r74'></a><a href='#f74' class='c016'><sup>[74]</sup></a></p>
-
-<p class='c007'><span class='pageno' id='Page_81'>81</span><strong>128. Excavation.</strong>—All excavation required for the curb and gutter
-shall be completed and trimmed to the proper lines as shown by the
-drawing. The drainage trench under the curb and gutter shown on
-the drawing shall have the top width and general form shown in the
-drawing but its depth may be varied to secure proper drainage, as
-the engineer may direct, provided that its depth below the base of
-the concrete shall not be less than nine inches nor more than two
-feet.</p>
-
-<p class='c007'><strong>129. Broken Stone Drainage.</strong><a id='r75'></a><a href='#f75' class='c016'><sup>[75]</sup></a>—After the excavation shall have
-been completed the trench shall be filled up to the level of the base
-of the concrete with sound, durable broken stone, or coarse gravel,
-from which the small fragments shall have been removed by screening
-over a wire screen having openings not less than one inch square.
-The stone or gravel shall be thoroughly tamped in the trench in
-layers not more than six (6) inches thick by the use of rammers
-weighing not less than thirty (30) pounds and having a face area
-not exceeding thirty-six (36) square inches, and its completed top
-surface shall conform truly to the designed base of the concrete.
-These drains shall be connected at suitable intervals with sewers,
-drains or other outlets to keep them free from standing water. The
-trench filling shall be completed at least twenty-five feet in advance
-of placing the forms for the concrete.</p>
-
-<p class='c007'><strong>130. Concrete.</strong><a id='r76'></a><a href='#f76' class='c016'><sup>[76]</sup></a>—The concrete shall be made of one (1) part
-<span class='pageno' id='Page_82'>82</span>Portland cement, one and three-fourths (1¾) parts of sand and
-three (3) parts of crushed stone or clean gravel. The Portland
-cement shall comply in all respects with the requirements of Section
-29 of these specifications.</p>
-
-<p class='c007'>The sand shall be clean, sharp silicious sand made up of grains
-of such size that not more than fifteen per cent. (15%) will pass a
-number thirty (30) sieve. It shall not contain more than five per
-cent. (5%) of clay or loam nor more than two per cent. (2%) of
-organic matter or other refuse. The stone shall be sound, hard,
-durable, and freshly broken, free from clay, loam, organic matter,
-or other impurities. Trap rock or granite will be preferred, but
-limestone, if hard and sound, may be used with the approval of the
-engineer. Only those fragments of the crushed stone that pass a
-screen with openings three-fourths inch square and those that are
-held on a screen with openings one-fourth inch square shall be used
-in the concrete.</p>
-
-<p class='c007'><strong>131. Mixing and Placing Concrete.</strong>—The concrete shall be mixed
-in accordance with Section 35 of these specifications. Very thorough
-mixing will be required.</p>
-
-<p class='c007'>The mixed concrete shall be handled so as to prevent as far as
-practicable any separation or segregation of the stone and mortar.
-When in place it shall be compacted by tamping and where placed
-against forms, forking or other effective means must be used to
-bring mortar to the surface and to secure complete contact between
-mortar and forms, so as to leave a solid, homogeneous and unbroken
-surface when the forms are removed. Where the concrete may not
-be laid against forms, all exposed surfaces must be troweled to a
-true surface conforming accurately to the lines shown by the plans,
-templates and straight-edges being used where necessary.</p>
-
-<p class='c007'><strong>132. Weather.</strong>—Concrete in combined curb and gutter shall
-not be laid in freezing weather nor shall frozen materials be used
-in the work. Completed work must be securely protected from
-frost for at least seven days after it is laid. Any concrete curb
-and gutter that may become frozen within that period shall be wholly
-removed and replaced with new work.</p>
-
-<p class='c007'><strong>133. Expansion Joints.</strong>—The combined curb and gutter shall be
-divided into blocks or panels not more than twelve feet long, by
-clear, open expansion joints perpendicular to the face of the curb,
-<span class='pageno' id='Page_83'>83</span>extending entirely and continuously through the whole mass of
-the concrete. These expansion joints shall be three-eighths inches
-wide and may be formed either by cutting through the completed
-curb and gutter with a suitable tool, or by the use of iron forms
-or partitions, but in either case the corners at the ends of the
-blocks must be made solid and dense and troweled with a suitable
-tool.</p>
-
-<p class='c007'><strong>134. Circular Corners.</strong>—At the intersections of streets, circular
-corners, having a radius equal, generally, to one-fifth of the width
-of the roadway of the narrower street, shall be constructed of the
-same dimensions and quality as on the body of the street, and the
-curb and gutter will be extended along the line of the cross street
-back to the front lot-lines. Properly curved circular curb and gutter
-shall also be constructed at all angles exceeding five degrees in the
-line of the curbing.</p>
-
-<p class='c007'><strong>135. Corner Protection.</strong>—Galvanized steel corner protectors or
-nose-pieces shall be used to protect the upper and outer corner of the
-curb at all circular corners and angles in the street. This steel
-protection may be of any pattern or section procurable in the market
-and approved by the engineer. It shall be firmly anchored and secured
-into the concrete.</p>
-
-<p class='c007'><strong>136. Finishing.</strong>—After the forms have been removed and before
-the concrete has set up too hard to be affected by the brush, the face
-and top of the curb shall be lightly scrubbed by a suitable wire
-brush so as to completely remove any glazed surface and to produce
-a surface of uniform texture and appearance. Dry cement or neat
-cement mortar shall not be used for dressing up exposed surfaces.<a id='r77'></a><a href='#f77' class='c016'><sup>[77]</sup></a></p>
-
-<p class='c007'><strong>137. Forms.</strong>—The forms used may be of dressed lumber or of
-metal as the contractor may prefer. But they shall have sufficient
-strength and rigidity to hold the concrete firmly in place, and to preserve
-the correct dimensions, alignment and levels of the curb and
-gutter.</p>
-
-<p class='c007'><strong>138. Protection.</strong>—The completed curb and gutter shall be protected
-from fracture, deformation or spalling until the concrete has
-fully set. The concrete must be kept moist for at least five days
-<span class='pageno' id='Page_84'>84</span>after it has been laid. Any part of the curb and gutter that shall
-have become injured before it is accepted or the street is opened for
-travel shall be taken up and replaced by the contractor.</p>
-
-<p class='c007'><strong>139. Payment.</strong>—Concrete combined curb and gutter will be paid
-for by the linear foot in place, the measurement to be made along
-the upper and outer corner of the curb. The price per linear foot
-named in the contract will cover all the excavation or grading required
-and all the materials and labor, including all necessary
-forms, for constructing the curb and gutter complete. But the
-crushed stone used for drainage will be paid for by the cubic yard
-measured in place, and steel corner protection will be paid for by
-the linear foot in place, at the prices named in the contract.</p>
-
-<h3 class='c003'>HYDRAULIC CONCRETE SIDEWALKS</h3>
-
-<p class='c006'><i>Note.</i>—These specifications conform to the common practice of laying
-the sidewalk in two courses.</p>
-
-<p class='c007'>In the author’s judgment this is neither necessary nor desirable. He
-believes that it would be better and somewhat cheaper to use a single
-course of concrete four inches in thickness. He suggests for this concrete
-the ratios of one cement, two sand, and three and one-half stone, the latter
-to be crushed to pass a screen with five-eighths inch square openings.</p>
-
-<p class='c007'>Tamping will bring a sufficient quantity of mortar to the surface to
-permit of satisfactory finishing. While the materials for such a single
-course of four inch concrete would cost somewhat more, the saving in
-cost of labor would, at usual prices of material and labor, make the single-course
-construction somewhat cheaper, while the solid four inches of
-richer concrete would make the walk much stronger. In fact, a single
-course of such concrete three inches thick would be sufficient in a great
-majority of cases. While the surface might not have the glazed appearance
-common in the two-course work it would be really better for use—a
-polished and slippery surface on sidewalks is not desirable.</p>
-
-<h4 class='c014'>SPECIFICATIONS<a id='r78'></a><a href='#f78' class='c016'><sup>[78]</sup></a></h4>
-
-<p class='c015'><strong>140.</strong> The hydraulic concrete sidewalk shall be&#160;...
-feet in width and its outer edge shall be&#160;... feet from
-<span class='pageno' id='Page_85'>85</span>the outer face of the street curbing. It shall be constructed with
-two courses of Portland cement concrete as hereinafter specified.</p>
-
-<p class='c007'><strong>141. Excavation and Grading.</strong>—The ground to be occupied by the
-sidewalk shall be excavated or filled to a sub-grade which after being
-compacted shall be&#160;... inches<a id='r79'></a><a href='#f79' class='c016'><sup>[79]</sup></a> below the finished
-surface of the sidewalk. The sub-grade shall be neatly dressed to a
-plane surface sloping downward toward the street one-fourth inch in
-one foot horizontal, and to such longitudinal gradients as the engineer
-may prescribe. The completed sub-grade shall project four (4)
-inches in excavation and eighteen (18) inches in embankment on
-each side beyond the edges of the completed sidewalk. After the
-grading is completed the surface shall be compacted by rolling or
-ramming.</p>
-
-<p class='c007'><strong>142. Drainage Course.</strong>—Upon the sub-grade prepared as specified
-in Section 141 a drainage course composed of broken stone,
-gravel or boiler-plant cinders,&#160;... inches<a id='r80'></a><a href='#f80' class='c016'><sup>[80]</sup></a> in thickness
-shall be laid. Broken stone for this purpose may be of any durable
-stone crushed to such size that all will pass through a screen with two
-inch openings. Crusher-run material may be used unless it contains
-an excessive quantity of fine material. Gravel for the purpose may
-be any sound durable gravel all of which will pass through a two inch
-screen and be retained upon a one-fourth (¼) inch screen. If
-cinders are used they must be good boiler-plant cinders from which
-the ashes have been screened out. The cinders must be thoroughly
-drenched with water at least one week before they are placed in the
-sidewalk.<a id='r81'></a><a href='#f81' class='c016'><sup>[81]</sup></a></p>
-
-<p class='c007'><span class='pageno' id='Page_86'>86</span><strong>143.</strong> This drainage material shall be placed on the sub-grade and
-properly graded. After grading it shall be thoroughly compacted
-by ramming or rolling, and its surface shall be brought to a plane
-parallel to and&#160;... inches below the designed surface
-of the sidewalk, after which the surface inequalities may be leveled
-up with screenings or small gravel.</p>
-
-<p class='c007'>The bottom of the drainage course shall be connected with the
-street drains or sewer inlets by three-inch hard drain pipe at such
-points, not more than three hundred feet apart, as will drain all
-standing water out of the drainage course.</p>
-
-<p class='c007'><strong>144. Concrete, Bottom Course.</strong>—The bottom course of concrete&#160;...<a id='r82'></a><a href='#f82' class='c016'><sup>[82]</sup></a> inches in depth, shall be constructed and placed
-in accordance with Sections 28, 29, 30, 31, 32, 33, 34, 35 and 36
-of these general specifications, except that the maximum size of
-the crushed stone shall not exceed one-half the thickness of the bottom
-course of concrete and the concrete shall be uniformly composed
-of one part Portland cement, three parts sand and six parts of
-crushed stone. Its upper surface shall be brought to a plane parallel
-to and one inch below the designed sidewalk surface.</p>
-
-<p class='c007'><strong>145. Surface or Finishing Course.</strong>—The surface or finishing course
-shall be of concrete, one inch thick, composed of one part Portland
-cement, one and one-half parts sand and two and one-half parts of
-hard, durable stone, crushed to such sizes that all will pass through
-a screen having openings one-half (½) inch square and none will
-pass through a screen having openings one-eighth (⅛) inch square.<a id='r83'></a><a href='#f83' class='c016'><sup>[83]</sup></a>
-This concrete shall be made as specified in Sections 28, 29, 30, 31, 32,
-33, 34, 35 and 36 except in the particulars named in the preceding
-paragraph. Care must be taken to make the mixing very thorough.
-The quantity of water used in this concrete shall be just sufficient
-to make a moderately wet mixture, and care shall be taken
-<span class='pageno' id='Page_87'>87</span>to make the different batches as nearly as practicable of the same
-consistency.</p>
-
-<p class='c007'>The surface concrete shall be spread over the bottom-course concrete
-before the latter has begun to set,<a id='r84'></a><a href='#f84' class='c016'><sup>[84]</sup></a> properly graded, well compacted
-by ramming, and its upper surface brought to the true designed
-plane and surface of the sidewalk by the use of straight-edges
-and troweling,<a id='r85'></a><a href='#f85' class='c016'><sup>[85]</sup></a> after which the surface shall be lightly gone over
-with a wire broom or brush to slightly roughen the surface. The
-finished plane of the sidewalk shall have a transverse downward
-slope toward the street of one-fourth (¼) inch to one foot of horizontal
-width. At no place shall the thickness of the surface-course
-be less than three-fourths of one inch. The outer top corners of the
-sidewalk shall be rounded off with a suitable tool to a radius of three-fourths
-(¾) inch.</p>
-
-<p class='c007'><strong>146. Forms.</strong>—Substantial and suitable forms of wood or iron
-shall be furnished and used by the contractor to support the
-concrete until it is hard set, when they shall be removed at his
-expense.</p>
-
-<p class='c007'><strong>147. Expansion Joints.</strong>—After the laying of both courses of concrete
-is completed expansion joints at right angles to the sidewalk,
-and not more than four (4) feet apart shall be constructed in the sidewalk
-in the following manner: the joint will be located by a line on
-the surface of the sidewalk and a straight-edged cutting tool one-fourth
-(¼) inch thick will be used to cut entirely through both
-courses of concrete, accurately along the line marked out, entirely
-across the sidewalk, after which a T-shaped trowel or tool shall be
-used to smooth and compact the cut surfaces for a depth of one
-inch, and to round off the corners of the sidewalk blocks to a radius
-of one-fourth (¼) inch.<a id='r86'></a><a href='#f86' class='c016'><sup>[86]</sup></a></p>
-
-<p class='c007'>Where the ends of the sidewalk abut against the curbing a clear
-<span class='pageno' id='Page_88'>88</span>expansion joint one and one-fourth (1¼) inches wide shall be
-left between the sidewalk and the curb.</p>
-
-<p class='c007'><strong>148.</strong> After the concrete laying is completed it shall be protected
-from use or injury until the concrete is set hard enough to withstand
-travel, and it shall be kept continuously damp for at least five days
-after the concrete is laid.</p>
-
-<p class='c007'><strong>149. Weather.</strong>—Concrete in sidewalks shall not be laid in freezing
-weather nor shall frozen materials be used in the work. Completed
-work must be securely protected from frost for at least seven days
-after the concrete is laid. Any concrete sidewalk that shall become
-frozen within that period of time shall be wholly taken up and
-replaced with new work, at the expense of the contractor.</p>
-
-<p class='c007'><strong>150. Regrading.</strong>—Directly after the concrete is completed,
-the forms removed, and the work inspected by the engineer, the
-space between the outer edge of the sidewalk and the street curb
-shall be excavated or filled up and dressed to a plane one inch
-below the top of the sidewalk and the top of the street curb; and the
-space on the inner side of the sidewalk shall be graded to a plane
-one inch below and parallel to the surface of the sidewalk for a
-distance of two feet back from the edge of the sidewalk and completed
-with a slope of one and one-half to one to the natural surface
-of the ground. Where this regrading requires filling up the filling
-material, for a depth of four inches from the surface, shall be good,
-rich surface soil.</p>
-
-<p class='c007'><strong>151.</strong> Should any defects due to faulty material or workmanship
-develop in the sidewalk within one year after the completion of
-the same the contractor shall repair or reconstruct all such defective
-places at his expense, doing the work in accordance with these
-specifications.</p>
-
-<p class='c007'><strong>152. Measurement and Payment.</strong>—Concrete sidewalk will be
-measured and paid for by the square foot of completed sidewalk
-surface, and the unit price per square foot shall cover the entire
-cost of the work, including grading, drainage work, all material
-and labor, forms, and the regrading or dressing up after the completion
-of the concrete work; except that the drain pipe used will be
-paid for per linear foot at the price named in the contract which
-price shall cover the cost of furnishing and putting the pipe in
-place complete.</p>
-
-<div class='chapter'>
- <span class='pageno' id='Page_89'>89</span>
- <h2 class='c005'>PART II<br /> <span class='large'>INSTRUCTIONS TO INSPECTORS ON STREET PAVING WORK</span></h2>
-</div>
-
-<div>
- <span class='pageno' id='Page_91'>91</span>
- <h3 class='c003'>INTRODUCTORY NOTE</h3>
-</div>
-
-<p class='c006'>Any general code of instructions for inspectors on street paving
-work must necessarily be little more than tentative or suggestive, as
-applied to any one city.</p>
-
-<p class='c007'>That here presented is intended for use in connection with the
-specifications in Part I of this book. Different specifications might
-make necessary many changes in the instructions that follow. The
-local or special conditions in any city might also make them inapplicable
-without material modifications and additions.</p>
-
-<p class='c007'>The author believes that in every city where considerable street
-pavement work is prosecuted and a number of inspectors employed
-on such work, some such code of instructions to inspectors should be
-formulated and used. Even where the inspectors are of high character
-and fully competent, the adoption of a system of rules and regulations
-relating to their work will tend to unify procedure, prevent
-misunderstandings and promote good discipline.</p>
-
-<p class='c007'>The preparation of such a code of instructions requires no little
-time and thought, especially where there are no precedents to suggest
-what is needed, or to be used as rough patterns. It is with the
-hope that the code here presented may be found useful in this way,
-even though it may be not appropriate for adoption in any given
-city, that it is offered to municipal engineers.</p>
-
-<h3 class='c003'>GENERAL REMARKS ABOUT INSPECTION AND INSPECTORS</h3>
-
-<p class='c006'>The necessity of having competent and honest inspectors upon
-any public work during its construction need not be here argued. It
-is generally understood and recognized in the case of work carried
-out by contract. Where the contractor is incompetent, careless or
-unreliable, inspection is absolutely necessary if good work is to be
-secured. Even where the contractor thoroughly understands his
-business and intends to faithfully comply with the specifications and
-to do all his work in a proper manner, the inspector cannot safely
-be dispensed with. The contractor cannot at all times be on
-the work; whatever may be his intention and instructions, foremen
-and laborers cannot be depended upon to exercise the proper
-<span class='pageno' id='Page_92'>92</span>care and judgment, even where they have no inclination, motive
-or interest to do otherwise, which is not always the case. It seems
-to be deeply and almost irradicably fixed in the mind of the average
-foreman on municipal work that he is expected to show his ability
-and skill by evading or circumventing the strict requirements of the
-specifications and the watchfulness of the municipal agents, whatever
-his employer may <i>say</i> to the contrary. Even when fairly careful,
-honest and conscientious he may need friendly oversight. He is
-naturally and properly anxious to save all the money he can for his
-employer, whether from a desire to loyally serve that employer’s
-interest, or to enhance his reputation for doing work cheaply. He
-may not appreciate the importance of minor requirements of the
-specifications and may believe they can be ignored without real
-detriment to the utility of the completed work. Like other men he
-may sometimes be careless or forgetful, however good his intentions.</p>
-
-<p class='c007'>These human qualities are not confined to foremen on <i>contract</i>
-work. They are liable if not likely to be found in the foremen on
-work done for the municipality by the direct, or day’s work system.
-They may be encouraged by the impression or belief that they will
-not be held by the municipal authorities to as strict an observance or
-accountability as they would be if the work were being done by a
-contractor—which is too often true. The absence of some of the
-motives of foremen employed by contractors is, therefore, not a
-sufficient reason for dispensing with inspectors on work done by the
-city direct.</p>
-
-<p class='c007'>It should be trite to say that inspectors should be chosen with
-some regard to their qualifications for the work they are expected to
-do. One cannot, of course, expect to secure experts for such positions
-at the rate of compensation usually paid; but it is reasonable
-to require that an appointee to such positions shall possess the following
-qualifications:</p>
-
-<p class='c007'>That he shall be honest, trustworthy and loyal.</p>
-
-<p class='c007'>That he shall be a man of at least average intelligence and common
-sense.</p>
-
-<p class='c007'>That he shall have some practical knowledge of or experience in
-the work he is employed to inspect.</p>
-
-<p class='c007'>That he shall be a man of good personal habits.</p>
-
-<p class='c007'>That he shall be habitually punctual, industrious, and alert, and
-shall possess a fair share of that quality commonly called “backbone.”</p>
-
-<p class='c007'>It will not, I am sure, be denied that a very large number of the
-<span class='pageno' id='Page_93'>93</span>inspectors found upon municipal public work fall short in one or more
-of these qualifications.</p>
-
-<p class='c007'>Inspectors who habitually expect or accept compensation or gratuities
-from the contractor violate the first requirement, and their
-number is astonishingly large. These are useless, or worse than useless,
-to the municipality. There are not a few contractors who will
-take advantage of the presence on the work of such inspectors to do
-things that they would not do if thrown wholly on their own honor
-and responsibility. Contractors can hardly be blamed for expecting
-some compensation for the money thus exacted or accepted by the
-inspector from them.</p>
-
-<p class='c007'>The requirement that the appointee shall have some practical
-knowledge of and experience in the work he is expected to do,
-while often disregarded, is of real importance. Good workmanship
-embraces many small details that are essential, and inferable from
-the specifications, but cannot be stated at length therein, and the
-inspector should have a good working knowledge of these.</p>
-
-<p class='c007'>Unfortunately, large numbers of inspectors are employed for
-personal or political reasons, or because more competent men are
-not available. They know little or nothing from practical knowledge
-and experience about the work they are assigned to inspect. Efficient
-service cannot be expected from such, even if they possess
-the other necessary qualifications. The obvious remedy, where a
-sufficient number of qualified inspectors cannot be obtained at
-call, would be to train up a permanent force by having the promising
-tyros serve a sufficient apprenticeship under older and more experienced
-inspectors; but this is seldom done.</p>
-
-<p class='c007'>Inspectors, whether appointed by the engineer in charge or not,
-should be absolutely under his control, including the power of
-dismissal without unnecessary formalities. Where they are under
-civil service regulations and can be dismissed only upon charges
-and after a hearing before some third person, the obstacles in the
-way of promptly getting rid of an incompetent or unfaithful inspector
-are often so great as to be discouraging if not deterrent. He may
-be clearly below a reasonable standard of honesty or efficiency but
-it may be very difficult to formulate distinct charges and support
-them with positive evidence. Thus, one may be morally certain
-that an inspector is accepting gratuities from a contractor, but
-unable to prove it by legal evidence. If in such cases the judgment
-and integrity of the responsible engineer cannot be trusted, he is
-not fit, himself, for the position he occupies.</p>
-
-<p class='c007'><span class='pageno' id='Page_94'>94</span>The question of how much authority and power shall be given
-to the inspector is always a troublesome one. If he be too much
-limited or restricted, he cannot properly discharge his duties or
-command the necessary respect from the contractor and his employees;
-if he be given too much authority and is disposed to be arbitrary
-or unreasonable, the contractor may be unjustly treated. So far
-as the definite requirements of the specifications are concerned there
-can usually be no room for going astray, but in the numberless
-little details not specifically covered in the specifications, or where
-their language and intent is not clear, differences and disputes may
-result which require a degree of knowledge and judgment that the
-inspector may not possess, and where his decisions might be against
-the interests of the municipality or unjust to the contractor. In
-such cases the matter should always be referred to the engineer
-or his assistant.</p>
-
-<p class='c007'>Where inspectors are employed upon work done directly by the
-municipality the relation between them and the superintendent
-or foreman should be clearly defined and understood. Briefly
-stated, this relation should be the same as that between the inspector
-and the contractor on contract work.</p>
-
-<h3 class='c003'>INSTRUCTIONS FOR THE GUIDANCE OF INSPECTORS ON STREET PAVING AND INCIDENTAL WORK</h3>
-<h4 class='c014'>GENERAL</h4>
-
-<p class='c015'><strong>1.</strong> The chief duty of the inspector is to see that the work to which
-he is assigned shall be carried out in full and strict accordance with
-the plans and specifications therefor, and with such additional
-instructions as may from time to time be given by the engineer.</p>
-
-<p class='c007'><strong>2.</strong> These instructions are intended to supplement but in no case
-to take the place of the specifications for the work, which must be
-fully and strictly complied with, unless they are changed or modified
-by the engineer.</p>
-
-<p class='c007'><strong>3.</strong> Wherever the words “<i>the engineer</i>” are used in these instructions
-they refer to the chief engineer in charge of the work for the
-municipality, or his authorized deputies or agents.</p>
-
-<p class='c007'>Wherever the words “<i>the contractor</i>” are used they refer to the
-person, or firm, or corporation under contract to perform the work
-to which you are assigned, or his agents or employees engaged upon
-the work.</p>
-
-<p class='c007'><span class='pageno' id='Page_95'>95</span><strong>4.</strong> You will report to and be under the exclusive direction and
-control of the engineer.</p>
-
-<p class='c007'><strong>5.</strong> Upon being assigned to any work you will obtain copies of
-the plans and specifications under which it is to be done, and will
-carefully read and acquaint yourself with all their provisions and
-requirements. If any part of these plans and specifications are not
-clearly understood by you, you will ask the engineer for explanations
-and instructions, and will be governed thereby. Failure to understand
-or to be familiar with the plans and specifications will in no
-case be accepted as an excuse for not complying with and enforcing
-them.</p>
-
-<p class='c007'>You will also obtain, study and familiarize yourself with all the
-blank forms, reports, etc., that are to be used by you on the work,
-so that they may be correctly utilized; you will also obtain a proper
-supply of such apparatus, tools, stationery, etc., as you will need
-upon the work.</p>
-
-<p class='c007'><strong>6.</strong> In inspecting any work done under contract you are to assume
-that the contractor is bound to carry out in good faith the plans and
-specifications attached to his contract, and that he may be, and must
-be, held to a strict compliance with them unless you receive instructions
-to the contrary from the engineer. You will be held responsible
-for the enforcement of these plans and specifications so far as
-they relate to the doing of the work.</p>
-
-<p class='c007'><strong>7.</strong> In case the contractor or his agents shall neglect or refuse to
-comply with the plans and specifications or to perform the work in
-a proper manner, or in accordance with the instructions of the engineer,
-you will direct him to suspend the particular work in fault
-and will report all the facts promptly to the engineer and await his
-instructions, which, when received, you will proceed to enforce.</p>
-
-<p class='c007'><strong>8.</strong> You will be expected to be upon the work at all times when
-work is in progress, whether during ordinary working or office hours,
-or not. But in case the contractor shall work continuous day and
-night forces, or otherwise so conduct the work as to require the presence
-of an inspector for unusual or unreasonable hours of service,
-you will notify the engineer and ask instructions or assistance. If
-for any reason you are to be unable to be present whenever work is
-in progress you will promptly notify the engineer in time to enable
-him to supply a substitute.</p>
-
-<p class='c007'><strong>9.</strong> All reports and records required of you by the engineer must
-be promptly made up and forwarded to him at the time and in the
-manner he may direct. You will promptly acknowledge in person
-<span class='pageno' id='Page_96'>96</span>or writing any instructions received from the engineer and in case
-such instructions are not clearly understood by you, you will ask
-for explanation or advice.</p>
-
-<p class='c007'>You will keep a notebook or diary in which all occurrences or
-matters of interest relating to the work will be recorded each day,
-which book will be delivered to the engineer on the completion of
-the work, or whenever your connection therewith may end. All
-diaries, notebooks and records kept on the work are the property
-of the city.</p>
-
-<p class='c007'><strong>10.</strong> While your first duty is to see that the work is done in accordance
-with the plans and specifications, you will, so far as consistent
-with this duty, be considerate of the interests of the contractor and
-facilitate his work as much as practicable. Materials should be
-inspected promptly upon delivery and in such a manner as not to
-delay or discommode the contractor more than is necessary. Errors,
-defects or delinquencies in the work should be detected and called
-attention to promptly, so as to avoid tearing up and re-construction
-as far as practicable.</p>
-
-<p class='c007'><strong>11.</strong> Orders and instructions should be given to the contractor or
-his foremen or representatives on the work and not to the laborers,
-unless in urgent cases.</p>
-
-<p class='c007'><strong>12.</strong> You shall not at any time, before, during, or after the completion
-of the work, ask or accept from the contractor or any of his
-agents or employees, or from any other person whom you may have
-reason to believe is acting for the contractor, any money, gifts,
-gratuities or other considerations of value, whether as compensation
-for services rendered him or otherwise. The penalty for violation
-of this rule will be dismissal from the service followed by such
-legal prosecution as the engineer may direct. This rule does not
-apply to the ordinary small courtesies common between gentlemen
-associated in business.</p>
-
-<p class='c007'><strong>13.</strong> It is a condition of your employment that your services shall
-be loyal to the interests of the municipality, efficient, and satisfactory
-to the engineer, and that whenever in his opinion your
-service falls short of this standard he may dismiss you at any time,
-without previous notice.</p>
-
-<h3 class='c003'>STREET PAVING WORK</h3>
-
-<p class='c006'><strong>14. Sub-foundation.</strong>—The usual procedure in preparing the sub-foundation
-for a pavement is:</p>
-
-<p class='c007'>The removal of the old pavement if one exists on the street.</p>
-
-<p class='c007'><span class='pageno' id='Page_97'>97</span>The setting of new or the resetting of the old curbing. (If concrete
-combined curb and gutter is used it is not constructed until
-after the rough grading is done.)</p>
-
-<p class='c007'>The rough grading of the street.</p>
-
-<p class='c007'>The fine grading of the street.</p>
-
-<p class='c007'>In this work the main things for the inspector to look after are
-the following:</p>
-
-<p class='c007'>If an old pavement is to be taken up and any part of it is to be
-reserved for use by the city, see that the material is not injured in
-handling and is disposed of as the specifications or the instructions
-of the engineer require.</p>
-
-<p class='c007'><strong>15. Curbing.</strong>—New curb stone should be inspected as soon as
-practicable after it is delivered on the street so that the contractor
-may have time to replace any that may be rejected. Rejected
-stones should be plainly marked on their tops with red paint, and
-the contractor required to remove them from the street. Stones
-that are defective in dressing should be given some distinctive mark
-and the attention of the contractor called to them so that the
-necessary redressing may be done well in advance of the setting,
-and reinspected.</p>
-
-<p class='c007'>If the old curb stone is to be redressed and reset, it should be
-inspected as soon as possible after it is taken out and all stones that
-are not suitable for re-use rejected and removed from the work.
-The redressing of the stones should be looked after carefully. The
-tendency in this work is toward the use of old stones that do not,
-or cannot be made to comply with the specifications, and toward
-laxity in the dressing.</p>
-
-<p class='c007'><strong>Setting Curbing.</strong>—In the setting of curbing the points to be
-looked after are:</p>
-
-<p class='c007'>To see that the trenches are excavated to the full dimensions so
-as to provide space for the use of the full quantity required of concrete,
-gravel or broken stone in which the curb is to be embedded.</p>
-
-<p class='c007'>To see that the stones are set to true grade and alignment.</p>
-
-<p class='c007'>That the concrete, gravel or crushed stone used is of the proper
-quality, the proper quantity used, and that it is placed and compacted
-so as to fill the spaces designated under and around the
-stone. The tendency of the workmen is to treat these details as
-unimportant and to slight the work.</p>
-
-<p class='c007'>After the curbing is set any spaces between it and the edge of the
-sidewalk are to be cleaned out, filled and trimmed with Portland
-cement mortar.</p>
-
-<p class='c007'><span class='pageno' id='Page_98'>98</span><strong>16. Rough Grading.</strong>—If plows and scrapers are used in the rough
-grading, see that they are not allowed to penetrate or to disturb
-the natural soil below the true grade, and to prevent this it is better
-to require that the plowing and scraping shall not approach nearer
-than one or two inches to the true grade.</p>
-
-<p class='c007'>If embankment or filling is necessary, the filling material must
-be deposited in regular layers not more than six inches deep and
-each layer must be well compacted by rolling or ramming before
-the next layer is applied.</p>
-
-<p class='c007'><strong>17. Fine Grading.</strong>—The fine grading (with pick or mattock and
-shovel), to bring the sub-grade to the true grade and contour required,
-should be done with reasonable accuracy and care. Allowance
-must be made for compression under the roller, so that when
-completed the surface shall not vary more than half an inch below
-nor more than a quarter of an inch above the true grade, in order
-that room for the full thickness of concrete foundation may be provided,
-and no more. Humps, depressions and irregularities of the
-surface are to be avoided. The fine grading will be completed by
-thoroughly rolling or tamping the surface to make the soil firm and
-dense. On some soft or wet, clayey soils, excessive rolling may produce
-a plastic or “liver-like” condition and the rolling should be
-discontinued where such a tendency appears.</p>
-
-<p class='c007'><strong>18. Work Incidental to Grading.</strong>—Where it is a part of the contractor’s
-work to reconstruct or readjust catch basins, manholes,
-covers, and other structures, he should be required to keep this
-work done well in advance of the laying of the concrete foundation.
-If this work is delayed until after the main body of the concrete
-is in place, leaving openings to be filled later, hurriedly and
-perhaps carelessly, it may result in weak patches in the concrete
-around these structures, where, in fact, the concrete should be
-strongest.</p>
-
-<h4 class='c014'>CONCRETE FOUNDATIONS</h4>
-
-<p class='c015'><strong>19.</strong> The concrete foundation of a pavement is a most important
-part of the work, and must not be slighted in any way.</p>
-
-<p class='c007'><strong>20. Quality of Materials.</strong>—The quality of the materials used for
-making the concrete are fully described in the specifications, and they
-must be substantially and uniformly adhered to.</p>
-
-<p class='c007'>The Portland cement delivered on the street will presumably have
-been previously inspected and accepted by the engineer, but any
-change in the kind, or brand, or apparent quality of the cement delivered
-<span class='pageno' id='Page_99'>99</span>after the beginning of the work should not be permitted without
-the approval of the engineer. Barrels or bags of cement not
-plainly marked with the brand, or name of the manufacturer must be
-rejected. You will frequently make balls of stiff mortar from the
-cement and sand used (1 part cement, 2 parts sand) and set them
-aside for observation. If in eight hours these balls do not set up
-hard the fact should be promptly reported to the engineer.</p>
-
-<p class='c007'>The sand and stone will naturally vary slightly from time to time,
-but should not differ materially from the requirements of the specifications
-or the standards adopted by the engineer. Stone or gravel
-that contains any considerable quantity, say more than 5%, of
-foreign matter, such as soil or refuse, should be rejected. Stone
-containing an excessive quantity of fine fragments or screenings
-bunched together in the pile, should be mixed with the mass of
-larger stone before it is used, so as to produce a mass of fairly even
-composition. Stone that is coated with mud, or that is not sound
-and hard should be thrown out.</p>
-
-<p class='c007'>Sand that is moderately coarse and does not contain more than
-7½% of clay or soil, and is free from vegetable refuse, may be used.</p>
-
-<p class='c007'><strong>21. Storing Materials.</strong>—Cement stored on the street must be
-stacked up on dry lumber floors at least four inches from the ground
-and effectually covered to protect it from rain or snow. Packages of
-cement which, when turned out for use contain hard lumps should be
-rejected.</p>
-
-<p class='c007'>Sand and stone must be stored on tight lumber floors to prevent
-their admixture, when being shoveled up, with street soil or other
-impurities. This requirement must be enforced.</p>
-
-<p class='c007'><strong>22. Proportioning Concrete.</strong>—The proportions of cement, sand
-and stone or gravel named in the specifications must be strictly
-adhered to.</p>
-
-<p class='c007'>A barrel of Portland cement will be considered as four cubic
-feet and a standard bag of cement as one cubic foot.</p>
-
-<p class='c007'>It is usual for the contractor to measure the sand and stone by
-wheelbarrow loads. In that case you will measure and determine
-the capacity, in cubic feet, of the convenient or average wheelbarrow
-load, and determine the size and number of loads each of sand and
-stone required for one batch of concrete (if made by hand) and thereafter
-see that the quantities thus determined are used, and the wheelbarrow
-loading uniform. To measure the contents of a wheelbarrow
-load, use a square box holding one cubic foot. It cannot be
-accurately measured on the barrow.</p>
-
-<p class='c007'><span class='pageno' id='Page_100'>100</span>As a check upon the proportioning of materials, you should occasionally
-keep a record of the quantities of cement, sand and stone
-used for, say, one or two hours, and mark and measure up the quantity
-of concrete made with them, and from this data compute the
-ratios of the materials used. (In ordinary street concrete, proportioned
-1:3:6, the volume of rammed concrete made will just about
-equal the volume of the stone used.)</p>
-
-<p class='c007'>Where the concrete is mixed by a machine with automatic feeding
-devices, reliance must not be placed upon the machine for proper
-proportioning. Frequent tests of the materials used and the volume
-of concrete turned out should be made as described above, and any
-necessary corrections made in the feeding devices of the machine.
-This test should be made daily if practicable. The eye will usually
-detect any material change in the composition of the concrete, and
-whenever such changes are observed the composition ought to be at
-once checked up by measurement.</p>
-
-<p class='c007'><strong>23. Mixing Concrete.</strong>—See that the specifications are followed.
-Use sufficient water to make what is commonly called a wet concrete
-but not so wet that free water will drain from the mixed batch
-before ramming. The test for proper mixing will be that all the
-fragments of stone are completely covered with mortar.</p>
-
-<p class='c007'><strong>24. Placing Concrete on Street.</strong>—All concrete must be placed
-and rammed before it begins to stiffen or set. Concrete should be
-so handled that the mortar will segregate or separate from the
-stone as little as possible. When in place on the street it should
-make a mass of uniform consistency and appearance. The concrete
-should, as soon as placed on the street, be graded to a proper thickness
-and surface, and then well compacted by ramming. Insist
-on good ramming; this part of the work is not often properly done.
-The surface of the concrete should be brought to the true grade
-by proper grading and tamping. Where necessary to raise the
-surface, additional concrete, made of small stone, may be applied
-during the tamping. Neat mortar should not be used for this
-purpose. Sweeping mortar over the surface with street brooms
-should not be permitted—it is useful only to cover up defects and
-to produce an extra smooth surface (which is not usually desirable).
-To measure the thickness of the bed of concrete, lay a straight-edge
-upon the surface with the end of the straight-edge projecting a
-foot or two beyond the edge of the concrete, and measure the space
-from the lower edge of the straight-edge down to the sub-foundation.</p>
-
-<p class='c007'>Care must be taken to finish the surface of the completed concrete
-<span class='pageno' id='Page_101'>101</span>at the proper distance below and truly parallel to the grade and contour
-of the finished pavement. This is more important in the case
-of sheet asphalt pavements, since irregularities in the concrete will
-cause variation in the thickness of the finished asphalt surface,
-which will affect the durability of the pavement. The grade
-stakes for the concrete should therefore be carefully set and worked
-to, and humps or depressions between the stakes should be avoided.</p>
-
-<p class='c007'><strong>25.</strong> In hot, dry, weather the concrete must be kept damp by
-watering it until it is at least five days old, and horse-travel over it
-must be prohibited until it has set up hard enough not to be injured
-thereby.</p>
-
-<p class='c007'><strong>26. Old Paving Stone Foundations.</strong>—If a foundation is to be
-made of old paving stone blocks reset, the important points to be
-looked after are,</p>
-
-<p class='c007'>The preparation of the sub-foundation.</p>
-
-<p class='c007'>The sand bed.</p>
-
-<p class='c007'>The setting of the blocks.</p>
-
-<p class='c007'>The grouting of the blocks.</p>
-
-<p class='c007'>The sub-foundation should be prepared, where necessary, as
-stipulated in Sects. 16 and 17 of these instructions. This part of
-the work is likely to be carelessly done unless proper work is insisted
-upon.</p>
-
-<p class='c007'>The sand used as a cushion course must be of good quality and
-reasonably clean. The use of mixed sand and soil taken from the
-street excavation should not be permitted.</p>
-
-<p class='c007'>The blocks, after being cleaned from adhering dirt, should be
-set with reasonable care, well bedded in the sand cushion, and laid
-at such an elevation below the completed pavement surface, that
-after being well rammed, the surface will be at the proper elevation
-below the pavement datum.</p>
-
-<p class='c007'>The grouting of the joints is the most important part of the work.
-See that the mortar is made and used in accordance with the specifications,
-and that the joints are completely filled.</p>
-
-<p class='c007'><strong>27. Broken Stone Foundations.</strong>—The specifications for broken
-stone foundations are sufficiently explicit, and compliance should
-be insisted upon. Thorough rolling is especially important.</p>
-
-<h4 class='c014'>SHEET ASPHALT PAVEMENTS</h4>
-
-<p class='c015'><strong>28.</strong> The manufacture of the mixture for sheet asphalt pavement,
-and the laying of it on the street, involve a number of separate
-elements or operations. The quality and durability of the pavement
-<span class='pageno' id='Page_102'>102</span>will depend largely upon the skill, intelligence and accuracy
-with which each and all parts of the work are carried out. The
-inspector, both at the mixing plant and on the street, must give
-constant and intelligent attention to the work.</p>
-
-<p class='c007'><strong>29. Inspecting at Paving Plant.</strong>—Inspectors at the plant where
-the asphalt paving mixture is made will be provided with the following
-apparatus:</p>
-
- <dl class='dl_1'>
- <dt>1</dt>
- <dd>nest of standard sieves, Nos. 10, 30, 50, 80, 100 and 200
- </dd>
- <dt>2</dt>
- <dd>thermometers for sand
- </dd>
- <dt>1</dt>
- <dd>tank thermometer
- </dd>
- <dt>2</dt>
- <dd>standard flow-plates and one dozen cartridges for same
- </dd>
- <dt>1</dt>
- <dd>balance for weighing sand
- </dd>
- <dt>6</dt>
- <dd>dishes, glass or porcelain, 4 inches in diameter.
- </dd>
- </dl>
-
-<p class='c007'><strong>30.</strong> The more important things for the Plant Inspector to watch
-during the manufacture of asphalt paving mixture are:</p>
-
- <dl class='dl_1'>
- <dt><i>a.</i></dt>
- <dd>Quality and grading of the sand.
- </dd>
- <dt><i>b.</i></dt>
- <dd>Temperature of heated sand.
- </dd>
- <dt><i>c.</i></dt>
- <dd>Uniform quality of the refined asphalt and flux.
- </dd>
- <dt><i>d.</i></dt>
- <dd>Temperature of melted bitumens.
- </dd>
- <dt><i>e.</i></dt>
- <dd>Uniform consistency of asphaltic cement.
- </dd>
- <dt><i>f.</i></dt>
- <dd>Correct ratios of sand and asphaltic cement.
- </dd>
- <dt><i>g.</i></dt>
- <dd>Thorough mixing of materials.
- </dd>
- </dl>
-
-<p class='c007'><strong>31. Sand.</strong>—The general quality and grain-size of the sand, required
-by the specifications, must be closely watched and adhered to.</p>
-
-<p class='c007'>It is hardly ever possible to secure a natural sand that will conform
-strictly to the theoretical composition, but <i>substantial</i> compliance
-should be required unless the Chief Engineer directs otherwise.
-After any sand has been approved for a given contract or
-street, all the sand thereafter used for that street should conform
-closely to the standard so approved; for any material change in
-the quality of the sand will change the quality of the pavement produced,
-unless the proportions of the other materials are changed
-accordingly. Any material change in the sand should therefore be
-promptly reported to the Chief Engineer.</p>
-
-<p class='c007'><strong>32.</strong> Sand for the sieve tests should be taken from the hot-sand
-box and allowed to become cold. From the sample thus taken,
-weigh out 50 grams. Arrange the nest of sieves with the No. 200
-at the bottom followed by Nos. 100, No. 80, No. 50, No. 30 and
-No. 10 at the top.</p>
-
-<p class='c007'>Place the weighed sample upon the No. 10 sieve and thoroughly
-shake the nest until all the sand that will, has passed through the
-<span class='pageno' id='Page_103'>103</span>various sieves; then weigh the various portions, beginning with that
-which has passed the No. 200 (deducting in each case the weight of
-the dish). The portion <i>remaining</i> on the No. 200, is the quantity
-<i>passing</i> the No. 100, etc. The sum of all these portions should be 50
-grams, though it will usually be slightly less because of unavoidable
-waste. In use, keep the sieves clean and as free as possible from
-adhering grains by using a bristle brush.</p>
-
-<p class='c007'><strong>33. Temperature of the Sand.</strong>—The temperature of the heated
-sand should be frequently noted by plunging the thermometer into
-the mass. It should not fall below 315° F. nor exceed 375° F. It is
-very important to avoid over-hot sand, because, in the mixer, the
-very thin films of bitumen covering the hot-sand grains are readily
-and quickly scorched by the excessive heat in the sand.</p>
-
-<p class='c007'><strong>34. Refined Asphalt and Fluxing Oil.</strong>—Unless otherwise notified
-by the Chief Engineer you will assume that the stock of refined
-asphalt on hand at the beginning of the work has been inspected and
-is satisfactory. You will, however, note the appearance of the
-material and the character and marking of the barrels or packages,
-and will not permit the use of any new shipments of materials of
-different appearance or brand without authority from the Chief
-Engineer. The above instructions apply also to the oil used for
-fluxing.</p>
-
-<p class='c007'><strong>35. Ratio of Asphalt and Flux.</strong>—You will frequently note and
-record the weight of asphalt and of flux used in charging the melting
-tanks.</p>
-
-<p class='c007'><strong>36. Temperature in Melting Tanks.</strong>—The melting kettles are
-usually equipped with fixed thermometers, but their reading should
-be frequently checked with your detached tank thermometer. You
-will see that the temperatures in the kettles are kept within the limits
-named in the specifications. See that the melted asphaltic cement
-is kept constantly agitated as required by the specifications.</p>
-
-<p class='c007'><strong>37. Uniformity of Asphaltic Cement.</strong>—It is very important that
-the asphaltic cement shall be of uniform composition and consistency,
-or hardness.</p>
-
-<p class='c007'>When the composition and consistency of the asphaltic cement to
-be used for the surface-course of any street has been determined
-upon and approved by the engineer, you will take out and preserve
-a sufficiently large quantity to be used thereafter as a standard, and
-each subsequent tank of cement, before it is used, should be tested
-by comparing it with this standard in the following manner, using
-the flow-plate apparatus:</p>
-
-<p class='c007'><span class='pageno' id='Page_104'>104</span>Melt and fill two cartridges with the standard cement, and two
-with the cement to be tested, marking them for identification.
-When cold, carefully remove with a wetted dull knife any surplus
-cement from the ends of the cartridges so as to leave them exactly
-full and the metal ends clean. Immerse them in cold water until
-they are all of the same temperature. Then place and fasten these
-filled cartridges on the grooved plate with their lower ends exactly
-to the zero line on the plate, the standard samples alternating with
-the new. Then place the plate, at an inclination of about 45°, in
-front of a source of uniformly distributed heat, as, for instance, near
-a steam boiler or large steam pipe, or (when the weather is favorable)
-in the sunshine, facing the sun. Leave the plate in this position until
-the bitumen in the cartridges shall have melted and flowed down
-the grooves an average of from four to five inches. Then measure
-the lengths of flow of each from the zero line on the plate. If the
-average flow of the new samples differs more than 5 per cent. from
-that of the standards, the new cement should be regarded as unsatisfactory
-and should be corrected by adding more asphalt or flux,
-as may be required.</p>
-
-<p class='c007'>(If a <i>penetration apparatus</i> is supplied or is available, the penetration
-method may be used instead of this flow-method for determining
-the consistency of the cements. Proper instructions for
-its use will accompany the apparatus.)</p>
-
-<p class='c007'><strong>38. Ratio of Sand and Cement.</strong>—When the proper ratio of sand
-and asphaltic cement has been determined for any street you will
-see that this ratio is carefully adhered to. The correctness of the
-weighing scales used should be frequently tested.</p>
-
-<p class='c007'><strong>39. Mixing.</strong>—When the sand and asphaltic cement are properly
-mixed the appearance of the mass will be perfectly uniform throughout,
-with every grain of sand entirely and evenly coated with cement.
-The mixing should, however, be continued somewhat beyond the
-attainment of this condition, so as to insure thoroughness. After
-the proper result has been arrived at, either the <i>time</i> in the mixer,
-or the <i>number of revolutions</i> of the mixer shaft should be noted and
-the standard thus determined substantially adhered to thereafter.
-With the standard mixers commonly used, the hot sand and the
-filler (dust) should first be put into the mixer and mixed for about
-fifteen seconds; then the asphaltic cement added and the mixing
-continued as long as necessary (in the usual mixer not less than sixty
-seconds).</p>
-
-<p class='c007'><strong>40. Records.</strong>—You will keep complete records of the results of
-<span class='pageno' id='Page_105'>105</span>your observations and tests in a book which will be provided for the
-purpose, and will make such reports to the Engineer as he may direct.</p>
-
-<p class='c007'><strong>41. Inspection on the Street.</strong>—The leading things to be kept in
-mind by the street inspector, in the laying of asphalt pavement on
-the street, are the following:</p>
-
- <dl class='dl_1'>
- <dt><i>a.</i></dt>
- <dd>Temperature of mixtures when applied to the street.
- </dd>
- <dt><i>b.</i></dt>
- <dd>Proper preparation of the street surface before material is laid.
- </dd>
- <dt><i>c.</i></dt>
- <dd>Laying and rolling of the binder-course.
- </dd>
- <dt><i>d.</i></dt>
- <dd>Laying of the surface-course.
- </dd>
- <dt><i>e.</i></dt>
- <dd>Rolling the surface-course.
- </dd>
- </dl>
-<p class='c007'><strong>42. Inspector’s Equipment.</strong>—The inspector will be supplied with
-the following apparatus:</p>
-
- <dl class='dl_2'>
- <dt>1</dt>
- <dd>armored thermometer reading from 200° F. to 500° F.
- </dd>
- <dt>1</dt>
- <dd>graduated spatula.
- </dd>
- <dt>1</dt>
- <dd>twelve-foot straight-edge.
- </dd>
- <dt>1</dt>
- <dd>fifty-foot tape line.
- </dd>
- </dl>
-
-<p class='c007'><strong>43. Temperature of Mixture.</strong>—If proper care has been taken at
-the mixing plant the mixture will not arrive on the street at too high
-a temperature, and your principal care will be to see that it is not
-laid at too low a temperature. The minimum temperature named
-in the specifications should be adhered to. While the main or interior
-mass of a wagon load may be well above that temperature, the top
-and outer part of the load may be, particularly in cold weather, too
-cold to be safely used. Some of this colder portion may usually be
-sufficiently reheated by mixing it with the hotter material, if properly
-handled in unloading; but any material that is so cold as to be
-lumpy when unloaded, or, more particularly, when being raked out,
-should be discarded. This applies to both surface and binder
-mixtures.</p>
-
-<p class='c007'>It must not, however, be overlooked that the different kinds
-of asphalts have different appropriate working temperatures, and
-for some asphalts the minimum temperature named in the specifications
-may be too low. The best practical guide is the manner in
-which the mixture behaves in raking. It must always be so hot
-that it will, under the rake, break up into a uniform, crumbling
-or powdery mass. If it does not do this it is (unless the mixture is
-excessively rich in bitumen or improperly compounded) too cold.</p>
-
-<p class='c007'><strong>44. Preparation of Street Surface.</strong>—Before the binder-course is
-laid, all loose material, rubbish, street dirt and other matter foreign
-to the concrete surface must be removed and the concrete surface
-<span class='pageno' id='Page_106'>106</span>swept, if necessary, to properly clean it, with street brooms. Neither
-binder nor surface mixture shall be laid upon wet surfaces. Before
-the spreading of the surface mixture on the binder the latter must
-be cleaned of all foreign matter and, if necessary, swept. If the
-binder is covered with mud from wagons or other travel, the surface
-must be scrubbed clean. Any part of the binder-course that may
-have become broken or loosened before the surface-course is applied
-must be taken up and new material laid in its place with the same
-care as the original.</p>
-
-<p class='c007'><strong>45. Laying Binder-course.</strong>—The binder mixture must be carefully
-spread and raked to such thickness that after being rolled
-it will present an even, true surface not varying more than one-fourth
-inch from the intended finished surface of the binder. The
-tendency is to lay the binder-course carelessly and to roll it insufficiently.
-Nearly the same care in raking and rolling as for the
-surface-course, should be insisted upon. If the binder is not thoroughly
-compressed before it becomes cold it is likely, in future hot
-weather, to soften and yield under heavy travel and thus to start
-depressions in the pavement which will increase with time.</p>
-
-<p class='c007'><strong>46. Laying the Surface-course.</strong>—The requirements of the specifications
-should be rigidly enforced in the laying of the surface-course.
-Joints against a cold edge of previously laid surface must be cut
-back until solid, fully compressed material of full thickness is reached,
-and the raw edge completely but thinly painted with liquid paving
-cement or pitch. No masses or fragments of cold mixture, whether
-of binder or surface, must be allowed to remain on the surface of
-the binder in advance of the placing of the surface-course, to be
-covered up by the latter. Such cold masses will not be compressed
-by the roller, but will later, under a hot sun and heavy travel,
-yield and start depressions in the pavement. The raking out
-requires to be properly and skilfully done. The tines of the rakes
-must penetrate to the binder, so that the raked material will be a
-uniform mass from top to bottom.</p>
-
-<p class='c007'><strong>47. Rolling.</strong>—You will insist upon the rollers being placed upon
-the freshly raked surface just as soon as the material will bear them
-without being squeezed out or displaced laterally. The tendency
-is to keep the rollers off too long, thus permitting the chilling of
-the surface and preventing its proper compression. Do not take
-the contractor’s word as to how soon the rolling may be begun,
-but have trials made until you are able yourself to judge. The
-rolling by the heavy roller should be very thorough: keep the roller
-<span class='pageno' id='Page_107'>107</span>at work constantly until the surface is too cold to be impressed.
-In operating the roller lengthwise of the street begin at the gutters
-and work toward the center of the street. Cross rolling and diagonal
-rolling must be insisted upon wherever the width of the street will
-permit it.</p>
-
-<p class='c007'><strong>48. Proper Thickness and Surface.</strong>—While the completed surface
-is still warm enough to permit it, measure the thickness of the
-surface-course by forcing the graduated spatula through it to the
-binder and noting the depth of penetration. Also test the trueness
-of the finished surface with the straight-edge, and if found defective
-in either thickness of pavement or trueness of surface, insist on more
-careful grading and raking on the further work. Try the completed
-gutters with water to see that they are so truly laid that puddles
-of water will not stand in them.</p>
-
-<p class='c007'><strong>49.</strong> Asphalt surface must not be laid when rain or snow is falling,
-or so long as the street surfaces are wet. Surface mixture raked out
-and caught in a shower before it is well enough rolled to exclude
-water must be taken up and discarded.</p>
-
-<p class='c007'>Unless unavoidable, neither binder nor surface should be laid
-when the street surface or the air is below 40° F. As a rule, the lower
-the temperature the of air the greater is the care necessary to properly
-lay asphalt pavement.</p>
-
-<p class='c007'><strong>50.</strong> Measure each day the area of pavement laid and record
-that, and the quantity (number of batches) of surface mixture used,
-and note any lack of uniformity in the area laid per batch.</p>
-
-<h4 class='c014'>ASPHALT BLOCK PAVEMENT</h4>
-
-<p class='c015'><strong>51.</strong> You may assume, unless otherwise instructed, that the
-Engineer has inspected and approved the general character of the
-blocks already delivered for the work, unless their inferiority be
-obvious, but you will be expected to observe them carefully as laid
-and to reject blocks that vary in dimensions from those permitted by
-the specifications, and those that are broken, disfigured or injured.
-But during the progress of the work you will note the character of
-subsequent deliveries and report to the Engineer any apparent change
-in the quality of the blocks.</p>
-
-<p class='c007'>The more important points to look after in the laying of the
-asphalt blocks are: the quality and grading of the mortar bed in
-which the blocks are set, and the care and accuracy of the block
-setting. The mortar must be of cement and sand in the ratios specified,
-<span class='pageno' id='Page_108'>108</span>and sufficient water used to make a medium stiff mortar; the use of
-merely moistened powder must not be permitted; and any mortar
-that has begun to set up before the blocks are laid and rammed must
-be discarded.</p>
-
-<p class='c007'><strong>52.</strong> In setting the blocks the principal requisites are: that they be
-well bedded in the mortar; that they be set so that after ramming their
-tops will be accurately in the pavement datum; that they be set and
-pressed as closely together as possible, levers or mauls being used to
-force them into close contact, both at ends and sides.</p>
-
-<h4 class='c014'>GRANITE BLOCK PAVING</h4>
-
-<p class='c015'><strong>53.</strong> Assuming that the foundation has been properly constructed,
-the more important things for the inspector to look after are:</p>
-
-<p class='c007'><i>a.</i> The quality and shape of the blocks.</p>
-
-<p class='c007'><i>b.</i> The sand cushion.</p>
-
-<p class='c007'><i>c.</i> The setting of the blocks.</p>
-
-<p class='c007'><i>d.</i> The ramming of the blocks.</p>
-
-<p class='c007'><i>e.</i> The filling of the joints.</p>
-
-<p class='c007'><strong>54. The Blocks.</strong>—Assuming that the general <i>quality</i> of the granite
-has been approved, you will need only to observe and reject blocks
-made from soft or weathered or otherwise defective stone. Any
-material divergence of the blocks from the correct form or from the
-sizes specified as permissible will be readily caught by the eye as they
-are brought to the street, and they can then be thrown out. The
-proper dressing of the blocks is important and should be watched
-carefully. While you are not expected to examine each individual
-block, close observation of the blocks as they are handled and laid
-will enable you to detect and reject those that are materially defective
-in shape or dressing; or excessively wide joints will call attention
-to these defects as the blocks are set.</p>
-
-<p class='c007'><strong>55. Sand Cushion.</strong>—The sand used for the cushion bed should be
-moderately coarse and must be fairly clean and pure. The tendency
-with contractors is to use any dirty sand or sandy loam available on
-the street. Such material, especially if it becomes filled with water,
-will yield under the blocks and will not support them properly. The
-sand bed should not vary materially in thickness. It should be laid
-and graded not more than fifty nor less than twenty feet in advance
-of the setting of the blocks.</p>
-
-<p class='c007'><strong>56. Setting of the Blocks.</strong>—The blocks should be delivered in
-front of the block setters on the blocks already set. The blocks
-must be set in straight courses from curb to curb, the courses running
-<span class='pageno' id='Page_109'>109</span>at right angles to the street (except at street intersections). All
-the blocks in any one course must be of the same width. Each block
-should be so set that the whole of its bed will be seated upon sand.
-The usual practice of block setters is to make a bed by drawing the
-sand into a small ridge upon which the outer edge of the block is
-rested, its weight canting it against the course already laid. This
-usually leaves a cavity under the back edge of the block which neither
-the subsequent joint filling or ramming closes up, so that the block
-may rest permanently on only a part of its bed. The practice is so
-fixed with block setters that it will require firmness and persistency
-to prevent it, but you should insist that it be so modified as to give
-a solid bearing for each block over its whole base.</p>
-
-<p class='c007'>The blocks must be set solidly against each other so as to make
-the joints of the least possible width. Unless close attention is
-given to this the joints are likely to greatly exceed the width permitted
-by the specifications. Care should be taken that the blocks
-are set truly vertical so that their upper face shall be parallel to the
-plane of the street. In setting the blocks their straightest and
-truest face should be placed upward so as to make the surface of the
-pavement as smooth and even as possible. Block setters are often
-careless about this.</p>
-
-<p class='c007'>Ordinarily no grade stakes are set for the surface of the pavement
-and templates are seldom used, the block setters using only their eyes
-to make the surface conform to the intended contour of the street.
-This usually results in the completed street being more or less wavy
-and irregular, and in a lack of regular and uniform cross-section in
-different parts of the street, often very perceptible to the eye.
-Care should be taken to avoid this as much as possible. Straight-edges
-and templates, cut to the proper curve for the surface, should
-be provided and used.</p>
-
-<p class='c007'><strong>57. Ramming the Blocks.</strong>—This part of the work is likely to
-be slighted unless carefully watched. The important thing is to
-have each block equally and sufficiently rammed to bring it to a
-firm bearing on the sand, as well as to bring its top to the proper
-grade. The rammers will be disposed to touch lightly blocks or
-areas which if thoroughly rammed would be driven below the true
-surface of the pavement, and subsequent travel may force these
-down, making depressions in the surface. It is a very common
-practice for the men working the rammers to shirk on this work by
-allowing the rammers to fall with little more force than that due to
-their own weight. This should be detected and remedied.</p>
-
-<p class='c007'><span class='pageno' id='Page_110'>110</span><strong>58. Filling the Joints.</strong>—The specifications are quite full and clear
-regarding this part of the work and little further need be said.</p>
-
-<p class='c007'>Care is necessary, whether the joints be filled with gravel and
-bituminous cement or with grout, to secure the complete filling of
-all the joints. If the weather is cold at the time the work is done,
-the gravel filling may become so chilled before the bituminous
-cement is poured that it will not flow to the bottom of the joints.
-For this reason it is important that the cement be worked at the
-highest temperature that it will bear without injury.</p>
-
-<p class='c007'>If grout filling is used care is necessary to make the mortar of
-the right consistency. If too thick it will not flow freely to the bottom
-of the joint; if too thin its strength will be materially reduced.
-Experiments should be made to determine the proper consistency,
-and when this is found, the quantity of water used in making the
-mortar should be determined and thereafter measured out for each
-batch.</p>
-
-<p class='c007'>The mortar must be kept constantly stirred until used, otherwise
-the sand is likely to settle to the bottom. Whatever filling is used,
-a second and sometimes a third pouring will be necessary to completely
-fill the joints.</p>
-
-<h4 class='c014'>BRICK PAVEMENT</h4>
-
-<p class='c015'><strong>59.</strong> The matters requiring most attention in the construction of
-brick pavement (assuming that the foundation is in place) are the
-character and quality of the brick, the sand cushion, the setting of
-the brick, and the filling of the joints between the brick.</p>
-
-<p class='c007'><strong>60. Inspecting the Brick.</strong>—The examination, testing and acceptance,
-in a general way, of the brick to be used for the work will
-be made in the engineer’s office, and your duty will be confined in
-this matter to seeing that the brick delivered and used are in accordance
-with the standard established and the general requirements
-of the specifications. You can best inspect the brick as they are
-being laid or after they have been laid, and before the surface has
-been rammed or rolled. Presumably the brick-setters will discard
-most of the unsuitable brick during the progress of their work,
-particularly if they are given to understand distinctly the defects
-that will cause rejection.</p>
-
-<p class='c007'>As the setting is completed, go carefully over the surface of the
-pavement and mark plainly all the bricks that are to be removed
-for defects and see that all such are taken out and replaced with
-<span class='pageno' id='Page_111'>111</span>good brick. The principal defects that should be observed are:
-soft or underburned bricks; those that are warped or deformed
-so that they will not fit closely to their neighbors, or have warped
-or ill-shaped tops; those that are broken or chipped or show injurious
-cracks, and those that are perceptibly wider or narrower than their
-neighbors in the same course.</p>
-
-<p class='c007'>Soft or underburned brick may be detected with most certainty
-by having the contractor wet the surface of the pavement by
-sprinkling. The soft brick will absorb more water and remain
-damp longer than the hard brick and can thus be readily detected.
-This test can be applied, however, only to pavements the joints of
-which are to be filled with grout, as bituminous filling should not
-be applied to brick with wet surfaces, and to wait until they become
-dry after the wetting would delay the work unwarrantably.</p>
-
-<p class='c007'><strong>61. Sand Cushion.</strong>—See that the sand used is free from foreign
-matter and pebbles, as required by the specifications, and that the
-sand bed is of uniform thickness, correctly gaged, and rolled to the
-true plane of the pavement, additional sand being added or surplus
-removed where necessary to secure this result. See that the cushion
-is not thereafter disturbed or, if disturbed, that it be restored to
-its original condition.</p>
-
-<p class='c007'><strong>62. Setting the Brick.</strong>—The bricks are to be set as closely together
-as possible both at sides and ends, so that the joints will not be wider
-than permitted by the specifications. Where the bricks have lugs
-or letters on one side, the lug-sides shall in no case be laid together.
-The courses must be reasonably straight entirely across the street.
-See that the bricks in adjoining courses break joint not less than
-three inches. Brick-setters are likely to be careless about this.
-Do not permit bats to be used except where necessary at the ends
-of courses or to fit the pavement against street railroad rails or around
-manholes or other structures in the street, and insist that this
-filling in shall follow immediately after the brick-setting, and that
-close fits shall be made.</p>
-
-<p class='c007'><strong>63. Rolling the Pavement Surface.</strong>—This should be carefully
-and uniformly done so as to insure the even surface and contour
-of the pavement. Do not allow the roller to make sharp turns
-on the freshly laid brick surface as it will disturb and cant the
-loose brick. The roller should run back onto the fully completed
-pavement to make any necessary turns or considerable changes of
-direction. Quick starts or stops of the roller on the fresh-laid brick
-should be avoided for the same reason.</p>
-
-<p class='c007'><span class='pageno' id='Page_112'>112</span><strong>64. Filling the Joints.</strong>—Whether grout or bituminous filling be
-used the important thing is to get all the joints completely filled.
-Where bituminous cement is used, if the work is done in very cool
-weather the brick is likely to chill the cement before it reaches the
-bottom of the joints unless the cement be applied as hot as possible
-without injuring it, and the pouring be rapidly and carefully done.</p>
-
-<p class='c007'>If grout filling be used, see that the mortar is made of the proper
-ratio of sand and cement and that it is of the proper consistency
-to just flow into the joints, and that after mixing it is kept stirred
-until used. Repour all joints where necessary to completely fill
-them.</p>
-
-<p class='c007'><strong>65. Gutters and Expansion Joints.</strong>—See that the gutters are laid
-with longitudinal courses of brick and their joints filled with bituminous
-cement as provided in the specifications.</p>
-
-<h4 class='c014'>WOOD-BLOCK PAVEMENT</h4>
-
-<p class='c015'><strong>66. Foundation.</strong>—The instructions relating to the preparation of
-the sub-foundation and the concrete foundation already given apply
-to wood-block pavement.</p>
-
-<p class='c007'><strong>67. Inspection of Blocks.</strong>—However carefully the lumber may have
-been inspected before its manufacture into blocks, the subsequent
-seasoning, treatment, handling and exposure to the weather will
-develop many defects and you will need to observe the delivered
-blocks closely, either before or after they are set, and reject those
-that do not comply with the specifications. The principal defects
-that you will be able to detect after the blocks are treated are the
-following: Southern pine blocks made of second-growth or inferior
-wood, partly shown by the number of annual growth rings per inch.
-Blocks having a less number of these annual growth rings per inch
-than is permitted by the specifications should be rejected. The
-treated blocks, especially when they are exposed to the weather for
-some time, are likely to develop seasoning cracks, “shakes” and loose
-knots, not observable in the lumber, and blocks showing these to an
-injurious extent should be rejected, though in many cases the defective
-part may be split off and the remainder of the block used for
-closers. If the blocks have become very dry and thoroughly seasoned
-out, they should be well sprinkled with water about twenty-four
-hours before they are to be set, to forestall excessive swelling and
-“humping” when a rain storm comes upon the new pavement.</p>
-
-<p class='c007'><strong>68. Mortar Bed.</strong>—It is the common practice in preparing the mortar
-<span class='pageno' id='Page_113'>113</span>for the mortar bed under the blocks to simply dampen the mixed
-sand and cement so that it may still be spread and handled like damp
-sand. See that sufficient water is used to make a moderately stiff
-mortar, suitable for being worked with a trowel. This mortar should
-be prepared in sufficiently small quantities at a time to insure that
-it will not begin to set before the blocks be placed in it and rammed.</p>
-
-<p class='c007'><strong>69. Setting the Blocks.</strong>—The setting of the wooden blocks is a
-comparatively simple operation and the specifications are sufficiently
-full and clear for your guidance. See that the blocks are so set that
-their tops, after the ramming is completed, shall be truly in the pavement
-datum, without humps or depressions.</p>
-
-<p class='c007'><strong>70. Filling the Joints.</strong>—See that the sand used is perfectly dry,
-fine and clean, and that it is swept about on the pavement until the
-joints are completely filled.</p>
-
-<h4 class='c014'>BITUMINOUS CONCRETE PAVEMENT</h4>
-
-<p class='c015'><strong>71. Preparation of Foundation.</strong>—Where a bituminous concrete
-wearing surface is to be placed upon an old pavement or Macadam
-road the specifications must be closely followed. A good foundation
-is as necessary, if good results are to be attained, as in the case of
-other pavements. The dressing down of high points and the filling
-up of depressions in the old pavement should be carefully done, so
-that the bituminous wearing surface shall be of uniform thickness,
-and shall be rigidly supported at all points.</p>
-
-<p class='c007'><strong>72. Bituminous Concrete Surface.</strong>—The instructions given for
-the manufacture and laying of sheet asphalt pavement should be
-followed here insofar as they are applicable.</p>
-
-<h4 class='c014'>HYDRAULIC CONCRETE ROADWAY PAVEMENT</h4>
-
-<p class='c015'><strong>73.</strong> Like other structures made of hydraulic concrete, the utility
-and durability of concrete roadway pavement depends largely upon
-the good quality of the materials used and the skill and fidelity with
-which the work is done. It is especially important that the second,
-or surface, course of the concrete shall be made and placed in strict
-accordance with the specifications and that a high degree of <i>uniformity</i>
-shall be secured in the composition, consistency and workmanship
-of that part of the work.</p>
-
-<p class='c007'><strong>74. Sub-foundation and Foundation.</strong>—The preparation of the sub-foundation
-will be the same as for other pavements, and the first, or
-<span class='pageno' id='Page_114'>114</span>foundation course, of concrete, will be constructed as in the case of
-the concrete foundation for other pavements.</p>
-
-<p class='c007'><strong>75. Material for Surface-course.</strong>—It may be assumed that, in
-general, the materials intended to be used on the work have been
-inspected and approved by the Engineer, but this should not prevent
-you from calling his attention to any defective or inferior materials
-that may be delivered on the street when the work is begun, or
-thereafter, and preventing the use of any materials that are not fully
-up to the requirements of the specifications.</p>
-
-<p class='c007'><strong>76. Mixing the Surface Course.</strong>—See that the cement sand and
-stone are proportioned accurately and that the quantity of water
-used with each batch is measured, so as to make the concrete of
-uniform consistency. Do not permit any defective batches of concrete
-to be used in the surface-course—if suitable for the bottom
-course they may be used in it. Care in this respect is particularly
-necessary with machine-mixed concrete where the machine is not
-working normally or the men operating it are careless or unskillful.</p>
-
-<p class='c007'><strong>77. Placing Surface Course Concrete.</strong>—See that the surface
-course is placed, graded and rammed <i>before the bottom course concrete
-begins to set</i>. This is imperative. Also that the concrete is distributed
-and graded in such a way as will not separate or segregate
-the mortar from the stone; that the grading of the surface is so accurate
-that it will not be necessary later to add additional concrete
-to that already graded and rammed; that the ramming is thorough
-and uniform over the whole surface, and that the rolling is well
-done.</p>
-
-<p class='c007'><strong>78. Expansion Joints.</strong>—Care should be taken to have the expansion
-joints made as the specifications require. See that they extend
-entirely through both courses of concrete; that the corners are properly
-compacted and troweled; that the joints are kept clean until
-they are filled with the bituminous cement, and are completely
-filled with the cement.</p>
-
-<p class='c007'><strong>79. Care of Finished Work.</strong>—Do not permit the completed work
-to be disturbed by travel over it, and see that the concrete is kept
-moist, until it shall be set up hard, and that the street is not opened
-for travel until the engineer so directs.</p>
-
-<h4 class='c014'>CONCRETE COMBINED CURB AND GUTTER</h4>
-
-<p class='c015'><strong>80. General.</strong>—The specifications for the construction of Hydraulic
-Concrete Combined Curb and Gutter are quite full and clear and the
-<span class='pageno' id='Page_115'>115</span>duty of the inspector will consist mainly in seeing that they are
-faithfully carried out.</p>
-
-<p class='c007'><strong>81. Concrete.</strong>—As in other concrete construction, the utility of
-the work depends largely on the care and skill with which the concrete
-is made and placed. See that the prescribed quality and ratio
-of materials are used and that the concrete is thoroughly mixed
-and properly placed in the forms and well tamped. Especial care
-is necessary to secure a continuous and satisfactory exposed surface
-by forking and working the mortar into contact with the forms,
-which must be placed and maintained in true line and surface.</p>
-
-<div class='figcenter id001'>
-<img src='images/i_128.jpg' alt='' class='ig001' />
-<div class='ic001'>
-<p>Concrete Combined Curb and Gutter</p>
-</div>
-</div>
-
-<p class='c007'><strong>82. Removing Forms.</strong>—Good judgment is required as to the
-proper time to remove the forms. They must remain until the
-concrete has set hard enough to be fully self-sustaining, but before
-it has set so hard that the wire brush will have no effect on the
-surface.</p>
-
-<p class='c007'><strong>83. Corner Protection.</strong>—See that the metallic corner or nose
-piece is correctly placed and that it is solidly anchored by and fully
-embedded in the body of the concrete.</p>
-
-<p class='c007'><span class='pageno' id='Page_116'>116</span><strong>84. Patching.</strong>—The practice of patching up cavities or irregularities
-in the exposed face of the curb and gutter with neat mortar,
-or dressing the surface with dry cement, must not be permitted.
-If a section of the curb is found, when the forms are removed, to be
-imperfect, the whole section must be removed and replaced.</p>
-
-<h4 class='c014'>HYDRAULIC CEMENT SIDEWALKS</h4>
-
-<p class='c015'><strong>85. General.</strong>—While the work of constructing concrete sidewalk
-is comparatively simple it is often carelessly and unskillfully
-done. The things that need most attention by the inspector are the
-following:</p>
-
-<p class='c007'><strong>86. Materials.</strong>—The materials used in the work must be fully
-up to the quality called for by the specifications. This applies
-more particularly to the cement and sand. These are not always
-properly tested by the engineer and you should frequently make
-samples of stiff mortar (1 cement, 2 sand) and set them aside for
-observation. If they do not, in summer weather, become very
-hard at the end of nine hours, the fact should be reported to the
-engineer.</p>
-
-<p class='c007'><strong>87. Drainage.</strong>—See that the necessary grading is properly done
-and that the drainage course is made of suitable material properly
-compacted. See that drain tiles are properly laid and connected
-as designed by the engineer. If cinders are used for the drainage
-course, see that they are screened to remove ashes and fine material,
-and that they are thoroughly drenched with water at least five
-days before they are placed in the walk.</p>
-
-<p class='c007'><strong>88. Two-course Work.</strong>—If the sidewalk is laid in two courses,
-see that the surface-course is put on and tamped before the bottom-course
-concrete has begun to set. This requirement must be strictly
-enforced.</p>
-
-<p class='c007'><strong>89. Finishing the Surface.</strong>—Dry or pure cement must not be
-used for trimming up or smoothing off the surface of the walk.
-After the surface has been properly completed by straight-edge
-and trowel, see that the wire broom is used as directed to remove
-the glaze and to slightly roughen the surface.</p>
-
-<p class='c007'>See that the expansion joints are made as specified, and that they
-extend entirely through both courses of concrete.</p>
-
-<p class='c007'><strong>90.</strong> See that the walk, after completion is properly protected
-from injury and from frost, and that the concrete is kept moist
-until it becomes well set.</p>
-
-<hr class='c022' />
-<div class='footnote' id='f1'>
-<p class='c007'><a href='#r1'>1</a>. In specifications to be used in any particular city the official name of the
-city government, as the City Council, the Commissioners of Public Works,
-etc., should be used instead of this general designation.</p>
-</div>
-<div class='footnote' id='f2'>
-<p class='c007'><a href='#r2'>2</a>. Such a proviso as this seems proper in justice to both the city engineer and
-the contractor; the former should not be held responsible for the acts of his
-assistants when they transcend the authority conferred upon them, and the
-latter should be put upon his guard with reference to requirements which he is
-not satisfied are sanctioned or approved by the city engineer.</p>
-</div>
-<div class='footnote' id='f3'>
-<p class='c007'><a href='#r3'>3</a>. It may be objected that this requirement is unusual and unnecessary, since
-such practices are recognized as wrong, and as presumptive of fraud and malpractice
-on the part both of the contractor and the inspector. It cannot, however,
-be denied that in many cities such means are employed by contractors to
-unduly influence the action of inspectors and that not infrequently the latter not
-only accept, but persistently demand, valuable considerations from the contractor.
-Silence of the specifications on this point cannot, of course, be construed
-into consent, but there is no good reason for the silence. There should
-be left no excuse for misconception of the position of the city or of the engineer
-upon this point.</p>
-</div>
-<div class='footnote' id='f4'>
-<p class='c007'><a href='#r4'>4</a>. This section is intended as much for the control and limitation of city
-officials as of contractors. The practice of carelessly or purposely allowing
-municipal contracts to be expanded greatly beyond the stated limits or the
-original intended volume and cost without formal authorization by the proper
-municipal body in which the power to make contracts is lodged, is dangerous
-and wrong and should be prohibited. In one instance coming to the notice of
-the author a contract originally intended to cover $50,000 worth of work was
-expanded by the department head without any authority from the city council
-until the final estimate reached the enormous sum of over $400,000.</p>
-</div>
-<div class='footnote' id='f5'>
-<p class='c007'><a href='#r5'>5</a>. As outlined in the introduction, these specifications are designed to secure
-the construction of the pavement in a proper manner, the city assuming responsibility
-for the character and utility of the work. The guarantee here proposed is
-therefore intended to cover only a proper compliance with the specifications, for
-which the contractor may properly be held responsible, and not the sufficiency
-or utility of the work, if constructed according to the specifications. The period
-of guaranty should therefore be short, not exceeding two years.</p>
-</div>
-<div class='footnote' id='f6'>
-<p class='c007'><a href='#r6'>6</a>. In the great majority of cases the most satisfactory and, in the end, the
-most economical foundation for a pavement is hydraulic cement concrete. Old
-paving-block foundation, if constructed as specified in Sect. 36, will give results
-equally as satisfactory, but if a fair market exists for the blocks taken up from
-the street, it will usually be found more economical to sell them and construct
-a concrete foundation for the new pavement. Broken stone or gravel foundations
-may serve the purpose fairly well upon a street of light travel, but it should
-never be used on streets of considerable or heavy travel. Its lower first cost is
-the only thing in its favor, but this will, in nearly every case, be more than offset
-by the better service and greater durability of the pavement, even on streets of
-light travel, if laid upon an adequate hydraulic concrete foundation. Proper
-repairs to pavement surfaces cut into for pipe work, etc., are difficult to make
-and hardly ever satisfactory over broken stone foundation for the reason that
-the lack of cohesion in the material allows it to loosen or crumble away from
-under the edge of the pavement surface, and it is difficult to restore it to its
-original solidity and strength. The first cost saved by its use is usually not
-great; for whenever its use would be permissible at all, a comparatively thin and
-lean concrete would give better results, at a very slight increase in cost. To
-illustrate: On a suburban street with light travel a concrete foundation four
-inches in thickness, the concrete made with Portland cement in the ratio of 1
-cement, 4 sand, and 8 stone, would be stronger and in every way better than a
-foundation eight inches in depth of broken stone. At the usual prices of materials
-and labor, the former may cost about $0.46 per sq. yd., and the latter about
-$0.40 per sq. yd.; but for the latter there would be required ⅑ cu. yd. more
-sub-foundation excavation, worth about four cents, so that the equivalent cost
-would be $0.44 per sq. yd. The difference, two cents per sq. yd., is insignificant
-when compared with the greater value, better service, and greater durability of
-a pavement on the concrete foundation. It is sometimes held that the broken
-stone foundation provides necessary sub-drainage. But all the standard pavements
-are, or soon become, impermeable to water from the surface, and seepage
-from the sub-foundation can be better taken care of by the sub-drainage specified
-in Sect. 26, which should usually cost not more than five cents per square yard
-of the pavement; and if drainage be required, these sub-drains should be used
-even with the broken stone foundation.</p>
-
-<p class='c007'>The practice of laying pavement surfaces, particularly those of asphalt, upon
-a foundation of old stone blocks, carelessly reset, with the joints unfilled with
-mortar, is all wrong and should never be resorted to. The integrity and durability
-of an asphalt pavement depends largely upon the strength and rigidity of
-its foundation; to lay an asphalt surface, however good, over such an old block
-foundation, is an inexcusable waste of money.</p>
-
-<p class='c007'>Old stone block and cobble-stone pavements, that have become solidified in
-place by long travel over them, make a good foundation for asphalt or other
-pavements, provided they can be utilized without taking up or disturbing the
-old pavement; but such cases occur so rarely that they have not been considered
-in these specifications.</p>
-
-<p class='c007'>A thoroughly consolidated old McAdam pavement, if not worn too thin, also
-makes a very satisfactory pavement foundation if it can be used undisturbed, or
-by simply trimming off the high points.</p>
-
-<p class='c007'>Low places in old pavements, that are otherwise satisfactory for a foundation,
-may be brought to the proper elevation with hydraulic concrete. “Binder”
-material is usually specified for this purpose in foundations for asphalt pavements,
-but hydraulic concrete is both better and cheaper.</p>
-</div>
-<div class='footnote' id='f7'>
-<p class='c007'><a href='#r7'>7</a>. The specifications for Portland cement here given are practically those
-adopted by the “American Society for Testing Materials.”</p>
-
-<p class='c007'><strong>Natural Cement.</strong> While these specifications uniformly refer to the use of
-Portland cement, it is not intended to convey the idea that natural cement concrete
-is not suitable for pavement foundations; on the contrary, it may be used with
-entire confidence, as the experience in a large number of cities has proven beyond
-question. Whether Portland or natural cement shall be used is usually a question
-of relative cost. At the present very low prices of Portland cement in most
-cities, more strength in pavement foundations can usually be obtained per
-dollar expended for cement, from Portland than from natural cement. The
-specifications for natural cement, as adopted by the American Society for
-Testing Materials differ from those for Portland cement in the following
-particulars:</p>
-
-<p class='c007'>The <strong>specific gravity</strong> shall not be less than 2.8.</p>
-
-<p class='c007'><strong>Fineness.</strong> The residue left on a No. 100 sieve shall not exceed 10 per cent.,
-and on a No. 200 sieve shall not exceed 30 per cent.</p>
-
-<p class='c007'><strong>Setting.</strong> It shall not begin to set in less than ten minutes, nor set hard in
-less than thirty minutes; but shall set hard within three hours.</p>
-
-<p class='c007'><strong>Tensile Strength</strong> (per sq. in.).</p>
-
-<table class='table1'>
- <tr>
- <td class='c009'><strong>Neat.</strong></td>
- <td class='c018'>24</td>
- <td class='c009'>hours in moist air</td>
- <td class='c017'>50 to 100 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>7</td>
- <td class='c009'>days (1 day in air, 6 days in water)</td>
- <td class='c017'>100 to 200 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>28</td>
- <td class='c009'>days (1 day in air, 27 days in water)</td>
- <td class='c017'>200 to 300 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>&#160;</td>
- <td class='c009'>&#160;</td>
- <td class='c017'>&#160;</td>
- </tr>
- <tr>
- <td class='c009' colspan='3'><strong>1 part cement, 3 parts sand.</strong></td>
- <td class='c017'>&#160;</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>7</td>
- <td class='c009'>days. (1 day in air, 6 days in water)</td>
- <td class='c017'>25 to 75 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>&#160;</td>
- <td class='c018'>28</td>
- <td class='c009'>days. (1 day in air, 27 days in water)</td>
- <td class='c017'>75 to 150 lbs.</td>
- </tr>
-</table>
-
-<p class='c007'><strong>Soundness.</strong> Standard pats kept in air and in water should remain firm and
-hard and show no signs of cracking or disintegration.</p>
-</div>
-<div class='footnote' id='f8'>
-<p class='c007'><a href='#r8'>8</a>. The frequent requirement that the fine material shall be screened out, is not
-necessary or advisable. Experiments and experience have shown conclusively
-that unless an unusual amount of fine material and “dust” be present, or unless
-this fine material be allowed to separate and aggregate in masses by itself, the
-resulting concrete is improved rather than deteriorated by its presence.</p>
-
-<p class='c007'>Where there is an unusual excess of “dust” in the crushed stone, the quantity
-of sand used in the concrete should be decreased accordingly.</p>
-</div>
-<div class='footnote' id='f9'>
-<p class='c007'><a href='#r9'>9</a>. Many specifications do not require this and in a number of cities where the
-specifications do require it, contractors habitually neglect to comply. When
-stone and sand are deposited directly upon the earth, it is very difficult to avoid
-taking up earth and mud with the materials, particularly when the street is wet
-and muddy. Lumps of soil and débris unquestionably injure the concrete. The
-cost of providing a lumber floor is comparatively small, as the plank may be
-used over and over again. Specifications should, therefore, contain this requirement
-and it should be enforced.</p>
-</div>
-<div class='footnote' id='f10'>
-<p class='c007'><a href='#r10'>10</a>. The ratios of the materials may appropriately be varied with the strength
-and soundness of the sub-foundation, the amount of travel on the street, and
-with the thickness of foundation it is proposed to use. Where good materials
-are used and the work is properly done, a 1:3:5 concrete six inches thick is sufficient
-for streets of the heaviest travel. For streets of light travel a 1:5:9 concrete
-will usually give entirely satisfactory results. The most economical thickness
-for a concrete foundation is an important consideration. The strength of concrete
-may be said to increase, within usual limits of practice, with the ratio of
-cement in it. The strength of concrete beams or slabs increases in the ratio of the
-square of their depth. To secure a required amount of strength in a pavement
-foundation, we may therefore vary the richness of the concrete and the depth
-of the foundation so as to secure the requisite strength at the least total cost of
-materials and labor. This will be influenced by the cost of materials and labor
-in each particular locality.</p>
-
-<p class='c007'>Within certain workable limits there is no reason why the same principles of
-proportioning the strength of a pavement foundation to the work required of it
-should not be applied as are employed in designing other engineering structures.</p>
-
-<p class='c007'>The practice, usual in many cities, of adopting general specifications requiring
-a standard thickness of foundation and composition of concrete, and applying
-these to all streets, regardless of the quantity and character of travel which
-the pavement is expected to carry, is illogical and often very wasteful. If
-such a standard foundation is sufficient for the streets of heaviest travel, it is
-obviously a sheer waste of money to use it on the suburban streets carrying the
-lightest travel. It is therefore better in preparing standard specifications for
-pavement in any city to leave blanks for the ratios of the concrete and for the
-thickness of the foundation, to be filled in, in each individual case, as the judgment
-of the engineer may dictate.</p>
-
-<p class='c007'>While it is important that the foundation of any pavement shall be adequate,
-it is inexcusable to waste money in providing superfluous strength. For the
-great majority of suburban streets, carrying but little except the local travel, a
-foundation four inches thick made of good Portland cement concrete in the
-ratios of 1:4:8 will prove entirely satisfactory. Hundreds of such streets paved
-over a foundation of that thickness, made of natural cement concrete in the
-ratios of 1:2:4 can be cited where the foundation has proved entirely satisfactory.</p>
-
-<p class='c007'>The character and firmness of the sub-foundation must, of course, be taken
-into consideration in designing the foundation.</p>
-</div>
-<div class='footnote' id='f11'>
-<p class='c007'><a href='#r11'>11</a>. The routine here described produces better concrete with less expenditure of
-labor, than the one often followed of putting all the dry materials on the concrete
-board before any mixing is begun. The writer has proved this from actual
-records covering a large quantity of work.</p>
-</div>
-<div class='footnote' id='f12'>
-<p class='c007'><a href='#r12'>12</a>. The objections to using mortar for plastering over the concrete are: that it
-is more costly than concrete; that the two materials may, under certain conditions,
-separate and the thin mortar surface break up under travel; that, if permitted,
-the mortar may be used to cover up defective concrete, and that in the
-case of asphalt pavements the pavement surface is more likely to “shift” on the
-smooth surface of the mortar than on the rough surface of the concrete. The
-practice of going over the fresh concrete with street brooms should not be permitted.
-The only argument in favor of it is that it may be used to conceal
-defective patches in the concrete.</p>
-</div>
-<div class='footnote' id='f13'>
-<p class='c007'><a href='#r13'>13</a>. See foot-note<a href='#f6' class='c016'><sup>[6]</sup></a>, p. <a href='#Page_23'>23</a>. The cost of filling the joints of old block pavement
-with mortar or grout is considerable. It will hardly ever be less than 20 cents
-and may exceed 35 cents per square yard, depending on the volume of joints
-and the local cost of material and labor. The cost of resetting and ramming
-the blocks with proper care will usually be from 10 cents to 12 cents per square
-yard, so that the cost of the foundation, exclusive of the value of the blocks, may
-vary from 30 cents to 47 cents per square yard.</p>
-
-<p class='c007'>As a good concrete foundation 6 inches in depth can be laid for from 70 to 90
-cents per square yard, it is obvious that if the old blocks can be sold for as much
-as the difference between the cost of the old block and the concrete foundation,
-nothing will be saved by using the old block foundation. In at least one city,
-asphalt pavement has been extensively laid over old stone block foundation
-relaid in a very careless manner, the joints being filled usually with the old sand
-or loam found in the street. This practice cannot be too strongly condemned.
-Asphalt pavement surfaces resting on such a foundation are necessarily short-lived
-and unsatisfactory. The practice of opening the street to travel for a
-period after the blocks are relaid and before the asphalt surface is applied, helps,
-under favorable conditions, to consolidate the foundation, but does not remove
-the objections to it. If heavy rains intervene, the sub-foundation becomes
-saturated with water, and its resistance so reduced that the stone blocks settle
-out of shape, particularly in soft spots, and they are usually hastily raised and
-reset just before the asphalt surface is applied. The result is an insecure foundation
-fatal to the durability and usefulness of the pavement.</p>
-</div>
-<div class='footnote' id='f14'>
-<p class='c007'><a href='#r14'>14</a>. Where there is a possibility that gravel may be used, the contractor should
-be asked to name prices for the gravel foundation as well as the stone foundation,
-since, unless this be done, the change from the one material to the other might
-be held to be illegal.</p>
-</div>
-<div class='footnote' id='f15'>
-<p class='c007'><a href='#r15'>15</a>. There has been much discussion as to the suitableness of these oil asphalts,
-called “residual pitches,” for use in making asphalt pavements. When properly
-prepared from suitable asphaltic oils, so as to comply with the specifications
-here given, there can be no doubt that good pavements can be made with them.
-But as they appear on the market, being usually produced at different localities
-and refineries from crude oils of differing qualities, distilled by somewhat differing
-methods, and usually at temperatures of from 900 degrees to 1200 degrees, they
-are likely to vary so greatly in quality as to make their use inadvisable without
-careful technical inspection. Unless, therefore, the engineer is prepared to make,
-or to have such inspection made, it is hardly wise or safe to permit their use.
-They stand, in this respect, upon a footing different from the better-known
-natural asphalts obtained from large deposits of practically uniform character
-and quality, where the simpler process of refining is less likely to effect injuriously
-the chemical quality of the material.</p>
-
-<p class='c007'>It may be confidently predicted that any of these “residual pitches” which
-comply with these specifications will, if properly handled, make a good
-pavement.</p>
-</div>
-<div class='footnote' id='f16'>
-<p class='c007'><a href='#r16'>16</a>. The possibility that some of these compounds or artificial asphalts, may be
-suitable for use in pavements is not denied. But in the absence of a fuller knowledge
-of them than we now have, and in the light of present experience, the only
-safe course is to reject them.</p>
-</div>
-<div class='footnote' id='f17'>
-<p class='c007'><a href='#r17'>17</a>. It is not intended here to enter into an extended discussion of the fact that
-some asphalts are injuriously affected by water, and the bearing which this fact
-should have upon the selection of an asphalt for pavement purposes. There
-can be no doubt that modern treatment and methods of construction have
-tended to diminish but not wholly to prevent the disintegrating effect of water
-upon pavements made with such asphalt, and if the engineer could be certain
-that his pavements would be constructed by contractors guided by long experience
-and the best expert advice, he might perhaps safely disregard this provision.
-Since in practice he can have no such assurance, the provision is a wise
-one and it does not involve any serious or material hardship to the contractor.</p>
-</div>
-<div class='footnote' id='f18'>
-<p class='c007'><a href='#r18'>18</a>. It is now well recognized that the character and quality of the sand used
-is one of the most important elements in determining the utility and durability
-of an asphalt pavement. A satisfactory sand should be insisted on, even if it
-involves a very considerable increase in the first cost of the work.</p>
-
-<p class='c007'>While our knowledge of the subject is not complete, experience seems to
-indicate pretty clearly that a sand of the quality and size-grading here specified
-as typical, may be depended upon to produce a good pavement.</p>
-</div>
-<div class='footnote' id='f19'>
-<p class='c007'><a href='#r19'>19</a>. The use of Portland cement in surface mixtures to be laid on streets of
-heavy travel, or those exposed to damp foundations, is very strongly recommended.
-On streets of the heaviest travel, or where the pavement will be exposed
-to unfavorable conditions of dampness, particularly if the pulverized stone
-is not very finely ground, the Portland cement may constitute twenty per cent.
-of the pulverized material, or “dust,” as it is commonly called. Ordinarily from
-five to ten per cent. may be used to advantage on all streets of moderately heavy
-travel.</p>
-</div>
-<div class='footnote' id='f20'>
-<p class='c007'><a href='#r20'>20</a>. For determining the consistency of individual batches of asphalt paving
-cement with a standard sample, the flow-plate method is most convenient and
-sufficiently accurate. For a description of the latest improved form of this
-apparatus see Engineering News of Aug. 22, 1912, p. 347. It can only be used,
-however, where the cements to be compared are of the same general composition—the
-same refined asphalt and tempering agent—as the standard.</p>
-</div>
-<div class='footnote' id='f21'>
-<p class='c007'><a href='#r21'>21</a>. The practical value of the exact determination of the ductility of asphalt
-paving cements is regarded by the author as not well established. It is customary,
-however, in most recent specifications to require it. Some asphaltic
-cements that have been quite successfully used for pavements have not complied
-with such requirements, while good coal-tar pitches will greatly exceed them.
-Where this test is used the usual specification requires that a briquette of
-asphaltic cement having a cross-section of one square centimeter, at penetration
-50, shall elongate to the extent of not less than 20 nor more than 85 centimeters
-at 77° F. If the asphaltic cement varies from 50 penetration an increase or decrease
-of at least 2 centimeters will be required for each five points above
-or below 50 penetration (Dow apparatus to be used).</p>
-</div>
-<div class='footnote' id='f22'>
-<p class='c007'><a href='#r22'>22</a>. It should be noted, in a general way, that there is quite a difference in the
-temperature to which different asphalts may be safely subjected.</p>
-
-<p class='c007'>Trinidad asphalt, and the California residual pitches, will not be injured by
-the higher range of temperatures named in these specifications, while Bermudez
-and some other asphalts should be worked at as nearly as possible to the lower
-range of temperatures named. The relative amount of loss of the different
-asphalts when exposed for seven hours to the temperature of 325 degrees (Sect.
-44) will supply a rough practical guide as to the temperature permissible—the
-greater the loss, the closer should the lower range of temperatures be adhered to.</p>
-</div>
-<div class='footnote' id='f23'>
-<p class='c007'><a href='#r23'>23</a>. The open base-course, or “binder,” composed only of crushed stone, coated
-with pitch or asphaltic cement, extensively and almost exclusively used up to
-a recent date, is no longer advocated by the best authorities on asphalt pavements.
-The aim is now to make the base-course as dense and strong as the
-surface-course.</p>
-</div>
-<div class='footnote' id='f24'>
-<p class='c007'><a href='#r24'>24</a>. The importance of proper and thorough rolling is not usually fully appreciated,
-and this part of the work is often shirked by the contractor. Not only
-should the heavy roller be at work as soon as the material will bear it, but the
-roller should, when work is progressing regularly, be kept at work all the time.
-It is a safe motto that the final rolling cannot be overdone.</p>
-</div>
-<div class='footnote' id='f25'>
-<p class='c007'><a href='#r25'>25</a>. There is still a wide difference of opinion as to the advisability of laying the
-asphalt surface directly against the rail, many engineers preferring to set one
-or more courses of paving brick, or stone paving blocks between the rail and
-the edge of the asphalt. The writer’s experience is to the effect that, if the
-work is properly done, the first-named form of construction is preferable. If
-the asphalt be laid against a rail so cold that the asphalt material in contact
-with or near the rail is chilled before it can be compressed, the work will necessarily
-be unsatisfactory. As to durability, wheels following the line of the rail
-or of the paving blocks will sooner or later form a rut in the asphalt which will
-require repair—and there is not much difference in the results. The attempts
-to prevent the formation of ruts by setting blocks alternately as headers and
-stretchers is not always successful, even when the work is well done, and the
-difficulty of properly compressing the tongues of asphalt between the headers
-is so great that it is usually not well done. The asphalt settles under travel or
-is gouged out, leaving a streak of rough pavement, and the difficulty and cost
-of repairs is considerably increased. When paving blocks or bricks are used,
-they should be firmly and carefully set in the concrete foundation. Probably
-the most satisfactory construction of this kind consists of two or three lines
-of the best paving brick set with their length parallel to the rail. It is somewhat
-easier to get at and repair rail joints with this construction.</p>
-</div>
-<div class='footnote' id='f26'>
-<p class='c007'><a href='#r26'>26</a>. The practice of laying asphalt block pavement upon crushed stone, or a
-sand foundation, on streets carrying a considerable travel, is inadvisable. See
-foot-note<a href='#f6' class='c016'><sup>[6]</sup></a>, page <a href='#Page_23'>23</a>.</p>
-</div>
-<div class='footnote' id='f27'>
-<p class='c007'><a href='#r27'>27</a>. Hard limestone may be used where trap is not procurable except at a prohibitive
-cost; but unless the difference in cost is very great the trap will be the
-most economical in the end.</p>
-</div>
-<div class='footnote' id='f28'>
-<p class='c007'><a href='#r28'>28</a>. The pressure commonly specified is 5000 lbs per. square inch, but recent
-investigations make it doubtful if that pressure is ever attained, or is, indeed,
-practicable with any presses so far constructed.</p>
-</div>
-<div class='footnote' id='f29'>
-<p class='c007'><a href='#r29'>29</a>. Asphalt blocks are now very commonly laid upon their sides, even where they
-are made as thin as two inches, on streets carrying very considerable travel.
-The practice is not to be recommended unless the blocks are at least four inches
-thick. Blocks two inches thick will give good service on private driveways
-and streets of quite light travel.</p>
-</div>
-<div class='footnote' id='f30'>
-<p class='c007'><a href='#r30'>30</a>. Granite block pavement is, as a rule, used upon, and appropriate for streets
-of the heaviest class of travel, and should, therefore, be provided with the best
-and strongest foundation. It is nearly always poor economy to lay granite
-blocks upon a broken stone, gravel, or sand foundation.</p>
-</div>
-<div class='footnote' id='f31'>
-<p class='c007'><a href='#r31'>31</a>. Like other stones, granite from various localities differs widely in strength,
-hardness and brittleness. Great hardness, accompanied with comparative
-brittleness, is not desirable in granite for paving blocks. Such material
-usually polishes by travel and becomes quite slippery, and it is likely to become
-“turtle-backed,” that is, the corners are likely to be chipped off or worn off,
-making the pavement very rough and uneven. The quality of the granite
-to be used in any one city is generally determined by the available supply, and
-specifications must be drawn with reference thereto.</p>
-</div>
-<div class='footnote' id='f32'>
-<p class='c007'><a href='#r32'>32</a>. Except on streets of excessively heavy travel there seems to be no good
-reason for making the blocks more than five inches deep. Blocks of this depth
-are quite sure to become deformed by irregular wear before the pavement will
-need to be renewed.</p>
-</div>
-<div class='footnote' id='f33'>
-<p class='c007'><a href='#r33'>33</a>. The widths of joints here specified as allowable are based upon the assumption
-that they will be filled with Portland cement grout as specified in Sect. 75.
-If this grout filling is used narrower joints are not necessary, as the grout has
-sufficient strength to support the corners of the blocks, and sufficient hardness
-to resist the wear of travel (largely protected as it is by the blocks themselves)
-and to cause the blocks to wear down quite evenly.</p>
-
-<p class='c007'>In many European cities the specifications require much closer joints. The
-granite there available appears to break out naturally to truer lines and better
-surfaces than that used in the Eastern states, at least, so that the cost of dressing
-the blocks abroad is not as great as here.</p>
-
-<p class='c007'>The City of New York has recently adopted specifications for “Special
-Improved” Granite Block pavement intended to approximate the Liverpool
-standard. These require that the blocks shall be not less than 6 nor more than
-ten inches long, not less than 3½ nor more than 4½ inches wide and five
-inches in depth. “The blocks are to be rectangular with tops and sides uniform
-in thickness, to lay closely, and with fair and true surface, free from bunches
-and so cut or dressed that when laid stone to stone the joints shall not exceed
-⅜ of one inch. The head of the block shall be so cut that it shall not have
-more than one-quarter of an inch depression from a straight-edge laid in any
-direction across the head and held parallel to the general surface of the block.”
-The joints are filled with bituminous cement.</p>
-
-<p class='c007'>The above specification is very difficult to meet from the granite available
-to New York without excessive and expensive cutting, and examination of the
-pavements laid under these specifications shows that the joints greatly exceed
-the width specified.</p>
-
-<p class='c007'>It is believed that equally good results may be secured by permitting somewhat
-wider joints filled with grout, and the cost would be materially reduced.</p>
-</div>
-<div class='footnote' id='f34'>
-<p class='c007'><a href='#r34'>34</a>. The most satisfactory arrangement of courses at street intersections is that
-shown by Fig. 14, page 208, Tillson’s Street Pavements and Paving Materials,
-2d edition.</p>
-</div>
-<div class='footnote' id='f35'>
-<p class='c007'><a href='#r35'>35</a>. The practice of filling the joints with gravel to a depth of one inch or more
-before the blocks are rammed is of doubtful utility. If the blocks are set closely
-against each other they will be well held in place while the ramming proceeds.
-In practice it is hardly possible to closely gage the depth of such preliminary
-gravel filling, and the top or final filling whether of grout or of gravel and bituminous
-cement, is likely to vary greatly in depth, and the lateral support of the
-blocks is thus likely to vary in strength and rigidity.</p>
-</div>
-<div class='footnote' id='f36'>
-<p class='c007'><a href='#r36'>36</a>. It has been the almost universal custom, in this country at least, to fill the
-joints in granite paving either with gravel alone or with gravel and bituminous
-cement. But the reasons that have led engineers to prefer grout filling
-for brick pavements apply with equal force to granite pavement. It makes a
-stronger and harder filling than the gravel and bituminous cement, and gives a
-better support to the edges of the paving blocks, thus tending to prevent chipping
-and “turtle-backing” in the pavement. It is also a materially cheaper filling
-than the gravel and bituminous cement. But to provide for the expansion and
-contraction of the pavement by changes of temperature, it is desirable that a
-strip in the gutters, and an occasional strip across the whole street, shall be filled
-with the more yielding material, as specified.</p>
-</div>
-<div class='footnote' id='f37'>
-<p class='c007'><a href='#r37'>37</a>. The object of adding asphalt and Portland cement is to make the cement
-stronger and less susceptible to changes of temperature. Pure coal-tar pitch
-is very brittle at low temperatures, and is liable to flow from the crown of the
-street to the gutters in hot summer weather. A cement made as here specified
-is not only much stronger and less brittle in cold weather, but requires a materially
-higher temperature to cause it to flow than does pure pitch.</p>
-</div>
-<div class='footnote' id='f38'>
-<p class='c007'><a href='#r38'>38</a>. As the wheels of vehicles frequently follow along the lines of the rails, thus
-concentrating their effect on a narrow strip near the rails, and as the continuous
-joint against the rail makes the pavement weaker there, the mortar bed, and
-the greater care in setting the blocks along and near the rail are advisable.</p>
-</div>
-<div class='footnote' id='f39'>
-<p class='c007'><a href='#r39'>39</a>. If the joints are parallel to the direction of travel on the street the wheels of
-vehicles are more likely to abrade or break off the corners of the stone and form
-incipient ruts.</p>
-</div>
-<div class='footnote' id='f40'>
-<p class='c007'><a href='#r40'>40</a>. These specifications conform in most particulars to those adopted by the
-“Association for Standardizing Paving Specifications,” and are substantially
-the same as those recommended by the “National Paving Brick Manufacturers’
-Association” though they differ in some details from each. The latest specifications
-adopted by the Association for Standardizing Paving Specifications are
-very full and satisfactory and are to be highly commended.</p>
-</div>
-<div class='footnote' id='f41'>
-<p class='c007'><a href='#r41'>41</a>. Here again a good concrete foundation is recommended, as being in the end
-the most satisfactory and economical. See foot-note<a href='#f6' class='c016'><sup>[6]</sup></a>, page <a href='#Page_23'>23</a>.</p>
-</div>
-<div class='footnote' id='f42'>
-<p class='c007'><a href='#r42'>42</a>. The Association for Standardizing Paving Specifications (New Orleans
-meeting) adopted a standard size for paving bricks and blocks as follows: Paving
-brick, 8½ inches long, 2½ inches wide and 4 inches in depth. Paving
-blocks 8½ inches long, 3½ inches wide and 4 inches deep. There seems to
-be no sufficient reason for confining the brick to these dimensions.</p>
-</div>
-<div class='footnote' id='f43'>
-<p class='c007'><a href='#r43'>43</a>. The specifications of the Association for Standardizing Paving Specifications
-require that all paving brick shall have lugs on one side, and allow a projection
-of ¼ inch from the face of the brick. The object is to provide a wider joint between
-the bricks in order to facilitate the filling of the joints. The author does
-not believe these lugs necessary, nor that brick without lugs, but otherwise
-acceptable, should be excluded. It is certain that many of the best brick pavements
-ever constructed have been built of bricks without lugs. If lugs are
-required they should preferably not project more than one-eighth inch. The
-same reasons that make narrow joints desirable in other block pavements apply
-equally to brick pavements.</p>
-</div>
-<div class='footnote' id='f44'>
-<p class='c007'><a href='#r44'>44</a>. The A. S. P. S. Specifications permit a loss of 22% with the block size, but
-do not name a permissible loss for “brick” size.</p>
-</div>
-<div class='footnote' id='f45'>
-<p class='c007'><a href='#r45'>45</a>. Absorption of less than one-half of one per cent., usually indicates that a shale
-brick has been over-burned, resulting in increased brittleness.</p>
-</div>
-<div class='footnote' id='f46'>
-<p class='c007'><a href='#r46'>46</a>. The absorption test is falling into disfavor, particularly with the manufacturers.
-The author believes that it possesses a distinct value and should be
-retained.</p>
-</div>
-<div class='footnote' id='f47'>
-<p class='c007'><a href='#r47'>47</a>. The object of this is to make a gutter offering less obstruction to the flow of
-water.</p>
-</div>
-<div class='footnote' id='f48'>
-<p class='c007'><a href='#r48'>48</a>. This is the simplest and most effective way to detect soft and underburned
-brick.</p>
-</div>
-<div class='footnote' id='f49'>
-<p class='c007'><a href='#r49'>49</a>. <i>If the joints are to be filled with bituminous cement</i>, substitute for sections
-90 and 91 the following:</p>
-
-<p class='c007'>Directly after the completion of the rolling and ramming, all the joints in the
-brick pavement and between it and the curbing, manholes or other structures,
-shall be filled with a bituminous cement in the following manner:</p>
-
-<p class='c007'>The bituminous cement shall be composed, by weight, of one hundred (100)
-parts of straight-run coal-tar pitch commercially known as number four and
-twenty (20) parts of refined Trinidad asphalt melted and thoroughly mixed together
-at a temperature of about 350° F., to which shall be added twenty (20)
-parts of dry Portland cement, which shall be thoroughly incorporated with the
-hot bitumen until a homogeneous mass is produced, and kept agitated so as to
-prevent settlement or separation until the cement is used. If another asphalt
-is used instead of Trinidad the quantity added to the pitch must be sufficient
-so that the cement will not flow at a temperature lower than one hundred and
-twenty-five degrees Fahrenheit (125° F.). This cement while at a temperature
-of about 325 degrees F. shall then be poured from a spouted vessel into all joints
-and vacancies in the pavement until they are completely filled, repouring being
-resorted to if necessary to accomplish the complete filling of the joints. After
-the joints are thus filled a layer of sand one-half inch thick will be spread over
-the whole surface of the pavement and allowed to remain until the engineer shall
-direct its removal.</p>
-</div>
-<div class='footnote' id='f50'>
-<p class='c007'><a href='#r50'>50</a>. The bituminous-cement joints are principally for the purpose of providing
-for the expansion of the pavement in very hot weather.</p>
-
-<p class='c007'>Experience seems to have proved that cement grout is, everything considered,
-the best and cheapest filling for the joints in brick pavement. If the filling is
-properly done, the edges of the brick are supported and the corners do not chip
-off. With the expansion joints provided at intervals by the bituminous-filled
-joints, the curbs will not be forced out of line, nor will the pavement be raised
-from its sand bed by expansion, causing the rumbling sound sometimes noticed.</p>
-
-<p class='c007'>Where grout filling is used there seems to be no necessity for covering the surface
-of the pavement with sand, as is usually done, provided the grout is kept damp.</p>
-</div>
-<div class='footnote' id='f51'>
-<p class='c007'><a href='#r51'>51</a>. Since immunity from early natural decay is secured by preservative treatment,
-the important requisite for wood paving blocks is capacity to withstand
-the wear and tear of the travel on the street. We have as yet no very satisfactory
-data as to the ability of the various species of wood to endure the somewhat
-peculiar and special duty to which paving blocks are subjected.</p>
-
-<p class='c007'>The test which seems to most nearly approach to what is wanted is that of
-crushing strength, when the force is applied to the end of the sample, parallel
-to its fibers; but this does not embrace the effect of impact to which paving
-blocks are subjected under street travel. Whether this may be considered a
-function of the end-crushing strength or not is an open question, though there
-seems good reason to believe that it will prove to be so; and if so, there is no
-good reason why woods of substantially equal strength under the end-crushing
-test should not show about the same endurance under street travel, independent
-of the element of natural durability, which is practically eliminated by preservative
-treatment.</p>
-
-<p class='c007'>The end-crushing strength per square inch of some of the kinds of timber named
-as acceptable is about as follows:</p>
-
-<table class='table1'>
- <tr>
- <td class='c009'>Southern long-leaved yellow pine</td>
- <td class='c017'>6900 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Lob-lolly pine</td>
- <td class='c017'>6500 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Short-leaved pine</td>
- <td class='c017'>5900 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Cuban pine</td>
- <td class='c017'>7900 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Norway pine</td>
- <td class='c017'>6700 lbs.</td>
- </tr>
- <tr>
- <td class='c009'>Red gum</td>
- <td class='c017'>7100 lbs.</td>
- </tr>
-</table>
-
-<p class='c007'>It was formerly very customary to specify that only Southern long-leaved
-yellow pine might be used for paving blocks, though this requirement was
-seldom strictly enforced. The fact is, that with the exception of the test based
-upon the number of growth rings per inch, it requires an expert knowledge,
-acquired only by long experience, to distinguish with certainty the species of
-Southern pine from the appearance of the lumber alone. It is now almost
-impossible to obtain in the market shipments of strictly long-leaved yellow pine,
-and while that wood is undoubtedly superior to the other pine timbers for paving
-blocks it seems useless to specify its exclusive use, or to propose specifications
-designed to exclude lumber made from other species of pine. It was doubtless
-the recognition of this situation that influenced the Association for Standardizing
-Paving Specifications, at its last (New Orleans) convention to adopt a specification which practically admits everything known in the market as “Southern
-yellow pine” having annual growth rings averaging less than eight to the inch
-and excluding all timber having less than six rings to the inch. Within these
-limits these specifications practically admit all pine lumber shipped from Southern
-mills.</p>
-
-<p class='c007'>The specifications here proposed, by limiting the number of growth rings to
-nine per inch, would not confine the lumber to true long-leaved yellow pine, but
-would secure a more mature and solid quality of lumber. It is true, however,
-that both these specifications and those adopted by the A. S. P. C. exclude most
-“Cuban pine” lumber which is very rapid growing, the growth rings often numbering
-but three or four to the inch, though the strength of the wood from this
-species indicates that it may safely be used for pavement.</p>
-</div>
-<div class='footnote' id='f52'>
-<p class='c007'><a href='#r52'>52</a>. The question of the most economical depth for wood paving blocks is as yet
-unsettled. In New York City, blocks 3½ inches in depth are adopted as the
-standard and are being used on streets of the heaviest travel, the practice of
-Berlin, Paris and other foreign cities being thus followed. The arguments in
-favor of these short blocks are lower first cost, and that, with much deeper blocks,
-the usual uneven wear of a wood pavement will make it so rough as to require
-removal before the blocks are worn down so as to be split up and dislodged from
-their places. While reliable data on these points are wanting, it seems to the
-writer very unwise to use such short blocks on streets of heavy travel, and he
-would recommend that the minimum length for use on such streets be 4½
-inches, and he would prefer 5 inches.</p>
-
-<p class='c007'>On streets of light travel a length of 3½ inches should be satisfactory.</p>
-
-<p class='c007'>Recent observations on heavy travelled streets in New York indicate that when
-long-leaved yellow pine blocks become worn down to a remaining depth of about
-2⅛ inches they split up into fine slivers and the pavement goes to pieces.</p>
-</div>
-<div class='footnote' id='f53'>
-<p class='c007'><a href='#r53'>53</a>. Most of the more recent specifications require the use of a heavy oil, said to
-be composed of creosote oil with an admixture of refined tar, on the ground that
-the tar is necessary as a water-proofing agent to prevent the creosote oil from
-being dissolved out by water or evaporated into the air. It is claimed that if
-moisture can thus be excluded from entering the wood, decay will be prevented,
-even in the absence of the antiseptic elements of creosote oil. It is not intended
-to discuss this matter at length here. We know from long experience that
-genuine creosote oil is the best preservative of wood so far found; also that creosoted
-piles have stood in tidal waters, alternately exposed to water and air, for
-twenty-five years and still retain sufficient creosote oil to resist the Teredo—a
-very severe test. Why experiment with a comparatively untried material,
-particularly when it costs as much as the genuine creosote oil, is rather more
-difficult to force into the wood, and has some admitted objectionable qualities?</p>
-</div>
-<div class='footnote' id='f54'>
-<p class='c007'><a href='#r54'>54</a>. It is a common practice of contractors in some cities, in the laying of both
-wood-block and asphalt block pavement, where a mortar bed is called for, to
-substitute a bed of mixed sand and cement, dampened only to such a degree as
-will make the mass pulverulent like damp sand, the claim being made that ordinary
-mortar cannot be spread and gaged properly. This claim is unfounded.
-The objection to the practice is that the dampened mixture does not contain
-sufficient water to cause the cement to set, and with the practically water-tight
-paving surface, does not receive, even in rainy weather, the necessary amount of
-water. If the weather be dry, the small quantity of moisture in the mixture
-quickly evaporates, leaving the so-called mortar bed not much better than a
-layer of sand alone. The writer has found such alleged mortar dry and unset
-two weeks after the pavement had been completed. If real mortar is not to be
-used, a layer of sand might almost as well be substituted at first.</p>
-</div>
-<div class='footnote' id='f55'>
-<p class='c007'><a href='#r55'>55</a>. In a number of cities the specifications require the joints in wood-block pavement
-to be filled with Portland cement grout. If the blocks are set as closely
-together as they should be, the joints will be so narrow that no grout, thick enough
-in consistency to be of value, will enter them, except for a short distance down
-from the top, the remaining depth of the joints remaining unfilled. An examination
-of any well-laid wood-block pavement soon after it has been attempted to
-fill the joints with grout will verify this statement. Furthermore, the oil which
-exudes from the blocks, acting on the thin films of grout, seems to deteriorate
-the mortar and to render it practically inert. On the contrary, fine
-dry sand will readily run into and completely fill the joints, and under travel
-the joints will soon become impervious to water. The sand filling is therefore
-regarded as better, and it costs less than the grout filling.</p>
-</div>
-<div class='footnote' id='f56'>
-<p class='c007'><a href='#r56'>56</a>. Wherever an old pavement or macadam road can be utilized it makes an
-excellent foundation for a pavement of this kind, provided it is not in too dilapidated
-a condition, extends from curb to curb, and its surface conforms near
-enough to the desired street surface so that the necessary changes and repairs
-will not be too expensive. Where the new pavement is expected to carry quite
-a heavy travel it is not advisable to use plain crushed stone for filling depressions
-and leveling up the surface. It is difficult, even where proper care is used, to
-make such patches of broken stone as firm and strong as the adjoining old pavement,
-which is a necessary condition to secure satisfactory results; for if the
-masses of broken stone yield under travel, slight depressions will form over
-them in the bituminous surface, which will in time become holes requiring
-repairs. The 1:4:9 concrete specified for this work is not very much more
-expensive than plain broken stone, it will not shift or break up under travel,
-and will in the end prove a better investment.</p>
-</div>
-<div class='footnote' id='f57'>
-<p class='c007'><a href='#r57'>57</a>. Where a new foundation is required broken stone or macadam is most frequently
-used for bituminous concrete pavements. Unless such foundations are
-constructed in the same way and with about the same care as is necessary for
-a macadam road it is liable to prove unsatisfactory. Under the very heavy
-wheel loads that may occasionally pass over the streets, imperfectly compacted
-broken stone is likely to shift sufficiently to start incipient ruts which will enlarge
-and in time necessitate expensive repairs. Such conditions are frequently seen
-on bituminous concrete pavements subjected to heavy travel. These pavements,
-like sheet asphalt pavements, require a foundation that will be absolutely
-unyielding under travel. For this reason a concrete foundation will generally
-be found more economical in the long run than a broken stone foundation. The
-increased first cost per square yard is not very great and this additional money
-will in most cases prove a good investment. At the usual prices of material and
-labor a square yard of 4 inch concrete should cost about 50 cents, while a properly
-constructed broken stone foundation 6 inches thick (which would not nearly
-equal in strength and rigidity 4 inches of concrete) would cost about 45 cents
-per square yard. Considering the much greater durability and lower cost of
-repairs of the pavement on the concrete foundation, this small additional cost
-is not worth consideration. While the specifications are made to cover the three
-kinds of foundation, it is assumed that the kind of foundation to be used will
-be decided in advance, and that the part of these specifications relating to the
-others kinds of foundation will, in actual use be omitted.</p>
-</div>
-<div class='footnote' id='f58'>
-<p class='c007'><a href='#r58'>58</a>. A bituminous cement composed largely of coal-tar pitch has heretofore been
-most used in pavements of this character. It is not denied that very good
-pavements have been, and can be built with this material, but the superiority
-of the asphaltic cement here specified is so great that it is true economy to use it.
-The difference in cost at prevailing prices of material will be ten to twelve cents
-per square yard. The greater durability and serviceability of the pavement
-made with the asphaltic cement will, particularly on streets of comparatively
-heavy travel, far more than justify this additional cost.</p>
-</div>
-<div class='footnote' id='f59'>
-<p class='c007'><a href='#r59'>59</a>. Hydraulic concrete pavement is to be recommended only for country roadways
-and for city streets of very moderate travel. While our experience with
-this kind of pavement is yet limited there is reason to believe from the nature
-of the material that it will not prove to be a satisfactory or economical pavement
-for streets of heavy travel. But in all cities and towns there are many residence
-streets where the travel is very light, and yet where a permanent pavement
-is wanted and warranted. For these, it is believed that a properly constructed
-concrete pavement will prove very satisfactory and durable, and the low cost
-at which it can be constructed should make it very attractive to city officials and
-property owners. The author has advocated its use under such conditions
-for many years (see Engineering News, July 21st, 1904). Like other composite
-pavements its utility and durability will depend largely upon the good quality
-of the materials used and the skill and thoroughness with which the work is
-done.</p>
-
-<p class='c007'>The specifications here offered are the result of the observation and experience
-of the author, and it is believed that pavements laid in accordance with them will
-give very satisfactory results.</p>
-</div>
-<div class='footnote' id='f60'>
-<p class='c007'><a href='#r60'>60</a>. A number of engineers advocate the construction of concrete pavement in
-one homogeneous course, and quite a number of pavements have been constructed
-in this way.</p>
-
-<p class='c007'>Like any other composite pavement, it is called upon to perform two functions;
-to safely sustain the weight of loads passing over it, and to resist wear and
-abrasion of its surface. A material and form of construction that meets the
-first requirement may not meet the second. Experience has proved that ordinary
-1:3:6 concrete makes an entirely satisfactory foundation for any pavement,
-but it lacks the hardness and strength to successfully resist the surface
-abrasion of travel. To secure this quality a richer and harder concrete is called
-for, but it is unnecessary that the foundation should be equally hard. To
-construct the pavement in two courses as here specified would seem to be the
-logical way, especially as it decreases the total cost, and should make a more
-durable pavement.</p>
-</div>
-<div class='footnote' id='f61'>
-<p class='c007'><a href='#r61'>61</a>. Some engineers advocate a greater total thickness of the pavement than is
-here specified (6 inches). Considering that this pavement should never be used
-on heavy traveled streets, a total thickness of concrete of six inches will have
-ample strength to carry the loads to which it will be subjected. If so, it is a
-useless waste of money to increase the thickness of the concrete.</p>
-</div>
-<div class='footnote' id='f62'>
-<p class='c007'><a href='#r62'>62</a>. The use of limestone for the top course (unless it is of very superior quality)
-is not advisable or economical unless the cost of trap rock is so high as to be
-prohibitive, which, considering its superior durability under the wear of travel,
-will not often be the case.</p>
-</div>
-<div class='footnote' id='f63'>
-<p class='c007'><a href='#r63'>63</a>. It is advisable to remove the screenings from this surface mixture for two
-reasons: first, to secure greater uniformity of composition. If the screenings
-are allowed to remain in the aggregate, there is danger of segregation into patches
-of different sized aggregate and different ratios of materials, which it is very
-important to avoid, and second, the small fragments of stone are more likely
-to be crushed under the concentrated weight of wheels than the larger masses,
-and to thus start disintegration. Lack of uniformity in the composition and
-homogeneity in this surface-course concrete is especially to be guarded against,
-otherwise the surface of the pavement will wear unevenly and depressions and
-ruts are likely to result.</p>
-</div>
-<div class='footnote' id='f64'>
-<p class='c007'><a href='#r64'>64</a>. The ideal composition of this surface-course concrete is one where the stone
-forms the largest possible part of the mass consistent with sufficient mortar to fill
-the voids and thoroughly bind the fragments of stone together.</p>
-</div>
-<div class='footnote' id='f65'>
-<p class='c007'><a href='#r65'>65</a>. The importance of securing high quality and great uniformity in the surface
-course cannot be urged too strongly.</p>
-</div>
-<div class='footnote' id='f66'>
-<p class='c007'><a href='#r66'>66</a>. This requirement must be strictly enforced. Otherwise there will be danger
-that the two courses may not properly adhere to each other. It is the writer’s
-experience that if this rule is observed there will be no danger of the two courses
-separating.</p>
-</div>
-<div class='footnote' id='f67'>
-<p class='c007'><a href='#r67'>67</a>. The purpose of this rolling is mainly to evenly compress the mass and thus
-secure its uniform density. It also produces a truer surface than can usually
-be secured by ramming alone.</p>
-</div>
-<div class='footnote' id='f68'>
-<p class='c007'><a href='#r68'>68</a>. Among engineers there is quite a wide difference of opinion as to the proper
-spacing of expansion joints, and, in fact, as to the necessity or advisability of
-providing them at all. It has been suggested that it might be better to omit
-them entirely, allowing the pavement to form its own expansion joints by cracking
-along lines where natural forces dictate. Such cracks by their irregularity give
-a bad appearance to the surface, but observation seems to indicate that the edges
-of these natural joints wear as well as those made by expansion joints. Further
-observation and experience is needed in the matter. In most concrete it is
-known that some contraction takes place during the setting of the cement,
-regardless of temperature changes, and cracking is probably due as much to
-this permanent contraction as to that caused by low temperature. The coefficient
-of expansion of concrete by heat is variable but so small that expansion
-joints ⅛ inch wide every fifty feet along the street should provide for
-temperature changes.</p>
-</div>
-<div class='footnote' id='f69'>
-<p class='c007'><a href='#r69'>69</a>. If the expansion joints are not thus filled with bituminous cement they will
-become filled and packed with incompressible stone, sand, etc., that will not
-permit expansion.</p>
-</div>
-<div class='footnote' id='f70'>
-<p class='c007'><a href='#r70'>70</a>. The practical value of oiling concrete pavements has not yet been determined
-by sufficient experience. There is reason, however, to believe that the slight
-coating of bitumen will materially preserve the surface from abrasion and that
-its benefit will thus be greater than its cost. It will also tend to prevent the very
-slight dust that might otherwise exist on the pavement.</p>
-</div>
-<div class='footnote' id='f71'>
-<p class='c007'><a href='#r71'>71</a>. In this class of pavements the contractor or promoter may properly be
-required to assume responsibility for the character and utility of the work produced,
-and the municipal authorities should assume no part of such responsibility.</p>
-</div>
-<div class='footnote' id='f72'>
-<p class='c007'><a href='#r72'>72</a>. Upon the general subject of time guarantees of municipal work, see Chapter
-XI, “Municipal Public Works,” by the author.</p>
-</div>
-<div class='footnote' id='f73'>
-<p class='c007'><a href='#r73'>73</a>. Concrete combined curb and gutter is suitable for use on the great majority
-of residence streets, and others where the travel is not excessive, or where it
-will not be subjected to specially severe use, as on business streets where heavy
-vehicles are likely to be often backed against the curb. If properly constructed
-it will have sufficient hardness and strength to withstand all ordinary usage; it
-makes a better appearance, particularly on residence streets, than any other
-kind of curbing, is durable, and is usually less expensive than any other suitable,
-equally durable and equally well-finished curbing of natural stone, since the
-gutter displaces an equal area of pavement.</p>
-</div>
-<div class='footnote' id='f74'>
-<p class='c007'><a href='#r74'>74</a>. The sketch here presented conforms pretty closely to usual practice except
-in the width of the gutter. It is not uncommon to make the gutter from two
-to three feet wide. This is not necessary or desirable. A width of 15 to 18
-inches forms a sufficient gutter to carry away all drainage except during very
-heavy rainfalls. Where the gutter projects out into the street sufficiently far
-to be exposed to large numbers of heavily loaded wheels the outer corner is
-likely to become broken off or unduly abraded.</p>
-</div>
-<div class='footnote' id='f75'>
-<p class='c007'><a href='#r75'>75</a>. Curbing of all kinds is more likely to be injured by freezing and the
-heaving of frost under and around it than from any other cause. Good drainage
-is the best protection against such injury. It is important that these drains
-shall be connected with sewers, drains or other outlets, so that water will not
-stand in them.</p>
-</div>
-<div class='footnote' id='f76'>
-<p class='c007'><a href='#r76'>76</a>. The most notable departure of these specifications from usual practice is
-the use of a solid body of rich, homogeneous concrete for the whole section of the
-structure, thus avoiding the use of two courses and qualities of concrete—the
-core concrete and the facing. The most common cause of failure of concrete
-curbs and gutters is the separation, more or less, of the facing from the core
-concrete. Without doubt this can be prevented by the use of proper materials,
-careful work, and the strict observance of the rule that the facing course must
-be applied before the core concrete has begun to set. But it is difficult to always
-secure these favorable conditions. Computation will show that the difference
-in cost of materials, between the usual two-course construction and a single
-body of rich concrete throughout, is not very great, while the saving in cost of
-labor is so considerable as to make the actual difference in cost of the two types
-very small. There can be no doubt that the simpler construction and the consequent
-greater certainty of securing a durable and satisfactory job is greatly
-in favor of the construction here recommended.</p>
-</div>
-<div class='footnote' id='f77'>
-<p class='c007'><a href='#r77'>77</a>. The appearance of “hair cracks” on the surface of rich concrete, finished by
-troweling, and the blotched appearance of the surface of concrete curbing, are
-usually caused by improper finishing. The glazed surface produced by troweling,
-particularly where pure, dry cement or neat mortar is applied is almost
-sure to develop hair cracks, and the varying texture of the surface is likely to
-absorb water unevenly and thus produce, in time, the unevenly colored or
-blotched surface so often seen.</p>
-</div>
-<div class='footnote' id='f78'>
-<p class='c007'><a href='#r78'>78</a>. The utility and durability of hydraulic concrete sidewalks depends largely
-on the quality of materials and workmanship employed in the work. Too
-frequently, specifications for this work are not sufficiently full, or not prepared
-with the requisite care, or the work is not properly supervised or inspected
-while in progress. The aggregate importance and cost of this sidewalk work
-in our cities warrants more care and attention than it generally receives.</p>
-</div>
-<div class='footnote' id='f79'>
-<p class='c007'><a href='#r79'>79</a>. Determined by the thickness of the drainage course adopted.</p>
-</div>
-<div class='footnote' id='f80'>
-<p class='c007'><a href='#r80'>80</a>. It is customary in many cities to require that the drainage course under the
-concrete shall have a depth of twelve or more inches. This deep-drainage is
-designed to prevent the heaving of the sidewalk by freezing. Experience seems
-to prove that this is not necessary, particularly if tile drains are provided to carry
-off the water from the drainage course, as specified. Comparatively dry material,
-even earth, does not heave with freezing; on the other hand, if the material and
-the trench in which it is placed is wholly or partly filled with water, heaving is
-liable to occur in severe freezing weather, whatever the depth of the drainage
-course. Experience has proven, however, that four inches of drainage material
-is sufficient if the water is drained out of it, while if allowed to stand saturated
-with water, deeper drainage will give little if any better results. Where the soil
-is sandy or the natural drainage is otherwise good, no drainage course is necessary.</p>
-</div>
-<div class='footnote' id='f81'>
-<p class='c007'><a href='#r81'>81</a>. Except in the matter of low first cost cinders are not desirable for the drainage
-course. In time, this material is likely to slack, or decompose, and shrink in
-volume more or less and to allow the sidewalk to settle. The hollow sound one
-often notices when walking over a sidewalk and the cracks that frequently appear,
-are usually caused by the irregular settlement of the drainage course. The object
-of wetting down the cinders several days before they are used is to cause as much
-as possible of this slacking to take place before the cinders are used in the
-drainage course.</p>
-</div>
-<div class='footnote' id='f82'>
-<p class='c007'><a href='#r82'>82</a>. There is a good deal of diversity of practice in the thickness of the concrete
-to be used. For all ordinary sidewalks three inches of bottom course and one
-inch of surface-course are ample, and in many cases the thickness of the surface
-course has been reduced to one-half inch with satisfactory results. Three-fourths
-inch of surface-course, if fairly uniform in thickness and of good quality,
-will generally be ample for ordinary sidewalks.</p>
-</div>
-<div class='footnote' id='f83'>
-<p class='c007'><a href='#r83'>83</a>. It is customary to make the surface-course concrete much richer than this,
-but it is not necessary if the materials are good and the work well done.</p>
-</div>
-<div class='footnote' id='f84'>
-<p class='c007'><a href='#r84'>84</a>. This requirement is very important and should be strictly enforced, otherwise
-there is danger that by the action of water, frost, and time, the two courses
-may separate and the surface-course break up—a condition not infrequently
-observed.</p>
-</div>
-<div class='footnote' id='f85'>
-<p class='c007'><a href='#r85'>85</a>. The troweling not only helps to secure a true surface, but tends to produce a
-dense surface on the concrete; but it is not desirable that this surface shall be
-smooth and glassy, hence the slight roughening of the surface with a wire brush.</p>
-</div>
-<div class='footnote' id='f86'>
-<p class='c007'><a href='#r86'>86</a>. Care must be taken to make and leave these expansion joints open to their
-full width entirely through the concrete. The practice of forming these expansion
-joints by partitions of iron plate, against which the blocks of sidewalk are
-built is not advised, for the reason that they are likely to prevent the thorough
-compression of the concrete surface against or near the plates.</p>
-</div>
-
-<div class='pbb'>
- <hr class='pb c002' />
-</div>
-<div class='tnotes x-ebookmaker'>
-
-<div class='chapter ph2'>
-
-<div class='nf-center-c0'>
-<div class='nf-center c001'>
- <div>TRANSCRIBER’S NOTES</div>
- </div>
-</div>
-
-</div>
-
- <ol class='ol_1 c004'>
- <li>Silently corrected obvious typographical errors and variations in spelling.
-
- </li>
- <li>Retained archaic, non-standard, and uncertain spellings as printed.
-
- </li>
- <li>Re-indexed footnotes using numbers and collected together at the end of the last
- chapter.
- </li>
- </ol>
-
-</div>
-
-<div style='display:block; margin-top:4em'>*** END OF THE PROJECT GUTENBERG EBOOK SPECIFICATIONS FOR STREET ROADWAY PAVEMENTS ***</div>
-<div style='text-align:left'>
-
-<div style='display:block; margin:1em 0'>
-Updated editions will replace the previous one&#8212;the old editions will
-be renamed.
-</div>
-
-<div style='display:block; margin:1em 0'>
-Creating the works from print editions not protected by U.S. copyright
-law means that no one owns a United States copyright in these works,
-so the Foundation (and you!) can copy and distribute it in the United
-States without permission and without paying copyright
-royalties. Special rules, set forth in the General Terms of Use part
-of this license, apply to copying and distributing Project
-Gutenberg&#8482; electronic works to protect the PROJECT GUTENBERG&#8482;
-concept and trademark. Project Gutenberg is a registered trademark,
-and may not be used if you charge for an eBook, except by following
-the terms of the trademark license, including paying royalties for use
-of the Project Gutenberg trademark. If you do not charge anything for
-copies of this eBook, complying with the trademark license is very
-easy. You may use this eBook for nearly any purpose such as creation
-of derivative works, reports, performances and research. Project
-Gutenberg eBooks may be modified and printed and given away&#8212;you may
-do practically ANYTHING in the United States with eBooks not protected
-by U.S. copyright law. Redistribution is subject to the trademark
-license, especially commercial redistribution.
-</div>
-
-<div style='margin-top:1em; font-size:1.1em; text-align:center'>START: FULL LICENSE</div>
-<div style='text-align:center;font-size:0.9em'>THE FULL PROJECT GUTENBERG LICENSE</div>
-<div style='text-align:center;font-size:0.9em'>PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK</div>
-
-<div style='display:block; margin:1em 0'>
-To protect the Project Gutenberg&#8482; mission of promoting the free
-distribution of electronic works, by using or distributing this work
-(or any other work associated in any way with the phrase &#8220;Project
-Gutenberg&#8221;), you agree to comply with all the terms of the Full
-Project Gutenberg&#8482; License available with this file or online at
-www.gutenberg.org/license.
-</div>
-
-<div style='display:block; font-size:1.1em; margin:1em 0; font-weight:bold'>
-Section 1. General Terms of Use and Redistributing Project Gutenberg&#8482; electronic works
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.A. By reading or using any part of this Project Gutenberg&#8482;
-electronic work, you indicate that you have read, understand, agree to
-and accept all the terms of this license and intellectual property
-(trademark/copyright) agreement. If you do not agree to abide by all
-the terms of this agreement, you must cease using and return or
-destroy all copies of Project Gutenberg&#8482; electronic works in your
-possession. If you paid a fee for obtaining a copy of or access to a
-Project Gutenberg&#8482; electronic work and you do not agree to be bound
-by the terms of this agreement, you may obtain a refund from the person
-or entity to whom you paid the fee as set forth in paragraph 1.E.8.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.B. &#8220;Project Gutenberg&#8221; is a registered trademark. It may only be
-used on or associated in any way with an electronic work by people who
-agree to be bound by the terms of this agreement. There are a few
-things that you can do with most Project Gutenberg&#8482; electronic works
-even without complying with the full terms of this agreement. See
-paragraph 1.C below. There are a lot of things you can do with Project
-Gutenberg&#8482; electronic works if you follow the terms of this
-agreement and help preserve free future access to Project Gutenberg&#8482;
-electronic works. See paragraph 1.E below.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.C. The Project Gutenberg Literary Archive Foundation (&#8220;the
-Foundation&#8221; or PGLAF), owns a compilation copyright in the collection
-of Project Gutenberg&#8482; electronic works. Nearly all the individual
-works in the collection are in the public domain in the United
-States. If an individual work is unprotected by copyright law in the
-United States and you are located in the United States, we do not
-claim a right to prevent you from copying, distributing, performing,
-displaying or creating derivative works based on the work as long as
-all references to Project Gutenberg are removed. Of course, we hope
-that you will support the Project Gutenberg&#8482; mission of promoting
-free access to electronic works by freely sharing Project Gutenberg&#8482;
-works in compliance with the terms of this agreement for keeping the
-Project Gutenberg&#8482; name associated with the work. You can easily
-comply with the terms of this agreement by keeping this work in the
-same format with its attached full Project Gutenberg&#8482; License when
-you share it without charge with others.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.D. The copyright laws of the place where you are located also govern
-what you can do with this work. Copyright laws in most countries are
-in a constant state of change. If you are outside the United States,
-check the laws of your country in addition to the terms of this
-agreement before downloading, copying, displaying, performing,
-distributing or creating derivative works based on this work or any
-other Project Gutenberg&#8482; work. The Foundation makes no
-representations concerning the copyright status of any work in any
-country other than the United States.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E. Unless you have removed all references to Project Gutenberg:
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.1. The following sentence, with active links to, or other
-immediate access to, the full Project Gutenberg&#8482; License must appear
-prominently whenever any copy of a Project Gutenberg&#8482; work (any work
-on which the phrase &#8220;Project Gutenberg&#8221; appears, or with which the
-phrase &#8220;Project Gutenberg&#8221; is associated) is accessed, displayed,
-performed, viewed, copied or distributed:
-</div>
-
-<blockquote>
- <div style='display:block; margin:1em 0'>
- This eBook is for the use of anyone anywhere in the United States and most
- other parts of the world at no cost and with almost no restrictions
- whatsoever. You may copy it, give it away or re-use it under the terms
- of the Project Gutenberg License included with this eBook or online
- at <a href="https://www.gutenberg.org">www.gutenberg.org</a>. If you
- are not located in the United States, you will have to check the laws
- of the country where you are located before using this eBook.
- </div>
-</blockquote>
-
-<div style='display:block; margin:1em 0'>
-1.E.2. If an individual Project Gutenberg&#8482; electronic work is
-derived from texts not protected by U.S. copyright law (does not
-contain a notice indicating that it is posted with permission of the
-copyright holder), the work can be copied and distributed to anyone in
-the United States without paying any fees or charges. If you are
-redistributing or providing access to a work with the phrase &#8220;Project
-Gutenberg&#8221; associated with or appearing on the work, you must comply
-either with the requirements of paragraphs 1.E.1 through 1.E.7 or
-obtain permission for the use of the work and the Project Gutenberg&#8482;
-trademark as set forth in paragraphs 1.E.8 or 1.E.9.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.3. If an individual Project Gutenberg&#8482; electronic work is posted
-with the permission of the copyright holder, your use and distribution
-must comply with both paragraphs 1.E.1 through 1.E.7 and any
-additional terms imposed by the copyright holder. Additional terms
-will be linked to the Project Gutenberg&#8482; License for all works
-posted with the permission of the copyright holder found at the
-beginning of this work.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.4. Do not unlink or detach or remove the full Project Gutenberg&#8482;
-License terms from this work, or any files containing a part of this
-work or any other work associated with Project Gutenberg&#8482;.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.5. Do not copy, display, perform, distribute or redistribute this
-electronic work, or any part of this electronic work, without
-prominently displaying the sentence set forth in paragraph 1.E.1 with
-active links or immediate access to the full terms of the Project
-Gutenberg&#8482; License.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.6. You may convert to and distribute this work in any binary,
-compressed, marked up, nonproprietary or proprietary form, including
-any word processing or hypertext form. However, if you provide access
-to or distribute copies of a Project Gutenberg&#8482; work in a format
-other than &#8220;Plain Vanilla ASCII&#8221; or other format used in the official
-version posted on the official Project Gutenberg&#8482; website
-(www.gutenberg.org), you must, at no additional cost, fee or expense
-to the user, provide a copy, a means of exporting a copy, or a means
-of obtaining a copy upon request, of the work in its original &#8220;Plain
-Vanilla ASCII&#8221; or other form. Any alternate format must include the
-full Project Gutenberg&#8482; License as specified in paragraph 1.E.1.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.7. Do not charge a fee for access to, viewing, displaying,
-performing, copying or distributing any Project Gutenberg&#8482; works
-unless you comply with paragraph 1.E.8 or 1.E.9.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.8. You may charge a reasonable fee for copies of or providing
-access to or distributing Project Gutenberg&#8482; electronic works
-provided that:
-</div>
-
-<div style='margin-left:0.7em;'>
- <div style='text-indent:-0.7em'>
- &#8226; You pay a royalty fee of 20% of the gross profits you derive from
- the use of Project Gutenberg&#8482; works calculated using the method
- you already use to calculate your applicable taxes. The fee is owed
- to the owner of the Project Gutenberg&#8482; trademark, but he has
- agreed to donate royalties under this paragraph to the Project
- Gutenberg Literary Archive Foundation. Royalty payments must be paid
- within 60 days following each date on which you prepare (or are
- legally required to prepare) your periodic tax returns. Royalty
- payments should be clearly marked as such and sent to the Project
- Gutenberg Literary Archive Foundation at the address specified in
- Section 4, &#8220;Information about donations to the Project Gutenberg
- Literary Archive Foundation.&#8221;
- </div>
-
- <div style='text-indent:-0.7em'>
- &#8226; You provide a full refund of any money paid by a user who notifies
- you in writing (or by e-mail) within 30 days of receipt that s/he
- does not agree to the terms of the full Project Gutenberg&#8482;
- License. You must require such a user to return or destroy all
- copies of the works possessed in a physical medium and discontinue
- all use of and all access to other copies of Project Gutenberg&#8482;
- works.
- </div>
-
- <div style='text-indent:-0.7em'>
- &#8226; You provide, in accordance with paragraph 1.F.3, a full refund of
- any money paid for a work or a replacement copy, if a defect in the
- electronic work is discovered and reported to you within 90 days of
- receipt of the work.
- </div>
-
- <div style='text-indent:-0.7em'>
- &#8226; You comply with all other terms of this agreement for free
- distribution of Project Gutenberg&#8482; works.
- </div>
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.E.9. If you wish to charge a fee or distribute a Project
-Gutenberg&#8482; electronic work or group of works on different terms than
-are set forth in this agreement, you must obtain permission in writing
-from the Project Gutenberg Literary Archive Foundation, the manager of
-the Project Gutenberg&#8482; trademark. Contact the Foundation as set
-forth in Section 3 below.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.1. Project Gutenberg volunteers and employees expend considerable
-effort to identify, do copyright research on, transcribe and proofread
-works not protected by U.S. copyright law in creating the Project
-Gutenberg&#8482; collection. Despite these efforts, Project Gutenberg&#8482;
-electronic works, and the medium on which they may be stored, may
-contain &#8220;Defects,&#8221; such as, but not limited to, incomplete, inaccurate
-or corrupt data, transcription errors, a copyright or other
-intellectual property infringement, a defective or damaged disk or
-other medium, a computer virus, or computer codes that damage or
-cannot be read by your equipment.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the &#8220;Right
-of Replacement or Refund&#8221; described in paragraph 1.F.3, the Project
-Gutenberg Literary Archive Foundation, the owner of the Project
-Gutenberg&#8482; trademark, and any other party distributing a Project
-Gutenberg&#8482; electronic work under this agreement, disclaim all
-liability to you for damages, costs and expenses, including legal
-fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
-LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
-PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE FOUNDATION, THE
-TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
-LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
-INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
-DAMAGE.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
-defect in this electronic work within 90 days of receiving it, you can
-receive a refund of the money (if any) you paid for it by sending a
-written explanation to the person you received the work from. If you
-received the work on a physical medium, you must return the medium
-with your written explanation. The person or entity that provided you
-with the defective work may elect to provide a replacement copy in
-lieu of a refund. If you received the work electronically, the person
-or entity providing it to you may choose to give you a second
-opportunity to receive the work electronically in lieu of a refund. If
-the second copy is also defective, you may demand a refund in writing
-without further opportunities to fix the problem.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.4. Except for the limited right of replacement or refund set forth
-in paragraph 1.F.3, this work is provided to you &#8216;AS-IS&#8217;, WITH NO
-OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT
-LIMITED TO WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.5. Some states do not allow disclaimers of certain implied
-warranties or the exclusion or limitation of certain types of
-damages. If any disclaimer or limitation set forth in this agreement
-violates the law of the state applicable to this agreement, the
-agreement shall be interpreted to make the maximum disclaimer or
-limitation permitted by the applicable state law. The invalidity or
-unenforceability of any provision of this agreement shall not void the
-remaining provisions.
-</div>
-
-<div style='display:block; margin:1em 0'>
-1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the
-trademark owner, any agent or employee of the Foundation, anyone
-providing copies of Project Gutenberg&#8482; electronic works in
-accordance with this agreement, and any volunteers associated with the
-production, promotion and distribution of Project Gutenberg&#8482;
-electronic works, harmless from all liability, costs and expenses,
-including legal fees, that arise directly or indirectly from any of
-the following which you do or cause to occur: (a) distribution of this
-or any Project Gutenberg&#8482; work, (b) alteration, modification, or
-additions or deletions to any Project Gutenberg&#8482; work, and (c) any
-Defect you cause.
-</div>
-
-<div style='display:block; font-size:1.1em; margin:1em 0; font-weight:bold'>
-Section 2. Information about the Mission of Project Gutenberg&#8482;
-</div>
-
-<div style='display:block; margin:1em 0'>
-Project Gutenberg&#8482; is synonymous with the free distribution of
-electronic works in formats readable by the widest variety of
-computers including obsolete, old, middle-aged and new computers. It
-exists because of the efforts of hundreds of volunteers and donations
-from people in all walks of life.
-</div>
-
-<div style='display:block; margin:1em 0'>
-Volunteers and financial support to provide volunteers with the
-assistance they need are critical to reaching Project Gutenberg&#8482;&#8217;s
-goals and ensuring that the Project Gutenberg&#8482; collection will
-remain freely available for generations to come. In 2001, the Project
-Gutenberg Literary Archive Foundation was created to provide a secure
-and permanent future for Project Gutenberg&#8482; and future
-generations. To learn more about the Project Gutenberg Literary
-Archive Foundation and how your efforts and donations can help, see
-Sections 3 and 4 and the Foundation information page at www.gutenberg.org.
-</div>
-
-<div style='display:block; font-size:1.1em; margin:1em 0; font-weight:bold'>
-Section 3. Information about the Project Gutenberg Literary Archive Foundation
-</div>
-
-<div style='display:block; margin:1em 0'>
-The Project Gutenberg Literary Archive Foundation is a non-profit
-501(c)(3) educational corporation organized under the laws of the
-state of Mississippi and granted tax exempt status by the Internal
-Revenue Service. The Foundation&#8217;s EIN or federal tax identification
-number is 64-6221541. Contributions to the Project Gutenberg Literary
-Archive Foundation are tax deductible to the full extent permitted by
-U.S. federal laws and your state&#8217;s laws.
-</div>
-
-<div style='display:block; margin:1em 0'>
-The Foundation&#8217;s business office is located at 809 North 1500 West,
-Salt Lake City, UT 84116, (801) 596-1887. Email contact links and up
-to date contact information can be found at the Foundation&#8217;s website
-and official page at www.gutenberg.org/contact
-</div>
-
-<div style='display:block; font-size:1.1em; margin:1em 0; font-weight:bold'>
-Section 4. Information about Donations to the Project Gutenberg Literary Archive Foundation
-</div>
-
-<div style='display:block; margin:1em 0'>
-Project Gutenberg&#8482; depends upon and cannot survive without widespread
-public support and donations to carry out its mission of
-increasing the number of public domain and licensed works that can be
-freely distributed in machine-readable form accessible by the widest
-array of equipment including outdated equipment. Many small donations
-($1 to $5,000) are particularly important to maintaining tax exempt
-status with the IRS.
-</div>
-
-<div style='display:block; margin:1em 0'>
-The Foundation is committed to complying with the laws regulating
-charities and charitable donations in all 50 states of the United
-States. Compliance requirements are not uniform and it takes a
-considerable effort, much paperwork and many fees to meet and keep up
-with these requirements. We do not solicit donations in locations
-where we have not received written confirmation of compliance. To SEND
-DONATIONS or determine the status of compliance for any particular state
-visit <a href="https://www.gutenberg.org/donate/">www.gutenberg.org/donate</a>.
-</div>
-
-<div style='display:block; margin:1em 0'>
-While we cannot and do not solicit contributions from states where we
-have not met the solicitation requirements, we know of no prohibition
-against accepting unsolicited donations from donors in such states who
-approach us with offers to donate.
-</div>
-
-<div style='display:block; margin:1em 0'>
-International donations are gratefully accepted, but we cannot make
-any statements concerning tax treatment of donations received from
-outside the United States. U.S. laws alone swamp our small staff.
-</div>
-
-<div style='display:block; margin:1em 0'>
-Please check the Project Gutenberg web pages for current donation
-methods and addresses. Donations are accepted in a number of other
-ways including checks, online payments and credit card donations. To
-donate, please visit: www.gutenberg.org/donate
-</div>
-
-<div style='display:block; font-size:1.1em; margin:1em 0; font-weight:bold'>
-Section 5. General Information About Project Gutenberg&#8482; electronic works
-</div>
-
-<div style='display:block; margin:1em 0'>
-Professor Michael S. Hart was the originator of the Project
-Gutenberg&#8482; concept of a library of electronic works that could be
-freely shared with anyone. For forty years, he produced and
-distributed Project Gutenberg&#8482; eBooks with only a loose network of
-volunteer support.
-</div>
-
-<div style='display:block; margin:1em 0'>
-Project Gutenberg&#8482; eBooks are often created from several printed
-editions, all of which are confirmed as not protected by copyright in
-the U.S. unless a copyright notice is included. Thus, we do not
-necessarily keep eBooks in compliance with any particular paper
-edition.
-</div>
-
-<div style='display:block; margin:1em 0'>
-Most people start at our website which has the main PG search
-facility: <a href="https://www.gutenberg.org">www.gutenberg.org</a>.
-</div>
-
-<div style='display:block; margin:1em 0'>
-This website includes information about Project Gutenberg&#8482;,
-including how to make donations to the Project Gutenberg Literary
-Archive Foundation, how to help produce our new eBooks, and how to
-subscribe to our email newsletter to hear about new eBooks.
-</div>
-
-</div>
- </body>
- <!-- created with ppgen.py 3.57c on 2022-07-06 18:01:25 GMT -->
-</html>
diff --git a/old/68464-h/images/cover.jpg b/old/68464-h/images/cover.jpg
deleted file mode 100644
index 4f1b666..0000000
--- a/old/68464-h/images/cover.jpg
+++ /dev/null
Binary files differ
diff --git a/old/68464-h/images/i_128.jpg b/old/68464-h/images/i_128.jpg
deleted file mode 100644
index a7eb488..0000000
--- a/old/68464-h/images/i_128.jpg
+++ /dev/null
Binary files differ